  s         ,
s
  -j'         '
,
  A       /ga areg#o,                            UNITED STATES
/ga areg#o,
        -8             ~,7              NUCLEAR REGULATORY COMMISSION
-j'
      '
'
          t             j                       WAS*NGTON, D. C. 20555
A
          %,
UNITED STATES
              *****
-8
                      /
~,
                                                  April 15, 1986                           -
NUCLEAR REGULATORY COMMISSION
          Docket No. 50-293
7
                Boston Edison Company
'
                ATTN: Mr. William D. Harrington
t
                          Vice President, Nuclear
j
                800 Boylston Street
WAS*NGTON, D. C. 20555
                Boston, Massachusetts 02199
%,
                Gentlemen:
/
                SUBJECT:   INSPECTION NO. 50-193/85-35
*****
                Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson
April 15, 1986
                and other NRC representatives on December 9 to 13, 1985, at your Braintree
-
                engineering offices and the 'ilgrim Nuclear Power Station of activities
Docket No. 50-293
                authorized by NRC License No. OPR-35. The team's findings were discussed with
Boston Edison Company
                you and members of your staff at the conclusion of the inspection. The
ATTN: Mr. William D. Harrington
                inspection reviewed your implementation of a program as required by 10 CFR
Vice President, Nuclear
                50.49 for establishing and maintaining the qualification of electric equipment
800 Boylston Street
                within the scope of 10 CFR 50.49. Within these areas, the inspection consisted
Boston, Massachusetts 02199
!               of examinations of selected procedures and records, interviews with personnel,
Gentlemen:
                and observations by the inspectors.
SUBJECT:
                The inspection determined that you have implemented a program to meet the
INSPECTION NO. 50-193/85-35
                requirements of 10 CFR 50.49. Two deficiencies in your program implementation,
Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson
                summarized in Appendix A, are classified as Potential Enforcement / Unresolved
and other NRC representatives on December 9 to 13, 1985, at your Braintree
;               Items and will be referred to the NRC Region I office for further action.
engineering offices and the 'ilgrim Nuclear Power Station of activities
authorized by NRC License No. OPR-35.
The team's findings were discussed with
you and members of your staff at the conclusion of the inspection. The
inspection reviewed your implementation of a program as required by 10 CFR
50.49 for establishing and maintaining the qualification of electric equipment
within the scope of 10 CFR 50.49. Within these areas, the inspection consisted
!
of examinations of selected procedures and records, interviews with personnel,
and observations by the inspectors.
The inspection determined that you have implemented a program to meet the
requirements of 10 CFR 50.49. Two deficiencies in your program implementation,
summarized in Appendix A, are classified as Potential Enforcement / Unresolved
;
Items and will be referred to the NRC Region I office for further action.
These deficiencies involve failure to fully document the qualification of
'
'
                These deficiencies involve failure to fully document the qualification of
Barton 288A main steam flow switches and General Electric EB-25 terminal
                Barton 288A main steam flow switches and General Electric EB-25 terminal
blocks. Three additional concerns are classified as Open Items, and a
                blocks. Three additional concerns are classified as Open Items, and a
future.NRC inspection will review your actions concerning them.
                future.NRC inspection will review your actions concerning them. Details
Details
                of all the deficiencies and concerns are discussed in the enclosed
of all the deficiencies and concerns are discussed in the enclosed
                inspection report.
inspection report.
                Your corrective actions regarding the identified deficiencies and concerns
Your corrective actions regarding the identified deficiencies and concerns
                should not-be delayed pending either a future NRC inspection or further action
should not-be delayed pending either a future NRC inspection or further action
                by the NRC Region I office.
by the NRC Region I office.
l
l
                            8604250157 860415'
8604250157 860415'
                            PDR   ADOCK 05000293
PDR
                            G                 PDR
ADOCK 05000293
G
PDR
r
r
L
L


                                                                                                ,
_ ___. ____ _
                                                              _ ___. ____ _
,
.
.
          '*
*
%   *
'*
.-
%
    '." bostonEdisonCompany                 -2-                               April 15, 1986
.-
          We are~available to discuss any questions you have concerning this inspection.
' . "
          -
bostonEdisonCompany
                                              Sincerely,
-2-
                                                            ~
April 15, 1986
                                                    *te
-
                                                                c          c(%_.
We are~available to discuss any questions you have concerning this inspection.
                                              Gary G. ech, Chief
Sincerely,
                                              Vendor Program Branch
-
                                              Division of Quality Assurance, Vendor
~
                                                and Technical Training Center Programs
*te
                                              Office of Inspection and Enforcement
c(%_.
          Enclosure:
c
            Inspection Report No. 50-293/85-35
Gary G.
ech, Chief
Vendor Program Branch
Division of Quality Assurance, Vendor
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
Inspection Report No. 50-293/85-35
,,
,,


                                                                                ._
._
'
.
.'
.
.
4
'
'
'
  .'
APPENDIX A
        .
Potential Enforcement / Unresolved Items
      .
As a result of the special equipment qualification inspection on December 9
          4
to 13, 1985, the fol~.owing items have been referred to NRC Region I as
    .
Potential Enforcement / Unresolved Items (paragraph references are to detailed
  '
portions of the inspection report).
      '
1.
                                              APPENDIX A
Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
        Potential Enforcement / Unresolved Items
the 00R Guidelines, at the time of the inspection Boston Edison Company's
        As a result of the special equipment qualification inspection on December 9
(BECO) files did not adequately demonstrate qualification of Barton 288A
        to 13, 1985, the fol~.owing items have been referred to NRC Region I as
main steam flow switches because of failure to demonstrate that plant
        Potential Enforcement / Unresolved Items (paragraph references are to detailed
accuracy requirements are satisfied.
        portions of the inspection report).
(Paragraph 4.D(1), Item 50-293/
          1. Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
85-35-1.)
              the 00R Guidelines, at the time of the inspection Boston Edison Company's
2.
              (BECO) files did not adequately demonstrate qualification of Barton 288A
Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
              main steam flow switches because of failure to demonstrate that plant
the D0R Guidelines, at the time of the inspection BEC0's files did not
              accuracy requirements are satisfied. (Paragraph 4.D(1), Item 50-293/
adequately demonstrate qualification of General Electric EB-25 terminal
              85-35-1.)
blocks because of failure to demonstrate that plant perfomance
        2.   Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
requirements are satisfied.
              the D0R Guidelines, at the time of the inspection BEC0's files did not
!
              adequately demonstrate qualification of General Electric EB-25 terminal
_
              blocks because of failure to demonstrate that plant perfomance
              requirements are satisfied.
                                                                                          !
                                                                                        _
}}
}}

Latest revision as of 01:16, 8 December 2024

Forwards Insp Rept 50-293/85-35 on 851209-13.Deficiency Re Failure to Fully Document Qualification of Barton 288A Main Steam Flow Switches Classified as Potential Enforcement/Unresolved Issue & Will Be Referred to Region I
ML20203F441
Person / Time
Site: Pilgrim
Issue date: 04/15/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20203F446 List:
References
NUDOCS 8604250157
Download: ML20203F441 (4)


See also: IR 05000293/1985035

Text

-

,,

9

s

,

/ga areg#o,

-j'

'

A

UNITED STATES

-8

~,

NUCLEAR REGULATORY COMMISSION

7

'

t

j

WAS*NGTON, D. C. 20555

%,

/

April 15, 1986

-

Docket No. 50-293

Boston Edison Company

ATTN: Mr. William D. Harrington

Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

SUBJECT:

INSPECTION NO. 50-193/85-35

Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson

and other NRC representatives on December 9 to 13, 1985, at your Braintree

engineering offices and the 'ilgrim Nuclear Power Station of activities

authorized by NRC License No. OPR-35.

The team's findings were discussed with

you and members of your staff at the conclusion of the inspection. The

inspection reviewed your implementation of a program as required by 10 CFR 50.49 for establishing and maintaining the qualification of electric equipment

within the scope of 10 CFR 50.49. Within these areas, the inspection consisted

!

of examinations of selected procedures and records, interviews with personnel,

and observations by the inspectors.

The inspection determined that you have implemented a program to meet the

requirements of 10 CFR 50.49. Two deficiencies in your program implementation,

summarized in Appendix A, are classified as Potential Enforcement / Unresolved

Items and will be referred to the NRC Region I office for further action.

These deficiencies involve failure to fully document the qualification of

'

Barton 288A main steam flow switches and General Electric EB-25 terminal

blocks. Three additional concerns are classified as Open Items, and a

future.NRC inspection will review your actions concerning them.

Details

of all the deficiencies and concerns are discussed in the enclosed

inspection report.

Your corrective actions regarding the identified deficiencies and concerns

should not-be delayed pending either a future NRC inspection or further action

by the NRC Region I office.

l

8604250157 860415'

PDR

ADOCK 05000293

G

PDR

r

L

_ ___. ____ _

,

.

'*

%

.-

' . "

bostonEdisonCompany

-2-

April 15, 1986

-

We are~available to discuss any questions you have concerning this inspection.

Sincerely,

-

~

  • te

c(%_.

c

Gary G.

ech, Chief

Vendor Program Branch

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 50-293/85-35

,,

._

'

.

.'

.

.

4

'

'

APPENDIX A

Potential Enforcement / Unresolved Items

As a result of the special equipment qualification inspection on December 9

to 13, 1985, the fol~.owing items have been referred to NRC Region I as

Potential Enforcement / Unresolved Items (paragraph references are to detailed

portions of the inspection report).

1.

Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of

the 00R Guidelines, at the time of the inspection Boston Edison Company's

(BECO) files did not adequately demonstrate qualification of Barton 288A

main steam flow switches because of failure to demonstrate that plant

accuracy requirements are satisfied.

(Paragraph 4.D(1), Item 50-293/

85-35-1.)

2.

Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of

the D0R Guidelines, at the time of the inspection BEC0's files did not

adequately demonstrate qualification of General Electric EB-25 terminal

blocks because of failure to demonstrate that plant perfomance

requirements are satisfied.

!