ML20204D689: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:N | {{#Wiki_filter:N Dave Morey Soutliern Nuclear Vice President Operating Compary Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN h March 18,1999 COMPANY Energy to Serve YourWorM" Docket No.: | ||
50-348 NEL-99-0104 U. S. Nuclear RW-M Commission ATIN: Document Control Deak W " 7. D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 1 Inservice Insnection Renort i | |||
Ladies and Gentlemen: | |||
4 Pursuant to Ge requirements of 10 CFR 50.55a(g) and 10 CFR 50.36, Southern Nuclear Operatag Company hereby submits the Farley Nuclear Plant Unit 1, Interval 2, Period 3, Outage 3 Inservice Inspection Report (Enclosure 1) and the Interval 3, Period 1, Outage 1 Inservice Inspection Report (Enclosure 2). Dese reports describe and summarize the inservice inspection activities performed during the Unit I fiAccoth refneling outage. Note that SNC had advised NRC by letter dated hy-M 18,1998 that activities pufu...d during this outage would serve to fulfill certain requirements of both the second and third Inservice Inspection Intervals. Dese activities were completed December 26,1998. Included in Enclosure 2 are the results of the steam p.;ar eddy current testing conducted during this outage as required by 10 CFR 50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications. A summary of these results may be found in Tab B of Enclosurc 2. | |||
W " 7. D. C. 20555-0001 | |||
Other p h.: report information is available at Farley Nuclear Plant for your review. His information includes, as applict.ble, examination plans and schedules, examination results and report, exammation methods and procedures, evaluation results, and corrective action and repairs. | Other p h.: report information is available at Farley Nuclear Plant for your review. His information includes, as applict.ble, examination plans and schedules, examination results and report, exammation methods and procedures, evaluation results, and corrective action and repairs. | ||
If there are any questions, please advise. His Idter contains no NRC cor.unitments. | If there are any questions, please advise. His Idter contains no NRC cor.unitments. | ||
Respectfully subm' | Respectfully subm' f7 7116w | ||
f7 7116w Dave Morey | / | ||
Dave Morey i | |||
AJP/maf: UIRIS. doc | |||
==Enclosures:== | ==Enclosures:== | ||
- Unit 1, Interval 2, Period 3, | |||
]')) | |||
Outrec 3 Inservice Inspectiou Report - Unit 1, Interval 3, Period 1, Outage 1 Inservice Inspection Report 9903240267 990318 F | |||
PDR ADOCK 05000348 t! | |||
O PDR y | |||
L | |||
I Page 2 U. S. Nuclear Regulatory Commission ec: | |||
Southern N'uclear Ooeratma comoany Mr. L. M. Stinson, General Manager - Farley - w/o Ecciosure i | |||
I Page 2 | |||
U. S. Nuclear Renulatory Commission. Wanhinato.1 D. C. | U. S. Nuclear Renulatory Commission. Wanhinato.1 D. C. | ||
Mr. J. I. Ziumerman, Licensing Project Manager - Farley - w/o Enclosure U. S. Nuclear Renulatory Commission. Renion II | Mr. J. I. Ziumerman, Licensing Project Manager - Farley - w/o Enclosure U. S. Nuclear Renulatory Commission. Renion II Mr. L. A. Reyes, Regianal Administratar-w/o Enclosure Mr. T. P. Johnson, Senior Resident Inspector - Farley 4 | ||
i l | |||
4 | |||
1 I | 1 I | ||
s}} | |||
Latest revision as of 23:37, 23 May 2025
| ML20204D689 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/18/1999 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20204D694 | List: |
| References | |
| NEL-99-0104, NEL-99-104, NUDOCS 9903240267 | |
| Download: ML20204D689 (2) | |
Text
N Dave Morey Soutliern Nuclear Vice President Operating Compary Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN h March 18,1999 COMPANY Energy to Serve YourWorM" Docket No.:
50-348 NEL-99-0104 U. S. Nuclear RW-M Commission ATIN: Document Control Deak W " 7. D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 1 Inservice Insnection Renort i
Ladies and Gentlemen:
4 Pursuant to Ge requirements of 10 CFR 50.55a(g) and 10 CFR 50.36, Southern Nuclear Operatag Company hereby submits the Farley Nuclear Plant Unit 1, Interval 2, Period 3, Outage 3 Inservice Inspection Report (Enclosure 1) and the Interval 3, Period 1, Outage 1 Inservice Inspection Report (Enclosure 2). Dese reports describe and summarize the inservice inspection activities performed during the Unit I fiAccoth refneling outage. Note that SNC had advised NRC by letter dated hy-M 18,1998 that activities pufu...d during this outage would serve to fulfill certain requirements of both the second and third Inservice Inspection Intervals. Dese activities were completed December 26,1998. Included in Enclosure 2 are the results of the steam p.;ar eddy current testing conducted during this outage as required by 10 CFR 50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications. A summary of these results may be found in Tab B of Enclosurc 2.
Other p h.: report information is available at Farley Nuclear Plant for your review. His information includes, as applict.ble, examination plans and schedules, examination results and report, exammation methods and procedures, evaluation results, and corrective action and repairs.
If there are any questions, please advise. His Idter contains no NRC cor.unitments.
Respectfully subm' f7 7116w
/
Dave Morey i
AJP/maf: UIRIS. doc
Enclosures:
- Unit 1, Interval 2, Period 3,
]'))
Outrec 3 Inservice Inspectiou Report - Unit 1, Interval 3, Period 1, Outage 1 Inservice Inspection Report 9903240267 990318 F
PDR ADOCK 05000348 t!
O PDR y
L
I Page 2 U. S. Nuclear Regulatory Commission ec:
Southern N'uclear Ooeratma comoany Mr. L. M. Stinson, General Manager - Farley - w/o Ecciosure i
U. S. Nuclear Renulatory Commission. Wanhinato.1 D. C.
Mr. J. I. Ziumerman, Licensing Project Manager - Farley - w/o Enclosure U. S. Nuclear Renulatory Commission. Renion II Mr. L. A. Reyes, Regianal Administratar-w/o Enclosure Mr. T. P. Johnson, Senior Resident Inspector - Farley 4
i l
1 I
s