BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC. DOCKET NO. 050-456, LICENSE NO. NPP-72 NkC DOCKET NO. 050-457, LICENSE NO. NPF-77 l
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC. DOCKET NO. 050-456, LICENSE NO. NPP-72 NkC DOCKET NO. 050-457, LICENSE NO. NPF-77 l
l.
l.
1 l
1 l
I 9101170103 910110 PDR     ADOCK 05000456 PDR R                                                               .
I 9101170103 910110 PDR ADOCK 05000456 PDR R


i ,: .; : , L'
i,:.; :, L' i
    ''.'#,**        i        a   e f
f a
I.       Monthly Report for Braidwood Unit 1 A. Summary of Operating Expgnigggg                                                                   s Unit 1: entered the month of December-at.approximately-99.2% power. On December.1, 1990-the unit tripped on low steam generator level resulting f rom the' loss -of a main-
e I.
                                          'feedwator pump. The pump was repaired and the unit returned to power operation on December:3, 1990. On December 4,-1990 the. generator was taken off-line to replace the seal ollivapor extractor motor.- After the
Monthly Report for Braidwood Unit 1 A.
                                                                        .                                                                    j motor replacement, the generator was-synchronized to the grid ~and the. unit-performed routinely until December 30, 1990 when it tripped due to a main generator neutral' ground.overcurrent. The unit remained off-line through'the remainder of the report period.
Summary of Operating Expgnigggg s
Unit 1: entered the month of December-at.approximately-99.2% power. On December.1, 1990-the unit tripped on low steam generator level resulting f rom the' loss -of a main-
'feedwator pump. The pump was repaired and the unit returned to power operation on December:3, 1990. On December 4,-1990 the. generator was taken off-line to replace the seal ollivapor extractor motor.- After the j
motor replacement, the generator was-synchronized to the grid ~and the. unit-performed routinely until December 30, 1990 when it tripped due to a main generator neutral' ground.overcurrent. The unit remained off-line through'the remainder of the report period.
j t
j t
f
f
                                                                                                                                          .k t -
.k t -
                          -(227/ZD85G)3-1
-(227/ZD85G)3-1
  !)
!)


I 4 . .        .
I 4..
4
4 B.
        .      B. DEX. RATING DATA REPQRI                             DOCKET NO.:     50-456 UNIT     Braidwood 1 DATE: 01/10/91 COMPILED BY: K. M. Dundek TELEPHONE:     (815)458-2801 ext. 2480 OPERATING STATUS
DEX. RATING DATA REPQRI DOCKET NO.:
: 1. Reporting Period: December, 1990         Gross Hours:     744
50-456 UNIT Braidwood 1 DATE: 01/10/91 COMPILED BY:
: 2. Currently Authorized Power Level (MWt):     3411 Design Electrical Rating (MWe-gross):       1175 Design Electrical Rating (MWe-net):         1120 Max Dependable Capacity (MWe-gross):         1175 Max Dependable Capacity (MWe-net):           1120
K. M. Dundek TELEPHONE:
: 3. Power level to which restricted (If Any):     None
(815)458-2801 ext. 2480 OPERATING STATUS 1.
: 4. Reasons for restriction (If-Any):   None IHIS MONTH YR TO DATE         CUMULATIVE
Reporting Period: December, 1990 Gross Hours:
: 5. Report period Hours:                           744             8760         21249
744 2.
: 6. Hours Reactor Critical:                       655.2           7830.1       16927.3
Currently Authorized Power Level (MWt):
: 7. RX Reserve Shutdown Hours:                       0.Q_           0.0           0 . 0. .
3411 Design Electrical Rating (MWe-gross):
: 8. Hours Gonerator on Line                       640.4           7781.3       16630.9 l
1175 Design Electrical Rating (MWe-net):
: 9. Unit Reserve Shutdown Hours:                     0.0             0.0           0.0
1120 Max Dependable Capacity (MWe-gross):
: 10. Gross Thermal Energy (MWH):                 2058699       21849862     49653070
1175 Max Dependable Capacity (MWe-net):
: 11. Gross Elec. Energy (MWH):                   710492         8600574     17080641
1120 3.
: 12. Net Elec. Energy (MWH):                     680782'     _3264585       If321756
Power level to which restricted (If Any):
: 13. Reactor Service Factor                           88.1           89.4         79.7 14 .- Reactor Availability Factor:                     88.1           69 1         79.7
None 4.
: 15. Unit Service Factor                               86.1           882 1         78.3
Reasons for restriction (If-Any):
: 16. Unit Availability Factor                         86.1           88.8         78.3
None IHIS MONTH YR TO DATE CUMULATIVE 5.
: 17. Unit Capacity Factor (MDC net):                   81.7           84.2         68.6
Report period Hours:
: 18. Unit Capacity Factor (DER not):                   81.7           84.2         68 1_
744 8760 21249 6.
: 19. Unit Forced Outage Rate                           13.9           11.2           8.2
Hours Reactor Critical:
: 20. Unit Forced Outage Hours:                       103.9           979         1479.3
655.2 7830.1 16927.3 7.
: 21. Shutdowns Scheduled Over Next 6 Months: Refueling Outage - March, 1991
RX Reserve Shutdown Hours:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:   Februarv 6,   1991_
0.Q_
0.0 0. 0..
8.
Hours Gonerator on Line 640.4 7781.3 16630.9 l
9.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10.
Gross Thermal Energy (MWH):
2058699 21849862 49653070 11.
Gross Elec. Energy (MWH):
710492 8600574 17080641 12.
Net Elec. Energy (MWH):
680782'
_3264585 If321756 13.
Reactor Service Factor 88.1 89.4 79.7 14.-
Reactor Availability Factor:
88.1 69 1 79.7 15.
Unit Service Factor 86.1 88 1 78.3 2
16.
Unit Availability Factor 86.1 88.8 78.3 17.
Unit Capacity Factor (MDC net):
81.7 84.2 68.6 18.
Unit Capacity Factor (DER not):
81.7 84.2 68 1_
19.
Unit Forced Outage Rate 13.9 11.2 8.2 20.
Unit Forced Outage Hours:
103.9 979 1479.3 21.
Shutdowns Scheduled Over Next 6 Months: Refueling Outage - March, 1991 22.
If Shutdown at End of Report Period, Estimated Date of Startup:
Februarv 6, 1991_
(227/ZD85G)4
(227/ZD85G)4


J 1
J 1
:r,,          ..        , ,
:r,,
                .4 C.     AVERAGE DAILY UNIT NET' POWER LEVEL LOG.                                           DOCKET No. 456 UNITI- Braidwood 1                           }
.4 C.
                                                                                                                                    -DATE:                 01/10/91' COMPILED BY                                 K. M. Dundek           '
AVERAGE DAILY UNIT NET' POWER LEVEL LOG.
TELEPHONE:                             (815)458-2801-ext. 2480 MONTH:   December, 1990
DOCKET No. 456 UNITI-Braidwood 1
                                < 1. .                     786                   17.                                                 *1129 L
}
: 2.                       -15                   18.-                                               *1128
-DATE:
: 3.                         -3                   19.:                                               *1128
01/10/91' COMPILED BY K. M. Dundek TELEPHONE:
: 4.                       116                   20.                                             '*1128
(815)458-2801-ext. 2480 MONTH:
'u.
December, 1990
: 5.                       691                   21.                                               *1128-
< 1..
: 6.                     1068                     22.                                               *1127                                       i 7,                     1069                     23.                                               *1128 8..                   1069                     -24.                                               *1128
786 17.
: 9.                     1070                     25.                                               *1124 10,                       1071                     26.                                               *1126 11..                     1070                     27. -                                           ~ *1126 ^
*1129 L
:12..                       1068                     28.                                               *1126                                       $
2.
13,                     1071                     29.                                                   1118
-15 18.-
                                    .                  1070                    - 3 0.                                                     308
*1128 3.
: 15.                     1086                     31.                                                       -14                                   !
-3 19.:
                            ?16.                   -*1129 i
*1128 4.
                                                                                                                                                                                -p
116 20.
                              ' INSTRUCTIONS.
'*1128
On this form list the average daily unit power level in MWe-Het for each                                                                           !
'u.
                            ; day in the reporting month. LCompute to the: nearest'whole megawatt.
5.
                            ?These figures > will; be used to plot a graph for cach reporting. month.
691 21.
Note that-when. maximum dependable capacity is used:for the net electrical                                                                         .
*1128-6.
                            -rating of the: unit there'may be-occasions when1the daily average power.                                                                             !
1068 22.
*1127 i
7, 1069 23.
*1128 8..
1069
-24.
*1128 9.
1070 25.
*1124 10, 1071 26.
*1126 11..
1070
: 27. -
~ *1126 ^
:12..
1068 28.
*1126 13, 1071 29.
1118 1070
- 3 0.
308 15.
1086 31.
-14
?16.
-*1129 i
-p
' INSTRUCTIONS.
On this form list the average daily unit power level in MWe-Het for each
; day in the reporting month. LCompute to the: nearest'whole megawatt.
?These figures > will; be used to plot a graph for cach reporting. month.
Note that-when. maximum dependable capacity is used:for the net electrical
-rating of the: unit there'may be-occasions when1the daily average power.
level exceeds the 100% line (or the restricted power: level line).- InL
level exceeds the 100% line (or the restricted power: level line).- InL
,                            -such cases the average-daily unit power output sheet should be footnoted to explain the apparent anomaly.
-such cases the average-daily unit power output sheet should be footnoted to explain the apparent anomaly.
                              *Due to. Condenser Efficiencies (227/ZD85G)5
*Due to. Condenser Efficiencies (227/ZD85G)5


d D. UNIT SHUTDOWNS / REDUCTIONS                                                           DOCKET NO.: 50-456 UNIT: Braidwood l~
d D.
DATE: 01/10/91               .
UNIT SHUTDOWNS / REDUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood l~
COMPILED BY: K. M. Dundek-TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 No   DATE TYPE HQURE REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 5     901201 F     53.7     A       3     90-021   EW N/A       The IB Feedwater Pump tripped due to low oil pressure. 'It is believed that the suction of the high pressure oil pump became partially plugged. A portable centrifuge has been connected to the pump oil reservoir to remove water and debris from the oil system. Other methods to minimize potential water intrusion into the oil system are being evaluated.
DATE: 01/10/91 COMPILED BY: K. M. Dundek-TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 No DATE TYPE HQURE REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 5
6     901230 F     39.6       A       3     90-023-   TG GEN       Neutral ground overcurrent trip of main generator. Problem isolated to stator with exact.cause being investigated for appropriate corrective action.
901201 F 53.7 A
3 90-021 EW N/A The IB Feedwater Pump tripped due to low oil pressure.
'It is believed that the suction of the high pressure oil pump became partially plugged. A portable centrifuge has been connected to the pump oil reservoir to remove water and debris from the oil system. Other methods to minimize potential water intrusion into the oil system are being evaluated.
6 901230 F 39.6 A
3 90-023-TG GEN Neutral ground overcurrent trip of main generator. Problem isolated to stator with exact.cause being investigated for appropriate corrective action.


==SUMMARY==
==SUMMARY==
TYPE                           REASON                       METHOD                     SYSTEM & COMPONENT                                 '
TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equ.ipment _ Failure Maint or Test 1 - Manual Exhibit F & H S-Scheduled
F-Forced           A-Equ.ipment _ Failure Maint or Test     1 - Manual             Exhibit F & H S-Scheduled       'B-Maint or Test                           2 - Manual Scram       Instructions for Preparation of C-Refueling-                             3 - Auto Scram         Data Entry Sheet D-Regulatory Restriction                 4 - Continued           Licensee Event Report E-Operator Training & License Examination 5 - Reduced Load       (LER)' File (NUREG-Ol61)
'B-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling-3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licensee Event Report E-Operator Training & License Examination 5 - Reduced Load (LER)' File (NUREG-Ol61)
F-Administration                         9 - Other G-Oper Error H-Other.
F-Administration 9 - Other G-Oper Error H-Other.
i (227/ZD85G)6
i (227/ZD85G)6
                                  .%:                                . ,                                    -  - < ~ . .-           e       . -
- < ~..-
e


4
4 E.
                                                                                        ~
UNIOUE REPORTING REOUIREMENTS - Unit 1
E. UNIOUE REPORTING REOUIREMENTS - Unit 1
~
: 1. Safety / Relief ' valve operations.
1.
VALVES         NO & TYPE- PLANT     DESCRIPTION                         s DATE         ACTUATED       ACTUATION   CONDITION JF EVENT NOME
Safety / Relief ' valve operations.
: 2. Licensee generated changes to ODCM.                                               '
VALVES NO & TYPE-PLANT DESCRIPTION s
DATE ACTUATED ACTUATION CONDITION JF EVENT NOME 2.
Licensee generated changes to ODCM.
See Attachment k
See Attachment k
(227/ZD85G)7
(227/ZD85G)7


  . . . . . .              .    - - - . .-        - - - . .      - - - - ~ .   ..    .-            .. . . .. .    ..-- ~. -
- - - - ~.
          . J .' ' . , z'
~.
                        ,3
. J.' '., z'
* DF.-   .klCERSEE EVENT REPORTS - UNIT l'                                                                 ;
,3 DF.-
i r
.klCERSEE EVENT REPORTS - UNIT l' i
The_-following isLa tabular summary of'all Licensee Event Reports                                 i submitted ~during the reporting _ period, December 1 through                                   I December 31, 1990. This information is provided. pursuant to the reportable ocettrence reporting requirements as set forth in 10 CFR 50.73.
r The_-following isLa tabular summary of'all Licensee Event Reports i
Licensee Event             Report Eleport Numbet             Rafa                   Title of Occurrence 90-020-                 12-21-90           Spurious start of the Auxiliary Building Inaccessible Filter Plenum             -l A Charcoal Booster Fan OB due to component failure.
I submitted ~during the reporting _ period, December 1 through December 31, 1990. This information is provided. pursuant to the reportable ocettrence reporting requirements as set forth in 10 CFR 50.73.
90-021                   12-31-90           Reactor trip as a result _.of a                   .
Licensee Event Report Eleport Numbet Rafa Title of Occurrence 90-020-12-21-90 Spurious start of the Auxiliary Building Inaccessible Filter Plenum
Feedwater Pump trip due to low oil pressure.-
-l A Charcoal Booster Fan OB due to component failure.
90-021 12-31-90 Reactor trip as a result _.of a Feedwater Pump trip due to low oil pressure.-
4 D
4 D
li                                                                                                                                   "
li
                                                                                                                                  .i p
.i p
                                                                                                                                -l (227/ZD850)8 i .                     __ .-                _ . . -                          _. .            ~ _ - , . -            , -
-l (227/ZD850)8 i.
~ _ -,. -


      ~
~
    .          .                                                                  1
1.
  ..         .                                                                    l 1
Monthly Report for Braidwood Unit 2 A.
: 1. Monthly Report for Braidwood Unit 2 A. Summary of Operating Experience 1
Summary of Operating Experience Braidwood Unit 2 operated routinely in December with no outages or significant power reductions caused by equipment problems.
Braidwood Unit 2 operated routinely in December with no   I outages or significant power reductions caused by equipment problems.
l (227/ZD85G)9
l (227/ZD85G)9


d -, ,
d
  '-i       -' - .            '
'-i
        .        - B.l         QPERATING DATA REPOEI                                   DOCKET NO. J 50-457 UNIT: Braidwood 2 DATE         01/10/91' COMPILED BY:           K. M. Dundek                 '
- B.l QPERATING DATA REPOEI DOCKET NO. J 50-457 UNIT:
TELEPHONE:           (815)458-2801 ext. 2480 OPERATING STATUS                                                                                             l
Braidwood 2 DATE 01/10/91' COMPILED BY:
: 1. -   Reporting Period       December, 1990     Gross Hourst             744
K. M. Dundek TELEPHONE:
: 2.     Currently Authorized Power Level _(Mh't):     3411 Design. Electrical Rating _(MWe-gross):       1175 Design Electrical Rating (MWe-net):           1120 Max Dependable Capacity (MWe-gross):           1175                                                 i Max Dependable Capacity (MWe-net):             1120 3.-     Power leve11to which' restricted (If Any): None
(815)458-2801 ext. 2480 OPERATING STATUS l
                              -4.         Reasons for restriction (If Any): None .            .
: 1. -
Reporting Period December, 1990 Gross Hourst 744 2.
Currently Authorized Power Level _(Mh't):
3411 Design. Electrical Rating _(MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 i
Max Dependable Capacity (MWe-net):
1120 3.-
Power leve11to which' restricted (If Any): None
-4.
Reasons for restriction (If Any): None.
THIS M0dTH yjLIQ_DATE CUMULATIVE r
THIS M0dTH yjLIQ_DATE CUMULATIVE r
: 5.     Report period Hours:                             744                   8760           19331
5.
                              -6.-       Hours Reactor-Critical                           '744                 -6904.2         16039.5
Report period Hours:
: 7.       RX Reserve Shutdown Hours:                           '0.0                   0.0           0.0 8.~ -Hours Generator-on Lines                           744                   6850.4   ,___15911.2 9.'     Unit Reserve Shutdown Hours:                           0.0                   0.0         '0.0
744 8760 19331
: 10.         Gross Thermal Energy (MWH):                   2397002               19469070     45310028           .
-6.-
: 11. - . Cross Elec. Energy (>941) _                       .8E1383               6643385-   15534773 12 .~ - . Net Elec.-Energy (MWH):                         797837               6334505     14827480
Hours Reactor-Critical
: 13.         Reactor Service. Factors                         100.0                   78.8           '83.0
'744
: 14.         Reactor;Avellability Factort-                     100.0                   78ta            83.0-
-6904.2 16039.5 7.
: 15.         Unit Service Factor:                             100.0_                 78.2           82.3 L 16. _       Unit Availability Factor:                         100.0                   78.2           82.3 Eli .         Unit Capacity.-Factor (MDC net):
RX Reserve Shutdown Hours:
o 95.7                 64.6           68.5
'0.0 0.0 0.0 8.~
: 18.         Unit Capacity Factor (DER net):                     95.7                 64.6           68.5' 119. -- -Unit: Forced Outage Rate:                                   0.0                   2.1           3.7 l
-Hours Generator-on Lines 744 6850.4
: 20.         Unit Forced-Outage Hours L                           0.0               147 2           613.6-i
,___15911.2 9.'
_21.       . Shutdowns Scheduled Over Next 6 Months: None                                                         i 22.
Unit Reserve Shutdown Hours:
0.0 0.0
'0.0 10.
Gross Thermal Energy (MWH):
2397002 19469070 45310028
: 11. -. Cross Elec. Energy (>941) _
.8E1383 6643385-15534773 12.~ -. Net Elec.-Energy (MWH):
797837 6334505 14827480 13.
Reactor Service. Factors 100.0 78.8
'83.0 14.
Reactor;Avellability Factort-100.0 78 a 83.0-t 15.
Unit Service Factor:
100.0_
78.2 82.3 L 16. _
Unit Availability Factor:
100.0 78.2 82.3 Eli.
Unit Capacity.-Factor (MDC net):
95.7 64.6 68.5 o
18.
Unit Capacity Factor (DER net):
95.7 64.6 68.5' 119. -- -Unit: Forced Outage Rate:
0.0 2.1 3.7 l
20.
Unit Forced-Outage Hours L 0.0 147 2 613.6-i
_21.
. Shutdowns Scheduled Over Next 6 Months: None i
22.
Il[ Shutdown at End of Report Period, Estimated Date'of Startup L
Il[ Shutdown at End of Report Period, Estimated Date'of Startup L
L (227/ZD85G)10
L (227/ZD85G)10


              ' -                              E-
.l E-
                                                                                                                .l
,1
        ,1             .
?..
    ?..             ;,
k.
: k.                                                     :
DOCKET.NO.s. 50-457
                                                                                                                'I C..   - AVERAGE DAILY UNIT NET POWER LEVEL LOG             DOCKET.NO.s. 50-457 UNITi~ Braidwood 2
'I C..
                ,                                                                      DATE:   01/10/91-         '
- AVERAGE DAILY UNIT NET POWER LEVEL LOG UNITi~ Braidwood 2 DATE:
COMPILED BY - K. M. Dundek TELEPHONES- (815)458-2801 ext. 2480-     ]
01/10/91-COMPILED BY -
                            ; MONTH: -December, 1990                                                           -!
K. M. Dundek TELEPHONES- (815)458-2801 ext. 2480-
q l'.              1107                 17.               1118               ..
]
: 2.              1003                 18.             *1129
; MONTH: -December, 1990
: 3.               1054                 19.             *1129                     I
-!q l'
: 4.               1102                 20.             *1129
1107 17.
: 5.             *113L-                 21,               1108'
1118 2.
: 6.             *1133                 2 2 .-           1097 1
1003 18.
                                  -7.             *1133                 '2 3.             1047               ;j
*1129 3.
: 8.             '1091                 24,               1043               'j-
1054 19.
: 9.               887                 25.               880
*1129 I
                              - 10.                 1043                 26.               1086               _
4.
: 11.               1032                 27.             '1109' f:
1102 20.
12 . .           1021                 28.               1073 1
*1129 5.
: 13.               1J04'-               29.               1020                   ;
*113L-21, 1108' 6.
14,               1110                 30.               1036
*1133 2 2.-
                                = 15.1             1032                 31,               1114               .!
1097 1
16,               1116 p
-7.
*1133
'2 3.
1047
;j 8.
'1091 24, 1043
'j 9.
887 25.
880
- 10.
1043 26.
1086 f:
11.
1032 27.
'1109' 12..
1021 28.
1073 13.
1J04'-
29.
1020 1
14, 1110 30.
1036 i
= 15.1 1032 31, 1114 16, 1116 p
INSTRUCTIONS
INSTRUCTIONS
                            'On;this-form list the-average-daily unit. power level--in MWe-Net for each~           ;
'On;this-form list the-average-daily unit. power level--in MWe-Net for each~
day.in the reporting month. Compute to-the: nearest whole megawatt.'
day.in the reporting month. Compute to-the: nearest whole megawatt.'
These figures will be used to plot a graph for each reporting month.
These figures will be used to plot a graph for each reporting month.
                            ? Note.that when maximum' dependable' capacity is used for the net electrical-
? Note.that when maximum' dependable' capacity is used for the net electrical-
                            -rating of.theltnit there may be occasions when the daily.' average power lovel exceeds the 100% line (or the> restricted power level line). ,In p                               such cases the average daily unit power output sheet should be footnoted to explain the; apparent anomaly.
-rating of.theltnit there may be occasions when the daily.' average power lovel exceeds the 100% line (or the> restricted power level line).,In p
                                *Due to Condenser Efficiencies.
such cases the average daily unit power output sheet should be footnoted to explain the; apparent anomaly.
                      -(227/ZD85G)11
*Due to Condenser Efficiencies.
-(227/ZD85G)11


m DOCKET NO.: 50-457 D.       UNIT SHUTDOWNS / REDUCTIONS                                                           UNIT: Braidwood 2 DATE: 01/10/91       l COMPILED BY: K. M. Dundek TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 l
m DOCKET NO.: 50-457 D.
No       p_A_TE TXP_E HQURS REASON METHQD RR_LPRfIlE_R SYSTEM COMPONENT CAUSE & CQRR_ECTIVE ACTION TO PREVENT NONE co***************
UNIT SHUTDOWNS / REDUCTIONS UNIT: Braidwood 2 DATE: 01/10/91 l
COMPILED BY: K. M. Dundek TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 No p_A_TE TXP_E HQURS REASON METHQD RR_LPRfIlE_R SYSTEM COMPONENT CAUSE & CQRR_ECTIVE ACTION TO PREVENT l
NONE co***************


==SUMMARY==
==SUMMARY==
oo***************
oo***************
METHOD             SYSTEM & lOMPONENT TYPE                         REASON 1 - Manual       Exhibit F & H j F-Forced               A-Equipment Failure Maint or Test                           Instructions for Preparation of 2 - Manual Scram l
METHOD SYSTEM & lOMPONENT TYPE REASON 1 - Manual Exhibit F & H j
S-Scheduled           B-Maint or Test Data Entry Sheet C-Refueling                               3 -  Auto Scram 4 - Continued   Licensee Event Report D-Regulatory Restriction E-Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-0161)
F-Forced A-Equipment Failure Maint or Test Instructions for Preparation of 2 - Manual Scram S-Scheduled B-Maint or Test l
F-Administration                         9 - Other G-Oper Error H-Other (227/ZD85G)12
3 - Auto Scram Data Entry Sheet C-Refueling 4 - Continued Licensee Event Report D-Regulatory Restriction E-Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-0161)
F-Administration 9 - Other G-Oper Error H-Other (227/ZD85G)12


e
e
                                                                                                                                                                                                                                                                            ~
~
E. TJNIOUE REPORTING REOUIREMENTS -' UNIT 2
E.
: 1.       Safety / Relief valve operations.
TJNIOUE REPORTING REOUIREMENTS -' UNIT 2 1.
VALVES                                                       NO & TYPE               PLANT               DESCRIPTION DATE                                                                         ACTUATED                                                     ACTUATION               CONDITION           .__OF EVENT None
Safety / Relief valve operations.
: 2.       Licensee generated changes to ODCM.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION
See Attachment                                                                                                                                                                                                                           i I
.__OF EVENT None 2.
Licensee generated changes to ODCM.
See Attachment i
I l
l l
l l
l I
I i
i l
l (227/ZD85G)13 t
(227/ZD85G)13 t
i
i
                                                                                                                                                                                        . . _ . . _ . . _      . . . _ _ ~. _          . _ . _ _ . . _ _ . _. __  ._      _ . . . _
~.


        . ~ . .       . . ~ .     . ~ ..~.       ~...~ ~ . .   . , . ~ . . - - - . ~ . . -
. ~..
                                                                                                            . . . .  . . ~ .   ~       . - - . ~ , - ~ . - - - . - . - - . , . .   -
.. ~.
. ~..~.
~...~ ~..
.,. ~.. - - -. ~.. -
.. ~.
~
. - -. ~, - ~. - - -. -. - -.,..
3
3
                          . F , --   LICENSEE EVENT REPORTS - UNIT                   2--
. F, --
LICENSEE EVENT REPORTS - UNIT 2--
The following is a-tabular summary of all Licensee Event Reports.
The following is a-tabular summary of all Licensee Event Reports.
                                    --submitted'during the reporting period, December-I through
--submitted'during the reporting period, December-I through
                                    . December 31) 1990, This-information is provided pursuant to-the
. December 31) 1990, This-information is provided pursuant to-the
                                    , reportable' occurrence reporting requirements as set forth in 13 CFR 50,73, Licensee' Event
, reportable' occurrence reporting requirements as set forth in 13 CFR 50,73, Licensee' Event Report i
                                                                                                                                                                                                    ~
~
Report                                                                                                                        i Report Number                           Date                               -Iltle of Occurreng.g                                                             -{
Report Number Date
90-012-                           12-18-90                     . Containment Ventilation isolation'                                                               !
-Iltle of Occurreng.g
                                                                                                      -signal due to a failed Radiation Detector.
- {
90-012-12-18-90
. Containment Ventilation isolation'
-signal due to a failed Radiation Detector.
l -
l -
                                                                                                                                                                                                          \
\\
.                                                                                                                                                                                                    .1 4
. 1 4
t.
t.
                                                                                                                                                                                                    .q i
.q i
l; f
l; f
r
r
  ;                                                                                                                                                                                                    'I l..
'I l..
V                                                                                                                                                                                                     .;
V (227/ZD85G)14-:
(227/ZD85G)14-:
...-. m.
                    .                      _ . _-            ._        .--- _.           . . _ _ - . . .        _        . _...-._m.                              - . . _ _ . ,  . .. - - _ -}}
-}}

Latest revision as of 18:31, 16 December 2024

Monthly Operating Repts for Braidwood Nuclear Power Station for Dec 1990
ML20066D908
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/31/1990
From: Dundek K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20066D888 List:
References
NUDOCS 9101170103
Download: ML20066D908 (13)


Text

7--

BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC. DOCKET NO. 050-456, LICENSE NO. NPP-72 NkC DOCKET NO. 050-457, LICENSE NO. NPF-77 l

l.

1 l

I 9101170103 910110 PDR ADOCK 05000456 PDR R

i,:.; :, L' i

f a

e I.

Monthly Report for Braidwood Unit 1 A.

Summary of Operating Expgnigggg s

Unit 1: entered the month of December-at.approximately-99.2% power. On December.1, 1990-the unit tripped on low steam generator level resulting f rom the' loss -of a main-

'feedwator pump. The pump was repaired and the unit returned to power operation on December:3, 1990. On December 4,-1990 the. generator was taken off-line to replace the seal ollivapor extractor motor.- After the j

motor replacement, the generator was-synchronized to the grid ~and the. unit-performed routinely until December 30, 1990 when it tripped due to a main generator neutral' ground.overcurrent. The unit remained off-line through'the remainder of the report period.

j t

f

.k t -

-(227/ZD85G)3-1

!)

I 4..

4 B.

DEX. RATING DATA REPQRI DOCKET NO.:

50-456 UNIT Braidwood 1 DATE: 01/10/91 COMPILED BY:

K. M. Dundek TELEPHONE:

(815)458-2801 ext. 2480 OPERATING STATUS 1.

Reporting Period: December, 1990 Gross Hours:

744 2.

Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120 3.

Power level to which restricted (If Any):

None 4.

Reasons for restriction (If-Any):

None IHIS MONTH YR TO DATE CUMULATIVE 5.

Report period Hours:

744 8760 21249 6.

Hours Reactor Critical:

655.2 7830.1 16927.3 7.

RX Reserve Shutdown Hours:

0.Q_

0.0 0. 0..

8.

Hours Gonerator on Line 640.4 7781.3 16630.9 l

9.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 10.

Gross Thermal Energy (MWH):

2058699 21849862 49653070 11.

Gross Elec. Energy (MWH):

710492 8600574 17080641 12.

Net Elec. Energy (MWH):

680782'

_3264585 If321756 13.

Reactor Service Factor 88.1 89.4 79.7 14.-

Reactor Availability Factor:

88.1 69 1 79.7 15.

Unit Service Factor 86.1 88 1 78.3 2

16.

Unit Availability Factor 86.1 88.8 78.3 17.

Unit Capacity Factor (MDC net):

81.7 84.2 68.6 18.

Unit Capacity Factor (DER not):

81.7 84.2 68 1_

19.

Unit Forced Outage Rate 13.9 11.2 8.2 20.

Unit Forced Outage Hours:

103.9 979 1479.3 21.

Shutdowns Scheduled Over Next 6 Months: Refueling Outage - March, 1991 22.

If Shutdown at End of Report Period, Estimated Date of Startup:

Februarv 6, 1991_

(227/ZD85G)4

J 1

r,,

.4 C.

AVERAGE DAILY UNIT NET' POWER LEVEL LOG.

DOCKET No. 456 UNITI-Braidwood 1

}

-DATE:

01/10/91' COMPILED BY K. M. Dundek TELEPHONE:

(815)458-2801-ext. 2480 MONTH:

December, 1990

< 1..

786 17.

  • 1129 L

2.

-15 18.-

  • 1128 3.

-3 19.:

  • 1128 4.

116 20.

'*1128

'u.

5.

691 21.

  • 1128-6.

1068 22.

  • 1127 i

7, 1069 23.

  • 1128 8..

1069

-24.

  • 1128 9.

1070 25.

  • 1124 10, 1071 26.
  • 1126 11..

1070

27. -

~ *1126 ^

12..

1068 28.

  • 1126 13, 1071 29.

1118 1070

- 3 0.

308 15.

1086 31.

-14

?16.

-*1129 i

-p

' INSTRUCTIONS.

On this form list the average daily unit power level in MWe-Het for each

day in the reporting month. LCompute to the
nearest'whole megawatt.

?These figures > will; be used to plot a graph for cach reporting. month.

Note that-when. maximum dependable capacity is used:for the net electrical

-rating of the: unit there'may be-occasions when1the daily average power.

level exceeds the 100% line (or the restricted power: level line).- InL

-such cases the average-daily unit power output sheet should be footnoted to explain the apparent anomaly.

  • Due to. Condenser Efficiencies (227/ZD85G)5

d D.

UNIT SHUTDOWNS / REDUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood l~

DATE: 01/10/91 COMPILED BY: K. M. Dundek-TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 No DATE TYPE HQURE REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 5

901201 F 53.7 A

3 90-021 EW N/A The IB Feedwater Pump tripped due to low oil pressure.

'It is believed that the suction of the high pressure oil pump became partially plugged. A portable centrifuge has been connected to the pump oil reservoir to remove water and debris from the oil system. Other methods to minimize potential water intrusion into the oil system are being evaluated.

6 901230 F 39.6 A

3 90-023-TG GEN Neutral ground overcurrent trip of main generator. Problem isolated to stator with exact.cause being investigated for appropriate corrective action.

SUMMARY

TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equ.ipment _ Failure Maint or Test 1 - Manual Exhibit F & H S-Scheduled

'B-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling-3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licensee Event Report E-Operator Training & License Examination 5 - Reduced Load (LER)' File (NUREG-Ol61)

F-Administration 9 - Other G-Oper Error H-Other.

i (227/ZD85G)6

- < ~..-

e

4 E.

UNIOUE REPORTING REOUIREMENTS - Unit 1

~

1.

Safety / Relief ' valve operations.

VALVES NO & TYPE-PLANT DESCRIPTION s

DATE ACTUATED ACTUATION CONDITION JF EVENT NOME 2.

Licensee generated changes to ODCM.

See Attachment k

(227/ZD85G)7

- - - - ~.

~.

. J.' '., z'

,3 DF.-

.klCERSEE EVENT REPORTS - UNIT l' i

r The_-following isLa tabular summary of'all Licensee Event Reports i

I submitted ~during the reporting _ period, December 1 through December 31, 1990. This information is provided. pursuant to the reportable ocettrence reporting requirements as set forth in 10 CFR 50.73.

Licensee Event Report Eleport Numbet Rafa Title of Occurrence 90-020-12-21-90 Spurious start of the Auxiliary Building Inaccessible Filter Plenum

-l A Charcoal Booster Fan OB due to component failure.90-021 12-31-90 Reactor trip as a result _.of a Feedwater Pump trip due to low oil pressure.-

4 D

li

.i p

-l (227/ZD850)8 i.

~ _ -,. -

~

1.

Monthly Report for Braidwood Unit 2 A.

Summary of Operating Experience Braidwood Unit 2 operated routinely in December with no outages or significant power reductions caused by equipment problems.

l (227/ZD85G)9

d

'-i

- B.l QPERATING DATA REPOEI DOCKET NO. J 50-457 UNIT:

Braidwood 2 DATE 01/10/91' COMPILED BY:

K. M. Dundek TELEPHONE:

(815)458-2801 ext. 2480 OPERATING STATUS l

1. -

Reporting Period December, 1990 Gross Hourst 744 2.

Currently Authorized Power Level _(Mh't):

3411 Design. Electrical Rating _(MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 i

Max Dependable Capacity (MWe-net):

1120 3.-

Power leve11to which' restricted (If Any): None

-4.

Reasons for restriction (If Any): None.

THIS M0dTH yjLIQ_DATE CUMULATIVE r

5.

Report period Hours:

744 8760 19331

-6.-

Hours Reactor-Critical

'744

-6904.2 16039.5 7.

RX Reserve Shutdown Hours:

'0.0 0.0 0.0 8.~

-Hours Generator-on Lines 744 6850.4

,___15911.2 9.'

Unit Reserve Shutdown Hours:

0.0 0.0

'0.0 10.

Gross Thermal Energy (MWH):

2397002 19469070 45310028

11. -. Cross Elec. Energy (>941) _

.8E1383 6643385-15534773 12.~ -. Net Elec.-Energy (MWH):

797837 6334505 14827480 13.

Reactor Service. Factors 100.0 78.8

'83.0 14.

Reactor;Avellability Factort-100.0 78 a 83.0-t 15.

Unit Service Factor:

100.0_

78.2 82.3 L 16. _

Unit Availability Factor:

100.0 78.2 82.3 Eli.

Unit Capacity.-Factor (MDC net):

95.7 64.6 68.5 o

18.

Unit Capacity Factor (DER net):

95.7 64.6 68.5' 119. -- -Unit: Forced Outage Rate:

0.0 2.1 3.7 l

20.

Unit Forced-Outage Hours L 0.0 147 2 613.6-i

_21.

. Shutdowns Scheduled Over Next 6 Months: None i

22.

Il[ Shutdown at End of Report Period, Estimated Date'of Startup L

L (227/ZD85G)10

.l E-

,1

?..

k.

DOCKET.NO.s. 50-457

'I C..

- AVERAGE DAILY UNIT NET POWER LEVEL LOG UNITi~ Braidwood 2 DATE:

01/10/91-COMPILED BY -

K. M. Dundek TELEPHONES- (815)458-2801 ext. 2480-

]

MONTH
-December, 1990

-!q l'

1107 17.

1118 2.

1003 18.

  • 1129 3.

1054 19.

  • 1129 I

4.

1102 20.

  • 1129 5.
  • 113L-21, 1108' 6.
  • 1133 2 2.-

1097 1

-7.

  • 1133

'2 3.

1047

j 8.

'1091 24, 1043

'j 9.

887 25.

880

- 10.

1043 26.

1086 f:

11.

1032 27.

'1109' 12..

1021 28.

1073 13.

1J04'-

29.

1020 1

14, 1110 30.

1036 i

= 15.1 1032 31, 1114 16, 1116 p

INSTRUCTIONS

'On;this-form list the-average-daily unit. power level--in MWe-Net for each~

day.in the reporting month. Compute to-the: nearest whole megawatt.'

These figures will be used to plot a graph for each reporting month.

? Note.that when maximum' dependable' capacity is used for the net electrical-

-rating of.theltnit there may be occasions when the daily.' average power lovel exceeds the 100% line (or the> restricted power level line).,In p

such cases the average daily unit power output sheet should be footnoted to explain the; apparent anomaly.

  • Due to Condenser Efficiencies.

-(227/ZD85G)11

m DOCKET NO.: 50-457 D.

UNIT SHUTDOWNS / REDUCTIONS UNIT: Braidwood 2 DATE: 01/10/91 l

COMPILED BY: K. M. Dundek TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: December, 1990 No p_A_TE TXP_E HQURS REASON METHQD RR_LPRfIlE_R SYSTEM COMPONENT CAUSE & CQRR_ECTIVE ACTION TO PREVENT l

NONE co***************

SUMMARY

oo***************

METHOD SYSTEM & lOMPONENT TYPE REASON 1 - Manual Exhibit F & H j

F-Forced A-Equipment Failure Maint or Test Instructions for Preparation of 2 - Manual Scram S-Scheduled B-Maint or Test l

3 - Auto Scram Data Entry Sheet C-Refueling 4 - Continued Licensee Event Report D-Regulatory Restriction E-Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-0161)

F-Administration 9 - Other G-Oper Error H-Other (227/ZD85G)12

e

~

E.

TJNIOUE REPORTING REOUIREMENTS -' UNIT 2 1.

Safety / Relief valve operations.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION

.__OF EVENT None 2.

Licensee generated changes to ODCM.

See Attachment i

I l

l l

I i

l (227/ZD85G)13 t

i

~.

. ~..

.. ~.

. ~..~.

~...~ ~..

.,. ~.. - - -. ~.. -

.. ~.

~

. - -. ~, - ~. - - -. -. - -.,..

3

. F, --

LICENSEE EVENT REPORTS - UNIT 2--

The following is a-tabular summary of all Licensee Event Reports.

--submitted'during the reporting period, December-I through

. December 31) 1990, This-information is provided pursuant to-the

, reportable' occurrence reporting requirements as set forth in 13 CFR 50,73, Licensee' Event Report i

~

Report Number Date

-Iltle of Occurreng.g

- {

90-012-12-18-90

. Containment Ventilation isolation'

-signal due to a failed Radiation Detector.

l -

\\

. 1 4

t.

.q i

l; f

r

'I l..

V (227/ZD85G)14-:

...-. m.

-