{{#Wiki_filter:I Page 1 of 2 cx EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS COWROWD C o
CHANGE NOTICE: 001 R1_h o CONTROL No.
PROCEDURE NO.: CPP-010 REVISION NO.:
7 ISSUE DATE: 05/15/86 (s
b PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.
l l
i M!h Prepared by:
Date:
.T!/F[6$
Approved by:
/u' at:/S Date:
On-Site QA Representa ve Approved by:
1 Date:
f6%
QA/p Review Team Lepder
//
8607170104 860711
~
PDR ADOCK 05000445 PDR
 
I Changs Notica 001 CPP-010 73 i
Revision:
7 V'
1.
Delete the following portion of Section 4.4.3:
", or an adverse trend analysis of the unclassified trend" 2.
Change the second sentence in the first paragraph of Section 5.2.2 to read:
"Second reviewers determine when a deviation or set of related deviations constitute an unclassified deviation."
3.
Change Section 5.3.2, first paragraph, to read:
"The QA/QC Records Administrator normally transmits copies of valid DRs received from the second reviewer (refer to Paragraph 5.2.2) to:
. the SSEG Supervisor for analyses,
. the CPSES QC Coordinator for further processing in accordance with Reference 3.3, and
, the QA/QC Interface Coordinator for action as required per Reference 3.5.
gis,)
Valid DRs in the following categories are also transmitted to tbs Project Manager, Pipe Stress and Pipe Support Reconciliation Project:
LBCO PIWM LBSR SBPS SBC0 PBFA LBSN PWRE Unclassified DRs and those reviewed by the ISAP I.d.1 Issue Coordinator are transmitted to the SSEG Supervisor for information only, as safety-significant evaluations for those DRs are unwarranted. DRs reviewed by the ISAP I.d.1 Issue Coordinator are also transmitted to the appropriate first I
reviewer for use in the collective evaluation."
I b s
2}}

Latest revision as of 02:14, 8 December 2024

Change Notice 001 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20202J558
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/15/1986
From: Bajada E
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-010, CPP-10, NUDOCS 8607170104
Download: ML20202J558 (2)


Text

I Page 1 of 2 cx EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS COWROWD C o

CHANGE NOTICE: 001 R1_h o CONTROL No.

PROCEDURE NO.: CPP-010 REVISION NO.:

7 ISSUE DATE: 05/15/86 (s

b PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.

l l

i M!h Prepared by:

Date:

.T!/F[6$

Approved by:

/u' at:/S Date:

On-Site QA Representa ve Approved by:

1 Date:

f6%

QA/p Review Team Lepder

//

8607170104 860711

~

PDR ADOCK 05000445 PDR

I Changs Notica 001 CPP-010 73 i

Revision:

7 V'

1.

Delete the following portion of Section 4.4.3:

", or an adverse trend analysis of the unclassified trend" 2.

Change the second sentence in the first paragraph of Section 5.2.2 to read:

"Second reviewers determine when a deviation or set of related deviations constitute an unclassified deviation."

3.

Change Section 5.3.2, first paragraph, to read:

"The QA/QC Records Administrator normally transmits copies of valid DRs received from the second reviewer (refer to Paragraph 5.2.2) to:

. the SSEG Supervisor for analyses,

. the CPSES QC Coordinator for further processing in accordance with Reference 3.3, and

, the QA/QC Interface Coordinator for action as required per Reference 3.5.

gis,)

Valid DRs in the following categories are also transmitted to tbs Project Manager, Pipe Stress and Pipe Support Reconciliation Project:

LBCO PIWM LBSR SBPS SBC0 PBFA LBSN PWRE Unclassified DRs and those reviewed by the ISAP I.d.1 Issue Coordinator are transmitted to the SSEG Supervisor for information only, as safety-significant evaluations for those DRs are unwarranted. DRs reviewed by the ISAP I.d.1 Issue Coordinator are also transmitted to the appropriate first I

reviewer for use in the collective evaluation."