ML20199G559: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. . ,-                 .-      ~ . .         . . -.      - _ . -                  .    - . -        --                        . - - . -
{{#Wiki_filter:..,-
DOCKET NO.: 50-354L                                                     ,
~..
                                                                                                                      -UNIT: Hope Creek DATE: 11/06/97
DOCKET NO.: 50-354L
                                                                                                        -COMPLETED BY: F.-Todd
-UNIT: Hope Creek DATE: 11/06/97
                                                                                                              ~ TELEPHONE:     (609) 339-1316-OPERATING DATA REPORT-
-COMPLETED BY: F.-Todd
                                  -                                                        OPERATING STATUS 1       Reporting-Period October 1997:                                         Hours in_ Report                             745 Period 2:     Currently _ Authorized 'ower Level _ (MWt)                                                                           3293
~ TELEPHONE:
.                                            Max l Dependable Capacity (MWe-Net)                                                                                   1031 Design Electrical-Rating (MWe-Net)                                                                                   1067 3       Power' level to which restricted (if any) _.(MWe Net)
(609) 339-1316-OPERATING DATA REPORT-OPERATING STATUS 1
Reporting-Period October 1997:
Hours in_ Report 745 Period 2:
Currently _ Authorized 'ower Level _ (MWt) 3293 Max l Dependable Capacity (MWe-Net) 1031 Design Electrical-Rating (MWe-Net) 1067 3
Power' level to which restricted (if any) _.(MWe Net)
None
None
                                    ,4       Reason For Restriction (if any)
,4 Reason For Restriction (if any)
This Month     Yr To                         Cumulative Date 5       No..of hours reactor was critical                                       0             6058                           79781 6       Reactor reserve shutdown hours                                         0.0           0.0                           0.0 7     l Hours generator-on line                                               0             6058                           78618 8       Unit reserve shutdown hours                                             0.0           0.0                           0.0 9       Gross thermal-energy generated (MWH)                                   C             18833746 250701993 10     Gross _ electrical energy generated (MWH)                               0             6285370                       83179583 11     Net electrical energy generated (MWH)                                   0             6008693                       79488089         ,
This Month Yr To Cumulative Date 5
12     Reactor Service f actor                                                 0.0%           83.0%                         83.7%
No..of hours reactor was critical 0
13     Reactor availability factor                                             0.0%           83.0%                         83.7%
6058 79781 6
14     Unit Service Factor                                                     0.0%           83.0%                         82.5%
Reactor reserve shutdown hours 0.0 0.0 0.0 7
15     Unit Availability Factor                                                 0.0%           83.0%                         82.5%
l Hours generator-on line 0
                                      '16 : Unit Capacity Factor (MDC)                                                 0.0%           79.9%                         80.9%
6058 78618 8
17 Unit Capacity _ Factor (DER)                                                 0.0%           77.2%                         78.2%
Unit reserve shutdown hours 0.0 0.0 0.0 9
18 - Unit: Forced Outage Rate                                                   0.0%           1.0%                           4.1%
Gross thermal-energy generated (MWH)
                                      '19 Shutdowns scheduled over next 6 months (type,-date, du ra ti" .1)::
C 18833746 250701993 10 Gross _ electrical energy generated (MWH) 0 6285370 83179583 11 Net electrical energy generated (MWH) 0 6008693 79488089 12 Reactor Service f actor 0.0%
_20 [If shutdown atl end of report- period, estimated date of Startup:             -11/25/97-9711250209 971117 PDR     ADOCK 05000354 -     '
83.0%
c-                                              R-                         PDR                                                                                                         l 1
83.7%
13 Reactor availability factor 0.0%
83.0%
83.7%
14 Unit Service Factor 0.0%
83.0%
82.5%
15 Unit Availability Factor 0.0%
83.0%
82.5%
'16 : Unit Capacity Factor (MDC) 0.0%
79.9%
80.9%
17 Unit Capacity _ Factor (DER) 0.0%
77.2%
78.2%
18 - Unit: Forced Outage Rate 0.0%
1.0%
4.1%
'19 Shutdowns scheduled over next 6 months (type,-date, du ra ti".1)::
_20 [If shutdown atl end of report-period, estimated date of Startup:
-11/25/97-9711250209 971117 PDR ADOCK 05000354 -
R-PDR c-1


DOCKET NO.,         50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:         F. Todd TELEPHCNE:         (609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH   OCTOBER 1997 METHOD OF SHUTTIN G
DOCKET NO.,
DOWN THE TYPE                                       REACTOR OR F= FORCED     DURATIO   REASON             REDUCIN       CORRECTIVE N                             G NO. DATE S= SCHEDULE   (HOURS)   (1)               POWER         ACTION / COMMENT s                                   D                                           (2) 1   10/1 S             745 Hrs   C                 2               Refuel Outage 10/31 A: F,quipment       11 Manual Eatlure             2: Mariu a l B: Maint or Test   Scram C: Refueltr.g       3:
50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:
D: Regulatory       Automatic Restrict!cn         Scram L: Operator         4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ;
F.
Todd TELEPHCNE:
(609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH OCTOBER 1997 METHOD OF SHUTTIN G
DOWN THE TYPE REACTOR OR F= FORCED DURATIO REASON REDUCIN CORRECTIVE N
G NO.
DATE S= SCHEDULE (HOURS)
(1)
POWER ACTION / COMMENT s
D (2) 1 10/1 S
745 Hrs C
2 Refuel Outage 10/31 A: F,quipment 11 Manual Eatlure 2: Mariu a l B: Maint or Test Scram C: Refueltr.g 3:
D: Regulatory Automatic Restrict!cn Scram L: Operator 4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ;
b
b


DOCKET NO. 50-354 UNIT: Hope Creek         .
DOCKET NO.
DATE: 11/06797 COMPLETED BY:     F. Todd TELEPilONE:   (609) 339-1316     !
50-354 UNIT: Hope Creek DATE: 11/06797 COMPLETED BY:
AVERAGE DAILY UNIT POWER LEVEL MONTH     OCTOBER 1997 DAY     AVERAGE DAILY POWER LEVEL         DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net) 1       0_                               17     0, 2       0                                 18     0 3       0                                 19     0 4       0                                 20     0 5       0                                 21     0 6       f,                               22     0 7       0                                 23     0 0       0                                 24     0 9       0                                 25     0 10     0                                 26     0 11     0                                 27     0 12     9                                 28     0 13     0                                 29     0
F.
        .4     0                                 30     0 15       0                               31     0 16     0
Todd TELEPilONE:
(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0_
17 0,
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 f,
22 0
7 0
23 0
0 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 9
28 0
13 0
29 0
.4 0
30 0
15 0
31 0
16 0


DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:   R. Ritzman TELEPHONE:   (609) 339-1445 REFUELING INFORMATION MONTH       OCTOBER 1997
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:
: 1. Refueling information has changed from last month:
R.
Yes       X       No
Ritzman TELEPHONE:
: 2. Scheduled date for next refueling (RF07): currently in refueling outage
(609) 339-1445 REFUELING INFORMATION MONTH OCTOBER 1997 1.
: 3. Scheduled date for restart following refueling:
Refueling information has changed from last month:
Yes X
No 2.
Scheduled date for next refueling (RF07): currently in refueling outage 3.
Scheduled date for restart following refueling:
11/25/97 4A Will Technical Specification changes or other license amendments be required?
11/25/97 4A Will Technical Specification changes or other license amendments be required?
Yes       __
Yes No X
No           X B. Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ?
B.
Yes                 No         X If no, when is it scheduled?   10/22/97
Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ?
: 5. Scheduled date(s) for submitting proposed licensing action:
Yes No X
N/A
If no, when is it scheduled?
: 6. Important licensing considerations associated with refueling:
10/22/97 5.
None
Scheduled date(s) for submitting proposed licensing action:
: 7. Number of Fuel Assemblies:
N/A 6.
A. Incore                                 764 B. In Spent Fuel Storage                 1708
Important licensing considerations associated with refueling:
: 8. Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity:             4006
None 7.
: 9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: 5/3/2006(EOC13)
Number of Fuel Assemblies:
A.
Incore 764 B.
In Spent Fuel Storage 1708 8.
Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity:
4006 9.
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
5/3/2006(EOC13)
(Doea allow for full-core 3ff-load)
(Doea allow for full-core 3ff-load)
(Assumes 244 bundle reload. every 18 months until then)
(Assumes 244 bundle reload. every 18 months until then)
(Does not allow for smaller reloads due to improved fuel)
(Does not allow for smaller reloads due to improved fuel)


DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY:   F. Todd TELEPilONE: (609) 339-1316 MONTHLY OPERATING  
DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY:
F.
Todd TELEPilONE:
(609) 339-1316 MONTHLY OPERATING  


==SUMMARY==
==SUMMARY==
 
HONTH OCTOBER 1997 For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.}}
HONTH     OCTOBER 1997
* For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.
                                                                              !}}

Latest revision as of 07:33, 10 December 2024

Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1
ML20199G559
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/31/1997
From: Todd F
Public Service Enterprise Group
To:
Shared Package
ML20199G546 List:
References
NUDOCS 9711250209
Download: ML20199G559 (5)


Text

..,-

~..

DOCKET NO.: 50-354L

-UNIT: Hope Creek DATE: 11/06/97

-COMPLETED BY: F.-Todd

~ TELEPHONE:

(609) 339-1316-OPERATING DATA REPORT-OPERATING STATUS 1

Reporting-Period October 1997:

Hours in_ Report 745 Period 2:

Currently _ Authorized 'ower Level _ (MWt) 3293 Max l Dependable Capacity (MWe-Net) 1031 Design Electrical-Rating (MWe-Net) 1067 3

Power' level to which restricted (if any) _.(MWe Net)

None

,4 Reason For Restriction (if any)

This Month Yr To Cumulative Date 5

No..of hours reactor was critical 0

6058 79781 6

Reactor reserve shutdown hours 0.0 0.0 0.0 7

l Hours generator-on line 0

6058 78618 8

Unit reserve shutdown hours 0.0 0.0 0.0 9

Gross thermal-energy generated (MWH)

C 18833746 250701993 10 Gross _ electrical energy generated (MWH) 0 6285370 83179583 11 Net electrical energy generated (MWH) 0 6008693 79488089 12 Reactor Service f actor 0.0%

83.0%

83.7%

13 Reactor availability factor 0.0%

83.0%

83.7%

14 Unit Service Factor 0.0%

83.0%

82.5%

15 Unit Availability Factor 0.0%

83.0%

82.5%

'16 : Unit Capacity Factor (MDC) 0.0%

79.9%

80.9%

17 Unit Capacity _ Factor (DER) 0.0%

77.2%

78.2%

18 - Unit: Forced Outage Rate 0.0%

1.0%

4.1%

'19 Shutdowns scheduled over next 6 months (type,-date, du ra ti".1)::

_20 [If shutdown atl end of report-period, estimated date of Startup:

-11/25/97-9711250209 971117 PDR ADOCK 05000354 -

R-PDR c-1

DOCKET NO.,

50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:

F.

Todd TELEPHCNE:

(609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH OCTOBER 1997 METHOD OF SHUTTIN G

DOWN THE TYPE REACTOR OR F= FORCED DURATIO REASON REDUCIN CORRECTIVE N

G NO.

DATE S= SCHEDULE (HOURS)

(1)

POWER ACTION / COMMENT s

D (2) 1 10/1 S

745 Hrs C

2 Refuel Outage 10/31 A: F,quipment 11 Manual Eatlure 2: Mariu a l B: Maint or Test Scram C: Refueltr.g 3:

D: Regulatory Automatic Restrict!cn Scram L: Operator 4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ;

b

DOCKET NO.

50-354 UNIT: Hope Creek DATE: 11/06797 COMPLETED BY:

F.

Todd TELEPilONE:

(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0_

17 0,

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 f,

22 0

7 0

23 0

0 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 9

28 0

13 0

29 0

.4 0

30 0

15 0

31 0

16 0

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:

R.

Ritzman TELEPHONE:

(609) 339-1445 REFUELING INFORMATION MONTH OCTOBER 1997 1.

Refueling information has changed from last month:

Yes X

No 2.

Scheduled date for next refueling (RF07): currently in refueling outage 3.

Scheduled date for restart following refueling:

11/25/97 4A Will Technical Specification changes or other license amendments be required?

Yes No X

B.

Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ?

Yes No X

If no, when is it scheduled?

10/22/97 5.

Scheduled date(s) for submitting proposed licensing action:

N/A 6.

Important licensing considerations associated with refueling:

None 7.

Number of Fuel Assemblies:

A.

Incore 764 B.

In Spent Fuel Storage 1708 8.

Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity:

4006 9.

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

5/3/2006(EOC13)

(Doea allow for full-core 3ff-load)

(Assumes 244 bundle reload. every 18 months until then)

(Does not allow for smaller reloads due to improved fuel)

DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY:

F.

Todd TELEPilONE:

(609) 339-1316 MONTHLY OPERATING

SUMMARY

HONTH OCTOBER 1997 For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.