-UNIT: Hope Creek DATE: 11/06/97 | |||
-COMPLETED BY: F.-Todd | |||
~ TELEPHONE: | |||
(609) 339-1316-OPERATING DATA REPORT-OPERATING STATUS 1 | |||
Reporting-Period October 1997: | |||
Hours in_ Report 745 Period 2: | |||
Currently _ Authorized 'ower Level _ (MWt) 3293 Max l Dependable Capacity (MWe-Net) 1031 Design Electrical-Rating (MWe-Net) 1067 3 | |||
Power' level to which restricted (if any) _.(MWe Net) | |||
None | None | ||
,4 Reason For Restriction (if any) | |||
This Month | This Month Yr To Cumulative Date 5 | ||
12 | No..of hours reactor was critical 0 | ||
13 | 6058 79781 6 | ||
14 | Reactor reserve shutdown hours 0.0 0.0 0.0 7 | ||
15 | l Hours generator-on line 0 | ||
6058 78618 8 | |||
17 Unit Capacity _ Factor (DER) | Unit reserve shutdown hours 0.0 0.0 0.0 9 | ||
18 - Unit: Forced Outage Rate | Gross thermal-energy generated (MWH) | ||
C 18833746 250701993 10 Gross _ electrical energy generated (MWH) 0 6285370 83179583 11 Net electrical energy generated (MWH) 0 6008693 79488089 12 Reactor Service f actor 0.0% | |||
_20 [If shutdown atl end of report- period, estimated date of Startup: | 83.0% | ||
83.7% | |||
13 Reactor availability factor 0.0% | |||
83.0% | |||
83.7% | |||
14 Unit Service Factor 0.0% | |||
83.0% | |||
82.5% | |||
15 Unit Availability Factor 0.0% | |||
83.0% | |||
82.5% | |||
'16 : Unit Capacity Factor (MDC) 0.0% | |||
79.9% | |||
80.9% | |||
17 Unit Capacity _ Factor (DER) 0.0% | |||
77.2% | |||
78.2% | |||
18 - Unit: Forced Outage Rate 0.0% | |||
1.0% | |||
4.1% | |||
'19 Shutdowns scheduled over next 6 months (type,-date, du ra ti".1):: | |||
_20 [If shutdown atl end of report-period, estimated date of Startup: | |||
-11/25/97-9711250209 971117 PDR ADOCK 05000354 - | |||
R-PDR c-1 | |||
DOCKET NO., | DOCKET NO., | ||
DOWN THE TYPE | 50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY: | ||
D: Regulatory | F. | ||
Todd TELEPHCNE: | |||
(609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH OCTOBER 1997 METHOD OF SHUTTIN G | |||
DOWN THE TYPE REACTOR OR F= FORCED DURATIO REASON REDUCIN CORRECTIVE N | |||
G NO. | |||
DATE S= SCHEDULE (HOURS) | |||
(1) | |||
POWER ACTION / COMMENT s | |||
D (2) 1 10/1 S | |||
745 Hrs C | |||
2 Refuel Outage 10/31 A: F,quipment 11 Manual Eatlure 2: Mariu a l B: Maint or Test Scram C: Refueltr.g 3: | |||
D: Regulatory Automatic Restrict!cn Scram L: Operator 4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ; | |||
b | b | ||
DOCKET NO. 50-354 UNIT: Hope Creek | DOCKET NO. | ||
DATE: 11/06797 COMPLETED BY: | 50-354 UNIT: Hope Creek DATE: 11/06797 COMPLETED BY: | ||
AVERAGE DAILY UNIT POWER LEVEL MONTH | F. | ||
Todd TELEPilONE: | |||
(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(MWe-Net) 1 0_ | |||
17 0, | |||
2 0 | |||
18 0 | |||
3 0 | |||
19 0 | |||
4 0 | |||
20 0 | |||
5 0 | |||
21 0 | |||
6 f, | |||
22 0 | |||
7 0 | |||
23 0 | |||
0 0 | |||
24 0 | |||
9 0 | |||
25 0 | |||
10 0 | |||
26 0 | |||
11 0 | |||
27 0 | |||
12 9 | |||
28 0 | |||
13 0 | |||
29 0 | |||
.4 0 | |||
30 0 | |||
15 0 | |||
31 0 | |||
16 0 | |||
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY: | DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY: | ||
R. | |||
Yes | Ritzman TELEPHONE: | ||
(609) 339-1445 REFUELING INFORMATION MONTH OCTOBER 1997 1. | |||
Refueling information has changed from last month: | |||
Yes X | |||
No 2. | |||
Scheduled date for next refueling (RF07): currently in refueling outage 3. | |||
Scheduled date for restart following refueling: | |||
11/25/97 4A Will Technical Specification changes or other license amendments be required? | 11/25/97 4A Will Technical Specification changes or other license amendments be required? | ||
Yes | Yes No X | ||
No | B. | ||
Yes | Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ? | ||
Yes No X | |||
N/A | If no, when is it scheduled? | ||
10/22/97 5. | |||
None | Scheduled date(s) for submitting proposed licensing action: | ||
N/A 6. | |||
A. Incore | Important licensing considerations associated with refueling: | ||
None 7. | |||
Number of Fuel Assemblies: | |||
A. | |||
Incore 764 B. | |||
In Spent Fuel Storage 1708 8. | |||
Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity: | |||
4006 9. | |||
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: | |||
5/3/2006(EOC13) | |||
(Doea allow for full-core 3ff-load) | (Doea allow for full-core 3ff-load) | ||
(Assumes 244 bundle reload. every 18 months until then) | (Assumes 244 bundle reload. every 18 months until then) | ||
(Does not allow for smaller reloads due to improved fuel) | (Does not allow for smaller reloads due to improved fuel) | ||
DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY: | DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY: | ||
F. | |||
Todd TELEPilONE: | |||
(609) 339-1316 MONTHLY OPERATING | |||
==SUMMARY== | ==SUMMARY== | ||
HONTH OCTOBER 1997 For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.}} | |||
HONTH | |||
Latest revision as of 07:33, 10 December 2024
| ML20199G559 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/31/1997 |
| From: | Todd F Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML20199G546 | List: |
| References | |
| NUDOCS 9711250209 | |
| Download: ML20199G559 (5) | |
Text
..,-
~..
DOCKET NO.: 50-354L
-UNIT: Hope Creek DATE: 11/06/97
-COMPLETED BY: F.-Todd
~ TELEPHONE:
(609) 339-1316-OPERATING DATA REPORT-OPERATING STATUS 1
Reporting-Period October 1997:
Hours in_ Report 745 Period 2:
Currently _ Authorized 'ower Level _ (MWt) 3293 Max l Dependable Capacity (MWe-Net) 1031 Design Electrical-Rating (MWe-Net) 1067 3
Power' level to which restricted (if any) _.(MWe Net)
None
,4 Reason For Restriction (if any)
This Month Yr To Cumulative Date 5
No..of hours reactor was critical 0
6058 79781 6
Reactor reserve shutdown hours 0.0 0.0 0.0 7
l Hours generator-on line 0
6058 78618 8
Unit reserve shutdown hours 0.0 0.0 0.0 9
Gross thermal-energy generated (MWH)
C 18833746 250701993 10 Gross _ electrical energy generated (MWH) 0 6285370 83179583 11 Net electrical energy generated (MWH) 0 6008693 79488089 12 Reactor Service f actor 0.0%
83.0%
83.7%
13 Reactor availability factor 0.0%
83.0%
83.7%
14 Unit Service Factor 0.0%
83.0%
82.5%
15 Unit Availability Factor 0.0%
83.0%
82.5%
'16 : Unit Capacity Factor (MDC) 0.0%
79.9%
80.9%
17 Unit Capacity _ Factor (DER) 0.0%
77.2%
78.2%
18 - Unit: Forced Outage Rate 0.0%
1.0%
4.1%
'19 Shutdowns scheduled over next 6 months (type,-date, du ra ti".1)::
_20 [If shutdown atl end of report-period, estimated date of Startup:
-11/25/97-9711250209 971117 PDR ADOCK 05000354 -
R-PDR c-1
DOCKET NO.,
50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:
F.
Todd TELEPHCNE:
(609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH OCTOBER 1997 METHOD OF SHUTTIN G
DOWN THE TYPE REACTOR OR F= FORCED DURATIO REASON REDUCIN CORRECTIVE N
G NO.
DATE S= SCHEDULE (HOURS)
(1)
POWER ACTION / COMMENT s
D (2) 1 10/1 S
745 Hrs C
2 Refuel Outage 10/31 A: F,quipment 11 Manual Eatlure 2: Mariu a l B: Maint or Test Scram C: Refueltr.g 3:
D: Regulatory Automatic Restrict!cn Scram L: Operator 4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ;
b
DOCKET NO.
50-354 UNIT: Hope Creek DATE: 11/06797 COMPLETED BY:
F.
Todd TELEPilONE:
(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0_
17 0,
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 f,
22 0
7 0
23 0
0 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 9
28 0
13 0
29 0
.4 0
30 0
15 0
31 0
16 0
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:
R.
Ritzman TELEPHONE:
(609) 339-1445 REFUELING INFORMATION MONTH OCTOBER 1997 1.
Refueling information has changed from last month:
Yes X
No 2.
Scheduled date for next refueling (RF07): currently in refueling outage 3.
Scheduled date for restart following refueling:
11/25/97 4A Will Technical Specification changes or other license amendments be required?
Yes No X
B.
Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ?
Yes No X
If no, when is it scheduled?
10/22/97 5.
Scheduled date(s) for submitting proposed licensing action:
N/A 6.
Important licensing considerations associated with refueling:
None 7.
Number of Fuel Assemblies:
A.
Incore 764 B.
In Spent Fuel Storage 1708 8.
Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity:
4006 9.
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
5/3/2006(EOC13)
(Doea allow for full-core 3ff-load)
(Assumes 244 bundle reload. every 18 months until then)
(Does not allow for smaller reloads due to improved fuel)
DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY:
F.
Todd TELEPilONE:
(609) 339-1316 MONTHLY OPERATING
SUMMARY
HONTH OCTOBER 1997 For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.