ML20199H007: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
/ pfato'%g UNITED STATES O' | |||
-- ~ ' ' | |||
NUCLEAR REGULATORY-COMMISSION WASHINGTON D C, 20555-0001 5, | |||
8 | |||
~ November ::4, 1997 j | |||
OFFICE OF THE SECRITARY Robin.A. E. Salvatore P.O. Box 333 Uncasville, CT.06382 | |||
==REFERENCE:== | ==REFERENCE:== | ||
| Line 24: | Line 28: | ||
==Dear Ms. Salvatore:== | ==Dear Ms. Salvatore:== | ||
Thank you for your letter sent to Chairman Jackson regarding the Millstone Nuclear Power-Station. | |||
Thank you for your letter sent to Chairman Jackson regarding the Millstone Nuclear Power-Station. Your correspondence hes been forwarded to the Nuclear Regulatory Commission Staff for appropriate consideration. A copy of your correspondence and this reply are also being placed in Agency records on the Millstone Nuclear Power Station. | Your correspondence hes been forwarded to the Nuclear Regulatory Commission Staff for appropriate consideration. A copy of your correspondence and this reply are also being placed in Agency records on the Millstone Nuclear Power Station. | ||
Sincerely yours- | Sincerely yours-f) f. | ||
f) f. | Emile L. J an Assistant for Rulemakings and Adjudications I | ||
Emile L. J | \\ | ||
) | |||
9711250356 971124 | 9711250356 971124 | ||
* "e *"* | |||
* 155.5.5.5,lpli | |||
* 155.5.5.5,lpli 3 SOS | ^"c " | ||
3 SOS | |||
hCTIONALERT STOP THE RESTART OF MILLSTONE UNIT #3 To: | hCTIONALERT STOP THE RESTART OF MILLSTONE UNIT #3 To: | ||
beccuse of employees' fears of retaliation, pipe breaks, back-up system failures, falsified inspection reports, violation of radiation control regulations, improper repairs, failure of operr' ions on qualifi-cation tests and the contamination of the soil, ground water, the air, and also Long island Sound, sincerely, Toer | Dr. Shirley Ann Jackson, Chairperson U.S. Nuclear Regulatory Commission Washington, D.C. 20555-00'J1 NU s frightening mismanagement does not wammt the restart cf Millstone Unit #3. I am concemed beccuse of employees' fears of retaliation, pipe breaks, back-up system failures, falsified inspection reports, violation of radiation control regulations, improper repairs, failure of operr' ions on qualifi-cation tests and the contamination of the soil, ground water, the air, and also Long island Sound, sincerely, Toer A E. | ||
36x*8E fb. Sw 33% Ume,eu m, CI | |||
' oc,s 7 4 3 | |||
- ------------ -.}} | |||
Latest revision as of 07:25, 10 December 2024
| ML20199H007 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/24/1997 |
| From: | Julian E NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Salvatore R AFFILIATION NOT ASSIGNED |
| References | |
| ML, NUDOCS 9711250356 | |
| Download: ML20199H007 (2) | |
Text
-
/ pfato'%g UNITED STATES O'
-- ~ ' '
NUCLEAR REGULATORY-COMMISSION WASHINGTON D C, 20555-0001 5,
8
~ November ::4, 1997 j
OFFICE OF THE SECRITARY Robin.A. E. Salvatore P.O. Box 333 Uncasville, CT.06382
REFERENCE:
Millstone Nuclear Power Station Docket No(s). 50-245/336/423
Dear Ms. Salvatore:
Thank you for your letter sent to Chairman Jackson regarding the Millstone Nuclear Power-Station.
Your correspondence hes been forwarded to the Nuclear Regulatory Commission Staff for appropriate consideration. A copy of your correspondence and this reply are also being placed in Agency records on the Millstone Nuclear Power Station.
Sincerely yours-f) f.
Emile L. J an Assistant for Rulemakings and Adjudications I
\\
)
9711250356 971124
- "e *"*
- 155.5.5.5,lpli
^"c "
3 SOS
hCTIONALERT STOP THE RESTART OF MILLSTONE UNIT #3 To:
Dr. Shirley Ann Jackson, Chairperson U.S. Nuclear Regulatory Commission Washington, D.C. 20555-00'J1 NU s frightening mismanagement does not wammt the restart cf Millstone Unit #3. I am concemed beccuse of employees' fears of retaliation, pipe breaks, back-up system failures, falsified inspection reports, violation of radiation control regulations, improper repairs, failure of operr' ions on qualifi-cation tests and the contamination of the soil, ground water, the air, and also Long island Sound, sincerely, Toer A E.
36x*8E fb. Sw 33% Ume,eu m, CI
' oc,s 7 4 3
- ------------ -.