ML20155B986: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:4,
{{#Wiki_filter:4,
              '
'
          .
SEP 261988
                                        SEP 261988
.
      Docket Nos. 50-325, 50-324
Docket Nos. 50-325, 50-324
      License Nos. DPR-71, DPR-62
License Nos. DPR-71, DPR-62
  /CarolinaPowerandLightCompany
/CarolinaPowerandLightCompany
      ATTN:     Mr. E. E. Utley
ATTN:
                Senior Executive Vice President
Mr. E. E. Utley
                Power Supply and Engineering
Senior Executive Vice President
                  and Construction
Power Supply and Engineering
      P. O. Box 1551
and Construction
      Raleigh, NC 27602
P. O. Box 1551
      Gentlemen:
Raleigh, NC 27602
      SUBJECT:     NRC INSPECTION REPORT NOS. 50-325/88-25 AND 50-324/88-25
Gentlemen:
      This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT:
      S. Tingen on August 1-5, 1988. The inspection included a review of activities
NRC INSPECTION REPORT NOS. 50-325/88-25 AND 50-324/88-25
      authorized for your Brunswick facility.   At the conclusion of the inspection,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
      the findings were discussed with those members of your staff identified in the
S. Tingen on August 1-5, 1988. The inspection included a review of activities
      enclosed inspection report.
authorized for your Brunswick facility.
      Areas examined during the inspection are identified in the report. Within
At the conclusion of the inspection,
      these areas, the inspection consisted of selective examinations of procedures
the findings were discussed with those members of your staff identified in the
      and representative records, interviews with personnel, and observation of
enclosed inspection report.
      activities in progress.
Areas examined during the inspection are identified in the report. Within
      Within the scope of the inspection, no violations or deviations were identi-
these areas, the inspection consisted of selective examinations of procedures
      fied.
and representative records, interviews with personnel, and observation of
      In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
activities in progress.
      Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
Within the scope of the inspection, no violations or deviations were identi-
      will be placed in the NRC Public Document Room.
fied.
                                                                                            I
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
      Should you have any questions concerning this letter, please contact us.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                Sincerely,                                 I
will be placed in the NRC Public Document Room.
                                                                                            l
Should you have any questions concerning this letter, please contact us.
                                                      f                                     1
Sincerely,
                                                                                            l
f
                                                Alan R. Herdt, Chief
Alan R. Herdt, Chief
                                                Engineering Branch
Engineering Branch
                                                Division of Reactor Safety
Division of Reactor Safety
      Enclorure:
Enclorure:
      NRC Inspection Report
NRC Inspection Report
      cc w/ encl:
cc w/ encl:
    v"P. W. Howe, Vice President
v"P. W. Howe, Vice President
          Brunswick Nuclear Project
Brunswick Nuclear Project
    dC. R. Dietz, Plant General Manager
dC. R. Dietz, Plant General Manager
      bcc w/ encl:     (See page 2)
bcc w/ encl:
              ss10070194 880924                                                       g\
(See page 2)
              PDR   ADOCK 0".000324
ss10070194 880924
                                  FDC
g\\
              O                                                                      y (,
PDR
ADOCK 0".000324
O
FDC
y
(,


  **
SEP 261988
+   .
**
                  *                                               SEP 261988
+
              .
.
          ,
*
                    '
.
        Carolina Power and Light Company         2
,
        b
'
      I ec w/ Resident
Carolina Power and Light Company
          NRC    enc 1: Inspector
2
        ORS, Technical Assistant
I ec w/ enc 1:
          Document Control Desk
b
          State of North Carolina
NRC Resident Inspector
                                                                                  l
ORS, Technical Assistant
                                                                                  l
Document Control Desk
                ,    ') W
State of North Carolina
          RII ,i                       RII         RII /       Ril       RII   .
') W
          ASzczepaniec:ser             FJape       PF dr'ickson STingen   JZe r
,
          OS/2t{/88                     0 /p( / 8   g/) /88     09/s1 /88 % /8
RII ,i
                                                                    70
RII
RII /
Ril
RII
.
ASzczepaniec:ser
FJape
PF dr'ickson
STingen
JZe
r
OS/2t{/88
0 /p( / 8
g/) /88
09/s1 /88
% /8
70
}}
}}

Latest revision as of 22:15, 10 December 2024

Forwards Insp Repts 50-325/88-25 & 50-324/88-25 on 880801-05.No Violations or Deviations Noted
ML20155B986
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/26/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20155B989 List:
References
NUDOCS 8810070194
Download: ML20155B986 (2)


See also: IR 05000324/1988025

Text

4,

'

SEP 261988

.

Docket Nos. 50-325, 50-324

License Nos. DPR-71, DPR-62

/CarolinaPowerandLightCompany

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-325/88-25 AND 50-324/88-25

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

S. Tingen on August 1-5, 1988. The inspection included a review of activities

authorized for your Brunswick facility.

At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

f

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclorure:

NRC Inspection Report

cc w/ encl:

v"P. W. Howe, Vice President

Brunswick Nuclear Project

dC. R. Dietz, Plant General Manager

bcc w/ encl:

(See page 2)

ss10070194 880924

g\\

PDR

ADOCK 0".000324

O

FDC

y

(,

SEP 261988

+

.

.

,

'

Carolina Power and Light Company

2

I ec w/ enc 1:

b

NRC Resident Inspector

ORS, Technical Assistant

Document Control Desk

State of North Carolina

') W

,

RII ,i

RII

RII /

Ril

RII

.

ASzczepaniec:ser

FJape

PF dr'ickson

STingen

JZe

r

OS/2t{/88

0 /p( / 8

g/) /88

09/s1 /88

% /8

70