May 21,1999
Mr. J. E. Cross
Generation Group
Duquesne Light Company
'
Post Office Box 4
Shippingport, Pennsylvania 15077
SUBJECT:
~ NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99 4 2,
50-412/99-02
. Dear Mr. Cross:
This refers to the inspection conducted from March 21 to May 1,1999, at the Beaver Valley
Power Station facility. The enclosed report represents the results of this inspection.
During the 6-week inspection period, your conduct of activities at the Beaver Valley Power
Station facility was characterized by safe conduct of activities, especially during the Unit 2
refueling outage and the Unit 1 surveillance outage. Your staff's human performance improved
as compared to the 1998 extended outages. This improvement was attributed to the strong
response to lower safety significant problems at the beginning of the Unit 2 outage and initiatives
such as the one-stop-shop outage work management concept. Surveillance procedure
deficiencies continue to challenge your operating staff. However, surveillance testing and
maintenance activities were generally performed well, in part, due to strong proevolution
briefings.' Emergent issues were properly addressed with good root-cause assessment by
system engineers and maintenance personnel.
The radiation' protechon program was effective during the Unit 2 refueling outage. Enhanced
informational postings, especially in the containment, aided in maintaining occupational
exposures as low as is reasonably achievable (ALARA). The scope and depth of Quality
Services Unit surveillances conducted for the outage, and as part of the annual health physics
program audit, were adequate to identify and document program deficiencies.
L No reply to this letter is necessary. Your cooperation is appreciated.
1
.
\\
lh '0(
\\
,
9906090167 990521
'
PDR
ADOCK 05000334
g
PDR
 
.t.
Mr. J. E. Cross
2
'
g
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original Signed By Neil Perry for
Peter W. Eselgroth, Chief
Projects Branch 7
Division of Reactor Projects
Docket Nos.: 50-334, 50-412
License Nos.: DRP-66, NPF-73
~
Enclosure: Inspection Report Nos. 50-334/99-02, 50-412/99-02
cc w/ encl:
S. Jain, Senior Vice President, Nuclear Services Group
K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
B. Tuite, General Manager, Nuclear Operations Unit -
W. Kline, Manager, Nuclear Engineering Department
M. Pearson, Manager, Quality Services Unit
M. Ackerman, Manager, Safety & Licensing Department
J. Macdonald, Manager, System and Performance Engineering
J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
M. Clancy, Mayor, Shippingport, PA
Commonwealth of Pennsylvania .
State of Ohio
State of West Virginia
;
.
 
- - _ _ - _ - -
_ _ _ - _ - - _ - _ - _ _ - - _ _ _ - _ _ _ _ _
i
t
t
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
h
PUBLIC
,
NRC Resident inspector
H. Miller, RA/J. Wggins, DRA
. P. Eselgroth, DRP
N. Derry, DRP
C. O'Daniell, DRP
,
Distribution w/enci(VIA E-MAIL):
M. Tschiltz, OEDO
S. Bajwa, PD1-2, NRR
D. Collins, PDI-2, NRR
V. Nerses, PDI-2, NRR
R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: G:\\ BRANCH 7\\BV\\bv990202.WPD
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment /erciosure
"N" =
No copy
OFFICE
Rl/DRP
M Rl/DRP
/
l
/
l
NAME
Kern /al 4)V/-AA
Eselgrothgk,p
f
'
DATE
OFFICIAL RECORD COPY
.
l
l : .
.
. . . . ,
.
.
.
..
.
.
_
}}
}}

Latest revision as of 19:51, 10 December 2024

Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage
ML20195C446
Person / Time
Site: Beaver Valley
Issue date: 05/21/1999
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20195C452 List:
References
50-334-99-02, 50-334-99-2, 50-412-99-02, 50-412-99-2, NUDOCS 9906080167
Download: ML20195C446 (3)


See also: IR 05000334/1999002

Text

r

>

_

.g L

$

May 21,1999

Mr. J. E. Cross

Generation Group

Duquesne Light Company

'

Post Office Box 4

Shippingport, Pennsylvania 15077

SUBJECT:

~ NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99 4 2,

50-412/99-02

. Dear Mr. Cross:

This refers to the inspection conducted from March 21 to May 1,1999, at the Beaver Valley

Power Station facility. The enclosed report represents the results of this inspection.

During the 6-week inspection period, your conduct of activities at the Beaver Valley Power

Station facility was characterized by safe conduct of activities, especially during the Unit 2

refueling outage and the Unit 1 surveillance outage. Your staff's human performance improved

as compared to the 1998 extended outages. This improvement was attributed to the strong

response to lower safety significant problems at the beginning of the Unit 2 outage and initiatives

such as the one-stop-shop outage work management concept. Surveillance procedure

deficiencies continue to challenge your operating staff. However, surveillance testing and

maintenance activities were generally performed well, in part, due to strong proevolution

briefings.' Emergent issues were properly addressed with good root-cause assessment by

system engineers and maintenance personnel.

The radiation' protechon program was effective during the Unit 2 refueling outage. Enhanced

informational postings, especially in the containment, aided in maintaining occupational

exposures as low as is reasonably achievable (ALARA). The scope and depth of Quality

Services Unit surveillances conducted for the outage, and as part of the annual health physics

program audit, were adequate to identify and document program deficiencies.

L No reply to this letter is necessary. Your cooperation is appreciated.

1

.

\\

lh '0(

\\

,

9906090167 990521

'

PDR

ADOCK 05000334

g

PDR

.t.

Mr. J. E. Cross

2

'

g

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By Neil Perry for

Peter W. Eselgroth, Chief

Projects Branch 7

Division of Reactor Projects

Docket Nos.: 50-334, 50-412

License Nos.: DRP-66, NPF-73

~

Enclosure: Inspection Report Nos. 50-334/99-02, 50-412/99-02

cc w/ encl:

S. Jain, Senior Vice President, Nuclear Services Group

K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager

B. Tuite, General Manager, Nuclear Operations Unit -

W. Kline, Manager, Nuclear Engineering Department

M. Pearson, Manager, Quality Services Unit

M. Ackerman, Manager, Safety & Licensing Department

J. Macdonald, Manager, System and Performance Engineering

J. A. Huitz, Manager, Projects and Support Services, FirstEnergy

M. Clancy, Mayor, Shippingport, PA

Commonwealth of Pennsylvania .

State of Ohio

State of West Virginia

.

- - _ _ - _ - -

_ _ _ - _ - - _ - _ - _ _ - - _ _ _ - _ _ _ _ _

i

t

t

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

h

PUBLIC

,

NRC Resident inspector

H. Miller, RA/J. Wggins, DRA

. P. Eselgroth, DRP

N. Derry, DRP

C. O'Daniell, DRP

,

Distribution w/enci(VIA E-MAIL):

M. Tschiltz, OEDO

S. Bajwa, PD1-2, NRR

D. Collins, PDI-2, NRR

V. Nerses, PDI-2, NRR

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\\ BRANCH 7\\BV\\bv990202.WPD

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment /erciosure

"N" =

No copy

OFFICE

Rl/DRP

M Rl/DRP

/

l

/

l

NAME

Kern /al 4)V/-AA

Eselgrothgk,p

f

'

DATE

OFFICIAL RECORD COPY

.

l

l : .

.

. . . . ,

.

.

.

..

.

.

_