ML20153B357: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:.. | ||
.. | |||
.. | |||
.. | |||
h | . | ||
- _ _ _ _ _ | |||
h | |||
. | |||
j | j | ||
.o ' | |||
4 | |||
68 WAR 1988 | |||
Docket No. 50-352 | |||
Philadelphia Electric Company | |||
ATTN: Mr. J. . S. Kemper, Sr. | |||
Vice President, Nuclear | |||
2301 Market Street | |||
Philadelphia, Pennsylvania 19101 | |||
Gentlemen: | |||
Subject: | |||
Inspection 50-352/87-31 | |||
This letter transmits the findings of the routine resident safety inspection | |||
by Messrs. E. Kelly and L. Scholl on December 11, 1987 - January 25, 1988 at | |||
the Lir.erick Generating Station, Limerick, Pennsylvania. | |||
The inspection | |||
consisted of document reviews, interviews, and observation of activities, and | |||
the ~results have been discussed with Mr. Jay Doering, Superintendent of | |||
Operations. | |||
No violat' ions of NRC requirements were identified and no response is required. | |||
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure | |||
will be placed in the Public Document Room. | |||
Your cooperation is appreciated. | |||
pistaat, stMg, | |||
k | |||
Edward C. Wenzinger, Chief | |||
' | |||
Projects Branch No. 2 | |||
Division of Reactor Projects | |||
Enclosure: NRC Region I Inspection Report 50-352/87-31 | |||
cc w/ encl: | |||
J. W. Gallagher, Vice President, Nuclear Services | |||
E. C. Kistner, Chairman, Nuclear Review Board | |||
G. M. Leitch, Vice President, Limerick Generating Station | |||
Troy 6. Conner, Jr. , Esquire | |||
Eugene J. Bradley, Esquire, Assistant General Counsel | |||
W. M. Alden, Director, Licensing Section | |||
Public Document Room (PDR) | |||
local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
Commonwealth of Pennsylvania | |||
8803220102 880308 | |||
PDR | |||
ADOCK 05000352 | |||
O | |||
PDR | |||
OFFICIAL RECORD COPY | |||
IR LIM 1 87-31 - 0001.0.0 | |||
03/04/88 | |||
) | |||
hoi | |||
l | |||
i | |||
///__ | |||
- | |||
. | |||
. | |||
. | |||
.-- | |||
. | |||
.- | |||
. | |||
. | |||
4 | |||
9 .. | |||
- Philadelphia ' Electric Company | |||
2 | |||
,. | |||
48 MAR 1988 | |||
bec.w/ encl: | |||
* | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, ORMA (w/o enc 1) | |||
Jim Linville, Section Chief, DRP | |||
Brent Clayton, EDO Office | |||
Dick' Clark, NRR Project Manager | |||
.,. | |||
Tom Johnson, SRI, Peach Bottom | |||
Bob Gramm, SRI, Limerick 2 | |||
, | , | ||
. | . | ||
i | i | ||
R | |||
RP | |||
: | |||
P | |||
L nville/rbl | |||
Wenzinger | |||
; | |||
' | |||
3/J/88 | |||
3/f788 | |||
, | , | ||
! | ! | ||
0FFICIAL RECORD COPY | |||
IR LIM 1 87-31 - 0002.0.0 | |||
03/04/88 | |||
., | ., | ||
- - - | |||
e,+-. | |||
. | |||
,y. | |||
.,-, _, | |||
e-,__.~yy.,e_-- | |||
- , ~ . . _ _ | |||
,, | |||
_ . , | |||
,..,,,.,,,,,.,,,..,mw...,..,._.-.,___v | |||
..y_ _ . _ . . , _ ,, ,-~, | |||
}} | }} | ||
Latest revision as of 03:17, 11 December 2024
| ML20153B357 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/08/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20153B359 | List: |
| References | |
| NUDOCS 8803220102 | |
| Download: ML20153B357 (2) | |
See also: IR 05000352/1987031
Text
..
..
..
..
.
- _ _ _ _ _
h
.
j
.o '
4
68 WAR 1988
Docket No. 50-352
Philadelphia Electric Company
ATTN: Mr. J. . S. Kemper, Sr.
Vice President, Nuclear
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection 50-352/87-31
This letter transmits the findings of the routine resident safety inspection
by Messrs. E. Kelly and L. Scholl on December 11, 1987 - January 25, 1988 at
the Lir.erick Generating Station, Limerick, Pennsylvania.
The inspection
consisted of document reviews, interviews, and observation of activities, and
the ~results have been discussed with Mr. Jay Doering, Superintendent of
Operations.
No violat' ions of NRC requirements were identified and no response is required.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the Public Document Room.
Your cooperation is appreciated.
pistaat, stMg,
k
Edward C. Wenzinger, Chief
'
Projects Branch No. 2
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-352/87-31
cc w/ encl:
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
G. M. Leitch, Vice President, Limerick Generating Station
Troy 6. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
W. M. Alden, Director, Licensing Section
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
8803220102 880308
ADOCK 05000352
O
OFFICIAL RECORD COPY
IR LIM 1 87-31 - 0001.0.0
03/04/88
)
hoi
l
i
///__
-
.
.
.
.--
.
.-
.
.
4
9 ..
- Philadelphia ' Electric Company
2
,.
48 MAR 1988
bec.w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
Jim Linville, Section Chief, DRP
Brent Clayton, EDO Office
Dick' Clark, NRR Project Manager
.,.
Tom Johnson, SRI, Peach Bottom
Bob Gramm, SRI, Limerick 2
,
.
i
R
P
L nville/rbl
Wenzinger
'
3/J/88
3/f788
,
!
0FFICIAL RECORD COPY
IR LIM 1 87-31 - 0002.0.0
03/04/88
.,
- - -
e,+-.
.
,y.
.,-, _,
e-,__.~yy.,e_--
- , ~ . . _ _
,,
_ . ,
,..,,,.,,,,,.,,,..,mw...,..,._.-.,___v
..y_ _ . _ . . , _ ,, ,-~,