ML20154D526: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _
9 VERMONT YANKEE NUCLEAR POWER CORPORATION I
RD 5. Box 169, Ferry Road, Brattleboro VT 05301
{
y y,,
cy ENGINEERING OFFICE 167' WORCESTER ROAD l
September 9, 1988 FRAmomMAss Amstus 01701 l
FVY 88-73 T6Lt*Moht 417-4904500 l
United States Nuclear Regulatory Comission Region I T
475 Allendale Road King of Prussia, PA 19406 Attention Mr. William J. Russell, Regional Administrator References (a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, NVY 88-154, USNRC to VYNPC, dated August 2, 1988
[
[
 
==Subject:==
Request for Plant-Specific Emergency Operating Procedures (EOPs)
[
Dear Sirt i
By letter, dated August 2,1988 (Reference (b)], you reo pat,ed that f
Vermont Yankee submit to the NRC, Region I our plant-specific Mergency Operating Procedures (EOPs) for use by the staf f during Incident Response l
Center activation.
In accordance with the subject request, this letter is to inform you that Vermont Yankee has placed Mr. R. Callo, Chief Operations Branch, Division of Reactor Safety. Region I on controlled copy distribution
[
for the Vermont Yankee E0Ps.
We trust that the above is satisfactory; however, should you have any f
questions or require further information concerning this matter, please
[
contact this office.
i l
Very truly yours.
l VERMONT YANKEE $' CLEAR POWER CORPORATION T a dyr4/
R. W. Cafstick f
f RWC/16.449 Licensing Engineer cci U.S. Nuclear Regulatory Comission Document Control Desk Washington, DC 20555 f
U.S. Nuclear Regulatory Comission Region I Nr. R. Callo U.S. Nuclear Regulatory Comission. Of fice of NRR Mr. V. Rooney, Vermont Yankee Project Manager j
l U.S. Nuclear Regulatory Comission f
l Resident Inspector - VYNPS 30 3*
,,1mnm%,
P i}}

Latest revision as of 01:15, 11 December 2024

Responds to 880802 Request for Submittal of plant-specific Emergency Operating Procedures for Use During Incident Response Ctr Activation.R Gallo Placed on Distribution List for Procedures
ML20154D526
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/09/1988
From: Capstick R
VERMONT YANKEE NUCLEAR POWER CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FVY-88-73, NUDOCS 8809150308
Download: ML20154D526 (1)


Text

_ _ _ _ _ _ _ _ _ _ _

9 VERMONT YANKEE NUCLEAR POWER CORPORATION I

RD 5. Box 169, Ferry Road, Brattleboro VT 05301

{

y y,,

cy ENGINEERING OFFICE 167' WORCESTER ROAD l

September 9, 1988 FRAmomMAss Amstus 01701 l

FVY 88-73 T6Lt*Moht 417-4904500 l

United States Nuclear Regulatory Comission Region I T

475 Allendale Road King of Prussia, PA 19406 Attention Mr. William J. Russell, Regional Administrator References (a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, NVY 88-154, USNRC to VYNPC, dated August 2, 1988

[

[

Subject:

Request for Plant-Specific Emergency Operating Procedures (EOPs)

[

Dear Sirt i

By letter, dated August 2,1988 (Reference (b)], you reo pat,ed that f

Vermont Yankee submit to the NRC, Region I our plant-specific Mergency Operating Procedures (EOPs) for use by the staf f during Incident Response l

Center activation.

In accordance with the subject request, this letter is to inform you that Vermont Yankee has placed Mr. R. Callo, Chief Operations Branch, Division of Reactor Safety. Region I on controlled copy distribution

[

for the Vermont Yankee E0Ps.

We trust that the above is satisfactory; however, should you have any f

questions or require further information concerning this matter, please

[

contact this office.

i l

Very truly yours.

l VERMONT YANKEE $' CLEAR POWER CORPORATION T a dyr4/

R. W. Cafstick f

f RWC/16.449 Licensing Engineer cci U.S. Nuclear Regulatory Comission Document Control Desk Washington, DC 20555 f

U.S. Nuclear Regulatory Comission Region I Nr. R. Callo U.S. Nuclear Regulatory Comission. Of fice of NRR Mr. V. Rooney, Vermont Yankee Project Manager j

l U.S. Nuclear Regulatory Comission f

l Resident Inspector - VYNPS 30 3*

,,1mnm%,

P i