ML20154P067: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20154P067 | | number = ML20154P067 | ||
| issue date = 04/28/1988 | | issue date = 04/28/1988 | ||
| title = Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants | | title = Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Complete | ||
| author name = Zech L | | author name = Zech L | ||
| author affiliation = NRC COMMISSION (OCM) | | author affiliation = NRC COMMISSION (OCM) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8806030194 | | document report number = NUDOCS 8806030194 | ||
| title reference date = 04-12-1988 | |||
| package number = ML20154N970 | | package number = ML20154N970 | ||
| document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS | | document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS | ||
| Line 19: | Line 20: | ||
{{#Wiki_filter:_ _ _ _ | {{#Wiki_filter:_ _ _ _ | ||
~ | ~ | ||
UNITED STATES | |||
[ | |||
[ | l NUCLE AR REGULATORY COMMISSION j | ||
o | |||
! ' kb I.. oi W ASHINGT ON, D. C. 20555 aN [/ | |||
y**..+ | |||
3- -{ygg | |||
/ 7'";~ 3 | |||
'Aldibb b ' | |||
y.n CHAIRMAN p ;l, f EWCS.U.SKR.C- | |||
-g | |||
William Kerr, Chairman Advisory Comittee on Reactorpafeguards FR0K: | *O | ||
, 1963 a | |||
N.c.mg,4[d kI 1 | |||
MEMORANDUM FOR: | |||
William Kerr, Chairman Advisory Comittee on Reactorpafeguards (F | |||
FR0K: | |||
Lando W. Zech, Jr. | |||
W. | |||
8 ACRS LETTER REGARDING REVIEW 0F SHUTDOWN NUCLEAR | |||
==SUBJECT:== | ==SUBJECT:== | ||
POWER PLANTS DATED APRIL 12, 1988 In the above subject letter, I was infomed that ACRS plans to review several nuclear power plants that have either been shutdown for an extended period and are now being considered for restart or have been delayed in initial startup for a longer period than usual. | |||
In the above subject letter, I was infomed that ACRS plans to review several nuclear power plants that have either been shutdown for an extended period and are now being considered for restart or have been delayed in initial startup for a longer period than usual. | |||
In scheduling these reviews, please coordinate closely with the Executive Director for Operation?s office to ensure that your review of these plants, such as Pilgrim and Peach Bottom, can be complete, and any concerns on these plants raised to Comission attention, sufficiently ahead of the date for a Commission vote on restart of these plants. | In scheduling these reviews, please coordinate closely with the Executive Director for Operation?s office to ensure that your review of these plants, such as Pilgrim and Peach Bottom, can be complete, and any concerns on these plants raised to Comission attention, sufficiently ahead of the date for a Commission vote on restart of these plants. | ||
cc: Comissioner Roberts Comissioner Bernthal Comissioner Carr | cc: Comissioner Roberts Comissioner Bernthal Comissioner Carr Comissioner Roberts EDO OGC SECY l | ||
EDO | l P | ||
l | l C | ||
8806030194 880525 PDR ADOCK 05000171 P | |||
C | PDR f f bb}} | ||
8806030194 880525 PDR | |||
Latest revision as of 23:39, 10 December 2024
| ML20154P067 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Pilgrim, 05000000 |
| Issue date: | 04/28/1988 |
| From: | Zech L NRC COMMISSION (OCM) |
| To: | Kerr W Advisory Committee on Reactor Safeguards |
| Shared Package | |
| ML20154N970 | List: |
| References | |
| NUDOCS 8806030194 | |
| Download: ML20154P067 (1) | |
Text
{{#Wiki_filter:_ _ _ _ ~ UNITED STATES [ l NUCLE AR REGULATORY COMMISSION j o ! ' kb I.. oi W ASHINGT ON, D. C. 20555 aN [/ y**..+ 3- -{ygg / 7'";~ 3 'Aldibb b ' y.n CHAIRMAN p ;l, f EWCS.U.SKR.C- -g
- O
, 1963 a N.c.mg,4[d kI 1 MEMORANDUM FOR: William Kerr, Chairman Advisory Comittee on Reactorpafeguards (F FR0K: Lando W. Zech, Jr. W. 8 ACRS LETTER REGARDING REVIEW 0F SHUTDOWN NUCLEAR
SUBJECT:
POWER PLANTS DATED APRIL 12, 1988 In the above subject letter, I was infomed that ACRS plans to review several nuclear power plants that have either been shutdown for an extended period and are now being considered for restart or have been delayed in initial startup for a longer period than usual. In scheduling these reviews, please coordinate closely with the Executive Director for Operation?s office to ensure that your review of these plants, such as Pilgrim and Peach Bottom, can be complete, and any concerns on these plants raised to Comission attention, sufficiently ahead of the date for a Commission vote on restart of these plants. cc: Comissioner Roberts Comissioner Bernthal Comissioner Carr Comissioner Roberts EDO OGC SECY l l P l C 8806030194 880525 PDR ADOCK 05000171 P PDR f f bb}}