ML20137W761: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
        *
*
    .,
.,
    5.'                                                                                                         l
5.'
    i
i
s
s
      .
.
                                                April 14, 1997                                                 I
April 14, 1997
                                                                                                                l
l
l
l
          EA97-160                                                                                             I
EA97-160
          Mr. Leon R. Eliason
Mr. Leon R. Eliason
          Chief Nuclear Officer and President
Chief Nuclear Officer and President
          Nuclear Business Unit                                                                               l
Nuclear Business Unit
          Public Service Electric and Gas Company
Public Service Electric and Gas Company
                                                                                                                l
Post Office Box 236
          Post Office Box 236
Hancocks Bridge, NJ 08038
          Hancocks Bridge, NJ 08038                                                                           l
SUBJECT:
                                                                                                                ;
NRC INTEGRATED INSPECTION REPORT 50-354/97-01
          SUBJECT:       NRC INTEGRATED INSPECTION REPORT 50-354/97-01                                       I
NOTICE OF VIOLATION
                          NOTICE OF VIOLATION
Dear Mr. Eliason:
                                                                                                                l
On March 17,1997, the NRC completed an inspection at your Hope Creek reactor facility.
          Dear Mr. Eliason:
The enclosed report presents the results of that inspection.
          On March 17,1997, the NRC completed an inspection at your Hope Creek reactor facility.
During the 6-week period covered by this inspection, your conduct of activities at the Hope
          The enclosed report presents the results of that inspection.                                         i
Creek facility was generally characterized by safety-conscious operations, sound
          During the 6-week period covered by this inspection, your conduct of activities at the Hope
i
          Creek facility was generally characterized by safety-conscious operations, sound                     i
maintenance practices, and careful radiological work controls. We were encouraged by
          maintenance practices, and careful radiological work controls. We were encouraged by                 I
some of the conclusions in the operations and maintenance areas, particularly regarding
          some of the conclusions in the operations and maintenance areas, particularly regarding             l
improved material conditions; the aggressive posture of your independent oversight groups;
          improved material conditions; the aggressive posture of your independent oversight groups;           I
and detailed self-assessment activities. While these latter two issues were considered
          and detailed self-assessment activities. While these latter two issues were considered
positively, the findings of these activities also indicated the need for continued
          positively, the findings of these activities also indicated the need for continued                   l
improvement in maintenance and operations.
          improvement in maintenance and operations.                                                           l
2
2
                                                                                                                !
We are concerned about two violations of NRC requirements that were identified. In the
                                                                                                                l
i
          We are concerned about two violations of NRC requirements that were identified. In the               i
first instance, NRC inspectors identified that the use and control of scaffolding in safety-
          first instance, NRC inspectors identified that the use and control of scaffolding in safety-         l
related areas of the plant was not in accordance with your station administrative
          related areas of the plant was not in accordance with your station administrative                   l
procedures. This violation is cited in the enclosed Notice of Violation, and the
          procedures. This violation is cited in the enclosed Notice of Violation, and the                     j
j
          circumstances surrounding the violation are described in detail in.the enclosed report.             '
circumstances surrounding the violation are described in detail in.the enclosed report.
          Please note that you are required to respond to this letter and should follow the
'
          instructions specified in the enclosed Notice when preparing your response. In the second
Please note that you are required to respond to this letter and should follow the
          instance, a repeat surveillance test failure of a testable check valve in the reactor core           I
instructions specified in the enclosed Notice when preparing your response. In the second
          isolation cooling system revealed ineffective corrective action implementation for previous
instance, a repeat surveillance test failure of a testable check valve in the reactor core
                                                                                                            /
isolation cooling system revealed ineffective corrective action implementation for previous
          like failures. This latter violation of 10 CFR 50 Appendix B, Criterion XVI, resulted in LER 9
/
          50-354/97-03-00 being submitted. Based on a review of the referenced LER, the                     ,/ l
like failures. This latter violation of 10 CFR 50 Appendix B, Criterion XVI, resulted in LER 9
          inspectors noted that your analysis and corrective actions for this event were appropriate. '        1
50-354/97-03-00 being submitted. Based on a review of the referenced LER, the
          As such, this violation is being treated as a cited violation not requiring a response. if,         I
,/
          however, you determine that a response is otherwise warranted for this violation, please             i
'
          note that you should follow the instructions specified in the enclosed Notice of Violation. A
inspectors noted that your analysis and corrective actions for this event were appropriate.
                                                                                                          /
1
                                                                                                            c0
As such, this violation is being treated as a cited violation not requiring a response. if,
                                                                                                        r
however, you determine that a response is otherwise warranted for this violation, please
                                                                                                                i
note that you should follow the instructions specified in the enclosed Notice of Violation. A c0
                                                                                                                l
/
            9704180206 970414                                                                                 i
r
            PDR     ADOCK 05000354                                                                             l
i
                                              -
9704180206 970414
                                                                          hlIlIllUI!!lllI,!lII,II,lbh
i
                                                                            ,               ,
PDR
ADOCK 05000354
-
hlIlIllUI!!lllI,!lII,II,lbh
,
,


.     ,
,
    .
.
  kO
.
  -
kO
        Mr. L. Eliason                                 2
-
        in accordance with 10 CFR 2.790 of the NRC's " Rules nf Practice," a copy of this letter
Mr. L. Eliason
        and its enclosures will be placed in the NRC Public Document Room (PDR).
2
                                                  Sincerely,
in accordance with 10 CFR 2.790 of the NRC's " Rules nf Practice," a copy of this letter
                                                  ORIGINAL SIGNED BY:
and its enclosures will be placed in the NRC Public Document Room (PDR).
                                                  James C. Linville, Chief
Sincerely,
                                                  Projects Branch 3
ORIGINAL SIGNED BY:
                                                  Division of Reactor Projects
James C. Linville, Chief
        Docket No.: 50-354
Projects Branch 3
        License No: NPF-57
Division of Reactor Projects
        Enclosures:   Notice of Violation
Docket No.: 50-354
                      Notice of Violation Not Requiring Response
License No: NPF-57
                      Inspection Report 50-354/97-01
Enclosures:
                                                                                                l
Notice of Violation
                                                                                                l
Notice of Violation Not Requiring Response
                                                                                                l
Inspection Report 50-354/97-01
                                                                                                1


        .                               _                       _ - . _ _ _
.
_
_ - . _ _ _
:
-
-
    :
.
  .
D.
D.
.
  .
Mr. L. Eliason
      Mr. L. Eliason                                 3
3
      cc w/enci:
cc w/enci:
      L. Storz, Senior Vice President - Nuclear Operations
L. Storz, Senior Vice President - Nuclear Operations
      E. Simpson, Senior Vice President - Nuclear Engineering
E. Simpson, Senior Vice President - Nuclear Engineering
      E. Salowitz, Director - Nuclear Business Support
E. Salowitz, Director - Nuclear Business Support
      A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.
A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.
      J. A. Isabella, Manager, Joint Generation
J. A. Isabella, Manager, Joint Generation
        Atlantic Electric
Atlantic Electric
      M. Bezilla, General Manager - Hope Creek Operations
M. Bezilla, General Manager - Hope Creek Operations
      J. Benjamin, Director - Quality Assurance & Nuclear Safety Review
J. Benjamin, Director - Quality Assurance & Nuclear Safety Review
      D. Powell, Manager - Licensing and Regulation
D. Powell, Manager - Licensing and Regulation
      R. Kankus, Joint Owner Affairs
R. Kankus, Joint Owner Affairs
      A. C. Tapert, Program Administrator
A. C. Tapert, Program Administrator
      Jeffrey J. Keenan, Esquire
Jeffrey J. Keenan, Esquire
      M. J. Wetterhahn, Esquire
M. J. Wetterhahn, Esquire
      Consumer Advocate, Office of Consumer Advocate
Consumer Advocate, Office of Consumer Advocate
      William Conklin, Public Safety Consultant, Lower Alloways Creek Township
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
      State of New Jersey
State of New Jersey
      State of Delaware
State of Delaware
                                                                                  1
1
                                                                                  1
1
                                                                                  l
l
                                                                                  i
i
                                                                                  l
!
                                                                                  !
i
                                                                                  i
l
                                                                                  l
r
                                                                                  r


                            . _ _ _ _ - . _ _                   _       _ _ _ - . _ . _ . . _ _ _ . . _
. _ _ _ _ - . _ _
                                                                                                  .                ._ ._         _         . . . . _ _               ._
_
              -
_ _ _ - . _ . _ . . _ _ _ . . _
, .
._ ._
:     ,    e         .
_
                '
. . . . _ _
._
.
-
, .
:
e
.
,
,
    t.   .
'
  t
t.
          ".          Mr. L. Eliason                                                                    4
.
,
,
".
Mr. L. Eliason
4
t
,
;
!
Distribution w/ encl:
.
'
Region I Docket Room (with concurrences)
W. Axelson, DRA
;
;
  !                    Distribution w/ encl:                                                                                                                              .
K. Gallagher, DRP
                                                                                                                                                                          '
j
                      Region I Docket Room (with concurrences)
D. Screnci, PAO (1)
                      W. Axelson, DRA
J. Linville, DRP
;                      K. Gallagher, DRP
j                     D. Screnci, PAO (1)
,
,
                      J. Linville, DRP
'
'
S. Barber, DRP
                      S. Barber, DRP
R. DePriest, DRP
                      R. DePriest, DRP
T. Dimitriadis, DRP
                      T. Dimitriadis, DRP
]
]                     Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
!                     NRC Resident Inspector
!
NRC Resident Inspector
PUBLIC
i
i
                      PUBLIC
F
F
;
;                     Distribution w/ encl: (Via E-Mail)
Distribution w/ encl: (Via E-Mail)
,                      W. Dean, OEDO
W. Dean, OEDO
l                     D. Jaffe, Project Manager, NRR
,
l
D. Jaffe, Project Manager, NRR
'
'
                      J. Stolz, PDI-2, NRR
J. Stolz, PDI-2, NRR
                      Inspection Program Branch, NRR (IPAS)
Inspection Program Branch, NRR (IPAS)
!                     R. Correia, NRR
!
j                     D. Taylor, NRR
R. Correia, NRR
j
D. Taylor, NRR
.
.
l
l
;
;
                                                                                                                                                                            1
e
e
:
:
Line 185: Line 212:
!
!
4
4
!
!
!
!
;
;
;
;
!
!
        DOCUMENT NAME: g:\ branch 3\970lrev.hc
DOCUMENT NAME: g:\\ branch 3\\970lrev.hc
'
'
        T3 receive a copy of this document, Indicate in the box: *C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure       *N" = No copy
T3 receive a copy of this document, Indicate in the box:
          OFFICE         Rl:DRP                 f/                                                             l
*C" = Copy without attachment / enclosure
}                                            _
"E" = Copy with attachment / enclosure
*N" = No copy
}
OFFICE
Rl:DRP
f/
l
_
4
4
          NAME           JLinville K                                                                                                                                       j
NAME
                                                U
JLinville K
          DATE            4/ A97
j
                              '
DATE
                                                                          OFFICIAL RECORD COPY
4/ A97
U
'
OFFICIAL RECORD COPY
i
i
                                                                                                                                                                            l
,
,
'
'
                                                            ._.         ,                       ,                         .                   . . . .
._.
,
,
.
. . . .
}}
}}

Latest revision as of 20:49, 11 December 2024

Forwards Insp Rept 50-354/97-01 on 970202-0317 & Notices of Violations,Apps a & B
ML20137W761
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/14/1997
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML20137W767 List:
References
EA-97-160, NUDOCS 9704180206
Download: ML20137W761 (4)


See also: IR 05000354/1997001

Text

.

.,

5.'

i

s

.

April 14, 1997

l

l

EA97-160

Mr. Leon R. Eliason

Chief Nuclear Officer and President

Nuclear Business Unit

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-354/97-01

NOTICE OF VIOLATION

Dear Mr. Eliason:

On March 17,1997, the NRC completed an inspection at your Hope Creek reactor facility.

The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Hope

Creek facility was generally characterized by safety-conscious operations, sound

i

maintenance practices, and careful radiological work controls. We were encouraged by

some of the conclusions in the operations and maintenance areas, particularly regarding

improved material conditions; the aggressive posture of your independent oversight groups;

and detailed self-assessment activities. While these latter two issues were considered

positively, the findings of these activities also indicated the need for continued

improvement in maintenance and operations.

2

We are concerned about two violations of NRC requirements that were identified. In the

i

first instance, NRC inspectors identified that the use and control of scaffolding in safety-

related areas of the plant was not in accordance with your station administrative

procedures. This violation is cited in the enclosed Notice of Violation, and the

j

circumstances surrounding the violation are described in detail in.the enclosed report.

'

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. In the second

instance, a repeat surveillance test failure of a testable check valve in the reactor core

isolation cooling system revealed ineffective corrective action implementation for previous

/

like failures. This latter violation of 10 CFR 50 Appendix B, Criterion XVI, resulted in LER 9

50-354/97-03-00 being submitted. Based on a review of the referenced LER, the

,/

'

inspectors noted that your analysis and corrective actions for this event were appropriate.

1

As such, this violation is being treated as a cited violation not requiring a response. if,

however, you determine that a response is otherwise warranted for this violation, please

note that you should follow the instructions specified in the enclosed Notice of Violation. A c0

/

r

i

9704180206 970414

i

PDR

ADOCK 05000354

-

hlIlIllUI!!lllI,!lII,II,lbh

,

,

,

.

.

kO

-

Mr. L. Eliason

2

in accordance with 10 CFR 2.790 of the NRC's " Rules nf Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

ORIGINAL SIGNED BY:

James C. Linville, Chief

Projects Branch 3

Division of Reactor Projects

Docket No.: 50-354

License No: NPF-57

Enclosures:

Notice of Violation

Notice of Violation Not Requiring Response

Inspection Report 50-354/97-01

.

_

_ - . _ _ _

-

.

D.

.

Mr. L. Eliason

3

cc w/enci:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

M. Bezilla, General Manager - Hope Creek Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager - Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. C. Tapert, Program Administrator

Jeffrey J. Keenan, Esquire

M. J. Wetterhahn, Esquire

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

State of New Jersey

State of Delaware

1

1

l

i

!

i

l

r

. _ _ _ _ - . _ _

_

_ _ _ - . _ . _ . . _ _ _ . . _

._ ._

_

. . . . _ _

._

.

-

, .

e

.

,

'

t.

.

,

".

Mr. L. Eliason

4

t

,

!

Distribution w/ encl:

.

'

Region I Docket Room (with concurrences)

W. Axelson, DRA

K. Gallagher, DRP

j

D. Screnci, PAO (1)

J. Linville, DRP

,

'

S. Barber, DRP

R. DePriest, DRP

T. Dimitriadis, DRP

]

Nuclear Safety Information Center (NSIC)

!

NRC Resident Inspector

PUBLIC

i

F

Distribution w/ encl: (Via E-Mail)

W. Dean, OEDO

,

l

D. Jaffe, Project Manager, NRR

'

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

!

R. Correia, NRR

j

D. Taylor, NRR

.

l

e

!

]

!

4

!

!

!

DOCUMENT NAME: g:\\ branch 3\\970lrev.hc

'

T3 receive a copy of this document, Indicate in the box:

  • C" = Copy without attachment / enclosure

"E" = Copy with attachment / enclosure

  • N" = No copy

}

OFFICE

Rl:DRP

f/

l

_

4

NAME

JLinville K

j

DATE

4/ A97

U

'

OFFICIAL RECORD COPY

i

,

'

._.

,

,

.

. . . .