ML20162A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC INSPECTION MANUAL                                                 IRIB INSPECTION MANUAL CHAPTER 2515 APPENDIX C SPECIAL AND INFREQUENTLY PERFORMED INSPECTIONS This appendix lists inspection procedures that are implemented infrequently for special situations. These inspections may be implemented in response to events, infrequent major activities at nuclear power plants, to evaluate emergent technical issues not related to licensee performance, to fulfill NRCs obligations under domestic interagency memoranda of understanding, or to implement the requirements of 10 CFR Part 75 for treaties between the United States and the International Atomic Energy Agency.
{{#Wiki_filter:Issue Date: 07/31/20 1
2515 Appendix C NRC INSPECTION MANUAL IRIB INSPECTION MANUAL CHAPTER 2515 APPENDIX C SPECIAL AND INFREQUENTLY PERFORMED INSPECTIONS This appendix lists inspection procedures that are implemented infrequently for special situations. These inspections may be implemented in response to events, infrequent major activities at nuclear power plants, to evaluate emergent technical issues not related to licensee performance, to fulfill NRCs obligations under domestic interagency memoranda of understanding, or to implement the requirements of 10 CFR Part 75 for treaties between the United States and the International Atomic Energy Agency.
These inspections are not part of the baseline or supplemental inspection program elements and Regional Administrator authorization is required for their implementation (see exception below).
These inspections are not part of the baseline or supplemental inspection program elements and Regional Administrator authorization is required for their implementation (see exception below).
This appendix also lists IPs for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants. The implementation of ISFSI procedures listed in this manual chapter does not require authorization from the Regional Administrator. IMC 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at ISFSIs, lists IPs for inspecting ISFSIs at other than operating plants.
This appendix also lists IPs for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants. The implementation of ISFSI procedures listed in this manual chapter does not require authorization from the Regional Administrator. IMC 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at ISFSIs, lists IPs for inspecting ISFSIs at other than operating plants.
Each inspection procedure in the table below will be reviewed in accordance with the periodicity and process specified in Inspection Manual Chapter (IMC) 0040, Preparing, Revising and Issuing Documents for the NRC Inspection Manual. IMC 0307, Appendix A, Reactor Oversight Process Self-Assessment Metrics and Data Trending is used to assess the conduct of this review. [C1]
Each inspection procedure in the table below will be reviewed in accordance with the periodicity and process specified in Inspection Manual Chapter (IMC) 0040, Preparing, Revising and Issuing Documents for the NRC Inspection Manual. IMC 0307, Appendix A, Reactor Oversight Process Self-Assessment Metrics and Data Trending is used to assess the conduct of this review. [C1]
Number                                 Inspection Procedure Title Inspections of 10 CFR Part 21 and Programs for Reporting Defects and 36100 Noncompliance 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, 37060 Systems, and Components Inspection 40100     Independent Safety Culture Assessment Follow-up 41500     Training and Qualification Effectiveness 43004     Inspection of Commercial-Grade Dedication Programs 50001     Steam Generator Replacement Inspection 50003     Pressurizer Replacement Inspection 52003     Digital Instrumentation & Control Modification Inspection 60715     Spent Fuel Safety at Operating Reactors 60845     Operation of Intra-Unit Fuel Transfer Canister and Cask System 60854.1     Preoperational Testing of ISFSIs at Operating Plants 60855.1     Operation of an ISFSI at Operating Plants 60856.1     Review of 10 CFR 72.212(b) Evaluations at Operating Plants Issue Date: 07/31/20                              1                              2515 Appendix C
Number Inspection Procedure Title 36100 Inspections of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance 37060 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 40100 Independent Safety Culture Assessment Follow-up 41500 Training and Qualification Effectiveness 43004 Inspection of Commercial-Grade Dedication Programs 50001 Steam Generator Replacement Inspection 50003 Pressurizer Replacement Inspection 52003 Digital Instrumentation & Control Modification Inspection 60715 Spent Fuel Safety at Operating Reactors 60845 Operation of Intra-Unit Fuel Transfer Canister and Cask System 60854.1 Preoperational Testing of ISFSIs at Operating Plants 60855.1 Operation of an ISFSI at Operating Plants 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants  


Number                               Inspection Procedure Title 71003   Post-Approval Site Inspection For License Renewal 71004   Power Uprate 71007   Reactor Vessel Head Replacement Inspection 71150   Discrepant or Unreported Performance Indicator Data 81311   Physical Security Requirements for Independent Spent Fuel Storage Installations Follow-up on Traditional Enforcement Actions Including Violations, Deviations, 92702    Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 92709   Licensee Strike Contingency Plans 92711   Continued Implementation of Strike Plans During an Extended Strike 92712   Resumption of Normal Operations After a Strike Follow up Inspection for Any Severity Level I or II Traditional Enforcement 92722    Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12 Month Period Follow up Inspection for Three or More Severity Level IV Traditional Enforcement 92723 Violations in the Same Area in a 12 Month Period 93002   Managing Fatigue 93100   Safety Conscious Working Environment Issue Follow-up 93800   Augmented Inspection Team 93812   Special Inspection Issue Date: 07/31/20                          2                                2515 Appendix C
Issue Date: 07/31/20 2
2515 Appendix C Number Inspection Procedure Title 71003 Post-Approval Site Inspection For License Renewal 71004 Power Uprate 71007 Reactor Vessel Head Replacement Inspection 71150 Discrepant or Unreported Performance Indicator Data 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations 92702 Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 92709 Licensee Strike Contingency Plans 92711 Continued Implementation of Strike Plans During an Extended Strike 92712 Resumption of Normal Operations After a Strike 92722 Follow up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12 Month Period 92723 Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period 93002 Managing Fatigue 93100 Safety Conscious Working Environment Issue Follow-up 93800 Augmented Inspection Team 93812 Special Inspection  


Attachment 1 - Revision History for IMC 2515 Appendix C Commitment       Accession     Description of Change                                     Description Comment Tracking        Number                                                                  of Training Resolution and Number          Issue Date                                                              Required    Closed Feedback Change Notice                                                            and        Form Accession Completion  Number (Pre-Date        Decisional, Non-Public Information)
Issue Date: 07/31/20 Att1-1 2515 Appendix C - Revision History for IMC 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)
N/A             10/28/93     Initial issuance                                           No         N/A N/A             09/08/97     Revised to update existing guidance on the use of PRA in   No         N/A CN 97-014    the inspection program N/A             04/03/00     Revised reactor oversight process                         No         N/A CN 00-003 N/A             04/04/00     Revised to include IP 92050 for use by Region II in the   No          N/A CN 00-005    inspection of Browns Ferry 1, Watts Bar 2, and Bellefonte plants.
N/A 10/28/93 Initial issuance No N/A N/A 09/08/97 CN 97-014 Revised to update existing guidance on the use of PRA in the inspection program No N/A N/A 04/03/00 CN 00-003 Revised reactor oversight process No N/A N/A 04/04/00 CN 00-005 Revised to include IP 92050 for use by Region II in the inspection of Browns Ferry 1, Watts Bar 2, and Bellefonte plants.
N/A             09/12/00     Revised to include three procedures that were part of the No          N/A CN 00-028    previous inspection program and are expected to be implemented infrequently in the current inspection program. They are IP 50001, "Steam Generator Replacement Inspection," IP 92050, "Review of Quality Assurance For Extended Construction Delay," and IP 36100, "10 CFR Part 21 Inspections at Nuclear Power Reactors."
No N/A N/A 09/12/00 CN 00-028 Revised to include three procedures that were part of the previous inspection program and are expected to be implemented infrequently in the current inspection program. They are IP 50001, "Steam Generator Replacement Inspection," IP 92050, "Review of Quality Assurance For Extended Construction Delay," and IP 36100, "10 CFR Part 21 Inspections at Nuclear Power Reactors."
N/A             03/06/01     Revised to add IP 60853, "On-Site Fabrication of           No          N/A CN 06-006    Components and Construction of an ISFSI" N/A             10/22/02     Revised to list Independent Spent Fuel Storage (ISFSI)     No          N/A CN 02-038    Installation inspection procedures that are funded for NRR inspections at operating reactor sites.
No N/A N/A 03/06/01 CN 06-006 Revised to add IP 60853, "On-Site Fabrication of Components and Construction of an ISFSI" No N/A N/A 10/22/02 CN 02-038 Revised to list Independent Spent Fuel Storage (ISFSI)
N/A             12/09/02     Revised to include the addition of IP 71003               No         N/A CN 02-044 Issue Date: 07/31/20                                      Att1-1                                        2515 Appendix C
Installation inspection procedures that are funded for NRR inspections at operating reactor sites.
No N/A N/A 12/09/02 CN 02-044 Revised to include the addition of IP 71003 No N/A  


Commitment       Accession     Description of Change                                     Description Comment Tracking        Number                                                                  of Training Resolution and Number          Issue Date                                                              Required    Closed Feedback Change Notice                                                            and        Form Accession Completion  Number (Pre-Date        Decisional, Non-Public Information)
Issue Date: 07/31/20 Att1-2 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)
N/A             ML023510036   Revised to include IP 71007, "Reactor Vessel Head         No         N/A 02/12/03      Replacement Inspection" CN 03-003 N/A              ML041280021  Revised to include Inspection Procedures for inspecting   No          N/A 05/06/04      Independent Spent Fuel Storage Installations (ISFSIs) at CN 04-011    operating plants as well as to add Inspection Procedures 71004 and 71005.
N/A ML023510036 02/12/03 CN 03-003 Revised to include IP 71007, "Reactor Vessel Head Replacement Inspection" No N/A N/A ML041280021 05/06/04 CN 04-011 Revised to include Inspection Procedures for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants as well as to add Inspection Procedures 71004 and 71005.
N/A             ML050340593   Revised to add inspection procedure 41500, Training and   No          N/A 01/27/05      Qualification Effectiveness. This is to allow for cause CN 05-004    inspections when it becomes necessary to augment activities in accordance with 10 CFR Part 55, 10 CFR 50.120, and program office guidance when necessary to ensure safe plant operation.
No N/A N/A ML050340593 01/27/05 CN 05-004 Revised to add inspection procedure 41500, Training and Qualification Effectiveness. This is to allow for cause inspections when it becomes necessary to augment activities in accordance with 10 CFR Part 55, 10 CFR 50.120, and program office guidance when necessary to ensure safe plant operation.
N/A             ML052010057   Revised to add IP 50003, "Pressurizer Replacement         No          N/A 07/07/05      Inspections." This procedure is to be implemented to CN 05-018    monitor licensees safety-related activities related to the removal and replacement of a pressurizer at operating reactor facilities.
No N/A N/A ML052010057 07/07/05 CN 05-018 Revised to add IP 50003, "Pressurizer Replacement Inspections." This procedure is to be implemented to monitor licensees safety-related activities related to the removal and replacement of a pressurizer at operating reactor facilities.
N/A             ML072820557   Added IP 92702 to the list of Special and Infrequently     No         N/A 01/10/08      Performed Inspections.
No N/A N/A ML072820557 01/10/08 CN 08-001 Added IP 92702 to the list of Special and Infrequently Performed Inspections.
CN 08-001 N/A              ML091490141  Added IP 92722 and IP 92723 to the list of Special and     No         N/A 08/11/09     Infrequently Performed Inspections CN 09-020 N/A              ML092300225  Added IP 52003 and IP 93002 to the list of Special and     No          N/A 11/09/09      Infrequently Performed Inspections and deleted IP 71005 CN 09-026    (previously deleted procedure).
No N/A N/A ML091490141 08/11/09 CN 09-020 Added IP 92722 and IP 92723 to the list of Special and Infrequently Performed Inspections No N/A N/A ML092300225 11/09/09 CN 09-026 Added IP 52003 and IP 93002 to the list of Special and Infrequently Performed Inspections and deleted IP 71005 (previously deleted procedure).
Issue Date: 07/31/20                                    Att1-2                                          2515 Appendix C
No N/A


Commitment       Accession     Description of Change                                       Description Comment Tracking        Number                                                                    of Training Resolution and Number          Issue Date                                                                Required    Closed Feedback Change Notice                                                            and        Form Accession Completion  Number (Pre-Date        Decisional, Non-Public Information)
Issue Date: 07/31/20 Att1-3 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)
N/A             ML102590503   Added IP 37060, IP 40100, IP 71150 and IP 93100 to the     No          N/A 10/21/11      list of Special and Infrequently Performed Inspections.
N/A ML102590503 10/21/11 CN 11-021 Added IP 37060, IP 40100, IP 71150 and IP 93100 to the list of Special and Infrequently Performed Inspections.
CN 11-021    IP 71150 is effective as an IMC 2515 Appendix C inspection as of January 1, 2012.
IP 71150 is effective as an IMC 2515 Appendix C inspection as of January 1, 2012.
N/A             ML12083A288  Added IP 60845                                              No          N/A 04/26/12 CN 12-007 ML13064A441  Added IP 43004 and IP 71013                                No         N/A 09/25/13 CN 13-023 ML14154A120   Clarifies requirements to show that Regional Administrator No          2515C-1820 06/11/14      approval is not required to perform ISFSI procedures CN 14-012    listed in this manual chapter appendix.
No N/A N/A ML12083A288 04/26/12 CN 12-007 Added IP 60845 No N/A ML13064A441 09/25/13 CN 13-023 Added IP 43004 and IP 71013 No N/A ML14154A120 06/11/14 CN 14-012 Clarifies requirements to show that Regional Administrator approval is not required to perform ISFSI procedures listed in this manual chapter appendix.
N/A             ML15167A079   Revised to add IP 60715, Reserved for: Spent Fuel Safety   No          2515C-2123 06/24/15      at Operating Reactors, clarify introductory text, and                   ML15175A204 CN 15-012    incorporate recommendations in FBF-2515C-2123.
No 2515C-1820 N/A ML15167A079 06/24/15 CN 15-012 Revised to add IP 60715, Reserved for: Spent Fuel Safety at Operating Reactors, clarify introductory text, and incorporate recommendations in FBF-2515C-2123.
C1  
No 2515C-2123 ML15175A204 C1  


==Reference:==
==Reference:==
ML19085A407   Revised to reflect requirement for consistent and periodic No          ML19085A425 Corrective      05/01/19      reviews of inspection procedures. This action satisfies Action from      CN 19-014    Recommendation 1 from OIG-18-A-13, Audit of NRCs OIG-18-A-13                    Special and Infrequently Performed Inspections.
Corrective Action from OIG-18-A-13 ML18136A734 ML19085A407 05/01/19 CN 19-014 Revised to reflect requirement for consistent and periodic reviews of inspection procedures. This action satisfies Recommendation 1 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections.
ML18136A734 Additionally, revised to remove procedures that were determined to no longer be warranted due to inclusion of relevant portions in other procedures, completion of program, or prior procedure deletion. This action satisfies Recommendation 3 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections Issue Date: 07/31/20                                      Att1-3                                          2515 Appendix C
Additionally, revised to remove procedures that were determined to no longer be warranted due to inclusion of relevant portions in other procedures, completion of program, or prior procedure deletion. This action satisfies Recommendation 3 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections No ML19085A425


Commitment       Accession     Description of Change                                     Description Comment Tracking        Number                                                                  of Training Resolution and Number          Issue Date                                                              Required    Closed Feedback Change Notice                                                          and        Form Accession Completion  Number (Pre-Date        Decisional, Non-Public Information)
Issue Date: 07/31/20 Att1-4 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)
C1  
C1  


==Reference:==
==Reference:==
ML20162A098   Editorial update was made to reflect that the requirement No          N/A Corrective      07/31/20      to conduct periodic reviews associated with Action from      CN 20-036    Commitment 1 will reside in IMC 0040.
Corrective Action from OIG-18-A-13 ML18136A734 ML20162A098 07/31/20 CN 20-036 Editorial update was made to reflect that the requirement to conduct periodic reviews associated with Commitment 1 will reside in IMC 0040.
OIG-18-A-13 ML18136A734 Issue Date: 07/31/20                                    Att1-4                                        2515 Appendix C}}
No N/A}}

Latest revision as of 20:40, 10 December 2024

IMC 2515 Appendix C Special and Infrequently Performed Inspections
ML20162A098
Person / Time
Issue date: 07/31/2020
From: Cauffman C
NRC/NRR/DRO/IRIB
To:
Cauffman C
Shared Package
ML20211L776 List:
References
CN 20-036
Download: ML20162A098 (6)


Text

Issue Date: 07/31/20 1

2515 Appendix C NRC INSPECTION MANUAL IRIB INSPECTION MANUAL CHAPTER 2515 APPENDIX C SPECIAL AND INFREQUENTLY PERFORMED INSPECTIONS This appendix lists inspection procedures that are implemented infrequently for special situations. These inspections may be implemented in response to events, infrequent major activities at nuclear power plants, to evaluate emergent technical issues not related to licensee performance, to fulfill NRCs obligations under domestic interagency memoranda of understanding, or to implement the requirements of 10 CFR Part 75 for treaties between the United States and the International Atomic Energy Agency.

These inspections are not part of the baseline or supplemental inspection program elements and Regional Administrator authorization is required for their implementation (see exception below).

This appendix also lists IPs for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants. The implementation of ISFSI procedures listed in this manual chapter does not require authorization from the Regional Administrator. IMC 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at ISFSIs, lists IPs for inspecting ISFSIs at other than operating plants.

Each inspection procedure in the table below will be reviewed in accordance with the periodicity and process specified in Inspection Manual Chapter (IMC) 0040, Preparing, Revising and Issuing Documents for the NRC Inspection Manual. IMC 0307, Appendix A, Reactor Oversight Process Self-Assessment Metrics and Data Trending is used to assess the conduct of this review. [C1]

Number Inspection Procedure Title 36100 Inspections of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance 37060 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 40100 Independent Safety Culture Assessment Follow-up 41500 Training and Qualification Effectiveness 43004 Inspection of Commercial-Grade Dedication Programs 50001 Steam Generator Replacement Inspection 50003 Pressurizer Replacement Inspection 52003 Digital Instrumentation & Control Modification Inspection 60715 Spent Fuel Safety at Operating Reactors 60845 Operation of Intra-Unit Fuel Transfer Canister and Cask System 60854.1 Preoperational Testing of ISFSIs at Operating Plants 60855.1 Operation of an ISFSI at Operating Plants 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants

Issue Date: 07/31/20 2

2515 Appendix C Number Inspection Procedure Title 71003 Post-Approval Site Inspection For License Renewal 71004 Power Uprate 71007 Reactor Vessel Head Replacement Inspection 71150 Discrepant or Unreported Performance Indicator Data 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations 92702 Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 92709 Licensee Strike Contingency Plans 92711 Continued Implementation of Strike Plans During an Extended Strike 92712 Resumption of Normal Operations After a Strike 92722 Follow up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12 Month Period 92723 Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period 93002 Managing Fatigue 93100 Safety Conscious Working Environment Issue Follow-up 93800 Augmented Inspection Team 93812 Special Inspection

Issue Date: 07/31/20 Att1-1 2515 Appendix C - Revision History for IMC 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)

N/A 10/28/93 Initial issuance No N/A N/A 09/08/97 CN 97-014 Revised to update existing guidance on the use of PRA in the inspection program No N/A N/A 04/03/00 CN 00-003 Revised reactor oversight process No N/A N/A 04/04/00 CN 00-005 Revised to include IP 92050 for use by Region II in the inspection of Browns Ferry 1, Watts Bar 2, and Bellefonte plants.

No N/A N/A 09/12/00 CN 00-028 Revised to include three procedures that were part of the previous inspection program and are expected to be implemented infrequently in the current inspection program. They are IP 50001, "Steam Generator Replacement Inspection," IP 92050, "Review of Quality Assurance For Extended Construction Delay," and IP 36100, "10 CFR Part 21 Inspections at Nuclear Power Reactors."

No N/A N/A 03/06/01 CN 06-006 Revised to add IP 60853, "On-Site Fabrication of Components and Construction of an ISFSI" No N/A N/A 10/22/02 CN 02-038 Revised to list Independent Spent Fuel Storage (ISFSI)

Installation inspection procedures that are funded for NRR inspections at operating reactor sites.

No N/A N/A 12/09/02 CN 02-044 Revised to include the addition of IP 71003 No N/A

Issue Date: 07/31/20 Att1-2 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)

N/A ML023510036 02/12/03 CN 03-003 Revised to include IP 71007, "Reactor Vessel Head Replacement Inspection" No N/A N/A ML041280021 05/06/04 CN 04-011 Revised to include Inspection Procedures for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants as well as to add Inspection Procedures 71004 and 71005.

No N/A N/A ML050340593 01/27/05 CN 05-004 Revised to add inspection procedure 41500, Training and Qualification Effectiveness. This is to allow for cause inspections when it becomes necessary to augment activities in accordance with 10 CFR Part 55, 10 CFR 50.120, and program office guidance when necessary to ensure safe plant operation.

No N/A N/A ML052010057 07/07/05 CN 05-018 Revised to add IP 50003, "Pressurizer Replacement Inspections." This procedure is to be implemented to monitor licensees safety-related activities related to the removal and replacement of a pressurizer at operating reactor facilities.

No N/A N/A ML072820557 01/10/08 CN 08-001 Added IP 92702 to the list of Special and Infrequently Performed Inspections.

No N/A N/A ML091490141 08/11/09 CN 09-020 Added IP 92722 and IP 92723 to the list of Special and Infrequently Performed Inspections No N/A N/A ML092300225 11/09/09 CN 09-026 Added IP 52003 and IP 93002 to the list of Special and Infrequently Performed Inspections and deleted IP 71005 (previously deleted procedure).

No N/A

Issue Date: 07/31/20 Att1-3 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)

N/A ML102590503 10/21/11 CN 11-021 Added IP 37060, IP 40100, IP 71150 and IP 93100 to the list of Special and Infrequently Performed Inspections.

IP 71150 is effective as an IMC 2515 Appendix C inspection as of January 1, 2012.

No N/A N/A ML12083A288 04/26/12 CN 12-007 Added IP 60845 No N/A ML13064A441 09/25/13 CN 13-023 Added IP 43004 and IP 71013 No N/A ML14154A120 06/11/14 CN 14-012 Clarifies requirements to show that Regional Administrator approval is not required to perform ISFSI procedures listed in this manual chapter appendix.

No 2515C-1820 N/A ML15167A079 06/24/15 CN 15-012 Revised to add IP 60715, Reserved for: Spent Fuel Safety at Operating Reactors, clarify introductory text, and incorporate recommendations in FBF-2515C-2123.

No 2515C-2123 ML15175A204 C1

Reference:

Corrective Action from OIG-18-A-13 ML18136A734 ML19085A407 05/01/19 CN 19-014 Revised to reflect requirement for consistent and periodic reviews of inspection procedures. This action satisfies Recommendation 1 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections.

Additionally, revised to remove procedures that were determined to no longer be warranted due to inclusion of relevant portions in other procedures, completion of program, or prior procedure deletion. This action satisfies Recommendation 3 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections No ML19085A425

Issue Date: 07/31/20 Att1-4 2515 Appendix C Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)

C1

Reference:

Corrective Action from OIG-18-A-13 ML18136A734 ML20162A098 07/31/20 CN 20-036 Editorial update was made to reflect that the requirement to conduct periodic reviews associated with Commitment 1 will reside in IMC 0040.

No N/A