AUG 311984 MEMORANDUM FOR: James G. Keppler, Regional Administrator FROM:
: p. ,            ,
R. L. Spessard, Director, Division of Reactor Safety
AUG 311984 MEMORANDUM FOR: James G. Keppler, Regional Administrator FROM:             R. L. Spessard, Director, Division of Reactor Safety


==SUBJECT:==
==SUBJECT:==
QUARTERLY REPORT OF OPERATOR LICENSING ACTIVITIES THIRD QUARTER FY 84                                       ,
QUARTERLY REPORT OF OPERATOR LICENSING ACTIVITIES THIRD QUARTER FY 84 This is the report of the Operator Licensing Section activities for the third quarter of FY 84. Attached are the two sections which comprise this report. - FY 84 Budget Estimates vs. Examinations Administered to Date - Results of Examinations by Facility - 3rd Quarter FY 84 In my memorandum of May 16, 1984, I provided you with a different version of of the Quarterly Report. A copy of that version is included as to this report.
This is the report of the Operator Licensing Section activities for the third quarter of FY 84. Attached are the two sections which comprise this report.
You will note that we have again changed the format of this section of the report. The reason for this change is as follows:
Attachment 1 - FY 84 Budget Estimates vs. Examinations Administered to Date Attachment 2 - Results of Examinations by Facility - 3rd Quarter FY 84 In my memorandum of May 16, 1984, I provided you with a different version of Attachment 1 of the Quarterly Report. A copy of that version is included as Attachment 3 to this report. You will note that we have again changed the format of this section of the report. The reason for this change is as follows:
1.
: 1. The operating plan for FY 85 will track the operator licensing effort in this same manner, i.e., Number of Budgeted Exams vs. Number of Exams Administered.
The operating plan for FY 85 will track the operator licensing effort in this same manner, i.e., Number of Budgeted Exams vs. Number of Exams Administered.
: 2. The difficulties with presenting information in the format of the May 16th version, without numerous notes to explain the changes as noted below.
2.
Since the examinations are administered to candidates on schedules established by utility personnel it sometimes requires extensive notes to explain the changes to these figures. Examples of some of these changes in the past three months are as follows.
The difficulties with presenting information in the format of the May 16th version, without numerous notes to explain the changes as noted below.
Initial:             Although we only had 12 exams scheduled for the final six months of FY 84 we will administer approximately 20 examinations in this category during the last three months of FY 84   These changes are due to requests from Byron and Fermi to comply with NRC requirements and retakes of examinations of candidates who previously failed.
Since the examinations are administered to candidates on schedules established by utility personnel it sometimes requires extensive notes to explain the changes to these figures.
Replacement:         Sixty-nine examinations were scheduled and as of this date we have had cre utility change the examination date to Ff 85. Several others have reduced the number of candidates as a result of their internal audits of candidates.
Examples of some of these changes in the past three months are as follows.
y72         2 g5gggg HARTMAN84-236     PDR.                                       <
Initial:
Although we only had 12 exams scheduled for the final six months of FY 84 we will administer approximately 20 examinations in this category during the last three months of FY 84 These changes are due to requests from Byron and Fermi to comply with NRC requirements and retakes of examinations of candidates who previously failed.
Replacement:
Sixty-nine examinations were scheduled and as of this date we have had cre utility change the examination date to Ff 85.
Several others have reduced the number of candidates as a result of their internal audits of candidates.
y72 2 g5gggg HARTMAN84-236 PDR.


4'- ,    ,
4'-
James G. Keppler                         2 Requalification:     The number of examinations administered in this category is dependent upon the utility schedule and the number of operators in any particular requalification class. In addition, since our primary objective is to assure adequate licensed personnel for operation, requalification examina-tions can only be performed when we have resources available, therefore, it is very difficult to predict the number of exams that will be administered over an extended period of time.
James G. Keppler 2
Certification:       At-the present time we do not have any additional certifi-cation examinations scheduled for this FY. Commonwealth Edison Production Training Center has postponed their examinations and no new date has been established.
Requalification:
Non-Power:           The number of examinations administered during the reporting period, changed because of additional requests from Universities. These additional requests were necessary because of failures by original candidates and unexpected attrition.
The number of examinations administered in this category is dependent upon the utility schedule and the number of operators in any particular requalification class.
In addition, since our primary objective is to assure adequate licensed personnel for operation, requalification examina-tions can only be performed when we have resources available, therefore, it is very difficult to predict the number of exams that will be administered over an extended period of time.
Certification:
At-the present time we do not have any additional certifi-cation examinations scheduled for this FY. Commonwealth Edison Production Training Center has postponed their examinations and no new date has been established.
Non-Power:
The number of examinations administered during the reporting period, changed because of additional requests from Universities. These additional requests were necessary because of failures by original candidates and unexpected attrition.
In addition to the activities reflected in the attachments, Region III examiners assisted in the administration of examinations at Comanche Peak and attended an item writing workshop in Region II.
In addition to the activities reflected in the attachments, Region III examiners assisted in the administration of examinations at Comanche Peak and attended an item writing workshop in Region II.
                                                      " Original SIsr.cd by P..L. Cp:.c.. -
" Original SIsr.cd by P..L. Cp:.c.. -
R. L. Spessard, Director Division of Reactor Safety Attachments: As stated cc w/attachs:
R. L. Spessard, Director Division of Reactor Safety Attachments: As stated cc w/attachs:
C. E. Norelius
C. E. Norelius


b-   -
b-ATTACHMENT 1 FY 84 Budget Estimates vs. Examinations Administered to Date Type of Budget Target
ATTACHMENT 1 FY 84 Budget Estimates vs. Examinations Administered to Date Type of               Budget           Target
* Completed Exam Estimates FY 84 9 months FY 84 Initial 200 127 115 Replacement 130 204 175 Recualification 75 42 30 Certification 60 55 39 "
* Completed Exam                 Estimates           FY 84             9 months FY 84 Initial                 200             127                     115 Replacement               130             204                     175 Recualification             75             42                       30 Certification               60             55                     39 "
Non-Power 32 20 18
Non-Power                   32             20                       18
* Based or utility response to Generic Letter 83-01 9
* Based or utility response to Generic Letter 83-01 9
: y. _
ATTACHMENT 2 Results of Examinations by Facility 3rd Quarter FY 84 Type of        Number    Number      Percent Facility                    Examination    Examined    Passed      Passed LaSalle                        SR0            2          2        100%
R0            5          2        40%
Kewaunee                        SR0            1          1      "1001-R0            2          2        1001 Requal          3          3        100%
Production Training          Instructor Center, Comonwealth        Certificatiens      9          4        44%
Edison Pc. int Beach                  SRO            2          2        1001 D. C. Cook                      SRO            1          1        1001 RC            3          3        1001
                                    -    Requal.          9          3        33C Dresder.                        SPO            E          4        80i FC            4          4        1001 Palisades                      SRO            1          1        100%
PO            3          3        100' Instructor Certi#icctiens      6          4        675.
Moriticell e                    SR0              E          5        1001 RO            6          5        83' Ur.iv. of Missouri              SPD              2          1          50i R0            3          2        66%


ATTA.CliflU!l 3
y.
                                                                                                                                .              y
ATTACHMENT 2 Results of Examinations by Facility 3rd Quarter FY 84 Type of Number Number Percent Facility Examination Examined Passed Passed LaSalle SR0 2
                                                                      -                                                                        D rkioarl iY 1984 ,(No.     __of_f,xams,}: ,
2 100%
Burigo t*                 83-01         5therfulcri           Comple tori     Scheduled   Target n of Exam                   Es t. ima tes             Ror.ponto       r, months             First 6 months Last 6 months FY 84 i t.ial                         200                   159     ~
R0 5
121                     115           12     127 (Note 4)'       ,
2 40%
i n acon..nl                   flis                   Mi               10n                     135           69     204 juldi f it:.h t.lon               l'a                 (Noto i)             2.'s (Note 3)
Kewaunee SR0 1
                                                                                      ~
1 "1001-R0 2
18           24       42 (Note 5)             :'
2 1001 Requal 3
e t i f i ca t. i on               I,o
3 100%
                                                        ~lT~(Noto 2)_       (2                     24           31       55 (Note 6) n-Power                           32                 ,y!9t;r? 1 )_ ._ _1. 4                       13             /       20 (Note /)             l I
Production Training Instructor Center, Comonwealth Certificatiens 9
i Hudget estimat os hascri on following                                               ,
4 44%
t Initial exams wnuirl ha 50 per/ unit and 4 unit.s rncoiving licensos
Edison Pc. int Beach SRO 2
      .        Replacomnnt. cyams - 2 trip /sito with 5 nynns/ trip                                                                               ,
2 1001 D. C. Cook SRO 1
      .        Reepiali ficainn exams - 10% of liconscr* parsonnni @ 50% of the facilities                                                         -
1 1001 RC 3
Cortification exams - Estimates from n3-01 anti clearing not nr back log from training facilities                                   i
3 1001 Requal.
      .        Non power - 1 trip / facility - 4 oxamc/t rip to 1         Genoric Intl.or 83-01 diel not. nririrnse, thoco e x am i na t.i n n e. .                                                          .
9 3
le 7         Genoric lot.tcr n3-01 tiid nnt rnrpine.t inf ormal. inn f rom training contors,                                                     i i
33C Dresder.
to 3           Roqualification Pyam acimInistralInn flopontInnl on facility schedule.                                                             '
SPO E
Ic 4           Porry exams rielayed until FY 85.
4 80i FC 4
I In 5           Number of exams asiministered depentinnt on t raining schedule.
4 1001 Palisades SRO 1
le f.         G.E. has delayed some of their exams.                                                           5 In 7           No flomand from research reactors.                                                                              .
1 100%
PO 3
3 100' Instructor Certi#icctiens 6
4 675.
Moriticell e SR0 E
5 1001 RO 6
5 83' Ur.iv. of Missouri SPD 2
1 50i R0 3
2 66%
 
ATTA.CliflU!l 3 y
rkioarl iY 1984,(No. __ f_f,xams,}:
D o
Burigo t*
83-01 5therfulcri Comple tori Scheduled Target n of Exam Es t. ima tes Ror.ponto r, months First 6 months Last 6 months FY 84 i t.ial 200 159
~
121 115 12 127 (Note 4)'
i n acon..nl flis Mi 10n 135 69 204 juldi f it:.h t.lon l'a (Noto i) 2.'s (Note 3) 18 24 42 (Note 5) e t i f i ca t. i on I,o
~lT~(Noto 2)_
(2
~
24 31 55 (Note 6) n-Power 32
,y!9t;r? 1 )_._ _1. 4 13
/
20 (Note /)
l I
i Hudget estimat os hascri on following t
Initial exams wnuirl ha 50 per/ unit and 4 unit.s rncoiving licensos Replacomnnt. cyams - 2 trip /sito with 5 nynns/ trip Reepiali ficainn exams - 10% of liconscr* parsonnni @ 50% of the facilities Cortification exams - Estimates from n3-01 anti clearing not nr back log from training facilities i
Non power - 1 trip / facility - 4 oxamc/t rip to 1 Genoric Intl.or 83-01 diel not. nririrnse, thoco e x am i na t.i n n e..
le 7 Genoric lot.tcr n3-01 tiid nnt rnrpine.t inf ormal. inn f rom training contors, i
i to 3 Roqualification Pyam acimInistralInn flopontInnl on facility schedule.
Ic 4 Porry exams rielayed until FY 85.
I In 5 Number of exams asiministered depentinnt on t raining schedule.
le f.
G.E. has delayed some of their exams.
5 In 7 No flomand from research reactors.
G}}
G}}

Latest revision as of 08:53, 12 December 2024

Submits Rept of Operator Licensing Section Activities for Third Quarter FY84,including FY84 Budget Estimates Vs Exams Administered to Date & Results of Exams by Facility
ML20133C817
Person / Time
Issue date: 08/31/1984
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20132B617 List:
References
FOIA-85-236 NUDOCS 8507220002
Download: ML20133C817 (5)


Text

F p.

AUG 311984 MEMORANDUM FOR: James G. Keppler, Regional Administrator FROM:

R. L. Spessard, Director, Division of Reactor Safety

SUBJECT:

QUARTERLY REPORT OF OPERATOR LICENSING ACTIVITIES THIRD QUARTER FY 84 This is the report of the Operator Licensing Section activities for the third quarter of FY 84. Attached are the two sections which comprise this report. - FY 84 Budget Estimates vs. Examinations Administered to Date - Results of Examinations by Facility - 3rd Quarter FY 84 In my memorandum of May 16, 1984, I provided you with a different version of of the Quarterly Report. A copy of that version is included as to this report.

You will note that we have again changed the format of this section of the report. The reason for this change is as follows:

1.

The operating plan for FY 85 will track the operator licensing effort in this same manner, i.e., Number of Budgeted Exams vs. Number of Exams Administered.

2.

The difficulties with presenting information in the format of the May 16th version, without numerous notes to explain the changes as noted below.

Since the examinations are administered to candidates on schedules established by utility personnel it sometimes requires extensive notes to explain the changes to these figures.

Examples of some of these changes in the past three months are as follows.

Initial:

Although we only had 12 exams scheduled for the final six months of FY 84 we will administer approximately 20 examinations in this category during the last three months of FY 84 These changes are due to requests from Byron and Fermi to comply with NRC requirements and retakes of examinations of candidates who previously failed.

Replacement:

Sixty-nine examinations were scheduled and as of this date we have had cre utility change the examination date to Ff 85.

Several others have reduced the number of candidates as a result of their internal audits of candidates.

y72 2 g5gggg HARTMAN84-236 PDR.

4'-

James G. Keppler 2

Requalification:

The number of examinations administered in this category is dependent upon the utility schedule and the number of operators in any particular requalification class.

In addition, since our primary objective is to assure adequate licensed personnel for operation, requalification examina-tions can only be performed when we have resources available, therefore, it is very difficult to predict the number of exams that will be administered over an extended period of time.

Certification:

At-the present time we do not have any additional certifi-cation examinations scheduled for this FY. Commonwealth Edison Production Training Center has postponed their examinations and no new date has been established.

Non-Power:

The number of examinations administered during the reporting period, changed because of additional requests from Universities. These additional requests were necessary because of failures by original candidates and unexpected attrition.

In addition to the activities reflected in the attachments, Region III examiners assisted in the administration of examinations at Comanche Peak and attended an item writing workshop in Region II.

" Original SIsr.cd by P..L. Cp:.c.. -

R. L. Spessard, Director Division of Reactor Safety Attachments: As stated cc w/attachs:

C. E. Norelius

b-ATTACHMENT 1 FY 84 Budget Estimates vs. Examinations Administered to Date Type of Budget Target

  • Completed Exam Estimates FY 84 9 months FY 84 Initial 200 127 115 Replacement 130 204 175 Recualification 75 42 30 Certification 60 55 39 "

Non-Power 32 20 18

y.

ATTACHMENT 2 Results of Examinations by Facility 3rd Quarter FY 84 Type of Number Number Percent Facility Examination Examined Passed Passed LaSalle SR0 2

2 100%

R0 5

2 40%

Kewaunee SR0 1

1 "1001-R0 2

2 1001 Requal 3

3 100%

Production Training Instructor Center, Comonwealth Certificatiens 9

4 44%

Edison Pc. int Beach SRO 2

2 1001 D. C. Cook SRO 1

1 1001 RC 3

3 1001 Requal.

9 3

33C Dresder.

SPO E

4 80i FC 4

4 1001 Palisades SRO 1

1 100%

PO 3

3 100' Instructor Certi#icctiens 6

4 675.

Moriticell e SR0 E

5 1001 RO 6

5 83' Ur.iv. of Missouri SPD 2

1 50i R0 3

2 66%

ATTA.CliflU!l 3 y

rkioarl iY 1984,(No. __ f_f,xams,}:

D o

Burigo t*

83-01 5therfulcri Comple tori Scheduled Target n of Exam Es t. ima tes Ror.ponto r, months First 6 months Last 6 months FY 84 i t.ial 200 159

~

121 115 12 127 (Note 4)'

i n acon..nl flis Mi 10n 135 69 204 juldi f it:.h t.lon l'a (Noto i) 2.'s (Note 3) 18 24 42 (Note 5) e t i f i ca t. i on I,o

~lT~(Noto 2)_

(2

~

24 31 55 (Note 6) n-Power 32

,y!9t;r? 1 )_._ _1. 4 13

/

20 (Note /)

l I

i Hudget estimat os hascri on following t

Initial exams wnuirl ha 50 per/ unit and 4 unit.s rncoiving licensos Replacomnnt. cyams - 2 trip /sito with 5 nynns/ trip Reepiali ficainn exams - 10% of liconscr* parsonnni @ 50% of the facilities Cortification exams - Estimates from n3-01 anti clearing not nr back log from training facilities i

Non power - 1 trip / facility - 4 oxamc/t rip to 1 Genoric Intl.or 83-01 diel not. nririrnse, thoco e x am i na t.i n n e..

le 7 Genoric lot.tcr n3-01 tiid nnt rnrpine.t inf ormal. inn f rom training contors, i

i to 3 Roqualification Pyam acimInistralInn flopontInnl on facility schedule.

Ic 4 Porry exams rielayed until FY 85.

I In 5 Number of exams asiministered depentinnt on t raining schedule.

le f.

G.E. has delayed some of their exams.

5 In 7 No flomand from research reactors.