l | l Wisconsin 1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l | ||
PBL %-0109 l | |||
May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen: | |||
DOCKETS 50-266 AND 50-301 l | |||
DOCKETS 50-266 AND 50-301 l | MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l | ||
Sincerely, Jl/l G. L Maxfield | Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996. | ||
PBNP Manager | Sincerely, Jl/l G. L Maxfield PBNP Manager l | ||
smb Attachments cc: | |||
L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector i | |||
i l | 9605140137 960430 PDR ADOCK 05000266 R | ||
PDR l | |||
i l | |||
l-'' I il.subsduy afIIluvauh theny {brp<n6m | |||
F OPERATING DATA REPORT | F OPERATING DATA REPORT DOCKET NO. 50-266 | ||
~ | |||
DOCKET NO. 50-266 DATE: | DATE: | ||
05/07/96 COMPLETED BY: | |||
M. B. | |||
Koudelka i | |||
TELEPHONE: 414 755-6480 OPERATING STATUS | TELEPHONE: 414 755-6480 OPERATING STATUS | ||
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 | : 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES i | ||
: 2. REPORTING PERIOD: April - 1996 | : 2. REPORTING PERIOD: April - 1996 | ||
: 3. LICENSED THERMAL POWER (MWT) : | |||
: 3. LICENSED THERMAL POWER (MWT) : 1518.5 | 1518.5 I | ||
: 4. NAMEPLATE RATING (GROSS MWE): | |||
: 4. NAMEPLATE RATING (GROSS MWE): 523.8 | 523.8 l | ||
l | : 5. DESIGN ELECTRICAL RATING (NET MWE) : | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 | 497.0 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : | 509.0. | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : | |||
485.0 8. | |||
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: | |||
NA | NA | ||
: 9. | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA t | ||
: 10. REASONS FOR RESTRICTIONS, (IF ANY) : | : 10. REASONS FOR RESTRICTIONS, (IF ANY) : | ||
: 11. HOURS IN REPORTING PERIOD | NA THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 223,391.0 | ||
: 13. REACTOR RESERVE SHUTDONN HOURS | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 197.7 2,338.5 186,992.9 | ||
: 14. HOURS GENERATOR ON LINE | : 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0. | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | 667.3 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 14. HOURS GENERATOR ON LINE 154.5 2,292.6 183,774.0 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED | : 15. UNIT RESERVE SHUTDOWN HOURS j | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | 0.0 0.0 846.9 | ||
: 19. UNIT SERVICE FACTOR | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 170031.0 3410754.0 260626903.0 | ||
: 20. UNIT AVAILABILITY FACTOR | : 17. GROSS ELECTRICAL ENERGY GENERATED 56680.0 1161750.0 88068120.0 | ||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 51251.0 1109759.0 83962843.5 i | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 19. UNIT SERVICE FACTOR 21.5% | ||
: 23. UNIT FORCED OUTAGE RATE | 79.0% | ||
82.3% | |||
: 20. UNIT AVAILABILITY FACTOR 21.5% | |||
79.0% | |||
82.6% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 14.7% | |||
78.8% | |||
77.2% | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 14.3% | |||
76.9% | |||
75.6% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% | |||
0.0% | |||
1.5% | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) : | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) : | ||
NONE | NONE | ||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | i NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | ||
t POINT BEACH NUCLEAR PLANT | t POINT BEACH NUCLEAR PLANT DOCKET NO. | ||
MWe NET 1 | 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH APRIL - | ||
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 | |||
-3 11 | |||
-2 21 | |||
-12 2 | |||
-2 12 | |||
-2 22 | |||
-13 3 | |||
-2 13 | |||
-2 23 | |||
-15 4 | |||
-2 14 | |||
-2 24 30 5 | |||
-2 15 | |||
-2 25 163 6 | |||
-2 16 | |||
-2 26 275 7 | |||
-2 17 | |||
-2 27 326 8 | |||
-2 18 | |||
-2 28 437 9 | |||
-2 19 | |||
-3 29 498 10 | |||
-2 20 | |||
-11 30 498 1 | |||
x | |||
POINT BEACH NifCLEAR PLANT | POINT BEACH NifCLEAR PLANT Docket No. | ||
Unit Name | 50-266 Unit Name Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH 6PRIL - 1996 Telephone No. | ||
REPORT MONTH 6PRIL - 1996 | 414n55-6480 Method of licensee Evem Duration Reactor Report No. | ||
Method of licensee Evem Duration | System Component Cause and Corrective Action No. | ||
* Shut Down' | Date Type' (Hours) | ||
* Code' | Reason | ||
* Shut Down' Code | |||
D - Regulatory Restriction | * Code' To Prevem Recurrence 1 | ||
3/30/96 S | |||
564.5 C | |||
1 NA NA NA Scheduled refueling and --- | |||
-e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection. | |||
'F: Forced | |||
' Reason: | |||
' Method: | |||
Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenanc'e or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161) | |||
D - Regulatory Restriction 4 - Continuation of E - Operator Training & | |||
Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain) | |||
Exhibit I-Same Source 8 | |||
G - Operational Ermr (explain) | |||
H - Other (explain) | H - Other (explain) | ||
( | ( | ||
| Line 83: | Line 139: | ||
PBF4328b (03-90) | PBF4328b (03-90) | ||
i l | i l | ||
DOCKET NO. | DOCKET NO. | ||
Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period. | 50-266 UNIT NAME Point Beach Unit 1 l | ||
DATE May 6, 1996 l | |||
COMPLETED BY M. | |||
B. Koudelka TELEPHONE 414/755-6480 l | |||
l Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period. | |||
I Safety-related maintenance included: | I Safety-related maintenance included: | ||
1 | 1. | ||
1A06 4.16 kV bus switchgear de ground located and corrected. | |||
2. | |||
1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced. | |||
l | 3. | ||
1CV-289 P2B charging pump discharge valve repacked. | |||
l 4. | |||
DY-14 safe shutdown panel inverter capacitor, wiring and cooling fan replaced. | |||
5. | |||
G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted. | |||
l | 6. | ||
l l | 1MS-317 HX-1B steam generator sample to MS-2084 inlet valve repacked. | ||
l | 7. | ||
1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced. | |||
l 8. | |||
1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l | |||
set screw inspected. | |||
l l | |||
9. | |||
1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced. | |||
l 10. | |||
IP-2C charging pump varidrive replaced. | |||
11. | |||
1P-15A safety injection pump oil sightglass installed. | |||
12. | |||
IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed. | |||
13. | |||
P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified. | |||
14. | |||
1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced. | |||
l | l | ||
~ | |||
f | f 15. | ||
1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed. | |||
t | t 16. | ||
1SI-847A eductor A sodium hydroxide supply check valve replaced. | |||
17. | |||
ISW-2908-M HX-15A-D containment recirculation heat exchanger j | |||
l | emergency flow control valve motor replaced. | ||
18. | |||
1W1C1 containment accident recirculation fan, shaft and l | |||
spoolpiece balanced. | |||
l 19. | |||
1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced. | |||
20. | |||
Eight main steam condenser steam dump valves replaced. | |||
l l | l l | ||
j | j | ||
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: | OPERATING DATA REPORT DOCKET NO. 50-301 DATE: | ||
COMPLETED BY: | 05/07/96 COMPLETED BY: | ||
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 | M. | ||
: 2. REPORTING PERIOD: April - 1996 | B. | ||
Koudelka TELEPHONE: | |||
414 755-6480 OPERATING STATUS | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : | : 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 | ||
. NOTES | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | : 2. REPORTING PERIOD: April - 1996 3. | ||
LICENSED THERMAL POWER (MWT): | |||
NA | 1518.5 4. | ||
NAMEPLATE RATING (GROSS MWE) : | |||
523.8 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : | |||
497.0 6. | |||
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : | |||
509.0. | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
485.0 8. | |||
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: | |||
NA 9. | |||
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): | |||
Power 90% | |||
: 10. REASONS FOR RESTRICTIONS, (IF ANY) : | : 10. REASONS FOR RESTRICTIONS, (IF ANY) : | ||
Self-imposed restriction because of SG tube plugging, pending further evaluation. | Self-imposed restriction because of SG tube plugging, pending further evaluation. | ||
THIS MONTH | THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 11. HOURS IN REPORTING PERIOD | : 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 208,176.0 | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 182,230.1 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9 | ||
: 11. HOURS GENERATOR ON LINE | : 11. HOURS GENERATOR ON LINE 719.0 2,903.0 179,757.4 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 982621.0 3966034.0 258498187.0 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED | : 17. GROSS ELECTRICAL ENERGY GENERATED 336930.0 1360390.0 87863650.0 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 321180.0 1297686.0 83762335.5 | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR 100.0% | ||
: 20. UNIT AVAILABILITY FACTOR | 100.0% | ||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) | 86.3% | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 20. UNIT AVAILABILITY FACTOR 100.0% | ||
: 23. UNIT FORCED OUTAGE RATE | 100.0% | ||
86.5% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1% | |||
92.2% | |||
82.4% | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 89.9% | |||
89.9% | |||
81.0% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% | |||
0.0% | |||
0.9% | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) : | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) : | ||
Refueling /SGRP, 10/05/96, 70 days | Refueling /SGRP, 10/05/96, 70 days | ||
| Line 152: | Line 251: | ||
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | ||
3 POINT BEACH NUCLEAR PLANT DOCKET NO. | |||
AVERAGE DAILY UNIT POWER LEVEL | 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH APRIL - | ||
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 | |||
447 11 448 21 445 2 | |||
447 12 464 22 446 3 | |||
446 13 430 23 446 4 | |||
447 14 447 24 450 5 | |||
447 15 448 25 442 6 | |||
447 16 448 26 447 7 | |||
428 17 448 27 442 l | |||
8 447 18 449 28 450 9 | |||
448 19 447 29 446 10 447 20 445 30 445 | |||
~ - - | |||
POINT BEACH NUCLEAR PLANT | ~ ~ - | ||
Unit Name | POINT BEACH NUCLEAR PLANT Docket No. | ||
REPORT MONTH APRIL - 1996 | 50-266 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH APRIL - 1996 Telephone No. | ||
414 055-6480 Method of Duration Reactor Licensee Event System Component Cause and Corrective Action No. | |||
* Shut Down' | Date Type' (Hours) | ||
Reason | |||
* Shut Down' Report No. | |||
D - Regulatory Restriction | Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA | ||
'F: Forced | |||
' Reason: | |||
' Method: | |||
' Exhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scrum LER file (NUREG-0161) | |||
D - Regulatory Restriction 4 - Continuation of E - Operator Training & | |||
Previous Shutdown Licensing Exam 5 - Reduced Load F-Administranve 6 - Other (explain) | |||
Exhibit I-Same Source 5 | |||
G - Operational Error (explain) | |||
H - Other (explain) i PBF-0028b (03-90) | H - Other (explain) i PBF-0028b (03-90) | ||
-= | |||
-1 i | |||
l l* | l l* | ||
1 | 1 e | ||
i l | |||
1 1 | 1 1 | ||
i l | 1 i | ||
i l | |||
DOCKET NO. | |||
50-301 UNIT NAME Point Beach Unit 2 DATE May 6, 1996 COMPLETED BY M. B. Koudelka 1 | |||
I TELEPHONE 414/755-6480 1 | |||
Unit 2 operated at an average of 446 MWe net for the report i | |||
period. | |||
l l | |||
l l | |||
i l | |||
I i | |||
l l | l l | ||
l i | l i | ||
e}} | |||
Latest revision as of 18:44, 25 May 2025
| ML20111B024 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/30/1996 |
| From: | Koudelka M, Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-96-0109, PBL-96-109, NUDOCS 9605140137 | |
| Download: ML20111B024 (10) | |
Text
!
l l
l Wisconsin 1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l
PBL %-0109 l
May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 l
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996.
Sincerely, Jl/l G. L Maxfield PBNP Manager l
smb Attachments cc:
L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector i
9605140137 960430 PDR ADOCK 05000266 R
PDR l
i l
l- I il.subsduy afIIluvauh theny {brp<n6m
F OPERATING DATA REPORT DOCKET NO. 50-266
~
DATE:
05/07/96 COMPLETED BY:
M. B.
Koudelka i
TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES i
- 2. REPORTING PERIOD: April - 1996
- 3. LICENSED THERMAL POWER (MWT) :
1518.5 I
- 4. NAMEPLATE RATING (GROSS MWE):
523.8 l
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA t
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 223,391.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 197.7 2,338.5 186,992.9
- 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0.
667.3
- 14. HOURS GENERATOR ON LINE 154.5 2,292.6 183,774.0
- 15. UNIT RESERVE SHUTDOWN HOURS j
0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 170031.0 3410754.0 260626903.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 56680.0 1161750.0 88068120.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 51251.0 1109759.0 83962843.5 i
- 19. UNIT SERVICE FACTOR 21.5%
79.0%
82.3%
- 20. UNIT AVAILABILITY FACTOR 21.5%
79.0%
82.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 14.7%
78.8%
77.2%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 14.3%
76.9%
75.6%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
t POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH APRIL -
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-3 11
-2 21
-12 2
-2 12
-2 22
-13 3
-2 13
-2 23
-15 4
-2 14
-2 24 30 5
-2 15
-2 25 163 6
-2 16
-2 26 275 7
-2 17
-2 27 326 8
-2 18
-2 28 437 9
-2 19
-3 29 498 10
-2 20
-11 30 498 1
x
POINT BEACH NifCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH 6PRIL - 1996 Telephone No.
414n55-6480 Method of licensee Evem Duration Reactor Report No.
System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Shut Down' Code
- Code' To Prevem Recurrence 1
3/30/96 S
564.5 C
1 NA NA NA Scheduled refueling and ---
-e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection.
'F: Forced
' Reason:
' Method:
Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenanc'e or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain)
Exhibit I-Same Source 8
G - Operational Ermr (explain)
H - Other (explain)
(
i I
PBF4328b (03-90)
i l
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 l
DATE May 6, 1996 l
COMPLETED BY M.
B. Koudelka TELEPHONE 414/755-6480 l
l Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period.
I Safety-related maintenance included:
1.
1A06 4.16 kV bus switchgear de ground located and corrected.
2.
1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced.
3.
1CV-289 P2B charging pump discharge valve repacked.
l 4.
DY-14 safe shutdown panel inverter capacitor, wiring and cooling fan replaced.
5.
G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted.
6.
1MS-317 HX-1B steam generator sample to MS-2084 inlet valve repacked.
7.
1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced.
l 8.
1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l
set screw inspected.
l l
9.
1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced.
l 10.
IP-2C charging pump varidrive replaced.
11.
1P-15A safety injection pump oil sightglass installed.
12.
IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed.
13.
P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified.
14.
1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced.
l
~
f 15.
1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed.
t 16.
1SI-847A eductor A sodium hydroxide supply check valve replaced.
17.
ISW-2908-M HX-15A-D containment recirculation heat exchanger j
emergency flow control valve motor replaced.
18.
1W1C1 containment accident recirculation fan, shaft and l
spoolpiece balanced.
l 19.
1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced.
20.
Eight main steam condenser steam dump valves replaced.
l l
j
OPERATING DATA REPORT DOCKET NO. 50-301 DATE:
05/07/96 COMPLETED BY:
M.
B.
Koudelka TELEPHONE:
414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: April - 1996 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE) :
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 208,176.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 182,230.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 11. HOURS GENERATOR ON LINE 719.0 2,903.0 179,757.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 982621.0 3966034.0 258498187.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 336930.0 1360390.0 87863650.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 321180.0 1297686.0 83762335.5
- 19. UNIT SERVICE FACTOR 100.0%
100.0%
86.3%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1%
92.2%
82.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 89.9%
89.9%
81.0%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) :
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
3 POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH APRIL -
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
447 11 448 21 445 2
447 12 464 22 446 3
446 13 430 23 446 4
447 14 447 24 450 5
447 15 448 25 442 6
447 16 448 26 447 7
428 17 448 27 442 l
8 447 18 449 28 450 9
448 19 447 29 446 10 447 20 445 30 445
~ - -
~ ~ -
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH APRIL - 1996 Telephone No.
414 055-6480 Method of Duration Reactor Licensee Event System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Shut Down' Report No.
Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA
'F: Forced
' Reason:
' Method:
' Exhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scrum LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F-Administranve 6 - Other (explain)
Exhibit I-Same Source 5
G - Operational Error (explain)
H - Other (explain) i PBF-0028b (03-90)
-=
-1 i
l l*
1 e
i l
1 1
1 i
i l
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE May 6, 1996 COMPLETED BY M. B. Koudelka 1
I TELEPHONE 414/755-6480 1
Unit 2 operated at an average of 446 MWe net for the report i