IR 05000313/1992024: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20125D739 | | number = ML20125D739 | ||
| issue date = 12/10/1992 | | issue date = 12/10/1992 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/92-24 & 50-368/92-24 | ||
| author name = Beach A | | author name = Beach A | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9212160011 | | document report number = NUDOCS 9212160011 | ||
| title reference date = 11-25-1992 | |||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| page count = 4 | | page count = 4 | ||
| Line 19: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:4 UNITED STATES | {{#Wiki_filter:4 UNITED STATES | ||
[gn RfCoq | |||
. | |||
$ | |||
NUCLEAR REGULATORY COMMISSION | |||
' | |||
E O | |||
DEC i 01992 Docket Nos. 50-313 50-368 License Nos. DPR-51 NPF-6 Entergy Operations, | |||
SUBJECT: NRC INSPECTION REPORT NO. 50-313/92-24; 50-368/92-24 (NOTICE OF VIOLATION) | ==REGION IV== | ||
Thank you for your letter of November 25, 1992, in response to our letter and Notice of Violation dated October 27, 1992. We have reviewed your i reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions ; | : s 3, | ||
during a future inspection to determine that full compliance has been achieved and will be | o, | ||
'[ | |||
611 RYAN PLAZA DRIVE, SUITE 400 (, | |||
& | |||
ARLINGTON, TEXAS 760118064 | |||
, | |||
***** | |||
' | |||
DEC i 01992 Docket Nos. 50-313 50-368 License Nos. DPR-51 NPF-6 Entergy Operations, Inc. | |||
ATTN: | |||
J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801 Gentlemen: | |||
SUBJECT: | |||
NRC INSPECTION REPORT NO. 50-313/92-24; 50-368/92-24 (NOTICE OF VIOLATION) | |||
Thank you for your letter of November 25, 1992, in response to our letter and Notice of Violation dated October 27, 1992. We have reviewed your i | |||
reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions | |||
; | |||
during a future inspection to determine that full compliance has been achieved and will be maintained. | |||
Sincerely, | Sincerely, | ||
! | ! | ||
RAL | |||
! | |||
/A. Bill Beach, Directcr | |||
! | ! | ||
Division of Reactor Projects l | |||
l CC: | l CC: | ||
Entergy Operations, | Entergy Operations, Inc. | ||
ATTN: Donald C. Hintz, President & | |||
Chief Operating Officer | |||
; | |||
l P.O. Box 31995 Jackson, Mississippi 39286 i | |||
! | ! | ||
9212160011 921210 | 9212160011 921210 | ||
PDR ADOCK 05000313 | , | ||
PDR ADOCK 05000313 | |||
/ | |||
G PDR I | |||
- | |||
.. - - - | |||
-.- - | |||
-. | |||
- | |||
... | |||
Entergy Operations, Inc. | |||
-2- | |||
~ | |||
< | |||
, | |||
- Entergy Operations, Inc. | |||
Wise, Carter, Child & Caraway ATTN: Robert B. McGehee, | ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 | ||
- | |||
Jackson, Mississippi 39205 Entergy Operations, | Wise, Carter, Child & Caraway ATTN: | ||
Robert B. McGehee, Esq. | |||
ATTN: R. A. Fenech, General Manager Plant Operations Route 3, Box 137G Russellville, Arkansas 72801 Entergy Operations, | |||
P.O. Box ~651 | |||
- ; | |||
. | |||
Jackson, Mississippi 39205 l | |||
Entergy Operations, Inc. | |||
- | |||
ATTN: | |||
R. A. Fenech, General Manager Plant Operations Route 3, Box 137G Russellville, Arkansas 72801 Entergy Operations, Inc. | |||
ATTN: James J. Fisicaro Director, licensing | |||
- Route 3, Box 137G Russellville, Arkansas - 72801 Honorable Joe W. Phillips County. Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn ATTN: Nicholas S. Reynolds, Esq. | |||
1400 L Street, N.W. | |||
Washington, D.C. | |||
20005-3502 Arkansas Department of Health ATTN: | |||
Ms. Greta Dicus, Director Division of Radiation-Control and Emergency. Management-4815 West Markham Street Little Rock, Arkansas 72201-3867 | |||
. B&W Nuclear Technologies ATTN: Robert B. Borsum Licensing Representative 1700 Rockville Pike,: Suite 525 Rockville, Maryland 20852 | |||
' | ' | ||
Admiral Kinnaird R. McKee, USN (Ret) | |||
214 South Morris Street | 214 South Morris Street | ||
' | |||
- 0xford, Maryland 21654- | |||
w e - | w e | ||
- | |||
--,---,m--,se | |||
-, | |||
-e.e- | |||
-g, | |||
, | |||
..y.,. | |||
-,,, | |||
,,,v,,,-,%-..-e.cm..www..,-, | |||
. | |||
.-%--+-ww.-,,.-r | |||
.,,, -.4e, ew..,.%-ce | |||
.- | |||
_. | |||
Entergy Operations, | - | ||
. | |||
. | |||
Entergy Operations, Inc. | |||
-3-ABB Combustion Engineering Nuclear Power ATTN: | |||
Charles B. Brinkman Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 e | |||
, | , | ||
- | |||
I v | I v | ||
_ _ _ _ . . . . . . . | _ _ _ _....... | ||
. | |||
.h Entergy Operations, Inc. | |||
DEC 1 0 IW2 | |||
-4-DEC 1 0 IW2 | |||
. | |||
% c t'o DMB-(IE01) | |||
bcc dist,-ib. by RIV: | bcc dist,-ib. by RIV: | ||
J. L. Milhoan | J. L. Milhoan Re:ident Inspector DRP Section Chief (DRP/A) | ||
Lisa Shea, RM/ALF, MS: MNBB 4503 | Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/A) | ||
G. F. Sanborn, EO | RIV File DRS Section Chief (DRP\\TSS) | ||
G. F. Sanborn, EO J. Lieberman, OE, MS: 7-H-5 | |||
.r . | _ | ||
RIV:DRP/A ,,1 , | . | ||
.r | |||
KMKennedy;bb | . | ||
_-__ - _ _ _ - _ _ _ - - _ _ _ _ . _ - _ _ _ _ _ _ _ _ _ - - - | RIV:DRP/A | ||
,,1, C:DRP/Ah D:DRP KMKennedy;bb WDJohnson AdB)ach | |||
' | |||
12/9 /92 12/%/92 12/10/92 | |||
_-__ | |||
- _ _ _ - _ _ _ - - _ _ _ _. _ - _ _ _ _ _ _ _ _ _ - - - | |||
. | |||
. | |||
- | |||
- | |||
- | |||
- | |||
- | |||
. | |||
. | |||
? a. :,, ' | |||
. | |||
.. | |||
s | |||
,, | |||
- | |||
- - Entergy a,a.,o o,.,.u....,e. | |||
Rtue 3 B'* 137G - | |||
. Operations | |||
. | |||
ms,- mx | |||
.- | |||
TetSC1 W ? 03 | |||
- | |||
d,lt1]h__'!?-d.m?l-il,Cl9 W | |||
iy | |||
- | |||
... | |||
. | |||
Il | |||
DEC - 3 992 | ' | ||
DEC - 3 992 | |||
: | |||
November 25, 1992 J - -l | |||
, ~s | |||
- - | |||
Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 Response to Inspection Report 50-313/92-24; 50-368/92-24' | ; | ||
OCAN119207 | |||
- | |||
~ ~ ~ " | |||
U. S. Nuclear :egulatory Commission Document Control Desk Mail Station 21-137 Washington, DC 20555 Subject: | |||
_ Arkansas Nuclear One - Units 1 and 2 | |||
- | |||
Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 Response to Inspection Report 50-313/92-24; 50-368/92-24' | |||
, | |||
Gentlemen: | Gentlemen: | ||
Pursuant to the provisions of 10CFR2.201, attached-is the response to the violation identified during the inspection of activities associated with the maintenance-activity which caused a bent valve stem and cracked disk.on high pressure safety injection valve 2CV-5015-1. | Pursuant to the provisions of 10CFR2.201, attached-is the response to the violation identified during the inspection of activities associated with the maintenance-activity which caused a bent valve stem and cracked disk.on high pressure safety injection valve 2CV-5015-1. | ||
' | ' | ||
Should-you have questions or comments, please contact me'at | Should-you have questions or comments, please contact me'at | ||
501-964- | - | ||
501-964-8601. | |||
Very truly yours, I~ | |||
James J icaro Director, Licensing-JJF/DWD/mmg attachment | James J icaro Director, Licensing-JJF/DWD/mmg attachment | ||
- | |||
p | p RY g ggy | ||
: | : | ||
! | ! | ||
- | |||
, _. | |||
. | |||
_ _. -, | |||
. | |||
_.. | |||
.. | |||
,x.o | |||
_. | |||
. | |||
. | |||
U. | |||
S. NRC | |||
. | |||
November 25, 1992 | |||
, | , | ||
Page 2 | Page 2 | ||
, | |||
cc: Mr. James L. M11hoan U. S. | cc: Mr. James L. M11hoan U. | ||
S. | |||
Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC S7nior Re.ident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road-Russellville, AR 72801 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-2 U. | |||
S. | |||
Nuclear Regulatory Commission NRR Mall Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Roby B. Bevan Jr. | |||
NRR Project Manager, Region IV/ANO-1 U. | |||
S. | |||
Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 | |||
. | |||
_ | |||
. _ _ _ _ _ _ _ | |||
.. _ _ _ _ _ _ _ _ _ | |||
_ | |||
- | |||
._. | |||
. | |||
, | |||
. | |||
.. | |||
Attachment to: | |||
. | |||
OCAN119207 Page 1 | OCAN119207 Page 1 | ||
.. | .. | ||
NOTICE OF VIOLATION-The NRC stated in inspection report 50-313/92-24; 50-368/92-24 that: | NOTICE OF VIOLATION-The NRC stated in inspection report 50-313/92-24; 50-368/92-24 that: | ||
"During an NRC inspection conducted on September 22-through October 6, 195_, a violation of NRC requirements-was identified. | |||
Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 required, in part, " Maintenance that can affect performance of safety-related equipment should be properly pre-planned and performed in accordance with written procedures . . . | In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992), the violation is listed below: | ||
Technical Specification 6.8.1.a required, in part, that " Written procedures shall be established, implemented.and maintained covering... the applicable procedures recommended in Appendix A of Regulatory Guida 1.33, Revirion 2, February 1978." | |||
Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 required, in part, " Maintenance that can affect performance of safety-related equipment should be properly pre-planned and performed in accordance with written procedures | |||
. appropriate | |||
.. | |||
to the circumstances." | |||
Job Order 00880725 required " Craft to take precautions as.necessary to keep the stem disk assembly from dropping back onto seat during removal of bonnet from valve body." | Job Order 00880725 required " Craft to take precautions as.necessary to keep the stem disk assembly from dropping back onto seat during removal of bonnet from valve body." | ||
Contrary to the above, on September 27, 1992, during disassembly of high pressure safety injection Valve 2CV-5015-1, sufficient care was not taken to keep the stem disk assembly from dropping back onto the seat during removal of the bonnet from the valve body and, as a result, maintenance activity caused | Contrary to the above, on September 27, 1992, during disassembly of high pressure safety injection Valve 2CV-5015-1, sufficient care was not taken to keep the stem disk assembly from dropping back onto the seat during removal of the bonnet from the valve body and, as a result, maintenance activity caused the valve stem to bend and the disk to crack all the | ||
' | |||
the valve stem to bend and the disk to crack all the way around the bottom of the | way around the bottom of the disk. | ||
This ir a Severity Level IV violation (Supplement I) | |||
368/9224-01)." | 368/9224-01)." | ||
RESPONSE TO VIOLATION 368/9224-01 | RESPONSE TO VIOLATION 368/9224-01-(l) Reason for the-violation: | ||
' | ' | ||
Entergy Operations has reviewed the conditions and circumstances surrounding this event to determine the | |||
Entergy Operations has reviewed the conditions and | |||
, | , | ||
root cause and appropriate corrective actions. | |||
Our root cause determination identified the following facts: | |||
1) The performance of this task is considered to be | |||
> | |||
within the skill of the craft, 2) during the shift | |||
# | # | ||
turnover briefing the craft personnel were told that bonnet galling was experienced during the stem / disk disassembly completed during the previous shift; | |||
. | |||
- - - | |||
. | |||
- | |||
-.. _ _ _.. | |||
_ | |||
. ~ _ -. _ _. _ _ _. -. | |||
.__ | |||
. | |||
. | |||
.- | |||
- | |||
' | |||
* | |||
. | |||
' | |||
-- Attachment-to: | |||
* | |||
OCAN119207 Page 2 therefore, when resistance was encountered they focused | |||
* | |||
on galling and lost sight of the need for maintaining the stem in mid-position, 3) craft personnel-have received training in valve fundamentals, and 4) a note prompting the craft to take precautions to keep the stem / disk assembly from dropping back onto the seat during disassembly was included in tha work-instructions | |||
; | |||
for this job. | |||
Based (n) the above, the root cause of this-violation was determined to be personnel error. | |||
The craft involved with this maintenance activity failed to take. adequate precautions to prevent the stem / disk assembly from dropping back onto the seat during valve-disassembly, as-stated in the job order. | |||
(2) Corrective steps taken and results achieved: | |||
- .. | . | ||
The damaged stem / disk assembly was immediately replaced. | |||
The valve was verified to be operable prior to returning the valve to service. | |||
The craft individuals involved in this incident received counselling regarding their failure to exercise appropriate precautions to prevent damage to the stem / disk assembly. | |||
(3)-Corrective steps which will be taken to avoid further violations: | |||
Mechanical maintenance craft personnel will receive a briefing during the weekly shop meetings regarding the-details of this event, including a discussion of the proper procedure for disassembly of_these valves. | |||
These-briefings will be completed by December 31, 1992. | |||
Additionally, a similar discussion will be incorporated. | |||
into the tormal, craft continuing training program during the first cycle of 1993 continuing training which is scheduled to begin on February 10, 1993. | |||
The increased awareness of craft personnel as a result of counselling and crew briefings, is designed to prevent recurrence of this condition. | |||
Additionally, other corrective actions unrelated to the root cause of this condition are in progress in accordance with our corrective action program. | |||
These other corrective actions also address other instances of-bent stems and cracked disks which have previously been identified. | |||
Examples of these corrective actions include: | |||
1) development of a procedure which will provide an additional measure of control over-the t | |||
_. _ - _ _ | |||
_ | |||
. | |||
- | |||
.. | |||
- | |||
> | |||
.. | |||
. | |||
. | |||
'. | |||
Attachmsnt to: | |||
OCAN119207 Page 3 | OCAN119207 Page 3 | ||
. | |||
maintenance activity.for these valves, 2) a revision to | |||
ANO was in full compliance with its maintenance program upon completion of counselling the individuals involved on September 29, 1992, and the completion of pust maintenunca testing on October 17, 1992, fellowing final repairs to the | ' | ||
the Station Information Management System (SIMS) | |||
i Component Notes CRT screen which will prorapt the job planners to include a caution statement, to maintain the stem in mid position during disassembly of the valve, when developing the instructions for a new job order, and 3) a component redesign which will strengthen the stem and disk assembly. | |||
(4) Date when full compliance will be achieved: | |||
ANO was in full compliance with its maintenance program upon completion of counselling the individuals involved on September 29, 1992, and the completion of pust maintenunca testing on October 17, 1992, fellowing final repairs to the valve. | |||
, | |||
}} | }} | ||
Latest revision as of 20:37, 12 December 2024
| ML20125D739 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/10/1992 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Yelverton J ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9212160011 | |
| Download: ML20125D739 (4) | |
Text
4 UNITED STATES
[gn RfCoq
.
$
NUCLEAR REGULATORY COMMISSION
'
E O
REGION IV
- s 3,
o,
'[
611 RYAN PLAZA DRIVE, SUITE 400 (,
&
ARLINGTON, TEXAS 760118064
,
'
DEC i 01992 Docket Nos. 50-313 50-368 License Nos. DPR-51 NPF-6 Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-313/92-24; 50-368/92-24 (NOTICE OF VIOLATION)
Thank you for your letter of November 25, 1992, in response to our letter and Notice of Violation dated October 27, 1992. We have reviewed your i
reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions
during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely,
!
!
/A. Bill Beach, Directcr
!
Division of Reactor Projects l
l CC:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President &
Chief Operating Officer
l P.O. Box 31995 Jackson, Mississippi 39286 i
!
9212160011 921210
,
PDR ADOCK 05000313
/
G PDR I
-
.. - - -
-.- -
-.
-
...
Entergy Operations, Inc.
-2-
~
<
,
- Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286
-
Wise, Carter, Child & Caraway ATTN:
Robert B. McGehee, Esq.
P.O. Box ~651
- ;
.
Jackson, Mississippi 39205 l
Entergy Operations, Inc.
-
ATTN:
R. A. Fenech, General Manager Plant Operations Route 3, Box 137G Russellville, Arkansas 72801 Entergy Operations, Inc.
ATTN: James J. Fisicaro Director, licensing
- Route 3, Box 137G Russellville, Arkansas - 72801 Honorable Joe W. Phillips County. Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 Arkansas Department of Health ATTN:
Ms. Greta Dicus, Director Division of Radiation-Control and Emergency. Management-4815 West Markham Street Little Rock, Arkansas 72201-3867
. B&W Nuclear Technologies ATTN: Robert B. Borsum Licensing Representative 1700 Rockville Pike,: Suite 525 Rockville, Maryland 20852
'
Admiral Kinnaird R. McKee, USN (Ret)
214 South Morris Street
'
- 0xford, Maryland 21654-
w e
-
--,---,m--,se
-,
-e.e-
-g,
,
..y.,.
-,,,
,,,v,,,-,%-..-e.cm..www..,-,
.
.-%--+-ww.-,,.-r
.,,, -.4e, ew..,.%-ce
.-
_.
-
.
.
Entergy Operations, Inc.
-3-ABB Combustion Engineering Nuclear Power ATTN:
Charles B. Brinkman Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 e
,
-
I v
_ _ _ _.......
.
.h Entergy Operations, Inc.
-4-DEC 1 0 IW2
.
% c t'o DMB-(IE01)
bcc dist,-ib. by RIV:
J. L. Milhoan Re:ident Inspector DRP Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator Project Engineer (DRP/A)
RIV File DRS Section Chief (DRP\\TSS)
G. F. Sanborn, EO J. Lieberman, OE, MS: 7-H-5
_
.
.r
.
RIV:DRP/A
,,1, C:DRP/Ah D:DRP KMKennedy;bb WDJohnson AdB)ach
'
12/9 /92 12/%/92 12/10/92
_-__
- _ _ _ - _ _ _ - - _ _ _ _. _ - _ _ _ _ _ _ _ _ _ - - -
.
.
-
-
-
-
-
.
.
? a. :,, '
.
..
s
,,
-
- - Entergy a,a.,o o,.,.u....,e.
Rtue 3 B'* 137G -
. Operations
.
ms,- mx
.-
TetSC1 W ? 03
-
d,lt1]h__'!?-d.m?l-il,Cl9 W
iy
-
...
.
Il
'
DEC - 3 992
November 25, 1992 J - -l
, ~s
- -
OCAN119207
-
~ ~ ~ "
U. S. Nuclear :egulatory Commission Document Control Desk Mail Station 21-137 Washington, DC 20555 Subject:
_ Arkansas Nuclear One - Units 1 and 2
-
Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 Response to Inspection Report 50-313/92-24; 50-368/92-24'
,
Gentlemen:
Pursuant to the provisions of 10CFR2.201, attached-is the response to the violation identified during the inspection of activities associated with the maintenance-activity which caused a bent valve stem and cracked disk.on high pressure safety injection valve 2CV-5015-1.
'
Should-you have questions or comments, please contact me'at
-
501-964-8601.
Very truly yours, I~
James J icaro Director, Licensing-JJF/DWD/mmg attachment
-
p RY g ggy
!
-
, _.
.
_ _. -,
.
_..
..
,x.o
_.
.
.
U.
S. NRC
.
November 25, 1992
,
Page 2
,
cc: Mr. James L. M11hoan U.
S.
Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC S7nior Re.ident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road-Russellville, AR 72801 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-2 U.
S.
Nuclear Regulatory Commission NRR Mall Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Roby B. Bevan Jr.
NRR Project Manager, Region IV/ANO-1 U.
S.
Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852
.
_
. _ _ _ _ _ _ _
.. _ _ _ _ _ _ _ _ _
_
-
._.
.
,
.
..
Attachment to:
.
OCAN119207 Page 1
..
NOTICE OF VIOLATION-The NRC stated in inspection report 50-313/92-24; 50-368/92-24 that:
"During an NRC inspection conducted on September 22-through October 6, 195_, a violation of NRC requirements-was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992), the violation is listed below:
Technical Specification 6.8.1.a required, in part, that " Written procedures shall be established, implemented.and maintained covering... the applicable procedures recommended in Appendix A of Regulatory Guida 1.33, Revirion 2, February 1978."
Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 required, in part, " Maintenance that can affect performance of safety-related equipment should be properly pre-planned and performed in accordance with written procedures
. appropriate
..
to the circumstances."
Job Order 00880725 required " Craft to take precautions as.necessary to keep the stem disk assembly from dropping back onto seat during removal of bonnet from valve body."
Contrary to the above, on September 27, 1992, during disassembly of high pressure safety injection Valve 2CV-5015-1, sufficient care was not taken to keep the stem disk assembly from dropping back onto the seat during removal of the bonnet from the valve body and, as a result, maintenance activity caused the valve stem to bend and the disk to crack all the
'
way around the bottom of the disk.
This ir a Severity Level IV violation (Supplement I)
368/9224-01)."
RESPONSE TO VIOLATION 368/9224-01-(l) Reason for the-violation:
'
Entergy Operations has reviewed the conditions and circumstances surrounding this event to determine the
,
root cause and appropriate corrective actions.
Our root cause determination identified the following facts:
1) The performance of this task is considered to be
>
within the skill of the craft, 2) during the shift
turnover briefing the craft personnel were told that bonnet galling was experienced during the stem / disk disassembly completed during the previous shift;
.
- - -
.
-
-.. _ _ _..
_
. ~ _ -. _ _. _ _ _. -.
.__
.
.
.-
-
'
.
'
-- Attachment-to:
OCAN119207 Page 2 therefore, when resistance was encountered they focused
on galling and lost sight of the need for maintaining the stem in mid-position, 3) craft personnel-have received training in valve fundamentals, and 4) a note prompting the craft to take precautions to keep the stem / disk assembly from dropping back onto the seat during disassembly was included in tha work-instructions
for this job.
Based (n) the above, the root cause of this-violation was determined to be personnel error.
The craft involved with this maintenance activity failed to take. adequate precautions to prevent the stem / disk assembly from dropping back onto the seat during valve-disassembly, as-stated in the job order.
(2) Corrective steps taken and results achieved:
.
The damaged stem / disk assembly was immediately replaced.
The valve was verified to be operable prior to returning the valve to service.
The craft individuals involved in this incident received counselling regarding their failure to exercise appropriate precautions to prevent damage to the stem / disk assembly.
(3)-Corrective steps which will be taken to avoid further violations:
Mechanical maintenance craft personnel will receive a briefing during the weekly shop meetings regarding the-details of this event, including a discussion of the proper procedure for disassembly of_these valves.
These-briefings will be completed by December 31, 1992.
Additionally, a similar discussion will be incorporated.
into the tormal, craft continuing training program during the first cycle of 1993 continuing training which is scheduled to begin on February 10, 1993.
The increased awareness of craft personnel as a result of counselling and crew briefings, is designed to prevent recurrence of this condition.
Additionally, other corrective actions unrelated to the root cause of this condition are in progress in accordance with our corrective action program.
These other corrective actions also address other instances of-bent stems and cracked disks which have previously been identified.
Examples of these corrective actions include:
1) development of a procedure which will provide an additional measure of control over-the t
_. _ - _ _
_
.
-
..
-
>
..
.
.
'.
Attachmsnt to:
OCAN119207 Page 3
.
maintenance activity.for these valves, 2) a revision to
'
the Station Information Management System (SIMS)
i Component Notes CRT screen which will prorapt the job planners to include a caution statement, to maintain the stem in mid position during disassembly of the valve, when developing the instructions for a new job order, and 3) a component redesign which will strengthen the stem and disk assembly.
(4) Date when full compliance will be achieved:
ANO was in full compliance with its maintenance program upon completion of counselling the individuals involved on September 29, 1992, and the completion of pust maintenunca testing on October 17, 1992, fellowing final repairs to the valve.
,