ML20126B977: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:--        - - _ _ _ _ _ _ _ _
{{#Wiki_filter:y ctt,
F y ctt ,
F f
UNITED STATES %
UNITED STATES %
f          .'%
g*.7 j
NUCLTAR REGULATORY COMMISSION' g*.7      .
NUCLTAR REGULATORY COMMISSION' WASHINGTON, D. C. 20555 r,
j WASHINGTON, D. C. 20555                                                                     r,
,C
                    ,C                                                                                                           *.
; j?)s
    ;C,j?)s
'=
                '=                                                                                                   ,
C, June 29, 1983 6
      %,           !                                  June 29, 1983                                 ,,          .
_l' Docket No. 50-289
6    '-                                        _l' Docket No. 50-289
,j! ', '
                                                                                                    ,j! ' , '                                       ~
~
MEMORANDUM FOR: Guy H. Cunningham, Executive ' Legal Directo Richard Vollmer, Director, Division of Licensing Hugh Thompson, Director, Division'of Human Fac, tors Sa.fety Roger Mattson, Director, Division of Systems Integration FROM:
MEMORANDUM FOR: Guy H. Cunningham, Executive ' Legal Directo Richard Vollmer, Director, Division of Licensing Hugh Thompson, Director, Division'of Human Fac, tors Sa.fety Roger Mattson, Director, Division of Systems Integration FROM:
Darrell G. Eisenhut, Director, Division of Licensing
Darrell G. Eisenhut, Director, Division of Licensing


==SUBJECT:==
==SUBJECT:==
TMI-l STEAM GENERATOR REPAIR SER Enclosed for parallel concurrence is the TMI-l Steam Generator Repair SER. Please note that:
TMI-l STEAM GENERATOR REPAIR SER Enclosed for parallel concurrence is the TMI-l Steam Generator Repair SER.
: 1. . An EIA for repair and operation after repair is not included. It is estimated.that DSI will complete input for an EIA by June 28, 1983.
Please note that:
: 2.     The determination of significant hazards consideration for operation after repair is not included. It will be completed after receipt and response to connents at the end of the FR notice comment period (June 30, 1983).
: 1.. An EIA for repair and operation after repair is not included.
: 3. Section 4.3, Emergency Operating Procedures, will be revised to incorporate confirmatory information on SGTR whole body and
It is estimated.that DSI will complete input for an EIA by June 28, 1983.
                        . thyroid dose rates which is expected to be received from the licensee by July 5,1983. SER input on review of the procedures is expected from PSRB by July 1,1983.
2.
: 4.     Attachments and appendices to the SER are.not included.
The determination of significant hazards consideration for operation after repair is not included.
Please indicate your concurrence blow by COB                                 1983 une 30,f fector e   3.                 ,
It will be completed after receipt and response to connents at the end of the FR notice comment period (June 30, 1983).
Division of Licensing
3.
  ~
Section 4.3, Emergency Operating Procedures, will be revised to incorporate confirmatory information on SGTR whole body and
cc:                                                                                 ,
. thyroid dose rates which is expected to be received from the licensee by July 5,1983. SER input on review of the procedures is expected from PSRB by July 1,1983.
HDenton JStolz Glainas Guy H. Cunningham 6/ /83 lv n                                       " - -
4.
                                                                                                      - -            ~-
Attachments and appendices to the SER are.not included.
                            ;,,,                    y-                                         .
Please indicate your concurrence blow by COB 1983 une 30,f f e
                        --T'
3.
                                            ,     (Hugh I mpson 6/           -
ector Division of Licensing
                                                                            /83 a
~
* gerlattson-- 6t ~/83 Riphard Vollmer ,6/'~ /82 m    ,
cc:
                                              ,g
HDenton JStolz Glainas Guy H. Cunningham 6/ /83 lv n
                                                                                                  \n h w..l
~-
                                                                \                               Y''         ~#""                                      >'"
y-
8506140270 850125                            hmm g                                 (v     d /n M                 ~7 PDR      FOIA                                                    .
--T'
DETJEN84-897 PDR ho ceteasu.4=
(
fj/ 6)}}
a Riphard Vollmer,6/'~ /82 Hugh I mpson 6/
/83
* gerlattson-- 6t ~/83
\\n h w..l m
,g
\\
Y''
~#""
PDR FOIA hmm g (v
d /n M
~7 8506140270 850125 fj/ )6 DETJEN84-897 PDR ho ceteasu.4=
_ _}}

Latest revision as of 20:09, 12 December 2024

Forwards TMI-1 Steam Generator Repair SER for Parallel Concurrence.Eia for Repair & Operation After Repair & Determination of Significant Hazards Consideration for Operation After Repair Not Included.W/O Encl
ML20126B977
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/29/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Cunningham G, Thompson H, Vollmer R
Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20126B295 List: ... further results
References
FOIA-84-897 NUDOCS 8506140270
Download: ML20126B977 (1)


Text

y ctt,

F f

UNITED STATES %

g*.7 j

NUCLTAR REGULATORY COMMISSION' WASHINGTON, D. C. 20555 r,

,C

j?)s

'=

C, June 29, 1983 6

_l' Docket No. 50-289

,j! ', '

~

MEMORANDUM FOR: Guy H. Cunningham, Executive ' Legal Directo Richard Vollmer, Director, Division of Licensing Hugh Thompson, Director, Division'of Human Fac, tors Sa.fety Roger Mattson, Director, Division of Systems Integration FROM:

Darrell G. Eisenhut, Director, Division of Licensing

SUBJECT:

TMI-l STEAM GENERATOR REPAIR SER Enclosed for parallel concurrence is the TMI-l Steam Generator Repair SER.

Please note that:

1.. An EIA for repair and operation after repair is not included.

It is estimated.that DSI will complete input for an EIA by June 28, 1983.

2.

The determination of significant hazards consideration for operation after repair is not included.

It will be completed after receipt and response to connents at the end of the FR notice comment period (June 30, 1983).

3.

Section 4.3, Emergency Operating Procedures, will be revised to incorporate confirmatory information on SGTR whole body and

. thyroid dose rates which is expected to be received from the licensee by July 5,1983. SER input on review of the procedures is expected from PSRB by July 1,1983.

4.

Attachments and appendices to the SER are.not included.

Please indicate your concurrence blow by COB 1983 une 30,f f e

3.

ector Division of Licensing

~

cc:

HDenton JStolz Glainas Guy H. Cunningham 6/ /83 lv n

~-

y-

--T'

(

a Riphard Vollmer,6/'~ /82 Hugh I mpson 6/

/83

  • gerlattson-- 6t ~/83

\\n h w..l m

,g

\\

Y

~#""

PDR FOIA hmm g (v

d /n M

~7 8506140270 850125 fj/ )6 DETJEN84-897 PDR ho ceteasu.4=

_ _