ML20132E430: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:.
DISTRIBUTION:
DISTRIBUTION:
Docket.Nos.. 50-424/425 NRC PDR Local PDR Docket Nos: 50-424                               PRC System and 50-425                               LB #4 r/f EAdensam MMiller Mr. David A. Ward                               MDuncan Chairman, Advisory Committee                     Attorney, OELD on Reactor Safeguards                         JPartlow, I&E U.S. Nuclear Regulatory Commission               BGrimes, I&E Washington, D.C. 20555                           EJordan, I&E cu nry
Docket.Nos.. 50-424/425 NRC PDR Local PDR Docket Nos: 50-424 PRC System and 50-425 LB #4 r/f EAdensam MMiller Mr. David A. Ward MDuncan Chairman, Advisory Committee Attorney, OELD on Reactor Safeguards JPartlow, I&E U.S. Nuclear Regulatory Commission BGrimes, I&E Washington, D.C.
20555 EJordan, I&E cu nry


==Dear Mr. Ward:==
==Dear Mr. Ward:==
==Subject:==
==Subject:==
Issuance of Safety Evaluation Report (Vogtle Electric Generating Plant, Units 1 and 2)
Issuance of Safety Evaluation Report (Vogtle Electric Generating Plant, Units 1 and 2)
Enclosed for review by the Committee are thirteen copies of the Safety Evaluation Report prepared by the Office of Nuclear Reactor Regulation in the matter of the application f eled by Georgia Power Company, et al., for licenses to operate the Vogtle Electric Generating Plant, Units'I and 2.
Enclosed for review by the Committee are thirteen copies of the Safety Evaluation Report prepared by the Office of Nuclear Reactor Regulation in the matter of the application f eled by Georgia Power Company, et al., for licenses to operate the Vogtle Electric Generating Plant, Units'I and 2.
At this time, 14 issues remain outstanding. These issues are identified in Section 1.7 of the'SER. We anticipate that several of these will be resolved prior to the August 1985 ACRS meeting. We will require the resolution of all open items prior to a decision on issuance of operating licenses.
At this time, 14 issues remain outstanding. These issues are identified in Section 1.7 of the'SER. We anticipate that several of these will be resolved prior to the August 1985 ACRS meeting.
We will require the resolution of all open items prior to a decision on issuance of operating licenses.
Sincerely,
Sincerely,
                                                  /S/
/S/
Thomas M. Novak, Assistant Director for Licensing Division of. Licensing
Thomas M. Novak, Assistant Director for Licensing Division of. Licensing


==Enclosure:==
==Enclosure:==
 
SER(13) h4 DLk#4 A
SER(13)
/d LA:DL LB #4 MDd n/hmc ler-EA nsam T ovak-
LA:DL LB #4 MDd     n/hmc h4 ler-DLk#4 EA nsam A    .
$//785
T ovak-
/85 T/[/85 7/85 Ab b 24,
                                                                      /d
E PDR}}
        $//785                 /85         T/[/85               7/85 E
Ab b PDR      24 ,}}

Latest revision as of 09:48, 12 December 2024

Forwards Ser.Issues Identified in Section 1.7 Remain Outstanding.Several Outstanding Issues Expected to Be Resolved Prior to Aug 1985 ACRS Meeting.W/O Encl
ML20132E430
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/02/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Ward D
Advisory Committee on Reactor Safeguards
References
NUDOCS 8507170703
Download: ML20132E430 (1)


Text

.

DISTRIBUTION:

Docket.Nos.. 50-424/425 NRC PDR Local PDR Docket Nos: 50-424 PRC System and 50-425 LB #4 r/f EAdensam MMiller Mr. David A. Ward MDuncan Chairman, Advisory Committee Attorney, OELD on Reactor Safeguards JPartlow, I&E U.S. Nuclear Regulatory Commission BGrimes, I&E Washington, D.C.

20555 EJordan, I&E cu nry

Dear Mr. Ward:

Subject:

Issuance of Safety Evaluation Report (Vogtle Electric Generating Plant, Units 1 and 2)

Enclosed for review by the Committee are thirteen copies of the Safety Evaluation Report prepared by the Office of Nuclear Reactor Regulation in the matter of the application f eled by Georgia Power Company, et al., for licenses to operate the Vogtle Electric Generating Plant, Units'I and 2.

At this time, 14 issues remain outstanding. These issues are identified in Section 1.7 of the'SER. We anticipate that several of these will be resolved prior to the August 1985 ACRS meeting.

We will require the resolution of all open items prior to a decision on issuance of operating licenses.

Sincerely,

/S/

Thomas M. Novak, Assistant Director for Licensing Division of. Licensing

Enclosure:

SER(13) h4 DLk#4 A

/d LA:DL LB #4 MDd n/hmc ler-EA nsam T ovak-

$//785

/85 T/[/85 7/85 Ab b 24,

E PDR