ML20132E756: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _
                              O
O
  '
O
'
.
.
                                                                    O
JUL 191985
                                                                    JUL 191985
Docket No. 50-443
    Docket No. 50-443
Public Service of New Hampshire
    Public Service of New Hampshire
ATTN: Mr. Robert J. Harrison
    ATTN: Mr. Robert J. Harrison
President and Chief Executive Officer
            President and Chief Executive Officer
P. O. Box 330
    P. O. Box 330
Manchester, New Hampshire 03105
    Manchester, New Hampshire 03105
Gentlemen:
    Gentlemen:
St.bject:
    St.bject:   Inspection Report No. 50-443/85-14
Inspection Report No. 50-443/85-14
        ' refers to the routine safety inspection conducted by Mr. R. A. McBrearty
' refers to the routine safety inspection conducted by Mr. R. A. McBrearty
    of this bffice on May 13-17, 1985, at Seabrook Station, Unit 1, Seabrook, New
of this bffice on May 13-17, 1985, at Seabrook Station, Unit 1, Seabrook, New
    Hampshire of activities authorized by NRC License No. CPPR-135 and to the dis-
Hampshire of activities authorized by NRC License No. CPPR-135 and to the dis-
    cussions of our findings held by Mr. McBrearty with Mr. R. E. Guillette of your
cussions of our findings held by Mr. McBrearty with Mr. R. E. Guillette of your
    staff at the conclusion of the inspection.
staff at the conclusion of the inspection.
    Areas examined during this inspection are described in the NRC Region ! Inspec-
Areas examined during this inspection are described in the NRC Region ! Inspec-
    tion Report which is enclosed with this letter. Within these areas, the in-
tion Report which is enclosed with this letter. Within these areas, the in-
    spection consisted of selective examinations of procedures and representative
spection consisted of selective examinations of procedures and representative
    records, interviews with personnel, and observations by the inspector.
records, interviews with personnel, and observations by the inspector.
    Within the scope of this inspection, no violations were observed.
Within the scope of this inspection, no violations were observed.
    No reply to this letter is required.       Your cooperation with us in this matter
No reply to this letter is required.
    is appreciated.
Your cooperation with us in this matter
                                                Sincerely,
is appreciated.
                                                ee...     -
Sincerely,
                                                                . ., p
ee...
                                                    .   *
. ., p
                                                towart D. Ebnetor, Director
-
                                          A     Division of Reactor Safety
*
    Enclosure: NRC Region I Inspection Report No. 50-443/85-14
.
                                          3
towart D. Ebnetor, Director
                  0$07l00Q
A
                  o
Division of Reactor Safety
                                OFFICIAL RECORD COPY       IR SEADR00K 85-14 - 0001.0.0
Enclosure: NRC Region I Inspection Report No. 50-443/85-14
                                                                                                    '
0$07l00Q
                                                            06/03/85
3
                                                                                zed /
o
OFFICIAL RECORD COPY
IR SEADR00K 85-14 - 0001.0.0
06/03/85
'
zed /
. -
--
--
-
-


                                                                            O                                                                           O
O
    '
O
  -
'
          Public Service Co. of New Hampshire 2
-
          cc w/ enc 1:
Public Service Co. of New Hampshire 2
          -John DeVincentis, Director, Engineering and Licensing
cc w/ enc 1:
        r W1111am B. Derrickson, Senior Vice President
-John DeVincentis, Director, Engineering and Licensing
          -Warren Hall, Operational Services Supervisor
r W1111am B. Derrickson, Senior Vice President
        M onald E. Moody, Station Manager - Seabrook Station
-Warren Hall, Operational Services Supervisor
      - Gerald F. Mcdonald, Construction QA Manager
M onald E. Moody, Station Manager - Seabrook Station
          Public Document Room (PDR)
- Gerald F. Mcdonald, Construction QA Manager
          Local Public Document Room (LPDR)
Public Document Room (PDR)
          Nuclear Safety Information Center (NSIC)
Local Public Document Room (LPDR)
      M RC Resident Inspector
Nuclear Safety Information Center (NSIC)
        --State of New Hampshire
M RC Resident Inspector
          bec w/ enc 1:
--State of New Hampshire
      + Region I Docket Room (with concurrences)
bec w/ enc 1:
          Senior Operations Officer (w/o encis)
+ Region I Docket Room (with concurrences)
l     - R. Gallo, Chief, Section #28, DRP
Senior Operations Officer (w/o encis)
        J ane Grant, DRP
l
- R. Gallo, Chief, Section #28, DRP
J ane Grant, DRP
i
i
l
l
Line 86: Line 99:
I
I
l
l
;           RI:0RS                               RI:DRS                                                                       RI:DRS
;
                                                                      ggins
RI:0RS
      'McGrearty/sm                                                                                                                   '
RI:DRS
RI:DRS
'McGrearty/sm
ggins
'
l
l
f(ff"
@f"
I
I
            f(ff"                              @f"                                                0FFICIAL RECORD COPY                 IR SEABROOK 85-14 - 0002.0.0
0FFICIAL RECORD COPY
i                                                                                                                                       06/03/85
IR SEABROOK 85-14 - 0002.0.0
i
06/03/85
I
I
i
i
,
,
i
i
                              . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _            . . _ _ _ _  _ _ _ - . _ . . _ . _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ . . _ _ . . _ _ _ . . _ _ _ _ . _ . _ . -
.
.
.
.
.
. .
- .
. .
.
.
.
.
. .
. .
. .
.
.
. -
}}
}}

Latest revision as of 09:45, 12 December 2024

Forwards Safety Insp Rept 50-443/85-14 on 850513-17.No Violation Noted
ML20132E756
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/12/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20132E759 List:
References
NUDOCS 8507180093
Download: ML20132E756 (2)


See also: IR 05000443/1985014

Text

_ _ _ _ _ _ _ _ _ _ _ _

O

O

'

.

JUL 191985

Docket No. 50-443

Public Service of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

St.bject:

Inspection Report No. 50-443/85-14

' refers to the routine safety inspection conducted by Mr. R. A. McBrearty

of this bffice on May 13-17, 1985, at Seabrook Station, Unit 1, Seabrook, New

Hampshire of activities authorized by NRC License No. CPPR-135 and to the dis-

cussions of our findings held by Mr. McBrearty with Mr. R. E. Guillette of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region ! Inspec-

tion Report which is enclosed with this letter. Within these areas, the in-

spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

ee...

. ., p

-

.

towart D. Ebnetor, Director

A

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-443/85-14

0$07l00Q

3

o

OFFICIAL RECORD COPY

IR SEADR00K 85-14 - 0001.0.0

06/03/85

'

zed /

. -

--

--

-

-

O

O

'

-

Public Service Co. of New Hampshire 2

cc w/ enc 1:

-John DeVincentis, Director, Engineering and Licensing

r W1111am B. Derrickson, Senior Vice President

-Warren Hall, Operational Services Supervisor

M onald E. Moody, Station Manager - Seabrook Station

- Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

M RC Resident Inspector

--State of New Hampshire

bec w/ enc 1:

+ Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

l

- R. Gallo, Chief, Section #28, DRP

J ane Grant, DRP

i

l

l

l

l

I

l

RI:0RS

RI:DRS

RI:DRS

'McGrearty/sm

ggins

'

l

f(ff"

@f"

I

0FFICIAL RECORD COPY

IR SEABROOK 85-14 - 0002.0.0

i

06/03/85

I

i

,

i

.

.

.

.

.

. .

- .

. .

.

.

.

.

. .

. .

. .

.

.

. -