AUG1 | |||
1985 | |||
Docket No. 50-440 | |||
The Cleveland Electric Illuminating | |||
Company | |||
ATTN: Mr. Murray R. Edelman | |||
Vice President | |||
Nuclear Group | |||
Post Office Box 5000 | |||
Cleveland, OH 44101 | |||
, | , | ||
Gentlemen: | |||
, | , | ||
This refers to the routine safety inspection conducted by Mr. J. H. Neisler of | |||
this office on June 26-28 and July 10-12, 1985, of activities at Perry Nuclear | |||
Power Plant Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to | |||
the discussion of our findings with Mr. C. M. Shuster and other members of your | |||
staff at the conclusion of the inspection. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
the inspection. Within these areas, the inspection consisted of a selective | |||
examination of procedures and representative records, observations, and | |||
interviews with personnel. | |||
No violations of NRC requirements were identified during the course of this | |||
inspection. | |||
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of | |||
this letter and the enclosed inspection report will be placed in the NRC's | |||
Public Document Room. | |||
' | ' | ||
, | , | ||
We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely, | |||
. | |||
, | |||
C.[. Pa | |||
e | |||
C. | |||
riello, Director | |||
Division of Reactor Safety | |||
Enclosure: | |||
Inspection Report | |||
No. 50-440/85041(DRS) | |||
See Attached List For Distribution | |||
8500070415 B20801 | |||
PDR | |||
ADOCK 05000440 | |||
g l | |||
G | |||
PDR | |||
.. | |||
d60 / | |||
, | |||
, | |||
AUG1 | |||
1985 | |||
Commonwealth Edison Company | |||
2 | |||
Distribution: | |||
cc w/ enclosure: | |||
J. J. Waldron, Manager, Perry | |||
Plant Technical Department | |||
M. D. Lyster, Manager, Perry Plant | |||
Operations Department | |||
L. O. Beck, General Supervising | |||
Engineer, Nuclear Licensing and | |||
Fuel Management Section | |||
DMB/ Document Control Desk (RIDS) | |||
Resident Inspector, RIII | |||
Harold W. Kohn, Ohio EPA | |||
Terry J. Lodge, Esq. | |||
James W. Harris, State of Ohio | |||
Robert H. Quillin, Ohio | |||
Department of Health | |||
. | |||
RII- | |||
RIII | |||
RII | |||
RI | |||
RIII | |||
N.i dd | |||
Wi | |||
ms | |||
Kno | |||
Ha | |||
P | |||
. | |||
07/ /85 | |||
1(M | |||
y g py | |||
_ | _ | ||
}} | }} | ||
Latest revision as of 08:46, 12 December 2024
| ML20133D688 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/01/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20133D694 | List: |
| References | |
| NUDOCS 8508070415 | |
| Download: ML20133D688 (2) | |
See also: IR 05000440/1985041
Text
L,
1
AUG1
1985
Docket No. 50-440
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
,
Gentlemen:
,
This refers to the routine safety inspection conducted by Mr. J. H. Neisler of
this office on June 26-28 and July 10-12, 1985, of activities at Perry Nuclear
Power Plant Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to
the discussion of our findings with Mr. C. M. Shuster and other members of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
'
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
,
C.[. Pa
e
C.
riello, Director
Division of Reactor Safety
Enclosure:
Inspection Report
No. 50-440/85041(DRS)
See Attached List For Distribution
8500070415 B20801
ADOCK 05000440
g l
G
..
d60 /
,
,
AUG1
1985
Commonwealth Edison Company
2
Distribution:
cc w/ enclosure:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
.
RII-
RIII
RII
RI
RIII
N.i dd
Wi
ms
Kno
Ha
P
.
07/ /85
1(M
y g py
_