ML20135E944: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- .-           .                     - -_--
{{#Wiki_filter:- .-
.
-
-_--
,
,
                                            SEP 1 3 G85
SEP 1 3 G85
  Docket No. 50-295
Docket No. 50-295
  Docket No. 50-304
Docket No. 50-304
  Commonwealth Ediscn Company
Commonwealth Ediscn Company
  ATTN: Mr. Cordell Reed
ATTN: Mr. Cordell Reed
            Vice President
Vice President
  Post Office Box 767
Post Office Box 767
  Chicago, IL 60690
Chicago, IL 60690
  Gentlemen:
Gentlemen:
  This refers to the routine safety inspection conducted by NRC inspectors
This refers to the routine safety inspection conducted by NRC inspectors
  M. M. Holzmer, L. E Kanter and J. N. Kish of this office on August 6 thrcugh
M. M. Holzmer, L. E Kanter and J. N. Kish of this office on August 6 thrcugh
,
September 3, 1985, of activities at the Zion Nuclear Generating Station
  September 3, 1985, of activities at the Zion Nuclear Generating Station
,
'
authorized by Licenses No. DPR-39 and No. DPR-48 and to the discussion of
  authorized by Licenses No. DPR-39 and No. DPR-48 and to the discussion of
'
  our findings with Mr. K. Graesser at the conclusion of the inspection.
our findings with Mr. K. Graesser at the conclusion of the inspection.
  The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
4
4
  the inspection. Within these areas, the inspection consisted of a selective
the inspection. Within these areas, the inspection consisted of a selective
  examination of procedures and representative records, observations, and
examination of procedures and representative records, observations, and
  interviews with personnel.
interviews with personnel.
  No violations of NRC requirements were identified during the course of this
No violations of NRC requirements were identified during the course of this
  inspection.
inspection.
  In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
  will be placed in the NRC Public Document Room.
will be placed in the NRC Public Document Room.
  We will gladly discuss any questions you have concerning this inspection.
We will gladly discuss any questions you have concerning this inspection.
                                                  Sincerely,
Sincerely,
                                                  N.J. Chrissotimos, Chief
N.J. Chrissotimos, Chief
                                                  Projects Branch 2
Projects Branch 2
  Enclosure: Inspection Reports
Enclosure:
    No. 50-295/85028(DRP);
Inspection Reports
    No. 50-304/85029(DRP)
No. 50-295/85028(DRP);
  See Attached Distribution
No. 50-304/85029(DRP)
                                          *
See Attached Distribution
            8509170100 850913
8509170100 850913
            PDR   ADOCK 05000295
*
            G                         PDR
PDR
                                                                                  8((
ADOCK 05000295
                      --, - . . - __           . _ -                 -
G
PDR
8((
. . . . .
.
--, - . . - __
. _ -
-


                                        . . . -     ..     -.               .   --               . . - .     ..
. . .
    .. .
-
        Commonwealth Edison Company               2                         SEP ' 3 085                               !
..
        Distribution
-.
        cc w/ enclosure:
.
        D. L. Farrar, Director
--
i'
. . - .
            - of Nuclear Licensing
..
        K. L. Graesser, Plant Manager
..
        Jan Norris, Project Manager, NRR
.
        DCS/RSB (RIDS)
Commonwealth Edison Company
        Licensing Fee Management Branch
2
        Resident Inspector, RIII
SEP ' 3 085
.        Phyllis Dunton, Attorney
!
4             General's Office, Environ-                                                                               -
Distribution
              mental Control Division
cc w/ enclosure:
        Mayor, City of Zion
D. L. Farrar, Director
                                                                                                                        1
- of Nuclear Licensing
i'
K. L. Graesser, Plant Manager
Jan Norris, Project Manager, NRR
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
.
4
General's Office, Environ-
-
mental Control Division
Mayor, City of Zion
1
i
!
i
i
!
i
i
i
4
4
          e
e
4
4
RIII
Rtu
RIII
*
*
        RIII              Rtu    RIII
ChrMsotimos
                  reann/rr     Su ChrMsotimos
reann/rr
        09/R T85
Su
                /3
09/R T85
/3
:
:
                                                        _ ..- _ - , ,_ -..       _. . . . _ _ _ _ , _ , , , . _ . . -
. . -.
          . . -.      _ _ ,        _        -
_ _ ,
                                                .,.    .
_
-
.,.
.
_ ..- _ - , ,_ -..
_.
. . . _ _ _ _ , _ , ,
, . _ . . -
}}
}}

Latest revision as of 02:06, 12 December 2024

Forwards Safety Insp Repts 50-295/85-28 & 50-304/85-29 on 850806-0903.No Violations Noted
ML20135E944
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/13/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20135E948 List:
References
NUDOCS 8509170100
Download: ML20135E944 (2)


See also: IR 05000295/1985028

Text

- .-

.

-

-_--

,

SEP 1 3 G85

Docket No. 50-295

Docket No. 50-304

Commonwealth Ediscn Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by NRC inspectors

M. M. Holzmer, L. E Kanter and J. N. Kish of this office on August 6 thrcugh

September 3, 1985, of activities at the Zion Nuclear Generating Station

,

authorized by Licenses No. DPR-39 and No. DPR-48 and to the discussion of

'

our findings with Mr. K. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

4

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N.J. Chrissotimos, Chief

Projects Branch 2

Enclosure:

Inspection Reports

No. 50-295/85028(DRP);

No. 50-304/85029(DRP)

See Attached Distribution

8509170100 850913

PDR

ADOCK 05000295

G

PDR

8((

. . . . .

.

--, - . . - __

. _ -

-

. . .

-

..

-.

.

--

. . - .

..

..

.

Commonwealth Edison Company

2

SEP ' 3 085

!

Distribution

cc w/ enclosure:

D. L. Farrar, Director

- of Nuclear Licensing

i'

K. L. Graesser, Plant Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

.

4

General's Office, Environ-

-

mental Control Division

Mayor, City of Zion

1

i

!

i

i

4

e

4

RIII

Rtu

RIII

ChrMsotimos

reann/rr

Su

09/R T85

/3

. . -.

_ _ ,

_

-

.,.

.

_ ..- _ - , ,_ -..

_.

. . . _ _ _ _ , _ , ,

, . _ . . -