Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO. | |||
UNIT | UNIT Callaway DATE 12/5/85 | ||
*~ | |||
DATE | COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o | ||
809 | DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) | ||
(MWe Net) 1125 1122 37 i | |||
129 1116 2 | |||
R | 3, 809 1123 3 | ||
3,. | |||
685 1129 4 | |||
20 0 | |||
1138 3 | |||
21 0 | |||
1123 a | |||
22 0 | |||
1092 y | |||
23 517 1107 s | |||
24 1095 g | |||
1106 5 | |||
1134 1104 10 1063 1136 11 27 12 50 1138 3 | |||
1141 13 811 3 | |||
14 1108 1140 3g 15 1105 33 1123 16 8602190052 851130 i | |||
PDR ADOCK 05000483 | |||
) | |||
R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204 c- | |||
e s | e s | ||
Part D OPERATING DATA REPORT DOCKET NO. | Part D OPERATING DATA REPORT 50-483 DOCKET NO. | ||
UNIT Callaway DATg 12/5/85 DAN B. PRATTE COMPLETED BY TELEPHONg (314) 676-8460 OPERATING 8TATUS November 1985 Gross Moums IN REPORTING PERICO: 720 | |||
. REPoRTtNo PeRico: | |||
3411 Max. DepeNO. CAPACITY tmwed. | |||
1120 | |||
: 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo: | : 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo: | ||
ossicm ELsCTRICAL RATINo tMw Neo: 1171* | |||
: 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned: | At stretch power level which is not a | ||
currentiv authorized under the operating M gense. | |||
: 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned: | |||
1 | |||
: 4. REASONS FOR RESTRICTION llP ANY1: | : 4. REASONS FOR RESTRICTION llP ANY1: | ||
THIS MONTM YM TO DATE CuMuLAfivt S. NuMetR of wouRs REACTOR was CRIT: CAL | THIS MONTM YM TO DATE CuMuLAfivt 695 7463.8 7766.3 S. NuMetR of wouRs REACTOR was CRIT: CAL 0 | ||
0 0 | |||
: s. REACTOR RESERVE shutdown MOUR$ | : s. REACTOR RESERVE shutdown MOUR$ | ||
605.1 7208.9 7511.4 7 HOURS GENERATOR ON LINE 0 | |||
605.1 | 0 0 | ||
: e. unit REsERva swuToowN Hours | : e. unit REsERva swuToowN Hours | ||
: 9. Gross THERMAL ENERGY GENER ATED IMwMI | |||
: 9. Gross THERMAL ENERGY GENER ATED IMwMI | .I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI.. | ||
668.969 7.714.156 8.053.336 | |||
668.969 | : 11. NET ELECTRtCAL ENERGY GENERATED IMwMI 615.1R4 7.121.780 7 Aaa.n03 | ||
: 11. NET ELECTRtCAL ENERGY GENERATED IMwMI | : 12. REACTom SERVICE PAcrom 96.57 91.17 93.4g 96.5% | ||
615.1R4 | 93.1% | ||
: 12. REACTom SERVICE PAcrom | 93,4% | ||
96.57 | : 13. REACTOR AV AILAe1LITY P ACTOR. | ||
: 13. REACTOR AV AILAe1LITY P ACTOR . | 84.1% | ||
89.9% | |||
84.1% | 90.3% | ||
14 UNIT sERvlCE PACTOR.. | |||
: 19. uN 7 AVAILA81LiTY PACTOR | 84.1% | ||
89.9% | |||
: 18. uNif CAPACITY P ACTOR tuesne MOC) | 90.3% | ||
: 19. uN 7 AVAILA81LiTY PACTOR | |||
: 18. uNif CAPACITY P ACTOR tuesne MOC) 78.8% | |||
is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI: | 81.6% | ||
A7.1Y 75.3% | |||
78.0% | |||
78.52 t7. UNIT CAPACITY PACToM tu ee o.eien Mweet....... | |||
*15.9% | |||
6.1% | |||
5.9% | |||
ts. unit soRCao ouTAce RAf t. | |||
1 is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI: | |||
Refuel, 2/28/85, approximately 42 days. | |||
: 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP: | : 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP: | ||
l 1 | l 1 | ||
ENNk Page 3 of 4 qap.zz.04204 | |||
D | |||
~ | |||
e-Y | x e-Y Pare E DOCKET NO. | ||
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J-, | |||
4 | DATE 12/s/85 n | ||
[F | 4 COMPLETED BY DAN B. PRATTE | ||
[F REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C | |||
7,,. : | 7,,. : | ||
H 40ETHOD OF k | H 40ETHOD OF k | ||
TYPE SHUTTING DOWN I | |||
00 0. DATE S: SCHEDULED 4 HOUR $8 | F: FOACED DURATION THE REACTOR OR | ||
~ | |||
LER 85-048-00 | 00 0. | ||
6 L | DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F | ||
26 | 15 hrs. | ||
A 3 | |||
Rod control problem caused a group of 30 min. | |||
rods to drop and reactor trip. | |||
LER 85-048-00 25 11-4 F | |||
81 hrs. | |||
A 1 | |||
Forced unit shutdown to mode 4 to repair sN 11 min. | |||
packing leak on pressurizer valve. | |||
6 L | |||
26 11-11 F | |||
18 hrs. | |||
A 3 | |||
Unit tripped due to main generator 5 min. | |||
stator cooling water temperature qj controller failure. | |||
Incrpased stator t, | |||
cooling temperature to trip setpoint. | cooling temperature to trip setpoint. | ||
;'y | ;'y LER 85-049-00 y | ||
i} | |||
i} | 27 11-24 S | ||
48 hrs. | |||
B 1 | |||
Power reduced to repair leaks on h | |||
secondary. | secondary. | ||
Tj h | Tj h | ||
l-jj | l-jj | ||
M 't asascos | """**M Y: | ||
M | |||
't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST | |||
[ | - 2: BAAIIUAL ScaAat C asynsrsassr: | ||
; | 3: Attgees4TICscaAss i | ||
D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t? | |||
E: cesaAigainassuesG AIGD 7: | |||
LaCEIEEE EXAaIIss419006 | |||
[ | |||
F: ADIABWTaAftvE | |||
; j c cetaAftoseALEamos(EEFLANG) | |||
CA-#804 3 | |||
05/09/84 f; | |||
Page 4 of 4 QDP-ZZ-04204 1.-; | |||
3g. | |||
W : | |||
1 | 1 o | ||
' ~ * ~ | |||
saa f' | |||
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217 | k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217 | ||
==Dear Sir:== | ==Dear Sir:== | ||
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i Technical Specifications. | |||
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i | |||
Technical Specifications. | |||
S. E. Miltenberger | S. E. Miltenberger | ||
~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure cc: Distribution attached Mczng Addess: P.O. Box 620. FuMon, MO 65254 J | |||
cc: Distribution attached | |||
Mczng Addess: P.O. Box 620. FuMon, MO 65254 | |||
J | |||
z, | |||
.s. | |||
.s. | |||
i | i | ||
_t dintribution for ULNRC-1217 | = | ||
~ | |||
with enclosures. | _t dintribution for ULNRC-1217 with enclosures. | ||
Mr.' James G. Keppler Regional Administrator | Mr.' James G. Keppler Regional Administrator | ||
,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III | |||
-799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector m | |||
Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector | t. | ||
.a | |||
s-MONTHLY OPERATING REPORT DOCKET No. | |||
PART A OPERATIONS | 50-483 UNIT NAME 6 DATE nFPFMRFR 5. | ||
19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 PART A OPERATIONS | |||
==SUMMARY== | ==SUMMARY== | ||
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions: | NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions: | ||
1. | |||
On 11/2/85 the unit tripped due to a rod control problem and was back | |||
~ | |||
on line the same day. | on line the same day. | ||
2. | |||
On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63. | |||
O | 3. | ||
On 11/11/85 the unit tripped due to a temperature-control valve failure j | |||
on Stator Cooling Water. The unit was back on line 11/12/85. | |||
O 4. | |||
On 11/23/85 load was reduced to renair leaks in secondarv side. | |||
Unit was returned to full power 11/24/85. | |||
PART B PORV AND SAFETY VALVE | |||
==SUMMARY== | ==SUMMARY== | ||
~ | |||
NONE s | NONE s | ||
8 i | 8 i | ||
f CA-#804 Q | f CA-#804 Q | ||
05/09/84 ff,h ' | |||
QDP-ZZ-04204 Page 1 of 4 j | |||
-}} | |||
Latest revision as of 21:10, 11 December 2024
| ML20137U097 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/30/1985 |
| From: | Miltenberger S, Pratte D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| ULNRC-1217, NUDOCS 8602190052 | |
| Download: ML20137U097 (6) | |
Text
.a 8
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE 12/5/85
- ~
COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1125 1122 37 i
129 1116 2
3, 809 1123 3
3,.
685 1129 4
20 0
1138 3
21 0
1123 a
22 0
1092 y
23 517 1107 s
24 1095 g
1106 5
1134 1104 10 1063 1136 11 27 12 50 1138 3
1141 13 811 3
14 1108 1140 3g 15 1105 33 1123 16 8602190052 851130 i
PDR ADOCK 05000483
)
R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204 c-
e s
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway DATg 12/5/85 DAN B. PRATTE COMPLETED BY TELEPHONg (314) 676-8460 OPERATING 8TATUS November 1985 Gross Moums IN REPORTING PERICO: 720
. REPoRTtNo PeRico:
3411 Max. DepeNO. CAPACITY tmwed.
1120
- 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:
ossicm ELsCTRICAL RATINo tMw Neo: 1171*
At stretch power level which is not a
currentiv authorized under the operating M gense.
- 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned:
1
- 4. REASONS FOR RESTRICTION llP ANY1:
THIS MONTM YM TO DATE CuMuLAfivt 695 7463.8 7766.3 S. NuMetR of wouRs REACTOR was CRIT: CAL 0
0 0
- s. REACTOR RESERVE shutdown MOUR$
605.1 7208.9 7511.4 7 HOURS GENERATOR ON LINE 0
0 0
- e. unit REsERva swuToowN Hours
- 9. Gross THERMAL ENERGY GENER ATED IMwMI
.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI..
668.969 7.714.156 8.053.336
- 11. NET ELECTRtCAL ENERGY GENERATED IMwMI 615.1R4 7.121.780 7 Aaa.n03
- 12. REACTom SERVICE PAcrom 96.57 91.17 93.4g 96.5%
93.1%
93,4%
- 13. REACTOR AV AILAe1LITY P ACTOR.
84.1%
89.9%
90.3%
14 UNIT sERvlCE PACTOR..
84.1%
89.9%
90.3%
- 19. uN 7 AVAILA81LiTY PACTOR
- 18. uNif CAPACITY P ACTOR tuesne MOC) 78.8%
81.6%
A7.1Y 75.3%
78.0%
78.52 t7. UNIT CAPACITY PACToM tu ee o.eien Mweet.......
- 15.9%
6.1%
5.9%
ts. unit soRCao ouTAce RAf t.
1 is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI:
Refuel, 2/28/85, approximately 42 days.
- 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:
l 1
ENNk Page 3 of 4 qap.zz.04204
D
~
x e-Y Pare E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J-,
DATE 12/s/85 n
4 COMPLETED BY DAN B. PRATTE
[F REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C
7,,. :
H 40ETHOD OF k
TYPE SHUTTING DOWN I
F: FOACED DURATION THE REACTOR OR
~
00 0.
DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F
15 hrs.
A 3
Rod control problem caused a group of 30 min.
rods to drop and reactor trip.
LER 85-048-00 25 11-4 F
81 hrs.
A 1
Forced unit shutdown to mode 4 to repair sN 11 min.
packing leak on pressurizer valve.
6 L
26 11-11 F
18 hrs.
A 3
Unit tripped due to main generator 5 min.
stator cooling water temperature qj controller failure.
Incrpased stator t,
cooling temperature to trip setpoint.
- 'y LER 85-049-00 y
i}
27 11-24 S
48 hrs.
B 1
Power reduced to repair leaks on h
secondary.
Tj h
l-jj
"""**M Y:
M
't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST
- 2: BAAIIUAL ScaAat C asynsrsassr:
3: Attgees4TICscaAss i
D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t?
E: cesaAigainassuesG AIGD 7:
LaCEIEEE EXAaIIss419006
[
F: ADIABWTaAftvE
- j c cetaAftoseALEamos(EEFLANG)
CA-#804 3
05/09/84 f;
Page 4 of 4 QDP-ZZ-04204 1.-;
3g.
W :
1 o
' ~ * ~
saa f'
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i Technical Specifications.
S. E. Miltenberger
~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure cc: Distribution attached Mczng Addess: P.O. Box 620. FuMon, MO 65254 J
z,
.s.
.s.
i
=
~
_t dintribution for ULNRC-1217 with enclosures.
Mr.' James G. Keppler Regional Administrator
,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III
-799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector m
t.
.a
s-MONTHLY OPERATING REPORT DOCKET No.
50-483 UNIT NAME 6 DATE nFPFMRFR 5.
19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 PART A OPERATIONS
SUMMARY
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:
1.
On 11/2/85 the unit tripped due to a rod control problem and was back
~
on line the same day.
2.
On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
3.
On 11/11/85 the unit tripped due to a temperature-control valve failure j
on Stator Cooling Water. The unit was back on line 11/12/85.
O 4.
On 11/23/85 load was reduced to renair leaks in secondarv side.
Unit was returned to full power 11/24/85.
PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE s
8 i
f CA-#804 Q
05/09/84 ff,h '
QDP-ZZ-04204 Page 1 of 4 j
-