8 Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-483      -
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT   Callaway
UNIT Callaway DATE 12/5/85
    *~
*~
DATE   12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH   NOVDfBER 1985 o           DAY AVERAGE DAILY POWER LEVEL             DAY AVERAGE DAILY POWER LEVEL (MWe Net)                                     (MWe Net) i              1122                       37 1125 129                       3, 1116 2
COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o
809                                         1123 3                                         3, .
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
4              685                                         1129 20 3                0                       21 1138
(MWe Net) 1125 1122 37 i
* 0                                         1123 a                                         22 y                0                                         1092 23 s               517                      24 1107 g             1106                       5                 1095 10              1134                       ,                1104 11 1063                      27 1136 12               50                       3                 1138 13               811                       3                 1141 14             1108                       3g               1140 15             1105                       33 16             1123 8602190052 851130                                                     i PDR   ADOCK 05000483                                                   )
129 1116 2
R               FDR 0 [dh84 Page 2 of,4                                 QDP-ZZ-04204
3, 809 1123 3
3,.
685 1129 4
20 0
1138 3
21 0
1123 a
22 0
1092 y
23 517 1107 s
24 1095 g
1106 5
1134 1104 10 1063 1136 11 27 12 50 1138 3
1141 13 811 3
14 1108 1140 3g 15 1105 33 1123 16 8602190052 851130 i
PDR ADOCK 05000483
)
R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204 c-


e s
e s
Part D OPERATING DATA REPORT DOCKET NO.
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
50-483 UNIT     Callaway DATg     12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONg     (314) 676-8460 OPERATING 8TATUS
UNIT Callaway DATg 12/5/85 DAN B. PRATTE COMPLETED BY TELEPHONg (314) 676-8460 OPERATING 8TATUS November 1985 Gross Moums IN REPORTING PERICO: 720
        . REPoRTtNo PeRico:  November 1985                     Gross Moums IN REPORTING PERICO: 720                                       ,
. REPoRTtNo PeRico:
3411 Max. DepeNO. CAPACITY tmwed.
1120
: 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:
: 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:
3411            Max. DepeNO. CAPACITY tmwed.            1120 ossicm ELsCTRICAL RATINo tMw Neo: 1171*                                 At stretch power level which is not a             currentiv authorized under the operating M gense.
ossicm ELsCTRICAL RATINo tMw Neo: 1171*
: 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned:                             1
At stretch power level which is not a
currentiv authorized under the operating M gense.
: 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned:
1
: 4. REASONS FOR RESTRICTION llP ANY1:
: 4. REASONS FOR RESTRICTION llP ANY1:
THIS MONTM YM TO DATE CuMuLAfivt S. NuMetR of wouRs REACTOR was CRIT: CAL                     , ...            . ..
THIS MONTM YM TO DATE CuMuLAfivt 695 7463.8 7766.3 S. NuMetR of wouRs REACTOR was CRIT: CAL 0
695        7463.8        7766.3
0 0
: s. REACTOR RESERVE shutdown MOUR$               .    .                          . .
: s. REACTOR RESERVE shutdown MOUR$
0            0            0 7 HOURS GENERATOR ON LINE        .      .                      .
605.1 7208.9 7511.4 7 HOURS GENERATOR ON LINE 0
605.1     7208.9       7511.4
0 0
: e. unit REsERva swuToowN Hours               ..              .      .      ...
: e. unit REsERva swuToowN Hours
0            0            0
: 9. Gross THERMAL ENERGY GENER ATED IMwMI
: 9. Gross THERMAL ENERGY GENER ATED IMwMI                   ..
.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI..
                                                                                              .I.,940.798     22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI . .                      . .
668.969 7.714.156 8.053.336
668.969     7.714.156     8.053.336
: 11. NET ELECTRtCAL ENERGY GENERATED IMwMI 615.1R4 7.121.780 7 Aaa.n03
: 11. NET ELECTRtCAL ENERGY GENERATED IMwMI               .....                .
: 12. REACTom SERVICE PAcrom 96.57 91.17 93.4g 96.5%
615.1R4     7.121.780     7 Aaa.n03
93.1%
: 12. REACTom SERVICE PAcrom       ..... .              ... ...                    ..
93,4%
96.57       91.17         93.4g 96.5%       93.1%         93,4%         l
: 13. REACTOR AV AILAe1LITY P ACTOR.
: 13. REACTOR AV AILAe1LITY P ACTOR .         .     .     ...                .          .
84.1%
l 14 UNIT sERvlCE PACTOR . .          .............. .                      . , ...
89.9%
84.1%       89.9%         90.3%
90.3%
I
14 UNIT sERvlCE PACTOR..
: 19. uN 7 AVAILA81LiTY PACTOR         .. . ...            . .. .            .....,
84.1%
84.1%        89.9%          90.3%    ,
89.9%
: 18. uNif CAPACITY P ACTOR tuesne MOC)       .        . . ....,......                        78.8%       81.6%         A7.1Y t7. UNIT CAPACITY PACToM tu ee o.eien Mweet . . . . . . .                ........
90.3%
75.3%        78.0%        78.52          l ts. unit soRCao ouTAce RAf t .                                                              *15.9%         6.1%         5.9%
: 19. uN 7 AVAILA81LiTY PACTOR
                                                  ... .... .............                                                                      l 1
: 18. uNif CAPACITY P ACTOR tuesne MOC) 78.8%
is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI:                                                         l Refuel, 2/28/85, approximately 42 days.
81.6%
* l
A7.1Y 75.3%
78.0%
78.52 t7. UNIT CAPACITY PACToM tu ee o.eien Mweet.......
*15.9%
6.1%
5.9%
ts. unit soRCao ouTAce RAf t.
1 is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI:
Refuel, 2/28/85, approximately 42 days.
: 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:
: 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:
l 1
l 1
l ENNk         I Page 3 of 4                                                     qap.zz.04204
ENNk Page 3 of 4 qap.zz.04204


x D                                                                                                     -
D
                                                                                                                                                      ~
~
e-Y                                                                                                                                                         .
x e-Y Pare E DOCKET NO.
  ,:                                                                    Pare E                                 DOCKET NO.         50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS                         UNIT NANE         Callaway J- ,                                                                                                                     DATE 12/s/85 n
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J-,
4                                                                                                           COMPLETED BY DAN B. PRATTE
DATE 12/s/85 n
[F;                                                            REPORT MONTH           NOVEMBER                 1ELEPHONE (314) 676-8460 C                                                                                       .
4 COMPLETED BY DAN B. PRATTE
[F REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C
7,,. :
7,,. :
H 40ETHOD OF k                             TYPE                                         SHUTTING DOWN I                         F: FOACED       DURATION                       THE REACTOR OR
H 40ETHOD OF k
    ~
TYPE SHUTTING DOWN I
00 0. DATE S: SCHEDULED 4 HOUR $8               REASON     REDUCaesG POWER                 CORRECTIVE ACTIONS /CORAeAENTS 24   11-2           F         15 hrs.             A                   3             Rod control problem caused a group of
F: FOACED DURATION THE REACTOR OR
    -                                      30 min.                                               rods to drop and reactor trip.
~
LER 85-048-00 s          25   11-4           F         81 hrs.             A                   1             Forced unit shutdown to mode 4 to repair N                                          11 min.                                               packing leak on pressurizer valve.
00 0.
6 L     ,
DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F
26   11-11         F         18 hrs.             A                   3             Unit tripped due to main generator 5 min.                                               stator cooling water temperature qj                                                                                                 controller failure. Incrpased stator t,
15 hrs.
A 3
Rod control problem caused a group of 30 min.
rods to drop and reactor trip.
LER 85-048-00 25 11-4 F
81 hrs.
A 1
Forced unit shutdown to mode 4 to repair sN 11 min.
packing leak on pressurizer valve.
6 L
26 11-11 F
18 hrs.
A 3
Unit tripped due to main generator 5 min.
stator cooling water temperature qj controller failure.
Incrpased stator t,
cooling temperature to trip setpoint.
cooling temperature to trip setpoint.
;'y
;'y LER 85-049-00 y
* LER 85-049-00 y
i}
i}         27   11-24       S           48 hrs.             B                   1             Power reduced to repair leaks on h
27 11-24 S
48 hrs.
B 1
Power reduced to repair leaks on h
secondary.
secondary.
Tj h
Tj h
l-jj         """**M Y:                                                                         ,
l-jj
M 't asascos                               amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4     3: SIA8alAL-a:BRAert.ORTEST                   - 2: BAAIIUAL ScaAat
"""**M Y:
    -                                  C asynsrsassr:                       3: Attgees4TICscaAss                                                 ,
M
i                                    D: ascam avgalt.aESTasCTeGes         4 OB W Rta W EAgat t?                                     E: cesaAigainassuesG AIGD 7:                                             LaCEIEEE EXAaIIss419006
't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST
[                                       F: ADIABWTaAftvE
- 2: BAAIIUAL ScaAat C asynsrsassr:
; j                                   c cetaAftoseALEamos(EEFLANG)
3: Attgees4TICscaAss i
                                        "'"'''''"*"''                                                                                CA-#804 3                                                                                                                                     05/09/84 f;                                                                           Page 4 of 4                                             QDP-ZZ-04204 1.-;
D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t?
3
E: cesaAigainassuesG AIGD 7:
: g.                                 .__                  .,,      ._
LaCEIEEE EXAaIIss419006
_.              -                            ._ .-__-_ W :
[
F: ADIABWTaAftvE
; j c cetaAftoseALEamos(EEFLANG)
CA-#804 3
05/09/84 f;
Page 4 of 4 QDP-ZZ-04204 1.-;
3g.
W :


1       o
1 o
  *    '~*~
' ~ * ~
    ,        saa
saa f'
      ,        f'     .
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217


==Dear Sir:==
==Dear Sir:==
 
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i Technical Specifications.
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i                 <
Technical Specifications.
S. E. Miltenberger
S. E. Miltenberger
                                                                        ~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure                                                                       ;
~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure cc: Distribution attached Mczng Addess: P.O. Box 620. FuMon, MO 65254 J
cc: Distribution attached l
Mczng Addess: P.O. Box 620. FuMon, MO 65254                                             l l
J


_                    ..                                                z,
z,
              .s.
.s.
        =
.s.
              .s.
i
i
_t dintribution for ULNRC-1217
=
                                      ~
~
with enclosures.
_t dintribution for ULNRC-1217 with enclosures.
Mr.' James G. Keppler Regional Administrator
Mr.' James G. Keppler Regional Administrator
                  ,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III
,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III
                  -799 Roosevelt Road                       -
-799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector m
Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector
t.
_____.____-____._________.a
.a


      . s-MONTHLY OPERATING REPORT DOCKET No.       50-483 UNIT NAME 6 DATE     nFPFMRFR 5. 19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460                                                             -
s-MONTHLY OPERATING REPORT DOCKET No.
PART A OPERATIONS  
50-483 UNIT NAME 6 DATE nFPFMRFR 5.
19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 PART A OPERATIONS  


==SUMMARY==
==SUMMARY==
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:
: 1. On 11/2/85 the unit tripped due to a rod control problem and was back
1.
                                                                              ~
On 11/2/85 the unit tripped due to a rod control problem and was back
~
on line the same day.
on line the same day.
: 2. On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
2.
: 3. On 11/11/85 the unit tripped due to a temperature- control valve failure j                     on Stator Cooling Water. The unit was back on line 11/12/85.
On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
O             4. On 11/23/85 load was reduced to renair leaks in secondarv side. Unit was returned to full power 11/24/85.
3.
  -          PART B     PORV AND SAFETY VALVE  
On 11/11/85 the unit tripped due to a temperature-control valve failure j
on Stator Cooling Water. The unit was back on line 11/12/85.
O 4.
On 11/23/85 load was reduced to renair leaks in secondarv side.
Unit was returned to full power 11/24/85.
PART B PORV AND SAFETY VALVE  


==SUMMARY==
==SUMMARY==
 
~
  ~
NONE s
NONE s
8 i
8 i
f CA-#804 Q   05/09/84 Page 1 of 4 ff,h '   QDP-ZZ-04204 j
f CA-#804 Q
                                                                                    <}}
05/09/84 ff,h '
QDP-ZZ-04204 Page 1 of 4 j
-}}

Latest revision as of 21:10, 11 December 2024

Monthly Operating Rept for Nov 1985
ML20137U097
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1985
From: Miltenberger S, Pratte D
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1217, NUDOCS 8602190052
Download: ML20137U097 (6)


Text

.a 8

Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE 12/5/85

  • ~

COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 1125 1122 37 i

129 1116 2

3, 809 1123 3

3,.

685 1129 4

20 0

1138 3

21 0

1123 a

22 0

1092 y

23 517 1107 s

24 1095 g

1106 5

1134 1104 10 1063 1136 11 27 12 50 1138 3

1141 13 811 3

14 1108 1140 3g 15 1105 33 1123 16 8602190052 851130 i

PDR ADOCK 05000483

)

R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204 c-

e s

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

UNIT Callaway DATg 12/5/85 DAN B. PRATTE COMPLETED BY TELEPHONg (314) 676-8460 OPERATING 8TATUS November 1985 Gross Moums IN REPORTING PERICO: 720

. REPoRTtNo PeRico:

3411 Max. DepeNO. CAPACITY tmwed.

1120

2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:

ossicm ELsCTRICAL RATINo tMw Neo: 1171*

At stretch power level which is not a

currentiv authorized under the operating M gense.

3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned:

1

4. REASONS FOR RESTRICTION llP ANY1:

THIS MONTM YM TO DATE CuMuLAfivt 695 7463.8 7766.3 S. NuMetR of wouRs REACTOR was CRIT: CAL 0

0 0

s. REACTOR RESERVE shutdown MOUR$

605.1 7208.9 7511.4 7 HOURS GENERATOR ON LINE 0

0 0

e. unit REsERva swuToowN Hours
9. Gross THERMAL ENERGY GENER ATED IMwMI

.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI..

668.969 7.714.156 8.053.336

11. NET ELECTRtCAL ENERGY GENERATED IMwMI 615.1R4 7.121.780 7 Aaa.n03
12. REACTom SERVICE PAcrom 96.57 91.17 93.4g 96.5%

93.1%

93,4%

13. REACTOR AV AILAe1LITY P ACTOR.

84.1%

89.9%

90.3%

14 UNIT sERvlCE PACTOR..

84.1%

89.9%

90.3%

19. uN 7 AVAILA81LiTY PACTOR
18. uNif CAPACITY P ACTOR tuesne MOC) 78.8%

81.6%

A7.1Y 75.3%

78.0%

78.52 t7. UNIT CAPACITY PACToM tu ee o.eien Mweet.......

  • 15.9%

6.1%

5.9%

ts. unit soRCao ouTAce RAf t.

1 is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI:

Refuel, 2/28/85, approximately 42 days.

20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:

l 1

ENNk Page 3 of 4 qap.zz.04204

D

~

x e-Y Pare E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J-,

DATE 12/s/85 n

4 COMPLETED BY DAN B. PRATTE

[F REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C

7,,. :

H 40ETHOD OF k

TYPE SHUTTING DOWN I

F: FOACED DURATION THE REACTOR OR

~

00 0.

DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F

15 hrs.

A 3

Rod control problem caused a group of 30 min.

rods to drop and reactor trip.

LER 85-048-00 25 11-4 F

81 hrs.

A 1

Forced unit shutdown to mode 4 to repair sN 11 min.

packing leak on pressurizer valve.

6 L

26 11-11 F

18 hrs.

A 3

Unit tripped due to main generator 5 min.

stator cooling water temperature qj controller failure.

Incrpased stator t,

cooling temperature to trip setpoint.

'y LER 85-049-00 y

i}

27 11-24 S

48 hrs.

B 1

Power reduced to repair leaks on h

secondary.

Tj h

l-jj

"""**M Y:

M

't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST

- 2: BAAIIUAL ScaAat C asynsrsassr:

3: Attgees4TICscaAss i

D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t?

E: cesaAigainassuesG AIGD 7:

LaCEIEEE EXAaIIss419006

[

F: ADIABWTaAftvE

j c cetaAftoseALEamos(EEFLANG)

CA-#804 3

05/09/84 f;

Page 4 of 4 QDP-ZZ-04204 1.-;

3g.

W :

1 o

' ~ * ~

saa f'

k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i Technical Specifications.

S. E. Miltenberger

~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure cc: Distribution attached Mczng Addess: P.O. Box 620. FuMon, MO 65254 J

z,

.s.

.s.

i

=

~

_t dintribution for ULNRC-1217 with enclosures.

Mr.' James G. Keppler Regional Administrator

,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III

-799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector m

t.

.a

s-MONTHLY OPERATING REPORT DOCKET No.

50-483 UNIT NAME 6 DATE nFPFMRFR 5.

19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 PART A OPERATIONS

SUMMARY

NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:

1.

On 11/2/85 the unit tripped due to a rod control problem and was back

~

on line the same day.

2.

On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.

3.

On 11/11/85 the unit tripped due to a temperature-control valve failure j

on Stator Cooling Water. The unit was back on line 11/12/85.

O 4.

On 11/23/85 load was reduced to renair leaks in secondarv side.

Unit was returned to full power 11/24/85.

PART B PORV AND SAFETY VALVE

SUMMARY

~

NONE s

8 i

f CA-#804 Q

05/09/84 ff,h '

QDP-ZZ-04204 Page 1 of 4 j

-