ML20138M695: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000818/2009028]]
| number = ML20138M695
| issue date = 10/16/1985
| title = Notice of Violation from Insp on 850818-0928
| author name = Dodds R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name =
| addressee affiliation =
| docket = 05000275, 05000323
| license number =
| contact person =
| document report number = 50-275-85-32, 50-323-85-29, NUDOCS 8511040216
| package number = ML20138M679
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000818/2009028]]
 
=Text=
{{#Wiki_filter:.
                                        APPENDIX A
                                  NOTICE OF VIOLATION
    Pacific Gas and Electric Company                      Docket Nos. 50-275 & 50-323
    77 Beale Street, Room 1451                            License Nos. DPR-80 & DPR-82
    San Francisco, California 94106
    As a result of the inspection conducted during the period of August 18 through
    September 28, 1985, and in accordance with tne NRC Enforcement Policy (10 CFR
    Part 2, Appendix C), the following violation was identified:
    A.  10 CFR 50, Appendix B, Criterion V and Policy Section 5 of the PGandE
        Quality Assurance Manual require that " Activities afffecting quality
        shall be prescribed by documented instructions, procedures, or drawings,
        of a type appropriate to the circumstances and shall be accomplished in
        accord'.nce with these instructions, proedures, or drawings." To
        implement this regulation, in part, PGandE Nuclear Plant Administrative
        Procedure (NPAP) D-538, " Control of Material at DCPP" states, " Access
        shall be limited at all times to those personnel on the current approved
        access list. Others shall be admitted only on a signed-in escort basis
        as required."
        Contrary to the above, on September 11, 1985, an NRC inspector, not on
        the approved access list, entered a Class I safety-related material
        storage a rea (Warehouse B) through the southwest roll-up door, completely
        unescorted and unchallenged. This is a repeat violation.
        This is a Severity Level V Violation (Supplement I)
    Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company
    is hereby required to submit to this office within thirty days of the date of
    this Notice, a written statement of explaination in reply including: (1) the
    corrective steps which have been taken and the results achieved; (2) the
    corrective steps which will be taken to avoid further items of noncompliance;
    and (3) the date when full compliance will be achieved. Consideration may be
    given to extending your response time for good cause shown.
      OCT 161985
        Dated
                                                    ))                [
                                                  'R." T. Dodd's, Chief
                                                    Reactor Projects Section 1
    8511040216 851016
    PDR
    G      ADOCK 05000275
                      PDR
l
,
}}

Latest revision as of 11:25, 25 September 2020