ML20148H501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:..       . . __       _         _. .         _   . -     .   _                                   . _ .   . _ _ _ _ _
{{#Wiki_filter:..
            s
. . __
              ,Q-
_
    -c.
_.
      ,
.
        .
_
                                                                              MAR 221988                                             ,
.
                          In Reply Refer To:                                                                                         i
-
                                                                                                                                      '
.
                          Dockets:     50-445/88-11
_
                                      -50-446/88-09
. _ .
                          TU Electric
. _ _ _ _ _
                          ATTN: Mr. W. G. Counsil
s
i                                   Executive Vice-President
,Q-
                          400 North Olive Street, Lock Box 81
-c.
                          Dallas, Texas         75201
,
                          Gentlemen:
.
                          This refers to the inspection conducted by NRC consultants during
MAR 221988
                                                  ~
,
                          the period February 3 through' March 1,-1988, of activities
In Reply Refer To:
                          authorized by NRC Construction Permits CPPR-126 and-CPPR-127 for
i
                          the Comanche Peak Steam Electric Station, Units 1 and 2, and to the
'
                          discussion of our findings with you and other members of your staff                                       ;
Dockets:
                          at the conclusion'of the inspection.
50-445/88-11
-50-446/88-09
TU Electric
ATTN:
Mr. W. G. Counsil
i
Executive Vice-President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by NRC consultants during
~
the period February 3 through' March 1,-1988, of activities
authorized by NRC Construction Permits CPPR-126 and-CPPR-127 for
the Comanche Peak Steam Electric Station, Units 1 and 2, and to the
discussion of our findings with you and other members of your staff
;
at the conclusion'of the inspection.
<
<
                          The enclosed copy of our inspection report identifies areas                                               ,
The enclosed copy of our inspection report identifies areas
                          examined during the inspection. Within these areas, the inspection                                         '
,
                          consisted of selective examination of procedures and representative
examined during the inspection.
                          records, interviews with personnel, and observations by the
Within these areas, the inspection
                          inspectors.
'
                                                                                                                                      '
consisted of selective examination of procedures and representative
                          Within the scope of the inspection, no violations or deviations
records, interviews with personnel, and observations by the
                          were identified.
inspectors.
                                                                                                                                      ,
'
Within the scope of the inspection, no violations or deviations
were identified.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a
"
"
                          In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
                          copy of this letter and the enclosed inspection report will be                                             )
)
;
placed in the NRC Public Document Room.
                          placed in the NRC Public Document Room.
;
                          Should you have any questions concerning this inspection, we will
Should you have any questions concerning this inspection, we will
                          be pleased to discuss them with you,
be pleased to discuss them with you,
                                                                                                                                      i
i
                                                                          Sincerely,                                                   j
Sincerely,
!
j
                                                                            ORIGINAL SIGUED BY R. F. Y?nmA                             ,
!
                                                                                                                                      l
ORIGINAL SIGUED BY R. F. Y?nmA
I                                                                       R. F. Warnick, Assistant Director                           l
,
                                                                            for Inspection Programs
l
,
I
                                                                          Comancho Peak Project Division                               i
R. F. Warnick, Assistant Director
i                                                                        Office of Special Projects                                   l
for Inspection Programs
                          Enclosure:
Comancho Peak Project Division
                          Inspection Report 50-445/88-11; 50-446/88-09
,
                          cc w/ enclosure:
i
                          See next page                                                                                 g
Office of Special Projects
                            IP:CPPD:OSPj         AD:I :WPD:OSP
Enclosure:
                          HLivermore            RWarnick                                                             [g
Inspection Report 50-445/88-11; 50-446/88-09
;                          3/st/88             3/ zt/ 88
cc w/ enclosure:
!                           8803300009 800322
See next page
  1                         PDR ADOCK 05000445
g
                            0                   DCD
:WPD:OSP
            ,   _
IP:CPPD:OSPj
                                      -. -,             - ..-     .- -           . - - - .               .-__ .           . - . -
AD:I
RWarnick
[ g
HLivermore
3/st/88
3/ zt/ 88
;
!
8803300009 800322
1
PDR
ADOCK 05000445
0
DCD
,
_
- -
-. -,
- ..-
.- -
. - - -
.
.
.-__ .
. - . -


      s
s
'.          "*%,                         UNITED STATES
"*%,
  j# *         %,j
'.
                                NUCLEAR REGULATORY COMMISSION
UNITED STATES
  *                                  WASHING TON, D. C. 20556
j# *
                  t
%
      '% . . . . M
NUCLEAR REGULATORY COMMISSION
              In Reply Refer To:
,j
                                                          m 22 m
WASHING TON, D. C. 20556
              Dockets:   50-445/88-11
*
                          50-446/88-09
t
              TU Electric
'% . . . . M
              ATTN: Mr. W. G. Counsil
m 22 m
                      Executive Vice President
In Reply Refer To:
              400 North Olive Street, Lock Box 81
Dockets:
              Dallas, Texas     75201
50-445/88-11
              Gentlemen:
50-446/88-09
              This refers to the inspection conducted by NRC consultants during
TU Electric
              the period February 3 through March 1, 1988, of activities
ATTN:
              authorized by NRC Construction Permits CPPR-126 and CPPR-127 for
Mr. W.
              the Comanche Peak Steam Electric Station, Units 1 and 2, and to the
G. Counsil
              discussion of our findings with you and other members of your staff
Executive Vice President
              at the conclusion of the inspection.
400 North Olive Street, Lock Box 81
              The enclosed copy of our inspection report identifies areas
Dallas, Texas
              examined during the inspcetion. Within these areas, the inspection
75201
              consisted of selective examination of procedures and representative
Gentlemen:
              records, interviews with personnel, and observations by the
This refers to the inspection conducted by NRC consultants during
              inspectors.
the period February 3 through March 1, 1988, of activities
              Within the scope of the inspection. no violations or deviations
authorized by NRC Construction Permits CPPR-126 and CPPR-127 for
              were identified.
the Comanche Peak Steam Electric Station, Units 1 and 2, and to the
              In accordance with 10 CFR 2.790 of the Commission's regulations,         a
discussion of our findings with you and other members of your staff
              copy of this letter and the enclosed inspection report will be
at the conclusion of the inspection.
              placed in the NRC Public Document Room.
The enclosed copy of our inspection report identifies areas
              Should you have any questions concerning this inspection, we will
examined during the inspcetion.
              be pleased to discuss them with you.
Within these areas, the inspection
                                                        Sincere]y,
consisted of selective examination of procedures and representative
                                                        RF(D O
records, interviews with personnel, and observations by the
                                                        R. F. Warnick, Assistant Director
inspectors.
                                                            for Inspection Programs
Within the scope of the inspection. no violations or deviations
                                                        Comanche Peak Project Division
were identified.
                                                        Office of Special Projects
In accordance with 10 CFR 2.790 of the Commission's regulations,
              Enclosure:
a
              Inspection Report 50-445/88-11; 50-446/88-09
copy of this letter and the enclosed inspection report will be
              cc w/ enclosure:
placed in the NRC Public Document Room.
              See next page
Should you have any questions concerning this inspection, we will
    _
be pleased to discuss them with you.
                                          -                   .         -               . -_
Sincere]y,
RF(D O
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Special Projects
Enclosure:
Inspection Report 50-445/88-11; 50-446/88-09
cc w/ enclosure:
See next page
_
-
.
-
. -_


    s
s
      .
.
  '.
'.
          TU Electric
TU Electric
          cc w/ enclosure:
cc w/ enclosure:
          Roger D. Walker                   Nancy H. Williams
Roger D. Walker
          Manager, Nuclear Licensing         CYGNA Energy Services
Nancy H. Williams
          Texas Utilities Electric Company   Suite 390
Manager, Nuclear Licensing
          Skyway Tower                       2121 N. California Blvd
CYGNA Energy Services
            400 North Olive Street, L.B. El   Walnut-Creek, CA           94596
Texas Utilities Electric Company
          Dallas, TX 75201
Suite 390
                                              Robert A. Wooldridge, Esq.
Skyway Tower
          Juanita Ellis                     Worsham, Forsythe, Sampels
2121 N. California Blvd
          President - CASE                     and Wooldridge
400 North Olive Street, L.B. El
            1426 South Folk Street             2001 Bryan Tower
Walnut-Creek, CA
          Dallas, TX 75224                   Suite 2500
94596
                                              Dallas, TX   75201
Dallas, TX
          Renea Hicks, Esq.
75201
          Assistant Attorney General         Mr. Homer C. Schmidt
Robert A. Wooldridge, Esq.
          Environmental Protection Division Director of Nuclear
Juanita Ellis
          P.O. Box 12548, Capitol Station       Services
Worsham, Forsythe, Sampels
          Austin, TX 78711-2548             TU Electric
President - CASE
                                              Skyway Tower
and Wooldridge
          Administrative Judge Peter Bloch   400 N. Olive St., L.B. 81
1426 South Folk Street
          U.S. Nuclear Regulatory Commission Dallas, TX 75201
2001 Bryan Tower
          Washington, DC 20555
Dallas, TX
          Elizabeth B. Johnson               Kenneth A. McCollom
75224
          Administrative Judge               Administrative Judge
Suite 2500
          Oak Ridge National Laboratory     1107 West Knapp
Dallas, TX
          Post Office Box X, Building 3500   Stillwater, OK           74075
75201
          Oak Ridge, TN 37830
Renea Hicks, Esq.
                                              GDS Associates, Inc.
Assistant Attorney General
          Jack R. Newman, Esq.               1850 Parkway Place, Suite 720
Mr. Homer C. Schmidt
          Newman & Holtzinger, P.C.         Marietta, GA 30067-8237
Environmental Protection Division
          1615 L Street, N.W., Suite   1000
Director of Nuclear
          Washington, D.C.   20036         Mr. Robert E. Ballard, Jr.
P.O. Box 12548, Capitol Station
                                              Director of Projects
Services
          Walter H. Jordan                   Gibbs and Hill, Inc.
Austin, TX
          Administrative Judge               11 Penn Plaza
78711-2548
          881 West Outer Drive               New York, NY   10001
TU Electric
          Oak Ridge, Tennesee   37830                                             ,
Skyway Tower
                                              Mr. R. S. Howard                       l
Administrative Judge Peter Bloch
          Anthony Z. Roisman, Esq.           Westinghouse Electric
400 N. Olive St., L.B.
          Suite 600                             Corporation
81
          1401 New York Avenue, N. W.       Post Office Box 355
U.S. Nuclear Regulatory Commission
          Washington, DC 20005               Pittsburgh, PA           15230
Dallas, TX
          Ms. Billie Pirner Garde, Esq.     Lanny A. Sinkin
75201
          Government Accountability Project Christic Institute
Washington, DC
          Midwest Office                     1324 N. Capitol Street
20555
          104 East Wisconsin Avenue - B     Washington, DC 20002
Elizabeth B. Johnson
          Appleton, WI   54911-4897
Kenneth A. McCollom
                                                                                    i
Administrative Judge
                                                                                    l
Administrative Judge
                                                                                    l
Oak Ridge National Laboratory
                                                                                    l
1107 West Knapp
Post Office Box X, Building 3500
Stillwater, OK
74075
Oak Ridge, TN
37830
GDS Associates, Inc.
Jack R. Newman, Esq.
1850 Parkway Place, Suite 720
Newman & Holtzinger, P.C.
Marietta, GA
30067-8237
1615 L Street,
N.W., Suite 1000
Washington, D.C.
20036
Mr. Robert E. Ballard, Jr.
Director of Projects
Walter H. Jordan
Gibbs and Hill, Inc.
Administrative Judge
11 Penn Plaza
881 West Outer Drive
New York, NY
10001
Oak Ridge, Tennesee
37830
,
Mr. R. S.
Howard
Anthony Z. Roisman, Esq.
Westinghouse Electric
Suite 600
Corporation
1401 New York Avenue, N. W.
Post Office Box 355
Washington, DC
20005
Pittsburgh, PA
15230
Ms. Billie Pirner Garde, Esq.
Lanny A. Sinkin
Government Accountability Project
Christic Institute
Midwest Office
1324 N. Capitol Street
104 East Wisconsin Avenue - B
Washington, DC
20002
Appleton, WI
54911-4897
i
'
'
                                                                                      l
l
                                                                                    l
.
        .    ._             _
._
                                                            . - _ . ,         .- --
_
. - _ . ,
.-
--


    s
s
      .
.
'
.
TU Electric
cc w/ enclosure:
(continued)
David R. Pigott, Esq.
Orrick, Herrington & Sutcliffe
600 Montgomery Street
San Francisco, CA
94111
Robert Jablon
Bonnie S.
Blair
Spiegel & McDiarmid
1350 New York Avenue, NW
Washington, DC
20005-4798
George A. Parker, Chairman
Public Utility Committee
Senior citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, TX
77010
Mr. Jack Redding
c/o Bethesda Licensing
TU Electric
3 Metro Center, Suite 610
)
Bethesda, MD
20814
j
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
Suite 700
1025 Thomas Jefferson St., NW
Washington, DC
20007
Regional Administrator, Region IV
U.S. Nuclear Regulatory Commission
'
'
  .
611 Ryan Plaza Drive, Suite 1000
        TU Electric
Arlington, Texas
        cc w/ enclosure:  (continued)
76011
        David R. Pigott, Esq.
        Orrick, Herrington & Sutcliffe
        600 Montgomery Street
        San Francisco, CA 94111
        Robert Jablon
        Bonnie S. Blair
        Spiegel & McDiarmid
        1350 New York Avenue, NW
        Washington, DC 20005-4798
        George A. Parker, Chairman
        Public Utility Committee
        Senior citizens Alliance of
          Tarrant County, Inc.
        6048 Wonder Drive
        Fort Worth, TX  76133
        Joseph F. Fulbright
        Fulbright & Jaworski
        1301 McKinney Street
        Houston, TX 77010
        Mr. Jack Redding
        c/o Bethesda Licensing
        TU Electric
        3 Metro Center, Suite 610          )
        Bethesda, MD 20814                j
        William A. Burchette, Esq.
        Counsel for Tex-La Electric
          Cooperative of Texas
        Heron, Burchette, Ruckert &
          Rothwell
        Suite 700
        1025 Thomas Jefferson St., NW
        Washington, DC 20007
        Regional Administrator, Region IV  '
        U.S. Nuclear Regulatory Commission
        611 Ryan Plaza Drive, Suite 1000
        Arlington, Texas 76011             l
                                          l
                                          l
                                          l
}}
}}

Latest revision as of 11:30, 11 December 2024

Forwards Insp Repts 50-445/88-11 & 50-446/88-09 on 880203-0301.No Violations or Deviations Noted
ML20148H501
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/22/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20148H505 List:
References
NUDOCS 8803300009
Download: ML20148H501 (4)


See also: IR 05000445/1988011

Text

..

. . __

_

_.

.

_

.

-

.

_

. _ .

. _ _ _ _ _

s

,Q-

-c.

,

.

MAR 221988

,

In Reply Refer To:

i

'

Dockets:

50-445/88-11

-50-446/88-09

TU Electric

ATTN:

Mr. W. G. Counsil

i

Executive Vice-President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by NRC consultants during

~

the period February 3 through' March 1,-1988, of activities

authorized by NRC Construction Permits CPPR-126 and-CPPR-127 for

the Comanche Peak Steam Electric Station, Units 1 and 2, and to the

discussion of our findings with you and other members of your staff

at the conclusion'of the inspection.

<

The enclosed copy of our inspection report identifies areas

,

examined during the inspection.

Within these areas, the inspection

'

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

'

Within the scope of the inspection, no violations or deviations

were identified.

,

In accordance with 10 CFR 2.790 of the Commission's regulations, a

"

copy of this letter and the enclosed inspection report will be

)

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you,

i

Sincerely,

j

!

ORIGINAL SIGUED BY R. F. Y?nmA

,

l

I

R. F. Warnick, Assistant Director

for Inspection Programs

Comancho Peak Project Division

,

i

Office of Special Projects

Enclosure:

Inspection Report 50-445/88-11; 50-446/88-09

cc w/ enclosure:

See next page

g

WPD:OSP

IP:CPPD:OSPj

AD:I

RWarnick

[ g

HLivermore

3/st/88

3/ zt/ 88

!

8803300009 800322

1

PDR

ADOCK 05000445

0

DCD

,

_

- -

-. -,

- ..-

.- -

. - - -

.

.

.-__ .

. - . -

s

"*%,

'.

UNITED STATES

j# *

%

NUCLEAR REGULATORY COMMISSION

,j

WASHING TON, D. C. 20556

t

'% . . . . M

m 22 m

In Reply Refer To:

Dockets:

50-445/88-11

50-446/88-09

TU Electric

ATTN:

Mr. W.

G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by NRC consultants during

the period February 3 through March 1, 1988, of activities

authorized by NRC Construction Permits CPPR-126 and CPPR-127 for

the Comanche Peak Steam Electric Station, Units 1 and 2, and to the

discussion of our findings with you and other members of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspcetion.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection. no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincere]y,

RF(D O

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report 50-445/88-11; 50-446/88-09

cc w/ enclosure:

See next page

_

-

.

-

. -_

s

.

'.

TU Electric

cc w/ enclosure:

Roger D. Walker

Nancy H. Williams

Manager, Nuclear Licensing

CYGNA Energy Services

Texas Utilities Electric Company

Suite 390

Skyway Tower

2121 N. California Blvd

400 North Olive Street, L.B. El

Walnut-Creek, CA

94596

Dallas, TX

75201

Robert A. Wooldridge, Esq.

Juanita Ellis

Worsham, Forsythe, Sampels

President - CASE

and Wooldridge

1426 South Folk Street

2001 Bryan Tower

Dallas, TX

75224

Suite 2500

Dallas, TX

75201

Renea Hicks, Esq.

Assistant Attorney General

Mr. Homer C. Schmidt

Environmental Protection Division

Director of Nuclear

P.O. Box 12548, Capitol Station

Services

Austin, TX

78711-2548

TU Electric

Skyway Tower

Administrative Judge Peter Bloch

400 N. Olive St., L.B.

81

U.S. Nuclear Regulatory Commission

Dallas, TX

75201

Washington, DC

20555

Elizabeth B. Johnson

Kenneth A. McCollom

Administrative Judge

Administrative Judge

Oak Ridge National Laboratory

1107 West Knapp

Post Office Box X, Building 3500

Stillwater, OK

74075

Oak Ridge, TN

37830

GDS Associates, Inc.

Jack R. Newman, Esq.

1850 Parkway Place, Suite 720

Newman & Holtzinger, P.C.

Marietta, GA

30067-8237

1615 L Street,

N.W., Suite 1000

Washington, D.C.

20036

Mr. Robert E. Ballard, Jr.

Director of Projects

Walter H. Jordan

Gibbs and Hill, Inc.

Administrative Judge

11 Penn Plaza

881 West Outer Drive

New York, NY

10001

Oak Ridge, Tennesee

37830

,

Mr. R. S.

Howard

Anthony Z. Roisman, Esq.

Westinghouse Electric

Suite 600

Corporation

1401 New York Avenue, N. W.

Post Office Box 355

Washington, DC

20005

Pittsburgh, PA

15230

Ms. Billie Pirner Garde, Esq.

Lanny A. Sinkin

Government Accountability Project

Christic Institute

Midwest Office

1324 N. Capitol Street

104 East Wisconsin Avenue - B

Washington, DC

20002

Appleton, WI

54911-4897

i

'

l

.

._

_

. - _ . ,

.-

--

s

.

'

.

TU Electric

cc w/ enclosure:

(continued)

David R. Pigott, Esq.

Orrick, Herrington & Sutcliffe

600 Montgomery Street

San Francisco, CA

94111

Robert Jablon

Bonnie S.

Blair

Spiegel & McDiarmid

1350 New York Avenue, NW

Washington, DC

20005-4798

George A. Parker, Chairman

Public Utility Committee

Senior citizens Alliance of

Tarrant County, Inc.

6048 Wonder Drive

Fort Worth, TX

76133

Joseph F. Fulbright

Fulbright & Jaworski

1301 McKinney Street

Houston, TX

77010

Mr. Jack Redding

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

)

Bethesda, MD

20814

j

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert &

Rothwell

Suite 700

1025 Thomas Jefferson St., NW

Washington, DC

20007

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

'

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011