ML20148N680: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20148N680
| number = ML20148N680
| issue date = 10/10/1978
| issue date = 10/10/1978
| title = Forwards IE Inspec Rept#50-522/78-02 & #50-523/78-02 on 780925-28 During Which No Items of Noncompliance Were Noted
| title = Forwards IE Inspec Rept 50-522/78-02 & 50-523/78-02 on 780925-28 During Which No Items of Noncompliance Were Noted
| author name = Spencer G
| author name = Spencer G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:. _ - - - ,
{{#Wiki_filter:. _ - - - ,
    -
-
  p            -o
-o
                .
p
  h
.
                  '
h
                          ,
                                                                                                  6
                        #                                    UNITED STATES
                                %,#
                  y e ,,,      . /t            NUCLEAR REGULA10RY COMMISSION
                  5                , j                          REGION V
                  O                                SUfTE 202, W ALNUT CREEK PLAZ A
                    s#
                      49          9
                                  0                1990 N. CALIFORNIA BOULEVARD
                        *****                    W ALNUT CREEK, CALIFORNI A 94596
                                                            0CT 10 E78
                            Docket Nos. 50-522
,
,
                                          50-523
6
                            Puget Sound Power and Light Company
'
                            Puget Power Building
#
                            Bellevue, Washington 98009
%,#
                            Attention: Mr. W. J. Ferguson
UNITED STATES
                                          Vice President
y e ,,,
                                          Engineering and Construction
. /t
                            Gentlemen:                                                             j
NUCLEAR REGULA10RY COMMISSION
                                                                                                    l
5
                            Subject:   NRC Inspection of Skagit Units 1 and 2                     '
j
                            This refers to the inspection conducted by Mr. W. G. Albert of this   i
REGION V
                            office on September 25-28, 1978, of activities related to your appli- !
,
                            cation for a construction permit, and to the discussion of our find-   1
O
                            ings held by Mr. Albert with Mr. W. J. Ferguson.and other members of
SUfTE 202, W ALNUT CREEK PLAZ A
                            your staff at the conclusion of the inspection.
s#4
                            Areas examined during this inspection are described in the encl'::ed
0
                            inspection report. Within these areas, the inspection consisted of
1990 N. CALIFORNIA BOULEVARD
                            selective examinations of procedures and representative records, in-
9
                            terviews with personnel, and observations by the inspector.
9
                            No deviations from the applicants commitments were identified within
*****
                            the scope of this inspection.
W ALNUT CREEK, CALIFORNI A 94596
                            In accordance with Section 2.790 of the NRC's " Rules of Practice,"
0CT 10 E78
                            Part 2, Title 10, Code of Federal Regulations, a copy of this letter
Docket Nos. 50-522
                            and the enclosed inspection report will be placed in the NRC's Public ,
50-523
                            Document Room. If this report contains any information that you be-
,
                            lieve to-be proprietary..it is necessary that you submit a written
Puget Sound Power and Light Company
                                                        .
Puget Power Building
                            application to this office, within 20 days of the date of this letter,
Bellevue, Washington 98009
                      7811270/W
Attention: Mr. W. J. Ferguson
Vice President
Engineering and Construction
Gentlemen:
j
Subject:
NRC Inspection of Skagit Units 1 and 2
'
This refers to the inspection conducted by Mr. W. G. Albert of this
office on September 25-28, 1978, of activities related to your appli-
cation for a construction permit, and to the discussion of our find-
ings held by Mr. Albert with Mr. W. J. Ferguson.and other members of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the encl'::ed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
No deviations from the applicants commitments were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
,
Document Room.
If this report contains any information that you be-
lieve to-be proprietary..it is necessary that you submit a written
.
application to this office, within 20 days of the date of this letter,
7811270/W


-.
-.
      . .
. .
                                                                                  !
4
  4
,
                                                                                  ,
Puget Sound Power and Light Company
          Puget Sound Power and Light Company         -2-       OCT 10 B78
-2-
                                                                                  ,
OCT 10 B78
                                                                                  l
,
                                                                                  l
requesting _ that such information be withheld from public disclosure.
          requesting _ that such information be withheld from public disclosure.
1
                                                            -
-
                                                                                  1
The application must include a full statement of the reasons why it
          The application must include a full statement of the reasons why it     :
is claimed that the information is proprietary.
          is claimed that the information is proprietary. The application should
The application should
          be prepared so that any proprietary information identified is contained ,
be prepared so that any proprietary information identified is contained
          in an enclosure to the application, since the application without the ;
,
          enclosure will also be placed in the Public Document Room. If we do
in an enclosure to the application, since the application without the
          not hear from you in this regard within the specified period, the re-
enclosure will also be placed in the Public Document Room.
          port will'be placed in the Public Document Room.
If we do
          Should you have any questions concerning this inspection, we will be   )
not hear from you in this regard within the specified period, the re-
          glad to discuss-them with you.
port will'be placed in the Public Document Room.
                                                Sincerely,
Should you have any questions concerning this inspection, we will be
                                                f(.' Al%)w
)
                                                          -
glad to discuss-them with you.
                                              < G. S. SpencEF, Chief
Sincerely,
                                                Reactor Construction and
f(.' Al%)w
                                                  Engineering Support Branch
-
          Enclosure:
< G. S. SpencEF, Chief
          - IE. Inspection Report
Reactor Construction and
              Nos 50-522/78-02
Engineering Support Branch
                    50-523/78-02
Enclosure:
                                                                                  1
- IE. Inspection Report
                                                                                  l
Nos 50-522/78-02
                                                                                  l
50-523/78-02
                                                                                  l
1
                                                                                  ;
;
                                                                                  l
1
                                                                                  1
.
                                                                                  l
    .
}}
}}

Latest revision as of 10:55, 11 December 2024

Forwards IE Inspec Rept 50-522/78-02 & 50-523/78-02 on 780925-28 During Which No Items of Noncompliance Were Noted
ML20148N680
Person / Time
Site: Skagit
Issue date: 10/10/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson W
PUGET SOUND POWER & LIGHT CO.
Shared Package
ML20148N686 List:
References
NUDOCS 7811270194
Download: ML20148N680 (2)


See also: IR 05000522/1978002

Text

. _ - - - ,

-

-o

p

.

h

,

6

'

%,#

UNITED STATES

y e ,,,

. /t

NUCLEAR REGULA10RY COMMISSION

5

j

REGION V

,

O

SUfTE 202, W ALNUT CREEK PLAZ A

s#4

0

1990 N. CALIFORNIA BOULEVARD

9

9

W ALNUT CREEK, CALIFORNI A 94596

0CT 10 E78

Docket Nos. 50-522

50-523

,

Puget Sound Power and Light Company

Puget Power Building

Bellevue, Washington 98009

Attention: Mr. W. J. Ferguson

Vice President

Engineering and Construction

Gentlemen:

j

Subject:

NRC Inspection of Skagit Units 1 and 2

'

This refers to the inspection conducted by Mr. W. G. Albert of this

office on September 25-28, 1978, of activities related to your appli-

cation for a construction permit, and to the discussion of our find-

ings held by Mr. Albert with Mr. W. J. Ferguson.and other members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the encl'::ed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

No deviations from the applicants commitments were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

,

Document Room.

If this report contains any information that you be-

lieve to-be proprietary..it is necessary that you submit a written

.

application to this office, within 20 days of the date of this letter,

7811270/W

-.

. .

4

,

Puget Sound Power and Light Company

-2-

OCT 10 B78

,

requesting _ that such information be withheld from public disclosure.

1

-

The application must include a full statement of the reasons why it

is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained

,

in an enclosure to the application, since the application without the

enclosure will also be placed in the Public Document Room.

If we do

not hear from you in this regard within the specified period, the re-

port will'be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

)

glad to discuss-them with you.

Sincerely,

f(.' Al%)w

-

< G. S. SpencEF, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

- IE. Inspection Report

Nos 50-522/78-02

50-523/78-02

1

1

.