ML20137L237: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ . | {{#Wiki_filter:_ _ _. _ | ||
Og g | |||
MEMORANDUM T0: | |||
Division of Radiation Safety and Safeguards Mb William J. Tobin, Senior Safeguards Inspector, DRSS i | David R. McGuire, Chief Safeguards Section Nuclear Materials Safety and Safeguards Branch g/- | ||
9 Division of Radiation Safety and Safeguards Mb FROM: | |||
William J. Tobin, Senior Safeguards Inspector, DRSS i | |||
==SUBJECT:== | ==SUBJECT:== | ||
SAFEGUARDS REVIEW REPORT, REVISION 41 TO THE ST. LUCIE i | SAFEGUARDS REVIEW REPORT, REVISION 41 TO THE ST. LUCIE i | ||
PYHSICAL SECURITY PLAN, CASE CONTROL NUMBER N5S69VA50033595 BACKGROUND: By letter dated January 27, 1995, Florida Power andlight Company submitted revision 41 to the St. Lucie Physical Security Plan under the provisions of 10 CFR 50.54(p). | PYHSICAL SECURITY PLAN, CASE CONTROL NUMBER N5S69VA50033595 BACKGROUND: By {{letter dated|date=January 27, 1995|text=letter dated January 27, 1995}}, Florida Power andlight Company submitted revision 41 to the St. Lucie Physical Security Plan under the provisions of 10 CFR 50.54(p). | ||
EVALUATION: The enclosed represents an accurate summary of the changes made. | |||
The revisions do not appear to lessen the effectiveness of the previously approved plan and are, therefore, acceptable for inclusion in the plan. | The revisions do not appear to lessen the effectiveness of the previously approved plan and are, therefore, acceptable for inclusion in the plan. | ||
==Attachment:== | ==Attachment:== | ||
Summary of Changes | Summary of Changes cc: | ||
cc: | Region II Licensing File (N5569VA50033595) 50-335 | ||
.P Sp. | |||
/ | |||
T.< | T.< | ||
/ | |||
/ | |||
/s | |||
/ | |||
W a | W a | ||
h N | h N | ||
g 40 g 8 970325 BINDER 96-485 | g 40 g 8 970325 BINDER 96-485 PDR | ||
-.}} | |||
Latest revision as of 22:55, 11 December 2024
Text
_ _ _. _
Og g
MEMORANDUM T0:
David R. McGuire, Chief Safeguards Section Nuclear Materials Safety and Safeguards Branch g/-
9 Division of Radiation Safety and Safeguards Mb FROM:
William J. Tobin, Senior Safeguards Inspector, DRSS i
SUBJECT:
SAFEGUARDS REVIEW REPORT, REVISION 41 TO THE ST. LUCIE i
PYHSICAL SECURITY PLAN, CASE CONTROL NUMBER N5S69VA50033595 BACKGROUND: By letter dated January 27, 1995, Florida Power andlight Company submitted revision 41 to the St. Lucie Physical Security Plan under the provisions of 10 CFR 50.54(p).
EVALUATION: The enclosed represents an accurate summary of the changes made.
The revisions do not appear to lessen the effectiveness of the previously approved plan and are, therefore, acceptable for inclusion in the plan.
Attachment:
Summary of Changes cc:
Region II Licensing File (N5569VA50033595) 50-335
.P Sp.
/
T.<
/
/
/s
/
W a
h N
g 40 g 8 970325 BINDER 96-485 PDR
-.