@ CONSEReft | |||
~ | |||
I F = Forced | NUCLEAR OPERATIONS DEPARTMENT 9 | ||
C = Refueling | Unit Shutdowns and Power Reductions Report Month Dotset Number Unit Date Completed by TAfsnhnne November 1985 50-155 Big Rock Point Plant Dec. 3, 1985 MJBielinski (616 FAT 6537 Ex228 Method of Shutting Duration Down Licensee Event System Comporynt l | ||
D = Regulatory Restriction | 2 3 | ||
E = Operator Training and License Examination | 4 Number Date Type (Hours) | ||
H = Other (Explain) | Reason Reactor Report Number Code Coded Cause and Corrective Action To Prevent Recurrence 85-07 09/06/85 S | ||
172.3 C | |||
1 20th Refueling Outage HOURS (1494.9 Total Hours) 85-08 11/14/85 F | |||
225 A | |||
1 Unit tripped after turbine generator Hours taken off line. Reference LER 85-008 Initiating reason, vessel flange 0-ring leakage. | |||
I 2 | |||
3 4 | |||
F = Forced Reason: | |||
Method: | |||
Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER) | |||
C = Refueling 3 = Automatic Scram File (NUREG-0161) | |||
D = Regulatory Restriction 4 - Other (Explain) | |||
E = Operator Training and License Examination 5Exhibit I = Same Source F = Administrative d | |||
G = Operational Error (Explain) 8602190049 B51130 | |||
~ | |||
H = Other (Explain) | |||
PDR ADOCK 05000155 R | |||
PDR Form 3156 1-82 | |||
OPERATING STATUS | OPERATING STATUS PHONE | ||
* 616-547-1537, ext 180 | * 616-547-1537, ext 180 oi; | ||
.1;d e | |||
'' W 1,. UNIT N".ME: ~ BIG 40CK POINT; NUCLEAR PLA4T NOTES: | |||
: 1. LICENSEO.THELMAL POWEA IMwTl* | , "E ih to RF00RTING PERIOD: | ||
11 / a5 | |||
'e | |||
: 5. DESIGN ELECTRICAL. RATING INET MwEls | .h | ||
: 1. LICENSEO.THELMAL POWEA IMwTl* | |||
240 JJ NAMETLaTE RATING IGROSS MYEls 75 4. | |||
(i[4 }' | |||
h | |||
: 5. DESIGN ELECTRICAL. RATING INET MwEls 72 | |||
g | .2 h CAMIMUM DEPENDABLE CAPACITY (GROSS MWEle 73 0 l | ||
',7 0 AMIMUM DEPENDAdLE CAPACITY tNET.MdEls 69.0 y | |||
Sir IF CHANGES OCCUR IN CAFACITY RATINGS 41TEMS 3 THRU 75 SINCE LAST REPORT, GIVF REASONSt' y | |||
qf | |||
yk W[L. | {N r | ||
THI$ MONTrt | ~ | ||
.i.. | |||
: 12. NuMSER OF HOURS REACTOR.WAS CRITICAL | 1 g | ||
.$, POWER LEVEL TO WHICH RESTRICTF0,IF ANY INET MwEls 0.0 i | |||
t-I | |||
143 NOURS GENERATOR ON-LINE | ;103. REASONS FOR RESTRICTIONS. IF ANY: | ||
:W g f* | |||
1Se' GROSS. THERMAL ENERGY GENERATEC (MdH) | yk W[ O) | ||
L. | |||
+ | |||
h THI$ MONTrt YEAR-TO-DATE CUMULATIVE | |||
.11e HOURS IN REPORTING PERIOD. | |||
720.0 t'016.0 199737.0 | |||
: 12. NuMSER OF HOURS REACTOR.WAS CRITICAL 371 6 5807 9 140500.2 J | |||
#j 1 | |||
'13, REACTOR RESERVE: SHUTDOWN HOURS 0.0 0.0- | |||
:j | . 0.0 fd 143 NOURS GENERATOR ON-LINE | ||
.322.7 5714 1 | |||
:137912.4 | |||
<-1. | |||
r 15 UNIT RESERVE SHUT 00dN HOURS 0.0 00 0.0. | |||
s. | |||
1Se' GROSS. THERMAL ENERGY GENERATEC (MdH) 4P716.0 1051609.0 25904363.0-17e GROSS ELECTRIC AL ENERGY GENEd ATED (MdN) 15815.0 333576.0 6195927.0 - | |||
-18. NET. ELECTRICAL ENFRGY GENERATED (MwH) 14793.6. | |||
319513 91 7749324.7 | |||
~ | |||
tj | |||
.1% UNIT SFRVICE F ACTOR - | |||
44.8% | |||
71 3% | |||
69.4% - | |||
'1 | |||
' 21., UN IT C AP AC ITY FACTOR tOSING MDC NETI 29.3% | |||
$7.8% | |||
58.0t' | |||
'q. | |||
4 | |||
,2Ds UNIT AVAILABILITY FACTOR 44.8% | |||
71.3% | |||
69.4% | |||
~ | |||
fl | |||
- 22, UNIT' C AP ACITY F ACTOR (USING DCR NET) 29.5% | |||
55.4t 54 121 "q | |||
i- | |||
'23. UNIT FORCED OUTAGE RATE. | |||
41.1% | |||
4.4% | |||
15.3t' | |||
:j f:3 | |||
.-24. SHUTOOWNS' SCHEDULED OVER NExT 6 MONTHS'4 TYPE,DATE, C DURATION OF EACHis i | |||
'25hlF. | |||
d SNUT DOWN AT END.0F REPORT'PEi !OD, ESTIMATED DATE OF~STARTupt g | |||
h | |||
] | |||
1 l | |||
q s | |||
se- | |||
,--s | |||
[ | [ | ||
1 | |||
,1 : | |||
f | |||
U | ) | ||
E U | |||
3- | |||
_.(117@@61 | |||
~' | |||
~~ " ~'' | |||
.. ;/ | |||
-, iDAYJ 1AVERAGELOAILY: POWER (MWT)~ | |||
'( MWEN ): | |||
~ | |||
l {, e t: | |||
- 1;. | |||
-10.0 | |||
[- ~ | - 0 0; | ||
36.42- | .2 0.0- | ||
' O. 0 '- | |||
10 | i- | ||
~ | |||
~ | |||
;3 - | |||
10.0 | |||
~00- | |||
[- ~ | |||
4' w.0~ | |||
'0 0 5-0.0 | |||
-0.0-6- | |||
1.'37 0.- 0 1 37.- | |||
-0.0' 8 | |||
36.42- | |||
-12.75 | |||
-9 135 01 40.67 l -- | |||
10 "165.17- | |||
'50.33 i-11 164.12' 50.53 | |||
?- | |||
12 | |||
.-16d.21- | |||
'51.15' 13-167.71 51.03 14 102 04 30.51 | |||
[ | [ | ||
15 | |||
~00 0.0 16-0 0-0.0 17-0.0 0.0 | |||
'i 18 2 12 0.0' | |||
'19 0.0 0.3 20 00 | |||
~0.0- | |||
? | |||
' 21 0.0 0.0 j | |||
j-22 0.0 0.0 j | |||
23 1.87 | |||
-0.0' i | |||
! 77.96-21.17J 25 158.50 48.40 | |||
[ | [ | ||
i. | 26 165 96 50.25 f-27 165 12 50 33 l | ||
i | 28 163 12 50.43 29 173 50 53 18' l _ | ||
i i-1 | 30 179.17 54.91 j | ||
I | |||
[ | |||
e i. | |||
i | |||
't i | |||
i i-1 i | |||
+ | |||
i n | i n | ||
a t | a t | ||
i w | i w | ||
I t | |||
y | |||
^ | |||
I | I | ||
fa | fa 9 | ||
x | |||
./ | |||
o | o s-e7q_, i.. : | ||
_:4i** 7*O | _:4i** 7*O | ||
-l H | |||
R'efueling InforeAtion Request. | R'efueling InforeAtion Request. | ||
L | L El | ||
El | + | ||
-1. | |||
Facility.name: xBig Rock Point Plant. | |||
2. | |||
Scheduled date for nexturefuelink; shutdown': ' October. 24,;1986-3. | |||
Scheduled date for restart'following' shutdown: ' January 2,71987 4. | |||
Will refueling or _ resumption of operation.thereafter require a technical' specification change or other license amendment?- ' No If yes, explain: | |||
If no, has the reload fuel design and core configuration'been reviewed Ny Plant' Safety Review Committee to determine. whether any, uareviewed safety ; | If no, has the reload fuel design and core configuration'been reviewed Ny Plant' Safety Review Committee to determine. whether any, uareviewed safety ; | ||
questions as associated with the core reload-(Reference'10 CFR,.Section 50.59)? No If no review has taken place, when is it scheduled? | questions as associated with the core reload-(Reference'10 CFR,.Section 50.59)? No If no review has taken place, when is it scheduled? | ||
5. | |||
Scheduled date(s) for submittal of proposed / licensing action and supporting information: | |||
6. | |||
Important licensing considerations' associated with refueling,n es, new or different fuel design or supplier, unreviewed' design or. performance - | |||
analysis methods, significant changes in fuel design new operating procedures: | analysis methods, significant changes in fuel design new operating procedures: | ||
7. | |||
Number of fuel assemblies in: core 84; spent fuel storage pool 192. | |||
8. | |||
Present licensed spent fuel storage capacity: 441 Siz* of any increase in licensed storage capacity that has beentrequested or is' planned (in number of fuel' assemblies): | |||
9. | |||
Projected.date ofilast refueling that can be discharged'to spent-fuel' pool assuming _the present license capacity:- 1994 | |||
.BP0385-0458A-BT01) | |||
1~ | 1~ | ||
Consumers Power | Consumers Power o,- | ||
Company | Company a-"- | ||
Big Rock Point Nuclear Plant, Box 591, Route 3, Charlevoix, Mt 4972o December 3, 1985 4 | Big Rock Point Nuclear Plant, Box 591, Route 3, Charlevoix, Mt 4972o December 3, 1985 4 | ||
J Director Office of Inspection and Enforcement United States Nuclear Regulatory Comunission Washington, DC 20555 | J Director Office of Inspection and Enforcement United States Nuclear Regulatory Comunission Washington, DC 20555 | ||
| Line 149: | Line 230: | ||
==Dear Sir:== | ==Dear Sir:== | ||
i Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period November 1 through November 30, 1985 Sincerely, O | |||
i Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period November 1 through November 30, 1985 Sincerely, O | D P Hoffman Plant Superintendent Enclosures cc: DEVanFarowe, Department of Public Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 RBDeWitt, P24-117B KWBerry, P24-614B t | ||
File l | |||
Plant Superintendent Enclosures cc: DEVanFarowe, Department of Public Health | c t MIO10-0667A-BT01 t | ||
e..,.,.,,, | |||
RBDeWitt, P24-117B | ,n | ||
KWBerry, P24-614B | ,-+y | ||
-- -}} | |||
l | |||
MIO10-0667A-BT01 t | |||
Latest revision as of 21:11, 11 December 2024
| ML20137U079 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 11/30/1985 |
| From: | Balch L, Bielinski M, Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8602190049 | |
| Download: ML20137U079 (5) | |
Text
_ _.
@ CONSEReft
~
NUCLEAR OPERATIONS DEPARTMENT 9
Unit Shutdowns and Power Reductions Report Month Dotset Number Unit Date Completed by TAfsnhnne November 1985 50-155 Big Rock Point Plant Dec. 3, 1985 MJBielinski (616 FAT 6537 Ex228 Method of Shutting Duration Down Licensee Event System Comporynt l
2 3
4 Number Date Type (Hours)
Reason Reactor Report Number Code Coded Cause and Corrective Action To Prevent Recurrence 85-07 09/06/85 S
172.3 C
1 20th Refueling Outage HOURS (1494.9 Total Hours) 85-08 11/14/85 F
225 A
1 Unit tripped after turbine generator Hours taken off line. Reference LER 85-008 Initiating reason, vessel flange 0-ring leakage.
I 2
3 4
F = Forced Reason:
Method:
Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER)
C = Refueling 3 = Automatic Scram File (NUREG-0161)
D = Regulatory Restriction 4 - Other (Explain)
E = Operator Training and License Examination 5Exhibit I = Same Source F = Administrative d
G = Operational Error (Explain) 8602190049 B51130
~
H = Other (Explain)
PDR ADOCK 05000155 R
PDR Form 3156 1-82
OPERATING STATUS PHONE
- 616-547-1537, ext 180 oi;
.1;d e
W 1,. UNIT N".ME: ~ BIG 40CK POINT; NUCLEAR PLA4T NOTES:
, "E ih to RF00RTING PERIOD:
11 / a5
'e
.h
- 1. LICENSEO.THELMAL POWEA IMwTl*
240 JJ NAMETLaTE RATING IGROSS MYEls 75 4.
(i[4 }'
h
- 5. DESIGN ELECTRICAL. RATING INET MwEls 72
.2 h CAMIMUM DEPENDABLE CAPACITY (GROSS MWEle 73 0 l
',7 0 AMIMUM DEPENDAdLE CAPACITY tNET.MdEls 69.0 y
Sir IF CHANGES OCCUR IN CAFACITY RATINGS 41TEMS 3 THRU 75 SINCE LAST REPORT, GIVF REASONSt' y
qf
{N r
~
.i..
1 g
.$, POWER LEVEL TO WHICH RESTRICTF0,IF ANY INET MwEls 0.0 i
t-I
- 103. REASONS FOR RESTRICTIONS. IF ANY
- W g f*
yk W[ O)
L.
+
h THI$ MONTrt YEAR-TO-DATE CUMULATIVE
.11e HOURS IN REPORTING PERIOD.
720.0 t'016.0 199737.0
- 12. NuMSER OF HOURS REACTOR.WAS CRITICAL 371 6 5807 9 140500.2 J
- j 1
'13, REACTOR RESERVE: SHUTDOWN HOURS 0.0 0.0-
. 0.0 fd 143 NOURS GENERATOR ON-LINE
.322.7 5714 1
- 137912.4
<-1.
r 15 UNIT RESERVE SHUT 00dN HOURS 0.0 00 0.0.
s.
1Se' GROSS. THERMAL ENERGY GENERATEC (MdH) 4P716.0 1051609.0 25904363.0-17e GROSS ELECTRIC AL ENERGY GENEd ATED (MdN) 15815.0 333576.0 6195927.0 -
-18. NET. ELECTRICAL ENFRGY GENERATED (MwH) 14793.6.
319513 91 7749324.7
~
tj
.1% UNIT SFRVICE F ACTOR -
44.8%
71 3%
69.4% -
'1
' 21., UN IT C AP AC ITY FACTOR tOSING MDC NETI 29.3%
$7.8%
58.0t'
'q.
4
,2Ds UNIT AVAILABILITY FACTOR 44.8%
71.3%
69.4%
~
fl
- 22, UNIT' C AP ACITY F ACTOR (USING DCR NET) 29.5%
55.4t 54 121 "q
i-
'23. UNIT FORCED OUTAGE RATE.
41.1%
4.4%
15.3t'
- j f:3
.-24. SHUTOOWNS' SCHEDULED OVER NExT 6 MONTHS'4 TYPE,DATE, C DURATION OF EACHis i
'25hlF.
d SNUT DOWN AT END.0F REPORT'PEi !OD, ESTIMATED DATE OF~STARTupt g
h
]
1 l
q s
se-
,--s
[
1
,1 :
f
)
E U
3-
_.(117@@61
~'
~~ " ~
.. ;/
-, iDAYJ 1AVERAGELOAILY: POWER (MWT)~
'( MWEN ):
~
l {, e t:
- 1;.
-10.0
- 0 0;
.2 0.0-
' O. 0 '-
i-
~
~
- 3 -
10.0
~00-
[- ~
4' w.0~
'0 0 5-0.0
-0.0-6-
1.'37 0.- 0 1 37.-
-0.0' 8
36.42-
-12.75
-9 135 01 40.67 l --
10 "165.17-
'50.33 i-11 164.12' 50.53
?-
12
.-16d.21-
'51.15'13-167.71 51.03 14 102 04 30.51
[
15
~00 0.0 16-0 0-0.0 17-0.0 0.0
'i 18 2 12 0.0'
'19 0.0 0.3 20 00
~0.0-
?
' 21 0.0 0.0 j
j-22 0.0 0.0 j
23 1.87
-0.0' i
! 77.96-21.17J 25 158.50 48.40
[
26 165 96 50.25 f-27 165 12 50 33 l
28 163 12 50.43 29 173 50 53 18' l _
30 179.17 54.91 j
I
[
e i.
i
't i
i i-1 i
+
i n
a t
i w
I t
y
^
I
fa 9
x
./
o s-e7q_, i.. :
_:4i** 7*O
-l H
R'efueling InforeAtion Request.
L El
+
-1.
Facility.name: xBig Rock Point Plant.
2.
Scheduled date for nexturefuelink; shutdown': ' October. 24,;1986-3.
Scheduled date for restart'following' shutdown: ' January 2,71987 4.
Will refueling or _ resumption of operation.thereafter require a technical' specification change or other license amendment?- ' No If yes, explain:
If no, has the reload fuel design and core configuration'been reviewed Ny Plant' Safety Review Committee to determine. whether any, uareviewed safety ;
questions as associated with the core reload-(Reference'10 CFR,.Section 50.59)? No If no review has taken place, when is it scheduled?
5.
Scheduled date(s) for submittal of proposed / licensing action and supporting information:
6.
Important licensing considerations' associated with refueling,n es, new or different fuel design or supplier, unreviewed' design or. performance -
analysis methods, significant changes in fuel design new operating procedures:
7.
Number of fuel assemblies in: core 84; spent fuel storage pool 192.
8.
Present licensed spent fuel storage capacity: 441 Siz* of any increase in licensed storage capacity that has beentrequested or is' planned (in number of fuel' assemblies):
9.
Projected.date ofilast refueling that can be discharged'to spent-fuel' pool assuming _the present license capacity:- 1994
.BP0385-0458A-BT01)
1~
Consumers Power o,-
Company a-"-
Big Rock Point Nuclear Plant, Box 591, Route 3, Charlevoix, Mt 4972o December 3, 1985 4
J Director Office of Inspection and Enforcement United States Nuclear Regulatory Comunission Washington, DC 20555
'l
Dear Sir:
i Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period November 1 through November 30, 1985 Sincerely, O
D P Hoffman Plant Superintendent Enclosures cc: DEVanFarowe, Department of Public Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 RBDeWitt, P24-117B KWBerry, P24-614B t