ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N                                                                 0W NO.
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N
RECORD OF CIIANGES AND REVISIONS                         ,
RECORD OF CIIANGES AND REVISIONS 0W NO.
1009.06A EMERGENCY PLAN PROCEDURE                                                       REV. //12         FC # ,
1009.06A EMERGENCY PLAN PROCEDURE REV. //12 FC #,
                                      ,,                                              l Safety Related YES Y NO O                       j
l Safety Related YES Y NO O j
                              " ~ ;)                         PLANT EVAUCATION                                 '                      '
" ~ ;)
                                                    .-        1903.30 1 REV. 4 w               i/
PLANT EVAUCATION 1903.30 1 REV. 4 w i/
4- y.              ;> >                        *                                  .
4-y.
i },A.lil:     .a -) fd d     e 's N !
i },A.lil:
N)       PAGE REV PC#             PAGE REV PC#             PAGE REV PC#       PAGE REV PC#         PAGE REV PC#
.a
1         3 2         3 3         3 4         3 5         4 6         3   1 7         4 0
-)
APPROVED BY:                                                                           APPROVAI. DATE
fd d e 's N !
                                                              ,                                    . /- .'? [ '
N)
M   ['<y.-?, ~     - [, /   4 b',h-[ n .                           REQUIRED EFFECTIVE DATE:
PAGE REV PC#
                  ,'              (General Manager) 8212080085 821201 PDR ADOCK 05000313 F                         PDR
PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
1 3
2 3
3 3
4 3
5 4
6 3
1 7
4 0
APPROVED BY:
APPROVAI. DATE
. /-.'? [ '
M
['<y.-?, ~
- [, /
4 b',h-[ n.
REQUIRED EFFECTIVE DATE:
(General Manager) 8212080085 821201 PDR ADOCK 05000313 F
PDR


PLANT fAANUAL SECTION:     PROCEDUREfWO% PLAN TITLE:                       N O-EMERGENCY PI.AN ppncrnimr                 pr As1T ptrArp vrins'                             i o n ')   70 PAGE     q nr 7 ARKANSAS NUCLEAR ONE   ~
PLANT fAANUAL SECTION:
aevision CHANGE
PROCEDUREfWO% PLAN TITLE:
                                                                                    . oa's.
N O-EMERGENCY PI.AN ppncrnimr pr As1T ptrArp vrins' i o n ')
DATE
70 PAGE q nr 7 ARKANSAS NUCLEAR ONE aevision
                                                                                              >><n, a,
. oa's.
8.6.6       If the Security computer is not working, the list of ac-                   .
>><n, a,
counted for on-site personnel obtained from the Technical Support Center A ,                   A chould be checked against badges in the badge racks. Persons not accounted for in this manner will be reported to the Duty Emcrgency Coordi-nator/ Recovery Manager.
~
8.6.7       If there is not time for Security to complete the account-ability on-site, the badges and badge racks and a master computer printout of badged personnel should be taken to the west end of the Emergency Control Center, ground floor. Accountability should then be established as stated in Paragraph 8.6.3 through 8.6.6 above.
CHANGE DATE 8.6.6 If the Security computer is not working, the list of ac-counted for on-site personnel obtained from the Technical Support Center A,
8.6.8   A Security personnel shall, upon ANO personnel exiting each applicable area, lock their post, as necessary, and assem-ble at the Main Guard Station (or as directed) for further instructions. A 8.7   If there are persons (s) unaccounted for, the Duty Emergency Coordi-nator/ Recovery Mancger shall direct personnel to scarch for the un-accounted for individual (s).
A chould be checked against badges in the badge racks.
Persons not accounted for in this manner will be reported to the Duty Emcrgency Coordi-nator/ Recovery Manager.
8.6.7 If there is not time for Security to complete the account-ability on-site, the badges and badge racks and a master computer printout of badged personnel should be taken to the west end of the Emergency Control Center, ground floor. Accountability should then be established as stated in Paragraph 8.6.3 through 8.6.6 above.
8.6.8 A Security personnel shall, upon ANO personnel exiting each applicable area, lock their post, as necessary, and assem-ble at the Main Guard Station (or as directed) for further instructions. A 8.7 If there are persons (s) unaccounted for, the Duty Emergency Coordi-nator/ Recovery Mancger shall direct personnel to scarch for the un-accounted for individual (s).
8.8 Af ter initial accountability is established, security personnel issuing /
8.8 Af ter initial accountability is established, security personnel issuing /
receiving personnel badges are responsible for notifying the Technical Support Center of changes when personnel ingress / egress the protected area.
receiving personnel badges are responsible for notifying the Technical Support Center of changes when personnel ingress / egress the protected area.
d.9 When the plant is determined to have returned to a condition where the plant evacuation is no longer required, the Duty Emergency Co-ordinator/ Recovery Manager may terminate the plant evaucuation.
d.9 When the plant is determined to have returned to a condition where the plant evacuation is no longer required, the Duty Emergency Co-ordinator/ Recovery Manager may terminate the plant evaucuation.
9.0 EVACUATION OF TifE ONSITE TECHNICAL SUPPORT CENTER AND OPERATIONAL SUPPORT CENTER The Onsite Technical Support Center and the Onsite Operational Center are not evacuated in the event of a Plant Evacuation. The Onsite Radiological Monitoring Section shall monitor radiation levels while the centers remain occupied.     However, if the following symptoms are observed, actions shall be taken in accordance with Section 9.2 and 9.3.
9.0 EVACUATION OF TifE ONSITE TECHNICAL SUPPORT CENTER AND OPERATIONAL SUPPORT CENTER The Onsite Technical Support Center and the Onsite Operational Center are not evacuated in the event of a Plant Evacuation. The Onsite Radiological Monitoring Section shall monitor radiation levels while the centers remain occupied.
9.1 Symptoms 9.1.1       Area radiation levels above 2.5 mR/hr.
However, if the following symptoms are observed, actions shall be taken in accordance with Section 9.2 and 9.3.
9.1.2       NMC alarm indicating particulate airborne of 450 CPM above background or gaseous airborne of 10 CPM above background.
9.1 Symptoms 9.1.1 Area radiation levels above 2.5 mR/hr.
9.1.2 NMC alarm indicating particulate airborne of 450 CPM above background or gaseous airborne of 10 CPM above background.
(Assuming installed iodine cartridges are removed and ana-lyzed every 4 hours.)
(Assuming installed iodine cartridges are removed and ana-lyzed every 4 hours.)
The material contained within these symbols (A) is proprietary or private infor-mation.
The material contained within these symbols (A) is proprietary or private infor-mation.


PLANT MANUAL SECTION:     PROCEDURE / WORK PLAN TITLE:                       NO:
PLANT MANUAL SECTION:
EMERGENCY PLAN noncenene               n1Av7 rv3cnamine                                     inn, ,n PAGE     7 nr 7 (1
PROCEDURE / WORK PLAN TITLE:
g_,/
NO:
ARKANSAS NUCLEAR ONE           arv=oa CHANGE x # ATE DATE
EMERGENCY PLAN noncenene n1Av7 rv3cnamine inn,,n PAGE 7 nr 7 (1
                                                                                                        , "nm, B. Perimeter gates and doors shall be locked following the evacuation C. Outside security posts should be established as close to the plant as practical to restrict access.
ARKANSAS NUCLEAR ONE arv=oa x # ATE
A   D. A minimum of four Security officers should report to the Control Room area to support plant access and egress. A A   E. As Security Officers evacuate the Guard Houses, they shall carry the badge boards and a master list compu-ter printout of badged personnel and if readily avail-able, a printout of remaining onsite personnel, to the Emergency Control Center. It should not be neces-sary to evacuate Security until the Technical and Operational Support personnel are evacuated.             Upon evacuation the Security Office should be established at the west end, ground floor, of the Emergency Con-trol Center. Access approval and badging should be in this area. Security Officers should report to this area for assignments. A
, "nm, g_,/
()                 9.3.7       The DEC/ Recovery Manager must approve re-entry into the plant until the evacuation is terminated.
CHANGE DATE B.
Perimeter gates and doors shall be locked following the evacuation C.
Outside security posts should be established as close to the plant as practical to restrict access.
A D.
A minimum of four Security officers should report to the Control Room area to support plant access and egress. A A
E.
As Security Officers evacuate the Guard Houses, they shall carry the badge boards and a master list compu-ter printout of badged personnel and if readily avail-able, a printout of remaining onsite personnel, to the Emergency Control Center.
It should not be neces-sary to evacuate Security until the Technical and Operational Support personnel are evacuated.
Upon evacuation the Security Office should be established at the west end, ground floor, of the Emergency Con-trol Center. Access approval and badging should be in this area. Security Officers should report to this area for assignments. A
()
9.3.7 The DEC/ Recovery Manager must approve re-entry into the plant until the evacuation is terminated.
10.0 ROAD BLGCKS l
10.0 ROAD BLGCKS l
10.1 Road blocks restricting access to ANO shall be manned by at least one ANO Security Officer. The AN0 Security Officer shall be capable of l                       making radio contact with the Security Duty Sergeant. The Security j                       Duty Sergeant shall obtain verbal approval from the Duty Emergency                     ,
10.1 Road blocks restricting access to ANO shall be manned by at least one ANO Security Officer. The AN0 Security Officer shall be capable of l
Coordinator / Recovery Manager or the Incident Response Director before allowing passage of individual (s) who are not part of the response organization.
making radio contact with the Security Duty Sergeant. The Security j
(         11.0 ATTACHMENTS AND FORMS None i V       The material contained within these symbols (A) is proprietary or private infor-mation.
Duty Sergeant shall obtain verbal approval from the Duty Emergency Coordinator / Recovery Manager or the Incident Response Director before allowing passage of individual (s) who are not part of the response organization.
l                     .
(
                                                                              -.        -}}
11.0 ATTACHMENTS AND FORMS None i V The material contained within these symbols (A) is proprietary or private infor-mation.
l
-}}

Latest revision as of 10:15, 16 December 2024

Public Version of Revision 4 to Emergency Plan Procedure 1903.30, Plant Evacuation
ML20069P542
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/11/1982
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20069P526 List:
References
1903.30-01, 1903.30-1, NUDOCS 8212080085
Download: ML20069P542 (3)


Text

_ ___. _ _ _ - _ _ -

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N

RECORD OF CIIANGES AND REVISIONS 0W NO.

1009.06A EMERGENCY PLAN PROCEDURE REV. //12 FC #,

l Safety Related YES Y NO O j

" ~ ;)

PLANT EVAUCATION 1903.30 1 REV. 4 w i/

4-y.

i },A.lil:

.a

-)

fd d e 's N !

N)

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

1 3

2 3

3 3

4 3

5 4

6 3

1 7

4 0

APPROVED BY:

APPROVAI. DATE

. /-.'? [ '

M

['<y.-?, ~

- [, /

4 b',h-[ n.

REQUIRED EFFECTIVE DATE:

(General Manager) 8212080085 821201 PDR ADOCK 05000313 F

PDR

PLANT fAANUAL SECTION:

PROCEDUREfWO% PLAN TITLE:

N O-EMERGENCY PI.AN ppncrnimr pr As1T ptrArp vrins' i o n ')

70 PAGE q nr 7 ARKANSAS NUCLEAR ONE aevision

. oa's.

>><n, a,

~

CHANGE DATE 8.6.6 If the Security computer is not working, the list of ac-counted for on-site personnel obtained from the Technical Support Center A,

A chould be checked against badges in the badge racks.

Persons not accounted for in this manner will be reported to the Duty Emcrgency Coordi-nator/ Recovery Manager.

8.6.7 If there is not time for Security to complete the account-ability on-site, the badges and badge racks and a master computer printout of badged personnel should be taken to the west end of the Emergency Control Center, ground floor. Accountability should then be established as stated in Paragraph 8.6.3 through 8.6.6 above.

8.6.8 A Security personnel shall, upon ANO personnel exiting each applicable area, lock their post, as necessary, and assem-ble at the Main Guard Station (or as directed) for further instructions. A 8.7 If there are persons (s) unaccounted for, the Duty Emergency Coordi-nator/ Recovery Mancger shall direct personnel to scarch for the un-accounted for individual (s).

8.8 Af ter initial accountability is established, security personnel issuing /

receiving personnel badges are responsible for notifying the Technical Support Center of changes when personnel ingress / egress the protected area.

d.9 When the plant is determined to have returned to a condition where the plant evacuation is no longer required, the Duty Emergency Co-ordinator/ Recovery Manager may terminate the plant evaucuation.

9.0 EVACUATION OF TifE ONSITE TECHNICAL SUPPORT CENTER AND OPERATIONAL SUPPORT CENTER The Onsite Technical Support Center and the Onsite Operational Center are not evacuated in the event of a Plant Evacuation. The Onsite Radiological Monitoring Section shall monitor radiation levels while the centers remain occupied.

However, if the following symptoms are observed, actions shall be taken in accordance with Section 9.2 and 9.3.

9.1 Symptoms 9.1.1 Area radiation levels above 2.5 mR/hr.

9.1.2 NMC alarm indicating particulate airborne of 450 CPM above background or gaseous airborne of 10 CPM above background.

(Assuming installed iodine cartridges are removed and ana-lyzed every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.)

The material contained within these symbols (A) is proprietary or private infor-mation.

PLANT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO:

EMERGENCY PLAN noncenene n1Av7 rv3cnamine inn,,n PAGE 7 nr 7 (1

ARKANSAS NUCLEAR ONE arv=oa x # ATE

, "nm, g_,/

CHANGE DATE B.

Perimeter gates and doors shall be locked following the evacuation C.

Outside security posts should be established as close to the plant as practical to restrict access.

A D.

A minimum of four Security officers should report to the Control Room area to support plant access and egress. A A

E.

As Security Officers evacuate the Guard Houses, they shall carry the badge boards and a master list compu-ter printout of badged personnel and if readily avail-able, a printout of remaining onsite personnel, to the Emergency Control Center.

It should not be neces-sary to evacuate Security until the Technical and Operational Support personnel are evacuated.

Upon evacuation the Security Office should be established at the west end, ground floor, of the Emergency Con-trol Center. Access approval and badging should be in this area. Security Officers should report to this area for assignments. A

()

9.3.7 The DEC/ Recovery Manager must approve re-entry into the plant until the evacuation is terminated.

10.0 ROAD BLGCKS l

10.1 Road blocks restricting access to ANO shall be manned by at least one ANO Security Officer. The AN0 Security Officer shall be capable of l

making radio contact with the Security Duty Sergeant. The Security j

Duty Sergeant shall obtain verbal approval from the Duty Emergency Coordinator / Recovery Manager or the Incident Response Director before allowing passage of individual (s) who are not part of the response organization.

(

11.0 ATTACHMENTS AND FORMS None i V The material contained within these symbols (A) is proprietary or private infor-mation.