ML20070G152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-   _ _______ __        _ _ _ _ _ _ _ _ _
{{#Wiki_filter:-
                  -                    ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One FORM NO.
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One FORM NO.
N RECORD OF CHANGES AND REVISIONS                                                                       1000. 0M REV. # 12             PC #
N RECORD OF CHANGES AND REVISIONS 1000. 0M REV. # 12 PC #
E!!E90F? cY PI.A!! PROCEDURE l Safety Related YES T NO O DUTIES CF THE E!!ERGE!!CY RADIATIC:: TEA:1                                                               1 y                            1903.43                       REV. 4 s     ,,'                        .,
E!!E90F? cY PI.A!! PROCEDURE l Safety Related YES T NO O DUTIES CF THE E!!ERGE!!CY RADIATIC:: TEA:1 1
                                                                                ",                                    II O,l y a s     ,.
1903.43 REV. 4 y
PAGE REV PC#             PAGE REV PC#                       PAGE REV PC#                 PAGE REV PC#                   PAGE REV PC#
II s
1     4     3 2     4 3     4     2 4     4     3 5     4     1 6     3 7     3 8     3 I
O,l y a s
APPROVED BY:                                                                                                     APPROVAL DATE
PAGE REV PC#
                                                        '                                                                  p / v. .'N t ib..cfl/   <            ys :                                                  REQUIRED EFFECTIVE DATE:
PAGE REV PC#
j (General Manager) 8212220004 821210 PDR ADOCK 05000313 F                     PDR l
PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
1 4
3 2
4 3
4 2
4 4
3 5
4 1
6 3
7 3
8 3
I APPROVED BY:
APPROVAL DATE p / v..'N t ib..cfl/
REQUIRED EFFECTIVE DATE:
ys :
(General Manager)
'j 8212220004 821210 PDR ADOCK 05000313 F
PDR l


4 PLANT MANUAL SECTION:       PROCEDURE / WORK PLAN TITLE:                     NO:
4 PLANT MANUAL SECTION:
EMERGENCY PLAN           DUTIES OF THE EMERGENCY j k         crev earter               e nt a-try 7e st,                                 1 em . 4 7 d   L                                                               PAGE       i ec 8 18               ARKANSAS NUCLEAR ONE                                 aevision   a o^ta =   ,'=3 CHANGE   er_, DATE 77/7a/co 1.0   PURPOSE The purpose of this procedure is to pr: vide guidance en the responsibilities and dut:.es of the Emergency Radiation Team for emergency situations.
PROCEDURE / WORK PLAN TITLE:
2.0   SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.
NO:
3.0   REFEREIICES 3.1 References Used in Procedure Preparation:
EMERGENCY PLAN DUTIES OF THE EMERGENCY j k crev earter e nt a-try 7e st, 1 em. 4 7 d
3.1.1         Arkansas :uclear one Emergency Plan 3.2   References Used in Cenjunction with this Precedure:
L PAGE i e c 8 18 ARKANSAS NUCLEAR ONE aevision a
3.2.1         1903.10, " Emergency Acticn Level Response" 3.3   Related Ano Procedures :
o^ta
3.3.1         1903.30, " Plant Evacuatien" 3.3.2         1903.60, " Emergency Supplies and Equipment" 3.3.3         1904.02, "offsite Dose Projection Procedures" 3.3.4         1904.03, " Aux. Eldg. Ventilation Exhaust Emergency Radiation Mcnitor" 4.0   DEFINIT!C:!S                                                                                   .
=
4.1   Cperational Support Center (OSC) - The AHO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Classroem and adjoining o'fice.           [Upon team assignments being made, the On-site Radiological Monitoring Section should centinue to operate from this location (unless otherwise instructed); the off-site Radiological Monitoring Section should operate from the Emer-gency Centrol Center (Technical Analysis Classroom)].
,'=3 CHANGE
4.2   Emergency Kit - A compilation cf supplies and equipment for determination of radiological hazards: these kits are located in the general vicinity of the:       (1) Unit 1 Control Recm, (2) First Floor Classroom (Admin. Eldg),
: er_,
DATE 77/7a/co 1.0 PURPOSE The purpose of this procedure is to pr: vide guidance en the responsibilities and dut:.es of the Emergency Radiation Team for emergency situations.
2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.
3.0 REFEREIICES 3.1 References Used in Procedure Preparation:
3.1.1 Arkansas :uclear one Emergency Plan 3.2 References Used in Cenjunction with this Precedure:
3.2.1 1903.10, " Emergency Acticn Level Response" 3.3 Related Ano Procedures :
3.3.1 1903.30, " Plant Evacuatien" 3.3.2 1903.60, " Emergency Supplies and Equipment" 3.3.3 1904.02, "offsite Dose Projection Procedures" 3.3.4 1904.03, " Aux. Eldg. Ventilation Exhaust Emergency Radiation Mcnitor" 4.0 DEFINIT!C:!S 4.1 Cperational Support Center (OSC) - The AHO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Classroem and adjoining o'fice.
[Upon team assignments being made, the On-site Radiological Monitoring Section should centinue to operate from this location (unless otherwise instructed); the off-site Radiological Monitoring Section should operate from the Emer-gency Centrol Center (Technical Analysis Classroom)].
4.2 Emergency Kit - A compilation cf supplies and equipment for determination of radiological hazards: these kits are located in the general vicinity of the:
(1) Unit 1 Control Recm, (2) First Floor Classroom (Admin. Eldg),
(3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital (Emergency Roem).
(3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital (Emergency Roem).
i 1
i 1


MNT MANUAL SECTION:         PROCEDURE / WORK PLAN TITLE:                       NO:
MNT MANUAL SECTION:
EMERGENCY PLAN             DUTIES OF THE EMERGENCY e , n y , + r m- - - . . ,                           4-aa       <a rr n gg7-rr
PROCEDURE / WORK PLAN TITLE:
  -                                                                      PAGE       ,
NO:
r n ARKANSAS NUCLEAR ONE-aavision CHANGE   e,_
EMERGENCY PLAN DUTIES OF THE EMERGENCY e, n y, + r m- - -..,
                                                                                      -  oAra
4-aa
                                                                                        ,DATE
<a rr n gg7-rr PAGE r n ARKANSAS NUCLEAR ONE
                                                                                                      ~
~
                                                                                                        ,,n,n-l
aavision oAra CHANGE e,_
: 2.       Available Any AP&L vehicle onsite is available :ar use.
,DATE
,,n,n-2.
Available Any AP&L vehicle onsite is available :ar use.
(Hand-held radios are available for the ve-hicles which are not radio-equipped.)
(Hand-held radios are available for the ve-hicles which are not radio-equipped.)
7.1.3       Each section should then rep' ort to their designated assembly area (as indicated in Section 4.0) to make ready the appro-priate emergency kit equipment, as necessary.
7.1.3 Each section should then rep' ort to their designated assembly area (as indicated in Section 4.0) to make ready the appro-priate emergency kit equipment, as necessary.
7.1.4       If not previously done, the team leader should contact the appropriate person in the current chain of command, per Attachment 1, to determine the current radiological re-sponse needs.
7.1.4 If not previously done, the team leader should contact the appropriate person in the current chain of command, per, to determine the current radiological re-sponse needs.
7.1.5       The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emer-gency procedures, as appropriate:
7.1.5 The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emer-gency procedures, as appropriate:
NOTE:     Activation of the Emergency Plan does not supercede the use of routine Health Physics procedures unless it is specifically stated so. Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should be followed.
NOTE:
A. 1903.30, " Plant Evacuation" B. 1903.33, "Re-entry Guidelines" C. 1903.76, " Arkansas Department of Health" D. 1904.02, "Offsite Dose Projection" 7.1.6       The team leader should provide a periodic update of the team's status to the appropriate individual, per Attachment 1.
Activation of the Emergency Plan does not supercede the use of routine Health Physics procedures unless it is specifically stated so.
7.1.7       After the initial team response, the Emergency Radiation Team should report as directed by the appropriate individual, per                     ,
Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should be followed.
Attachment 1.
A.
8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Unusual Event is declared as a result of a radiological incident.                 In that case, refer to Section 7.0.
1903.30, " Plant Evacuation" B.
1903.33, "Re-entry Guidelines" C.
1903.76, " Arkansas Department of Health" D.
1904.02, "Offsite Dose Projection" 7.1.6 The team leader should provide a periodic update of the team's status to the appropriate individual, per Attachment 1.
7.1.7 After the initial team response, the Emergency Radiation Team should report as directed by the appropriate individual, per 8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Unusual Event is declared as a result of a radiological incident.
In that case, refer to Section 7.0.
8.2 Alert If the emergency does not involve a radiological incident, the Emergency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.
8.2 Alert If the emergency does not involve a radiological incident, the Emergency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.
8.2.1       Notifications should be made in accordance with Section 6.0 of this procedure.
8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.
I S.2.2       When onsite, the team leader should report to the Duty
I S.2.2 When onsite, the team leader should report to the Duty
(                             Emergency Coordinator to obtain further instructions, as necessary.
(
                                                    . . .}}
Emergency Coordinator to obtain further instructions, as necessary.
...}}

Latest revision as of 09:41, 16 December 2024

Public Version of Change PC-3 to Revision 4 of Emergency Plan Procedure 1903.43, Duties of Emergency Radiation Team
ML20070G152
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/19/1982
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20070G142 List:
References
1903.43-03, 1903.43-3, NUDOCS 8212220004
Download: ML20070G152 (3)


Text

-

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One FORM NO.

N RECORD OF CHANGES AND REVISIONS 1000. 0M REV. # 12 PC #

E!!E90F? cY PI.A!! PROCEDURE l Safety Related YES T NO O DUTIES CF THE E!!ERGE!!CY RADIATIC:: TEA:1 1

1903.43 REV. 4 y

II s

O,l y a s

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

1 4

3 2

4 3

4 2

4 4

3 5

4 1

6 3

7 3

8 3

I APPROVED BY:

APPROVAL DATE p / v..'N t ib..cfl/

REQUIRED EFFECTIVE DATE:

ys :

(General Manager)

'j 8212220004 821210 PDR ADOCK 05000313 F

PDR l

4 PLANT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY j k crev earter e nt a-try 7e st, 1 em. 4 7 d

L PAGE i e c 8 18 ARKANSAS NUCLEAR ONE aevision a

o^ta

=

,'=3 CHANGE

er_,

DATE 77/7a/co 1.0 PURPOSE The purpose of this procedure is to pr: vide guidance en the responsibilities and dut:.es of the Emergency Radiation Team for emergency situations.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.

3.0 REFEREIICES 3.1 References Used in Procedure Preparation:

3.1.1 Arkansas :uclear one Emergency Plan 3.2 References Used in Cenjunction with this Precedure:

3.2.1 1903.10, " Emergency Acticn Level Response" 3.3 Related Ano Procedures :

3.3.1 1903.30, " Plant Evacuatien" 3.3.2 1903.60, " Emergency Supplies and Equipment" 3.3.3 1904.02, "offsite Dose Projection Procedures" 3.3.4 1904.03, " Aux. Eldg. Ventilation Exhaust Emergency Radiation Mcnitor" 4.0 DEFINIT!C:!S 4.1 Cperational Support Center (OSC) - The AHO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Classroem and adjoining o'fice.

[Upon team assignments being made, the On-site Radiological Monitoring Section should centinue to operate from this location (unless otherwise instructed); the off-site Radiological Monitoring Section should operate from the Emer-gency Centrol Center (Technical Analysis Classroom)].

4.2 Emergency Kit - A compilation cf supplies and equipment for determination of radiological hazards: these kits are located in the general vicinity of the:

(1) Unit 1 Control Recm, (2) First Floor Classroom (Admin. Eldg),

(3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital (Emergency Roem).

i 1

MNT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY e, n y, + r m- - -..,

4-aa

<a rr n gg7-rr PAGE r n ARKANSAS NUCLEAR ONE

~

aavision oAra CHANGE e,_

,DATE

,,n,n-2.

Available Any AP&L vehicle onsite is available :ar use.

(Hand-held radios are available for the ve-hicles which are not radio-equipped.)

7.1.3 Each section should then rep' ort to their designated assembly area (as indicated in Section 4.0) to make ready the appro-priate emergency kit equipment, as necessary.

7.1.4 If not previously done, the team leader should contact the appropriate person in the current chain of command, per, to determine the current radiological re-sponse needs.

7.1.5 The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emer-gency procedures, as appropriate:

NOTE:

Activation of the Emergency Plan does not supercede the use of routine Health Physics procedures unless it is specifically stated so.

Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should be followed.

A.

1903.30, " Plant Evacuation" B.

1903.33, "Re-entry Guidelines" C.

1903.76, " Arkansas Department of Health" D.

1904.02, "Offsite Dose Projection" 7.1.6 The team leader should provide a periodic update of the team's status to the appropriate individual, per Attachment 1.

7.1.7 After the initial team response, the Emergency Radiation Team should report as directed by the appropriate individual, per 8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Unusual Event is declared as a result of a radiological incident.

In that case, refer to Section 7.0.

8.2 Alert If the emergency does not involve a radiological incident, the Emergency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.

8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.

I S.2.2 When onsite, the team leader should report to the Duty

(

Emergency Coordinator to obtain further instructions, as necessary.

...