ML20070G154: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_____ _ ___                             _ _ - _ - _ _ - - - - - - - - - - - - - - - - - - - - -                                      -  - - - -
{{#Wiki_filter:_____ _ ___
e     .
e VERMONT YANKEE NUCLEAR POW ER CORPOR ATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 March 10, 1991 VYV 91-072 U.S. Nuclear Pegulatory Commission ATTN: Document Control Desk Washington, D.C.
VERMONT YANKEE NUCLEAR POW ER CORPOR ATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 March 10, 1991 VYV 91-072 U.S. Nuclear Pegulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
20555


==Dear Sir:==
==Dear Sir:==
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1991.
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1991.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
Anfft Wa rren P. / Murphy.
Anfft Wa rren P. / Murphy.
Senior Vice Pres;       , Operations cci- 1) USNRC Region I 475 Allendale Road King of Prussia, PA                                           19406
Senior Vice Pres;
, Operations cci-1) USNRC Region I 475 Allendale Road King of Prussia, PA 19406
: 2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 3 Page 1 of 1
: 2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 3 Page 1 of 1
                  ' fa 3Qh;)               h I           l
' f 3Qh;)
h I
l a


                                                          )
l VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 91-02 FOR THE MONTH OF E'EBRUARY, 1991 DP 0411 Rev. 3 Page 1 of 1
        .                                                I l
l l
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 91-02 FOR THE MONTH OF E'EBRUARY, 1991 DP 0411 Rev. 3 Page 1 of 1


l
l
[*                           OPERATING DATA REPORT DOCKET NO.               50-271 DATE             910310 COMPLETED BY                 G.A. Wallin TELEPHONE                 (802)257-7711 OPERATING STATUS
[*
        '1.       Unit Name:         Vermont Yankee NOTES:
OPERATING DATA REPORT DOCKET NO.
        '2.       Reporting Period:       February
50-271 DATE 910310 COMPLETED BY G.A.
: 3.       Licensed Thermal Power (MWt):           1593
Wallin TELEPHONE (802)257-7711 OPERATING STATUS
: 4.       Nameplate Rating (Gross MWe):             540
'1.
:5.       Design Electrical Rating (Net MWe): 514(oc) 504(cc)
Unit Name:
: 6.       . Maximum Dependable capacity (Gross MWe): 535
Vermont Yankee NOTES:
: 7.       Maximum Dependable Capacity (Net MWe):                         504
'2.
: 8.       If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:
Reporting Period:
February 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540
:5.
Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.
. Maximum Dependable capacity (Gross MWe): 535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:
N/A 9.
Power level to which restricted, if any(Net MWe):
N/A
N/A
: 9.        Power level to which restricted, if any(Net MWe):                                          N/A
: 10.. Reasons for rettrictions, if any:
: 10. . Reasons for rettrictions, if any:                                                                 N/A This Month           Yr-to-Date                     Cumulative-
N/A This Month Yr-to-Date Cumulative-
: 11. - Hours In Reporting Period                                           672.00-               1416.00                     159936.00 12 .~ Number Of Hours Reactor was Critical                               672.00                 1416 00                     129604.63
: 11. - Hours In Reporting Period 672.00-1416.00 159936.00 12.~ Number Of Hours Reactor was Critical 672.00 1416 00 129604.63 13.
: 13. Reactor Reserve Shutdown Hours                                           0.00                       0.00                     0.00 11 4 .       Hours' Generator On-Line                                     672.00                 1416.00                     126787.60
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 11 4.
: 15. Unit Reserve Shutdown Hours                                             0.00                       0.00                     0.00
Hours' Generator On-Line 672.00 1416.00 126787.60 15.
: 16.         Gross Thermal Energy Generated (MWH)1069794.00                             2228731.50                     187544036.50
Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
      '17 .       Gross Electrical Energy Generated                     361283.00             752270.00                         62499765.00
Gross Thermal Energy Generated (MWH)1069794.00 2228731.50 187544036.50
: 18.         Net Electrical Energy Generated (MWH)346731.00                             721864.00                         59353834.00 11 9 .     Unit Service Factor-                                           100.00-                   100.00                     78.44
'17.
:20.       Unit Availability Factor                                     100.00                     100.00                     78.44
Gross Electrical Energy Generated 361283.00 752270.00 62499765.00 18.
: 21.         Unit-Capacity Factor (Using MDC Net)                         102.37                     101.15                     72.83
Net Electrical Energy Generated (MWH)346731.00 721864.00 59353834.00 11 9.
: 22.         Unit Capacity Factor (Using DER Net)                         100.38                     99.18                     71.44
Unit Service Factor-100.00-100.00 78.44
: 23.         Ur.it Forced Outage Rate .         _    _
:20.
0.00                       0.00 _                   5.46
Unit Availability Factor 100.00 100.00 78.44 21.
: 24.         Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each):-N/A,
Unit-Capacity Factor (Using MDC Net) 102.37 101.15 72.83 22.
: 25.         If shut down at end-of report petiod, estimated date of startup: N/A
Unit Capacity Factor (Using DER Net) 100.38 99.18 71.44 23.
: 26. -Units In Test Status (prior-to commercial operation): N/A Forecast                     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                         ~
Ur.it Forced Outage Rate.
0.00 0.00 _
5.46 24.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each):-N/A, 25.
If shut down at end-of report petiod, estimated date of startup: N/A
: 26. -Units In Test Status (prior-to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
~
COMMERCIAL OPERATION VYDPF 0411.01 DP.0411 Rev. 3 Page'1.of 1 RT No. 13.F01.19F
COMMERCIAL OPERATION VYDPF 0411.01 DP.0411 Rev. 3 Page'1.of 1 RT No. 13.F01.19F


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY     G.A. Wallin ___
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY G.A. Wallin ___
TELEPHONE (802)257-7711 MONTH                                         rebruary DAY AVERAGE DAILY POWER LEVEL                                                                                                           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                                                   (MWe-Net)
TELEPHONE (802)257-7711 MONTH rebruary DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 1.                                             516                                                                                 17.                             515
(MWe-Net) 1.
              ~~
516 17.
: 2.                                            516                                                                                 18.                             516
515 2.
: 3.                                             515                                                                                 19.                             516
~~
: 4.                                             516                                                                                 20.                             516 5,                                             517                                                                                 21,                             516
516 18.
: 6.                                             517                                                                                 22,                               518
516 3.
: 7.                                             516                                                                                 23.                               516
515 19.
: 8.                                             516                                                                                 24.                               515
516 4.
: 9.                                             516                                                                                 25.                             516 10,                                               515                                                                                 26,                             516
516 20.
                                                                                                                                                  ~~
516 5,
: 11.                                               516                                                                                 27.                             516 12,                                               515                                                                                 28.                             516
517 21, 516 6.
: 13.                                               516                                                                                 29.
517 22, 518 7.
: 14.                                               516                                                                                 30.
516 23.
: 15.                                               516                                                                                 31,
516 8.
: 16.                                               516 INSTRUCTIONS:
516 24.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
515 9.
VYDPF 0411.02 DP 0411 Rev. 3
516 25.
~      Page 1 of 1 RT No. 13.FO1.18V
516 10, 515 26, 516 11.
516 27.
~~
516 12, 515 28.
516 13.
516 29.
14.
516 30.
15.
516 31, 16.
516 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 DP 0411 Rev. 3 Page 1 of 1
~
RT No. 13.FO1.18V


e
e
                                                                                                                                    ,  .e.
.e.
e UNIT SHUTDOWNS AND POWER REDUCTION 9 DOCKET NO 50-271 REPORT MONTH FEBRUARY                               UNIT NAME Vermont Yankee DATE 910310 COMPLETED BY G.A. Wallin TELEPHONE (802:257-7711 1                     2     Method of       License   system   Component   Cause and Corrective No.         Date Type   . Duration   Reason   Shutting Down   Event. Code     . Code       Action to (hours)             Reactor 3       Reporte     4           5       Prevent Recurrence None 1 F: Forced           2 Reasons                                         3 Method:             4 Exhibit G- Instructions S: Scheduled           A-Equipment Failure (Explain)                   1- Manual             for Preparation of Data B-Maintenance or Test                           2- Manual Scras'     Entry Sheets for Licensee C-Refueling                                       3- Automatic Scram   Event Report (LER) File.
e UNIT SHUTDOWNS AND POWER REDUCTION 9 DOCKET NO 50-271 REPORT MONTH FEBRUARY UNIT NAME Vermont Yankee DATE 910310 COMPLETED BY G.A.
D-Regulatory Restriction                         4- Other (Explain)   (NUREG 0161)
Wallin g
E-Operator Training and License Examination F-Administrative                                                     5 Exhibit I - Same Source VYDPr C411.03             0-Operational Error (Explain)
TELEPHONE (802:257-7711 1
DP 0411 Rev. 3             H-(Explain)
2 Method of License system Component Cause and Corrective No.
Page 1 of 1 i
Date Type
. Duration Reason Shutting Down Event.
Code
. Code Action to (hours)
Reactor 3 Reporte 4
5 Prevent Recurrence None 1 F: Forced 2 Reasons 3 Method:
4 Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras' Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File.
D-Regulatory Restriction 4-Other (Explain)
(NUREG 0161)
E-Operator Training and License Examination F-Administrative 5 Exhibit I - Same Source VYDPr C411.03 0-Operational Error (Explain)
DP 0411 Rev. 3 H-(Explain)
Page 1 of 1 5
e i
l l
l l
(
(


    . f.
. f.
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 REPORT MONTH   February
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-7711 REPORT MONTH February


==SUMMARY==
==SUMMARY==
Line 105: Line 151:
There were no items of interest to report this month.
There were no items of interest to report this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18X}}
VYDPF 0411.04 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18X
.}}

Latest revision as of 09:41, 16 December 2024

Monthly Operating Rept for Feb 1991 for Vermont Yankee Power Station
ML20070G154
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/28/1991
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-91-072, VYV-91-72, NUDOCS 9103110274
Download: ML20070G154 (6)


Text

_____ _ ___

e VERMONT YANKEE NUCLEAR POW ER CORPOR ATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 March 10, 1991 VYV 91-072 U.S. Nuclear Pegulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1991.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.

Anfft Wa rren P. / Murphy.

Senior Vice Pres;

, Operations cci-1) USNRC Region I 475 Allendale Road King of Prussia, PA 19406

2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 3 Page 1 of 1

' f 3Qh;)

h I

l a

l VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 91-02 FOR THE MONTH OF E'EBRUARY, 1991 DP 0411 Rev. 3 Page 1 of 1

l

[*

OPERATING DATA REPORT DOCKET NO.

50-271 DATE 910310 COMPLETED BY G.A.

Wallin TELEPHONE (802)257-7711 OPERATING STATUS

'1.

Unit Name:

Vermont Yankee NOTES:

'2.

Reporting Period:

February 3.

Licensed Thermal Power (MWt):

1593 4.

Nameplate Rating (Gross MWe):

540

5.

Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.

. Maximum Dependable capacity (Gross MWe): 535 7.

Maximum Dependable Capacity (Net MWe):

504 8.

If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:

N/A 9.

Power level to which restricted, if any(Net MWe):

N/A

10.. Reasons for rettrictions, if any:

N/A This Month Yr-to-Date Cumulative-

11. - Hours In Reporting Period 672.00-1416.00 159936.00 12.~ Number Of Hours Reactor was Critical 672.00 1416 00 129604.63 13.

Reactor Reserve Shutdown Hours 0.00 0.00 0.00 11 4.

Hours' Generator On-Line 672.00 1416.00 126787.60 15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Gross Thermal Energy Generated (MWH)1069794.00 2228731.50 187544036.50

'17.

Gross Electrical Energy Generated 361283.00 752270.00 62499765.00 18.

Net Electrical Energy Generated (MWH)346731.00 721864.00 59353834.00 11 9.

Unit Service Factor-100.00-100.00 78.44

20.

Unit Availability Factor 100.00 100.00 78.44 21.

Unit-Capacity Factor (Using MDC Net) 102.37 101.15 72.83 22.

Unit Capacity Factor (Using DER Net) 100.38 99.18 71.44 23.

Ur.it Forced Outage Rate.

0.00 0.00 _

5.46 24.

Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each):-N/A, 25.

If shut down at end-of report petiod, estimated date of startup: N/A

26. -Units In Test Status (prior-to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

~

COMMERCIAL OPERATION VYDPF 0411.01 DP.0411 Rev. 3 Page'1.of 1 RT No. 13.F01.19F

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY G.A. Wallin ___

TELEPHONE (802)257-7711 MONTH rebruary DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

516 17.

515 2.

~~

516 18.

516 3.

515 19.

516 4.

516 20.

516 5,

517 21, 516 6.

517 22, 518 7.

516 23.

516 8.

516 24.

515 9.

516 25.

516 10, 515 26, 516 11.

516 27.

~~

516 12, 515 28.

516 13.

516 29.

14.

516 30.

15.

516 31, 16.

516 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 DP 0411 Rev. 3 Page 1 of 1

~

RT No. 13.FO1.18V

e

.e.

e UNIT SHUTDOWNS AND POWER REDUCTION 9 DOCKET NO 50-271 REPORT MONTH FEBRUARY UNIT NAME Vermont Yankee DATE 910310 COMPLETED BY G.A.

Wallin g

TELEPHONE (802:257-7711 1

2 Method of License system Component Cause and Corrective No.

Date Type

. Duration Reason Shutting Down Event.

Code

. Code Action to (hours)

Reactor 3 Reporte 4

5 Prevent Recurrence None 1 F: Forced 2 Reasons 3 Method:

4 Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras' Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File.

D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training and License Examination F-Administrative 5 Exhibit I - Same Source VYDPr C411.03 0-Operational Error (Explain)

DP 0411 Rev. 3 H-(Explain)

Page 1 of 1 5

e i

l l

(

. f.

DOCKET NO. 50-271 UNIT Vermont Yankee DATE 910310 COMPLETED BY G.A.

Wallin TELEPHONE (802)257-7711 REPORT MONTH February

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9% of rated thermal power for the month.

Gross electrical generation was 361,283 MWHe or 99.6% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

There were no items of interest to report this month.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18X

.