    ,    VERMONT YANKEE
VERMONT YANKEE
        . NUCLEIR POWER CORPORATION
. NUCLEIR POWER CORPORATION
            *MD.                 P.O. Box 157, Governor Hunt Road W                    vernon, vermont 05354-0157 Yq 'N / ')      /    (802) 257-7711
*MD.
P.O. Box 157, Governor Hunt Road
( %xy.
( %xy.
: m.  .
Yq 'N / ')
d-' ..
W vernon, vermont 05354-0157 d-'
,s May 10,1994 VY-RCE-94-012 BVY 94-50 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:           Document Control Desk
/
(802) 257-7711 m.
,s May 10,1994 VY-RCE-94-012 BVY 94-50 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:
Document Control Desk


==Reference:==
==Reference:==
a)     License No. DPR-28 (Docket No. 50-271)
a)
License No. DPR-28 (Docket No. 50-271)


==Dear Sir:==
==Dear Sir:==
Submitted herewith is the Monthly Statistical Report for the Vennont i
Submitted herewith is the Monthly Statistical Report for the Vennont i
Yankee Nuclear Power Station for the month of April.1994.
Yankee Nuclear Power Station for the month of April.1994.
Very truly yours, 2
Very truly yours, 2
Vennont Yankee Nuclear Power Corp.
Vennont Yankee Nuclear Power Corp.
N           V-y i.
N i.
1-Donald A. Reid Vice President, Operations cc:     USNRC, Region I USNRC Resident inspector, VYNPS
V-y 1-Donald A. Reid Vice President, Operations cc:
                                                                                                                          .c 9405200290 940430 PDR   ADOCK 05000271                                                                 -     l#
USNRC, Region I USNRC Resident inspector, VYNPS
Y        I
.c 9405200290 940430 Y
                                                                                                                                      'g '
I PDR ADOCK 05000271
                        .R                       PDR                                                                                       '
- l#
W OUUUd
'g '
.R PDR W OUUUd


,    .                                                        1 l
1 VERMONT YANKEE NUCLEAR POWER STATION MONTIIIJ STATISTICAL REPOl(T 94-04 FOlt TIIE MONTil OF APRIL 1994 DP 0411 Rev. 5 Page 1 ofI
i l
l 1
VERMONT YANKEE NUCLEAR POWER STATION MONTIIIJ STATISTICAL REPOl(T 94-04 FOlt TIIE MONTil OF APRIL 1994 DP 0411 Rev. 5 Page 1 ofI


w
w OPERATING DATA REPORT F
                ,                                                OPERATING DATA REPORT F
DOCKET NO 50-271 DATE 940510 COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711 OPERATTELETATHS 1.
DOCKET     NO 50-271 DATE 940510 COMPLETED BY G.A. WALLIN
Unit Name:
;                                                                                                                TELEPHONE (802)257-7711 OPERATTELETATHS
yfrmont YalDlLQ2 2.
: 1. Unit Name:                     yfrmont YalDlLQ2
Reporting Period:
: 2. Reporting Period:                                 April                       NOTES:
April NOTES:
: 3. Licensed Thermal Power (MWt):1593
: 3. Licensed Thermal Power (MWt):1593
,                4. Nameplate Rating (Gross MWe) : 51Q
: 4. Nameplate Rating (Gross MWe) : 51Q 5.
: 5. Design Electrical Rating (Net MWe) :                         114 (oc) 504(cc)
Design Electrical Rating (Net MWe) :
: 6. Maximum Dependable Capacity (Gross MWe) :                                   111 l
114 (oc) 504(cc) l
7.-Maximum Dependable Capacity (Net MWe):                                       1Q4
: 6. Maximum Dependable Capacity (Gross MWe) :
: 8. If changes, occur in capacity ratings (Items Number 3 through 7) since
111 7.-Maximum Dependable Capacity (Net MWe):
:                    last report, give reasons:
1Q4 8.
If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A t
N/A t
: 9. Power level to which restricted, if any(Net MWe):                                                 N/A
9.
: 10. Reasons for restrictions, if any:                                                   N/A This Month                       Yr-to-Date   Cumulative
Power level to which restricted, if any(Net MWe):
;            11. Hours in Reporting Period                                                   719.00                 2879.00     187703.00 a           12. Number Of Hours Reactor was Critical                                       678.12                 2838.12     154055.53
N/A
: 13. Reactor Reserve Shutdown Hours                                                 0.00                   0.00             0.00
: 10. Reasons for restrictions, if any:
: 14. Hours Generator On-Line                                                     667.82                 2822 17
N/A This Month Yr-to-Date Cumulative
                                                                                                                            .      150937.79
: 11. Hours in Reporting Period 719.00 2879.00 187703.00 a
: 15. Unit Reserve Shutdown Hours                                                   0.00                   0.00             0.00
: 12. Number Of Hours Reactor was Critical 678.12 2838.12 154055.53
: 16. Gross Thermal Energy Generated (MWH)                             1955857.00_                       4455498.00 225161169.50 17     Gross Electrical Energy Generated                                 357363.00                     1509118.00   75028500.00       '
: 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
i            18. Net Electrical Energy Generated (MWH)                                 343697.00                 _1451057.00     71298081.00
: 14. Hours Generator On-Line 667.82 2822 17 150937.79
: 19. Unit Service Factor                                                             92.88                   98.03             79 62
: 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
            '2 0. Unit Availability Factor                                                       92.88                   98.03             79.69
: 16. Gross Thermal Energy Generated (MWH) 1955857.00_
: 21. Unit Capacity Factor (Using MDC Net)                                             94.85                 100.00             74.69
4455498.00 225161169.50 17 Gross Electrical Energy Generated 357363.00 1509118.00 75028500.00 i
: 22. Unit Capacity Factor (UJing DER Net)                                             133.00                 98.06             73.23
: 18. Net Electrical Energy Generated (MWH) 343697.00
: 23. Unit Forced Outage Rate                                                           7.12                   1.97-             5.12
_1451057.00 71298081.00
: 24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of 4
: 19. Unit Service Factor 92.88 98.03 79 62
Each:       N/A
'2 0. Unit Availability Factor 92.88 98.03 79.69
: 21. Unit Capacity Factor (Using MDC Net) 94.85 100.00 74.69
: 22. Unit Capacity Factor (UJing DER Net) 133.00 98.06 73.23
: 23. Unit Forced Outage Rate 7.12 1.97-5.12
: 24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each:
N/A 4
: 25. If shut down at end of report period, estimated date of startup:N/A
: 25. If shut down at end of report period, estimated date of startup:N/A
: 26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved                                     ,]
: 26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved
INITIAL CRITICALITY                                                                                                   l INITIAL ELECTRICITY                                                                                                   l COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 5 Page 1 of 1 RT No. 13.F01.19F 1
,]
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 5 Page 1 of 1 RT No. 13.F01.19F


                                                                                  --_.._._.                . .. _ . .            .                      . ~ . _ _ . . _                  _.m..m__.-.__ .
. ~. _ _..
                                                                                                                                                                                                                    )
_.m..m__.-.__
                    .'                                          AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-'271 UNIT Vermont Yankee DATE 240510 COMPLETED BY                               G.A. WALLIN TELEPHONE                     _(802)257-7711 MONTH                             Apr,il__                                                                                                                                                         l i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-'271 UNIT Vermont Yankee DATE 240510 COMPLETED BY G.A.
DAY                   AVERAGE DAILY POWER LEVEL                                                     DAY   AVERAGE DAILY POWER LEVEL                                                             I (MWe-Net)                                                           (MWe-Net)                                                                         I l
WALLIN TELEPHONE
: 1.                                                   519                                         17,                             520
_(802)257-7711 MONTH Apr,il__
: 2.                                                     519                                         18.                             520
l i
                *3.                                                       496                                         19.                             520 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I
: 4.                                                   518                                         20.                             520
(MWe-Net)
: 5.                                                   518                                         21.                             520
(MWe-Net) l 1.
.                    6.                                                   517                                         22.                             520
519 17, 520 2.
: 7.                                                   517                                         23.                             520
519 18.
: 8.                                                   51.&                                         24.                             519 i
520
: 9.                                                   518                                         25.                             520
*3.
: 10.                                                           29                                       26.                             519
496 19.
: 11.                                                               0                                   27,                             520 1
520 4.
: 12.                                                       308                                         28.                             519 1
518 20.
l                13,                                                       516                                         29.                             518                                                         !
520 5.
I
518 21.
!                14,                                                       518                                         30.                             519                                                         l l
520 6.
: 15.                                                       520                                         31.                             ---
517 22.
16,                                                       52.0                                             *23 hour day INSTRUCTIONS On this format, list the average daily unit power level in MWE-Net for each day in the reporting month. Compute to the nearest whole megawatt.                                                                                                                                                                                           ,
520 7.
l VYDPF 0411.02                                                                                                                                                                                     '
517 23.
l DP 0411 Rev. 5 Page 1 of 1 RT No. 13 F01.18V 1
520 8.
I
51.&
            . , , . . - . ~ . . - . . _ . , _ . . - , . . - . . . . _ _ . _ _ . _ . . _ . _ . . - , . - - -                         _ _ . - - . _ _ _ _ . ,                  . . - - . - _ - -        .--  -..-l
24.
519 9.
518 25.
520 10.
29 26.
519 11.
0 27, 520 1
12.
308 28.
519 l
13, 516 29.
518 14, 518 30.
519 15.
520 31.
16, 52.0
*23 hour day INSTRUCTIONS On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 DP 0411 Rev. 5 Page 1 of 1 RT No. 13 F01.18V 1
.,,.. -. ~.. -.. _., _.. -,.. -.... _ _. _ _. _.. _. _.. -,. - - -


                                                                                                                                        ,- I
,- I
                                                                                                                                      ~
~
                                                                                                                                    ,    - l UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH       APRIL                                     DOCKET NO 50-271     -
- l UNIT SHUTDOWNS AND POWER REDUCTIONS f
f UNIT NAME   Vermont Yankee         F 4
REPORT MONTH APRIL DOCKET NO 50-271 UNIT NAME Vermont Yankee F
DATE 940510 1
DATE 940510 4
COMPLETED BY G.A. Wallin TELEPHONE   (802)257-7711           '
1 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 1
1                    2           3                       4             5                                           ,
2 3
4 No.     Date Type     Duration   Reason   Method of     License System         Component       Cause and Corrective             E
4 5
!                                (hours)             Shutting     Event     Code       Code             Action to Prevent               i Down         Report #                               Recurrence
4 No.
* Reactor                                                                               >
Date Type Duration Reason Method of License System Component Cause and Corrective E
94-04 940410   F         51.18       A           3         94-04     HA         VALVEX       "C" moisuture separator high level.
(hours)
i                                                                                                         Turbine tripped and j                                                                                                         a reactor scram.
Shutting Event Code Code Action to Prevent i
Down Report #
Recurrence Reactor 94-04 940410 F
51.18 A
3 94-04 HA VALVEX "C" moisuture separator high level.
i Turbine tripped and j
a reactor scram.
I Replaced a faulty level cont]oller.
I Replaced a faulty level cont]oller.
1   F: Forced       2 Reason:                                   3 Method:                       4 Exhibit G- Jnstructions
}
,        S: Scheduled         A-Equipment Failure (Explain)             1 - Manual                   for Preparacion of Data             ,
1 F: Forced 2 Reason:
B-Maintenance or Test                     2 - Manual Scram               Entry Sheets for License           j C-Refueling                               3 - Automatic Scram           Event Report (LER) File D-Regulatory. Restriction                 4 - Other (Explain)           (NUREG 0161)
3 Method:
E-Operator Training and l                                 License Examination                                                 5 Exhibit I - Same Source
4 Exhibit G-Jnstructions S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparacion of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License j
;    .VYDPF 0411.03           F-Administrative.                                                                                             ;
C-Refueling 3 - Automatic Scram Event Report (LER) File
;    DP 0411 Rev. 5           G-Operational Error (Explain)                                                                               f Page 1 of 1               H-(Explain) s i
[
1
D-Regulatory. Restriction 4 - Other (Explain)
                            ,y-                                 ,
(NUREG 0161)
E-Operator Training and l
License Examination 5 Exhibit I - Same Source
.VYDPF 0411.03 F-Administrative.
DP 0411 Rev. 5 G-Operational Error (Explain) f Page 1 of 1 H-(Explain) j s
i 1
,y-


  .    ~ - . - . - ..                                .-.  .  . _ .      .. ...    .      .    . . . -_            .  - ..        - - .
~ -. -. -..
        '.'                                                                                        DOCKET'NO. 50-271                                     l d
DOCKET'NO. 50-271
                                                                                                                .DATE 230510                               l
.DATE 230510 d
                                  .'                                                        COMPLETED BY                       G.A. WALLIN               l TELEPHONE                   (802)257-7711             l
COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711
[                                                     REPORT MONTH           April
[
      - SJJMMARY OF OPEBATING EXPEFJEE.CfES Highlighte Vermont Yankee operated at 92.2% of rated thermal power for the' month.
REPORT MONTH April
      ' Gross electrical generation was 357.363 MWHe or 92.0% design electrical
- SJJMMARY OF OPEBATING EXPEFJEE.CfES Highlighte Vermont Yankee operated at 92.2% of rated thermal power for the' month.
:      capacity.
' Gross electrical generation was 357.363 MWHe or 92.0% design electrical capacity.
i Operating Summary i
i Operating Summary i
        -The following is a chronological description of plant operations including other pertinent items of interest for the month:
-The following is a chronological description of plant operations including other pertinent items of interest for the month:
;        At the beginning of the reporting period the plant was operating at 99.9%
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
of rated thermal power.
940410                   At 0122 hours, turbine tripped and reactor scrammed, caused by a 4
940410 At 0122 hours, turbine tripped and reactor scrammed, caused by a high level signal in the "C" moisture separator.
high level signal in the "C" moisture separator.                                       (See Unit Shutdowns and Power Reductions) 940411                   At 1815 hours, the reactor was critical following repairs; 940412                   At 0433 hours, the turbine-generator was phased to the grid, and 3
(See Unit 4
a return to full power was initiated.
Shutdowns and Power Reductions) 940411 At 1815 hours, the reactor was critical following repairs; 940412 At 0433 hours, the turbine-generator was phased to the grid, and a return to full power was initiated.
3
-f
-f
                                                                                                                                                        .i i
.i i
l 1
l 1
.                                                                                                                                                          i At the end of the reporting period the plant was operating at 99.9% of.
i At the end of the reporting period the plant was operating at 99.9% of.
rated thermal power.
rated thermal power.
VYDPF 0411.-04 DP 0411 Rev. 5                                                                                                                                   )
VYDPF 0411.-04 DP 0411 Rev. 5
Page 1 of 1                                                                                                                                     l RT No. 13.F01.18X I
)
__ _ _ ._ _ _ _          ._ _        ._~   _ __    _-.          . _ _ . .._          _  _      __ . . .}}
Page 1 of 1 RT No. 13.F01.18X
. ~
-}}

Latest revision as of 09:12, 16 December 2024

Monthly Operating Rept for Apr 1994 for Vermont Yankee Nuclear Power Station
ML20070R608
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/30/1994
From: Reid D, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-50, VY-RCE-94-012, VY-RCE-94-12, NUDOCS 9405200290
Download: ML20070R608 (6)


Text

_..

VERMONT YANKEE

. NUCLEIR POWER CORPORATION

  • MD.

P.O. Box 157, Governor Hunt Road

( %xy.

Yq 'N / ')

W vernon, vermont 05354-0157 d-'

/

(802) 257-7711 m.

,s May 10,1994 VY-RCE-94-012 BVY 94-50 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:

Document Control Desk

Reference:

a)

License No. DPR-28 (Docket No. 50-271)

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vennont i

Yankee Nuclear Power Station for the month of April.1994.

Very truly yours, 2

Vennont Yankee Nuclear Power Corp.

N i.

V-y 1-Donald A. Reid Vice President, Operations cc:

USNRC, Region I USNRC Resident inspector, VYNPS

.c 9405200290 940430 Y

I PDR ADOCK 05000271

- l#

'g '

.R PDR W OUUUd

1 VERMONT YANKEE NUCLEAR POWER STATION MONTIIIJ STATISTICAL REPOl(T 94-04 FOlt TIIE MONTil OF APRIL 1994 DP 0411 Rev. 5 Page 1 ofI

w OPERATING DATA REPORT F

DOCKET NO 50-271 DATE 940510 COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711 OPERATTELETATHS 1.

Unit Name:

yfrmont YalDlLQ2 2.

Reporting Period:

April NOTES:

3. Licensed Thermal Power (MWt):1593
4. Nameplate Rating (Gross MWe) : 51Q 5.

Design Electrical Rating (Net MWe) :

114 (oc) 504(cc) l

6. Maximum Dependable Capacity (Gross MWe) :

111 7.-Maximum Dependable Capacity (Net MWe):

1Q4 8.

If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

N/A t

9.

Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 719.00 2879.00 187703.00 a
12. Number Of Hours Reactor was Critical 678.12 2838.12 154055.53
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 667.82 2822 17 150937.79
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1955857.00_

4455498.00 225161169.50 17 Gross Electrical Energy Generated 357363.00 1509118.00 75028500.00 i

18. Net Electrical Energy Generated (MWH) 343697.00

_1451057.00 71298081.00

19. Unit Service Factor 92.88 98.03 79 62

'2 0. Unit Availability Factor 92.88 98.03 79.69

21. Unit Capacity Factor (Using MDC Net) 94.85 100.00 74.69
22. Unit Capacity Factor (UJing DER Net) 133.00 98.06 73.23
23. Unit Forced Outage Rate 7.12 1.97-5.12
24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each:

N/A 4

25. If shut down at end of report period, estimated date of startup:N/A
26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved

,]

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 5 Page 1 of 1 RT No. 13.F01.19F

. ~. _ _..

_.m..m__.-.__

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-'271 UNIT Vermont Yankee DATE 240510 COMPLETED BY G.A.

WALLIN TELEPHONE

_(802)257-7711 MONTH Apr,il__

l i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

(MWe-Net)

(MWe-Net) l 1.

519 17, 520 2.

519 18.

520

  • 3.

496 19.

520 4.

518 20.

520 5.

518 21.

520 6.

517 22.

520 7.

517 23.

520 8.

51.&

24.

519 9.

518 25.

520 10.

29 26.

519 11.

0 27, 520 1

12.

308 28.

519 l

13, 516 29.

518 14, 518 30.

519 15.

520 31.

16, 52.0

  • 23 hour day INSTRUCTIONS On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 DP 0411 Rev. 5 Page 1 of 1 RT No. 13 F01.18V 1

.,,.. -. ~.. -.. _., _.. -,.. -.... _ _. _ _. _.. _. _.. -,. - - -

,- I

~

- l UNIT SHUTDOWNS AND POWER REDUCTIONS f

REPORT MONTH APRIL DOCKET NO 50-271 UNIT NAME Vermont Yankee F

DATE 940510 4

1 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 1

2 3

4 5

4 No.

Date Type Duration Reason Method of License System Component Cause and Corrective E

(hours)

Shutting Event Code Code Action to Prevent i

Down Report #

Recurrence Reactor 94-04 940410 F

51.18 A

3 94-04 HA VALVEX "C" moisuture separator high level.

i Turbine tripped and j

a reactor scram.

I Replaced a faulty level cont]oller.

}

1 F: Forced 2 Reason:

3 Method:

4 Exhibit G-Jnstructions S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparacion of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License j

C-Refueling 3 - Automatic Scram Event Report (LER) File

[

D-Regulatory. Restriction 4 - Other (Explain)

(NUREG 0161)

E-Operator Training and l

License Examination 5 Exhibit I - Same Source

.VYDPF 0411.03 F-Administrative.

DP 0411 Rev. 5 G-Operational Error (Explain) f Page 1 of 1 H-(Explain) j s

i 1

,y-

~ -. -. -..

DOCKET'NO. 50-271

.DATE 230510 d

COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711

[

REPORT MONTH April

- SJJMMARY OF OPEBATING EXPEFJEE.CfES Highlighte Vermont Yankee operated at 92.2% of rated thermal power for the' month.

' Gross electrical generation was 357.363 MWHe or 92.0% design electrical capacity.

i Operating Summary i

-The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

940410 At 0122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br />, turbine tripped and reactor scrammed, caused by a high level signal in the "C" moisture separator.

(See Unit 4

Shutdowns and Power Reductions) 940411 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, the reactor was critical following repairs; 940412 At 0433 hours0.00501 days <br />0.12 hours <br />7.159392e-4 weeks <br />1.647565e-4 months <br />, the turbine-generator was phased to the grid, and a return to full power was initiated.

3

-f

.i i

l 1

i At the end of the reporting period the plant was operating at 99.9% of.

rated thermal power.

VYDPF 0411.-04 DP 0411 Rev. 5

)

Page 1 of 1 RT No. 13.F01.18X

. ~

-