ML20071D777: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 2
| page count = 2
| project = TAC:48062, TAC:49793
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:- ' , .
{{#Wiki_filter:- ',
Docket No. 50-336 ATTACHMENT 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS MARCH, 1983 8303110322 830301             i PDR ADOCK 05000336             i P             PDR.      .
Docket No. 50-336 ATTACHMENT 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS MARCH, 1983 8303110322 830301 i
PDR ADOCK 05000336 i
P PDR.


REACTOR COOLANT SYSTEM REACT 03 COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION I
REACTOR COOLANT SYSTEM REACT 03 COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION 1
1 3.4.6.2     Reactor Coolant System leakage shall be limited to:
3.4.6.2 Reactor Coolant System leakage shall be limited to:
: a. No PRESSURE BDUNDARY LEAKAGE,
a.
: b. 1 GPM UNIDENTIFIED LEAKAGE,
No PRESSURE BDUNDARY LEAKAGE, b.
: c. 1 GPM total prinary-to-secondary leakage through both steam generators and 0.5 GPM through any one steam generator, and
1 GPM UNIDENTIFIED LEAKAGE, c.
: d. 10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.
1 GPM total prinary-to-secondary leakage through both steam generators and 0.5 GPM through any one steam generator, and d.
10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.
APPLICABILITY: MODES 1, 2, 3 and 4.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
ACTION:
: a. With any PRES 5URE BOUNDARY LEAKAGE, be in COLD SHUTDOWN with-in 36 hours.
a.
: b. With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours or be in COLD SHUTDOWN within the next 36 hours.**
With any PRES 5URE BOUNDARY LEAKAGE, be in COLD SHUTDOWN with-in 36 hours.
b.
With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours or be in COLD SHUTDOWN within the next 36 hours.**
SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:
SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:
!              a. Monitoring the containment atmosphere particulate radioactivity at least once per 12 hours.
Monitoring the containment atmosphere particulate radioactivity a.
: b. Monitoring the containment sump inventory at least once per 12 hours, i
at least once per 12 hours.
l              c. Perforr.ance of a Reactor Coolant System water inventory balance at least once per 72 hours during steady state opera-tion except when operating in the shutdown cooling mode.
b.
For the shutdown commencing on March 1,1983, the unit shall be placed in HOT l               STANDBY within the next 6 hours and COLD SHUTDOWN within the next 54 hours.
Monitoring the containment sump inventory at least once per 12 hours, i
MILLSTONE - UNIT 2                     3/4 4-9 l
Perforr.ance of a Reactor Coolant System water inventory l
c.
balance at least once per 72 hours during steady state opera-tion except when operating in the shutdown cooling mode.
For the shutdown commencing on March 1,1983, the unit shall be placed in HOT l
STANDBY within the next 6 hours and COLD SHUTDOWN within the next 54 hours.
MILLSTONE - UNIT 2 3/4 4-9 l
l}}
l}}

Latest revision as of 06:49, 15 December 2024

Proposed Changes to Tech Spec 3.4.6.2.b,extending Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit
ML20071D777
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/01/1983
From:
NORTHEAST UTILITIES
To:
Shared Package
ML20071D751 List:
References
TAC-48062, TAC-49793, NUDOCS 8303110322
Download: ML20071D777 (2)


Text

- ',

Docket No. 50-336 ATTACHMENT 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS MARCH, 1983 8303110322 830301 i

PDR ADOCK 05000336 i

P PDR.

REACTOR COOLANT SYSTEM REACT 03 COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION 1

3.4.6.2 Reactor Coolant System leakage shall be limited to:

a.

No PRESSURE BDUNDARY LEAKAGE, b.

1 GPM UNIDENTIFIED LEAKAGE, c.

1 GPM total prinary-to-secondary leakage through both steam generators and 0.5 GPM through any one steam generator, and d.

10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With any PRES 5URE BOUNDARY LEAKAGE, be in COLD SHUTDOWN with-in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

b.

With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.**

SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:

Monitoring the containment atmosphere particulate radioactivity a.

at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

Monitoring the containment sump inventory at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, i

Perforr.ance of a Reactor Coolant System water inventory l

c.

balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state opera-tion except when operating in the shutdown cooling mode.

For the shutdown commencing on March 1,1983, the unit shall be placed in HOT l

STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the next 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br />.

MILLSTONE - UNIT 2 3/4 4-9 l

l