TMI-20-015, 2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ThreeMileIslandNuclearStation,Unit1 | ||
NEI 99-04 TMI-20-015 April 30, 2020 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility License No. DPR-50 NRC Docket No. 50-289 | |||
441S.P.O.Box480 | |||
Middletown,PA17057 | |||
10 CFR 50.59(d)(2) | |||
NEI 99-04 TMI-20-015 April 30, 2020 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility License No. DPR-50 NRC Docket No. 50-289 | |||
==Subject:== | ==Subject:== | ||
2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report | 2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report | ||
==References:== | ==References:== | ||
| Line 26: | Line 32: | ||
: 2. Exelon Letter to NRC, "Certification of Permanent Removal of Fuel from the Reactor Vessel for Three Mile Island Nuclear Station, Unit 1," dated September 26, 2019 (ADAMS Accession No. ML19269E480) | : 2. Exelon Letter to NRC, "Certification of Permanent Removal of Fuel from the Reactor Vessel for Three Mile Island Nuclear Station, Unit 1," dated September 26, 2019 (ADAMS Accession No. ML19269E480) | ||
This letter submits the 2018-2019 Biennial 10 CFR 50.59 Summary Report required by 10 CFR 50.59(d)(2) and the 2019 Annual Commitment Revision Summary Report required by SECY-00-0045 (NEI 99-04). | This letter submits the 2018-2019 Biennial 10 CFR 50.59 Summary Report required by 10 CFR 50.59(d)(2) and the 2019 Annual Commitment Revision Summary Report required by SECY-00-0045 (NEI 99-04). | ||
By letter dated June 20, 2017 (Reference 1), Exelon provided formal notification to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of Exelon's determination to permanently cease operations at Three Mile Island Nuclear Station, Unit 1 (TMl-1) on or about September 30, 2019. On September 20, 2019, Exelon permanently ceased power operations at TMI-1. On September 26, 2019, pursuant to 10 CFR 50.82(a)(1)(ii) and 10 CFR 50.4(b)(9), Exelon provided certification to the NRC that all fuel had been permanently removed from the TMI-1 reactor vessel and placed in the spent fuel pool (SFP) (Reference 2). Since the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel were submitted to the NRC pursuant to 10 CFR 50.82(a)(1)(i) and (ii), then pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license no longer authorizes operation of the reactor or placement or retention of fuel in the reactor vessel. | By {{letter dated|date=June 20, 2017|text=letter dated June 20, 2017}} (Reference 1), Exelon provided formal notification to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of Exelon's determination to permanently cease operations at Three Mile Island Nuclear Station, Unit 1 (TMl-1) on or about September 30, 2019. On September 20, 2019, Exelon permanently ceased power operations at TMI-1. On September 26, 2019, pursuant to 10 CFR 50.82(a)(1)(ii) and 10 CFR 50.4(b)(9), Exelon provided certification to the NRC that all fuel had been permanently removed from the TMI-1 reactor vessel and placed in the spent fuel pool (SFP) (Reference 2). Since the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel were submitted to the NRC pursuant to 10 CFR 50.82(a)(1)(i) and (ii), then pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license no longer authorizes operation of the reactor or placement or retention of fuel in the reactor vessel. | ||
U.S. Nuclear Regulatory Commission Biennial 50.59 and Annual Commitment Change Reports April 30, 2020 Page 2 Based on the possession only status, a review of prior commitments was conducted and determined that several commitments are no longer applicable. The results of the review are attached. | U.S. Nuclear Regulatory Commission Biennial 50.59 and Annual Commitment Change Reports April 30, 2020 Page 2 Based on the possession only status, a review of prior commitments was conducted and determined that several commitments are no longer applicable. The results of the review are attached. | ||
| Line 32: | Line 38: | ||
There are no new regulatory commitments established by this submittal. | There are no new regulatory commitments established by this submittal. | ||
Should you have any questions concerning this letter, please contact Mr. Robert Brady at (717) 948-8776. | Should you have any questions concerning this letter, please contact Mr. Robert Brady at (717) 948-8776. | ||
Respectfully, Trevor L. Orth Decommissioning Plant Manager Three Mile Island Nuclear Station, Unit 1 | Respectfully, Trevor L. Orth Decommissioning Plant Manager Three Mile Island Nuclear Station, Unit 1 | ||
==Attachment:== | ==Attachment:== | ||
TMI-1 2019 Commitment Change Summary Report | TMI-1 2019 Commitment Change Summary Report | ||
U.S. Nuclear Regulatory Commission Biennial 50.59 and Annual Commitment Change Reports April 30, 2020 Page 3 cc: | |||
w/ Attachments NRC Regional Administrator - NRC Region I NRC Project Manager, NRR Three Mile Island, Unit 1 NRC Project Manager, NMSS Three Mile Island Unit 1 Director, Bureau of Radiation Protection - PA Department of Environmental Resources | |||
ATTACHMENT Three Mile Island Description of 2019 Commitment Revisions Part A: - One-Time Commitments Part B: - Programmatic Commitments tied to Generic Communications Part C: - Programmatic Commitments tied to Licensing Actions Part D: - Miscellaneous Programmatic Commitments Part E: - Items Classified as no longer being Regulatory Commitments | |||
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 1 of 44 The following provides the update of one-time commitments that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2). | |||
LetterSource: | |||
Various-RefertoTable1foreachitem | |||
ExelonTrackingNumber Various-RefertoTable1foreachitem | |||
NatureofCommitment: | |||
Table1 listonetime opencommitmentsthatarerelatedto inspections,analysisorresponsestoNRCgeneric communications(e.g.Bulletins,andGenericLetters),Thetable containsthecommitmentnumber,thecommitmentsource,a summaryofthecommitment,andbasisforthedeletionofthe commitment. | |||
EachoftheoriginalregulatorycommitmentslistedinTable1 willbeclosed,sincetheactionsarenolongerapplicableasa resultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,ExelonprovidedcertificationthatTMI1 was permanentlyshutdown and defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith10CFR50.82(a)2TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiatedfuelinthe SpentFuelPool.TheregulatorycommitmentsinTable1nolongeraffordtheoriginalintentandprotection.Table1 providesadditionalbasisforeachactionitem. | |||
Table1 OneTimeCommitmentsthatarenolongerapplicablebasedonPermanentShutdownStatus | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0135661904 Updated Commitment ScheduleRVI MRP227A Examinations TMIhaselectedtodelay implementationofthefinalscope ofRVIMRP227Aexaminations fromtheT1R22(2017)refueling outagetotheT1R23(2019) refuelingoutage. | |||
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel. | |||
TheneedtoperformRVIMRP227A examinationsofReactorVesselinternals wererequiredtosupportlongterm operation,howeversinceoperationisno longerpermittedtheneedtocompletethis vesselinspectionisnolongergermane. | |||
Therefore,thiscommitmentisbeingplaced inhistory. | |||
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 2 of 44 Table1(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0151677404 TMI1Resolution ofGenericLetter 200402 | |||
(Commitment4) | |||
TheCommitmentdue dateofJune 1,2017,hasbeenextendedbased onthefollowingexcerptfromTMI LettertoUSNRC(TMI17051):TMI isanOption2Aplantwitha calculatedinvesselfiberdebris bypassof19.66grams/fuel assembly,whichexceedstheNRC acceptancelimitof15grams/fuel assembly.Therefore,WCAP17788, "ComprehensiveAnalysisandTest ProgramforGSI191YGeneric SafetyIssue191Closure," | |||
methodologyisrequiredto properlycloseoutGL200402and GSI191.WCAP17788iscurrently underNRCreviewwithforecasted approvalin2018.Thefinal calculationsforinvesselfiber debris,aswellastheexistingECCS flowsumpperformancefinal calculations,willbeperformed togethertoallowefficient utilizationofengineeringresources. | |||
Thefinalupdated supplementalresponsetosupport closureofGL200402forTMI,Unit 1willbesubmittedwithinnine monthsfollowingNRCapprovalof WCAP17788. | |||
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel. | |||
ThescopedofDesignBasisAccidentshave beenreducedtotheFuelHandling AccidentintheSpentFuelPool.Lossof CoolantAccidentisnolongeracredible eventbasedonthefacttheunitisno longerpermittedtooperate,and subsequentEmergencyCoreCooling Systemresponseisnolongerrequiredto mitigateacredibleevent.Therefore,this commitmentisbeingplacedinhistory. | |||
0242869301 TMI15038,Ltr toNRCdated April6,2015 | |||
10CFR50.46 30DayReport | |||
TMI1Thermal Conductivity Degradation (TCD) | |||
Commitment Thefull LBLOCAreanalysiswillbe completedwithin21months followingNRCissuanceofthefinal SafetyEvaluationReport(SER)for BAW10179Revision9,which incorporatesbyreferencethe supplementtoBAW10192PA Revision0. | |||
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel. | |||
ThescopedofDesignBasisAccidentshave beenreducedtotheFuelHandling AccidentintheSpentFuelPool.TheLarge BreakLossofCoolantAccidentisnolonger acredibleeventbasedonthefacttheunit isnolongerpermittedtooperate,and subsequentEmergencyCoreCooling Systemanalysisisnolongerrequiredto mitigateacredibleevent.Therefore,this commitmentisbeingplacedinhistory. | |||
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 3 of 44 | |||
Table1(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0256770802 NRCLtrdated September 15,2015 | |||
Approvalof ReliefRequest RR1401and SER InnerDiameter(ID)surface breakingflawsgreaterthan50% | |||
throughwallandsubsurfaceflaws greaterthan50%throughwallshall berepairedorevaluatedpriorto plantrestart.Evaluationsshallbe submittedtotheNRCforreview andapprovalpriortoplantrestart. | |||
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel. | |||
Sincethisisarestartcommitmentandis nolongerapplicablethisitemwillbe placedinhistory. | |||
0256941701 NRCLtrdated September 15,2015 | |||
Approvalof ReliefRequest RR1401and SER(RMS) | |||
InnerDiameter(ID)surface breakingflawsgreaterthan50% | |||
throughwallandsubsurfaceflaws greaterthan50%throughwallshall berepairedorevaluatedpriorto plantrestart.Evaluationsshallbe submittedtotheNRCforreview andapprovalpriortoplantrestart. | |||
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel. | |||
Sincethisisarestartcommitmentandis nolongerapplicablethisitemwillbe placedinhistory. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 4 of 44 The following provides the update of programmatic commitments tied to Generic Communication responses that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2). | |||
LetterSource: | |||
Various-Referto Table2 foreachitem | |||
ExelonTrackingNumber Various-RefertoTable2 foreachitem | |||
NatureofCommitment: | |||
Table2 listprogrammatic opencommitmentsthatare relatedtoresponsestoNRCgenericcommunications(e.g. | |||
Bulletins,andGenericLetters),Thetablecontainsthe commitmentnumber,thecommitmentsource,asummaryof thecommitment,andbasisforthedeletionofthe commitment. | |||
EachoftheoriginalregulatorycommitmentslistedinTable1 willbeclosed,sincetheactionsarenolongerapplicableasa resultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certification thatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiatedfuelin theSpentFuelPool.ThecommitmentsinTable1nolongeraffordtheoriginalintentandprotection.Table1 providesadditionalbasisforeachactionitem. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 5 of 44 Table2 GenericCommunicationsCommitmentsthataresubjecttodeletion basedonChangeofPlantStatustoPermanentlyShutdown Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207201 6710962097 GL89013: | |||
REVISED | |||
===RESPONSE=== | |||
Theoriginalcommitmentis describedintheupdatedresponse providedtotheNRCforGL8913 (6710962097dated6/6/1996): | |||
TheControlBuildingChillersarenot NuclearSafetyRelatedbydesign, howeverweacknowledgethe importantfunctiontheyprovide; thuswefeelitisprudentto monitortheirperformance.The buildingcooledbythissystemis continuallyoccupied.Assuch, degradedperformanceofachiller wouldbedetectedthrough increasedtemperatureinthe ControlBuilding.Itshouldbenoted thatGL8913allowsanalternative actionoffrequentregular maintenanceinlieuoftestingfor degradedperformanceoftheheat exchanger.Bothregular maintenance(bimonthlyPMand annualoverhaul)andperformance trendingwillbedoneforthe ControlBuildingChillers. | |||
BasedonPDTStheControlBuilding VentilationSystemwillnolongerbe classifiedasSafetyRelated. | |||
0112207203 59280320148 SIXTYDAY RESPONSETO NRCBULLETIN 200301 Theplantwillimprovethe containmentcloseoutinspection proceduretospecificallyaddress dirt,dust,andsmalldebris accumulation. | |||
ContainmentIntegrityisnolonger required,andContainmentCloseoutwill nolongerberequired.Thereareno safetyrelatedcomponentshousedinthe RB. | |||
0112207227 6710972253 GL8910CLOSE OUTLETTER GL8910closeoutletter671097 2253committedto: | |||
1.TMI1maintenanceprocedures fortheMOVswillberevisedto ensurethatanyworkonvalve internalsisevaluatedforpotential effectsonstemthrust requirements.Thiswillensurethat postmaintenancedynamictesting isconsideredwhenappropriate. | |||
Thesechangeswillbecompleted duringthenextoperatingcycle, TMI1OperatingCycle12. | |||
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI. | |||
TheMOVprogramisnolongerrequired andwillbeabandoned. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 6 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207228 19209820242 RESPONSETO NRC'SSAFETY EVALUATION JOINTOWNER'S GROUP PROGRAMON PERIODIC VERIFICATIONOF MOVS InresponsetoNRCGenericLetter 9605,ThreeMileIslandUnit1 committedtoimplementtheJoint OwnersGroup(JOG)Programfor MotorOperatedValvePeriodic VerificationinaccordancewithMPR 1807(Interim)andMPR2524A Rev.1(Final).Note:NotallGL9605 MOVProgramValvesarewithinthe scopeoftheFinalJOGProgram. | |||
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI. | |||
TheJOGMOVprogramisnolonger requiredandwillbeabandoned. | |||
0112207230 GL96005:RAI REGARDING GPUN'S RESPONSETOGL 96005FOR TMINSTMI1 PERIODIC VERIFICATIONOF DESIGNBASIS CAPABILITYOF SAFETYRELATED MOTOR OPERATED VALVES (M97111) | |||
Inresponsetoitem3oftheNRC RequestforAdditionalInformation dated11/5/1998,thelicensee committedtoaddresspotentialage relateddegradationbyperforming theperiodicstaticdiagnosticor preventivemaintenanceofMOVas requiredbytheJOGprogram. | |||
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI. | |||
TheJOGMOVprogramisnolonger requiredandwillbeabandoned. | |||
0112207232 19209820605 GL9804,GPUN | |||
===RESPONSE=== | |||
GPUNletter(19209820605) committedtoevaluatetheguidance providedinEPRITR109937, "GuidelineonNuclearSafetyRelated Coatings,"datedApril1998and implementanychangesby 12/31/99. | |||
Containmentisnolongerasafetyrelated componentandmaintainingSafety Relatedcoatingsprogramisnolonger required. | |||
0112207235 GQL1202 IEB7901A:ASCO SOLENOIDVALVE SERVICELIFE GPUNCOMMITTEDTOTHENRCIN RESPONSETOTHEORIGINAL BULLETINTHATMAINTENANCE PROCEDURE1401P14APPROVED TOIMPROVEFUTURE MAINTENANCE.MP1410P14 PROVIDEDUPGRADEDDETAILED OVERHAULANDALIGNMENT INSTRUCTIONSANDREQUIRED MOREDETAILEDDOCUMENTATION OFBOTH"ASFOUND"AND"AS LEFT"PUMPCONDITIONS. | |||
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI. | |||
TheneedtomaintainASCOsolenoid valvecontrolsarenolongerrequired. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 7 of 44 Table2(Continued) | ||
Commitment | Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207237 IEB7915:DEEP DRAFTPUMP DEFICIENCIES GPUNCOMMITTEDTOTHENRCIN RESPONSETOTHEORIGINALBULLETIN THATMAINTENANCEPROCEDURE 1401P14APPROVEDTOIMPROVE FUTUREMAINTENANCE.MP1410P14 PROVIDEDUPGRADEDDETAILED OVERHAULANDALIGNMENT INSTRUCTIONSANDREQUIREDMORE DETAILEDDOCUMENTATIONOFBOTH "ASFOUND"AND"ASLEFT"PUMP CONDITIONS. | ||
BasedonPermanentShutdown StatusatTMI,andimplementation ofthePDTS,therearenoactive safetysystematTMI.Thesesystems arenolongerrequiredtomeet ASMESectionXIISTrequirements. | |||
01122072 3800 IEB8012:DECAY HEATREMOVAL SYSTEM OPERABILITY GPUNCOMMITTEDTOTHENRCTO:1) | |||
MODIFICATIONOFOP11044TO PROVIDEADDITIONAL ADMINISTRATIVECONTROLOVERTHE POSITIONOFDHV6AANDDHV6B (REACTORBUILDINGSUMPISOLATION VALVES).DURINGCOLDSHUTDOWN ANDREFUELINGSHUTDOWN CONDITIONS,THEVALVES(EXCEPT DURINGTESTING)WILLBETAGGED CLOSEDWITHTHEIRBREAKERSOPEN TOPREVENTINADVERTENTOPENING ANDPOTENTIALDRAININGOFTHE BORATEDWATERSTORAGETANK (BWST)TOTHEREACTORBUILDING SUMP. | |||
Thiswillnolongerberequiredsince DecayHeatandtheBWSTareno longerTSrequiredfunctionsto protect.Therewillnolongerbefuel storedintheRPVtoprotect. | |||
0112207242 IEB7925: | |||
FAILUREOF WESTINGHOUSE BFDRELAYSIN SAFETYRELATED SYSTEMS GPUNCOMMITTEDTOTHENRC WITHINTLL005DATED1/10/80THAT: | |||
(1)TMI1USEDWESTINGHOUSETYPE BFD,STYLE5072A49,COILSTYLE 1271C50G01RELAYSASCONTROL RELAYSFORTHE1AAND1B EMERGENCYDIESELGENERATORS. | |||
(2)THEDIESELGENERATORANNUAL INSPECTIONPROCEDUREWASREVISED TOINCLUDEAFUNCTIONALTESTON EACHRELAY. | |||
(3)THEDOCUMENTATIONOFALL RELAYFAILURESFOUNDDURINGTHE INITIALORFOLLOWUPPROGRAM TESTINGINACCORDANCEWITHTHE REQUIREMENTSSETFORTHINTHE BULLETIN. | |||
BasedonPermanentShutdown StatusatTMI,andimplementation ofthePDTS,therearenoactive safetysystematTMI.The EmergencyDieselGeneratorsareno longersafetyrelatedandthis commitmentisnolongerapplicable. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 8 of 44 Table2(Continued) | ||
Commitment | Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207244 GL8121: | ||
NATURAL CIRCULATION COOLDOWN NATURALCIRCULATIONCOOLDOWN PROCEDURES&TRAINING. | |||
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
0112207247 5211822149 IEB7927:LOSS OFNONCLASS 1E INSTRUMENTATI ONAND CONTROL TOTALANDPARTIALLOSSOF ICS/NNIPOWEREMERGENCY PROCEDURES. | |||
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
0112207249 5211832040 GL8114:EFW SEISMIC QUALIFICATION ATTACHMENTS ITEM4 COV10A/BLOCKEDOPEN REQUIREMENT. | |||
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
0112207250 5211832055 GL8114:EFW SEISMIC QUALIFICATION ATTACHMENTS ITEM4 EFWSEISMICQUALIFICATION Attachment(s):GPUNCOMMITTED TOTHENRCTOLOCKOPENTHE RECIRCULATIONLINESONTHE EMERGENCYFEEDWATER(EFW) | |||
PUMPS. | |||
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
0112207252 5211832133: | |||
EFWSEISMIC QUALIFICATION | |||
EFWSEISMICQUALIFICATION CO V27A/B Attachment(s):GPUNCOMMITTED TOTHENRCTOLOCKCLOSETHE VALVESCOV27AANDCOV27B DURINGOPERATION. | |||
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
0112207254 5211832330 GL8328ITEM 3.1.1:POSTTRIP REVIEW ATWSREVIEWITEMSFROM GL83 28. | |||
Thisevent requiresthereactortobein operations.Withcertificationrequired by50.82submitted,TMIisnolonger permittedtooperateorstorefuelinthe reactorvessel.Theprotectionafforded bythiscommitmentisnolonger required. | |||
0112207256 5211833222: | |||
NATURAL CIRCULATION COOLDOWN (GENERICLETTER 8121) | |||
NATURALCIRCULATIONCOOLDOWN PROCEDURE. | |||
NaturalCirculationcooldownrequires theplanttobeinoperations.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 9 of 44 Table2(Continued) | ||
Commitment | Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207257 5211832330 GL8328ITEM 2.1:EQUIPMENT CLASSIFICATION ANDVENDOR INTERFACE(RTS) | ||
ITEM2.1REQUIREDTHE CONFIRMATIONTHATALL COMPONENTSWHOSEFUNCTIONING WASREQUIREDTOTRIPTHE REACTORWEREIDENTIFIEDAS SAFETYRELATEDONALL DOCUMENTATIONANDIN INFORMATIONHANDLINGSYSTEMS THATWEREUSEDTOCONTROLALL ACTIVITIESPERFORMEDONTHAT SAFETYRELATEDEQUIPMENT.THE NRC. | |||
SER5211873170ACCEPTEDTHE GPUNRESPONSEANDCLOSEDTHE ITEM. | |||
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired. | |||
ReactorProtectionisnolongerasafety relatedsystem. | |||
0112207258 5211832330 GL8228SEC 4.5.1:REACTOR TRIPSYSTEM ONLINE FUNCTIONAL TESTING GPUNCOMMITTEDTOTHENRCTHAT SP13134.1PERFORMEDONLINE TESTINGOFTHEREACTORTRIP SYSTEM(RTS)ONAMONTHLYBASIS: | |||
SP13134.4INCORPORATEDTHE CRDCSSCRTRIPTESTGUIDELINES PROVIDEDBYBABCOCK&WILCOX:SP 13034.1WASREVISEDTO INCORPORATETESTINGOFTRIPPING THECRDMPOWERFEEDCIRCUIT BREAKERSVIATHEIRSHUNTTRIP DEVICES. | |||
0112207258 | Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired. | ||
0112207259 5211832330 GL8328ITEM 1.2:POSTTRIP REVIEW(DATA AND INFORMATION CAPABILITY) | |||
PLANTCOMPUTERSYSTEMPOSTTRIP CHECKLISTGPUNCOMMITTEDTO THENRCTOINCORPORATEA CHECKLISTOFPLANTCOMPUTER SYSTEMPARAMETERSFORREACTOR TRIPINTOTMI1PROCEDURESTO ENSUREASSEMBLYOFCOMPLETE DATAPACKAGE. | |||
0112207259 | Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired. | ||
AND | 0112207260 5211832330 GL8228ITEM 1.2:POSTTRIP REVIEW(DATA AND INFORMATION CAPABILITY) | ||
0112207260 | GPUNCOMMITTEDTOTHENRCTO INCORPORATEMETHODSAND CRITERIAFORCOMPARINGTHE EVENTINFORMATIONWITHKNOWN OREXPECTEDBEHAVIOR. | ||
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 10 of 44 Table2(Continued) | ||
Commitment Change Summary Report | Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207261 5211832330 GL8328ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION ANDPROCEDURE) | ||
Commitment | ROLES | ||
POSTTRIPREVIEW& ANALYSIS ROLE&RESPONSIBILITY. | |||
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired. | |||
0112207262 5211832330 GL8228ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION ANDPROCEDURE) | |||
RESTART | |||
RESTARTDECISIONPREREQUISITE ACTIONS. | |||
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired. | |||
0112207263 5211832330 GL8228ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION AND PROCEDURES) | |||
INDEPENDENTREVIEWINITIATING CRITERIA. | |||
Sincenolongerpermittedto operateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired. | |||
0112207265 5211822229 IEB7921: | |||
TEMPERATURE EFFECTSON LEVEL MEASUREMENTS POTENTIALOFERRONEOUSLEVEL INDICATIONS Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISE PROCEDURES12026A,12026B, 12026CAND120324TOREMIND THEOPERATORSOFTHE POTENTIALOF ERRONEOUSSTEAMGENERATOR ANDPRESSURIZERLEVEL INDICATIONS. | |||
ThetemperatureeffectontheSteam GeneratorsorPressurizerarerelatedto NormalOperatingPressureand Temperaturesconditionswithrespectto coldconditions.Bothoftheinstruments areintheReactorCoolantSystemwhichis nolongersafetyrelated.Theconditions arenolongerplausiblesinceTMIisno longerpermittedtooperateorplacefuel inthereactorvessel. | |||
0112207266 5211832330 GL8328ITEM 4.5.1:REACTOR TRIPSYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING) | |||
REACTORTRIPSYSTEMTRIP FEATURETESTING. | |||
Sincenolongerpermittedtooperate or placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 11 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207271 5211842286 IEB8403: | |||
POTENTIALFOR REFUELING CAVITYWATER SEALFAILURE REFUELINGCAVITYWATERSEAL FAILURE Attachment(s):GPUNCOMMITTEDIN THERESPONSE5211842286THAT THEPOTENTIALFORAND CONSEQUENCESOFAREFUELING CAVITYSEALGASKETFAILUREHAS BEENREVIEWEDANDSUBMITTEDA | |||
==SUMMARY== | ==SUMMARY== | ||
REPORTTOTHENRC. | |||
0112207274 | SinceFuelisnolongerpermittedtobe placedinthereactorvessel,thisactionis nolongerrequiredtoprotectthedecay heatremovalorprotectionoffuelinthe reactorpressurevessel. | ||
0112207274 5211842072 NUREG0612: | |||
0112207276 | CONTROLOF HEAVYLOADS HEAVYLOADS INCORE INSTRUMENTATION Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISEPROCEDURE 15081ONINCORE INSTRUMENTATIONPERITEM3OF THEGPUCONTROLOFHEAVYLOADS IMPLEMENTATIONSCHEDULESO THATTHEPROCEDURESATISFIEDTHE REQUIREMENTSOF5.1.1(2)OF NUREG0612. | ||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding. | |||
0112207276 5211842156 GL8121: | |||
GENERICLETTER 8121NATURAL CIRCULATION COOLDOWN NATURALCIRCULATIONCOOLDOWN PROCEDURECHANGE. | |||
Nolongerpermittedtooperatereactor orplacefuelinthereactorpressure vessel,thereforethismitigationstrategy isnolongerrequired. | |||
0112207278 5211852182 IEB8202: | |||
DEGRADATIONOF THREADED FASTENERSINRC PRESSURE BOUNDARY THREADEDFASTENERDEGRADATION INRCSBOUNDARY. | |||
TheRCSpressureboundaryisnolonger safetyrelated,per50.82(a)2TMIisno longerpermittedtooperateorplacefuel inreactorvessel. | |||
0112207279 5211842147 NUREG0612: | |||
CONTROLOF HEAVYLOADS | |||
HEAVYLOADSPROCEDURE SLING SELECTION/APPROVAL RelatedtoRPVSealPlate. | |||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding. | |||
0112207281 5211842200 NUREG0612: | |||
CONTROLOF HEAVYLOADS | |||
POLARCRANEOPPROCCRANE INSPECTIONREQUIREMENT Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISEPROCEDURE RP15071POLARCRANEOPERATION TOINCLUDEAREQUIREMENTFOR INSPECTIONPRIORTOEACHLIFT USINGSLINGSOROTHERAPPROVED DEVICES. | |||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 12 of 44 Table2(Continued) | |||
Commitment TrackingNumber CommitmentSource Document CommitmentDetails BasisforDeletion 011220728300 5211842242 GL8415:PROPOSED STAFFACTIONSTO IMPROVE&MAINTAIN DGRELIABILITY DIESELGENERATORRELIABILITY IMPROVEMENTS. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforewiththe implementationofthePDTSthe EmergencyDieselGeneratorsare nolongersafetyrelated. | |||
011220728500 5211842179 NUREG0737II.B.2:TMI ACTIONPLANT SECTIONII.B.2DH PLANTSHIELDING OPTION BORONPRECIPITATIONSHIELDING GPUNCOMMITTEDTOTHENRCTO LOCKOPENTHEVALVEDHV12B ANDTOINSTALLAREACHRODFOR DHV64SOTHATSUFFICIENT FLOWISAVAILABLEFORCORE COOLINGANDBORON PRECIPITATIONPREVENTION UNDERWORSTCASESINGLE FAILURESWITHOUTREQUIRING MANUALACTIONINAN INACCESSIBLEHIGHRADIATION AREA. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, PostLOCAconditionsareno longerapplicablethereforethe protectionaffordedbythis commitmentisnolonger required. | |||
011220728600 5211842153: | |||
CONTROLROOM DESIGNREVIEW SUPPLEMENTAL REPORT(NUREG0737 I.D.1) | |||
ATPCOMMITMENTSFROMATOG COMMITTEE GPUNCOMMITTEDTOTHENRC THEFOLLOWINGACTIONS: | |||
(1)REVISEPROCEDURE12107STEP 10TOREDUCETHERUNOUTLIMIT OF1800GPMTOAVALUEOF1750 GPM.(HistoricalseeUPDATE 8/16/07below) | |||
(2)REVISEPROCEDURE12107 SECTION2.0STEP10THATTHE PROCEDURALLIMITBESTATEDIN TERMSOFTHENETPUMPFLOWAS INDICATEDONTHECONTROL ROOMINDICATOR.(Ongoing) | |||
(3)REVISEPROCEDURE121010 THATTHEMAKEUPPUMP PROCEDURALLIMITSBESTATEDIN TERMSOFNETINJECTION THROUGHTTHEVIG'S. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, andtherearenotransients/ATP requiredfortheprotectionofthe spentfuelpool. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 13 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207288 | |||
5211832149 NUREG1019 SUPP1:STEAM GENERATORTUBE REPAIRAND RETURNTO OPERATION SGSHELLTOTUBEDIFFERENTIAL TEMPERATURELIMIT. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforetheSteamGenerators arenolongersafetyrelated,andthe protectionsprovidedbythis commitmentisnolongerrequired. | |||
0112207289 5211832149 NUREG1019 SUPP1:STEAM GENERATORTUBE REPAIRAND RETURNTO OPERATION ISOLATEDSTEAMGENERATOR PRESSURECONTROL. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforetheSteamGenerators arenolongersafetyrelated,andthe protectionsprovidedbythis commitmentisnolongerrequired. | |||
0112207291 5211843249: | |||
SERACCEPTANCE OFRESPONSETO GL8328ATWS ITEM4.3 REACTORTRIP; 5211843249: | |||
SYSTEM RELIABILITY CRDMCIRCUITBREAKERTRIPPING MECHANISMTESTING. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeAnticipatedTransient withoutSCRAMprotectionisnolonger required. | |||
0112207294 5211842013 NUREG0612: | |||
CONTROLOF HEAVYLOADS PROCEDURESFORHEAVYLOADSIN REACTORBUILDING. | |||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding 0112207295 5211842013 NUREG0612: | |||
CONTROLOF HEAVYLOADS RVHEADREMOVAL&INSTALLATION LIFTHEIGHTRESTRICTION. | |||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding. | |||
0112207296 5211842013 NUREG0612: | |||
CONTROLOF HEAVYLOADS RBPOLARCRANESPECIALLIFTING DEVICES. | |||
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding. | |||
0112235501 5211862034 IEB8501:STEAM BINDINGOF AUXILIARY FEEDWATER PUMP EFWPUMPSTEAMBINDINGPUMP RESTORATION. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeemergencyfeedwateris nolongerasafetyrelatedsystem. | |||
0112235502 5211862034 IEB8501:STEAM BINDINGOF AUXILIARY FEEDWATER PUMP EFWPUMPSTEAMBINDING TEMPERATURECHECKS. | |||
Once thecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeemergencyfeedwateris nolongerasafetyrelatedsystem. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 14 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235504 5211842200 NUREG0612: | |||
CONTROLOF HEAVYLOADS HEAD&INTERNALSHANDLINGFIXTURE WELDISIPROG. | |||
Sincefuelisnolonger permitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding. | |||
0112235506 5211852092 Source DocumentTitle: | |||
GL8328ITEM 4.2.1:PERIODIC MAINTENANCE PROGRAMFOR REACTORTRIP BREAKERS REACTORTRIPBREAKERMAINTENANCE. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore AnticipatedTransientwithout SCRAMprotectionisnolonger required. | |||
0112235509 5211842013 NUREG0612: | |||
CONTROLOF HEAVYLOADS HEAVYLOADSPROCEDURE HEAD& | |||
INTERNALSHANDLING. | |||
Sincefuelisnolongerpermitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding. | |||
0112235518 5211862186 IEB8603: | |||
POTENTIAL FAILUREOF MULTIPLEECCS PUMPSDUETO SINGLEFAILURE GPUNCOMMITTEDTOTHENRCTHATTMI1 DOESHAVEASINGLERECIRCULATIONLINE FORTHEHIGHPRESSUREINJECTION(HPI) | |||
PUMPSWHICHAREISOLATED AUTOMATICALLYONEMERGENCY SAFEGUARDS(ES)ACTUATION. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore anyrequirementrelatedtoECCS performancecriteriaarenolonger required. | |||
0112235522 5211862021 whichreferences 521183176 IEB8303: | |||
CHECKVALVE FAILUREIN DIESEL GENERATOR COOLING SYSTEM CHECKVALVEFAILUREDIESELGENERATOR COOLINGSYSTEM. | |||
EDGnolongersafetyrelated 0112235531 5211842013: | |||
RESPONSETO NUREG0612 CONTROLOF HEAVYLOADS POLARCRANESAFELOADPATHFORRB REGIOND2. | |||
Sincefuelisnolongerpermitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 15 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235535 C311882087 IEB8804: | |||
POTENTIAL SAFETYRELATED PUMPLOSS IEB8804ITEM3:POTENTIALSAFETY RELATEDPUMPLOSS GPUNCOMMITTEDINTERNALLYTHAT INRESPONSETOIEB8804ITEM3AN INDEPTHSTUDYTOPREDICTPUMP DAMAGEANDVERIFYPUMP MINIMUMFLOWREQUIREMENTSWAS NOTNECESSARYWHENCONSIDERING THATTHECURRENTINSERVICETEST (IST)PROGRAMWASINPLACETO DETECTSUCHDAMAGE. | |||
Once thecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,therearenolonger anysafetyrelatedpumpsandthe protectionprovidedbythis commitmentisnolongerrequired. | |||
0112235537 C311882138 IEB8202: | |||
DEGRADATIONOF THREADED FASTENERSIN THERCPBOF PWRPLANTS EXAMINATIONOFTHREADED FASTENERSPRIORTOREUSE GPUNCOMMITTEDTOTHENRCTO PERFORMVISUALEXAMINATIONSON ALLREACTORCOOLANTPRESSURE BOUNDARY(RCPB)FASTENERSPRIOR TOREUSEANDTOPERFORM MAGNETICPARTICLE(MT)OR PENETRANTEXAMINATIONS(PT)ALSO UNLESSTHERCPBFASTENERHASONLY EXPERIENCEDSHORTTERMSERVICE LESSTHANOREQUALTO3MONTHS SINCEITSLASTMTORPTANDTHE FASTENERWASFOUNDDRYAND WITHOUTEVIDENCEOFBORICACID CRYSTALSORRUST. | |||
TheRCSpressureboundaryisno longersafetyrelated,per50.82(a)2 TMIisnolongerpermittedtooperate orplacefuelinreactorvessel. | |||
0112235534 C311882087 IEB8804: | |||
POTENTIAL SAFETYRELATED PUMPLOSS ADEQUATEMINIMUMPUMP RECIRCULATIONFLOW GPUNCOMMITTEDTOTHENRCTHAT ALLPUMPSINTMI1SAFETYRELATED SYSTEMSEVALUATEDWITHINIEB88 04RESPONSEWHICHHADTHE MINIMUMRECIRCULATION REQUIREMENTHADADEQUATE MINIMUMRECIRCULATIONFLOWIN ACCORDANCEWITHTHEPUMP SPECIFICATIONS. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,therearenolonger anysafetyrelatedpumpsandthe protectionprovidedbythis commitmentisnolongerrequired. | |||
0112235538 C311882165 GL8817: | |||
GENERICLETTER 8817 EXPEDITIOUS ACTION2 GL8817:GENERICLETTER8817 EXPEDITIOUSACTION2. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,thereforeDecay Heatinthereactorvesselisnolonger required.Therefore,anyprotection providedbythiscommitmentisno longerrequired. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 16 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235539 C311882165 GL8817: | |||
GENERICLETTER 8817 EXPEDITIOUS ACTION3AND PROGRAMMED ENHANCEMENT; GL8817:1(B) | |||
CONTINUOUSCOREEXIT TEMPERATUREMONITORING. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired. | |||
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired. | |||
0112235540 C311882165 GL8817: | |||
GENERICLETTER 8817 EXPEDITIOUS ACTION4AND PROGRAMMED ENHANCEMENT; GL8817:1(A) | |||
GL8817:GENERICLETTER8817 EXPEDITIOUSACTION4AND PROGRAMMEDENHANCEMENT;GL 8817:1(A). | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired. | |||
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired. | |||
0112235541 C311882165 GL8817: | |||
GENERICLETTER 8817 EXPEDITIOUS ACTION5 PROCEDURALOPSGUIDANCE REDUCEDINVENTORY PERTURBATIONSTOTHERCS Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired. | |||
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired. | |||
0112235542 C311892015 GL8817: | |||
GENERICLETTER 8817 EXPEDITIOUS ACTION6AND PROGRAMMED ENHANCE RCSINVENTORYADDITIONOTHER THANDHRSYSTEMPUMPS. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired. | |||
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 17 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235543 C311892015 GL8817: | |||
GENERICLETTER 8817 PROGRAMMED ENHANCEMENT2 (PROCEDURES) | |||
BASEDON;GL88 17:ANALYSIS GPUNCOMMITTEDTOTHENRC TO MAKEPROCEDURALCHANGESIN ADDITIONTOTHOSECOMMITTEDTO WITHIN5211872188AND521188 2165BYJULY1989TOIMPROVE OPERATORGUIDANCEINTHE FOLLOWINGFOURAREAS: | |||
1)THETIMEBEFORECOREBOILINGAND COREUNCOVERYFOLLOWINGALOSSOF DECAYHEATREMOVAL(DHR). | |||
2)PROVIDINGSUFFICIENTREACTOR COOLANTSYSTEM(RCS)VENTAREATO PERMITADEQUATEMAKEUPFLOW. | |||
3)CONTAINMENTCLOSURE REQUIREMENTS. | |||
4)RESTARTOFDHRFROMSATURATED CONDITIONS. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore DecayHeatinthereactorvesselis nolongerrequired.Therefore,any protectionprovidedbythis commitmentisnolongerrequired. | |||
0112235544 GENERICLETTER 8817 PROGRAMMED ENHANCEMENT 1(D) | |||
(INSTRUMENTATI ON) | |||
GPUNCOMMITTEDTOTHENRC THE FOLLOWINGVISUALORAUDIBLE INDICATORSWEREAVAILABLEINTHE CONTROLROOMTOASSISTTHE OPERATORINTHEIDENTIFICATIONOF ABNORMALCONDITIONSWHICHAFFECT HEATREMOVAL. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore DecayHeatinthereactorvesselis nolongerrequired.Therefore,any protectionprovidedbythis commitmentisnolongerrequired. | |||
0112235546 GL8904: | |||
GUIDANCEON DEVELOPING ACCEPTABLEIST PROGRAMS GPUNISCOMMITTEDTOTHEGUIDANCE INGL8904"GUIDANCEONDEVELOPING ACCEPTABLEISTPROGRAMS"BYVIRTUE OFTHEFACTTHATTHISGLWASISSUED TOLICENSEES.THEGLCONTAINS INTERPRETATIONSANDADDITIONAL GUIDANCETHATMAYDIFFERFROMTMI 1PROGRAMSANDPROCEDURES. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforewith theimplementationofthePDTS therearenolongeranysafety relatedpumpsorvalvesandtheIST programisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 18 of 44 Table2(Continued) | |||
Commitment Tracking Number CommitmentSource Document CommitmentDetails BasisforDeletion 0112235547 C311892032 IEB8804:POTENTIAL SAFETYRELATED PUMPLOSS GPUNCOMMITTEDTOTHENRC: | |||
1)THEDHRPUMPMINIMUM RECIRCULATIONCAPACITYWAS ADEQUATETOENSURETHATPUMP OPERABILITYWASNOTAFFECTEDBY MINIMUMRECIRCULATIONOPERATION. | |||
2)ADDITIONALVIBRATIONREADINGS WEREINCORPORATEDINTOTHE SURVEILLANCETESTPROCEDURESOPTM 212201/202/203/204/205/206 13035.2AND13003A/B. | |||
3)THEREVISIONBYJUNE1989OF PROCEDURESTOPROVIDEADDITIONAL GUIDANCETHATWILLAPPLYWHEN HIGHERVIBRATIONLEVELSARE ENCOUNTEREDATBLADEPASSING FREQUENCYWHILEOPERATINGOR TESTINGTHEDHRPUMPSATMINIMUM RECIRCULATIONFLOWRATE. | |||
4)THECOMPLETIONOFSTEPSTO MINIMIZETHETIMETHATDHRPUMPS AREOPERATEDATMINIMUMFLOW DURINGTESTING. | |||
5)THENOTIFICATIONOFTHENRCBY LETTEROFANYADDITIONALACTIONS THATMAYBEREQUIREDINTHEFUTURE. | |||
ALSO,TOPROVIDETHEJUSTIFICATION FORCONTINUEDOPERATIONAS REQUESTEDBYIEB8804. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereforewith theimplementationofPDTS DecayHeatisnotsafety related,andtheprotection providedbythiscommitmentis nolongerrequired. | |||
0112235548 5450890103 GL8331:SEOF ABNORMAL TRANSIENT OPERATING GUIDELINES NRCCOMMITTEDGPUNTOUSESPECIFIC GENERICGUIDANCEASPROVIDEDBYTHE B&WOWNERSGROUPWHENAVAILABLE. | |||
DEVIATIONSFROMTHATGUIDANCETOBE ADDRESSEDBYEACHLICENSEE. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereareno longeranydesignbasisthreats thatrequireanyabnormal transientguidelines. | |||
0112235550 C311892078 GL8908:GL8908 EROSION/CORROSION INDUCEDPIPEWALL THINNING GPUNCOMMITTEDTOTHENRCTO MODIFYTHEEXISTING EROSION/CORROSIONMONITORING PROGRAMATTMI1TOPROVIDEALONG TERMCORPORATELEVELAPPROACH.THIS WILLBECOMPLETEINTIMETOSUPPORT 09ROUTAGESCHEDULEDINSPECTIONS. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereforethere isnoconditionthatinthespent fuelpoolthatwouldcreatea erosion/corrosionorpipewall thinningevent. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 19 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235551 C311892068: | |||
10CFR50 APPENDIXRGL 8112RESPONSE TONRC QUESTIONS GPUNCOMMITTEDTOTHENRCTOINCLUDE ANOTEINEP120237,ITEM13.K,TOTHE OPERATORTHATAFAILEDOPENRCV1MAY BEINDICATEDBYRAPIDRCS DEPRESSURIZATION,INORDERTOENSURE CORRECTIONOFSPURIOUSOPENINGOFRC V1DUETOAFIRE. | |||
GPUNALSOCOMMITTEDTOEXERCISING 480VMOLDEDCASEBREAKERSIN ACCORDANCEWITHPROCEDURES;TO PROVIDEGUIDANCEIN1420Y13TO MAINTENANCEPERSONNELTHATWHEN REPLACINGFUSES,THEYARETOBE REPLACEDWITHTHESAMESIZEANDTYPEAS THEFUSEREMOVED,TOREFERTO DRAWINGS,VENDORMANUALS,OROTHER REFERENCESIFTHESIZEANDTYPECANNOT BEDETERMINED,ORREQUESTPLANT ENGINEERINGTOPROVIDEAPPROPRIATE RESOLUTION;TOUTILIZETHEGPUN OPERATIONALQAPLANFORCOMMERCIAL GRADEDEDICATIONOFFUSESFORSAFETY RELATEDAPPLICATIONS. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, AppendixRfireprotectionisno longerrequired,andinthe decommissioningstatefire protectionisboundedby 50.48(f). | |||
0112235552 C311902001 IEB8903: | |||
POTENTIALLOSS OFREQUIRED SHUTDOWN MARGINDURING REFUELINGOPS GPUNCOMMITTEDTOTHENRCTOREVISE PROCEDURESGOVERNINGFUELLOADINGTO REFLECTTHEFACTTHATFUELASSEMBLIES WILLNORMALLYONLYBELOADEDINTO THEIRFINALCORELOCATIONS;HOWEVER,IF AFUELASSEMBLYISTOBEPLACEDINTOANY OTHERCORELOCATIONDUETOFUEL HANDLINGCONSTRAINTS,ITSHALLONLYBE PLACEDINTOCORELOCATIONSTHATWOULD CONTAINANASSEMBLYOFEQUALOR HIGHERREACTIVITYASDETERMINEDBYTHE APPROVEDCORERELOADDESIGN. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 20 of 44 Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235553 C311893246 GL8112:POST FIRESAFE SHUTDOWN METHODOLOGY NRCTECHNICAL EVALUATION;GL 8112:REPORT GL8112:POSTFIRESAFESHUTDOWN METHODOLOGYNRC. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,AppendixR fireprotectionisnolonger required,andinthe decommissioningstatefire protectionisboundedby50.48(f). | |||
0112235555 C311902031 GL8919: | |||
REQUESTFOR ACTIONRELATED TORESOLUTION OFUSIA47 GPUNCOMMITTEDTOTHENRCTHAT TMI1OTSGOVERFILLPROTECTIONIS ADEQUATEBECAUSEOFTHEOTSGHIGH LEVELALARMRESPONSEPROCEDURES* | |||
AVAILABLETOTHEOPERATORS(MAIN ANUNCIATORPANELH,H11(REV12)) | |||
ANDBECAUSEOFTHEFOLLOWING SURVEILLANCESVERIFYTHEOPERABILITY ANDCALIBRATIONOFTHEOTSGHIGH LEVELMFWISOLATIONFEATUREOFTHE HSPS. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe SteamGeneratorsarenolonger safetyrelated,andtheprotections providedbythiscommitmentisno longerrequired. | |||
0112235558 C311912015 IEB8811: | |||
PRESSURIZER SURGELINE THERMAL STRATIFICATION DECEMBER20, 1988 GPUNCOMMITTEDTO THENRCTO REDUCEFUTURESURGELINETHERMAL CYCLESBYADOPTINGTHEB&W RECOMMENDEDLOWER(APPENDIXG) | |||
RCSSUBCOOLINGMARGINSINPLANT OPERATINGANDPROCEDURES PURSUANTTOITSTOPICALREPORTNO BAW2127(FIGURE8)AND"WHENTHE PREFERREDLOWERRCSSUBCOOLING MARGINISNOTMAINTAINED, (CONDUCT)ANEVALUATIONOFACTUAL PLANTPERFORMANCE,INA PROGRAMMATICMANNER,TO DETERMINETHEIMPACT(S)ONFATIGUE LIFE." | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe protectionprovidedbythis commitmentisnolongerrequired. | |||
0112235559 C311912015 IEB8811: | |||
PRESSURIZER SURGELINE THERMAL STRATIFICATION DECEMBER20, 1988 GPUNCOMMITTEDTOTHENRCTO ATAKESTEPSTOREDUCEFUTURE (PRESSURIZER)SURGELINETHERMAL CYCLES. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe protectionprovidedbythis commitmentisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 21 of 44 | |||
Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235561 C311922003: | |||
STAFFREVIEWOF GL9006 GPUNCOMMITTEDTOTHENRCTHAT: | |||
1.STROKETESTINGISPERFORMEDAT WYLELABORATORIESACERTIFIEDOFFSITE FACILITYINACCORDANCEWITH SPECIFICATIONSP110112087.TESTINGIS PERFORMEDATNORMALSTEAMINLET CONDITIONSANDVERIFIESBOTH SETPOINTS;2450PSIGFORPOWER OPERATIONAND5592PSIGFORLTOP, CONDITIONSTHATAREREPRESENTATIVE OFTHEPORVOPERATINGENVIRONMENT. | |||
2.14012.1A,"REMOVE/INSTALLRCRV2 (PORV)"AND13026.16"SETPOINTAND REMOVEPOSITIONCHECKOFTHEPORV (RCRV2)","PROVIDESVERIFICATIONOF PROPERREINSTALLATIONOFTHEPORV ANDCONTROLS. | |||
3.ALTHOUGHBENCHTESTINGISTHE PREFERREDMETHODOFPORVTESTING, OPTM220203PERMITSACTUATIONOF THEPORVINPLACEASANALTERNATIVE TESTMETHOD.INPLACESTROKETESTING OFTHEPORVUSESSTEAMATRCS TEMPERATUREGREATERTHAN32913 DEGREESFANDRCSPRESSUREAT500700 PSIG,CONDITIONSEQUIVALENTTOOR GREATERTHANSTSMODE3ANDMODE4. | |||
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required. | |||
0112235562 C311932086 IEB9302:DEBRIS PLUGGINGOF ECCSSUCTION STRAINERS GPUNCOMMITTEDEXTERNALLYTOTHE NRCINRESPONSETOBULLETIN9302THAT FIBROUSAIRFILTERSWHICHARE INSTALLEDINSIDECONTAINMENTARE PROTECTEDFROMMIGRATINGINTOTHE REACTORBUILDINGSUMPPRIORTO,OR DURINGALOCAEVENTDUETOADEQAUTE FILTERMAINTENANCEPROCEDURES, PROCEDURALCONTROLSAND ENGINEERINGEVALUATIONSWHICH DOCUMENTTEMPORARYSOURCESOF FIBROUSMATERIALSTOREDIN CONTAINMENT,PROCEDURESWHICH REQUIREREACTORBUILDING WALKDOWNSANDINSPECTIONSPRIORTO SETTINGCONTAINMENTFORPLANT OPERATIONS,ANDPROCEDURAL CONTROLS Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required. | |||
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 22 of 44 | |||
Table2(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235570 59280320148 SIXTYDAY RESPONSETO NRCBULLETIN 200301 Theplantwill developaspecific procedureforcleaningand inspectingthefloordrainsin containmentandwillcoordinate thisworkwiththecontainment closeoutprocedure. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforethereisnoneedto performacontainmentcloseout inspection.Theprotectionprovidedby thiscommitmentisnolongerrequired. | |||
0112235572 RESPONSETORAI BULLETIN2003 01"POTENTIAL IMPACTOF DEBRIS BLOCKAGEON EMERGENCY SUMP RECIRCULATION ATPRESSURIZED WATER REACTORS TMIwillrevisethesiteEOPsto incorporateinterimmeasuresto includeinitiatingBWSTrefillafter switchovertorecirculationfromthe containmentsump. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,theneedforLOCAprotectionin theRCSisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 26 of 44 | |||
The following provides the update of programmatic commitments associated with Licensing Actions that impacted Technical Specifications (TS) that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2) and implementation of TS Amendment 297, which implemented the Permanently Defueled Technical Specifications. | |||
LetterSource: | |||
Various-RefertoTable3 foreachitem | |||
ExelonTrackingNumber Various-RefertoTable3 foreachitem | |||
NatureofCommitment: | |||
Table3 lists open programmaticregulatorycommitments forThreeMileIsland,Unit1(TMI1),thatarerelatedto licensingactions(e.g.LARs).TechnicalSpecification Amendments295and297wereimplementedon September27,2019andrepresentsthePermanently DefueledTechnicalSpecifications(PDTS).Thetable containsthecommitmentnumber,thecommitment source,asummaryofthecommitment,andbasisforthe deletionofthecommitment. | |||
EachoftheoriginalregulatorycommitmentslistedinTable 3willbeclosed,sincetheactionsarenolongerapplicable asaresultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,ExelonprovidedcertificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith10CFR50.82(a)2TMI1is nolongerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiated fuelintheSpentFuelPool.TheregulatorycommitmentsinTable3nolongeraffordtheoriginalintentand protection.Table3providesadditionalbasisforeachactionitem. | |||
Table3 ProgrammaticCommitmentstiedtoLicensingActionsthatareno longerapplicablebasedonPermanentShutdownStatus | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207204 59280420162 TSCRNO.326 TSCRNO.326 ELIMINATIONOF CONTAINMENTEQUIPMENTHATCH CLOSUREDURINGREFUELING Procedureswillbeinplacewhichwill requiretheplacementofcontinuously operatedparticulateandradioiodineair samplingequipmentinboardoftheopen containmentequipmenthatchopening duringfuelloadingandrefuelingactivities. | |||
Nolongerpermittedtoperform fuelemplacementintheRPV.TS 3.8FuelLoadingandRefuelingwas deletedinTSAmendment297. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 27 of 44 Table3(Continued) | |||
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207233 GQL0036 TSAMENDMENT 17:NRCSER DATED5/18/76 PERIODICREACTORCOOLANTFLOW VERIFICATION Licenseecommittedtoverifythe reactorcoolantflowratewillbeverified every6months,plusorminus30days, tobedonebytheheatbalance techniquedescribedintheMetEd letterdated4/8/76. | |||
BasedonthefactthatTMIisnolonger permittedtooperateorplacefuelin thevesselthisverificationwouldno longerberequired.TS3.5.1forRPS inputsanditsassociatedSRswere deletedinAmendment297. | |||
0112207245 NRCSERDATED 8/28/81:ADV SPURIOUS OPENINGUPON LOSSOFNNIOR ICS ATMOSPHERICSTEAMDUMPVALVES SPURIOUSOPENING. | |||
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermitted tooperateorstorefuelinthereactor vessel.TS3.4.1DecayHeatRemoval withT>250Fwasdeletedby Amendment297. | |||
0112207267 5211832014 PERIODIC TESTINGOFAUX ANDFHB VENTILATION SYSTEM MODIFICATIONS FHBISOLATIONDAMPERINTERLOCK TESTING Attachment(s):GPUNCOMMITTEDTO THENRCTOREVISIONOFTHE SURVEILLANCEPROCEDURE(SP)1303 4.15TOINCLUDETHETESTINGOFTHE FUELHANDLINGBUILDING (FHB)ISOLATIONDAMPERINTERLOCKS WITHTHEFHBVENTILATIONSUPPLY FAN.THEEQUIPMENTWASTESTED MONTHLYTOVERIFYPROPER OPERATIONOF THEINTERLOCKSFORTHEISOLATION DAMPERSANDTHESUPPLYFAN.THAT WASACCOMPLISHEDBYSIMULATINGA HIGHRADIATIONSIGNALFORRMA4 (THEATMOSPHERICRADIATION MONITORINTERLOCK)ANDRMG9 (AREARADIATIONMONITOR INTERLOCK)WHICHTRIPPEDTHEFHB SUPPLYFANAND CLOSEDTHEISOLATIONDAMPERS. | |||
TechnicalSpecificationAmendment 297providedanewFuelHandling AccidentintheSpentFuelPool,and concludedthatAux.BuildingandFuel HandlingBuildingESFVentilationisnot requiredformitigation.TS3.15.4Fuel HandlingBuildingESFAirTreatment SystemwasdeletedinTSAmendment 297. | |||
0112235525 5211962168 TSAMENDMENT 122:NRCSER DATED12/12/86 | |||
FUELHANDLING BUILDINGESF VENTILATIONSYSTEMEnsuresystemis inservicepriortoFuelHandling. | |||
TechnicalSpecificationAmendment 297providedanewFuelHandling AccidentintheSpentFuelPool,and concludedthatFuelHandlingBuilding ESFVentilationisnotrequiredfor mitigation.TS3.15.4FuelHandling BuildingESFAirTreatmentSystem wasdeletedinTSAmendment297. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 28 of 44 Table3(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235563 C311933140: | |||
TECHSPEC AMENDMENT175 GPUNCOMMITTEDTOTHENRCTO INCORPORATEAMODIFIEDBATTERY PERFORMANCETESTASDESCRIBEDIN IEEESTANDARD4501993. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTStheelectricalpowersystem includingtheDCandbatterysystems arenolongersafetyrelated.TS3.7 ElectricalPowerwasdeletedby Amendment297. | |||
0112235564 592800 20120.001TSCR NO.283RAI | |||
===RESPONSE=== | |||
CLARIFICATIONS PURSUANTTO TELEPHONE CONFERENCECALL 99096TSCR283DEGRADEDGRID SETPOINTTOLERANCEANDTURBINE PLANTLOADINGDESIGNLIMIT REVISIONS. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTStheelectricalpowersystem includingtheDegradedGrid protectionarenolongersafety related.TS3.5.3wasdeletedby Amendment297. | |||
0112235567 59280120209 RESPONSETO REQUESTFOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUESTNO.249 CONTAINMENT INTEGRITYDURING REFUELING OPERATIONS TMIUnit1Procedure15051willbe revisedtoreflecttheproposedTechnical Specificationchangeandensure continuedawarenessbytheShift Operating/RefuelingcrewsoftheOPEN statusofthecontainmentduringcore alterationsandfuelhandling. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel.TS3.6.1 ContainmentIntegritywasdeletedby Amendment297. | |||
0112235568 59280120209 | |||
===RESPONSE=== | |||
TO REQUEST FOR ADDITIONAL INFORMATION | |||
LICENSE AMENDMENT REQUEST NO. 249 CONTAINMENT INTEGRITYDURING REFUELING OPERATIONS Operating Procedure | |||
: 11013, "Containment Integrity and Access Limits,"willberevisedtoprovideforthe placement of continuously operated particulate and radioiodine air sampling equipment inboard open airlocks during corealterationandfuelhandling activities. | |||
Once the certification of 50.82(a)2 were completed, TMI is no longer permittedtooperateorplacefuelin the reactor vessel. | |||
TS 3.6.1 ContainmentIntegritywasdeletedby Amendment297. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 29 of 44 Table3(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235569 59280230061 SAFETY EVALUATIONOF PROCEDURESFOR PERFORMING ANDEVALUATING THEREACTOR BUILDING TENDON SURVEILLANCE (TACNO. | |||
MA9460) | |||
TheNRC'sSafetyEvaluationbasedits acceptanceofthetendonsurveillance andinspectionsasmeetingthe requirementsof10CFR50.55a(b)(2)(ix) onthefollowingAmerGencommitment fromthe25thYearTendonSurveillance Report(TR136)submittaldated 2/25/00(59280020066):"the Mechanical/StructuralEngineershall performcontinuedmonitoringofthe greaseleakageaspartofitsRepetitive PreventiveMaintenanceTaskNo. | |||
9641."Therefore,performanceofthis PMTaskbecomesanongoing commitment. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,with implementationofthePDTStheTS 3.19andSR4.4.2forRBTendon Surveillanceweredeletedin Amendment297. | |||
0112235571 59280510223 TSCRNO.324 REACTOR PROTECTION SYSTEMTEST INTERVAL EXTENSION Theasfoundandasleftvalueswill continuetoberecordedandreviewed forconsistencywiththeassumptionsof thesurveillanceintervalextension analysis.Thereviewwillverifythetest resultsmeetacceptancecriteria.Outof toleranceresultswillbe evaluatedtodetermineiftheymeetthe requirementsoutlinedinBAW10167. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,thereaction protectionsystemisnolonger requiredtosupportprotectionoffuel cladandRCSpressureboundary.TS 3.5.1wasdeletedbyAmendment 297. | |||
0112235576 59280520253 ADDITIONAL INFORMATION TECHNCIAL SPECIFICATION CHANGE REQUESTNO. | |||
326: | |||
ELIMINATIONOF CONTAINMENT EQUIPMENT HATCHCLOSURE DURING REFUELING Proceduralcontrolswillensurethat duringthemovementofirradiatedfuel theEquipmentHatch/MissileShield areawillbemanned24Hours/Day,7 Days/Weekinsupportoftheoutage unlesstheEquipmentHatchisclosed and4boltsareinstalled.The "committeddateoroutage"forthis itemisT1R16. | |||
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTSremovedanycontrolsor constraintsonrefuelingoperations sinceitnolongerpermitted.TS3.8 FuelLoadingandRefuelingwas deletedinTSAmendment297. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 30 of 44 Table3(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235577 59280520253 ADDITIONAL INFORMATION TECHNCIAL SPECIFICATION CHANGE REQUESTNO. | |||
326: | |||
ELIMINATIONOF CONTAINMENT EQUIPMENT HATCHCLOSURE DURING REFUELING TMIUnit1procedureswillinclude thefollowingrequirementsto ensurethatGeneralDesignCriterion (GDC)64requirementswillcontinue tobemetduringthemovementof irradiatedfuel: | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,implementationofthePDTS removedanycontrolsorconstraintson refuelingoperationssinceitnolonger permitted.TS3.8FuelLoadingand RefuelingwasdeletedinTSAmendment 297. | |||
0112235578 59280720006 TSCRNO.335 REACTOR COOLANTSYSTEM PRESSURE TEMPERATURE SAFETYLIMITS TheVLPTNominalSetpoint(NSP) andTotalLoopUncertainty(TLU)are determinedusingthemethodology providedbyANSI/ISAS67.04Part1 1994.ThepredefinedlimitsforNSP asfoundtolerancewillbe determinedinaccordancewiththe NRCacceptedmethodology describedinNRCRIS200617. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel.TS2.3LimitingSafetySystem SettingsweredeletedinAmendment 297. | |||
0112235581 59280720097 TECHNICAL SPECIFICATION CHANGE REQUESTNO.337 "CHANGEOF CONTAINMENT EMERGENCY SUMPSPRAYPH CONTROL" InstallTSP buffermodificationand isolateNaOHtankBST2.Atleast onemanualvalveineachsupply trainwillbelockedclosedproviding permanentisolationoftheNaOH tank. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,LOCAisnolongeracredibleDBA, thereforethereisnoneedtoprovide postLOCAphcontrolincontainment.TS 3.3.1.3RBSprayandRBEmergency CoolingSystemwasdeletedin Amendment297. | |||
0112235582 59280720164 RESPONSETORAI TSCR#335: | |||
REACTOR COOLANTSYSTEM PRESSURE TEMPERATURE SAFETYLIMIT WithregardtotheVLPTsetpoint calculationandthereferencesof Sections7and8ofPart1ofISA S67.041994,TMIUnit1isin agreementwiththisRegulatory Positionandcommitstoimplement Reg.Guide1.105,Rev.3. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel.TS2.3LimitingSafetySystem SettingsweredeletedinAmendment 297. | |||
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 31 of 44 Table3(Continued) | |||
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235583 59280720202 RESPONSETO REQUESTFOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION CHANGE REQUESTNO. | |||
337:REACTOR BUILDING EMERGENCY SUMPPH CONTROLSYSTEM BUFFERCHANGE 1)Theelementsandmethodology oftheproposedTSTable4.15, Item2.bsurveillancetestingwillbe clearlydelineatedinstation surveillanceprocedures. | |||
(Programmatic) 2)Procedureswillensurethat samplesaretakenwithinthebasket atbothinteriorandperipheral locationstoobtainarepresentative sample.(Programmatic) 3)UseoftheWCAP16530NP modelisbeingconsidered,andif utilized,thisissue(ref.Q.9)willbe addressedintheTMIUnit1Generic Letter200402response.(One TimeAction) | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, LOCAisnolongeracredibleDBA, thereforethereisnoneedtoprovidepost LOCAphcontrolincontainment.TS3.3.1.3 RBSprayandRBEmergencyCooling SystemwasdeletedinAmendment297. | |||
0112235593 59280820132 AmerGenEnergy Co.LLC(Exelon) toU.S.Nuclear Regulatory Commission datedSeptember 29,2008.Seealso Technical Specification Amendment273. | |||
Controlrodpatchverificationwill beperformedbymovingeach controlrodtoverifycorrect group/rodassignmentfollowing anysoftwarerecompilingand download. | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, inadvertentcriticalityorreactivity managementisnolongeraconcern.SR 4.7ReactorControlRodSystemTestwere deletedinAmendment297. | |||
0256938101 TMI14121 Responseto Requestfor Additional Information RegardingLicense Amendment Requestto EliminateCertain Technical Specification Reporting Requirements. | |||
TMIPeriodicLeakReduction ProgramIncorporateadescription ofthePeriodicLeakReduction Programintothelicensingbasisby revisingUFSARSection6.4, "EngineeredSafeguardsLeakage andRadiationConsiderations." | |||
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, sinceaLOCAisnolongeracredibleDBA, quantifyingleakageintotheAuxBuilding intheeventofsumprecirculation exceedingPart100limitsisnolongera concern.SR4.5.4ESFsystemleakagewas deletedinAmendment297. | |||
Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 37 of 44 The following provides the update of Miscellaneous Programmatic Commitments that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2). | |||
LetterSource: | |||
5211872059-LTRtoNRC:RCPS ThermalBarrierCoolingandInjection. | |||
C311882010-LTRtoNRC:10CFR50APPENDIXRLOSSOFHVAC ExelonTracking Number 0112235527 0112235530 Natureof Commitment: | |||
Bothlistedcommitmentsareassociatedwithcompliancewith10CFR50,AppendixR. | |||
0112235527ReactorCoolantPumpsAppendixRexemption.Thelicenseecommittedto theNRCthatintheeventofacontrolroomorrelayroomfires,mitigationresponse procedurestorestorereactorcoolantpumpsealbarriercoolantattheremoteshutdown panel. | |||
011223553010CFR50AppendixR-LossofHVAC.Thelicenseecommittedtomonitor dieselengineparametersduringdieselgeneratoroperationstoensureEDGisadequately cooledduringlossofventilationinthedieselroomsduetoanAppendixRFire. | |||
Eachoftheoriginalregulatorycommitmentswillbeclosed,sincetheactionsarenolonger applicableasaresultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,therequirementsof10CFR 50.47.(b)(2)andAppendixRarenolongerapplicableandfireprotectionforadecommissioningplantiscovered by10CFR50.48(f). | |||
LetterSource: | |||
5211842015LTRtoNRCGL 8233RESPONSENUREG0737ITEMIC1ATOG IMPLEMENTATION | |||
5211842154LTRtoNRC:NUREG0737ITEMI.C.1RESPONSETOSERQUESTIONS ExelonTracking Number 0112207264 0112207277 Natureof Commitment: | |||
Bothlistedcommitmentsareassociatedwithimplementation AbnormalTransient OperatingGuidelines(ATOG)inEmergencyOperatingProcedures(EOPs). | |||
0112207264-AbnormalTransientOperatingGuidelines(ATOGs).Thelicenseecommitted totheNRCthattheATOGswouldbeintegratedintotheAbnormalTransientProcedures, whichultimatelybecometheEOPs.TheguidancetofollowtheATOGswasplacedinAP 1001E,"WritersGuideforAbnormalTransientProcedures." | |||
0112207277-EOPUpgradeProgram.ThelicenseecommittedtocorrectNRCconcernson WritersGuideAdministrative ProceduresforAbnormalTransientProcedures. | |||
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,theneedforEOPsthatmeetthe ATOGsarenolongernecessary,sincethetransientsinquestionarenotapplicabletoadefueledfacilitythatisno longerlicensedtooperate.Inaddition,therequirementtomaintainawriter'sguideprocedureforthe maintenanceoftheseproceduresisnolongerrequired. | |||
Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 38 of 44 | |||
LetterSource: | |||
TMI15120- LTRtoNRC: FleetCommitmenttoMaintainSevereAccidentManagement Guidelines(SAMGs) | |||
ExelonTracking Number 0261101222 Natureof Commitment: | |||
0261101222FleetCommitmenttoMaintainSevereAccidentManagementGuidelines (SAMGs).ThelicenseecommittedtoimplementtheNuclearEnergyInstitute(NEI)Nuclear StrategicIssuesAdvisoryCommittee(NSIAC)approvedinitiativetoimplementSAMGs.The SAMGswouldbeusedbyemergencyresponsepersonnelduringaccidentconditionsthat progressbeyondthemitigationcapabilitiesdescribedinEOPs.SAMGstrategiesare intendedtoarresttheprogressionoffueldamage,maintainthecapabilityofthe containmentaslongaspossible,andminimizeradiologicalreleases. | |||
Theoriginalregulatorycommitmentlistedabovewillbeclosed,sincetheactionsareno longerapplicableasaresultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,theneedforEOPsthatmeetthe ATOGsarenolongernecessary,sincethetransientsinquestionarenotapplicabletoadefueledfacilitythatisno longerlicensedtooperate.Therefore,theneedtoprovideSAMGstoprovidestrategiestoarresttheprogression offueldamageormaintainthecapabilityofcontainment.AlthoughtheSAMGsprovidedspentfuelmitigation strategiesintheeventofalossofwatertothespentfuelpool,theseExtensiveDamageMitigationStrategiesto ensurewatersourcestotheSpentFuelPoolarealreadybuiltintotheAbnormalOperatingproceduretoaddress thelossofspentfuelpoolcooling. | |||
LetterSource: | |||
TMI15120- LTR toNRC: ResponseProvidingInformationRegardingImplementation DetailsfortheB.5.bPhases2and3MitigationStrategies ExelonTracking Number 0112207215 0112207217 Natureof Commitment: | |||
112207215B.5.bCommitments Three MileIslandNuclearStationUnit1willincludethe commandandcontrolenhancementstrategiesasdescribedinthegeneraldescriptionin inplantprocedures(TablesA.31) | |||
112207217B.5.bCommitmentsThreeMileIslandNuclearStationUnit1willlistthe viablesitespecificreactor/containmentstrategiesdescribedinAttachment1thatcouldbe usedbyemergencyresponseorganizationorplantpersonnelinappropriateprocedures (TableA.6.1). | |||
Theoriginalregulatorycommitmentlistedabovewillbeclosed,sincetheactionsareno longerapplicableasaresultofTMI1beinginapermanentshutdownstate. | |||
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.TheB.5.bcommitmentsarepartofthebroader ExtensiveDamageMitigationStrategiesthatarerequiredby10CFR50.155,Mitigationofbeyonddesignbasis events.Pursuantto50.155.(a)2(i),oncethecertificationsdescribedin50.82aresubmitted,thelicenseeneed onlycomplywiththebyEDGMstrategiesassociatedwithspentfuelpoolcoolingcapabilities. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 39 of 44 | ||
LetterSource: | |||
GPUNletterstoNRCC311902073,5211853262andC311903248concerningTMIFire BrigadeTraining. | |||
ExelonTracking Number 0112235510 0112235557 Natureof Commitment: | |||
InlettertoNRC,5211853262GPUNcommittedTHATINDIVIDUALSWHOSERVEONTHE FIREBRIGADESOFBOTHUNIT1ANDUNIT2ARE (1) COGNIZANTOFCHANGESINTHEFIREPROTECTIONPLAN,PROCEDURES,AND EQUIPMENTOFEACHUNIT (2) PARTICIPATEDINDRILLSONBOTHUNITS (3) PERIODICALLYEVALUATEDONASCHEDULECOMMENSURATEWITHCURRENT EVALUATIONCRITERIA. | |||
InC311902073,GPUNCOMMITTEDTOTHENRCTHATEACHFIREBRIGADEMEMBER SHALLPARTICIPATEIN: | |||
1) | |||
ATLEASTTWODRILLSPERYEARATTMI1TOREMAINQUALIFIED 2) | |||
ATLEASTONEDRILLPERYEARFOREACHTMI1OPERATINGSHIFTSHALLBE CONDUCTEDINTMI2. | |||
THESEDRILLSSHALLBESCHEDULEDSUCHTHATATLEASTONEDRILLPERQUARTERTAKES PLACEINTMI2. | |||
InC311903248,dated11/21/90,documentstheNRCStaffreviewandapprovaloftheGPU proposedcommitment.Thenewcommitmentrequiredonefiredrillpershiftperyearin Unit2. | |||
Thesecommitmentswillbeclosed.TrainingrequirementsfortheIncipientFireBrigadewill conformtoRG1.191andNFPA600requirementsasdescribedintheTMIIncipientFire BrigadeEvaluation.TheTMIFireProtectionProgramprocedure1038willdescribethe training,qualificationanddrillrequirementsfortheIncipientFireBrigade. | |||
JustificationforChange In1985and1990whenthesecommitmentsweremade,theregulatoryframeworkforFireProtectionwasbeing developed.By2000,NRChadissuedRegulatoryGuide1.189toprovideguidanceforFireProtectionatan operatingfacility.InMay2001,NRCissuedRegulatoryGuide1.191toprovideguidanceforcompliancewith 10CFR50.48(f)forapermanentlydefueledfacility. | |||
InSeptember2019,TMI1waspermanentlydefueledandtheTMI1FireHazardsAnalysis(9901745)was modifiedtoensurecompliancewith10CFR50.48(f)andRegulatoryGuide1.191.InJanuary2020,theTMI2Fire ProtectionProgramEvaluation(9903017)wasmodifiedtoensurecompliancewith10CFR50.48(f)andRegulatory Guide1.191. | |||
TheoperatingplantrequirementsforfirebrigadetrainingwillbemaintaineduntiltheIncipientFireBrigadeis implemented.TheIncipientFireBrigadeEvaluation(TechnicalEvaluation421497115)identifiedhowthe requirementsofRG1.191wouldbesatisfiedwhenTMItransitionstoanIncipientFireBrigade.Thisincludedfire brigadetraining,qualificationanddrillrequirements. | |||
TheprogramrequirementsofRegGuide1.191supersedethepurposefortheoriginalcommitments.Theoriginal commitmentsshouldbeeliminatedwhentheIncipientFireBrigadeisimplemented.TheTMIFireProtection programwillcontinuetocomplywithRegGuide1.191. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 40 of 44 | ||
LetterSource: | |||
NUREG1928,SafetyEvaluationReportRelatedtothe LicenseRenewalofThreeMileIsland NuclearStation,Unit1,AppendixAdatedOctober2009. | |||
ExelonTracking Number SeeTable4 Natureof Commitment: | |||
Table4listalloftheopen LicenseRenewalCommitmentsprovidedinNUREG1928,Safety EvaluationReportRelatedtotheLicenseRenewalofThreeMileIslandNuclearStation,Unit 1,AppendixAdatedOctober2009. | |||
EachoftheoriginalcommitmentslistedinTable4willbereassignedasagingmanagement itemsandnolongerbecategorizedasregulatorycommitmentsastheynolongermeetthe NEIdefinitionofaregulatorycommitment. | |||
JustificationforChange Uponapprovalofthelicenserenewallicenseamendment request,theNRCissuedalicenseconditiontothe TMI 1sRenewedFacilityOperatingLicense(2.c.(20)),thatrequiredthattheregulatorycommitmentsrelatedto licenserenewalbeincorporatedintothestationUFSAR.ThisconditionwassatisfiedinRevision20oftheUFSAR andprovidedinAppendixAoftheTMIUFSAR.LicenseCondition2.c.(20)wasdeletedinTSAmendment297, PermanentlyDefueledTechnicalSpecifications.SincetheseitemsarenointheUFSAR,theyarecontrolledunder the50.59changeprocessandreportedtotheNRCinaccordancewith50.71(e). | |||
Table4 LicenseRenewalCommitmentsReClassifiedasNoLongerbeingRegulatoryCommitments | |||
Commitment | Commitment Tracking Number Commitment CommitmentDetails 0060357301 ASMESecXIISIIWB,IWC, andIWDAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXIInserviceInspection,Subsections IWB,IWC,andIWDAgingManagementProgram(ReferenceTMI1 LicenseRenewalApplicationsectionsA.2.1.1andB.2.1.1) 0060357302 WaterChemistryAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeWaterChemistryAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.2and B.2.1.2).Whenallofthesubassignmentsdueonorbefore4/19/2014 arecompleted,theduedateforthisassignmentshallbechangedto 4/19/2034. | ||
0060357303 ReactorHeadClosureStuds AgingManagement ProgramB.2.1.3 ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeReactorHeadClosureStudsAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.3andB.2.1.3) 0060357304 BoricAcidCorrosionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBoricAcidCorrosionAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.4and B.2.1.4) 0060357305 NiAlloyRxHeadNozzle PenetrationAMP Thisassignment capturestheLicenseRenewalcommitments associatedwiththeNickelAlloyPenetrationNozzlesWeldedtothe UpperReactorVesselClosureHeadsofPressurizedWaterReactors AgingManagementProgram(ReferenceTMI1LicenseRenewal ApplicationsectionsA.2.1.5andB.2.1.5) | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 41 of 44 Table4(Continued) | ||
Commitment | Commitment Tracking Number Commitment CommitmentDetails 0060357306 FlowAccelerated CorrosionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFlowAcceleratedCorrosionAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.6andB.2.1.6) 0060357307 BoltingIntegrityAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBoltingIntegrityAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.7and B.2.1.7) 0060357308 SteamGeneratorTube IntegrityAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeSteamGeneratorTubeIntegrityAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.8andB.2.1.8) 0060357309 OpenCycleCooling AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeOpenCycleCoolingWaterSystemAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.9andB.2.1.9).Includesimplementationof programmaticworkorders. | ||
0060357310 ClosedCycleCooling AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeClosedCycleCoolingWaterSystemAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.10andB.2.1.10).Includesimplementationof programmaticworkorders. | |||
0060357311 Cranes&HoistsAging ManagementProgram Thisassignmentcaptures theLicenseRenewalcommitments associatedwiththeInspectionofOverheadHeavyLoadandLight Load(RelatedtoRefueling)HandlingSystemsAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationSections A.2.1.11andB.2.1.11). | |||
0060357312 CompressedAir MonitoringAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeCompressedAirMonitoringAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.12andB.2.1.12).Whenallofthesubassignmentsdueonor before4/19/2014arecompleted,theduedateforthisassignment shallbechangedto4/19/2034.).Includesimplementationof programmaticworkorders. | |||
0060357313 FireProtectionAging ManagementProgram Thisassignmentcapturesthe LicenseRenewalcommitments associatedwiththeFireProtectionAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.13and B.2.1.13).Includesimplementationofprogrammaticworkorders. | |||
0060357314 FireWaterSystemAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFireWaterSystemAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.14and B.2.1.14).Whenallofthesubassignmentsdueonorbefore 4/19/2014arecompleted,theduedateforthisassignmentshallbe changedto4/19/2034).Includesimplementationofprogrammatic workorders. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 42 of 44 Table4(Continued) | ||
Commitment | Commitment Tracking Number Commitment CommitmentDetails 0060357315 AbovegroundSteel TanksAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeAbovegroundSteelTanksAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.15andB.2.1.15).Includesimplementationofprogrammatic workorders. | ||
0060357316 FuelOilChemistryAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFuelOilChemistryAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.16and B.2.1.16).Whenallofthesubassignmentsdueonorbefore 4/19/2014arecompletedorextended,theduedateforthis assignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders. | |||
0060357317 ReactorVessel SurveillanceAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeReactorVesselSurveillanceAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.17andB.2.1.17).Includesimplementationofprogrammatic workorders. | |||
0060357320 BuriedPipingandTanks AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBuriedPipingandTanksInspectionAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.20andB.2.1.20).Whenallofthesubassignmentsdue onorbefore4/19/2024arecompletedorextended,theduedatefor thisassignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders. | |||
0060357321 ExternalSurfaces MonitoringAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeExternalSurfacesMonitoringAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.21andB.2.1.21).Includesimplementationofprogrammatic workorders. | |||
0060357322 InternalSurfaces InspectionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeInspectionofInternalSurfacesinMiscellaneous PipingandDuctingComponentsAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.22and B.2.1.22)Whenallofthespecificcommitmentactivitiesrequiredto beperformedby4/19/2014arecompleted,thiscommitmentdue dateshouldberesettocoincidewiththeterminationoftheoperating licensein2034.Includesimplementationofprogrammaticwork ordersandvolumetricExamsofSSofSCCs. | |||
0060357323 LubricatingOilAnalysis AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeLubricatingOilAnalysisAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.23andB.2.1.23).Includesimplementationofprogrammatic workorders. | |||
0060357324 ASMESectionXI, SubsectionIWEAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWEAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.24andB.2.1.24). | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 43 of 44 Table4(Continued) | ||
Commitment | Commitment Tracking Number Commitment CommitmentDetails 0060357325 ASMESectionXI, SubsectionIWLAging ManagementProgram Thisassignmentcapturesthe LicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWLAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.25andB.2.1.25)Whenalltheimplementingdocument changesrequiredby4/19/2014havebeenmade,theduedateforthis commitmentshouldbechangedto4/19/2034,theendofthe operatingperiod. | ||
0060357326 ASMESectionXI, SubsectionIWFAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWFAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.26andB.2.1.26)Whenalloftheprocedurechanges requiredby4/19/2014havebeencompleted,resettheduedatefor thiscommitmentto4/19/2034,theendoftheoperatingperiod. | |||
0060357327 10CFRPart50, AppendixJAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththe10CFRPart50,AppendixJAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.27andB.2.1.27). | |||
0060357328 StructuresMonitoring ProgramAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeStructuresMonitoringProgramAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.28andB.2.1.28)Whenalloftheassignmentswithdue datesonorbefore4/19/2014havebeencompleted,thisassignment shouldbechangedto04/19/2034,theendoftheoperatingperiod. | |||
Includesimplementationofprogrammaticworkorders. | |||
0060357329 ProtectiveCoatings AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeProtectiveCoatingMonitoringandMaintenance ProgramAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.2.1.29andB.2.1.29).Includes implementationofprogrammaticworkorders. | |||
0060357330 NonEQCablesand ConnectionsAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeElectricalCablesandConnectionsNotSubjectto 10CFR50.49EnvironmentalQualificationRequirementsAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.30andB.2.1.30)Whenallofthesubassignmentsdue onorbefore4/19/2014arecompletedorextended,theduedatefor thisassignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders. | |||
Commitment Change Summary Report | Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 44 of 44 Table4(Continued) | ||
Commitment | Commitment Tracking Number Commitment CommitmentDetails 0060357331 NonEQInstrument CablesandConnections AMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeElectricalCablesandConnectionsNotSubjectto 10CFR50.49EnvironmentalQualificationRequirementsUsedin InstrumentationCircuitsAgingManagementProgram(ReferenceTMI 1LicenseRenewalApplicationsectionsA.2.1.31andB.2.1.31).When allofthesubassignmentsdueonorbefore4/19/2014arecompleted orextended,theduedateforthisassignmentshouldbechangedto 4/19/2034.Includesimplementationofprogrammaticworkorders. | ||
0060357332 InaccessibleMedium VoltageCableAMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeInaccessibleMediumVoltageCablesNotSubject to10CFR50.49EnvironmentalQualificationRequirementsAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.32andB.2.1.32).Includesimplementationof programmaticworkorders. | |||
0060357332 | 0060357333 MetalEnclosedBus AgingManagement Program Thisassignment capturestheLicenseRenewalcommitments associatedwiththeMetalEnclosedBusAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.33and B.2.1.33).Includesimplementationofprogrammaticworkorders. | ||
0060357333 | 0060357335 NickelAlloyAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeNickelAlloyAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.2.1and B.2.2.1). | ||
0060357335 | 0060357336 PWRVesselInternals AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththePWRVesselInternalsAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationSectionA.5No.36). | ||
0060357336 | IncludesReactorInternalsInspectionPlan. | ||
0060357337 RCPressureBoundary MetalFatigueAMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeMetalFatigueofReactorCoolantPressure BoundaryAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.3.1.1andB.3.1.1). | |||
0060357337 | 0060357338 ConcreteContainment TendonPreStressAging MgmtProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeConcreteContainmentTendonPrestressAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.3.1.2andB.3.1.2). | ||
0060357338 | 0060357339 EQofElectrical ComponentsAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeEnvironmentalQualification(EQ)ofElectrical ComponentsAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.3.1.3andB.3.1.3). | ||
0060357339 | 0060357343 BoralandMetamicTest CouponSurveillance ThisassignmentcapturestheLicenseRenewalcommitment associatedwiththeBoralTestCouponSurveillanceascommittedin RAIresponseletter#59280820229andthe201010CFR54.37b reportidentifyingtheMetamicfuelracksasa"newlyidentifiedSCC" thatrequireagingmanagementreview.}} | ||
0060357343 | |||
Latest revision as of 21:11, 12 December 2024
| ML20121A006 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/30/2020 |
| From: | Orth T Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TMI-20-015 | |
| Download: ML20121A006 (40) | |
Text
ThreeMileIslandNuclearStation,Unit1
441S.P.O.Box480
Middletown,PA17057
NEI 99-04 TMI-20-015 April 30, 2020 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility License No. DPR-50 NRC Docket No. 50-289
Subject:
2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report
References:
- 1. Exelon Letter to NRC, "Certification of Permanent Cessation of Operations for Three Mile Island Nuclear Station," dated June 20, 2017 (ADAMS Accession No. ML17171A151)
- 2. Exelon Letter to NRC, "Certification of Permanent Removal of Fuel from the Reactor Vessel for Three Mile Island Nuclear Station, Unit 1," dated September 26, 2019 (ADAMS Accession No. ML19269E480)
This letter submits the 2018-2019 Biennial 10 CFR 50.59 Summary Report required by 10 CFR 50.59(d)(2) and the 2019 Annual Commitment Revision Summary Report required by SECY-00-0045 (NEI 99-04).
By letter dated June 20, 2017 (Reference 1), Exelon provided formal notification to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of Exelon's determination to permanently cease operations at Three Mile Island Nuclear Station, Unit 1 (TMl-1) on or about September 30, 2019. On September 20, 2019, Exelon permanently ceased power operations at TMI-1. On September 26, 2019, pursuant to 10 CFR 50.82(a)(1)(ii) and 10 CFR 50.4(b)(9), Exelon provided certification to the NRC that all fuel had been permanently removed from the TMI-1 reactor vessel and placed in the spent fuel pool (SFP) (Reference 2). Since the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel were submitted to the NRC pursuant to 10 CFR 50.82(a)(1)(i) and (ii), then pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license no longer authorizes operation of the reactor or placement or retention of fuel in the reactor vessel.
U.S. Nuclear Regulatory Commission Biennial 50.59 and Annual Commitment Change Reports April 30, 2020 Page 2 Based on the possession only status, a review of prior commitments was conducted and determined that several commitments are no longer applicable. The results of the review are attached.
There were no procedure changes, tests or experiments, or facility modifications that required a 50.59 evaluation during the 2018-2019 reporting period.
There are no new regulatory commitments established by this submittal.
Should you have any questions concerning this letter, please contact Mr. Robert Brady at (717) 948-8776.
Respectfully, Trevor L. Orth Decommissioning Plant Manager Three Mile Island Nuclear Station, Unit 1
Attachment:
TMI-1 2019 Commitment Change Summary Report
U.S. Nuclear Regulatory Commission Biennial 50.59 and Annual Commitment Change Reports April 30, 2020 Page 3 cc:
w/ Attachments NRC Regional Administrator - NRC Region I NRC Project Manager, NRR Three Mile Island, Unit 1 NRC Project Manager, NMSS Three Mile Island Unit 1 Director, Bureau of Radiation Protection - PA Department of Environmental Resources
ATTACHMENT Three Mile Island Description of 2019 Commitment Revisions Part A: - One-Time Commitments Part B: - Programmatic Commitments tied to Generic Communications Part C: - Programmatic Commitments tied to Licensing Actions Part D: - Miscellaneous Programmatic Commitments Part E: - Items Classified as no longer being Regulatory Commitments
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 1 of 44 The following provides the update of one-time commitments that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2).
LetterSource:
Various-RefertoTable1foreachitem
ExelonTrackingNumber Various-RefertoTable1foreachitem
NatureofCommitment:
Table1 listonetime opencommitmentsthatarerelatedto inspections,analysisorresponsestoNRCgeneric communications(e.g.Bulletins,andGenericLetters),Thetable containsthecommitmentnumber,thecommitmentsource,a summaryofthecommitment,andbasisforthedeletionofthe commitment.
EachoftheoriginalregulatorycommitmentslistedinTable1 willbeclosed,sincetheactionsarenolongerapplicableasa resultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,ExelonprovidedcertificationthatTMI1 was permanentlyshutdown and defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith10CFR50.82(a)2TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiatedfuelinthe SpentFuelPool.TheregulatorycommitmentsinTable1nolongeraffordtheoriginalintentandprotection.Table1 providesadditionalbasisforeachactionitem.
Table1 OneTimeCommitmentsthatarenolongerapplicablebasedonPermanentShutdownStatus
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0135661904 Updated Commitment ScheduleRVI MRP227A Examinations TMIhaselectedtodelay implementationofthefinalscope ofRVIMRP227Aexaminations fromtheT1R22(2017)refueling outagetotheT1R23(2019) refuelingoutage.
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel.
TheneedtoperformRVIMRP227A examinationsofReactorVesselinternals wererequiredtosupportlongterm operation,howeversinceoperationisno longerpermittedtheneedtocompletethis vesselinspectionisnolongergermane.
Therefore,thiscommitmentisbeingplaced inhistory.
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 2 of 44 Table1(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0151677404 TMI1Resolution ofGenericLetter 200402
(Commitment4)
TheCommitmentdue dateofJune 1,2017,hasbeenextendedbased onthefollowingexcerptfromTMI LettertoUSNRC(TMI17051):TMI isanOption2Aplantwitha calculatedinvesselfiberdebris bypassof19.66grams/fuel assembly,whichexceedstheNRC acceptancelimitof15grams/fuel assembly.Therefore,WCAP17788, "ComprehensiveAnalysisandTest ProgramforGSI191YGeneric SafetyIssue191Closure,"
methodologyisrequiredto properlycloseoutGL200402and GSI191.WCAP17788iscurrently underNRCreviewwithforecasted approvalin2018.Thefinal calculationsforinvesselfiber debris,aswellastheexistingECCS flowsumpperformancefinal calculations,willbeperformed togethertoallowefficient utilizationofengineeringresources.
Thefinalupdated supplementalresponsetosupport closureofGL200402forTMI,Unit 1willbesubmittedwithinnine monthsfollowingNRCapprovalof WCAP17788.
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel.
ThescopedofDesignBasisAccidentshave beenreducedtotheFuelHandling AccidentintheSpentFuelPool.Lossof CoolantAccidentisnolongeracredible eventbasedonthefacttheunitisno longerpermittedtooperate,and subsequentEmergencyCoreCooling Systemresponseisnolongerrequiredto mitigateacredibleevent.Therefore,this commitmentisbeingplacedinhistory.
0242869301 TMI15038,Ltr toNRCdated April6,2015
10CFR50.46 30DayReport
TMI1Thermal Conductivity Degradation (TCD)
Commitment Thefull LBLOCAreanalysiswillbe completedwithin21months followingNRCissuanceofthefinal SafetyEvaluationReport(SER)for BAW10179Revision9,which incorporatesbyreferencethe supplementtoBAW10192PA Revision0.
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel.
ThescopedofDesignBasisAccidentshave beenreducedtotheFuelHandling AccidentintheSpentFuelPool.TheLarge BreakLossofCoolantAccidentisnolonger acredibleeventbasedonthefacttheunit isnolongerpermittedtooperate,and subsequentEmergencyCoreCooling Systemanalysisisnolongerrequiredto mitigateacredibleevent.Therefore,this commitmentisbeingplacedinhistory.
Commitment Change Summary Report Attachment Part A - One-Time Commitments Page 3 of 44
Table1(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0256770802 NRCLtrdated September 15,2015
Approvalof ReliefRequest RR1401and SER InnerDiameter(ID)surface breakingflawsgreaterthan50%
throughwallandsubsurfaceflaws greaterthan50%throughwallshall berepairedorevaluatedpriorto plantrestart.Evaluationsshallbe submittedtotheNRCforreview andapprovalpriortoplantrestart.
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel.
Sincethisisarestartcommitmentandis nolongerapplicablethisitemwillbe placedinhistory.
0256941701 NRCLtrdated September 15,2015
Approvalof ReliefRequest RR1401and SER(RMS)
InnerDiameter(ID)surface breakingflawsgreaterthan50%
throughwallandsubsurfaceflaws greaterthan50%throughwallshall berepairedorevaluatedpriorto plantrestart.Evaluationsshallbe submittedtotheNRCforreview andapprovalpriortoplantrestart.
T1R23wasadefuelingoutageinwhichthe stationcertifiedper50.82thatthestation wascompletelydefueled,andpursuantto 50.82TMIisnolongerpermittedto operate,orstorefuelinthereactorvessel.
Sincethisisarestartcommitmentandis nolongerapplicablethisitemwillbe placedinhistory.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 4 of 44 The following provides the update of programmatic commitments tied to Generic Communication responses that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2).
LetterSource:
Various-Referto Table2 foreachitem
ExelonTrackingNumber Various-RefertoTable2 foreachitem
NatureofCommitment:
Table2 listprogrammatic opencommitmentsthatare relatedtoresponsestoNRCgenericcommunications(e.g.
Bulletins,andGenericLetters),Thetablecontainsthe commitmentnumber,thecommitmentsource,asummaryof thecommitment,andbasisforthedeletionofthe commitment.
EachoftheoriginalregulatorycommitmentslistedinTable1 willbeclosed,sincetheactionsarenolongerapplicableasa resultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certification thatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiatedfuelin theSpentFuelPool.ThecommitmentsinTable1nolongeraffordtheoriginalintentandprotection.Table1 providesadditionalbasisforeachactionitem.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 5 of 44 Table2 GenericCommunicationsCommitmentsthataresubjecttodeletion basedonChangeofPlantStatustoPermanentlyShutdown Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207201 6710962097 GL89013:
REVISED
RESPONSE
Theoriginalcommitmentis describedintheupdatedresponse providedtotheNRCforGL8913 (6710962097dated6/6/1996):
TheControlBuildingChillersarenot NuclearSafetyRelatedbydesign, howeverweacknowledgethe importantfunctiontheyprovide; thuswefeelitisprudentto monitortheirperformance.The buildingcooledbythissystemis continuallyoccupied.Assuch, degradedperformanceofachiller wouldbedetectedthrough increasedtemperatureinthe ControlBuilding.Itshouldbenoted thatGL8913allowsanalternative actionoffrequentregular maintenanceinlieuoftestingfor degradedperformanceoftheheat exchanger.Bothregular maintenance(bimonthlyPMand annualoverhaul)andperformance trendingwillbedoneforthe ControlBuildingChillers.
BasedonPDTStheControlBuilding VentilationSystemwillnolongerbe classifiedasSafetyRelated.
0112207203 59280320148 SIXTYDAY RESPONSETO NRCBULLETIN 200301 Theplantwillimprovethe containmentcloseoutinspection proceduretospecificallyaddress dirt,dust,andsmalldebris accumulation.
ContainmentIntegrityisnolonger required,andContainmentCloseoutwill nolongerberequired.Thereareno safetyrelatedcomponentshousedinthe RB.
0112207227 6710972253 GL8910CLOSE OUTLETTER GL8910closeoutletter671097 2253committedto:
1.TMI1maintenanceprocedures fortheMOVswillberevisedto ensurethatanyworkonvalve internalsisevaluatedforpotential effectsonstemthrust requirements.Thiswillensurethat postmaintenancedynamictesting isconsideredwhenappropriate.
Thesechangeswillbecompleted duringthenextoperatingcycle, TMI1OperatingCycle12.
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI.
TheMOVprogramisnolongerrequired andwillbeabandoned.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 6 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207228 19209820242 RESPONSETO NRC'SSAFETY EVALUATION JOINTOWNER'S GROUP PROGRAMON PERIODIC VERIFICATIONOF MOVS InresponsetoNRCGenericLetter 9605,ThreeMileIslandUnit1 committedtoimplementtheJoint OwnersGroup(JOG)Programfor MotorOperatedValvePeriodic VerificationinaccordancewithMPR 1807(Interim)andMPR2524A Rev.1(Final).Note:NotallGL9605 MOVProgramValvesarewithinthe scopeoftheFinalJOGProgram.
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI.
TheJOGMOVprogramisnolonger requiredandwillbeabandoned.
0112207230 GL96005:RAI REGARDING GPUN'S RESPONSETOGL 96005FOR TMINSTMI1 PERIODIC VERIFICATIONOF DESIGNBASIS CAPABILITYOF SAFETYRELATED MOTOR OPERATED VALVES (M97111)
Inresponsetoitem3oftheNRC RequestforAdditionalInformation dated11/5/1998,thelicensee committedtoaddresspotentialage relateddegradationbyperforming theperiodicstaticdiagnosticor preventivemaintenanceofMOVas requiredbytheJOGprogram.
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI.
TheJOGMOVprogramisnolonger requiredandwillbeabandoned.
0112207232 19209820605 GL9804,GPUN
RESPONSE
GPUNletter(19209820605) committedtoevaluatetheguidance providedinEPRITR109937, "GuidelineonNuclearSafetyRelated Coatings,"datedApril1998and implementanychangesby 12/31/99.
Containmentisnolongerasafetyrelated componentandmaintainingSafety Relatedcoatingsprogramisnolonger required.
0112207235 GQL1202 IEB7901A:ASCO SOLENOIDVALVE SERVICELIFE GPUNCOMMITTEDTOTHENRCIN RESPONSETOTHEORIGINAL BULLETINTHATMAINTENANCE PROCEDURE1401P14APPROVED TOIMPROVEFUTURE MAINTENANCE.MP1410P14 PROVIDEDUPGRADEDDETAILED OVERHAULANDALIGNMENT INSTRUCTIONSANDREQUIRED MOREDETAILEDDOCUMENTATION OFBOTH"ASFOUND"AND"AS LEFT"PUMPCONDITIONS.
BasedonPermanentShutdownStatusat TMI,andimplementationofthePDTS, therearenoactivesafetysystematTMI.
TheneedtomaintainASCOsolenoid valvecontrolsarenolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 7 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207237 IEB7915:DEEP DRAFTPUMP DEFICIENCIES GPUNCOMMITTEDTOTHENRCIN RESPONSETOTHEORIGINALBULLETIN THATMAINTENANCEPROCEDURE 1401P14APPROVEDTOIMPROVE FUTUREMAINTENANCE.MP1410P14 PROVIDEDUPGRADEDDETAILED OVERHAULANDALIGNMENT INSTRUCTIONSANDREQUIREDMORE DETAILEDDOCUMENTATIONOFBOTH "ASFOUND"AND"ASLEFT"PUMP CONDITIONS.
BasedonPermanentShutdown StatusatTMI,andimplementation ofthePDTS,therearenoactive safetysystematTMI.Thesesystems arenolongerrequiredtomeet ASMESectionXIISTrequirements.
01122072 3800 IEB8012:DECAY HEATREMOVAL SYSTEM OPERABILITY GPUNCOMMITTEDTOTHENRCTO:1)
MODIFICATIONOFOP11044TO PROVIDEADDITIONAL ADMINISTRATIVECONTROLOVERTHE POSITIONOFDHV6AANDDHV6B (REACTORBUILDINGSUMPISOLATION VALVES).DURINGCOLDSHUTDOWN ANDREFUELINGSHUTDOWN CONDITIONS,THEVALVES(EXCEPT DURINGTESTING)WILLBETAGGED CLOSEDWITHTHEIRBREAKERSOPEN TOPREVENTINADVERTENTOPENING ANDPOTENTIALDRAININGOFTHE BORATEDWATERSTORAGETANK (BWST)TOTHEREACTORBUILDING SUMP.
Thiswillnolongerberequiredsince DecayHeatandtheBWSTareno longerTSrequiredfunctionsto protect.Therewillnolongerbefuel storedintheRPVtoprotect.
0112207242 IEB7925:
FAILUREOF WESTINGHOUSE BFDRELAYSIN SAFETYRELATED SYSTEMS GPUNCOMMITTEDTOTHENRC WITHINTLL005DATED1/10/80THAT:
(1)TMI1USEDWESTINGHOUSETYPE BFD,STYLE5072A49,COILSTYLE 1271C50G01RELAYSASCONTROL RELAYSFORTHE1AAND1B EMERGENCYDIESELGENERATORS.
(2)THEDIESELGENERATORANNUAL INSPECTIONPROCEDUREWASREVISED TOINCLUDEAFUNCTIONALTESTON EACHRELAY.
(3)THEDOCUMENTATIONOFALL RELAYFAILURESFOUNDDURINGTHE INITIALORFOLLOWUPPROGRAM TESTINGINACCORDANCEWITHTHE REQUIREMENTSSETFORTHINTHE BULLETIN.
BasedonPermanentShutdown StatusatTMI,andimplementation ofthePDTS,therearenoactive safetysystematTMI.The EmergencyDieselGeneratorsareno longersafetyrelatedandthis commitmentisnolongerapplicable.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 8 of 44 Table2(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207244 GL8121:
NATURAL CIRCULATION COOLDOWN NATURALCIRCULATIONCOOLDOWN PROCEDURES&TRAINING.
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
0112207247 5211822149 IEB7927:LOSS OFNONCLASS 1E INSTRUMENTATI ONAND CONTROL TOTALANDPARTIALLOSSOF ICS/NNIPOWEREMERGENCY PROCEDURES.
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
0112207249 5211832040 GL8114:EFW SEISMIC QUALIFICATION ATTACHMENTS ITEM4 COV10A/BLOCKEDOPEN REQUIREMENT.
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
0112207250 5211832055 GL8114:EFW SEISMIC QUALIFICATION ATTACHMENTS ITEM4 EFWSEISMICQUALIFICATION Attachment(s):GPUNCOMMITTED TOTHENRCTOLOCKOPENTHE RECIRCULATIONLINESONTHE EMERGENCYFEEDWATER(EFW)
PUMPS.
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
0112207252 5211832133:
EFWSEISMIC QUALIFICATION
EFWSEISMICQUALIFICATION CO V27A/B Attachment(s):GPUNCOMMITTED TOTHENRCTOLOCKCLOSETHE VALVESCOV27AANDCOV27B DURINGOPERATION.
EFWisnolongerrequired.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
0112207254 5211832330 GL8328ITEM 3.1.1:POSTTRIP REVIEW ATWSREVIEWITEMSFROM GL83 28.
Thisevent requiresthereactortobein operations.Withcertificationrequired by50.82submitted,TMIisnolonger permittedtooperateorstorefuelinthe reactorvessel.Theprotectionafforded bythiscommitmentisnolonger required.
0112207256 5211833222:
NATURAL CIRCULATION COOLDOWN (GENERICLETTER 8121)
NATURALCIRCULATIONCOOLDOWN PROCEDURE.
NaturalCirculationcooldownrequires theplanttobeinoperations.With certificationrequiredby50.82 submitted,TMIisnolongerpermittedto operateorstorefuelinthereactor vessel.Theprotectionaffordedbythis commitmentisnolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 9 of 44 Table2(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207257 5211832330 GL8328ITEM 2.1:EQUIPMENT CLASSIFICATION ANDVENDOR INTERFACE(RTS)
ITEM2.1REQUIREDTHE CONFIRMATIONTHATALL COMPONENTSWHOSEFUNCTIONING WASREQUIREDTOTRIPTHE REACTORWEREIDENTIFIEDAS SAFETYRELATEDONALL DOCUMENTATIONANDIN INFORMATIONHANDLINGSYSTEMS THATWEREUSEDTOCONTROLALL ACTIVITIESPERFORMEDONTHAT SAFETYRELATEDEQUIPMENT.THE NRC.
SER5211873170ACCEPTEDTHE GPUNRESPONSEANDCLOSEDTHE ITEM.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired.
ReactorProtectionisnolongerasafety relatedsystem.
0112207258 5211832330 GL8228SEC 4.5.1:REACTOR TRIPSYSTEM ONLINE FUNCTIONAL TESTING GPUNCOMMITTEDTOTHENRCTHAT SP13134.1PERFORMEDONLINE TESTINGOFTHEREACTORTRIP SYSTEM(RTS)ONAMONTHLYBASIS:
SP13134.4INCORPORATEDTHE CRDCSSCRTRIPTESTGUIDELINES PROVIDEDBYBABCOCK&WILCOX:SP 13034.1WASREVISEDTO INCORPORATETESTINGOFTRIPPING THECRDMPOWERFEEDCIRCUIT BREAKERSVIATHEIRSHUNTTRIP DEVICES.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired.
0112207259 5211832330 GL8328ITEM 1.2:POSTTRIP REVIEW(DATA AND INFORMATION CAPABILITY)
PLANTCOMPUTERSYSTEMPOSTTRIP CHECKLISTGPUNCOMMITTEDTO THENRCTOINCORPORATEA CHECKLISTOFPLANTCOMPUTER SYSTEMPARAMETERSFORREACTOR TRIPINTOTMI1PROCEDURESTO ENSUREASSEMBLYOFCOMPLETE DATAPACKAGE.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired.
0112207260 5211832330 GL8228ITEM 1.2:POSTTRIP REVIEW(DATA AND INFORMATION CAPABILITY)
GPUNCOMMITTEDTOTHENRCTO INCORPORATEMETHODSAND CRITERIAFORCOMPARINGTHE EVENTINFORMATIONWITHKNOWN OREXPECTEDBEHAVIOR.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 10 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207261 5211832330 GL8328ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION ANDPROCEDURE)
ROLES
POSTTRIPREVIEW& ANALYSIS ROLE&RESPONSIBILITY.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired.
0112207262 5211832330 GL8228ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION ANDPROCEDURE)
RESTART
RESTARTDECISIONPREREQUISITE ACTIONS.
Sincenolongerpermittedtooperateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired.
0112207263 5211832330 GL8228ITEM 1.1:POSTTRIP REVIEW (PROGRAM DESCRIPTION AND PROCEDURES)
INDEPENDENTREVIEWINITIATING CRITERIA.
Sincenolongerpermittedto operateor placefuelinthereactorvessel,Reactor Protection/Tripisnolongerpossibleand posttripreviewisnotrequired.
0112207265 5211822229 IEB7921:
TEMPERATURE EFFECTSON LEVEL MEASUREMENTS POTENTIALOFERRONEOUSLEVEL INDICATIONS Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISE PROCEDURES12026A,12026B, 12026CAND120324TOREMIND THEOPERATORSOFTHE POTENTIALOF ERRONEOUSSTEAMGENERATOR ANDPRESSURIZERLEVEL INDICATIONS.
ThetemperatureeffectontheSteam GeneratorsorPressurizerarerelatedto NormalOperatingPressureand Temperaturesconditionswithrespectto coldconditions.Bothoftheinstruments areintheReactorCoolantSystemwhichis nolongersafetyrelated.Theconditions arenolongerplausiblesinceTMIisno longerpermittedtooperateorplacefuel inthereactorvessel.
0112207266 5211832330 GL8328ITEM 4.5.1:REACTOR TRIPSYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING)
REACTORTRIPSYSTEMTRIP FEATURETESTING.
Sincenolongerpermittedtooperate or placefuelinthereactorvessel,Reactor Protection/Tripisnolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 11 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207271 5211842286 IEB8403:
POTENTIALFOR REFUELING CAVITYWATER SEALFAILURE REFUELINGCAVITYWATERSEAL FAILURE Attachment(s):GPUNCOMMITTEDIN THERESPONSE5211842286THAT THEPOTENTIALFORAND CONSEQUENCESOFAREFUELING CAVITYSEALGASKETFAILUREHAS BEENREVIEWEDANDSUBMITTEDA
SUMMARY
REPORTTOTHENRC.
SinceFuelisnolongerpermittedtobe placedinthereactorvessel,thisactionis nolongerrequiredtoprotectthedecay heatremovalorprotectionoffuelinthe reactorpressurevessel.
0112207274 5211842072 NUREG0612:
CONTROLOF HEAVYLOADS HEAVYLOADS INCORE INSTRUMENTATION Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISEPROCEDURE 15081ONINCORE INSTRUMENTATIONPERITEM3OF THEGPUCONTROLOFHEAVYLOADS IMPLEMENTATIONSCHEDULESO THATTHEPROCEDURESATISFIEDTHE REQUIREMENTSOF5.1.1(2)OF NUREG0612.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding.
0112207276 5211842156 GL8121:
GENERICLETTER 8121NATURAL CIRCULATION COOLDOWN NATURALCIRCULATIONCOOLDOWN PROCEDURECHANGE.
Nolongerpermittedtooperatereactor orplacefuelinthereactorpressure vessel,thereforethismitigationstrategy isnolongerrequired.
0112207278 5211852182 IEB8202:
DEGRADATIONOF THREADED FASTENERSINRC PRESSURE BOUNDARY THREADEDFASTENERDEGRADATION INRCSBOUNDARY.
TheRCSpressureboundaryisnolonger safetyrelated,per50.82(a)2TMIisno longerpermittedtooperateorplacefuel inreactorvessel.
0112207279 5211842147 NUREG0612:
CONTROLOF HEAVYLOADS
HEAVYLOADSPROCEDURE SLING SELECTION/APPROVAL RelatedtoRPVSealPlate.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding.
0112207281 5211842200 NUREG0612:
CONTROLOF HEAVYLOADS
POLARCRANEOPPROCCRANE INSPECTIONREQUIREMENT Attachment(s):GPUNCOMMITTED TOTHENRCTOREVISEPROCEDURE RP15071POLARCRANEOPERATION TOINCLUDEAREQUIREMENTFOR INSPECTIONPRIORTOEACHLIFT USINGSLINGSOROTHERAPPROVED DEVICES.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 12 of 44 Table2(Continued)
Commitment TrackingNumber CommitmentSource Document CommitmentDetails BasisforDeletion 011220728300 5211842242 GL8415:PROPOSED STAFFACTIONSTO IMPROVE&MAINTAIN DGRELIABILITY DIESELGENERATORRELIABILITY IMPROVEMENTS.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforewiththe implementationofthePDTSthe EmergencyDieselGeneratorsare nolongersafetyrelated.
011220728500 5211842179 NUREG0737II.B.2:TMI ACTIONPLANT SECTIONII.B.2DH PLANTSHIELDING OPTION BORONPRECIPITATIONSHIELDING GPUNCOMMITTEDTOTHENRCTO LOCKOPENTHEVALVEDHV12B ANDTOINSTALLAREACHRODFOR DHV64SOTHATSUFFICIENT FLOWISAVAILABLEFORCORE COOLINGANDBORON PRECIPITATIONPREVENTION UNDERWORSTCASESINGLE FAILURESWITHOUTREQUIRING MANUALACTIONINAN INACCESSIBLEHIGHRADIATION AREA.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, PostLOCAconditionsareno longerapplicablethereforethe protectionaffordedbythis commitmentisnolonger required.
011220728600 5211842153:
CONTROLROOM DESIGNREVIEW SUPPLEMENTAL REPORT(NUREG0737 I.D.1)
ATPCOMMITMENTSFROMATOG COMMITTEE GPUNCOMMITTEDTOTHENRC THEFOLLOWINGACTIONS:
(1)REVISEPROCEDURE12107STEP 10TOREDUCETHERUNOUTLIMIT OF1800GPMTOAVALUEOF1750 GPM.(HistoricalseeUPDATE 8/16/07below)
(2)REVISEPROCEDURE12107 SECTION2.0STEP10THATTHE PROCEDURALLIMITBESTATEDIN TERMSOFTHENETPUMPFLOWAS INDICATEDONTHECONTROL ROOMINDICATOR.(Ongoing)
(3)REVISEPROCEDURE121010 THATTHEMAKEUPPUMP PROCEDURALLIMITSBESTATEDIN TERMSOFNETINJECTION THROUGHTTHEVIG'S.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, andtherearenotransients/ATP requiredfortheprotectionofthe spentfuelpool.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 13 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112207288
5211832149 NUREG1019 SUPP1:STEAM GENERATORTUBE REPAIRAND RETURNTO OPERATION SGSHELLTOTUBEDIFFERENTIAL TEMPERATURELIMIT.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforetheSteamGenerators arenolongersafetyrelated,andthe protectionsprovidedbythis commitmentisnolongerrequired.
0112207289 5211832149 NUREG1019 SUPP1:STEAM GENERATORTUBE REPAIRAND RETURNTO OPERATION ISOLATEDSTEAMGENERATOR PRESSURECONTROL.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforetheSteamGenerators arenolongersafetyrelated,andthe protectionsprovidedbythis commitmentisnolongerrequired.
0112207291 5211843249:
SERACCEPTANCE OFRESPONSETO GL8328ATWS ITEM4.3 REACTORTRIP; 5211843249:
SYSTEM RELIABILITY CRDMCIRCUITBREAKERTRIPPING MECHANISMTESTING.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeAnticipatedTransient withoutSCRAMprotectionisnolonger required.
0112207294 5211842013 NUREG0612:
CONTROLOF HEAVYLOADS PROCEDURESFORHEAVYLOADSIN REACTORBUILDING.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding 0112207295 5211842013 NUREG0612:
CONTROLOF HEAVYLOADS RVHEADREMOVAL&INSTALLATION LIFTHEIGHTRESTRICTION.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding.
0112207296 5211842013 NUREG0612:
CONTROLOF HEAVYLOADS RBPOLARCRANESPECIALLIFTING DEVICES.
Sincefuelisnolongerpermittedtobe placedinthereactorpressurevessel, heavyloadsprotectionisnolonger requiredintheReactorBuilding.
0112235501 5211862034 IEB8501:STEAM BINDINGOF AUXILIARY FEEDWATER PUMP EFWPUMPSTEAMBINDINGPUMP RESTORATION.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeemergencyfeedwateris nolongerasafetyrelatedsystem.
0112235502 5211862034 IEB8501:STEAM BINDINGOF AUXILIARY FEEDWATER PUMP EFWPUMPSTEAMBINDING TEMPERATURECHECKS.
Once thecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforeemergencyfeedwateris nolongerasafetyrelatedsystem.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 14 of 44 Table2(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235504 5211842200 NUREG0612:
CONTROLOF HEAVYLOADS HEAD&INTERNALSHANDLINGFIXTURE WELDISIPROG.
Sincefuelisnolonger permitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding.
0112235506 5211852092 Source DocumentTitle:
GL8328ITEM 4.2.1:PERIODIC MAINTENANCE PROGRAMFOR REACTORTRIP BREAKERS REACTORTRIPBREAKERMAINTENANCE.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore AnticipatedTransientwithout SCRAMprotectionisnolonger required.
0112235509 5211842013 NUREG0612:
CONTROLOF HEAVYLOADS HEAVYLOADSPROCEDURE HEAD&
INTERNALSHANDLING.
Sincefuelisnolongerpermitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding.
0112235518 5211862186 IEB8603:
POTENTIAL FAILUREOF MULTIPLEECCS PUMPSDUETO SINGLEFAILURE GPUNCOMMITTEDTOTHENRCTHATTMI1 DOESHAVEASINGLERECIRCULATIONLINE FORTHEHIGHPRESSUREINJECTION(HPI)
PUMPSWHICHAREISOLATED AUTOMATICALLYONEMERGENCY SAFEGUARDS(ES)ACTUATION.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore anyrequirementrelatedtoECCS performancecriteriaarenolonger required.
0112235522 5211862021 whichreferences 521183176 IEB8303:
CHECKVALVE FAILUREIN DIESEL GENERATOR COOLING SYSTEM CHECKVALVEFAILUREDIESELGENERATOR COOLINGSYSTEM.
EDGnolongersafetyrelated 0112235531 5211842013:
RESPONSETO NUREG0612 CONTROLOF HEAVYLOADS POLARCRANESAFELOADPATHFORRB REGIOND2.
Sincefuelisnolongerpermitted tobeplacedinthereactor pressurevessel,heavyloads protectionisnolongerrequiredin theReactorBuilding.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 15 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235535 C311882087 IEB8804:
POTENTIAL SAFETYRELATED PUMPLOSS IEB8804ITEM3:POTENTIALSAFETY RELATEDPUMPLOSS GPUNCOMMITTEDINTERNALLYTHAT INRESPONSETOIEB8804ITEM3AN INDEPTHSTUDYTOPREDICTPUMP DAMAGEANDVERIFYPUMP MINIMUMFLOWREQUIREMENTSWAS NOTNECESSARYWHENCONSIDERING THATTHECURRENTINSERVICETEST (IST)PROGRAMWASINPLACETO DETECTSUCHDAMAGE.
Once thecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,therearenolonger anysafetyrelatedpumpsandthe protectionprovidedbythis commitmentisnolongerrequired.
0112235537 C311882138 IEB8202:
DEGRADATIONOF THREADED FASTENERSIN THERCPBOF PWRPLANTS EXAMINATIONOFTHREADED FASTENERSPRIORTOREUSE GPUNCOMMITTEDTOTHENRCTO PERFORMVISUALEXAMINATIONSON ALLREACTORCOOLANTPRESSURE BOUNDARY(RCPB)FASTENERSPRIOR TOREUSEANDTOPERFORM MAGNETICPARTICLE(MT)OR PENETRANTEXAMINATIONS(PT)ALSO UNLESSTHERCPBFASTENERHASONLY EXPERIENCEDSHORTTERMSERVICE LESSTHANOREQUALTO3MONTHS SINCEITSLASTMTORPTANDTHE FASTENERWASFOUNDDRYAND WITHOUTEVIDENCEOFBORICACID CRYSTALSORRUST.
TheRCSpressureboundaryisno longersafetyrelated,per50.82(a)2 TMIisnolongerpermittedtooperate orplacefuelinreactorvessel.
0112235534 C311882087 IEB8804:
POTENTIAL SAFETYRELATED PUMPLOSS ADEQUATEMINIMUMPUMP RECIRCULATIONFLOW GPUNCOMMITTEDTOTHENRCTHAT ALLPUMPSINTMI1SAFETYRELATED SYSTEMSEVALUATEDWITHINIEB88 04RESPONSEWHICHHADTHE MINIMUMRECIRCULATION REQUIREMENTHADADEQUATE MINIMUMRECIRCULATIONFLOWIN ACCORDANCEWITHTHEPUMP SPECIFICATIONS.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,therearenolonger anysafetyrelatedpumpsandthe protectionprovidedbythis commitmentisnolongerrequired.
0112235538 C311882165 GL8817:
GENERICLETTER 8817 EXPEDITIOUS ACTION2 GL8817:GENERICLETTER8817 EXPEDITIOUSACTION2.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,thereforeDecay Heatinthereactorvesselisnolonger required.Therefore,anyprotection providedbythiscommitmentisno longerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 16 of 44 Table2(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235539 C311882165 GL8817:
GENERICLETTER 8817 EXPEDITIOUS ACTION3AND PROGRAMMED ENHANCEMENT; GL8817:1(B)
CONTINUOUSCOREEXIT TEMPERATUREMONITORING.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired.
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired.
0112235540 C311882165 GL8817:
GENERICLETTER 8817 EXPEDITIOUS ACTION4AND PROGRAMMED ENHANCEMENT; GL8817:1(A)
GL8817:GENERICLETTER8817 EXPEDITIOUSACTION4AND PROGRAMMEDENHANCEMENT;GL 8817:1(A).
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired.
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired.
0112235541 C311882165 GL8817:
GENERICLETTER 8817 EXPEDITIOUS ACTION5 PROCEDURALOPSGUIDANCE REDUCEDINVENTORY PERTURBATIONSTOTHERCS Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired.
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired.
0112235542 C311892015 GL8817:
GENERICLETTER 8817 EXPEDITIOUS ACTION6AND PROGRAMMED ENHANCE RCSINVENTORYADDITIONOTHER THANDHRSYSTEMPUMPS.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermitted tooperateorplacefuelinthereactor vessel,thereforeDecayHeatinthe reactorvesselisnolongerrequired.
Therefore,anyprotectionprovidedby thiscommitmentisnolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 17 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235543 C311892015 GL8817:
GENERICLETTER 8817 PROGRAMMED ENHANCEMENT2 (PROCEDURES)
BASEDON;GL88 17:ANALYSIS GPUNCOMMITTEDTOTHENRC TO MAKEPROCEDURALCHANGESIN ADDITIONTOTHOSECOMMITTEDTO WITHIN5211872188AND521188 2165BYJULY1989TOIMPROVE OPERATORGUIDANCEINTHE FOLLOWINGFOURAREAS:
1)THETIMEBEFORECOREBOILINGAND COREUNCOVERYFOLLOWINGALOSSOF DECAYHEATREMOVAL(DHR).
2)PROVIDINGSUFFICIENTREACTOR COOLANTSYSTEM(RCS)VENTAREATO PERMITADEQUATEMAKEUPFLOW.
3)CONTAINMENTCLOSURE REQUIREMENTS.
4)RESTARTOFDHRFROMSATURATED CONDITIONS.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore DecayHeatinthereactorvesselis nolongerrequired.Therefore,any protectionprovidedbythis commitmentisnolongerrequired.
0112235544 GENERICLETTER 8817 PROGRAMMED ENHANCEMENT 1(D)
(INSTRUMENTATI ON)
GPUNCOMMITTEDTOTHENRC THE FOLLOWINGVISUALORAUDIBLE INDICATORSWEREAVAILABLEINTHE CONTROLROOMTOASSISTTHE OPERATORINTHEIDENTIFICATIONOF ABNORMALCONDITIONSWHICHAFFECT HEATREMOVAL.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,therefore DecayHeatinthereactorvesselis nolongerrequired.Therefore,any protectionprovidedbythis commitmentisnolongerrequired.
0112235546 GL8904:
GUIDANCEON DEVELOPING ACCEPTABLEIST PROGRAMS GPUNISCOMMITTEDTOTHEGUIDANCE INGL8904"GUIDANCEONDEVELOPING ACCEPTABLEISTPROGRAMS"BYVIRTUE OFTHEFACTTHATTHISGLWASISSUED TOLICENSEES.THEGLCONTAINS INTERPRETATIONSANDADDITIONAL GUIDANCETHATMAYDIFFERFROMTMI 1PROGRAMSANDPROCEDURES.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforewith theimplementationofthePDTS therearenolongeranysafety relatedpumpsorvalvesandtheIST programisnolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 18 of 44 Table2(Continued)
Commitment Tracking Number CommitmentSource Document CommitmentDetails BasisforDeletion 0112235547 C311892032 IEB8804:POTENTIAL SAFETYRELATED PUMPLOSS GPUNCOMMITTEDTOTHENRC:
1)THEDHRPUMPMINIMUM RECIRCULATIONCAPACITYWAS ADEQUATETOENSURETHATPUMP OPERABILITYWASNOTAFFECTEDBY MINIMUMRECIRCULATIONOPERATION.
2)ADDITIONALVIBRATIONREADINGS WEREINCORPORATEDINTOTHE SURVEILLANCETESTPROCEDURESOPTM 212201/202/203/204/205/206 13035.2AND13003A/B.
3)THEREVISIONBYJUNE1989OF PROCEDURESTOPROVIDEADDITIONAL GUIDANCETHATWILLAPPLYWHEN HIGHERVIBRATIONLEVELSARE ENCOUNTEREDATBLADEPASSING FREQUENCYWHILEOPERATINGOR TESTINGTHEDHRPUMPSATMINIMUM RECIRCULATIONFLOWRATE.
4)THECOMPLETIONOFSTEPSTO MINIMIZETHETIMETHATDHRPUMPS AREOPERATEDATMINIMUMFLOW DURINGTESTING.
5)THENOTIFICATIONOFTHENRCBY LETTEROFANYADDITIONALACTIONS THATMAYBEREQUIREDINTHEFUTURE.
ALSO,TOPROVIDETHEJUSTIFICATION FORCONTINUEDOPERATIONAS REQUESTEDBYIEB8804.
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereforewith theimplementationofPDTS DecayHeatisnotsafety related,andtheprotection providedbythiscommitmentis nolongerrequired.
0112235548 5450890103 GL8331:SEOF ABNORMAL TRANSIENT OPERATING GUIDELINES NRCCOMMITTEDGPUNTOUSESPECIFIC GENERICGUIDANCEASPROVIDEDBYTHE B&WOWNERSGROUPWHENAVAILABLE.
DEVIATIONSFROMTHATGUIDANCETOBE ADDRESSEDBYEACHLICENSEE.
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereareno longeranydesignbasisthreats thatrequireanyabnormal transientguidelines.
0112235550 C311892078 GL8908:GL8908 EROSION/CORROSION INDUCEDPIPEWALL THINNING GPUNCOMMITTEDTOTHENRCTO MODIFYTHEEXISTING EROSION/CORROSIONMONITORING PROGRAMATTMI1TOPROVIDEALONG TERMCORPORATELEVELAPPROACH.THIS WILLBECOMPLETEINTIMETOSUPPORT 09ROUTAGESCHEDULEDINSPECTIONS.
Oncethecertificationof 50.82(a)2werecompleted,TMI isnolongerpermittedto operateorplacefuelinthe reactorvessel,thereforethere isnoconditionthatinthespent fuelpoolthatwouldcreatea erosion/corrosionorpipewall thinningevent.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 19 of 44 Table2(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112235551 C311892068:
10CFR50 APPENDIXRGL 8112RESPONSE TONRC QUESTIONS GPUNCOMMITTEDTOTHENRCTOINCLUDE ANOTEINEP120237,ITEM13.K,TOTHE OPERATORTHATAFAILEDOPENRCV1MAY BEINDICATEDBYRAPIDRCS DEPRESSURIZATION,INORDERTOENSURE CORRECTIONOFSPURIOUSOPENINGOFRC V1DUETOAFIRE.
GPUNALSOCOMMITTEDTOEXERCISING 480VMOLDEDCASEBREAKERSIN ACCORDANCEWITHPROCEDURES;TO PROVIDEGUIDANCEIN1420Y13TO MAINTENANCEPERSONNELTHATWHEN REPLACINGFUSES,THEYARETOBE REPLACEDWITHTHESAMESIZEANDTYPEAS THEFUSEREMOVED,TOREFERTO DRAWINGS,VENDORMANUALS,OROTHER REFERENCESIFTHESIZEANDTYPECANNOT BEDETERMINED,ORREQUESTPLANT ENGINEERINGTOPROVIDEAPPROPRIATE RESOLUTION;TOUTILIZETHEGPUN OPERATIONALQAPLANFORCOMMERCIAL GRADEDEDICATIONOFFUSESFORSAFETY RELATEDAPPLICATIONS.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, AppendixRfireprotectionisno longerrequired,andinthe decommissioningstatefire protectionisboundedby 50.48(f).
0112235552 C311902001 IEB8903:
POTENTIALLOSS OFREQUIRED SHUTDOWN MARGINDURING REFUELINGOPS GPUNCOMMITTEDTOTHENRCTOREVISE PROCEDURESGOVERNINGFUELLOADINGTO REFLECTTHEFACTTHATFUELASSEMBLIES WILLNORMALLYONLYBELOADEDINTO THEIRFINALCORELOCATIONS;HOWEVER,IF AFUELASSEMBLYISTOBEPLACEDINTOANY OTHERCORELOCATIONDUETOFUEL HANDLINGCONSTRAINTS,ITSHALLONLYBE PLACEDINTOCORELOCATIONSTHATWOULD CONTAINANASSEMBLYOFEQUALOR HIGHERREACTIVITYASDETERMINEDBYTHE APPROVEDCORERELOADDESIGN.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 20 of 44 Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235553 C311893246 GL8112:POST FIRESAFE SHUTDOWN METHODOLOGY NRCTECHNICAL EVALUATION;GL 8112:REPORT GL8112:POSTFIRESAFESHUTDOWN METHODOLOGYNRC.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,AppendixR fireprotectionisnolonger required,andinthe decommissioningstatefire protectionisboundedby50.48(f).
0112235555 C311902031 GL8919:
REQUESTFOR ACTIONRELATED TORESOLUTION OFUSIA47 GPUNCOMMITTEDTOTHENRCTHAT TMI1OTSGOVERFILLPROTECTIONIS ADEQUATEBECAUSEOFTHEOTSGHIGH LEVELALARMRESPONSEPROCEDURES*
AVAILABLETOTHEOPERATORS(MAIN ANUNCIATORPANELH,H11(REV12))
ANDBECAUSEOFTHEFOLLOWING SURVEILLANCESVERIFYTHEOPERABILITY ANDCALIBRATIONOFTHEOTSGHIGH LEVELMFWISOLATIONFEATUREOFTHE HSPS.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe SteamGeneratorsarenolonger safetyrelated,andtheprotections providedbythiscommitmentisno longerrequired.
0112235558 C311912015 IEB8811:
PRESSURIZER SURGELINE THERMAL STRATIFICATION DECEMBER20, 1988 GPUNCOMMITTEDTO THENRCTO REDUCEFUTURESURGELINETHERMAL CYCLESBYADOPTINGTHEB&W RECOMMENDEDLOWER(APPENDIXG)
RCSSUBCOOLINGMARGINSINPLANT OPERATINGANDPROCEDURES PURSUANTTOITSTOPICALREPORTNO BAW2127(FIGURE8)AND"WHENTHE PREFERREDLOWERRCSSUBCOOLING MARGINISNOTMAINTAINED, (CONDUCT)ANEVALUATIONOFACTUAL PLANTPERFORMANCE,INA PROGRAMMATICMANNER,TO DETERMINETHEIMPACT(S)ONFATIGUE LIFE."
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe protectionprovidedbythis commitmentisnolongerrequired.
0112235559 C311912015 IEB8811:
PRESSURIZER SURGELINE THERMAL STRATIFICATION DECEMBER20, 1988 GPUNCOMMITTEDTOTHENRCTO ATAKESTEPSTOREDUCEFUTURE (PRESSURIZER)SURGELINETHERMAL CYCLES.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuel inthereactorvessel,thereforethe protectionprovidedbythis commitmentisnolongerrequired.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 21 of 44
Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235561 C311922003:
STAFFREVIEWOF GL9006 GPUNCOMMITTEDTOTHENRCTHAT:
1.STROKETESTINGISPERFORMEDAT WYLELABORATORIESACERTIFIEDOFFSITE FACILITYINACCORDANCEWITH SPECIFICATIONSP110112087.TESTINGIS PERFORMEDATNORMALSTEAMINLET CONDITIONSANDVERIFIESBOTH SETPOINTS;2450PSIGFORPOWER OPERATIONAND5592PSIGFORLTOP, CONDITIONSTHATAREREPRESENTATIVE OFTHEPORVOPERATINGENVIRONMENT.
2.14012.1A,"REMOVE/INSTALLRCRV2 (PORV)"AND13026.16"SETPOINTAND REMOVEPOSITIONCHECKOFTHEPORV (RCRV2)","PROVIDESVERIFICATIONOF PROPERREINSTALLATIONOFTHEPORV ANDCONTROLS.
3.ALTHOUGHBENCHTESTINGISTHE PREFERREDMETHODOFPORVTESTING, OPTM220203PERMITSACTUATIONOF THEPORVINPLACEASANALTERNATIVE TESTMETHOD.INPLACESTROKETESTING OFTHEPORVUSESSTEAMATRCS TEMPERATUREGREATERTHAN32913 DEGREESFANDRCSPRESSUREAT500700 PSIG,CONDITIONSEQUIVALENTTOOR GREATERTHANSTSMODE3ANDMODE4.
Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required.
0112235562 C311932086 IEB9302:DEBRIS PLUGGINGOF ECCSSUCTION STRAINERS GPUNCOMMITTEDEXTERNALLYTOTHE NRCINRESPONSETOBULLETIN9302THAT FIBROUSAIRFILTERSWHICHARE INSTALLEDINSIDECONTAINMENTARE PROTECTEDFROMMIGRATINGINTOTHE REACTORBUILDINGSUMPPRIORTO,OR DURINGALOCAEVENTDUETOADEQAUTE FILTERMAINTENANCEPROCEDURES, PROCEDURALCONTROLSAND ENGINEERINGEVALUATIONSWHICH DOCUMENTTEMPORARYSOURCESOF FIBROUSMATERIALSTOREDIN CONTAINMENT,PROCEDURESWHICH REQUIREREACTORBUILDING WALKDOWNSANDINSPECTIONSPRIORTO SETTINGCONTAINMENTFORPLANT OPERATIONS,ANDPROCEDURAL CONTROLS Oncethecertificationof 50.82(a)2werecompleted,TMIis nolongerpermittedtooperateor placefuelinthereactorvessel, thereforetheprotectionprovided bythiscommitmentisnolonger required.
Commitment Change Summary Report Attachment Part B - Programmatic Commitments tied to Generic Communications Page 22 of 44
Table2(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235570 59280320148 SIXTYDAY RESPONSETO NRCBULLETIN 200301 Theplantwill developaspecific procedureforcleaningand inspectingthefloordrainsin containmentandwillcoordinate thisworkwiththecontainment closeoutprocedure.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,thereforethereisnoneedto performacontainmentcloseout inspection.Theprotectionprovidedby thiscommitmentisnolongerrequired.
0112235572 RESPONSETORAI BULLETIN2003 01"POTENTIAL IMPACTOF DEBRIS BLOCKAGEON EMERGENCY SUMP RECIRCULATION ATPRESSURIZED WATER REACTORS TMIwillrevisethesiteEOPsto incorporateinterimmeasuresto includeinitiatingBWSTrefillafter switchovertorecirculationfromthe containmentsump.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,theneedforLOCAprotectionin theRCSisnolongerrequired.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 26 of 44
The following provides the update of programmatic commitments associated with Licensing Actions that impacted Technical Specifications (TS) that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2) and implementation of TS Amendment 297, which implemented the Permanently Defueled Technical Specifications.
LetterSource:
Various-RefertoTable3 foreachitem
ExelonTrackingNumber Various-RefertoTable3 foreachitem
NatureofCommitment:
Table3 lists open programmaticregulatorycommitments forThreeMileIsland,Unit1(TMI1),thatarerelatedto licensingactions(e.g.LARs).TechnicalSpecification Amendments295and297wereimplementedon September27,2019andrepresentsthePermanently DefueledTechnicalSpecifications(PDTS).Thetable containsthecommitmentnumber,thecommitment source,asummaryofthecommitment,andbasisforthe deletionofthecommitment.
EachoftheoriginalregulatorycommitmentslistedinTable 3willbeclosed,sincetheactionsarenolongerapplicable asaresultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,ExelonprovidedcertificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith10CFR50.82(a)2TMI1is nolongerpermittedtooperateorplacefuelinthereactorvessel.Theonlyriskisthesafestorageofirradiated fuelintheSpentFuelPool.TheregulatorycommitmentsinTable3nolongeraffordtheoriginalintentand protection.Table3providesadditionalbasisforeachactionitem.
Table3 ProgrammaticCommitmentstiedtoLicensingActionsthatareno longerapplicablebasedonPermanentShutdownStatus
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207204 59280420162 TSCRNO.326 TSCRNO.326 ELIMINATIONOF CONTAINMENTEQUIPMENTHATCH CLOSUREDURINGREFUELING Procedureswillbeinplacewhichwill requiretheplacementofcontinuously operatedparticulateandradioiodineair samplingequipmentinboardoftheopen containmentequipmenthatchopening duringfuelloadingandrefuelingactivities.
Nolongerpermittedtoperform fuelemplacementintheRPV.TS 3.8FuelLoadingandRefuelingwas deletedinTSAmendment297.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 27 of 44 Table3(Continued)
Commitment Tracking Number Commitment Source Document CommitmentDetails BasisforDeletion 0112207233 GQL0036 TSAMENDMENT 17:NRCSER DATED5/18/76 PERIODICREACTORCOOLANTFLOW VERIFICATION Licenseecommittedtoverifythe reactorcoolantflowratewillbeverified every6months,plusorminus30days, tobedonebytheheatbalance techniquedescribedintheMetEd letterdated4/8/76.
BasedonthefactthatTMIisnolonger permittedtooperateorplacefuelin thevesselthisverificationwouldno longerberequired.TS3.5.1forRPS inputsanditsassociatedSRswere deletedinAmendment297.
0112207245 NRCSERDATED 8/28/81:ADV SPURIOUS OPENINGUPON LOSSOFNNIOR ICS ATMOSPHERICSTEAMDUMPVALVES SPURIOUSOPENING.
Withcertificationrequiredby50.82 submitted,TMIisnolongerpermitted tooperateorstorefuelinthereactor vessel.TS3.4.1DecayHeatRemoval withT>250Fwasdeletedby Amendment297.
0112207267 5211832014 PERIODIC TESTINGOFAUX ANDFHB VENTILATION SYSTEM MODIFICATIONS FHBISOLATIONDAMPERINTERLOCK TESTING Attachment(s):GPUNCOMMITTEDTO THENRCTOREVISIONOFTHE SURVEILLANCEPROCEDURE(SP)1303 4.15TOINCLUDETHETESTINGOFTHE FUELHANDLINGBUILDING (FHB)ISOLATIONDAMPERINTERLOCKS WITHTHEFHBVENTILATIONSUPPLY FAN.THEEQUIPMENTWASTESTED MONTHLYTOVERIFYPROPER OPERATIONOF THEINTERLOCKSFORTHEISOLATION DAMPERSANDTHESUPPLYFAN.THAT WASACCOMPLISHEDBYSIMULATINGA HIGHRADIATIONSIGNALFORRMA4 (THEATMOSPHERICRADIATION MONITORINTERLOCK)ANDRMG9 (AREARADIATIONMONITOR INTERLOCK)WHICHTRIPPEDTHEFHB SUPPLYFANAND CLOSEDTHEISOLATIONDAMPERS.
TechnicalSpecificationAmendment 297providedanewFuelHandling AccidentintheSpentFuelPool,and concludedthatAux.BuildingandFuel HandlingBuildingESFVentilationisnot requiredformitigation.TS3.15.4Fuel HandlingBuildingESFAirTreatment SystemwasdeletedinTSAmendment 297.
0112235525 5211962168 TSAMENDMENT 122:NRCSER DATED12/12/86
FUELHANDLING BUILDINGESF VENTILATIONSYSTEMEnsuresystemis inservicepriortoFuelHandling.
TechnicalSpecificationAmendment 297providedanewFuelHandling AccidentintheSpentFuelPool,and concludedthatFuelHandlingBuilding ESFVentilationisnotrequiredfor mitigation.TS3.15.4FuelHandling BuildingESFAirTreatmentSystem wasdeletedinTSAmendment297.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 28 of 44 Table3(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235563 C311933140:
TECHSPEC AMENDMENT175 GPUNCOMMITTEDTOTHENRCTO INCORPORATEAMODIFIEDBATTERY PERFORMANCETESTASDESCRIBEDIN IEEESTANDARD4501993.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTStheelectricalpowersystem includingtheDCandbatterysystems arenolongersafetyrelated.TS3.7 ElectricalPowerwasdeletedby Amendment297.
0112235564 592800 20120.001TSCR NO.283RAI
RESPONSE
CLARIFICATIONS PURSUANTTO TELEPHONE CONFERENCECALL 99096TSCR283DEGRADEDGRID SETPOINTTOLERANCEANDTURBINE PLANTLOADINGDESIGNLIMIT REVISIONS.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTStheelectricalpowersystem includingtheDegradedGrid protectionarenolongersafety related.TS3.5.3wasdeletedby Amendment297.
0112235567 59280120209 RESPONSETO REQUESTFOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUESTNO.249 CONTAINMENT INTEGRITYDURING REFUELING OPERATIONS TMIUnit1Procedure15051willbe revisedtoreflecttheproposedTechnical Specificationchangeandensure continuedawarenessbytheShift Operating/RefuelingcrewsoftheOPEN statusofthecontainmentduringcore alterationsandfuelhandling.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel.TS3.6.1 ContainmentIntegritywasdeletedby Amendment297.
0112235568 59280120209
RESPONSE
TO REQUEST FOR ADDITIONAL INFORMATION
LICENSE AMENDMENT REQUEST NO. 249 CONTAINMENT INTEGRITYDURING REFUELING OPERATIONS Operating Procedure
- 11013, "Containment Integrity and Access Limits,"willberevisedtoprovideforthe placement of continuously operated particulate and radioiodine air sampling equipment inboard open airlocks during corealterationandfuelhandling activities.
Once the certification of 50.82(a)2 were completed, TMI is no longer permittedtooperateorplacefuelin the reactor vessel.
TS 3.6.1 ContainmentIntegritywasdeletedby Amendment297.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 29 of 44 Table3(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235569 59280230061 SAFETY EVALUATIONOF PROCEDURESFOR PERFORMING ANDEVALUATING THEREACTOR BUILDING TENDON SURVEILLANCE (TACNO.
MA9460)
TheNRC'sSafetyEvaluationbasedits acceptanceofthetendonsurveillance andinspectionsasmeetingthe requirementsof10CFR50.55a(b)(2)(ix) onthefollowingAmerGencommitment fromthe25thYearTendonSurveillance Report(TR136)submittaldated 2/25/00(59280020066):"the Mechanical/StructuralEngineershall performcontinuedmonitoringofthe greaseleakageaspartofitsRepetitive PreventiveMaintenanceTaskNo.
9641."Therefore,performanceofthis PMTaskbecomesanongoing commitment.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,with implementationofthePDTStheTS 3.19andSR4.4.2forRBTendon Surveillanceweredeletedin Amendment297.
0112235571 59280510223 TSCRNO.324 REACTOR PROTECTION SYSTEMTEST INTERVAL EXTENSION Theasfoundandasleftvalueswill continuetoberecordedandreviewed forconsistencywiththeassumptionsof thesurveillanceintervalextension analysis.Thereviewwillverifythetest resultsmeetacceptancecriteria.Outof toleranceresultswillbe evaluatedtodetermineiftheymeetthe requirementsoutlinedinBAW10167.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,thereaction protectionsystemisnolonger requiredtosupportprotectionoffuel cladandRCSpressureboundary.TS 3.5.1wasdeletedbyAmendment 297.
0112235576 59280520253 ADDITIONAL INFORMATION TECHNCIAL SPECIFICATION CHANGE REQUESTNO.
326:
ELIMINATIONOF CONTAINMENT EQUIPMENT HATCHCLOSURE DURING REFUELING Proceduralcontrolswillensurethat duringthemovementofirradiatedfuel theEquipmentHatch/MissileShield areawillbemanned24Hours/Day,7 Days/Weekinsupportoftheoutage unlesstheEquipmentHatchisclosed and4boltsareinstalled.The "committeddateoroutage"forthis itemisT1R16.
Oncethecertificationof50.82(a)2 werecompleted,TMIisnolonger permittedtooperateorplacefuelin thereactorvessel,implementationof thePDTSremovedanycontrolsor constraintsonrefuelingoperations sinceitnolongerpermitted.TS3.8 FuelLoadingandRefuelingwas deletedinTSAmendment297.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 30 of 44 Table3(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235577 59280520253 ADDITIONAL INFORMATION TECHNCIAL SPECIFICATION CHANGE REQUESTNO.
326:
ELIMINATIONOF CONTAINMENT EQUIPMENT HATCHCLOSURE DURING REFUELING TMIUnit1procedureswillinclude thefollowingrequirementsto ensurethatGeneralDesignCriterion (GDC)64requirementswillcontinue tobemetduringthemovementof irradiatedfuel:
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,implementationofthePDTS removedanycontrolsorconstraintson refuelingoperationssinceitnolonger permitted.TS3.8FuelLoadingand RefuelingwasdeletedinTSAmendment 297.
0112235578 59280720006 TSCRNO.335 REACTOR COOLANTSYSTEM PRESSURE TEMPERATURE SAFETYLIMITS TheVLPTNominalSetpoint(NSP) andTotalLoopUncertainty(TLU)are determinedusingthemethodology providedbyANSI/ISAS67.04Part1 1994.ThepredefinedlimitsforNSP asfoundtolerancewillbe determinedinaccordancewiththe NRCacceptedmethodology describedinNRCRIS200617.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel.TS2.3LimitingSafetySystem SettingsweredeletedinAmendment 297.
0112235581 59280720097 TECHNICAL SPECIFICATION CHANGE REQUESTNO.337 "CHANGEOF CONTAINMENT EMERGENCY SUMPSPRAYPH CONTROL" InstallTSP buffermodificationand isolateNaOHtankBST2.Atleast onemanualvalveineachsupply trainwillbelockedclosedproviding permanentisolationoftheNaOH tank.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel,LOCAisnolongeracredibleDBA, thereforethereisnoneedtoprovide postLOCAphcontrolincontainment.TS 3.3.1.3RBSprayandRBEmergency CoolingSystemwasdeletedin Amendment297.
0112235582 59280720164 RESPONSETORAI TSCR#335:
REACTOR COOLANTSYSTEM PRESSURE TEMPERATURE SAFETYLIMIT WithregardtotheVLPTsetpoint calculationandthereferencesof Sections7and8ofPart1ofISA S67.041994,TMIUnit1isin agreementwiththisRegulatory Positionandcommitstoimplement Reg.Guide1.105,Rev.3.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactor vessel.TS2.3LimitingSafetySystem SettingsweredeletedinAmendment 297.
Commitment Change Summary Report Attachment Part C - Programmatic Commitments tied to Licensing Actions Page 31 of 44 Table3(Continued)
Commitment Tracking Number Commitment SourceDocument CommitmentDetails BasisforDeletion 0112235583 59280720202 RESPONSETO REQUESTFOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION CHANGE REQUESTNO.
337:REACTOR BUILDING EMERGENCY SUMPPH CONTROLSYSTEM BUFFERCHANGE 1)Theelementsandmethodology oftheproposedTSTable4.15, Item2.bsurveillancetestingwillbe clearlydelineatedinstation surveillanceprocedures.
(Programmatic) 2)Procedureswillensurethat samplesaretakenwithinthebasket atbothinteriorandperipheral locationstoobtainarepresentative sample.(Programmatic) 3)UseoftheWCAP16530NP modelisbeingconsidered,andif utilized,thisissue(ref.Q.9)willbe addressedintheTMIUnit1Generic Letter200402response.(One TimeAction)
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, LOCAisnolongeracredibleDBA, thereforethereisnoneedtoprovidepost LOCAphcontrolincontainment.TS3.3.1.3 RBSprayandRBEmergencyCooling SystemwasdeletedinAmendment297.
0112235593 59280820132 AmerGenEnergy Co.LLC(Exelon) toU.S.Nuclear Regulatory Commission datedSeptember 29,2008.Seealso Technical Specification Amendment273.
Controlrodpatchverificationwill beperformedbymovingeach controlrodtoverifycorrect group/rodassignmentfollowing anysoftwarerecompilingand download.
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, inadvertentcriticalityorreactivity managementisnolongeraconcern.SR 4.7ReactorControlRodSystemTestwere deletedinAmendment297.
0256938101 TMI14121 Responseto Requestfor Additional Information RegardingLicense Amendment Requestto EliminateCertain Technical Specification Reporting Requirements.
TMIPeriodicLeakReduction ProgramIncorporateadescription ofthePeriodicLeakReduction Programintothelicensingbasisby revisingUFSARSection6.4, "EngineeredSafeguardsLeakage andRadiationConsiderations."
Oncethecertificationof50.82(a)2were completed,TMIisnolongerpermittedto operateorplacefuelinthereactorvessel, sinceaLOCAisnolongeracredibleDBA, quantifyingleakageintotheAuxBuilding intheeventofsumprecirculation exceedingPart100limitsisnolongera concern.SR4.5.4ESFsystemleakagewas deletedinAmendment297.
Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 37 of 44 The following provides the update of Miscellaneous Programmatic Commitments that will be deleted based on the TMI-1 no longer being permitted to operate in accordance with 10 CFR 50.82(a)(2).
LetterSource:
5211872059-LTRtoNRC:RCPS ThermalBarrierCoolingandInjection.
C311882010-LTRtoNRC:10CFR50APPENDIXRLOSSOFHVAC ExelonTracking Number 0112235527 0112235530 Natureof Commitment:
Bothlistedcommitmentsareassociatedwithcompliancewith10CFR50,AppendixR.
0112235527ReactorCoolantPumpsAppendixRexemption.Thelicenseecommittedto theNRCthatintheeventofacontrolroomorrelayroomfires,mitigationresponse procedurestorestorereactorcoolantpumpsealbarriercoolantattheremoteshutdown panel.
011223553010CFR50AppendixR-LossofHVAC.Thelicenseecommittedtomonitor dieselengineparametersduringdieselgeneratoroperationstoensureEDGisadequately cooledduringlossofventilationinthedieselroomsduetoanAppendixRFire.
Eachoftheoriginalregulatorycommitmentswillbeclosed,sincetheactionsarenolonger applicableasaresultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,therequirementsof10CFR 50.47.(b)(2)andAppendixRarenolongerapplicableandfireprotectionforadecommissioningplantiscovered by10CFR50.48(f).
LetterSource:
5211842015LTRtoNRCGL 8233RESPONSENUREG0737ITEMIC1ATOG IMPLEMENTATION
5211842154LTRtoNRC:NUREG0737ITEMI.C.1RESPONSETOSERQUESTIONS ExelonTracking Number 0112207264 0112207277 Natureof Commitment:
Bothlistedcommitmentsareassociatedwithimplementation AbnormalTransient OperatingGuidelines(ATOG)inEmergencyOperatingProcedures(EOPs).
0112207264-AbnormalTransientOperatingGuidelines(ATOGs).Thelicenseecommitted totheNRCthattheATOGswouldbeintegratedintotheAbnormalTransientProcedures, whichultimatelybecometheEOPs.TheguidancetofollowtheATOGswasplacedinAP 1001E,"WritersGuideforAbnormalTransientProcedures."
0112207277-EOPUpgradeProgram.ThelicenseecommittedtocorrectNRCconcernson WritersGuideAdministrative ProceduresforAbnormalTransientProcedures.
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,theneedforEOPsthatmeetthe ATOGsarenolongernecessary,sincethetransientsinquestionarenotapplicabletoadefueledfacilitythatisno longerlicensedtooperate.Inaddition,therequirementtomaintainawriter'sguideprocedureforthe maintenanceoftheseproceduresisnolongerrequired.
Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 38 of 44
LetterSource:
TMI15120- LTRtoNRC: FleetCommitmenttoMaintainSevereAccidentManagement Guidelines(SAMGs)
ExelonTracking Number 0261101222 Natureof Commitment:
0261101222FleetCommitmenttoMaintainSevereAccidentManagementGuidelines (SAMGs).ThelicenseecommittedtoimplementtheNuclearEnergyInstitute(NEI)Nuclear StrategicIssuesAdvisoryCommittee(NSIAC)approvedinitiativetoimplementSAMGs.The SAMGswouldbeusedbyemergencyresponsepersonnelduringaccidentconditionsthat progressbeyondthemitigationcapabilitiesdescribedinEOPs.SAMGstrategiesare intendedtoarresttheprogressionoffueldamage,maintainthecapabilityofthe containmentaslongaspossible,andminimizeradiologicalreleases.
Theoriginalregulatorycommitmentlistedabovewillbeclosed,sincetheactionsareno longerapplicableasaresultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.Asaresult,theneedforEOPsthatmeetthe ATOGsarenolongernecessary,sincethetransientsinquestionarenotapplicabletoadefueledfacilitythatisno longerlicensedtooperate.Therefore,theneedtoprovideSAMGstoprovidestrategiestoarresttheprogression offueldamageormaintainthecapabilityofcontainment.AlthoughtheSAMGsprovidedspentfuelmitigation strategiesintheeventofalossofwatertothespentfuelpool,theseExtensiveDamageMitigationStrategiesto ensurewatersourcestotheSpentFuelPoolarealreadybuiltintotheAbnormalOperatingproceduretoaddress thelossofspentfuelpoolcooling.
LetterSource:
TMI15120- LTR toNRC: ResponseProvidingInformationRegardingImplementation DetailsfortheB.5.bPhases2and3MitigationStrategies ExelonTracking Number 0112207215 0112207217 Natureof Commitment:
112207215B.5.bCommitments Three MileIslandNuclearStationUnit1willincludethe commandandcontrolenhancementstrategiesasdescribedinthegeneraldescriptionin inplantprocedures(TablesA.31)
112207217B.5.bCommitmentsThreeMileIslandNuclearStationUnit1willlistthe viablesitespecificreactor/containmentstrategiesdescribedinAttachment1thatcouldbe usedbyemergencyresponseorganizationorplantpersonnelinappropriateprocedures (TableA.6.1).
Theoriginalregulatorycommitmentlistedabovewillbeclosed,sincetheactionsareno longerapplicableasaresultofTMI1beinginapermanentshutdownstate.
JustificationforChange ByletterdatedSeptember26,2019,Exelonprovided certificationthatTMI1 was permanentlyshutdownand defueledwithallirradiatedfuelbeingstoredintheSpentFuelPool.Inaccordancewith50.82(a)(2),TMI1isno longerpermittedtooperateorplacefuelinthereactorvessel.TheB.5.bcommitmentsarepartofthebroader ExtensiveDamageMitigationStrategiesthatarerequiredby10CFR50.155,Mitigationofbeyonddesignbasis events.Pursuantto50.155.(a)2(i),oncethecertificationsdescribedin50.82aresubmitted,thelicenseeneed onlycomplywiththebyEDGMstrategiesassociatedwithspentfuelpoolcoolingcapabilities.
Commitment Change Summary Report Attachment Part D - Miscellaneous Programmatic Commitments Page 39 of 44
LetterSource:
GPUNletterstoNRCC311902073,5211853262andC311903248concerningTMIFire BrigadeTraining.
ExelonTracking Number 0112235510 0112235557 Natureof Commitment:
InlettertoNRC,5211853262GPUNcommittedTHATINDIVIDUALSWHOSERVEONTHE FIREBRIGADESOFBOTHUNIT1ANDUNIT2ARE (1) COGNIZANTOFCHANGESINTHEFIREPROTECTIONPLAN,PROCEDURES,AND EQUIPMENTOFEACHUNIT (2) PARTICIPATEDINDRILLSONBOTHUNITS (3) PERIODICALLYEVALUATEDONASCHEDULECOMMENSURATEWITHCURRENT EVALUATIONCRITERIA.
InC311902073,GPUNCOMMITTEDTOTHENRCTHATEACHFIREBRIGADEMEMBER SHALLPARTICIPATEIN:
1)
ATLEASTTWODRILLSPERYEARATTMI1TOREMAINQUALIFIED 2)
ATLEASTONEDRILLPERYEARFOREACHTMI1OPERATINGSHIFTSHALLBE CONDUCTEDINTMI2.
THESEDRILLSSHALLBESCHEDULEDSUCHTHATATLEASTONEDRILLPERQUARTERTAKES PLACEINTMI2.
InC311903248,dated11/21/90,documentstheNRCStaffreviewandapprovaloftheGPU proposedcommitment.Thenewcommitmentrequiredonefiredrillpershiftperyearin Unit2.
Thesecommitmentswillbeclosed.TrainingrequirementsfortheIncipientFireBrigadewill conformtoRG1.191andNFPA600requirementsasdescribedintheTMIIncipientFire BrigadeEvaluation.TheTMIFireProtectionProgramprocedure1038willdescribethe training,qualificationanddrillrequirementsfortheIncipientFireBrigade.
JustificationforChange In1985and1990whenthesecommitmentsweremade,theregulatoryframeworkforFireProtectionwasbeing developed.By2000,NRChadissuedRegulatoryGuide1.189toprovideguidanceforFireProtectionatan operatingfacility.InMay2001,NRCissuedRegulatoryGuide1.191toprovideguidanceforcompliancewith 10CFR50.48(f)forapermanentlydefueledfacility.
InSeptember2019,TMI1waspermanentlydefueledandtheTMI1FireHazardsAnalysis(9901745)was modifiedtoensurecompliancewith10CFR50.48(f)andRegulatoryGuide1.191.InJanuary2020,theTMI2Fire ProtectionProgramEvaluation(9903017)wasmodifiedtoensurecompliancewith10CFR50.48(f)andRegulatory Guide1.191.
TheoperatingplantrequirementsforfirebrigadetrainingwillbemaintaineduntiltheIncipientFireBrigadeis implemented.TheIncipientFireBrigadeEvaluation(TechnicalEvaluation421497115)identifiedhowthe requirementsofRG1.191wouldbesatisfiedwhenTMItransitionstoanIncipientFireBrigade.Thisincludedfire brigadetraining,qualificationanddrillrequirements.
TheprogramrequirementsofRegGuide1.191supersedethepurposefortheoriginalcommitments.Theoriginal commitmentsshouldbeeliminatedwhentheIncipientFireBrigadeisimplemented.TheTMIFireProtection programwillcontinuetocomplywithRegGuide1.191.
Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 40 of 44
LetterSource:
NUREG1928,SafetyEvaluationReportRelatedtothe LicenseRenewalofThreeMileIsland NuclearStation,Unit1,AppendixAdatedOctober2009.
ExelonTracking Number SeeTable4 Natureof Commitment:
Table4listalloftheopen LicenseRenewalCommitmentsprovidedinNUREG1928,Safety EvaluationReportRelatedtotheLicenseRenewalofThreeMileIslandNuclearStation,Unit 1,AppendixAdatedOctober2009.
EachoftheoriginalcommitmentslistedinTable4willbereassignedasagingmanagement itemsandnolongerbecategorizedasregulatorycommitmentsastheynolongermeetthe NEIdefinitionofaregulatorycommitment.
JustificationforChange Uponapprovalofthelicenserenewallicenseamendment request,theNRCissuedalicenseconditiontothe TMI 1sRenewedFacilityOperatingLicense(2.c.(20)),thatrequiredthattheregulatorycommitmentsrelatedto licenserenewalbeincorporatedintothestationUFSAR.ThisconditionwassatisfiedinRevision20oftheUFSAR andprovidedinAppendixAoftheTMIUFSAR.LicenseCondition2.c.(20)wasdeletedinTSAmendment297, PermanentlyDefueledTechnicalSpecifications.SincetheseitemsarenointheUFSAR,theyarecontrolledunder the50.59changeprocessandreportedtotheNRCinaccordancewith50.71(e).
Table4 LicenseRenewalCommitmentsReClassifiedasNoLongerbeingRegulatoryCommitments
Commitment Tracking Number Commitment CommitmentDetails 0060357301 ASMESecXIISIIWB,IWC, andIWDAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXIInserviceInspection,Subsections IWB,IWC,andIWDAgingManagementProgram(ReferenceTMI1 LicenseRenewalApplicationsectionsA.2.1.1andB.2.1.1) 0060357302 WaterChemistryAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeWaterChemistryAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.2and B.2.1.2).Whenallofthesubassignmentsdueonorbefore4/19/2014 arecompleted,theduedateforthisassignmentshallbechangedto 4/19/2034.
0060357303 ReactorHeadClosureStuds AgingManagement ProgramB.2.1.3 ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeReactorHeadClosureStudsAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.3andB.2.1.3) 0060357304 BoricAcidCorrosionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBoricAcidCorrosionAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.4and B.2.1.4) 0060357305 NiAlloyRxHeadNozzle PenetrationAMP Thisassignment capturestheLicenseRenewalcommitments associatedwiththeNickelAlloyPenetrationNozzlesWeldedtothe UpperReactorVesselClosureHeadsofPressurizedWaterReactors AgingManagementProgram(ReferenceTMI1LicenseRenewal ApplicationsectionsA.2.1.5andB.2.1.5)
Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 41 of 44 Table4(Continued)
Commitment Tracking Number Commitment CommitmentDetails 0060357306 FlowAccelerated CorrosionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFlowAcceleratedCorrosionAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.6andB.2.1.6) 0060357307 BoltingIntegrityAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBoltingIntegrityAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.7and B.2.1.7) 0060357308 SteamGeneratorTube IntegrityAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeSteamGeneratorTubeIntegrityAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.8andB.2.1.8) 0060357309 OpenCycleCooling AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeOpenCycleCoolingWaterSystemAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.9andB.2.1.9).Includesimplementationof programmaticworkorders.
0060357310 ClosedCycleCooling AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeClosedCycleCoolingWaterSystemAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.10andB.2.1.10).Includesimplementationof programmaticworkorders.
0060357311 Cranes&HoistsAging ManagementProgram Thisassignmentcaptures theLicenseRenewalcommitments associatedwiththeInspectionofOverheadHeavyLoadandLight Load(RelatedtoRefueling)HandlingSystemsAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationSections A.2.1.11andB.2.1.11).
0060357312 CompressedAir MonitoringAgingMgmt Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeCompressedAirMonitoringAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.12andB.2.1.12).Whenallofthesubassignmentsdueonor before4/19/2014arecompleted,theduedateforthisassignment shallbechangedto4/19/2034.).Includesimplementationof programmaticworkorders.
0060357313 FireProtectionAging ManagementProgram Thisassignmentcapturesthe LicenseRenewalcommitments associatedwiththeFireProtectionAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.13and B.2.1.13).Includesimplementationofprogrammaticworkorders.
0060357314 FireWaterSystemAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFireWaterSystemAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.14and B.2.1.14).Whenallofthesubassignmentsdueonorbefore 4/19/2014arecompleted,theduedateforthisassignmentshallbe changedto4/19/2034).Includesimplementationofprogrammatic workorders.
Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 42 of 44 Table4(Continued)
Commitment Tracking Number Commitment CommitmentDetails 0060357315 AbovegroundSteel TanksAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeAbovegroundSteelTanksAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.15andB.2.1.15).Includesimplementationofprogrammatic workorders.
0060357316 FuelOilChemistryAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeFuelOilChemistryAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.16and B.2.1.16).Whenallofthesubassignmentsdueonorbefore 4/19/2014arecompletedorextended,theduedateforthis assignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders.
0060357317 ReactorVessel SurveillanceAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeReactorVesselSurveillanceAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.17andB.2.1.17).Includesimplementationofprogrammatic workorders.
0060357320 BuriedPipingandTanks AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeBuriedPipingandTanksInspectionAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.20andB.2.1.20).Whenallofthesubassignmentsdue onorbefore4/19/2024arecompletedorextended,theduedatefor thisassignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders.
0060357321 ExternalSurfaces MonitoringAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeExternalSurfacesMonitoringAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.21andB.2.1.21).Includesimplementationofprogrammatic workorders.
0060357322 InternalSurfaces InspectionAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeInspectionofInternalSurfacesinMiscellaneous PipingandDuctingComponentsAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.22and B.2.1.22)Whenallofthespecificcommitmentactivitiesrequiredto beperformedby4/19/2014arecompleted,thiscommitmentdue dateshouldberesettocoincidewiththeterminationoftheoperating licensein2034.Includesimplementationofprogrammaticwork ordersandvolumetricExamsofSSofSCCs.
0060357323 LubricatingOilAnalysis AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeLubricatingOilAnalysisAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.23andB.2.1.23).Includesimplementationofprogrammatic workorders.
0060357324 ASMESectionXI, SubsectionIWEAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWEAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.24andB.2.1.24).
Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 43 of 44 Table4(Continued)
Commitment Tracking Number Commitment CommitmentDetails 0060357325 ASMESectionXI, SubsectionIWLAging ManagementProgram Thisassignmentcapturesthe LicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWLAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.25andB.2.1.25)Whenalltheimplementingdocument changesrequiredby4/19/2014havebeenmade,theduedateforthis commitmentshouldbechangedto4/19/2034,theendofthe operatingperiod.
0060357326 ASMESectionXI, SubsectionIWFAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeASMESectionXI,SubsectionIWFAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.26andB.2.1.26)Whenalloftheprocedurechanges requiredby4/19/2014havebeencompleted,resettheduedatefor thiscommitmentto4/19/2034,theendoftheoperatingperiod.
0060357327 10CFRPart50, AppendixJAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththe10CFRPart50,AppendixJAgingManagement Program(ReferenceTMI1LicenseRenewalApplicationsections A.2.1.27andB.2.1.27).
0060357328 StructuresMonitoring ProgramAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeStructuresMonitoringProgramAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.28andB.2.1.28)Whenalloftheassignmentswithdue datesonorbefore4/19/2014havebeencompleted,thisassignment shouldbechangedto04/19/2034,theendoftheoperatingperiod.
Includesimplementationofprogrammaticworkorders.
0060357329 ProtectiveCoatings AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeProtectiveCoatingMonitoringandMaintenance ProgramAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.2.1.29andB.2.1.29).Includes implementationofprogrammaticworkorders.
0060357330 NonEQCablesand ConnectionsAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeElectricalCablesandConnectionsNotSubjectto 10CFR50.49EnvironmentalQualificationRequirementsAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.30andB.2.1.30)Whenallofthesubassignmentsdue onorbefore4/19/2014arecompletedorextended,theduedatefor thisassignmentshouldbechangedto4/19/2034.Includes implementationofprogrammaticworkorders.
Commitment Change Summary Report Attachment Part E - Items Classified as no longer being Regulatory Commitments Page 44 of 44 Table4(Continued)
Commitment Tracking Number Commitment CommitmentDetails 0060357331 NonEQInstrument CablesandConnections AMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeElectricalCablesandConnectionsNotSubjectto 10CFR50.49EnvironmentalQualificationRequirementsUsedin InstrumentationCircuitsAgingManagementProgram(ReferenceTMI 1LicenseRenewalApplicationsectionsA.2.1.31andB.2.1.31).When allofthesubassignmentsdueonorbefore4/19/2014arecompleted orextended,theduedateforthisassignmentshouldbechangedto 4/19/2034.Includesimplementationofprogrammaticworkorders.
0060357332 InaccessibleMedium VoltageCableAMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeInaccessibleMediumVoltageCablesNotSubject to10CFR50.49EnvironmentalQualificationRequirementsAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.2.1.32andB.2.1.32).Includesimplementationof programmaticworkorders.
0060357333 MetalEnclosedBus AgingManagement Program Thisassignment capturestheLicenseRenewalcommitments associatedwiththeMetalEnclosedBusAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.1.33and B.2.1.33).Includesimplementationofprogrammaticworkorders.
0060357335 NickelAlloyAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeNickelAlloyAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationsectionsA.2.2.1and B.2.2.1).
0060357336 PWRVesselInternals AgingManagement Program ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththePWRVesselInternalsAgingManagementProgram (ReferenceTMI1LicenseRenewalApplicationSectionA.5No.36).
IncludesReactorInternalsInspectionPlan.
0060357337 RCPressureBoundary MetalFatigueAMP ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeMetalFatigueofReactorCoolantPressure BoundaryAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.3.1.1andB.3.1.1).
0060357338 ConcreteContainment TendonPreStressAging MgmtProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeConcreteContainmentTendonPrestressAging ManagementProgram(ReferenceTMI1LicenseRenewalApplication sectionsA.3.1.2andB.3.1.2).
0060357339 EQofElectrical ComponentsAging ManagementProgram ThisassignmentcapturestheLicenseRenewalcommitments associatedwiththeEnvironmentalQualification(EQ)ofElectrical ComponentsAgingManagementProgram(ReferenceTMI1License RenewalApplicationsectionsA.3.1.3andB.3.1.3).
0060357343 BoralandMetamicTest CouponSurveillance ThisassignmentcapturestheLicenseRenewalcommitment associatedwiththeBoralTestCouponSurveillanceascommittedin RAIresponseletter#59280820229andthe201010CFR54.37b reportidentifyingtheMetamicfuelracksasa"newlyidentifiedSCC" thatrequireagingmanagementreview.