ML20097E934: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Pacific Gas and Electric Company | {{#Wiki_filter:Pacific Gas and Electric Company Diablo Canyon Power Plant P O. Box 56 Avila Beach. CA 93424 805/545 6000 January 25,1996 R. | ||
January 25,1996 | PG&E Letter DCL-96-015 n | ||
PG&E Letter DCL-96-015 | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emeroency Plan Imolementino Procedure Update | ||
==Dear Commissioners and Staff:== | ==Dear Commissioners and Staff:== | ||
in accordance with Section V, " Implementing Procedures" of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan implementing procedures for the Diablo Canyon Power Plant Units 1 and 2. | |||
This update includes the following emergency procedure (EP) changes: | This update includes the following emergency procedure (EP) changes: | ||
: 1. EP OR-2, " Release of Information to the Public," has been rescinded and incorporated into a new procedure EP EF-10, " Joint Media Center Activation and Operation." | : 1. EP OR-2, " Release of Information to the Public," has been rescinded and incorporated into a new procedure EP EF-10, " Joint Media Center Activation and Operation." | ||
| Line 29: | Line 28: | ||
: 3. Both Revision 15 and 16 of EP G-4," Personnel Assembly, Accountability and Site Access Control During Emergencies," are included in this submittal. Revision 15 is included for record purposes only. Revision 16 is the current procedure in effect. | : 3. Both Revision 15 and 16 of EP G-4," Personnel Assembly, Accountability and Site Access Control During Emergencies," are included in this submittal. Revision 15 is included for record purposes only. Revision 16 is the current procedure in effect. | ||
: 4. Additional procedures have been revised as indicated in the enclosures to this letter. | : 4. Additional procedures have been revised as indicated in the enclosures to this letter. | ||
02M 5 | 02M 5 140051 W( | ||
9602140392 960125 PDR ADOCK 05000275 F | |||
PDR | |||
Document Control D:sk January 25,1996 Page 2 As provided under 10 CFR 50.54(q), the changes in this update have been made without commission approval since they do not decrease the effectiveness of the emergency plan; and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. | |||
of the emergency plan; and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. | |||
This update contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans." | This update contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans." | ||
Sincerely, un Robert P. Powers Manager - Operations Services cc: | Sincerely,un Robert P. Powers Manager - Operations Services cc: | ||
Steven D. Bloom (w/o enclosures) | |||
L.J. Callan (2) | L.J. Callan (2) | ||
Kenneth E. Perkins (w/o enclosures) | Kenneth E. Perkins (w/o enclosures) | ||
Michael D. Tschiltz (w/o enclosures) | Michael D. Tschiltz (w/o enclosures) | ||
Enclosures 1403S/JER/1345 | Enclosures 1403S/JER/1345 l}} | ||
l}} | |||
Latest revision as of 07:30, 13 December 2024
| ML20097E934 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/25/1996 |
| From: | Powers R PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20097E936 | List: |
| References | |
| NUDOCS 9602140392 | |
| Download: ML20097E934 (2) | |
Text
Pacific Gas and Electric Company Diablo Canyon Power Plant P O. Box 56 Avila Beach. CA 93424 805/545 6000 January 25,1996 R.
PG&E Letter DCL-96-015 n
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emeroency Plan Imolementino Procedure Update
Dear Commissioners and Staff:
in accordance with Section V, " Implementing Procedures" of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan implementing procedures for the Diablo Canyon Power Plant Units 1 and 2.
This update includes the following emergency procedure (EP) changes:
- 1. EP OR-2, " Release of Information to the Public," has been rescinded and incorporated into a new procedure EP EF-10, " Joint Media Center Activation and Operation."
- 2. EP EF-3A," Interim EOF Activation and Operation," and EP EF-3B, "Long-Term EOF Activation and Operation" have been rescinded and incorporated into procedure EP EF-3, " Activation and Operation of the Emergency Operations Facility." EP EF-3 had previously been rescinded (Revision 9), but has been resurrected as Revision 10.
- 3. Both Revision 15 and 16 of EP G-4," Personnel Assembly, Accountability and Site Access Control During Emergencies," are included in this submittal. Revision 15 is included for record purposes only. Revision 16 is the current procedure in effect.
- 4. Additional procedures have been revised as indicated in the enclosures to this letter.
02M 5 140051 W(
9602140392 960125 PDR ADOCK 05000275 F
Document Control D:sk January 25,1996 Page 2 As provided under 10 CFR 50.54(q), the changes in this update have been made without commission approval since they do not decrease the effectiveness of the emergency plan; and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
This update contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans."
Sincerely,un Robert P. Powers Manager - Operations Services cc:
Steven D. Bloom (w/o enclosures)
L.J. Callan (2)
Kenneth E. Perkins (w/o enclosures)
Michael D. Tschiltz (w/o enclosures)
Enclosures 1403S/JER/1345 l