{{#Wiki_filter:~4- '9       g~l Commonwealth Edison
{{#Wiki_filter:~4-
[ w ")) one First Nation't Plaza. Chicago, litmois Address Reply ta: P:st Offica Box 767
'9 g~l Commonwealth Edison
              \
[
) one First Nation't Plaza. Chicago, litmois
") Address Reply ta: P:st Offica Box 767
\\
w
(,/ Chicago, Illinois 60690 September 28, 1984 J.
(,/ Chicago, Illinois 60690 September 28, 1984 J.
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
        ' Washington, DC         20555 Sub ject:           Braidwood Station Units 1 and 2 Request for Examples from Observation Training Per 10 CFR 55.7 NRC Docket Nos. 50-456 and 50-457 References (a):             Administration of Operating Tests Prior to Initial Criticality (Generic Letter No. 84-10).
' Washington, DC 20555 Sub ject:
(b):       April 13, 1984 letter from E. D. Swartz to H. R. Denton concering Braidwood Operating Shift Experience.
Braidwood Station Units 1 and 2 Request for Examples from Observation Training Per 10 CFR 55.7 NRC Docket Nos. 50-456 and 50-457 References (a):
Administration of Operating Tests Prior to Initial Criticality (Generic Letter No. 84-10).
(b):
{{letter dated|date=April 13, 1984|text=April 13, 1984 letter}} from E. D. Swartz to H. R. Denton concering Braidwood Operating Shift Experience.


==Dear Mr. Denton:==
==Dear Mr. Denton:==
Reference (a) required Observation Training for individuals without " extensive : actual operating experience at a comparable
Reference (a) required Observation Training for individuals without " extensive : actual operating experience at a comparable
        -facility."       In accordance with reference (a) and 10 CFR 55.7, Commonwealth Edison requests exemptions from Observation Training for selected individuals who have accumulated experience levels that may permit. waiver of this requirement.
-facility."
Operating experience data sheets have been completed and are enclosed for all current license candidates. The data has been determined in the same manner as previous Byron Station submittals.
In accordance with reference (a) and 10 CFR 55.7, Commonwealth Edison requests exemptions from Observation Training for selected individuals who have accumulated experience levels that may permit. waiver of this requirement.
Exemptions from the Observation Training requirements are requested for those personnel with a minimum 36 months total nuclear P         plant. experience as. calculated by the conservative methods on the data sheets.         This level of experience was chosen because we feel it satisfies the. intent of the requirement for such a - program.
Operating experience data sheets have been completed and are enclosed for all current license candidates.
The data has been determined in the same manner as previous Byron Station submittals.
Exemptions from the Observation Training requirements are requested for those personnel with a minimum 36 months total nuclear P
plant. experience as. calculated by the conservative methods on the data sheets.
This level of experience was chosen because we feel it satisfies the. intent of the requirement for such a - program.
Two additional exemptio,is for people who do not meet the 36 month minimum are requested for the individuals listed below.
Two additional exemptio,is for people who do not meet the 36 month minimum are requested for the individuals listed below.
Amplifying rational is also provided.
Amplifying rational is also provided.
Suo2B8FS8%                                                                     3 v                                                                           #
Suo2B8FS8%
it \
3 v
it\\


ec - -
ec -
3 w   .
3 w
H. R. Denton-                                     September 28, 1984 NAME'                         RATIONALE Sanborn     Over.seven years Navy nuclear experience plus EWS qualification for 15 months have given him
H. R. Denton-September 28, 1984 NAME' RATIONALE Sanborn Over.seven years Navy nuclear experience plus EWS qualification for 15 months have given him significant operating experience-at power reactors.
-                          significant operating experience-at power reactors.
Weber Has previously held an FM) license at an operating PWR and has thus gained actual operating experience
Weber       Has previously held an FM) license at an operating PWR and has thus gained actual operating experience
:in the control rocm.
:in the control rocm.
The name of each individual for whom an exemption is requested has a triangle (Jk) above it. A response from the NRC by
The name of each individual for whom an exemption is requested has a triangle (Jk) above it.
: December 1,-1984 will enable Braidwood Station to schedule people from Observation Training on the basis of whether or not they are exempted from that requirement. We would appreciate a response by then.-
A response from the NRC by
: December 1,-1984 will enable Braidwood Station to schedule people from Observation Training on the basis of whether or not they are exempted from that requirement.
We would appreciate a response by then.-
Please direct any questions you may have concerning this
Please direct any questions you may have concerning this
        ~ matter.to this office.
~ matter.to this office.
One signed original and fifteen copies of this letter and its-attachment are provided for your-use.
One signed original and fifteen copies of this letter and its-attachment are provided for your-use.
Very truly yours, g.n wd6L J. G. Marshall Nuclear Licensing Administrator 1m cc:   Joe-Millan - Region III Don Beckham - NRR, Operating License Branch
Very truly yours, g.n wd6L J. G. Marshall Nuclear Licensing Administrator 1m cc:
        ' Attachment _(1):   Lperating Shift Experience Data Sheets (10 pages) 9246N
Joe-Millan - Region III Don Beckham - NRR, Operating License Branch
' Attachment _(1):
Lperating Shift Experience Data Sheets (10 pages) 9246N


a DATE P/31/84 PLANT NAME Braidwood                                                       CPERATING SHIFT EXPERIENCE                                                                                           ,
a DATE P/31/84 PLANT NAME Braidwood CPERATING SHIFT EXPERIENCE UTILITY. Commonwealth Edison g
UTILITY . Commonwealth Edison                                                                           g     3,                   g 0.L. DATE August 1985             NUCLEAR POWER PLANT EXPERIENCE                             (NOTE 2)
3, g
0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM             A           A           g           A             A TYPE OF EXPERIENCE                                     FACTOR       CREDIT       Masters McGee           Cretens       Schuman     Jackenn   Funka
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM A
: 1. SAME TYPE COPf1ERCIAL SRO                         1.00     NO LIMIT-
A g
                                                                                                                                                                      \
A A
: 2. OTHER CCM1ERCIAL SRO                               .75     NO LIMIT
TYPE OF EXPERIENCE FACTOR CREDIT Masters McGee Cretens Schuman Jackenn Funka
: 3. SAME TYPE COPHERCIAL R0                           1.00     NO LIMIT                                   N                                                               '
\\
: 4. OTHER COMMERCIAL R0                               .75     NO LIMIT R E                                                                            6m           3m           Ma           35 m       15 m     13.5ii
1.
                              )                         .50 OTHER)                                       .25                                                                                   "
SAME TYPE COPf1ERCIAL SRO 1.00 NO LIMIT-2.
72 m       6m             60 m       70 m         4 m       %e
OTHER CCM1ERCIAL SRO
: 6. SIMULATOR                                                  12 MONTHS 3.5 r         3.5 e       3m                             N (REFERENCE FLANT)                           5.00     (12 MONTHS)       3w 3"        3w           4w (SIMILAR)                                   3.00       (9 MONTHS)       4w                                   .
.75 NO LIMIT 3.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)               24 MONTHS 3"                                                                                  \
SAME TYPE COPHERCIAL R0 1.00 NO LIMIT N
(LESS THAN 1h YEARS PRIOR TO F.L.)
4.
(NORE THAN 1% YEARS PRIOR TO F.L.)
OTHER COMMERCIAL R0
                                                        .75
.75 NO LIMIT 6m 3m Ma 35 m 15 m 13.5ii R E
                                                        .50 (12 MONTHS)
)
(12 MONTHS) 0"                                                                                          \N
.50 OTHER)
: 8. LICENJED CLASSROOM TRAINING ANO EXAM               .50       9 MONTHS
.25 72 m 6m 60 m 70 m 4 m
: 9. PARTICIPATION AT OPERATING PLANT                   .75     12 MONTHS       \           \                   \     \           \         \                 \                   \
%e 3.5 r 3.5 e 3m N
: 10. OTHER NUCLEAR PLANT EXPERIENCE                       .25     12 MONTHS h("
6.
                                                                                    \                      '
SIMULATOR 12 MONTHS 3"
                                                                                                                                                                                \
(REFERENCE FLANT) 5.00 (12 MONTHS) 3w 3w 4w (SIMILAR) 3.00 (9 MONTHS) 4w
: 11. CON 00CTIhd LICENSE TRAINING                         .25       9 MONTHS
\\
: 12. OEGREE (ENGIN ERING, APPLIED SCIENCE OR                                                                                                                   \
3" 7.
N' 12 m         12 m         12 m               \ 12 m       12 m EQUIVALENT)                                       12 MONTHS                     g (BACHELORS DEGREE)                                 (12 MONTHS)
NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS (LESS THAN 1h YEARS PRIOR TO F.L.)
BSEE     %-MAT         8SEE                       BS       BSNE (ASSOCIATESCEGREE)                                   (6 MONTHS)
.75 (12 MONTHS)
\\
0" (NORE THAN 1% YEARS PRIOR TO F.L.)
.50 (12 MONTHS)
N 8.
LICENJED CLASSROOM TRAINING ANO EXAM
.50 9 MONTHS 9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
\\
\\
\\
\\
\\
\\
\\
\\
h("
\\
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS
: 11. CON 00CTIhd LICENSE TRAINING
.25 9 MONTHS
\\
: 12. OEGREE (ENGIN ERING, APPLIED SCIENCE OR N' 12 m 12 m 12 m
\\ 12 m 12 m
\\
EQUIVALENT) 12 MONTHS g
(BACHELORS DEGREE)
(12 MONTHS)
BSEE
%-MAT 8SEE BS BSNE (ASSOCIATESCEGREE)
(6 MONTHS)
TOTAL NUCLEAR PLANT EXPERIENCE:
TOTAL NUCLEAR PLANT EXPERIENCE:
HOT PARTICIPATIod EXPERIENCE TIME 20 PWR/8WR (WKS)                                                                     15 w (BWR     52w (BWR)
HOT PARTICIPATIod EXPERIENCE TIME 20 PWR/8WR (WKS) 15 w (BWR 52w (BWR)
STARTUP & SHUT 00WN (YES/NO)                                                               yes (SWR { yes (BWR)
STARTUP & SHUT 00WN (YES/NO) yes (SWR { yes (BWR)
MONTHS ON SHIFT                                                                         i m (BWR)       24 m (BW                                                                               -
MONTHS ON SHIFT i m (BWR) 24 m (BW NOTE 1: SEE *!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"
NOTE 1: SEE *!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"                                                     CHECK ONE OF THE FOLLOWING:
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)
O a-g,g,$og5g,p,y g,y,t,13,y,y ***
ANO SHIFT TEHCNICAL A0 VISORS (STA).
ANO SHIFT TEHCNICAL A0 VISORS (STA).
O     a-g,g,$og5g,p,y g,y,t,13,y,y ***
O b.
O    b. Shift advisors iii Probabir be reautred. at least for some sairts.
Shift advisors iii Probabir be reautred. at least for some sairts.
O     c. Do not plan to use shift advisors unless some unforeseen circumstance arises
O c.
Do not plan to use shift advisors unless some unforeseen circumstance arises


e ATE       8/31/84 PLAlO NAME Braldwood                                                     ' OPERATING SHIFT EXPERIENCE UTILITY Commionwealth Edison 0.L. DATE August 1985             NUCLEAR POWER PLANT EXPERIENCE                             (NOTE 2)
e ATE 8/31/84 PLAlO NAME Braldwood
' OPERATING SHIFT EXPERIENCE UTILITY Commionwealth Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXItt21             &'                    &                                    &
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXItt21 TYPE OF EXPERIENCE FACTOR CREDIT Herbert Chovan Bowers P. Smith McCue Petro 1.
TYPE OF EXPERIENCE                                     FACTOR       CREDIT       Herbert Chovan         Bowers     P. Smith McCue         Petro
SAME TYPE CO M RCIAL SRO 1.00 NO LIMIT
: 1. SAME TYPE CO M RCIAL SRO                         1.00     NO LIMIT
\\
: 2. OTHER COPHERCIAL SRO                                 .75     NO LIMIT                   *
2.
                                                                                                                                                      \
OTHER COPHERCIAL SRO
: 3. SAME TYPE COPNERCIAL R0                           1.00     NO LIMIT         N                                                                                                                                                                                           '
.75 NO LIMIT 3.
: 4. OTHER COPHERCIAL R0                                 .75     NO LIMIT
SAME TYPE COPNERCIAL R0 1.00 NO LIMIT N
: 5. NAVY (MILITARY) NUCLEAR                                       36 MCNTHS (RO. L.S. E00W. PPWS)                           .50 6.
4.
(OTHER)                                         .25
OTHER COPHERCIAL R0
                                                                                                                                                                                                                                                                                      \
.75 NO LIMIT 5.
              $1MULATOR                                                   12 MONTHS             3.5 m       3.5 m     3.5 m     3.5 m (REFERENCE PLANT)                           5.00     (12 MONTHS)       3,         3,         3,         3, (SIMILAR)                                     3.00     (9 MONTHS)                                                                                                                                                                                                       N
NAVY (MILITARY) NUCLEAR 36 MCNTHS (RO. L.S. E00W. PPWS)
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)
.50
                                                                  .75 24 MONTHS               J.5  b                t.5 m                                    3.5 (LESS THAN 1% YEARS PRIOR TO F.L.)                     (12 MONTHS)       5m                       5m                                 5m (HORE THAN 1 YEARS PRIOR TO F.L.)               .50     (12 MONTHS)                                                                 22 m
\\
: 8. LICENSED CLASSROOM TRAINING AND EXAM               .50       9 MONTHS
(OTHER)
                                                                                                                                                                  \
.25 6.
: 9. PARTICIPATION AT OPERATING PLANT                   .75     12 MONTHS
$1MULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3, 3,
                                                                                                \                             \                     \                                                                                                                                     \
3, 3,
: 10. OTFER NUCLEAR PLANT EXPERIENCE                       .25     12 MONTHS
(SIMILAR) 3.00 (9 MONTHS)
: 11. CONDUCTING LICENSE TRAINING                           .25       9 MONTHS
N b
                                                                                                \
t.5 m 3.5 7.
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR                                                                                                                                                         N
NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS J.5 (LESS THAN 1% YEARS PRIOR TO F.L.)
                                                                                                ,, 12 m         12 m     12 m       12 m       12 m                   12 m EQUIVALENT)                                       12 MONTHS A        $      )
.75 (12 MONTHS) 5m 5m 5m (HORE THAN 1 YEARS PRIOR TO F.L.)
BSME         BSNE       BSNE       BSNE       BSEE           olo TOTAL NUCLEAR PLANT EXPERIENCE:                                                 52 m       30.5 m     =0 ,       30.5 a     24 m       38 m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/BWR (WKS)                                                         66 w (BWR     *26 w     63 w (BWR >
.50 (12 MONTHS) 22 m 8.
STARTUP & SHUTDOWN (YES/NO)                                                   yes (SWR)     yes       yes (BWR)
LICENSED CLASSROOM TRAINING AND EXAM
MONTHS ON SHIFT                                                               P4 m (BWR     6m         23 m (BW t)                                                                                                                                                       .
.50 9 MONTHS
\\
9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
\\
\\
\\
\\
: 10. OTFER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS
: 11. CONDUCTING LICENSE TRAINING
.25 9 MONTHS
\\
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR
,, 12 m 12 m 12 m 12 m 12 m 12 m N
EQUIVALENT) 12 MONTHS BSME BSNE BSNE BSNE BSEE olo A
)
TOTAL NUCLEAR PLANT EXPERIENCE:
52 m 30.5 m
=0,
30.5 a 24 m 38 m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/BWR (WKS) 66 w (BWR
*26 w 63 w (BWR >
STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes yes (BWR)
MONTHS ON SHIFT P4 m (BWR 6m 23 m (BW t)
NOTE 1: SEE
NOTE 1: SEE
* INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EX'ERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=                                                 CHECK ONE OF THE FOLLOWING:
* INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EX'ERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=
1'  c g
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S, REACTOR OPERATORS (RO)
c NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S, REACTOR OPERATORS (RO)
O ' g,",,gcjPggtp,1 f,,",,%,t1,7 ""*
1' g
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
O ' g,",,gcjPggtp,1 f,,",,%,t1,7 ""*
* This tire is based on 100% availability of Ceco's Zion Nuclear Power Station u-c.
u-
Do not plan to use shift advisors unless some unforeseen circumstance arises
* This tire is based on 100% availability of Ceco's Zion Nuclear Power Station
: c. Do not plan to use shift advisors unless some unforeseen circumstance arises


DATE 8tJI/84 PLANT NAME Braidwood                                                       08ERATING SHIFT EXPERIENCE                                                                                       . .
DATE 8tJI/84 PLANT NAME Braidwood 08ERATING SHIFT EXPERIENCE C
UTILITYCommonwealth Edison
UTILITY ommonwealth Edison
                                                                                                - JOB TITLE: Shift Control Room Engineer 0.L. DATE August 1985             NUCLEAR POWER PLANT EXPERIENCE                             (NOTE 2)
- JOB TITLE: Shift Control Room Engineer 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACT;A WEIGHTING MAXIMlM                         A                               A TYPE OF EXPERIENCE                                     F8rTOR       CREDIT       Shim       Malewajka Maher         Anderson Cooper       Stiller   Peterson Malkswin
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACT;A WEIGHTING MAXIMlM A
: 1. SAKE TYPE COP 91ERCIAL SRO                       1.00     NO LIMIT
A TYPE OF EXPERIENCE F8rTOR CREDIT Shim Malewajka Maher Anderson Cooper Stiller Peterson Malkswin 1.
: 3. OTHER COPHERCIAL SRO                               .75     NO LIMIT
SAKE TYPE COP 91ERCIAL SRO 1.00 NO LIMIT 3.
: 3. SSX TYPE COPMERCIAL R0                           1.00     NO LIMIT
OTHER COPHERCIAL SRO
: 4. OTHER COPMERCIAL R0                               .75     NO LIMIT
.75 NO LIMIT 3.
: 5. NAVY (MILITARY) NUCLEAR                                     36 MONTHS 24 m                             12 m (RO.EWS.E00W.PPWS)                             .50 (OTHER)                                       .25                                   48 m                             48 m
SSX TYPE COPMERCIAL R0 1.00 NO LIMIT 4.
: 6.   $1MULATOR                                                   12 MONTHS             3.5 a       3.5 a                           3.5 m (REFERENCE PLANT)                           5.00     (12 MONTHS)                                                     3w     a (SIMILAR)                                   3.00       (9 MONTHS)       3.w         3w         ,
OTHER COPMERCIAL R0
4w       ,
.75 NO LIMIT 5.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT)               24 MONTHS             3.5 m     0.5 a                                                               5m (LESS THAN 1% YEARS PRIOR TO F.L.)             .75     (12 MONTHS)
NAVY (MILITARY) NUCLEAR 36 MONTHS 24 m 12 m (RO.EWS.E00W.PPWS)
(MORE TH#N 1% YEARS PRIOR TO F.L.)             .50     (12 MONTHS)       5m           Im                                                                 10 m
.50 (OTHER)
: 8. LICENSED CLASSROOM TRAINING AND EXAM               .50       9 MONTHS
.25 48 m 48 m 6.
: 9. PARTICIPATION AT OPERATING PLANT                   .75     12 MONTHS
$1MULATOR 12 MONTHS 3.5 a 3.5 a 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3w a
                                                                                                                                              \                                   \
(SIMILAR) 3.00 (9 MONTHS) 3.w 3w 4w 7.
NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 3.5 m 0.5 a 5m (LESS THAN 1% YEARS PRIOR TO F.L.)
.75 (12 MONTHS)
(MORE TH#N 1% YEARS PRIOR TO F.L.)
.50 (12 MONTHS) 5m Im 10 m 8.
LICENSED CLASSROOM TRAINING AND EXAM
.50 9 MONTHS
\\
\\
9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
\\
: 10. OTHER NUCLEAR PLANT EXPERIENCE
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS
: 11. CONDUCTING LICENSE TRAINING
: 11. CONDUCTING LICENSE TRAINING
                                                        .25
.25 9 MONTHS
                                                        .25 12 MONTHS 9 MONTHS
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR
                                                                                                                                                                            \
\\ 12 m 12 m 12 m 12 m 12 m 12 m 12 m 12 m EQUIVALENT)
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR EQUIVALENT)                                      ,12 MONTHS
,12 MONTHS g
                                                                                    \ 12 m         12 m         12 m     12 m       12 m     12 m       12 m       12 m g     g$,                               g$.
g$,
fA OC ES G )                                                                     Physi         85ME       BSME     Biolo       BSME    BSME       BSME
g$.
                                                                            )      BSME \
fA OC ES G )
TOTAL NUCLEAR PLANT EXPERIENCE:
)
26 m     43 m         17.5 m     16.5 m   46.5 m     22.5 m   14 m         17 m HOT PAFTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
BSME \\
Physi 85ME BSME Biolo BSME BSME BSME TOTAL NUCLEAR PLANT EXPERIENCE:
26 m 43 m 17.5 m 16.5 m 46.5 m 22.5 m 14 m 17 m HOT PAFTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
STARTUP & SHUT 00WN (YES/NO)
STARTUP & SHUT 00WN (YES/NO)
MONTHS ON SHIFT                                                                                                                                                                             -
MONTHS ON SHIFT NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTGAS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=
NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTGAS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=                                                   CHECK ONE OF THE FOLLOWING:
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SRO'S. REACTOR OPERATORS (RO)
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SRO'S. REACTOR OPERATORS (RO)
O
* g,1,*,gggy,g g,gg,t1,7 ***=
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
O
O b.
* g,1,*,gggy,g g,gg,t1,7                          ,          ***=
Shift advisors will probably be required, at least for some shifts.
O b. Shift advisors will probably be required, at least for some shifts.
Q. c.
Q . c. Do r:ot plan to use shift advisors unless some unforeseen circumstance arises
Do r:ot plan to use shift advisors unless some unforeseen circumstance arises


a PLANT NAME Braidwood                                                         OPERATING SHIFT EXPERIENCE                                                                                                   .-
a PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Conssonwealth Edison g
UTILITY Conssonwealth Edison JOB TITLE: Shift Foreman O.t. wu_ Amaim                 ,,, g - gg g g;I g ,,                                           : tm 2);                                                                                                   c ENTER DATA: . MONTHS / MONTHS X WE!GHTING FACTOR WEIGHTING MAXIPRM               &          .4         A           A         A                       A         A           A           A.         /5'
JOB TITLE: Shift Foreman O.t. wu_ Amaim
    - TYPE OF EXPERIENCE                                       FACTOR         CREDIT   Hidinbotham Bush               Meents     McCow       Rest       Chafnicki Sufft       Weber     Raer           thhel
,,, g - g g g;I g,,
: 1. SAME TYPE ComEECIAL SRO                           1.00       NO LIMIT
: tm 2);
: 2. OTHER Ca mERCIAL SRO                                 .75     NO LIMIT
c ENTER DATA:. MONTHS / MONTHS X WE!GHTING FACTOR WEIGHTING MAXIPRM
: 3. SAME TYPE CO MERCIAL R0                           1.00       NO LIMIT         N                                                                               e
.4 A
: 4. OTHER ComERCIAL R0                                   .75     NO LIMIT                                                                                                                   u
A A
: 5. NAVY (MILITARY) NUCLEAR                                       36 MONTels (RO.EWS.E00W,PPWS)                                                                 21 m                               36 m       12 m                                                       6m
A A
                                                                  .50                                                                                                                            12 m           ,
A A.
(OTHER) 9
/5'
                                                                  .25                       42 m                                 120 m       48 m                                         48 m         ga
- TYPE OF EXPERIENCE FACTOR CREDIT Hidinbotham Bush Meents McCow Rest Chafnicki Sufft Weber Raer thhel 1.
    -6. SIMULATOR                                                     12 MONTHS               3.5 a       3.5 m     3.5 a                   3m       3m                                             3m (REFERENCE PLANT)                           5.00     (12 MONTHS)
SAME TYPE ComEECIAL SRO 1.00 NO LIMIT 2.
(SIMILAR)                                   3.00       (9 MONTHS)       3w             3w         3w                     4w       4w       _
OTHER Ca mERCIAL SRO
4w
.75 NO LIMIT 3.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT)                 24 MONTHS                 *'$,                                                                                          '
SAME TYPE CO MERCIAL R0 1.00 NO LIMIT N
(LESS THAN 1 YEARSPRIORTOF.L.)                   .75     (12 MONTHS)       6m             2a         2m
e 4.
                                                                  .50 38 m       45 a                                           25 m (HORE THAN 1% YEARS PRIOR TO F.L.)                       (12 MONTHS)       3,
OTHER ComERCIAL R0
: 8. LICENSED CLASSROOM TRAINING AND EXAM                 .50       9 MONTHS 6
.75 NO LIMIT u
: 9.                                                                                                 "          "
5.
PARTICTPATION AT OPERATING PLANT                     .75       12 MONTHS
NAVY (MILITARY) NUCLEAR 36 MONTels 6m (RO.EWS.E00W,PPWS)
: 10. OTHER NUCLEAR PLANT EXPERIENCE                           .25       12 MONTHS
.50 21 m 36 m 12 m 12 m (OTHER)
: 11. CONOUCTING LICENSE TRAINING                             .25       9 M0r:THS
.25 42 m 120 m 48 m 48 m ga 9
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE OR                                             N EQUIVALENT)                                          12 MONTHS
-6.
                                                                                                  '              1m                                           6m                     6m         5m           6m 55 (BACHELORS DEGREE)                                 (12 MONTHS)
SIMULATOR 12 MONTHS 3.5 a 3.5 m 3.5 a 3m 3m 3m (REFERENCE PLANT) 5.00 (12 MONTHS)
(ASSOCIATES DEGREE)                                   (6 MONTHS) 13 hr                                          AS                  AAS        sem          AS hrs TOTAL NUCLEAR PLANT EXPERIENCE:
(SIMILAR) 3.00 (9 MONTHS) 3w 3w 3w 4w 4w 4w 7.
45.5 m       36.5 m   55.5 m       45 m     43.5 m     32.5 m     48 m       34 m       61 m .         51 m HOT PARTICIPATION EXPERIENCE                                                                                                             l TIME     20*. PWR/BWR (WKS)                                                                 54 w (BWR,   134 w (BUR)
NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1 YEARSPRIORTOF.L.)
* 93 w   **33 w     107 w (BH)
.75 (12 MONTHS) 6m 2a 2m 38 m 45 a 25 m (HORE THAN 1% YEARS PRIOR TO F.L.)
STARTUP & SHUTDOWN (YES/NO)                                                                   yes (SWR)   yes (BWR                                       yes       yes       yes (BWR)
.50 (12 MONTHS) 3, 8.
MONTHS ON SHIFT                                                                               20 M (BWR; 49 m (BWU)                                     34 m       12 m       52 m (BWR)             -
LICENSED CLASSROOM TRAINING AND EXAM
NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"                                                     CHECK ONE OF THE FOLLOWING:
.50 9 MONTHS 6
9.
PARTICTPATION AT OPERATING PLANT
.75 12 MONTHS
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS
: 11. CONOUCTING LICENSE TRAINING
.25 9 M0r:THS
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE OR N
1m 6m 6m 5m 6m EQUIVALENT) 12 MONTHS 55 (BACHELORS DEGREE)
(12 MONTHS) 13 hr AS AAS sem AS (ASSOCIATES DEGREE)
(6 MONTHS) hrs TOTAL NUCLEAR PLANT EXPERIENCE:
45.5 m 36.5 m 55.5 m 45 m 43.5 m 32.5 m 48 m 34 m 61 m.
51 m HOT PARTICIPATION EXPERIENCE l
TIME 20*.
PWR/BWR (WKS) 54 w (BWR, 134 w (BUR)
* 93 w
**33 w 107 w (BH)
STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes (BWR yes yes yes (BWR)
MONTHS ON SHIFT 20 M (BWR; 49 m (BWU) 34 m 12 m 52 m (BWR)
NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE aLL SHIFT SUPERVISORS (SS), SHIFT SRO'$ REACTOR OPERATORS (RO)
NOTE 2: INCLUDE aLL SHIFT SUPERVISORS (SS), SHIFT SRO'$ REACTOR OPERATORS (RO)
AND SHIFT TEHCNICAL ADVISORS (STA).
O a-g,*,dQ" gg,g g,1,g,t1,y We*
O     a-g,*,dQ" gg,g g,1,g,t1,y We*
c
c   ,,q                           ,
,,q AND SHIFT TEHCNICAL ADVISORS (STA).
* This time is based on 75% availability of CECO's Zion Nuclear Power Station
* This time is based on 75% availability of CECO's Zion Nuclear Power Station O
            ** This time is based on 75% availability of Witrantin Electric Power's Point Beach' O   b. Shire advisors wiii Probabir be required, at least ro sor- shirts.
b.
l Mucipac Pow r Station O    c-   Do not Plaa to use shirt advisors unless some unforeseea cirra= stance arises P f
Shire advisors wiii Probabir be required, at least ro sor-shirts.
l This time is based on 75% availability of Witrantin Electric Power's Point Beach' O
c-Do not Plaa to use shirt advisors unless some unforeseea cirra= stance arises P Mucipac Pow r Station f
O
O


                                                                                                                                                                      ' ~ ^        ' ~ -            -
DATE 8/31/84
DATE       8/31/84   '
' ~ ^
PLANT NME Braidwood                                                         OPERATING SHIFT EXPERIENCE
' ~ -
* UTILITY Commonwealth Edison 0.L. DATE August 1985                                                                           JOS TIE W t For m NUCLEAR POWER PLANT EXPERIENCE                               (NOTE 2)
PLANT NME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison JOS TIE W t For m 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS / MONTHS I WEIGHTtMG FACTOR WEIGHTING MAXIPRM                 A           A                     A                       A TYPE OF DPr1ttENCE                                     FACTOR       CREDIT       schert,       rehert     trin       Jan un     Pame w     Receveur
ENTER DATA: MONTHS / MONTHS I WEIGHTtMG FACTOR WEIGHTING MAXIPRM A
: 1. SAME TYPE COPttERCIAL SRO                         1.00     NO LIMIT N
A A
: 2. OTHER C0 mERCIAL SRO                               .75     NO LIMIT
A TYPE OF DPr1ttENCE FACTOR CREDIT
: 3. SAME TYPE ComERCIAL R0                             1.00     NO LIMIT           '                                                        '
: schert, rehert trin Jan un Pame w Receveur 1.
N         '
SAME TYPE COPttERCIAL SRO 1.00 NO LIMIT N
: 4. OTHER COPf4ERCIAL RO                               .75     NO LIMIT
2.
: 5. NAVY (MILITARf) NUCLEAR                                     36 MONT<iS (RO. EWS. E00W. PPWS)                           .50                                                       14 m       36 a     24 m       2.5 m (OTHER)                                         .25                                                   57 a     120 m     48 m     45 a
OTHER C0 mERCIAL SRO
: 6. SIMULATOR                                                   12 MONTHS               3a           3m                     3a                   3m (REFERENCE PLANT)                           5.00     (12 MONTHS)         4,           4,                     4,                 4, (SIMILAR)                                   3.00       (9 MONTHS)
.75 NO LIMIT 3.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT)               24 MONTHS 12 m  \ 12 m                    4.5 m                  12 m          \
SAME TYPE ComERCIAL R0 1.00 NO LIMIT N
(LESSTHAN1%YEARSPRIORTOF.L.)                     .75     (12 MONTHS) 0 II "                       -
4.
                                                            .50                        30 m         40 m                   42 a               43 m (NORE THAtt 15 YEARS PRIOR TO F.L.)                     (12710MTHS)
OTHER COPf4ERCIAL RO
: 8. LICENSED CLASSROOM TRAINING A M EIAM               .50       9 MONTHS       ,
.75 NO LIMIT 5.
: 9. PARTICIPATION AT OPERATING PLANT                   .75     12 MONTHS
NAVY (MILITARf) NUCLEAR 36 MONT<iS (RO. EWS. E00W. PPWS)
: 10. OTHER NUCLEAR PLANT EXPERIENCE                       .25     12 NONTHS 4             y                                                                         \
.50 14 m 36 a 24 m 2.5 m (OTHER)
II. CONDUCTING LICENSE TRAINING                           .25       9 MONTHS
.25 57 a 120 m 48 m 45 a 6.
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR                                             ,                                                                  \
SIMULATOR 12 MONTHS 3a 3m 3a 3m (REFERENCE PLANT) 5.00 (12 MONTHS) 4, 4,
EQUIVALENT)                                         12 MONTHS             \                         0"                                        \
4, 4,
(SACHELORS CEGREE)                                 (12 MONTHS)
(SIMILAR) 3.00 (9 MONTHS) 12 m \\ 12 m 4.5 m 12 m
(ASSOCIATES DEGREE)                                                                             AS (6 MONTHS)                                                               \
\\
TOTAL NUCLEAR PLANT EXPERIENCE:                                                 41 a         35.5 a       32 a       63 a     30 m       53.5 m NOT PARTICIPATICM EXPERIENCE TIME 20% PWR/ SWR (WKS)
7.
* 26 w STARTUP & SHUTDOWN (YES/NO)                                                                   I'5 PONTHS ON SHIFT                                                                               6m NOTE 1: SEE
NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESSTHAN1%YEARSPRIORTOF.L.)
* INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EIFERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=                                                     CHECK CNE OF THE FOLLOWING:
.75 (12 MONTHS) 0 II "
30 m 40 m 42 a 43 m (NORE THAtt 15 YEARS PRIOR TO F.L.)
.50 (12710MTHS) 8.
LICENSED CLASSROOM TRAINING A M EIAM
.50 9 MONTHS 9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 NONTHS
\\
4 y
II. CONDUCTING LICENSE TRAINING
.25 9 MONTHS
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR
\\
0"
\\
EQUIVALENT) 12 MONTHS
\\
(SACHELORS CEGREE)
(12 MONTHS)
(ASSOCIATES DEGREE)
(6 MONTHS)
AS
\\
TOTAL NUCLEAR PLANT EXPERIENCE:
41 a 35.5 a 32 a 63 a 30 m 53.5 m NOT PARTICIPATICM EXPERIENCE TIME 20% PWR/ SWR (WKS)
* 26 w STARTUP & SHUTDOWN (YES/NO)
I'5 PONTHS ON SHIFT 6m NOTE 1: SEE
* INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EIFERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=
CHECK CNE OF THE FOLLOWING:
NOTE 2: INCLUCE ALL SHIFT SUPERVISORS ($$). SHIFT SRO'S, REACTOR OPERATORS (RO)
NOTE 2: INCLUCE ALL SHIFT SUPERVISORS ($$). SHIFT SRO'S, REACTOR OPERATORS (RO)
O a-g,1,* ym 3g,p,y g,1,g,t1,y ***
g,,,
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
O     a-g,1,* g ,,, ym 3g,p,y g,1,g,t1,y ***    ,
O b.
L
Saire savisors witi Preeabir de re2=ir e. at ieast for so m sairts-L
* Th t        s based on 100% availability of Ceco's Zion Nuclear O    b. Saire savisors witi Preeabir de re2=ir e. at ieast for so m sairts-Q     c. Do not plan to use shif t advisors emless sore uforeseen circestance artses
* Th t s based on 100% availability of Ceco's Zion Nuclear Q
c.
Do not plan to use shif t advisors emless sore uforeseen circestance artses


e DATE 8/31/84 PLANT NAME Braftwood                                                                                                                                                                       e OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison 0.L. DATE August 1985                                                                 JOB TITLE: Nuclear Station Operator NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
e DATE 8/31/84 PLANT NAME Braftwood e
FOR OPERATING SHIFT POSITIONS (NOTE 1)
OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison JOB TITLE: Nuclear Station Operator 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE FOR OPERATING SHIFT POSITIONS (NOTE 1)
WEIGHTING MAXIMUM                    ENTER E.ATA: MONTHS / MONTHS X WEIGHTIhG FACTOR TYPE OF EXPERIENCE                                                                         A                      A                                            A FACTOR       CREDIT Waaner       Hamilton Pallentt1e B. Smith Royston Yurtcvich Kropp               Cooley       Lambert Rahriq
(NOTE 2)
: 1. SAME TYPE COPttERCIAL SR0                         1.00       NO LIMIT
ENTER E.ATA: MONTHS / MONTHS X WEIGHTIhG FACTOR WEIGHTING MAXIMUM A
: 2. OTHER COPitERCIAL SRO                               .75 y
A A
NO LIMIT
TYPE OF EXPERIENCE FACTOR CREDIT Waaner Hamilton Pallentt1e B. Smith Royston Yurtcvich Kropp Cooley Lambert Rahriq 1.
: 3. SAME TYPE COPf4ERCIAL R0                         1.00       NO LIMIT                                                                                             '
SAME TYPE COPttERCIAL SR0 1.00 NO LIMIT y
: 4. OTHER COPf1ERCIAL R0                               .75     NO LIMIT
2.
: 5. NAVY (MILITARY) NUCLEAR                                     36 MONTHS (RO. EWS. E00W. PPWS)                         .50                                   9m                               3a                               21 m (OTHER)                                           25                             36 m                             12 m
OTHER COPitERCIAL SRO
: 6. SIMULATOR y                          42 m 12 MONTHS 3.5 m       3.5 m     3.5 m       3.5 m     .5 m     3.5 m     3.5 m         3.5 a       3.5 a       3.5 a 3"         3"         3"         3"     N 3"           3"       3"                     3"           3"
.75 NO LIMIT 3.
: 7.                                                                                4.5 s'   4.5 m       4.5 m     4.5 m       6m   '
SAME TYPE COPf4ERCIAL R0 1.00 NO LIMIT 4.
4.5 a     2.5 m.       12 m     2. 3 m NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)               24 MONTHS         2m       6.5 m       2m
OTHER COPf1ERCIAL R0
: e. 3 m (LESS THAN lh YEARS PRIOR TO F.L.)             .75 5m                    Fm (12 MONTHS)   5m         6m       6m         6m         12 m       6m       5m           $1         5m           5 (HORE THAN 1 YEARS PRIOR TO F.L.)             .50     (12 MONTHS)   4m       13 a       4m         10 m                   14 m
.75 NO LIMIT 5.
: 8. LICENSED CLASSROOM TRAINING AND EXAM               .50       9 MONTHS 5
NAVY (MILITARY) NUCLEAR 36 MONTHS (RO. EWS. E00W. PPWS)
: 9. PARTICIPATION AT OPERATING PLANT                                                 "
.50 9m 3a 21 m (OTHER) 25 36 m 12 m y 42 m 6.
                                                            .75       12 MONTHS                       "          "          "
SIMULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m
: 10. OTHER NUCLEAR PLANT EXPERIENCE                       .25       12 MONTHS
.5 m 3.5 m 3.5 m 3.5 a 3.5 a 3.5 a 3"
                                                                                                                                                    }            )
3" 3"
I
3" 3"
                                                                                                                                                                                          \
3" 3"
: 11. CCNDUCTING LICENSE TRAINING                         .25       9 MONTHS
3" 3"
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR                                     N EQUIVALENT)                                       12 MONTHS       3m                               7m                               6m (BACHELORS DEGREE) 2m          6m (12 MONTHS)   30                               70 (ASSOCIATES DEGREE)                                                                                                                             24 (6 MONTHS)   sem hr                           sem hr                           ASS         see hr       ASS TOTAL huCLEAR PLANT EXPERIENCE:
N 4.5 s' 4.5 m 4.5 m 4.5 m 6m 4.5 a 2.5 m.
28 m     43 a       25 m       36 m       20.5 m       30 m     22 m       59.5 e       28.5 m       15 m HOT PARTICIPATION EXPERIENCE TIME 20S PWR/BWR (WKS)
12 m
: 2. 3 m
: e. 3 m 7.
NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS 2m 6.5 m 2m 5m Fm (LESS THAN lh YEARS PRIOR TO F.L.)
.75 (12 MONTHS) 5m 6m 6m 6m 12 m 6m 5m
$1 5m 5
(HORE THAN 1 YEARS PRIOR TO F.L.)
.50 (12 MONTHS) 4m 13 a 4m 10 m 14 m 8.
LICENSED CLASSROOM TRAINING AND EXAM
.50 9 MONTHS 5
9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
}
\\
)
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS I
: 11. CCNDUCTING LICENSE TRAINING
.25 9 MONTHS
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR N
EQUIVALENT) 12 MONTHS 3m 7m 6m 2m 6m (BACHELORS DEGREE)
(12 MONTHS) 30 70 24 (ASSOCIATES DEGREE)
(6 MONTHS) sem hr sem hr ASS see hr ASS TOTAL huCLEAR PLANT EXPERIENCE:
28 m 43 a 25 m 36 m 20.5 m 30 m 22 m 59.5 e 28.5 m 15 m HOT PARTICIPATION EXPERIENCE TIME 20S PWR/BWR (WKS)
STARTUP & SHUTDOWN (YES/NO)
STARTUP & SHUTDOWN (YES/NO)
MONTHS ON SHIFT L.
MONTHS ON SHIFT L.
NOTE 1: SEJ " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)*                                         CHECK ONE OF THE FOLLOWING:
NOTE 1: SEJ " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)*
CHECK ONE OF THE FOLLOWING:
NOTE 2:
NOTE 2:
t IttCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SR3'S. REACTOR OPERATOPS (RO)
IttCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SR3'S. REACTOR OPERATOPS (RO)O *,g,adj!agg,p,y g,y,g,q,ty,y **Ma AND SHIFT TEHCNICAL ADVISORS (STA),
AND SHIFT TEHCNICAL ADVISORS (STA),                                                  O * ,g,adj!agg,p,y g,y,g,q,ty,y **Ma
,c t
                                                                                                                          ,c O   b. Shift advisors w*ii Predabir be required. at ienst for some shirts.
O b.
O   c. Do not plan to use shift advisors unless serie un'oreseen circumstance arises.
Shift advisors w*ii Predabir be required. at ienst for some shirts.
O c.
Do not plan to use shift advisors unless serie un'oreseen circumstance arises.


as                           . o _. .       . _ . . . . _ . _ _ . . . . _ . .          _ . . -
as
OATE 8/31/84                                                                                                                                                                                             ,
. o _..
OPERATING SHIFT EXPEPIENCE PLANT NAME Braldwood UTILITY Comonwealth Edison                                                                                     g       g 0.L. DATE August 1985             NUCLEAR POWER PLANT EXPERIENCE                                         (NOTE 2)
OATE 8/31/84 PLANT NAME Braldwood OPERATING SHIFT EXPEPIENCE UTILITY Comonwealth Edison g
g 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS /HONTHS X WEIGHTING FACTOR WEIGHTING MAXIMJM                                   &          A Braq11a Andrews       Stefan RWeki 7andem..A Hett Va uerhevden Cuintu FACTOR          CREDIT TYPE OF EXPERIENCE 1.00          NO LIMIT
ENTER DATA: MONTHS /HONTHS X WEIGHTING FACTOR WEIGHTING MAXIMJM A
: 1. SAME TYPE C0tt1ERCIAL SRO
TYPE OF EXPERIENCE FACTOR CREDIT Braq11a Andrews Stefan RWeki 7andem..A Hett Va uerhevden Cuintu 1.
                                                                .75          NO LIMIT
SAME TYPE C0tt1ERCIAL SRO 1.00 NO LIMIT 3.
: 3. OTHER COMMERCIAL SRO
OTHER COMMERCIAL SRO
: 3. SAME TYPE CCFNERCIAL R0                               1.00         NO LIMIT
.75 NO LIMIT 3.
: 4. OTHER COPHERCIAL R0                                     .75         NO LIMIT
SAME TYPE CCFNERCIAL R0 1.00 NO LIMIT 4.
: 5. NAVY (MILITARY) NUCLEAR 36 MONTHS                             21 m       10.5 a
OTHER COPHERCIAL R0
                                                                  .50                                                        42 m (RO.EWS.E00W.PPWS)                                   .25                                          42 m (OTHER) 3m
.75 NO LIMIT 5.
: 6. SIMULATOR 5.00 12 MONTHS (12 MONTHS)
NAVY (MILITARY) NUCLEAR 36 MONTHS 21 m 10.5 a (RO.EWS.E00W.PPWS)
                                                                                                    \          4, 3m 4,
.50 42 m 42 m
3m 4,
.25 (OTHER) 12 MONTHS
(REFERENCE PLANT)                                                                                                              \                                   .
\\
($1MILAR)                                       3.00           (9 MONTHS)
3m 3m 3m 6.
                                                                                                                                                                            ~
SIMULATOR (REFERENCE PLANT) 5.00 (12 MONTHS) 4, 4,
24 MONTHS                                                      e          m                    '5 m            "n
4,
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)                                                                                                                 6m              6m (LESS THAN 1% YEARS PRIOR TO F.L.)
\\
                                                                  .75       (12 MONTHS)                       34 m         38 m       6mA     6m         6m
($1MILAR) 3.00 (9 MONTHS)
                                                                  .50       (12 MONT' 5)                                               6m \     17 m       14 m       (3 m         .
~
7m (HORE THAN 15 YEARS PRIOR TO F.L.)
7.
: 8. LICENSED CLA55R00M TRAINING AND EXAM                     .50           9 MONTHS                                             \
NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS e
: 9. PARTICIPATION AT OPERATING PLANT                         .75         12 MONTHS M* *                          "                          "
m
: 10. OT;iER NUCLEAR PLANT E;.PERIENCE,                         .25         12 HONTHS
'5 m "n
: 11. CONOUCT!hG LICENSE TRAINING                               .25           9 MONTHS                                                                                                 \
(LESS THAN 1% YEARS PRIOR TO F.L.)
                                                                                                                                                                        \
.75 (12 MONTHS) 34 m 38 m 6mA 6m 6m 6m 6m (HORE THAN 15 YEARS PRIOR TO F.L.)
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR                                                       'N . O g 6m 12 NONTHS EQUIVALENT)                                                                        0 (BACHELORS DEGREE)                                         (12 MONTHS)                                   AAS (ASSOCIATES DEGREE)                                         (6 MONTHS)             semh\
.50 (12 MONT' 5) 6m \\
TOTAL NUCLEAR PLANT EXPERIENCE:                                                                         48 m       46.5 m   13.5 a     34 m     23.5       23 a             21.5 m 14.5 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
17 m 14 m (3 m
. 7m
\\
8.
LICENSED CLA55R00M TRAINING AND EXAM
.50 9 MONTHS 9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS M*
: 10. OT;iER NUCLEAR PLANT E;.PERIENCE,
.25 12 HONTHS
\\
: 11. CONOUCT!hG LICENSE TRAINING
.25 9 MONTHS
\\
: 12. DEGREE (ENGINEERING. APPLIED SCIENCE OR
'N. O g EQUIVALENT) 12 NONTHS 6m 0
(BACHELORS DEGREE)
(12 MONTHS)
AAS (ASSOCIATES DEGREE)
(6 MONTHS) semh\\
TOTAL NUCLEAR PLANT EXPERIENCE:
14.5 m 48 m 46.5 m 13.5 a 34 m 23.5 23 a 21.5 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
STARTUP & SHUTDOWN (YES/NO)
STARTUP & SHUTDOWN (YES/NO)
MONTHS ON SHIFT NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR                                   CHECK ONE OF THE FOLLOWING:
MONTHS ON SHIFT NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR CHECK ONE OF THE FOLLOWING:
OPERATING SHIFT POSITIONS (OL APPLICANTS)*
OPERATING SHIFT POSITIONS (OL APPLICANTS)*
O a-g,",,al,yg,yg,g g,ag,t1,y ***
NOTE 2: INCLUDE ALL SHIFT SUPERh SORS (SS). SHIFT SRO'S, REACTOR OPERATORS (RO)
NOTE 2: INCLUDE ALL SHIFT SUPERh SORS (SS). SHIFT SRO'S, REACTOR OPERATORS (RO)
O    a-g,",,al,yg,yg,g g,ag,t1,y ***
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
: c. Do not plan to use shift advisors unless some unforeseen circumstance arises.
Q c.
Q
Do not plan to use shift advisors unless some unforeseen circumstance arises.


                                                                                                                                                                                  .n CATI     8/31/84 PLANT NAME Brath                                                                                                                                                           ,
.n CATI 8/31/84 l
l                                                                                    OPERATING SHIFT EXPERIENCE                                                                   Y UTILITT Commonwealth Edison 1 JOB TITLE: Equipment Operator l         0.L. DATE A89ust 1985             NUCLEAR POWER PLANT EXPERIENCE                             (NOTE 2)
PLANT NAME Brath OPERATING SHIFT EXPERIENCE Y
FOR OPERATING SHIFT POSITIONS (NOTE 1) l ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR TYPE OF EXPERIENCE                                       A Ot E     Carlson         Pempe       Nordland Spangler Scharf D'Orazio
UTILITT Commonwealth Edison 1 JOB TITLE: Equipment Operator l
    - 1. SAME TYPE C0f9ERCIAL SRO                         1.00 -       NO LIMIT                                                                                               -
0.L. DATE A89ust 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
: 2. OTHER C0petERCIAL SRO -                             .75       NO LIMIT                   ,                                                    N         \ {               ,
FOR OPERATING SHIFT POSITIONS (NOTE 1) l ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR TYPE OF EXPERIENCE A Ot E
: 3. SAME TYPE COP 9tERCIAL R0                         1.00         NO LIMIT       N gN
Carlson Pempe Nordland Spangler Scharf D'Orazio
: 4. OTHE' COPeqERCIAL R0                               .75       NO LIMIT
- 1.
: 5. NAVT (MILITART) NUCLEAR
SAME TYPE C0f9ERCIAL SRO 1.00 -
NO LIMIT 2.
OTHER C0petERCIAL SRO -
.75 NO LIMIT N
\\ {
3.
SAME TYPE COP 9tERCIAL R0 1.00 NO LIMIT N
gN 4.
OTHE' COPeqERCIAL R0
.75 NO LIMIT
{
{
36 MONTE (RO. EWS. E00W. PPWS)                           .50                                                                                                   \
5.
(OTHER)                                         .25                                                                                                     N 6.
NAVT (MILITART) NUCLEAR 36 MONTE (RO. EWS. E00W. PPWS)
N                            N SIMULATOR                                                       12 MONTHS         3,$ ,
.50
(REFERENCE PLANT)                           5.00     (12 MONTHS)-
\\ N (OTHER)
(SIMILAR)                                     3.00         (9 MONTHS)   3W                                                               N
.25 N
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT)                 24 MONTHS                                       *"
N 6.
(LESS THAN 1 TEARS PRIOR TO F.L.)               .75     (12 MONTHS)
SIMULATOR 12 MONTHS 3,$,
(MORETHAN14VEARSPRIORTOF.L.)                   .50     (12 MONTHS) g"                                         \N       N
(REFERENCE PLANT) 5.00 (12 MONTHS)-
: 8. LICENSED CLASSROOM TRAINING AND EXAM               .50         9 MONTHS
(SIMILAR) 3.00 (9 MONTHS) 3W N
                                                                                                                                                                          \
7.
: 9. PARTICIPATION AT OPERATING PLANT                   .75       12 MONTiS X       ,
NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1 TEARS PRIOR TO F.L.)
                                                                                                                ]           ]         2       i l
.75 (12 MONTHS)
: 10. OTHER NUCLEAR PLANT EXPERIENCE                       .25       12 MONTHS f           f       lh                                     f
(MORETHAN14VEARSPRIORTOF.L.)
.50 (12 MONTHS) g"
\\
N N
\\
8.
LICENSED CLASSROOM TRAINING AND EXAM
.50 9 MONTHS 9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTiS X
]
]
2 l
i
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS f
f lh f
: 11. CONDUCTING LICENSE TRAINING
: 11. CONDUCTING LICENSE TRAINING
.25 9 MONTHS
\\
f\\l h
i
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE
                                                              .25          9 MONTHS
\\
                                                                                          \
6*
                                                                                                      \
6*
f\l                h                  i EQUIVALENT)                                       12 MONTHS 6*          6*                      \\
\\
(BACHELORS DEGREE)                                 (12 MONTHS)             \         g$           g5 (ASSOCIATES DEGREE)                                 (6 MONIH3)
EQUIVALENT) 12 MONTHS
                                                                                                \                                           \
\\
(BACHELORS DEGREE)
(12 MONTHS)
\\
g$
g5 (ASSOCIATES DEGREE)
(6 MONIH3)
\\
\\
TOTAL NUCLEAR PLANT EXPERIENCE:
TOTAL NUCLEAR PLANT EXPERIENCE:
: 9. 5 m_           20 m         23 m     15 m   15 m       14 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
: 9. 5 m_
20 m 23 m 15 m 15 m 14 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)
STARTUP & SHUTDOWN (YES/NO)
STARTUP & SHUTDOWN (YES/NO)
MONTHS ON SHIFT l
MONTHS ON SHIFT l
NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR' OPERATING SHIFT POSITIONS (OL APPLICANTS)*                                       CHECK ONE OF THE FOLLOWING:
NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR' OPERATING SHIFT POSITIONS (OL APPLICANTS)*
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)
O a-,y,1,*gg,yg,g g,3,gy,y pa***
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
O    a-
                                                                                                                ,y,1,*gg,yg,g g,3,gy,y pa***
O '. Shift ae isors ili oroeabi> ee m
O '. Shift ae isors ili oroeabi> ee m
* e . *: iew. 9r so* sai'u o
* e. *: iew. 9r so* sai'u o
O = k m o'v = u w" v --- ~ ~-- '"-
O = k m o'v = u w" v --- ~ ~-- '"-


DATg 8/31/84 PLANT NAME     B ralhd                                                     OPERATING SHIFT EXPERIENCE UTILITY Commonweaith Edison 0.L. DATE August 1985             NUCLEAR POWER PLANT EXPERIENCE                           (NOTE 2)
DATg 8/31/84 PLANT NAME B ralhd OPERATING SHIFT EXPERIENCE UTILITY Commonweaith Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXDUt TYPE OF EXPERIENCE                                     FACTOR       CREDIT       unit,     mneuen     Acker       Biskie   seeman     Schumacher Kurmuk
ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXDUt TYPE OF EXPERIENCE FACTOR CREDIT
: 1. SAME TYPE Cott1ERCIAL SRO                         1.00       NO LIMIT N                                                                         N_
: unit, mneuen Acker Biskie seeman Schumacher Kurmuk 1.
: 2. OTHER ComtERCIAL SRO                               .75     NO LIMIT
SAME TYPE Cott1ERCIAL SRO 1.00 NO LIMIT N
: 3. SAME TYPE Cort 1ERCIAL R0                         1.00       NO LIMIT         N                                                                                     '
N_
: 4. OTHER C0rttERCIAL R0                               .75       NO LIMIT
2.
: 5. NAVY (MILITAr.Y) NUCLEAR                                     36 MONT<ts (RO,EWS,E00W,PPWS)                             .50                                                   24 m
OTHER ComtERCIAL SRO
                                                              .25 (OTHER)                                                                                          48 m                         N f                                   N             MONTH
.75 NO LIMIT 3.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT)               24 MONTHS                                   5m (LESSTHANI%YEARSPRIORTOF.L.)                   .75     (12 MONTHS)
SAME TYPE Cort 1ERCIAL R0 1.00 NO LIMIT N
(HORE THAN 1% YEARS PRIOP TO F.L.)             .50     (12 MONTHS)                               10 m
4.
: 8. LICENSED CLASSROOM TRAINING AND EXAM               .50         9 MONTHS
OTHER C0rttERCIAL R0
: 9. PARTICIPATION AT OPERATING PLANT                   .75     12 MONTHS Qm
.75 NO LIMIT 5.
: 10. OTHER NUCLEAR PLANT EXPERIENCE                       .25                               0                       0 12 MONTHS
NAVY (MILITAr.Y) NUCLEAR 36 MONT<ts (RO,EWS,E00W,PPWS)
: 11. CONDUCTING LICENSE TRAINING                           .25       9 MONTHS
.50 24 m (OTHER)
                                                                                            \
.25 48 m N
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE OR                                         \'            6m                     9m EQUIVALENT)                                         12 MONTHS 92 (BACHELORS DEGREE)                                 (12 MONTHS)
f N
AS                       see (ASSOCIATES DEGREE)                                   (6 MONTHS)                                         hrs.
MONTH 7.
NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 5m (LESSTHANI%YEARSPRIORTOF.L.)
.75 (12 MONTHS)
(HORE THAN 1% YEARS PRIOP TO F.L.)
.50 (12 MONTHS) 10 m 8.
LICENSED CLASSROOM TRAINING AND EXAM
.50 9 MONTHS 9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS Qm
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS 0
0
: 11. CONDUCTING LICENSE TRAINING
.25 9 MONTHS
\\
: 12. DEGREE (ENGINEERING, APPLIED SCIENCE OR
\\
6m 9m EQUIVALENT) 12 MONTHS 92 (BACHELORS DEGREE)
(12 MONTHS)
AS see (ASSOCIATES DEGREE)
(6 MONTHS) hrs.
TOTAL NUCLEAR PLANT EXPERIENCE:
TOTAL NUCLEAR PLANT EXPERIENCE:
13.5 m     17 m       31.5 m   11 m     1.5 a     2m       2m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/EWR (WKS)
13.5 m 17 m 31.5 m 11 m 1.5 a 2m 2m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/EWR (WKS)
STARTUP & SHUTOOWN (YES/NO)
STARTUP & SHUTOOWN (YES/NO) lMONTHSONSHIFT L_
L_
PME 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"
PME 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR lMONTHSONSHIFT OPERATING SHIFT POSITIONS (OL APPLICANTS)"
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55), SHIFT SR0'$. REACTOR OPERATORS (RO)
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55), SHIFT SR0'$. REACTOR OPERATORS (RO)
O a-g,ajpog,75g,g,g;g,ty,y me*
AND SHIFT TEHCNICAL ADVISORS (STA).
AND SHIFT TEHCNICAL ADVISORS (STA).
O CHECK ONE OF THE FOLLOWING:
O b.
O a-b.
g,ajpog,75g,g ,g;g,ty,y me*
Shift aevisors iii probabis be required at ienst for some shirts.
Shift aevisors iii probabis be required at ienst for some shirts.
Do not piaa to use shirt ao.isars uniess some unforeseen circtostance arises.
O c-Do not piaa to use shirt ao.isars uniess some unforeseen circtostance arises.
O    c-


a DATE     8/31/84 PLANT NAME Braidwood                                                         OPERATING SHIFT EXPERIENCE                                                                                                   '
a DATE 8/31/84 PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Ceemonwealth Edison JOB TITLE: SRos (not on shift) 0.L. DATE August 1985
UTILITY Ceemonwealth Edison 0.L. DATE August 1985 JOB TITLE: SRos (not on shift)
' NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
                                          ' NUCLEAR POWER PLANT EXPERIENCE                               (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
FOR OPERATING SHIFT POSITIONS (NOTE 1)
ENTER DATA: PONTHS/ MONTHS X WEIGHTING FACTOR WEICTING MAXIMUM                             A Lemke  &            A         &        A                     .A             A TYPE OF EXPERTrNCE                                      FACTOR        CREDIT      Yu& ngk       Hertogul               Ungeran Sanborn Glaza             Krowzack Paquette O'Brien             Legner
ENTER DATA: PONTHS/ MONTHS X WEIGHTING FACTOR WEICTING MAXIMUM Yu&
: 1. SAME TYPE CONMERCIAL SR0                           1.00       NO LIMIT
A A
: 3. OTHER COPHERCIAL SRO                                 .75     NO LIMIT
A
: 3.                                                     1.00                          '
.A A
N SAME TYPE C0Ft1ERCIAL R0                                     NO LIMIT
ngk Hertogul Lemke Ungeran Sanborn Glaza Krowzack Paquette O'Brien Legner TYPE OF EXPERTrNCE FACTOR CREDIT 1.
: 4. OTHER COPYTERCIAL R0                                 .75     NO LIMIT
SAME TYPE CONMERCIAL SR0 1.00 NO LIMIT 3.
: 5. NAVY (MILITARY) NUCLEAR                                       36 MONT,G                                                               7.5 a   30 m                     3m         21 m (RO. EWS. E00W. PPWS)                           .50                                                                               #"
OTHER COPHERCIAL SRO
(OTHER)                                         .25                                                                         15 m       60                    6m 10. M 59 ,                             43 ,         42 m
.75 NO LIMIT 3.
: 6. SIMULATOR                                                     12 MONTHS                 3.5 m     3.5 m     3.5 m       3.5 m       3.5 m     3.5       3.5 m                   3.5 a           3o 5.00                        3w        3" 3w        "
SAME TYPE C0Ft1ERCIAL R0 1.00 NO LIMIT N
3w 3"       3w 38 3w                                                        .5m 4, (REFERENCE PLANT)                                     (12 MONTHS)                                                                     3w         3w                     3w (SIMILAR)                                     3.00       (9 MONTHS)       4w             4w         4w       . 4w                                                       2w
4.
: 7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)
OTHER COPYTERCIAL R0
(LESS THAN 14 YEARS PRIOR TO F.L.)               .75 24 MONTHS (12 MONTHS)         34 m I "
.75 NO LIMIT 5.
x
NAVY (MILITARY) NUCLEAR 36 MONT,G 7.5 a 30 m 3m 21 m (RO. EWS. E00W. PPWS)
                                                                                                                                                                                                      \N
.50
                                                            .50 (MORETHAN15YEARSPRIORTOF.L.)                             (12 MONTHS)
: 10. M 15 m 60 6m (OTHER)
                                                                                                                                    \                                               N                       \
.25 42 m 59,
: 8. LICENSED CLASSR00ri TRAINING AND EXAM               .50       9 MONTHS       ,
43,
g
6.
: 9.                                                       .75 PARTICIPATION AT OPERATING PLANT                             12 MONTHS
SIMULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m 3.5 m 3.5 3.5 m 3.5 a 3o 3"
                                                                                              \
3" 38
: 10. OTHER NUCLEAR PLANT EXPERIENCE                         .25                                   m                                  m            N 12 MONTHS x M2 m                        ,
.5m (REFERENCE PLANT) 5.00 (12 MONTHS) 3w 3w 3w 3w 3w 3w 3w 3w 4,
: 11. CONOUCTING LICENSE TRAINING                           .25       9 MCNTHS
(SIMILAR) 3.00 (9 MONTHS) 4w 4w 4w
                                                                                              \         \
. 4w 2w
: 12. OEGREE (ENGINEERING. APPLIED SCIENCE OR                                               ,    12 m       12 m     12 m         12 m                 6m         12 m         12 m       12 m         12 m EQUIVALENT)                                         12 MONTHS (BACHELORS DEGREE)                                 (12 MONTHS)         BSEE         8SNE       MBA       BSME                   AS         MSNE     BSP'E       MSIA         MSSM (ASSOCIATES DEGREE)                                   (6 MONTHS)                     MSNE       BSNE       MSNE                                                   ,BSEE       .
\\
TOTAL NUCLEAR PLANT EXPERIENCE:
I "
48.5 a       36.5 m     36.5       51.5 m     32 m       43.5 m     30.5 m       37.5 m     70 m       30 m HOT PARTICIPATION EXPERIENCE TIP1E 205 PWR/BWR (WKS)
7.
* 42 w                                                   **32 w STARTUP & SHUTDOWN (YES/NO)                                                                                           yes                                                       yes MONTHS ON SHIFT                                                                                                                                                                                         '
NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS (LESS THAN 14 YEARS PRIOR TO F.L.)
15                                                         16 NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER. PLANT EXPERIENCE FACTORS                               FOR CHECK ONC OF THE FOLLOWING:
.75 (12 MONTHS) 34 m x
OPERATING SHIFT POSITIONS (OL APPLICANTS)
N (MORETHAN15YEARSPRIORTOF.L.)
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S. REACTOR OPERATORS (PO)                           O   a-g ,*,d   ,c    Q a g g , $ t;,q q ,y , y * *
.50 (12 MONTHS)
* t
\\
* Th s ti is based n 1 availability of Ceco's Zion Nuclear Station                                       b. Shift advisors will probably be required, at least for some shifts.
N
              ** This time is based on 46% availability of Ceco's Zion Nuclear Station                                 *      "      "    "'        *    $"  ""            ""        "        #    "
\\
8.
LICENSED CLASSR00ri TRAINING AND EXAM
.50 9 MONTHS g
9.
PARTICIPATION AT OPERATING PLANT
.75 12 MONTHS
\\
m m
N M2 m
: 10. OTHER NUCLEAR PLANT EXPERIENCE
.25 12 MONTHS x
: 11. CONOUCTING LICENSE TRAINING
.25 9 MCNTHS
\\
\\
: 12. OEGREE (ENGINEERING. APPLIED SCIENCE OR 12 m 12 m 12 m 12 m 6m 12 m 12 m 12 m 12 m EQUIVALENT) 12 MONTHS (BACHELORS DEGREE)
(12 MONTHS)
BSEE 8SNE MBA BSME AS MSNE BSP'E MSIA MSSM (ASSOCIATES DEGREE)
(6 MONTHS)
MSNE BSNE MSNE
,BSEE TOTAL NUCLEAR PLANT EXPERIENCE:
48.5 a 36.5 m 36.5 51.5 m 32 m 43.5 m 30.5 m 37.5 m 70 m 30 m HOT PARTICIPATION EXPERIENCE TIP1E 205 PWR/BWR (WKS)
* 42 w
**32 w STARTUP & SHUTDOWN (YES/NO) yes yes MONTHS ON SHIFT 15 16 NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER. PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)
CHECK ONC OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S. REACTOR OPERATORS (PO)
O a-g,*,d Q a g g, $ t;,q q,y, y * * *
,c t
b.
Shift advisors will probably be required, at least for some shifts.
* Th s ti is based n 1 availability of Ceco's Zion Nuclear Station
** This time is based on 46% availability of Ceco's Zion Nuclear Station
.}}
.}}

Latest revision as of 06:54, 13 December 2024

Requests Exemptions from Observation Training Requirements for Personnel W/Min 36 Months Total Nuclear Plant Experience.Completed Operating Experience Data Sheets for All Current License Candidates Encl
ML20098F765
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/28/1984
From: John Marshall
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
9246N, GL-84-10, NUDOCS 8410030349
Download: ML20098F765 (12)


Text

~4-

'9 g~l Commonwealth Edison

[

) one First Nation't Plaza. Chicago, litmois

") Address Reply ta: P:st Offica Box 767

\\

w

(,/ Chicago, Illinois 60690 September 28, 1984 J.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

' Washington, DC 20555 Sub ject:

Braidwood Station Units 1 and 2 Request for Examples from Observation Training Per 10 CFR 55.7 NRC Docket Nos. 50-456 and 50-457 References (a):

Administration of Operating Tests Prior to Initial Criticality (Generic Letter No. 84-10).

(b):

April 13, 1984 letter from E. D. Swartz to H. R. Denton concering Braidwood Operating Shift Experience.

Dear Mr. Denton:

Reference (a) required Observation Training for individuals without " extensive : actual operating experience at a comparable

-facility."

In accordance with reference (a) and 10 CFR 55.7, Commonwealth Edison requests exemptions from Observation Training for selected individuals who have accumulated experience levels that may permit. waiver of this requirement.

Operating experience data sheets have been completed and are enclosed for all current license candidates.

The data has been determined in the same manner as previous Byron Station submittals.

Exemptions from the Observation Training requirements are requested for those personnel with a minimum 36 months total nuclear P

plant. experience as. calculated by the conservative methods on the data sheets.

This level of experience was chosen because we feel it satisfies the. intent of the requirement for such a - program.

Two additional exemptio,is for people who do not meet the 36 month minimum are requested for the individuals listed below.

Amplifying rational is also provided.

Suo2B8FS8%

3 v

it\\

ec -

3 w

H. R. Denton-September 28, 1984 NAME' RATIONALE Sanborn Over.seven years Navy nuclear experience plus EWS qualification for 15 months have given him significant operating experience-at power reactors.

Weber Has previously held an FM) license at an operating PWR and has thus gained actual operating experience

in the control rocm.

The name of each individual for whom an exemption is requested has a triangle (Jk) above it.

A response from the NRC by

December 1,-1984 will enable Braidwood Station to schedule people from Observation Training on the basis of whether or not they are exempted from that requirement.

We would appreciate a response by then.-

Please direct any questions you may have concerning this

~ matter.to this office.

One signed original and fifteen copies of this letter and its-attachment are provided for your-use.

Very truly yours, g.n wd6L J. G. Marshall Nuclear Licensing Administrator 1m cc:

Joe-Millan - Region III Don Beckham - NRR, Operating License Branch

' Attachment _(1):

Lperating Shift Experience Data Sheets (10 pages) 9246N

a DATE P/31/84 PLANT NAME Braidwood CPERATING SHIFT EXPERIENCE UTILITY. Commonwealth Edison g

3, g

0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM A

A g

A A

TYPE OF EXPERIENCE FACTOR CREDIT Masters McGee Cretens Schuman Jackenn Funka

\\

1.

SAME TYPE COPf1ERCIAL SRO 1.00 NO LIMIT-2.

OTHER CCM1ERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE COPHERCIAL R0 1.00 NO LIMIT N

4.

OTHER COMMERCIAL R0

.75 NO LIMIT 6m 3m Ma 35 m 15 m 13.5ii R E

)

.50 OTHER)

.25 72 m 6m 60 m 70 m 4 m

%e 3.5 r 3.5 e 3m N

6.

SIMULATOR 12 MONTHS 3"

(REFERENCE FLANT) 5.00 (12 MONTHS) 3w 3w 4w (SIMILAR) 3.00 (9 MONTHS) 4w

\\

3" 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS (LESS THAN 1h YEARS PRIOR TO F.L.)

.75 (12 MONTHS)

\\

0" (NORE THAN 1% YEARS PRIOR TO F.L.)

.50 (12 MONTHS)

N 8.

LICENJED CLASSROOM TRAINING ANO EXAM

.50 9 MONTHS 9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

\\

\\

\\

\\

\\

\\

\\

\\

h("

\\

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS

11. CON 00CTIhd LICENSE TRAINING

.25 9 MONTHS

\\

12. OEGREE (ENGIN ERING, APPLIED SCIENCE OR N' 12 m 12 m 12 m

\\ 12 m 12 m

\\

EQUIVALENT) 12 MONTHS g

(BACHELORS DEGREE)

(12 MONTHS)

BSEE

%-MAT 8SEE BS BSNE (ASSOCIATESCEGREE)

(6 MONTHS)

TOTAL NUCLEAR PLANT EXPERIENCE:

HOT PARTICIPATIod EXPERIENCE TIME 20 PWR/8WR (WKS) 15 w (BWR 52w (BWR)

STARTUP & SHUT 00WN (YES/NO) yes (SWR { yes (BWR)

MONTHS ON SHIFT i m (BWR) 24 m (BW NOTE 1: SEE *!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"

CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)

O a-g,g,$og5g,p,y g,y,t,13,y,y ***

ANO SHIFT TEHCNICAL A0 VISORS (STA).

O b.

Shift advisors iii Probabir be reautred. at least for some sairts.

O c.

Do not plan to use shift advisors unless some unforeseen circumstance arises

e ATE 8/31/84 PLAlO NAME Braldwood

' OPERATING SHIFT EXPERIENCE UTILITY Commionwealth Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXItt21 TYPE OF EXPERIENCE FACTOR CREDIT Herbert Chovan Bowers P. Smith McCue Petro 1.

SAME TYPE CO M RCIAL SRO 1.00 NO LIMIT

\\

2.

OTHER COPHERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE COPNERCIAL R0 1.00 NO LIMIT N

4.

OTHER COPHERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITARY) NUCLEAR 36 MCNTHS (RO. L.S. E00W. PPWS)

.50

\\

(OTHER)

.25 6.

$1MULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3, 3,

3, 3,

(SIMILAR) 3.00 (9 MONTHS)

N b

t.5 m 3.5 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS J.5 (LESS THAN 1% YEARS PRIOR TO F.L.)

.75 (12 MONTHS) 5m 5m 5m (HORE THAN 1 YEARS PRIOR TO F.L.)

.50 (12 MONTHS) 22 m 8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS

\\

9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

\\

\\

\\

\\

10. OTFER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS

11. CONDUCTING LICENSE TRAINING

.25 9 MONTHS

\\

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR

,, 12 m 12 m 12 m 12 m 12 m 12 m N

EQUIVALENT) 12 MONTHS BSME BSNE BSNE BSNE BSEE olo A

)

TOTAL NUCLEAR PLANT EXPERIENCE:

52 m 30.5 m

=0,

30.5 a 24 m 38 m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/BWR (WKS) 66 w (BWR

  • 26 w 63 w (BWR >

STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes yes (BWR)

MONTHS ON SHIFT P4 m(BWR 6m 23 m (BW t)

NOTE 1: SEE

  • INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EX'ERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=

CHECK ONE OF THE FOLLOWING:

c NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S, REACTOR OPERATORS (RO)

O ' g,",,gcjPggtp,1 f,,",,%,t1,7 ""*

1' g

AND SHIFT TEHCNICAL ADVISORS (STA).

  • This tire is based on 100% availability of Ceco's Zion Nuclear Power Station u-c.

Do not plan to use shift advisors unless some unforeseen circumstance arises

DATE 8tJI/84 PLANT NAME Braidwood 08ERATING SHIFT EXPERIENCE C

UTILITY ommonwealth Edison

- JOB TITLE: Shift Control Room Engineer 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACT;A WEIGHTING MAXIMlM A

A TYPE OF EXPERIENCE F8rTOR CREDIT Shim Malewajka Maher Anderson Cooper Stiller Peterson Malkswin 1.

SAKE TYPE COP 91ERCIAL SRO 1.00 NO LIMIT 3.

OTHER COPHERCIAL SRO

.75 NO LIMIT 3.

SSX TYPE COPMERCIAL R0 1.00 NO LIMIT 4.

OTHER COPMERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITARY) NUCLEAR 36 MONTHS 24 m 12 m (RO.EWS.E00W.PPWS)

.50 (OTHER)

.25 48 m 48 m 6.

$1MULATOR 12 MONTHS 3.5 a 3.5 a 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3w a

(SIMILAR) 3.00 (9 MONTHS) 3.w 3w 4w 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 3.5 m 0.5 a 5m (LESS THAN 1% YEARS PRIOR TO F.L.)

.75 (12 MONTHS)

(MORE TH#N 1% YEARS PRIOR TO F.L.)

.50 (12 MONTHS) 5m Im 10 m 8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS

\\

\\

9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

\\

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS

11. CONDUCTING LICENSE TRAINING

.25 9 MONTHS

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR

\\ 12 m 12 m 12 m 12 m 12 m 12 m 12 m 12 m EQUIVALENT)

,12 MONTHS g

g$,

g$.

fA OC ES G )

)

BSME \\

Physi 85ME BSME Biolo BSME BSME BSME TOTAL NUCLEAR PLANT EXPERIENCE:

26 m 43 m 17.5 m 16.5 m 46.5 m 22.5 m 14 m 17 m HOT PAFTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUT 00WN (YES/NO)

MONTHS ON SHIFT NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTGAS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=

CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SRO'S. REACTOR OPERATORS (RO)

O

  • g,1,*,gggy,g g,gg,t1,7 ***=

AND SHIFT TEHCNICAL ADVISORS (STA).

O b.

Shift advisors will probably be required, at least for some shifts.

Q. c.

Do r:ot plan to use shift advisors unless some unforeseen circumstance arises

a PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Conssonwealth Edison g

JOB TITLE: Shift Foreman O.t. wu_ Amaim

,,, g - g g g;I g,,

tm 2);

c ENTER DATA:. MONTHS / MONTHS X WE!GHTING FACTOR WEIGHTING MAXIPRM

.4 A

A A

A A

A A.

/5'

- TYPE OF EXPERIENCE FACTOR CREDIT Hidinbotham Bush Meents McCow Rest Chafnicki Sufft Weber Raer thhel 1.

SAME TYPE ComEECIAL SRO 1.00 NO LIMIT 2.

OTHER Ca mERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE CO MERCIAL R0 1.00 NO LIMIT N

e 4.

OTHER ComERCIAL R0

.75 NO LIMIT u

5.

NAVY (MILITARY) NUCLEAR 36 MONTels 6m (RO.EWS.E00W,PPWS)

.50 21 m 36 m 12 m 12 m (OTHER)

.25 42 m 120 m 48 m 48 m ga 9

-6.

SIMULATOR 12 MONTHS 3.5 a 3.5 m 3.5 a 3m 3m 3m (REFERENCE PLANT) 5.00 (12 MONTHS)

(SIMILAR) 3.00 (9 MONTHS) 3w 3w 3w 4w 4w 4w 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1 YEARSPRIORTOF.L.)

.75 (12 MONTHS) 6m 2a 2m 38 m 45 a 25 m (HORE THAN 1% YEARS PRIOR TO F.L.)

.50 (12 MONTHS) 3, 8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS 6

9.

PARTICTPATION AT OPERATING PLANT

.75 12 MONTHS

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS

11. CONOUCTING LICENSE TRAINING

.25 9 M0r:THS

12. DEGREE (ENGINEERING, APPLIED SCIENCE OR N

1m 6m 6m 5m 6m EQUIVALENT) 12 MONTHS 55 (BACHELORS DEGREE)

(12 MONTHS) 13 hr AS AAS sem AS (ASSOCIATES DEGREE)

(6 MONTHS) hrs TOTAL NUCLEAR PLANT EXPERIENCE:

45.5 m 36.5 m 55.5 m 45 m 43.5 m 32.5 m 48 m 34 m 61 m.

51 m HOT PARTICIPATION EXPERIENCE l

TIME 20*.

PWR/BWR (WKS) 54 w (BWR, 134 w (BUR)

  • 93 w
    • 33 w 107 w (BH)

STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes (BWR yes yes yes (BWR)

MONTHS ON SHIFT 20 M (BWR; 49 m (BWU) 34 m 12 m 52 m (BWR)

NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"

CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE aLL SHIFT SUPERVISORS (SS), SHIFT SRO'$ REACTOR OPERATORS (RO)

O a-g,*,dQ" gg,g g,1,g,t1,y We*

c

,,q AND SHIFT TEHCNICAL ADVISORS (STA).

  • This time is based on 75% availability of CECO's Zion Nuclear Power Station O

b.

Shire advisors wiii Probabir be required, at least ro sor-shirts.

l This time is based on 75% availability of Witrantin Electric Power's Point Beach' O

c-Do not Plaa to use shirt advisors unless some unforeseea cirra= stance arises P Mucipac Pow r Station f

O

DATE 8/31/84

' ~ ^

' ~ -

PLANT NME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison JOS TIE W t For m 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS I WEIGHTtMG FACTOR WEIGHTING MAXIPRM A

A A

A TYPE OF DPr1ttENCE FACTOR CREDIT

schert, rehert trin Jan un Pame w Receveur 1.

SAME TYPE COPttERCIAL SRO 1.00 NO LIMIT N

2.

OTHER C0 mERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE ComERCIAL R0 1.00 NO LIMIT N

4.

OTHER COPf4ERCIAL RO

.75 NO LIMIT 5.

NAVY (MILITARf) NUCLEAR 36 MONT<iS (RO. EWS. E00W. PPWS)

.50 14 m 36 a 24 m 2.5 m (OTHER)

.25 57 a 120 m 48 m 45 a 6.

SIMULATOR 12 MONTHS 3a 3m 3a 3m (REFERENCE PLANT) 5.00 (12 MONTHS) 4, 4,

4, 4,

(SIMILAR) 3.00 (9 MONTHS) 12 m \\ 12 m 4.5 m 12 m

\\

7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESSTHAN1%YEARSPRIORTOF.L.)

.75 (12 MONTHS) 0 II "

30 m 40 m 42 a 43 m (NORE THAtt 15 YEARS PRIOR TO F.L.)

.50 (12710MTHS) 8.

LICENSED CLASSROOM TRAINING A M EIAM

.50 9 MONTHS 9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 NONTHS

\\

4 y

II. CONDUCTING LICENSE TRAINING

.25 9 MONTHS

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR

\\

0"

\\

EQUIVALENT) 12 MONTHS

\\

(SACHELORS CEGREE)

(12 MONTHS)

(ASSOCIATES DEGREE)

(6 MONTHS)

AS

\\

TOTAL NUCLEAR PLANT EXPERIENCE:

41 a 35.5 a 32 a 63 a 30 m 53.5 m NOT PARTICIPATICM EXPERIENCE TIME 20% PWR/ SWR (WKS)

  • 26 w STARTUP & SHUTDOWN (YES/NO)

I'5 PONTHS ON SHIFT 6m NOTE 1: SEE

  • INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EIFERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)=

CHECK CNE OF THE FOLLOWING:

NOTE 2: INCLUCE ALL SHIFT SUPERVISORS ($$). SHIFT SRO'S, REACTOR OPERATORS (RO)

O a-g,1,* ym 3g,p,y g,1,g,t1,y ***

g,,,

AND SHIFT TEHCNICAL ADVISORS (STA).

O b.

Saire savisors witi Preeabir de re2=ir e. at ieast for so m sairts-L

  • Th t s based on 100% availability of Ceco's Zion Nuclear Q

c.

Do not plan to use shif t advisors emless sore uforeseen circestance artses

e DATE 8/31/84 PLANT NAME Braftwood e

OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison JOB TITLE: Nuclear Station Operator 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE FOR OPERATING SHIFT POSITIONS (NOTE 1)

(NOTE 2)

ENTER E.ATA: MONTHS / MONTHS X WEIGHTIhG FACTOR WEIGHTING MAXIMUM A

A A

TYPE OF EXPERIENCE FACTOR CREDIT Waaner Hamilton Pallentt1e B. Smith Royston Yurtcvich Kropp Cooley Lambert Rahriq 1.

SAME TYPE COPttERCIAL SR0 1.00 NO LIMIT y

2.

OTHER COPitERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE COPf4ERCIAL R0 1.00 NO LIMIT 4.

OTHER COPf1ERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITARY) NUCLEAR 36 MONTHS (RO. EWS. E00W. PPWS)

.50 9m 3a 21 m (OTHER) 25 36 m 12 m y 42 m 6.

SIMULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m

.5 m 3.5 m 3.5 m 3.5 a 3.5 a 3.5 a 3"

3" 3"

3" 3"

3" 3"

3" 3"

N 4.5 s' 4.5 m 4.5 m 4.5 m 6m 4.5 a 2.5 m.

12 m

2. 3 m
e. 3 m 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS 2m 6.5 m 2m 5m Fm (LESS THAN lh YEARS PRIOR TO F.L.)

.75 (12 MONTHS) 5m 6m 6m 6m 12 m 6m 5m

$1 5m 5

(HORE THAN 1 YEARS PRIOR TO F.L.)

.50 (12 MONTHS) 4m 13 a 4m 10 m 14 m 8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS 5

9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

}

\\

)

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS I

11. CCNDUCTING LICENSE TRAINING

.25 9 MONTHS

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR N

EQUIVALENT) 12 MONTHS 3m 7m 6m 2m 6m (BACHELORS DEGREE)

(12 MONTHS) 30 70 24 (ASSOCIATES DEGREE)

(6 MONTHS) sem hr sem hr ASS see hr ASS TOTAL huCLEAR PLANT EXPERIENCE:

28 m 43 a 25 m 36 m 20.5 m 30 m 22 m 59.5 e 28.5 m 15 m HOT PARTICIPATION EXPERIENCE TIME 20S PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT L.

NOTE 1: SEJ " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)*

CHECK ONE OF THE FOLLOWING:

NOTE 2:

IttCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SR3'S. REACTOR OPERATOPS (RO)O *,g,adj!agg,p,y g,y,g,q,ty,y **Ma AND SHIFT TEHCNICAL ADVISORS (STA),

,c t

O b.

Shift advisors w*ii Predabir be required. at ienst for some shirts.

O c.

Do not plan to use shift advisors unless serie un'oreseen circumstance arises.

as

. o _..

OATE 8/31/84 PLANT NAME Braldwood OPERATING SHIFT EXPEPIENCE UTILITY Comonwealth Edison g

g 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS /HONTHS X WEIGHTING FACTOR WEIGHTING MAXIMJM A

TYPE OF EXPERIENCE FACTOR CREDIT Braq11a Andrews Stefan RWeki 7andem..A Hett Va uerhevden Cuintu 1.

SAME TYPE C0tt1ERCIAL SRO 1.00 NO LIMIT 3.

OTHER COMMERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE CCFNERCIAL R0 1.00 NO LIMIT 4.

OTHER COPHERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITARY) NUCLEAR 36 MONTHS 21 m 10.5 a (RO.EWS.E00W.PPWS)

.50 42 m 42 m

.25 (OTHER) 12 MONTHS

\\

3m 3m 3m 6.

SIMULATOR (REFERENCE PLANT) 5.00 (12 MONTHS) 4, 4,

4,

\\

($1MILAR) 3.00 (9 MONTHS)

~

7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS e

m

'5 m "n

(LESS THAN 1% YEARS PRIOR TO F.L.)

.75 (12 MONTHS) 34 m 38 m 6mA 6m 6m 6m 6m (HORE THAN 15 YEARS PRIOR TO F.L.)

.50 (12 MONT' 5) 6m \\

17 m 14 m (3 m

. 7m

\\

8.

LICENSED CLA55R00M TRAINING AND EXAM

.50 9 MONTHS 9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS M*

10. OT;iER NUCLEAR PLANT E;.PERIENCE,

.25 12 HONTHS

\\

11. CONOUCT!hG LICENSE TRAINING

.25 9 MONTHS

\\

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR

'N. O g EQUIVALENT) 12 NONTHS 6m 0

(BACHELORS DEGREE)

(12 MONTHS)

AAS (ASSOCIATES DEGREE)

(6 MONTHS) semh\\

TOTAL NUCLEAR PLANT EXPERIENCE:

14.5 m 48 m 46.5 m 13.5 a 34 m 23.5 23 a 21.5 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR CHECK ONE OF THE FOLLOWING:

OPERATING SHIFT POSITIONS (OL APPLICANTS)*

O a-g,",,al,yg,yg,g g,ag,t1,y ***

NOTE 2: INCLUDE ALL SHIFT SUPERh SORS (SS). SHIFT SRO'S, REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

Q c.

Do not plan to use shift advisors unless some unforeseen circumstance arises.

.n CATI 8/31/84 l

PLANT NAME Brath OPERATING SHIFT EXPERIENCE Y

UTILITT Commonwealth Edison 1 JOB TITLE: Equipment Operator l

0.L. DATE A89ust 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1) l ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR TYPE OF EXPERIENCE A Ot E

Carlson Pempe Nordland Spangler Scharf D'Orazio

- 1.

SAME TYPE C0f9ERCIAL SRO 1.00 -

NO LIMIT 2.

OTHER C0petERCIAL SRO -

.75 NO LIMIT N

\\ {

3.

SAME TYPE COP 9tERCIAL R0 1.00 NO LIMIT N

gN 4.

OTHE' COPeqERCIAL R0

.75 NO LIMIT

{

5.

NAVT (MILITART) NUCLEAR 36 MONTE (RO. EWS. E00W. PPWS)

.50

\\ N (OTHER)

.25 N

N 6.

SIMULATOR 12 MONTHS 3,$,

(REFERENCE PLANT) 5.00 (12 MONTHS)-

(SIMILAR) 3.00 (9 MONTHS) 3W N

7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1 TEARS PRIOR TO F.L.)

.75 (12 MONTHS)

(MORETHAN14VEARSPRIORTOF.L.)

.50 (12 MONTHS) g"

\\

N N

\\

8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS 9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTiS X

]

]

2 l

i

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS f

f lh f

11. CONDUCTING LICENSE TRAINING

.25 9 MONTHS

\\

f\\l h

i

12. DEGREE (ENGINEERING, APPLIED SCIENCE

\\

6*

6*

\\

EQUIVALENT) 12 MONTHS

\\

(BACHELORS DEGREE)

(12 MONTHS)

\\

g$

g5 (ASSOCIATES DEGREE)

(6 MONIH3)

\\

\\

TOTAL NUCLEAR PLANT EXPERIENCE:

9. 5 m_

20 m 23 m 15 m 15 m 14 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT l

NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR' OPERATING SHIFT POSITIONS (OL APPLICANTS)*

CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)

O a-,y,1,*gg,yg,g g,3,gy,y pa***

AND SHIFT TEHCNICAL ADVISORS (STA).

O '. Shift ae isors ili oroeabi> ee m

  • e. *: iew. 9r so* sai'u o

O = k m o'v = u w" v --- ~ ~-- '"-

DATg 8/31/84 PLANT NAME B ralhd OPERATING SHIFT EXPERIENCE UTILITY Commonweaith Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXDUt TYPE OF EXPERIENCE FACTOR CREDIT

unit, mneuen Acker Biskie seeman Schumacher Kurmuk 1.

SAME TYPE Cott1ERCIAL SRO 1.00 NO LIMIT N

N_

2.

OTHER ComtERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE Cort 1ERCIAL R0 1.00 NO LIMIT N

4.

OTHER C0rttERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITAr.Y) NUCLEAR 36 MONT<ts (RO,EWS,E00W,PPWS)

.50 24 m (OTHER)

.25 48 m N

f N

MONTH 7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 5m (LESSTHANI%YEARSPRIORTOF.L.)

.75 (12 MONTHS)

(HORE THAN 1% YEARS PRIOP TO F.L.)

.50 (12 MONTHS) 10 m 8.

LICENSED CLASSROOM TRAINING AND EXAM

.50 9 MONTHS 9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS Qm

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS 0

0

11. CONDUCTING LICENSE TRAINING

.25 9 MONTHS

\\

12. DEGREE (ENGINEERING, APPLIED SCIENCE OR

\\

6m 9m EQUIVALENT) 12 MONTHS 92 (BACHELORS DEGREE)

(12 MONTHS)

AS see (ASSOCIATES DEGREE)

(6 MONTHS) hrs.

TOTAL NUCLEAR PLANT EXPERIENCE:

13.5 m 17 m 31.5 m 11 m 1.5 a 2m 2m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/EWR (WKS)

STARTUP & SHUTOOWN (YES/NO) lMONTHSONSHIFT L_

PME 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"

CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55), SHIFT SR0'$. REACTOR OPERATORS (RO)

O a-g,ajpog,75g,g,g;g,ty,y me*

AND SHIFT TEHCNICAL ADVISORS (STA).

O b.

Shift aevisors iii probabis be required at ienst for some shirts.

O c-Do not piaa to use shirt ao.isars uniess some unforeseen circtostance arises.

a DATE 8/31/84 PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE UTILITY Ceemonwealth Edison JOB TITLE: SRos (not on shift) 0.L. DATE August 1985

' NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: PONTHS/ MONTHS X WEIGHTING FACTOR WEICTING MAXIMUM Yu&

A A

A

.A A

ngk Hertogul Lemke Ungeran Sanborn Glaza Krowzack Paquette O'Brien Legner TYPE OF EXPERTrNCE FACTOR CREDIT 1.

SAME TYPE CONMERCIAL SR0 1.00 NO LIMIT 3.

OTHER COPHERCIAL SRO

.75 NO LIMIT 3.

SAME TYPE C0Ft1ERCIAL R0 1.00 NO LIMIT N

4.

OTHER COPYTERCIAL R0

.75 NO LIMIT 5.

NAVY (MILITARY) NUCLEAR 36 MONT,G 7.5 a 30 m 3m 21 m (RO. EWS. E00W. PPWS)

.50

10. M 15 m 60 6m (OTHER)

.25 42 m 59,

43,

6.

SIMULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m 3.5 m 3.5 3.5 m 3.5 a 3o 3"

3" 38

.5m (REFERENCE PLANT) 5.00 (12 MONTHS) 3w 3w 3w 3w 3w 3w 3w 3w 4,

(SIMILAR) 3.00 (9 MONTHS) 4w 4w 4w

. 4w 2w

\\

I "

7.

NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS (LESS THAN 14 YEARS PRIOR TO F.L.)

.75 (12 MONTHS) 34 m x

N (MORETHAN15YEARSPRIORTOF.L.)

.50 (12 MONTHS)

\\

N

\\

8.

LICENSED CLASSR00ri TRAINING AND EXAM

.50 9 MONTHS g

9.

PARTICIPATION AT OPERATING PLANT

.75 12 MONTHS

\\

m m

N M2 m

10. OTHER NUCLEAR PLANT EXPERIENCE

.25 12 MONTHS x

11. CONOUCTING LICENSE TRAINING

.25 9 MCNTHS

\\

\\

12. OEGREE (ENGINEERING. APPLIED SCIENCE OR 12 m 12 m 12 m 12 m 6m 12 m 12 m 12 m 12 m EQUIVALENT) 12 MONTHS (BACHELORS DEGREE)

(12 MONTHS)

BSEE 8SNE MBA BSME AS MSNE BSP'E MSIA MSSM (ASSOCIATES DEGREE)

(6 MONTHS)

MSNE BSNE MSNE

,BSEE TOTAL NUCLEAR PLANT EXPERIENCE:

48.5 a 36.5 m 36.5 51.5 m 32 m 43.5 m 30.5 m 37.5 m 70 m 30 m HOT PARTICIPATION EXPERIENCE TIP1E 205 PWR/BWR (WKS)

  • 42 w
    • 32 w STARTUP & SHUTDOWN (YES/NO) yes yes MONTHS ON SHIFT 15 16 NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER. PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)

CHECK ONC OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S. REACTOR OPERATORS (PO)

O a-g,*,d Q a g g, $ t;,q q,y, y * * *

,c t

b.

Shift advisors will probably be required, at least for some shifts.

  • Th s ti is based n 1 availability of Ceco's Zion Nuclear Station
    • This time is based on 46% availability of Ceco's Zion Nuclear Station

.