4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ'   J IREMENTS (Continued) 2.
4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' IREMENTS (Continued)
                                                                              ~ w --s_.p, grean.rthan   or c al 4 24$
J al 4 24$
For the HPCI system, verifying that the system develop a flow of
~ w --s_.p,
                                                                                                      -)
- )
at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a
grean.rthan or c 2.
: 3. Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid.
For the HPCI system, verifying that the system develop a flow of at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a 3.
: 4. Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal.
Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid.
: 5. Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig.
4.
: d.   . . the ADS:
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal.
: 1. At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
5.
: 2. At least once per 18 months:
Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig.
a)     Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b)     Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either:
d.
: 1)   The control valve or bypass valve position responds accordingly, or
.. the ADS:
: 2)   There is a corresponding change in the measured steam flow, c)     Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure.
1.
l
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
: e. At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested:
2.
At least once per 18 months:
a)
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b)
Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either:
1)
The control valve or bypass valve position responds accordingly, or 2)
There is a corresponding change in the measured steam
: flow, c)
Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure.
l e.
At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested:
l L
l L
                  *The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure is adequate to perform the test.
*The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure
                                                              ~
~
                ** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.
is adequate to perform the test.
SUSQUEHANNA - UNIT 1                         3/4 5-5                   Amendment No.112 9109100226 910904 PDR   ADOCK 05000387                                                                       .
** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.
P                    PDR
SUSQUEHANNA - UNIT 1 3/4 5-5 Amendment No.112 9109100226 910904 PDR ADOCK 05000387 P
PDR


(       EMERGENCY CORE COOLING SYSTEMS                                         --
(
                                                                                                  )
EMERGENCY CORE COOLING SYSTEMS
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued)                     A*#
)
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued)
A*#
2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig."
2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig."
: 3. Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid.
3.
: 4. Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer       water level high signal.
Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid.
: 5. Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig,
4.
: d. For the ADS:
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer water level high signal.
: 1. At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
5.
: 2. At least once per 18 months:
Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig, d.
a)   Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3
For the ADS:
1.
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
2.
At least once per 18 months:
a)
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3
actuation.
actuation.
b)     Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
b)
: 1)   The control valve or bypass valve position responds accordingly, or
Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
: 2)   There is a corresponding change in the measured steam flow.
1)
            "The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours after reactor steam pressure is adequate to perform the test.
The control valve or bypass valve position responds accordingly, or 2)
          ** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.
There is a corresponding change in the measured steam flow.
          #For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows:
"The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours after reactor steam pressure is adequate to perform the test.
** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.
#For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows:
For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.*
For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.*
l SUSQUEHANNA - UNIT 2                 3/4 5-5                       Amendment No.62 DEC 181989
l SUSQUEHANNA - UNIT 2 3/4 5-5 Amendment No.62 DEC 181989
                                                                                                .}}
.}}

Latest revision as of 06:38, 14 December 2024

Proposed Tech Specs for HPCI Sys Low Pressure Surveillance Test Acceptance Criteria
ML20082P187
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/04/1991
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17157A838 List:
References
NUDOCS 9109100226
Download: ML20082P187 (5)


Text

,

4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' IREMENTS (Continued)

J al 4 24$

~ w --s_.p,

- )

grean.rthan or c 2.

For the HPCI system, verifying that the system develop a flow of at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a 3.

Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid.

4.

Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal.

5.

Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig.

d.

.. the ADS:

1.

At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.

2.

At least once per 18 months:

a)

Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b)

Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either:

1)

The control valve or bypass valve position responds accordingly, or 2)

There is a corresponding change in the measured steam

flow, c)

Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure.

l e.

At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested:

l L

  • The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure

~

is adequate to perform the test.

    • ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.

SUSQUEHANNA - UNIT 1 3/4 5-5 Amendment No.112 9109100226 910904 PDR ADOCK 05000387 P

PDR

(

EMERGENCY CORE COOLING SYSTEMS

)

ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued)

A*#

2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig."

3.

Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid.

4.

Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer water level high signal.

5.

Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig, d.

For the ADS:

1.

At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.

2.

At least once per 18 months:

a)

Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3

actuation.

b)

Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:

1)

The control valve or bypass valve position responds accordingly, or 2)

There is a corresponding change in the measured steam flow.

"The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.

    • ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2.
  1. For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows:

For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.*

l SUSQUEHANNA - UNIT 2 3/4 5-5 Amendment No.62 DEC 181989

.