ML20082P187: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' | 4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' IREMENTS (Continued) | ||
J al 4 24$ | |||
For the HPCI system, verifying that the system develop a flow of | ~ w --s_.p, | ||
- ) | |||
at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a | grean.rthan or c 2. | ||
For the HPCI system, verifying that the system develop a flow of at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a 3. | |||
Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid. | |||
4. | |||
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal. | |||
5. | |||
Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig. | |||
a) | d. | ||
.. the ADS: | |||
1. | |||
l | At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system. | ||
2. | |||
At least once per 18 months: | |||
a) | |||
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b) | |||
Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either: | |||
1) | |||
The control valve or bypass valve position responds accordingly, or 2) | |||
There is a corresponding change in the measured steam | |||
: flow, c) | |||
Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure. | |||
l e. | |||
At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested: | |||
l L | l L | ||
*The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure | |||
~ | |||
is adequate to perform the test. | |||
SUSQUEHANNA - UNIT 1 | ** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2. | ||
SUSQUEHANNA - UNIT 1 3/4 5-5 Amendment No.112 9109100226 910904 PDR ADOCK 05000387 P | |||
PDR | |||
( | ( | ||
EMERGENCY CORE COOLING SYSTEMS | |||
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued) | ) | ||
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued) | |||
A*# | |||
2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig." | 2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig." | ||
3. | |||
Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid. | |||
4. | |||
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer water level high signal. | |||
5. | |||
Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig, d. | |||
a) | For the ADS: | ||
1. | |||
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system. | |||
2. | |||
At least once per 18 months: | |||
a) | |||
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3 | |||
actuation. | actuation. | ||
b) | b) | ||
Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either: | |||
1) | |||
The control valve or bypass valve position responds accordingly, or 2) | |||
There is a corresponding change in the measured steam flow. | |||
"The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours after reactor steam pressure is adequate to perform the test. | |||
** ADS solenoid energization shall be used alternating between ADS Division 1 and ADS Division 2. | |||
#For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows: | |||
For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.* | For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.* | ||
l SUSQUEHANNA - UNIT 2 | l SUSQUEHANNA - UNIT 2 3/4 5-5 Amendment No.62 DEC 181989 | ||
.}} | |||
Latest revision as of 06:38, 14 December 2024
| ML20082P187 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/04/1991 |
| From: | PENNSYLVANIA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17157A838 | List: |
| References | |
| NUDOCS 9109100226 | |
| Download: ML20082P187 (5) | |
Text
,
4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' IREMENTS (Continued)
J al 4 24$
~ w --s_.p,
- )
grean.rthan or c 2.
For the HPCI system, verifying that the system develop a flow of at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a 3.
Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid.
4.
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal.
5.
Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig.
d.
.. the ADS:
1.
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
2.
At least once per 18 months:
a)
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b)
Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either:
1)
The control valve or bypass valve position responds accordingly, or 2)
There is a corresponding change in the measured steam
- flow, c)
Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure.
l e.
At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested:
l L
- The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure
~
is adequate to perform the test.
SUSQUEHANNA - UNIT 1 3/4 5-5 Amendment No.112 9109100226 910904 PDR ADOCK 05000387 P
(
EMERGENCY CORE COOLING SYSTEMS
)
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued)
A*#
2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig."
3.
Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid.
4.
Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer water level high signal.
5.
Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig, d.
For the ADS:
1.
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
2.
At least once per 18 months:
a)
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3
actuation.
b)
Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
1)
The control valve or bypass valve position responds accordingly, or 2)
There is a corresponding change in the measured steam flow.
"The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.
- For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows:
For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.*
l SUSQUEHANNA - UNIT 2 3/4 5-5 Amendment No.62 DEC 181989
.