ML20083D227: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
| project = | | project = TAC:00081, TAC:74609 | ||
| stage = Request | | stage = Request | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
A w.mm ge. ,,*, cm .+ m o. . .., , .m m . | A w.mm ge.,,*, cm.+ m o....,,.m m. | ||
O J 'he' 7enngue W e Fw.aent Hrms hey Opersons SEp 3 0193) l | O J 'he' 7enngue W e Fw.aent Hrms hey Opersons SEp 3 0193) l U.S. Nuclear Regulatory Commission l | ||
In the Matter of | ATTN: Document Control Desk Washington, D.C. | ||
20555 Gentlemen: | |||
In the Matter of | |||
) | |||
Docket Nos. 50-259 Tennessee Valley Authority | |||
) | |||
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - PRIMARY CONTAINMENT ISOLATION VALVES AND THE BFN TECHNICAL SPECIFICATION (TS) AMENDMENT REQUESTS | |||
==Reference:== | ==Reference:== | ||
1. | |||
R00080, R00081, and R00082) | TVA letter, dated September 17, 1990, BFN response to NRC Recommendations Regarding Primary Containment (TAC Nos. | ||
R00080, R00081, and R00082) 2. | |||
TVA letter, dated February 27, 1991, BFN Containment Isolation Valves Associated with The Containment Atmospheric Dilution System 3. | |||
Reference 1 and 2 submitted TVA responses to NRC concerns and recommendations regarding BFN TS 251 and primary containment isolation at BFN. These submittals included TVA cot.mitments to request a TS amendment | NRC letter, dated March 22, 1991, Issuance of Amendment and Compliance Review of 10 CFR 50 Appendix J and I;M Item II.E.4.2.1-4 (TAC Nos 00081 and 74609) (TS 251) | ||
Reference 1 and 2 submitted TVA responses to NRC concerns and recommendations regarding BFN TS 251 and primary containment isolation at BFN. These submittals included TVA cot.mitments to request a TS amendment to formally cite the auxiliary boiler block valve and the Containment Atmospheric Dilution primary check valves as primary containment isolation valves. BFN TS Table 3.7,A was to be revised to reflect these | |||
-valves as primary containment isolation valves. | |||
l l | |||
The NRC Safety Evaluation Report (Reference 3) found the primary l | |||
l l | containment isolation arrangement and the updated Table 3.7.A acceptabic. | ||
9109300093 910920 | 9109300093 910920 | ||
PDR | / | ||
PDR ADOCK 05000259 PDR (g, | |||
p | |||
\\\\\\ | |||
2 U.S. Nuclear Regulatory Commission SEP 2 01991 Subsequently, NRC issued Generic Letter (GL) 91-08, " Removal of Components Lists from Technical Specifications". This guidance included the incorporation of component lists into plant procedures that are subject to the change control provisions for plant procedures in the Administrative Controls Section of the TS (Chapter 6). | 2 U.S. Nuclear Regulatory Commission SEP 2 01991 Subsequently, NRC issued Generic Letter (GL) 91-08, " Removal of Components Lists from Technical Specifications". This guidance included the incorporation of component lists into plant procedures that are subject to the change control provisions for plant procedures in the Administrative Controls Section of the TS (Chapter 6). | ||
Instead of submitting the referenced TS amendments TVA vill meet the GL 91-08 guidelines and remove the components list from the TS. The referenced valves will be placed in the TVA program and procedures as primary containment isolation valves. | Instead of submitting the referenced TS amendments TVA vill meet the GL 91-08 guidelines and remove the components list from the TS. | ||
The referenced valves will be placed in the TVA program and procedures as primary containment isolation valves. | |||
This concept was discussed with Thierry M. Ross, Project Manager, NRC on September 5, 1991, and found to be acceptable. | This concept was discussed with Thierry M. Ross, Project Manager, NRC on September 5, 1991, and found to be acceptable. | ||
TVA vill submit a TS amendment to remove the Table 3.7.A components lists f rom the BFN TS by January 10, 1992. The enclosure contains a summary of commitments made in this letter. | TVA vill submit a TS amendment to remove the Table 3.7.A components lists f rom the BFN TS by January 10, 1992. The enclosure contains a summary of commitments made in this letter. | ||
If you have any questions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-7566. | If you have any questions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-7566. | ||
Very truly yours, TENNESSEE ALLEY AUT110RITY i | Very truly yours, TENNESSEE ALLEY AUT110RITY i' L p;< p fuzlgw j/. Zeringu ) | ||
O J | |||
,/ | |||
L' Enclosure cc (Enclosure): | L' Enclosure cc (Enclosure): | ||
NRC Resident Inspoetor Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr. Thierry M. Roos, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 | NRC Resident Inspoetor Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr. Thierry M. Roos, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 B. A. Wilson, Project Chief b.S. Nuclear Regulatory Commisolon Region II 101 Marietta Street, NW, Guite 2900 Atlanta, Georgia 30323 | ||
BNCLOSURE I | BNCLOSURE I | ||
| Line 55: | Line 63: | ||
==SUMMARY== | ==SUMMARY== | ||
OF COMMITMENTS | OF COMMITMENTS 1. | ||
TVA vill submit a Technical Specification Amendment to remove Table 3.7.A by January 10, 1992. | |||
2. | |||
TVA will place the auxiliary boiler block valve and the Containment Atmospheric Dilution primary check valves in TVA program and procedures within the time frame allowed by NRC approval of the Technical Specfication amendment. | |||
__}} | |||
Latest revision as of 06:04, 14 December 2024
| ML20083D227 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/20/1991 |
| From: | Zeringue O TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TASK-2.E.4.2, TASK-TM GL-91-08, GL-91-8, TAC-00081, TAC-74609, TAC-81, TAC-R00080, TAC-R00081, TAC-R00082, TAC-R80, TAC-R81, TAC-R82, NUDOCS 9109300093 | |
| Download: ML20083D227 (3) | |
Text
.
A w.mm ge.,,*, cm.+ m o....,,.m m.
O J 'he' 7enngue W e Fw.aent Hrms hey Opersons SEp 3 0193) l U.S. Nuclear Regulatory Commission l
ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - PRIMARY CONTAINMENT ISOLATION VALVES AND THE BFN TECHNICAL SPECIFICATION (TS) AMENDMENT REQUESTS
Reference:
1.
TVA letter, dated September 17, 1990, BFN response to NRC Recommendations Regarding Primary Containment (TAC Nos.
R00080, R00081, and R00082) 2.
TVA letter, dated February 27, 1991, BFN Containment Isolation Valves Associated with The Containment Atmospheric Dilution System 3.
NRC letter, dated March 22, 1991, Issuance of Amendment and Compliance Review of 10 CFR 50 Appendix J and I;M Item II.E.4.2.1-4 (TAC Nos 00081 and 74609) (TS 251)
Reference 1 and 2 submitted TVA responses to NRC concerns and recommendations regarding BFN TS 251 and primary containment isolation at BFN. These submittals included TVA cot.mitments to request a TS amendment to formally cite the auxiliary boiler block valve and the Containment Atmospheric Dilution primary check valves as primary containment isolation valves. BFN TS Table 3.7,A was to be revised to reflect these
-valves as primary containment isolation valves.
l l
The NRC Safety Evaluation Report (Reference 3) found the primary l
containment isolation arrangement and the updated Table 3.7.A acceptabic.
9109300093 910920
/
p
\\\\\\
2 U.S. Nuclear Regulatory Commission SEP 2 01991 Subsequently, NRC issued Generic Letter (GL) 91-08, " Removal of Components Lists from Technical Specifications". This guidance included the incorporation of component lists into plant procedures that are subject to the change control provisions for plant procedures in the Administrative Controls Section of the TS (Chapter 6).
Instead of submitting the referenced TS amendments TVA vill meet the GL 91-08 guidelines and remove the components list from the TS.
The referenced valves will be placed in the TVA program and procedures as primary containment isolation valves.
This concept was discussed with Thierry M. Ross, Project Manager, NRC on September 5, 1991, and found to be acceptable.
TVA vill submit a TS amendment to remove the Table 3.7.A components lists f rom the BFN TS by January 10, 1992. The enclosure contains a summary of commitments made in this letter.
If you have any questions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-7566.
Very truly yours, TENNESSEE ALLEY AUT110RITY i' L p;< p fuzlgw j/. Zeringu )
O J
,/
L' Enclosure cc (Enclosure):
NRC Resident Inspoetor Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr. Thierry M. Roos, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 B. A. Wilson, Project Chief b.S. Nuclear Regulatory Commisolon Region II 101 Marietta Street, NW, Guite 2900 Atlanta, Georgia 30323
BNCLOSURE I
BROWNS FERRY NUCLEAR PLANT -
SUMMARY
OF COMMITMENTS 1.
TVA vill submit a Technical Specification Amendment to remove Table 3.7.A by January 10, 1992.
2.
TVA will place the auxiliary boiler block valve and the Containment Atmospheric Dilution primary check valves in TVA program and procedures within the time frame allowed by NRC approval of the Technical Specfication amendment.
__