ML20070F258: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20070F258
| number = ML20070F258
| issue date = 06/30/1994
| issue date = 06/30/1994
| title = Monthly Operating Rept for June 1994 for Byron Nuclear Power Station Units 1 & 2.W/940708 Ltr
| title = Monthly Operating Rept for June 1994 for Byron Nuclear Power Station Units 1 & 2
| author name = Colglazier R, Schwartz G
| author name = Colglazier R, Schwartz G
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
[D)' C:mm::nw::lth Byron Nuclear StationEdison k   O-     4450 North German Church Road Byron. Illinois 61010 4
[D)' C:mm::nw::lth Edison Byron Nuclear Station k
1 July 8, 1994                                                                 i LTR:         BYRON 94-0251 FILE:       2.7.200 (1.10.0101)
O-4450 North German Church Road Byron. Illinois 61010 4
Director, Office of Management Information and Program control United States Nuclear Regulatory Commission Washington, D.C.         20555 ATTN:       Document Control Desk Gentlemen:
1 July 8, 1994 i
LTR:
BYRON 94-0251 FILE:
2.7.200 (1.10.0101)
Director, Office of Management Information and Program control United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period June 1 through June 30, 1994.
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period June 1 through June 30, 1994.
Sincerely, i
Sincerely, i
                /G. -K. Schwartz Station Manager Byron Nuclear Power Station GKS/RC/mn cc:
/ -
J.B. Martin, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support D.R. Eggett, Station Nuclear Engineering INPO Records Center G.F. Dick, Jr. - USNRC F. Yost - Utility Data Institute, Inc.
G.
(9928MM/070894/1)                 9407180249 94rv'o                       /
K.
I PDR   ADDCK 050064"4                             i R               PDR
Schwartz Station Manager Byron Nuclear Power Station GKS/RC/mn cc:
J.B. Martin, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support D.R.
Eggett, Station Nuclear Engineering INPO Records Center G.F.
Dick, Jr. - USNRC F.
Yost - Utility Data Institute, Inc.
(9928MM/070894/1) 9407180249 94rv'o
/
PDR ADDCK 050064"4 I
i R
PDR


a BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONNEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE FO. NPF-66 (9928MM/070894/2) e
a BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONNEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE FO. NPF-66 (9928MM/070894/2) e


I l
I l
l I,   Monthly Reoort for Byron LWir 1 for the month of June 1994         j i
l I,
E m gummary of Ooeratina Exnerience for Unit 1                     l The Unit began this reporting period in Mode 1 (Power Operations).
Monthly Reoort for Byron LWir 1 for the month of June 1994 j
i l
E m gummary of Ooeratina Exnerience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).
t i
t i
i' The power level varied due to load following requirements.
i The power level varied due to load following requirements.
l f
l f
l t
l t
6
6
                                                                            ,P t
,P t
l I
l I
i 6
i 6
i (9928MM/070894/3)
i (9928MM/070894/3)


B. OPERATING n&TA REPORT DOCKET NO.. 050-454
B.
                ,                                                    UNIT: Byron One DATE: 07/08/94 COMPILED BY:   R. Colglazier             l TELEPHONE: (815)234-5441 x2282                     )
OPERATING n&TA REPORT DOCKET NO..
OPERATING STATUS
050-454 UNIT: Byron One DATE:
: 1. Reporting Period:   June, 1994. Gross Hours:   720                                     i i
07/08/94 COMPILED BY:
: 2. Currently Authorized Power Level: 3411 (MWt)                                           -!
R.
Design Electrical Rating: 1175 (MWe-gross)                                             l Design Electrical Rating: 1120 (MWe-net)                                               f Max Dependable Capacity: 1105 (MWe-net)
Colglazier l
: 3. Power Level to Which Restricted (If Any) : None                                         i
TELEPHONE:
: 4. Reasons for Restriction (If Any) : N/A THIS MONTH       YR TO DATE     CUMULATIVE *
(815)234-5441 x2282
: 5. Report Period Hrs.                             720           4,343           77,040 i
)
: 6. Rx Critical Hours                             720           4,343         65,153.5     j 7   Rx Reserve Shutdown Hours                         0               0             3B     *
OPERATING STATUS 1.
: 8. Hours Generator on Line                       720           4,343         64,475.1
Reporting Period:
: 9. Unit Reserve Shutdown Hours                       0               0               0   {,
June, 1994.
        *10. Gross Thermal Energy (MWH)               2,406,999       14,542,143     197,603,242
Gross Hours:
: 11. Gross Elec. Energy (MWH)                   820,312       4,993,782       66,812,327
720 i
: 12. Net Elec. Energy (MWH)                     783,872       4,775,248       63,338,583
i 2.
: 13. Reactor Service Factor                         100             100           84.57
Currently Authorized Power Level: 3411 (MWt)
: 14. Reactor Availability Factor                     100             100           84.62
Design Electrical Rating: 1175 (MWe-gross) l Design Electrical Rating: 1120 (MWe-net) f Max Dependable Capacity: 1105 (MWe-net) 3.
: 15. Unit Service Factor                             100             100           83.69
Power Level to Which Restricted (If Any) : None i
: 16. Unit Availability Factor                       100             100           83.69
4.
: 17. Unit Capacity Factor (MDC net)               98.53           99.50           74.40 I
Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE
: 18. Unit Capacity Factor (DER net)               97.21           98.17           73.41
* 5.
: 19. Unit Forced Outage Hrs.                           0               0         1,498.2
Report Period Hrs.
: 20. Unit Forced Outage Rate                           0               0           2.27
720 4,343 77,040 i
: 21. Shutdowns Scheduled Over Next 6 Months: 1     (B1R06)                                   !
6.
i
Rx Critical Hours 720 4,343 65,153.5 j
7 Rx Reserve Shutdown Hours 0
0 3B 8.
Hours Generator on Line 720 4,343 64,475.1 9.
Unit Reserve Shutdown Hours 0
0 0
{
*10. Gross Thermal Energy (MWH) 2,406,999 14,542,143 197,603,242
: 11. Gross Elec. Energy (MWH) 820,312 4,993,782 66,812,327
: 12. Net Elec. Energy (MWH) 783,872 4,775,248 63,338,583
: 13. Reactor Service Factor 100 100 84.57
: 14. Reactor Availability Factor 100 100 84.62
: 15. Unit Service Factor 100 100 83.69
: 16. Unit Availability Factor 100 100 83.69
: 17. Unit Capacity Factor (MDC net) 98.53 99.50 74.40 I
: 18. Unit Capacity Factor (DER net) 97.21 98.17 73.41
: 19. Unit Forced Outage Hrs.
0 0
1,498.2
: 20. Unit Forced Outage Rate 0
0 2.27
: 21. Shutdowns Scheduled Over Next 6 Months: 1 (B1R06) i
: 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
: 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
: 23. Units in Test Status (Prior to Commercial Operation): None
: 23. Units in Test Status (Prior to Commercial Operation): None
Line 72: Line 110:
(9928MM/070894/4)
(9928MM/070894/4)


C. AVEP3dE DAILY UNIT POWER LEVEL DOCKET NO.:   050-454 UNIT: Byron One DATE:   07/08/94 COMPILED BY:   R. Colglazier TELEPHONE:   (815)234-5441 x2282 MONTH: June, 1994 DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)
C.
: 1.               1112 MW                     16.             1087 MW
AVEP3dE DAILY UNIT POWER LEVEL DOCKET NO.:
: 2.               1119 MW                     17.             1088 MW
050-454 UNIT: Byron One DATE:
: 3.               1117 MW                     18.             1088 MW
07/08/94 COMPILED BY:
: 4.               1104 MW                     19.             1091 MW
R. Colglazier TELEPHONE:
: 5.               1091 MW                     20.             1090 MW
(815)234-5441 x2282 MONTH: June, 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
: 6.               1088 MW                     21.             1088 MW
1112 MW 16.
: 7.               1104 MW                     22.             1092 MW B.               1118 MW                     23.             1099 MW
1087 MW 2.
: 9.               1117 MW                     24.             1099 MW
1119 MW 17.
: 10.             1093 MW                     25.             1084 MW
1088 MW 3.
: 11.             1047 MW                     26,             1077 MW
1117 MW 18.
: 12.             1100 MW                     27.             1068 MW
1088 MW 4.
: 13.             1093 MW                     28.             1052 MW
1104 MW 19.
: 14.             1084 MW                     29.             1041 MW
1091 MW 5.
: 15.             1084 MW                     30.             1032 MW 31.
1091 MW 20.
INSTRUCTIONS on-this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures-will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)     In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
1090 MW 6.
1088 MW 21.
1088 MW 7.
1104 MW 22.
1092 MW B.
1118 MW 23.
1099 MW 9.
1117 MW 24.
1099 MW 10.
1093 MW 25.
1084 MW 11.
1047 MW 26, 1077 MW 12.
1100 MW 27.
1068 MW 13.
1093 MW 28.
1052 MW 14.
1084 MW 29.
1041 MW 15.
1084 MW 30.
1032 MW 31.
INSTRUCTIONS on-this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures-will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(9928MM/070894/5)
(9928MM/070894/5)


Report Period June, 1994
Report Period June, 1994 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1) h Date TyDe Hours Reason Method LER Number System Compenent Cause & Corrective Action to Preveg Recurrence 2
* BYRON
06/24/94 S
* UNIT SHUTDOWNS / REDUCTIONS (UNIT 1)                                 **************************
H 9
h                 Date                     TyDe Hours Reason Method LER Number System                                                 Compenent     Cause & Corrective Action to Preveg Recurrence 2     06/24/94                             S               H     9                                                                             Unit One Began It's Coastdown to BIR06
Unit One Began It's Coastdown to BIR06 Summary TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
* Summary
& License Examination 9-Other (LER) File (NUREG-0161)
* TYPE                                               Reason                                                   Method                                     System & Component F-Forced                                           A-Equip Failure F-Admin                                   1-Manual                                   Exhibit F & H S-Sched                                             B-Maint or Test G-Oper Error                             2-Manual Scram                             Instructions for C-Refueling     H-Other                                 3-Auto Scram                               Preparation of D-Regulatory Restriction                                 4-Continued                                 Data Entry Sheet E-Operator Training                                     5-Reduced Load                             Licensee Event Report
                                                                & License Examination                                 9-Other                                     (LER) File (NUREG-0161)
(9928MM/070894/6)
(9928MM/070894/6)
      ~
~
m_-___-__          __ - - _ - _ - - _ _ . - - - . . _ - ._ - _.                  . - . . . _ _ _ _ _ _ . . _ . _ _          , __ . _ . . _ _ _ . .                  - . _ _ _ _ _ _  _ - _ _ _ _ _  __-______________J
m -
J


        .      . . .      .        .-      - . -              -            . - ~ . . . . .  .    .,      . . . . . . - .
. - ~.....
1 i
1 i
l E.         UNIOUE REPORTING REQUIREMENTS (UNIT 1) for the month of June. 1994
l E.
: 1.         Safety /Reljef valve operations for Unit One.
UNIOUE REPORTING REQUIREMENTS (UNIT 1) for the month of June. 1994 1.
                                                                                                                              ?
Safety /Reljef valve operations for Unit One.
VALVES     NO & TYPE                         PLANT       DESCRIPTION DATE               ACTUATED   tscTUATION                         CONDITION   OF EVENT                   {
?
None                                                                                                     !
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED tscTUATION CONDITION OF EVENT
i I
{
I
None i
: 2.         Licensee generated changes to ODCM.
I I
2.
Licensee generated changes to ODCM.
None k
None k
i
i 3.
: 3.         Indications of failed fuel.
Indications of failed fuel.
No. Fuel Reliability Indicator:   FRI = 3.8 E-5 pCi/CC f
No.
Fuel Reliability Indicator:
FRI = 3.8 E-5 pCi/CC f
1 l
1 l
i I
i I
Line 120: Line 182:
F i
F i
i
i
                                                                                                                              \
\\
l' I
l I
t
t
                                                                                                                              ?
?
t                                                                                                                               l I
l t
i (9928bM/070894/7) i i'                                                                                                                              l
I i
: l.         -          _ ,                  . _        _ _ _ _ _ . _ . _
(9928bM/070894/7) i' i
l l.
I
I


i F. LICENSEE EVENT REPORTS (UNIT 1)
i F.
The fol' lowing is a tabular summary of all Licensee Event Reports for                   l Byron Nuclear Power Station, Unit One, occurring during the reporting period,           j June 1, 1994 through June 30, 1994. This information is provided pursuant to the     ,
LICENSEE EVENT REPORTS (UNIT 1)
reportable occurrence reporting requirements as set forth in 10CFR 50."3.               !
The fol' lowing is a tabular summary of all Licensee Event Reports for l
Occurrence                                           {
Byron Nuclear Power Station, Unit One, occurring during the reporting period, j
Licennee Eyent Report Number       Date           Title of Occurrence None                                                                                     ,
June 1, 1994 through June 30, 1994.
l
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50."3.
                                                                                                +
Occurrence
{
Licennee Eyent Report Number Date Title of Occurrence None l
+
t t
t t
4
4
                                                                                              . j.
. j.
t e
t e
i, t
i t
i k
i k
i i
i i
Line 146: Line 212:
3 e
3 e
t
t
                                                                                                ?
?
k
k
(
(
                                                                                                ?
?
I s
I s
i 1
i 1
I l
I l
l i
i 4
4 (9928MM/070894/8)                                                                     l
(9928MM/070894/8)


1
1
  = . .
=
II. Monthly Report for Byron UfiIT 2 for the month of June 1994 A. Summary of Operatina Exnerience for Unit 2 The Unit began this reporting period in Mode 1 (Power operations).
II. Monthly Report for Byron UfiIT 2 for the month of June 1994 A.
Summary of Operatina Exnerience for Unit 2 The Unit began this reporting period in Mode 1 (Power operations).
I f
I f
I 6
I 6
1
1
                                                                              +
+
4 (9928MM/070894 / 9)
4 (9928MM/070894 / 9)


B_   OPERATING DATA REPORT DOCKET NO.*   050-455                   !
B_
UNIT: Byron Two                         l DATE: 07/08/94                         j COMPILED BY: R. Colglazier TELEPHONE:   (815)234-5441 x2282 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.*
: 1. Reporting Period:   June, 1994. Gross Hours:     720
050-455 UNIT:
: 2. Currently Authorized Power Level: 3411 (MWt)
Byron Two DATE:
Design Electrical Rating: 1175   (MWe-gross)
07/08/94 j
Design Electrical Rating: 1120 (MWe-net)                                               ~
COMPILED BY:
R.
Colglazier TELEPHONE:
(815)234-5441 x2282 OPERATING STATUS 1.
Reporting Period:
June, 1994.
Gross Hours:
720 2.
Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
: 3. Power Level to Which Restricted (If Any): None
~
: 4. Reasons for Restriction (If Any): N/A                                                   ,
3.
THIS MONTH       YR TO DATE     CUMULATIVE *
Power Level to Which Restricted (If Any): None 4.
: 5. Report Period Hrs,                               720           4,343           60,144
Reasons for Restriction (If Any): N/A THIS MONTH YR TO DATE CUMULATIVE
: 6. Rx Critical Hours                               720           4,343         52,148.9
* 5.
: 7. Rx Reserve Shutdown Hours                           0             0                 0
Report Period Hrs, 720 4,343 60,144 6.
: 8. Hours Generator on Line                         720           4,343         51,548.6
Rx Critical Hours 720 4,343 52,148.9 7.
: 9. Unit Reserve Shutdown Hours                         0             0                 0
Rx Reserve Shutdown Hours 0
: 10. Gross Thermal Energy (MWH)               2,413,890       14,495,946     150,567,873
0 0
                                                                                                    ?
8.
: 11. Gross Elec. Energy (MWH)                     826,224       4,991,565       51,174,839   !
Hours Generator on Line 720 4,343 51,548.6 9.
: 12. Net Elec, Energy (MWH)                       789,910       4,774,762       48,557,989
Unit Reserve Shutdown Hours 0
: 13. Reactor Service Factor                           100             100             86.71 l
0 0
: 14. Reactor Availability Factor                       100             100             86.71
: 10. Gross Thermal Energy (MWH) 2,413,890 14,495,946 150,567,873
: 15. Unit Service Factor                               100             100             85.71
?
: 16. Unit Availability Factor                         100             100             85.71
: 11. Gross Elec. Energy (MWH) 826,224 4,991,565 51,174,839
: 17. Unit Capacity Factor (MDC net)                 99.28           99.49             73.06
: 12. Net Elec, Energy (MWH) 789,910 4,774,762 48,557,989
: 18. Unit Capacity Factor (DER net)                 97.96           98.16             72.09 ,
: 13. Reactor Service Factor 100 100 86.71 l
: 19. Unit Forced Outage Hrs.                             0             0           1,343.4
: 14. Reactor Availability Factor 100 100 86.71
: 20. Unit Forced Outage Rate                             0             0             2.54 21, .thutdowns Scheduled over Next 6 Months:   0
: 15. Unit Service Factor 100 100 85.71
: 16. Unit Availability Factor 100 100 85.71
: 17. Unit Capacity Factor (MDC net) 99.28 99.49 73.06
: 18. Unit Capacity Factor (DER net) 97.96 98.16 72.09
: 19. Unit Forced Outage Hrs.
0 0
1,343.4
: 20. Unit Forced Outage Rate 0
0 2.54 21,.thutdowns Scheduled over Next 6 Months:
0
: 22. Lf Shutdown at End of Report Period, Date of Startup: None
: 22. Lf Shutdown at End of Report Period, Date of Startup: None
: 23. Jnits in Test Status-(Prior to Commercial Operation); None
: 23. Jnits in Test Status-(Prior to Commercial Operation); None
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
                                                                                                      )
)
(9928MM/070894/10)
(9928MM/070894/10)


                =
=
: c. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.. 050-455             j UNIT:   Byron Two           '
c.
DATE:   07/08/94           j COMPILED BY:   R. Colglazier TELEPHONE:   (815)234-5441       i x2282 MONTH:   June, 1994
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO..
050-455 j
UNIT:
Byron Two DATE:
07/08/94 j
COMPILED BY:
R. Colglazier TELEPHONE:
(815)234-5441 i
x2282 MONTH:
June, 1994
[
[
DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                 l I
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l I
: 1.                   1115 MW               16,             1092 MW
1.
: 2.                   1121 MW             17.             1093 MW
1115 MW 16, 1092 MW 2.
: 3.             .. 1119 MW               18,             1091 fed                   -t i
1121 MW 17.
: 4.                   1083 MW               19.             7086 MW                     ,
1093 MW 3.
: 5.                   1046 MW               20.             1042 MW 6,                   1095 MW               21.             1097 MW
1119 MW 18, 1091 fed
: 7.                   1106 MW               22.             1103 MW                     5
-t i
: 8.                   1078 MW               23.             1107 MW                   .
4.
: 9.                  1099 MW               24,             1106 MW
1083 MW 19.
: 10.                 1115 MW               25.             1102 MW                     ,
7086 MW 5.
: 11.                 110 8 MW             26,             1103 MW                     l 8
1046 MW 20.
i
1042 MW 6,
: 12.                 1100 MW               27,             1107 MW                     '
1095 MW 21.
I
1097 MW 7.
: 13.                 1098 MW               28,             1102 MW 29,            1105 MW
1106 MW 22.
: 14.                 _ LOB 9 MW                                                         f 15,                 1099 MW               30,             1104 MW                     l t
1103 MW 5
: 31.                                         j i
8.
INSTRUCTIONS On this form list the average' daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum           j dependable capacity is used for the net electrical rating of the unit there may         ;
1078 MW 23.
be occasions when the daily average power level exceeds the 100% line (or the           l restricted power level line.)   In such cases the average daily unit power             t output sheet should be footnoted to explain the apparent anomaly.
1107 MW 9.
1099 MW 24, 1106 MW 10.
1115 MW 25.
1102 MW 11.
110 8 MW 26, 1103 MW l
8 i
12.
1100 MW 27, 1107 MW I
13.
1098 MW 28, 1102 MW f
14.
_ LOB 9 MW 29, 1105 MW 15, 1099 MW 30, 1104 MW l
t 31.
j i
INSTRUCTIONS On this form list the average' daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum j
dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the l
restricted power level line.)
In such cases the average daily unit power t
output sheet should be footnoted to explain the apparent anomaly.
t 5
t 5
l
l
                    -(9928MM/070894/11)                                                                   {
-(9928MM/070894/11)
{
a l'
a l'
l
l


Report Period June, 1994                                                                   UNIT SHUTDOWNS / REDUCTIONS
Report Period June, 1994 UNIT SHUTDOWNS / REDUCTIONS BYRON (miIT 2)
* BYRON                         *
***************+++++++++++
(miIT 2)                           ***************+++++++++++
jiL Date TvDe Ecurs Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence NO SHUTDOWNS OR MAJOR REDUCTIONS FOR UNIT TWO i
jiL                     Date         TvDe Ecurs Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence NO SHUTDOWNS OR MAJOR REDUCTIONS FOR UNIT TWO i
************+++
              ************+++
Summary
* Summary                 *
+*e++**********
              +*e++**********
"TPE Reanen Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
            "TPE                                       Reanen                                                                 Method                                   System & Component F-Forced                                 A-Equip Failure F-Admin                                                 1-Manual                                 Exhibit F & H S-Sched                                   B-Maint or Test G-Oper Error                                           2-Manual Scram                           Instructions for C-Refueling                       H-Other                               3-Auto Scram                             Preparation of D-Regulatory Restriction                                               4-Continued                               Data Entry Sheet E-Operator Training                                                     5-Reduced Load                           Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-9161)
                                                                & License Examination                                         9-Other                                   (LER) File (NUREG-9161)
+
  +
(9928MM/070894/12) 4
(9928MM/070894/12) 4
      -- . - . - , . -      -.wwi.--,     . , . . . - - ..mvvw<,s     +r,v--m.<-o%--w     me..m---v---   -w- , - - w--w,         .,---y--- w -=m- e,i-r-1 -- ,-,--r-"w   - - - ~ - - .w.s-,v --%m-v-w<,.---,-- ,- --.m _ ...____m__.___
-.wwi.--,
..mvvw<,s
+r,v--m.<-o%--w me..m---v---
-w-w--w,
.,---y---
w
-=m-e,i-r-1
,-,--r-"w
- - - ~ - -
.w.s-,v
--%m-v-w<,.---,--
--.m m


_ _ . .        _. . _ _ _ . _ .        ___ .. . . _ _ _ _  .    .-.  . . _. m. .  ... . _ . _ _ .-.            . . _ _ _ _
m.
__  .....a .
.....a t
t
+
          * , +
E.
UltiL3E REPORTING F3OUIREMENTS (UNIT 2) for the month of June 1994 E.
UltiL3E REPORTING F3OUIREMENTS (UNIT 2) for the month of June 1994 1.
: 1.          Safety / Relief valve operations for Unit Two.
Safety / Relief valve operations for Unit Two.
VALVES             NO & TYPE         PLANT                       DESCRIPTION                     ;
VALVES NO & TYPE PLANT DESCRIPTION DJs ACTUATED ACTUATION CONDITION OF EVENT i
DJs           ACTUATED           ACTUATION         CONDITION                   OF EVENT                         .
None i
i None                                                                                                             i
+
                                                                                                                                            +
B e
B e
: 2.         Licensee generated changes to ODCM.
2.
i None                                                                                                             i
Licensee generated changes to ODCM.
                                                                                                                                            +
i None i
: 3.         Indications of failed fuel.                                                                                     f No. Fuel Reliability Indicator:         FRI = 2.6 E-5 pCi/CC                                                 l I
+
L I
f 3.
i f
Indications of failed fuel.
r i                                                                                                                                           ;
No.
l
Fuel Reliability Indicator:
,                                                                                                                                            i 4                                                                                                                                           j 6
FRI = 2.6 E-5 pCi/CC l
I L
I i
f r
i l
i j
4 6
I i
I i
k t
k t
Line 268: Line 397:
I i
I i
t I
t I
: r. LICENSEE EVENT REPORTS (UNIT 2)                                                           I The following is a tabular summary of all Licensee Event Reports for                           !
I r.
Byron Nuclear Power Station, Unit Two, occurring during the reporting period,                 l June 1, 1994 through June 30, 1994.     This information is provided pursuant to the         l reportable occurrence reporting requirements as set forth in 10CFR 50.73.                     )
LICENSEE EVENT REPORTS (UNIT 2)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, l
June 1, 1994 through June 30, 1994.
This information is provided pursuant to the l
reportable occurrence reporting requirements as set forth in 10CFR 50.73.
)
i l
i l
i
i
                                                                                                            }
}
Occurrence                                                     [
Occurrence
Licannee Event Report Number         Date             Title of Occurrence                     ,
[
t None                                                                                     l
Licannee Event Report Number Date Title of Occurrence t
None l
[
[
B b
B b
Line 288: Line 423:
f f
f f
l
l
                                                                                                            ?
?
l I
I j
j l
l (9928FN/070894 /14)
(9928FN/070894 /14)                                                                         )
)
    -..            . .- - . .      ..    .        .  .    - . -      --.        .  - .        -      .}}
.}}

Latest revision as of 09:45, 16 December 2024

Monthly Operating Rept for June 1994 for Byron Nuclear Power Station Units 1 & 2
ML20070F258
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/30/1994
From: Colglazier R, Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-94-0251, BYRON-94-251, NUDOCS 9407180249
Download: ML20070F258 (14)


Text

_

[D)' C:mm::nw::lth Edison Byron Nuclear Station k

O-4450 North German Church Road Byron. Illinois 61010 4

1 July 8, 1994 i

LTR:

BYRON 94-0251 FILE:

2.7.200 (1.10.0101)

Director, Office of Management Information and Program control United States Nuclear Regulatory Commission Washington, D.C.

20555 ATTN:

Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period June 1 through June 30, 1994.

Sincerely, i

/ -

G.

K.

Schwartz Station Manager Byron Nuclear Power Station GKS/RC/mn cc:

J.B. Martin, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support D.R.

Eggett, Station Nuclear Engineering INPO Records Center G.F.

Dick, Jr. - USNRC F.

Yost - Utility Data Institute, Inc.

(9928MM/070894/1) 9407180249 94rv'o

/

PDR ADDCK 050064"4 I

i R

PDR

a BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONNEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE FO. NPF-66 (9928MM/070894/2) e

I l

l I,

Monthly Reoort for Byron LWir 1 for the month of June 1994 j

i l

E m gummary of Ooeratina Exnerience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).

t i

i The power level varied due to load following requirements.

l f

l t

6

,P t

l I

i 6

i (9928MM/070894/3)

B.

OPERATING n&TA REPORT DOCKET NO..

050-454 UNIT: Byron One DATE:

07/08/94 COMPILED BY:

R.

Colglazier l

TELEPHONE:

(815)234-5441 x2282

)

OPERATING STATUS 1.

Reporting Period:

June, 1994.

Gross Hours:

720 i

i 2.

Currently Authorized Power Level: 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross) l Design Electrical Rating: 1120 (MWe-net) f Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any) : None i

4.

Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

720 4,343 77,040 i

6.

Rx Critical Hours 720 4,343 65,153.5 j

7 Rx Reserve Shutdown Hours 0

0 3B 8.

Hours Generator on Line 720 4,343 64,475.1 9.

Unit Reserve Shutdown Hours 0

0 0

{

  • 10. Gross Thermal Energy (MWH) 2,406,999 14,542,143 197,603,242
11. Gross Elec. Energy (MWH) 820,312 4,993,782 66,812,327
12. Net Elec. Energy (MWH) 783,872 4,775,248 63,338,583
13. Reactor Service Factor 100 100 84.57
14. Reactor Availability Factor 100 100 84.62
15. Unit Service Factor 100 100 83.69
16. Unit Availability Factor 100 100 83.69
17. Unit Capacity Factor (MDC net) 98.53 99.50 74.40 I
18. Unit Capacity Factor (DER net) 97.21 98.17 73.41
19. Unit Forced Outage Hrs.

0 0

1,498.2

20. Unit Forced Outage Rate 0

0 2.27

21. Shutdowns Scheduled Over Next 6 Months: 1 (B1R06) i
22. If Shutdown at End of Report Period, Estimated Date of Startup: None
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(9928MM/070894/4)

C.

AVEP3dE DAILY UNIT POWER LEVEL DOCKET NO.:

050-454 UNIT: Byron One DATE:

07/08/94 COMPILED BY:

R. Colglazier TELEPHONE:

(815)234-5441 x2282 MONTH: June, 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

1112 MW 16.

1087 MW 2.

1119 MW 17.

1088 MW 3.

1117 MW 18.

1088 MW 4.

1104 MW 19.

1091 MW 5.

1091 MW 20.

1090 MW 6.

1088 MW 21.

1088 MW 7.

1104 MW 22.

1092 MW B.

1118 MW 23.

1099 MW 9.

1117 MW 24.

1099 MW 10.

1093 MW 25.

1084 MW 11.

1047 MW 26, 1077 MW 12.

1100 MW 27.

1068 MW 13.

1093 MW 28.

1052 MW 14.

1084 MW 29.

1041 MW 15.

1084 MW 30.

1032 MW 31.

INSTRUCTIONS on-this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures-will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)

In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(9928MM/070894/5)

Report Period June, 1994 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1) h Date TyDe Hours Reason Method LER Number System Compenent Cause & Corrective Action to Preveg Recurrence 2

06/24/94 S

H 9

Unit One Began It's Coastdown to BIR06 Summary TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

(9928MM/070894/6)

~

m -

J

. - ~.....

1 i

l E.

UNIOUE REPORTING REQUIREMENTS (UNIT 1) for the month of June. 1994 1.

Safety /Reljef valve operations for Unit One.

?

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED tscTUATION CONDITION OF EVENT

{

None i

I I

2.

Licensee generated changes to ODCM.

None k

i 3.

Indications of failed fuel.

No.

Fuel Reliability Indicator:

FRI = 3.8 E-5 pCi/CC f

1 l

i I

f l

F i

i

\\

l I

t

?

l t

I i

(9928bM/070894/7) i' i

l l.

I

i F.

LICENSEE EVENT REPORTS (UNIT 1)

The fol' lowing is a tabular summary of all Licensee Event Reports for l

Byron Nuclear Power Station, Unit One, occurring during the reporting period, j

June 1, 1994 through June 30, 1994.

This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50."3.

Occurrence

{

Licennee Eyent Report Number Date Title of Occurrence None l

+

t t

4

. j.

t e

i t

i k

i i

5 4

3 e

t

?

k

(

?

I s

i 1

I l

i 4

(9928MM/070894/8)

1

=

II. Monthly Report for Byron UfiIT 2 for the month of June 1994 A.

Summary of Operatina Exnerience for Unit 2 The Unit began this reporting period in Mode 1 (Power operations).

I f

I 6

1

+

4 (9928MM/070894 / 9)

B_

OPERATING DATA REPORT DOCKET NO.*

050-455 UNIT:

Byron Two DATE:

07/08/94 j

COMPILED BY:

R.

Colglazier TELEPHONE:

(815)234-5441 x2282 OPERATING STATUS 1.

Reporting Period:

June, 1994.

Gross Hours:

720 2.

Currently Authorized Power Level: 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net)

~

3.

Power Level to Which Restricted (If Any): None 4.

Reasons for Restriction (If Any): N/A THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs, 720 4,343 60,144 6.

Rx Critical Hours 720 4,343 52,148.9 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Generator on Line 720 4,343 51,548.6 9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 2,413,890 14,495,946 150,567,873

?

11. Gross Elec. Energy (MWH) 826,224 4,991,565 51,174,839
12. Net Elec, Energy (MWH) 789,910 4,774,762 48,557,989
13. Reactor Service Factor 100 100 86.71 l
14. Reactor Availability Factor 100 100 86.71
15. Unit Service Factor 100 100 85.71
16. Unit Availability Factor 100 100 85.71
17. Unit Capacity Factor (MDC net) 99.28 99.49 73.06
18. Unit Capacity Factor (DER net) 97.96 98.16 72.09
19. Unit Forced Outage Hrs.

0 0

1,343.4

20. Unit Forced Outage Rate 0

0 2.54 21,.thutdowns Scheduled over Next 6 Months:

0

22. Lf Shutdown at End of Report Period, Date of Startup: None
23. Jnits in Test Status-(Prior to Commercial Operation); None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

)

(9928MM/070894/10)

=

c.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO..

050-455 j

UNIT:

Byron Two DATE:

07/08/94 j

COMPILED BY:

R. Colglazier TELEPHONE:

(815)234-5441 i

x2282 MONTH:

June, 1994

[

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l I

1.

1115 MW 16, 1092 MW 2.

1121 MW 17.

1093 MW 3.

1119 MW 18, 1091 fed

-t i

4.

1083 MW 19.

7086 MW 5.

1046 MW 20.

1042 MW 6,

1095 MW 21.

1097 MW 7.

1106 MW 22.

1103 MW 5

8.

1078 MW 23.

1107 MW 9.

1099 MW 24, 1106 MW 10.

1115 MW 25.

1102 MW 11.

110 8 MW 26, 1103 MW l

8 i

12.

1100 MW 27, 1107 MW I

13.

1098 MW 28, 1102 MW f

14.

_ LOB 9 MW 29, 1105 MW 15, 1099 MW 30, 1104 MW l

t 31.

j i

INSTRUCTIONS On this form list the average' daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum j

dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the l

restricted power level line.)

In such cases the average daily unit power t

output sheet should be footnoted to explain the apparent anomaly.

t 5

l

-(9928MM/070894/11)

{

a l'

l

Report Period June, 1994 UNIT SHUTDOWNS / REDUCTIONS BYRON (miIT 2)

                              • +++++++++++

jiL Date TvDe Ecurs Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence NO SHUTDOWNS OR MAJOR REDUCTIONS FOR UNIT TWO i

                        • +++

Summary

+*e++**********

"TPE Reanen Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-9161)

+

(9928MM/070894/12) 4

-.wwi.--,

..mvvw<,s

+r,v--m.<-o%--w me..m---v---

-w-w--w,

.,---y---

w

-=m-e,i-r-1

,-,--r-"w

- - - ~ - -

.w.s-,v

--%m-v-w<,.---,--

--.m m

m.

.....a t

+

E.

UltiL3E REPORTING F3OUIREMENTS (UNIT 2) for the month of June 1994 1.

Safety / Relief valve operations for Unit Two.

VALVES NO & TYPE PLANT DESCRIPTION DJs ACTUATED ACTUATION CONDITION OF EVENT i

None i

+

B e

2.

Licensee generated changes to ODCM.

i None i

+

f 3.

Indications of failed fuel.

No.

Fuel Reliability Indicator:

FRI = 2.6 E-5 pCi/CC l

I L

I i

f r

i l

i j

4 6

I i

k t

i r

l I

t (9928MM/070094/13)

I i

t I

I r.

LICENSEE EVENT REPORTS (UNIT 2)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, l

June 1, 1994 through June 30, 1994.

This information is provided pursuant to the l

reportable occurrence reporting requirements as set forth in 10CFR 50.73.

)

i l

i

}

Occurrence

[

Licannee Event Report Number Date Title of Occurrence t

None l

[

B b

i I

f i

l t

i i

[

i h

t n

i i

f f

l

?

I j

l (9928FN/070894 /14)

)

.