ML020810317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML020810317
| number = ML020810317
| issue date = 03/12/2002
| issue date = 03/12/2002
| title = Meeting Agenda, to Discuss the Licensee'S Reactor Pressure Vessel Head Penetration Nozzle Inspection Plans
| title = Meeting Agenda, to Discuss the Licensees Reactor Pressure Vessel Head Penetration Nozzle Inspection Plans
| author name =  
| author name =  
| author affiliation = NRC/NRR/DLPM
| author affiliation = NRC/NRR/DLPM
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Overvicir           - Steve         Scacc SitimnarY           of'Respolise             - Clark       Maxson hielitstrY       Eyerience               - Clark         Maxson NDE       Method.s           - Mlkc         Stark NDE       Equipment               - Dan       Schladcr         (F77)
{{#Wiki_filter:Overvicir  
ContingencY               PlansllRA               -  Yehl'a     Khalil I'lltilre     Phills       - Steve       scace Conclusions               - Alan       Price IcCV
- Steve Scacc SitimnarY of'Respolise Clark Maxson hielitstrY Eyerience Clark Maxson NDE Method.s  
- Mlkc Stark NDE Equipment Dan Schladcr (F77)
ContingencY PlansllRA Yehl'a Khalil I'lltilre Phills Steve scace Conclusions  
- Alan Price IcCV


DNChas.1011ovved                       the       allov       000     cracking           problem hi   1997,       peýlo'oned             a     100(/(       ECTInspection                 o/'/]()-,7./e.v Visual       Inspection         (ý/, /he Millstone                   2 penetrations               is impraclical             due   to     the       insulation           coll.liguratioll.
DNChas.1011ovved the allov 000 cracking problem hi
I)INCintelids             to peij(')rm               an     NDE       inspection           ofthe Millstone           2 head       pelICII-(ItiO17S.
: 1997, peýlo'oned a
MCinspections                     will result               in   an   i.n1lovati     .ve, aggressi       . ve, and     comprehensive                     data         set.
100(/(
Atstarlupfil-om               2RI4             there       it-ill be     assurance             that   the MP2 head       i rill   meet     all     regidotor.v               and     peiftwmance reqn1remelits.
ECTInspection o/'/]()-,7./e.v Visual Inspection
(ý/, /he Millstone 2 penetrations is impraclical due to the insulation coll.liguratioll.
I)INCintelids to peij(')rm an NDE inspection ofthe Millstone 2 head pelICII-(ItiO17S.
MCinspections will result in an i.n1lovati  
.ve, aggressi  
.ve, and comprehensive data set.
Atstarlupfil-om 2RI4 there it-ill be assurance that the MP2 head i rill meet all regidotor.v and peiftwmance reqn1remelits.
2 002r
2 002r


Ranked           29th       In the   NUSCeptibilitY out       of'09     PWRN CE     de.vi,(,)1ied andfi'ibricaied           head   using       Huntington     A/loYs pelletratioll           Ilfbcs.
Ranked 29th In the NUSCeptibilitY out of'09 PWRN CE de.vi,(,)1ied andfi'ibricaied head using Huntington A/loYs pelletratioll Ilfbcs.
Penelrotion.s               do   not   comain   thermal       sleeves Asbeslos           insidallon       ol'vessel   head is   conlonred       and close to   the     he( I(VS illjiice.
Penelrotion.s do not comain thermal sleeves Asbeslos insidallon ol'vessel head is conlonred and close to the he(
I(VS illjiice.
3 (93
3 (93


TYPICAL CEDM NOZZLE cot,
TYPICAL CEDM NOZZLE
: cot,


REACTOR HEAD NOZZLE CONFIGURATION iINSULATION DETAIL iiiCOG~
REACTOR HEAD NOZZLE CONFIGURATION


Millstone            2  is  a    CENSSS
iINSULATION DETAIL iiiCOG~
    - Zero        circunitýrenlial            cracks        have  beenftnind      lo dale      ill  non      B&  VV NSSS (over              OSO noz,'Jes inspected)
CE      Fabricated              Head      with    Himlin                    -Jes
    - Zero        leaks      have    been    reportedft')r        CEftibricated heads co-1


Current Inspection Status Plnt  w  t    lff      *t    J          *exa l~  *  &#xa2;  .    *J.flL  71,1 Bulletin 2001-01                      B & W Plants                                                            Non B & W Plants Category    Plant Name    Inspected Leaks        %Leaks        CircAbove      PlantName            Inspected        Leaks          % Leaks  CircAbove Flants < 5 EPPY  Oconnee 1        69          1      14%                0      North Anna 1              65              0            0.0%      0 Relavtie to Oconee Oconee 2         69          4        5.8%                1      Robinson 2                69              0            0.0%      0 Oconee 3          69          9      13.0%                3      Sorry 1                  69              2            3.1%      0 ANO-1            69          1      1.4%              0 TMI-I            69          5        72%                0
Millstone 2
                                                                  -I Totals =        345      20        5.8%                4        Totals
is a
* 199              2            1.0%      0 lants 5-30 EFPY Turkey 7o777            65              0            0.00%      0 RdativevoOconee    CrystalRiver3    69          1      1.4%                1      Farley 1                69              0            0&#xfd;00%      0 Farley 2                69              0            0.00%      0 Totals          69 6            1      1.4%                1        Calvert Cliffs 2          8              0            0.00%      0 St. Lucil                2              0            0.00%      0 SONGS3                  34              0            000%        0 Bea'er Valley 1          65              0            0.00%      0 Salem 1                  78              0          0.00%        0 Kewaunee                40              0          0.00%        0 PrairieIsland)           40              0          000%        0 Totals                470                0          000%
CENSSS
Plants >30 EFPY McGuireI                11              0            000%
- Zero circunit&#xfd;renlial cracks have beenftnind lo dale ill non B&
relative to Oconee Totals  -*              11              0          0.00%        0 Totals &#xfd;        414        21        5.1%                                                680 5        Totals &#xfd;                                2            0.3%      0 I                    J          I...................J  0.3%
VV NSSS (over OSO noz,'Jes inspected)
                                                                                                                                            -     I    0 eta Icrcks co%
CE Fabricated Head with Himlin
-Jes
- Zero leaks have been reportedft')r CEftibricated heads co-1


Lick     oftherinal             Sleeves         (it   MP2         allows       access./o'l 111trasOlift,                             ()It's, that       will:
Current Inspection Status Plnt w
ti-Vitil o"d         circ,     I////(, relitial         cracks         iii   the tube.
t lff
  - Assess         the     area     around             the   tithe     to   ver&#xfd;ft         the s/1-11clitra/ inleorih,                 o   'the     RCSbottlidarv                     is   h7t(ICI be   ore     a breach           would           be   (let jo                                                         ected       vistiallY.
*t J
Gather additional                 data       jor     hiditstr.i to   ass   ess     the   susceptibilit),               ofCE           designed             plants.
*exa l~
&#xa2;
*J.flL 71,1 Bulletin 2001-01 B & W Plants Non B & W Plants Category Plant Name Inspected Leaks
%Leaks CircAbove PlantName Inspected Leaks
% Leaks CircAbove Flants < 5 EPPY Oconnee 1 69 1
14%
0 North Anna 1 65 0
0.0%
0 Relavtie to Oconee Oconee 2 69 4
5.8%
1 Robinson 2 69 0
0.0%
0 Oconee 3 69 9
13.0%
3 Sorry 1 69 2
3.1%
0 ANO-1 69 1
1.4%
0 TMI-I 69 5
72%
0
-I Totals =
345 20 5.8%
4 Totals
* 199 2
1.0%
0 lants 5-30 EFPY Turkey 7o777 65 0
0.00%
0 RdativevoOconee CrystalRiver3 69 1
1.4%
1 Farley 1 69 0
0&#xfd;00%
0 Farley 2 69 0
0.00%
0 Totals 6 69 1
1.4%
1 Calvert Cliffs 2 8
0 0.00%
0 St. Lucil 2
0 0.00%
0 SONGS3 34 0
000%
0 Bea'er Valley 1 65 0
0.00%
0 Salem 1 78 0
0.00%
0 Kewaunee 40 0
0.00%
0 Prairie Island )
40 0
000%
0 Totals 470 0
000%
Plants >30 EFPY McGuireI 11 0
000%
relative to Oconee Totals -*
11 0
0.00%
0 Totals &#xfd; 680 2
0.3%
0 I
J I...................J I
co%
Totals &#xfd; 414 21 5.1%
5 eta Icrcks 0
0.3%
 
Lick oftherinal Sleeves (it MP2 allows access./o'l 111trasOlift,
()It's, that will:
ti-Vitil o"d
: circ, I////(, relitial cracks iii the tube.  
- Assess the area around the tithe to ver&#xfd;ft the s/1-11clitra/ inleorih, o  
'the RCSbottlidarv is h7t(ICI be ore a breach would be (let jo ected vistiallY.
Gather additional data jor hiditstr.i to ass ess the susceptibilit),
ofCE designed plants.
9
9


cvaillinatioll             ofthe       nozzlemicces.&#xfd;ll         HN, Ultrasonic demonstrated               the     capabilitY           to detect:
Ultrasonic cvaillinatioll ofthe nozzlemicces.&#xfd;ll HN, demonstrated the capabilitY to detect:  
in   the     tube     above       or   beloiv   the   &#xfd;veld
- Cia-flawls, in the tube above or beloiv the  
  - Cia-flawls, the     tube     above       or below     the weld
&#xfd;veld  
    - Axial        f7aits in c'I'law.s over               the   ailoclunclit         wehl over      the    aitachment            wehl
- Axial f7aits in the tube above or below the weld c'I'law.s over the ailoclunclit wehl  
    - A-via/flairs 10 CIO
- A-via/flairs over the aitachment wehl 10 CIO


Circumferential Axial FHaw Flaw Over      Over Weld  Surface Exam Weld      (Detection of of Attachment    Flaw Depth Circumferential Axial Flaw in (Detection of  crack tip in     Weld          Sizing Flaw in Tube       Tube      crack tip in    Oconee    (Currently no  (Currently no (Above or      (Above or       Oconee        Sp ecim en  MRP dem o      MRP demno Below Weld)   Below Weld)    Specimen in     required)    available)      available) required)
Circumferential Flaw in Tube (Above or Below Weld)
Framatome  Demonstrated    Demonstrated Dem onstrated   Demonstrated  Weld metal not Flaw sizing not Rotating  successfully by  successfully successfully by  successfully   addressed      addressed.
Demonstrated successfully by detecting crack tip in appropriate Oconee Specimen.
Ultrasonics detecting crack  by detecting detecting crack by detecting tip in     crack tip in     tip in      crack tip in appropriate     appropriate  appropriate    appropriate Oconee        Oconee        Oconee        Oconee Specimen.       Specim en      Specimen      Specimen CI I
Axial Flaw in Tube (Above or Below Weld)
Demonstrated successfully by detecting crack tip in appropriate Oconee Specim en Circumferential Flaw Over Weld (Detection of crack tip in Oconee Specimen in required)
Dem onstrated successfully by detecting crack tip in appropriate Oconee Specimen Over Weld (Detection of crack tip in Oconee Sp ecim en required)
Demonstrated successfully by detecting crack tip in appropriate Oconee Specimen Surface Exam of Attachment Weld (Currently no MRP dem o available)
Weld metal not addressed Flaw Depth Sizing (Currently no MRP demno available)
Flaw sizing not addressed.
Framatome Rotating Ultrasonics CI I Axial FHaw


Meihott&#xfd;           - UTol'the           Inteije'rence             Fit     Region
Meihott&#xfd; UTol'the Inteije'rence Fit Region  
  - Demonsirated                 to   Mill.&#xfd;Ioiie           NDE         Personnel           that dala         takeii   tit variou.s siles             can     reliablv         defect       the leak       palh     throul(,)h the           lmelj&#xfd;relicejil                 region.
- Demonsirated to Mill.&#xfd;Ioiie NDE Personnel that dala takeii tit variou.s siles can reliablv defect the leak palh throul(,)h the lmelj&#xfd;relicejil region.
  - lyle       abilitY       to review         this   reglon         ultrasonically enhances           our     leak       detection           capabilities             be&#xfd;bre       a leak         &#xfd;vould     be detected             blv a   bare       head       visual examination.
lyle abilitY to review this reglon ultrasonically enhances our leak detection capabilities be&#xfd;bre a
leak  
&#xfd;vould be detected blv a bare head visual examination.
12 c117-
12 c117-


INTERFERENCE FIT HOT TO SCALE
INTERFERENCE FIT HOT TO SCALE


Ae       ultrasonic         in.spection           technique,           capturing rellected         encrg.v       oll   compitlerized                 C-scan         dj,&#xfd;/?/(I.vs, can     accuratelY           defect     a   leak         path     emalialing           either 11-om the         we/d   to   tube     Intei.-Iiice         or   above       the   we/d 1111-Olf"17     the   1*1110jercticefil               reg   *1011.
Ae ultrasonic in.spection technique, capturing rellected encrg.v oll compitlerized C-scan dj,&#xfd;/?/(I.vs, can accuratelY defect a
leak path emalialing either 11-om the we/d to tube Intei.-Iiice or above the we/d 1111-Olf"17 the 1*1110jercticefil reg  
*1011.
14
14


Line 79: Line 173:
16
16


F77   chosen           bused         oil:
F77 chosen bused oil:
( , olltilluous             Improvelliellt               ill   exalllillatioll teclmiqlw               increasin'(1,their                 abilitY       to detect       till the
(, olltilluous Improvelliellt ill exalllillatioll teclmiqlw increasin'(1, their abilitY to detect till the  
    ./laws         aliticipated             ill the     Ilfbe.
./laws aliticipated ill the Ilfbe.
Continuou's                 improvellielit               Ill equipment             ellubling odditional               dato       to   he   obtained             bY 111COMORI/i/I(I) multiple             probe         rotamil(.,       head         design.
Continuou's improvellielit Ill equipment ellubling odditional dato to he obtained bY 111COMORI/i/I(I) multiple probe rotamil(.,
Colltilliloirs             improvement                 ill examination lechnique             to   imesti(i.,ate           111tel-ferencefit               regionftv evidence             ol'a     leak     path.
head design.
Colltilliloirs improvement ill examination lechnique to imesti(i.,ate 111tel-ferencefit regionftv evidence ol'a leak path.
17 615
17 615


Ill Progress           NDE       Development
Ill Progress NDE Development FTI Is con till to make advances ill ultrasonic examillalioll lcclllliqllc&#xfd; Ilial call assess cracks illiliatilig I'll the weld reglOll.
  - FTI         Is con   till             to make       advances       ill ultrasonic examillalioll             lcclllliqllc&#xfd;       Ilial     call assess     cracks illiliatilig       I'll the     weld   reglOll.
18
18


Q-7
Q-7
clca
.1 r.,
.1 r.,
clca


We     expect         thal     our     MP2       RPV       Head       is   healthY Our       owage           plan       includes         planftw           1001/c voltimetric inspections               ofRPVHP, A     minimifin             conlidenceftictor                     ol'90%         wi//     be   attained
We expect thal our MP2 RPV Head is healthY Our owage plan includes planftw 1001/c voltimetric inspections
,similar         to   the     Steam         Generator               Tlfbe     Inspection             StandartL AnY indication                     ol'PW&#xfd;CC               In   anY     RPVHP             requires completion                 ofall       penetratiOlls.
: ofRPVHP, A
A     RefielfReqtiestjor                     NRCapproval                   is   beim)       prepared           to address             vve/d repairs               &#xfd;fnecessar.V.
minimifin conlidenceftictor ol'90%
wi//
be attained  
,similar to the Steam Generator Tlfbe Inspection StandartL AnY indication ol'PW&#xfd;CC In anY RPVHP requires completion ofall penetratiOlls.
A RefielfReqtiestjor NRCapproval is beim) prepared to address vve/d repairs  
&#xfd;fnecessar.V.
21 CAc
21 CAc


Assumes             that       the     (IT     inspection               has   identified       no imacceptableflairs                           In     "n   " RPVHPs Calculates               the     iq)per         90(/(       con   'fidence       limit on   the     nuinber ol'RPVHPv                 with       poten         tia   l/Y imacceplableflows                     (is   a
Assumes that the (IT inspection has identified no imacceptableflairs In "n  
'fillictioll       of     "n This       method           is   oppropriateft'ff                   the   RPVHP         inspection           since the     popidation               sil-e     is   finite A     random           sunipling             that       is   consistent         with   SG Tube inspection             wi//       be     emplo.ved 22 oW
" RPVHPs Calculates the iq)per 90(/(
con  
' fidence limit on the nuinber ol'RPVHPv with poten tia l/Y imacceplableflows (is a  
'fillictioll of "n
This method is oppropriateft'ff the RPVHP inspection since the popidation sil-e is finite A
random sunipling that is consistent with SG Tube inspection wi//
be emplo.ved 22 oW
 
C&#xfd;zl


C&#xfd;zl where:       r is   the     number           o1'RPVHPs                 with                                               in OUT' C11Se We           require         that     I- =     0),     72 112 is   the     normal       variale exceeded           with       probabilitv             "12, and           P is   the   probabilit.l.         offinding a RVHP           no'-Je         with     imacceptableflaws.                             Note     that   Ilie   equalion above                   dolthIc-sided               distribillioll.
where:
Since       we   have       afiiiiie       population               with     si,.e     N   =   78, we     replace
r is the number o1'RPVHPs with in OUT' C11Se We require that I- =
/--' '/' /).v 12     ,      -n)4(N-       1)     Nole:     lor     sing/c-sided               distribution           replace         12
0),
    '/1 (N                                                                                                                   :'12 ith 24 ciz?-
72 112 is the normal variale exceeded with probabilitv "12, and P
is the probabilit.l.
offinding a RVHP no'-Je with imacceptableflaws.
Note that Ilie equalion above dolthIc-sided distribillioll.
Since we have afiiiiie population with si,.e N  
=
78, we replace  
/--' '/' /).v 12  
-n)4(N-
: 1)
Nole:
lor sing/c-sided distribution replace 12  
'/1 (N
:'12 ith 24 ciz?-


MP2 RPVHP Examination Potentially Uninspected Defects vs Sample Size 6
MP2 RPVHP Examination Potentially Uninspected Defects vs Sample Size Number of Penetrations Examined c-fl3 6
5 4?
5 4?
  ,  3 o 2 z
3 o 2 z
0 Number of Penetrations Examined c-fl3
0


Develop         a design         package)&#xfd;)r               removable           instilation Develop         inspeclion           plan     based       on     2002     residts llti'll,-,e doia       and     lesson.v       Icanic(I.11-oin           olher       utilities il i specl   I'M IS.
Develop a design package)&#xfd;)r removable instilation Develop inspeclion plan based on 2002 residts llti'll,-,e doia and lesson.v Icanic(I.11-oin olher utilities il i specl I'M IS.
Participate           in   indirstrY       work         on   replacements                 with our olher       Dominion           planl,&#xfd;.       EPRI         and     Owners         Gl'Otlj)S.
Participate in indirstrY work on replacements with our olher Dominion planl,&#xfd;.
EPRI and Owners Gl'Otlj)S.
26 02'f-
26 02'f-


Millsione           has     been     a((Nressive           in   addressing           the     AlloY       000 cracking           problem.
Millsione has been a((Nressive in addressing the AlloY 000 cracking problem.
DNC         Intends       to   Inspect         100(/(     ofthe       Millsione           -2 Reactor Vessel       Head     penetrations               in   the   next     rel'ieling         outage.
DNC Intends to Inspect 100(/(
tVe hare         demon.strated             el   &#xfd;&#xfd;ct've techn'ques               to   detect./laws Contin'tenci,             to   slop     Inspecting           w/H onlY         be eml)1o.ved           iftre aresatislied             1hat     our     Reactor         Vessel       Head       can     be     returned ioservice           sa,/e'/Y.
ofthe Millsione  
-2 Reactor Vessel Head penetrations in the next rel'ieling outage.
tVe hare demon.strated el  
&#xfd;&#xfd;ct've techn'ques to detect./laws Contin'tenci, to slop Inspecting w/H onlY be eml)1o.ved iftre aresatislied 1hat our Reactor Vessel Head can be returned ioservice sa,/e'/Y.
27 C-2S
27 C-2S


Millton 2     eactr Uni Had Ispetio}}
Millton Uni 2
eactr Had Ispetio}}

Latest revision as of 19:27, 16 January 2025

Meeting Agenda, to Discuss the Licensees Reactor Pressure Vessel Head Penetration Nozzle Inspection Plans
ML020810317
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/12/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2639
Download: ML020810317 (28)


Text

Overvicir

- Steve Scacc SitimnarY of'Respolise Clark Maxson hielitstrY Eyerience Clark Maxson NDE Method.s

- Mlkc Stark NDE Equipment Dan Schladcr (F77)

ContingencY PlansllRA Yehl'a Khalil I'lltilre Phills Steve scace Conclusions

- Alan Price IcCV

DNChas.1011ovved the allov 000 cracking problem hi

1997, peýlo'oned a

100(/(

ECTInspection o/'/]()-,7./e.v Visual Inspection

(ý/, /he Millstone 2 penetrations is impraclical due to the insulation coll.liguratioll.

I)INCintelids to peij(')rm an NDE inspection ofthe Millstone 2 head pelICII-(ItiO17S.

MCinspections will result in an i.n1lovati

.ve, aggressi

.ve, and comprehensive data set.

Atstarlupfil-om 2RI4 there it-ill be assurance that the MP2 head i rill meet all regidotor.v and peiftwmance reqn1remelits.

2 002r

Ranked 29th In the NUSCeptibilitY out of'09 PWRN CE de.vi,(,)1ied andfi'ibricaied head using Huntington A/loYs pelletratioll Ilfbcs.

Penelrotion.s do not comain thermal sleeves Asbeslos insidallon ol'vessel head is conlonred and close to the he(

I(VS illjiice.

3 (93

TYPICAL CEDM NOZZLE

cot,

REACTOR HEAD NOZZLE CONFIGURATION

iINSULATION DETAIL iiiCOG~

Millstone 2

is a

CENSSS

- Zero circunitýrenlial cracks have beenftnind lo dale ill non B&

VV NSSS (over OSO noz,'Jes inspected)

CE Fabricated Head with Himlin

-Jes

- Zero leaks have been reportedft')r CEftibricated heads co-1

Current Inspection Status Plnt w

t lff

  • t J
  • exa l~

¢

  • J.flL 71,1 Bulletin 2001-01 B & W Plants Non B & W Plants Category Plant Name Inspected Leaks

%Leaks CircAbove PlantName Inspected Leaks

% Leaks CircAbove Flants < 5 EPPY Oconnee 1 69 1

14%

0 North Anna 1 65 0

0.0%

0 Relavtie to Oconee Oconee 2 69 4

5.8%

1 Robinson 2 69 0

0.0%

0 Oconee 3 69 9

13.0%

3 Sorry 1 69 2

3.1%

0 ANO-1 69 1

1.4%

0 TMI-I 69 5

72%

0

-I Totals =

345 20 5.8%

4 Totals

  • 199 2

1.0%

0 lants 5-30 EFPY Turkey 7o777 65 0

0.00%

0 RdativevoOconee CrystalRiver3 69 1

1.4%

1 Farley 1 69 0

0ý00%

0 Farley 2 69 0

0.00%

0 Totals 6 69 1

1.4%

1 Calvert Cliffs 2 8

0 0.00%

0 St. Lucil 2

0 0.00%

0 SONGS3 34 0

000%

0 Bea'er Valley 1 65 0

0.00%

0 Salem 1 78 0

0.00%

0 Kewaunee 40 0

0.00%

0 Prairie Island )

40 0

000%

0 Totals 470 0

000%

Plants >30 EFPY McGuireI 11 0

000%

relative to Oconee Totals -*

11 0

0.00%

0 Totals ý 680 2

0.3%

0 I

J I...................J I

co%

Totals ý 414 21 5.1%

5 eta Icrcks 0

0.3%

Lick oftherinal Sleeves (it MP2 allows access./o'l 111trasOlift,

()It's, that will:

ti-Vitil o"d

circ, I////(, relitial cracks iii the tube.

- Assess the area around the tithe to verýft the s/1-11clitra/ inleorih, o

'the RCSbottlidarv is h7t(ICI be ore a breach would be (let jo ected vistiallY.

Gather additional data jor hiditstr.i to ass ess the susceptibilit),

ofCE designed plants.

9

Ultrasonic cvaillinatioll ofthe nozzlemicces.ýll HN, demonstrated the capabilitY to detect:

- Cia-flawls, in the tube above or beloiv the

ýveld

- Axial f7aits in the tube above or below the weld c'I'law.s over the ailoclunclit wehl

- A-via/flairs over the aitachment wehl 10 CIO

Circumferential Flaw in Tube (Above or Below Weld)

Demonstrated successfully by detecting crack tip in appropriate Oconee Specimen.

Axial Flaw in Tube (Above or Below Weld)

Demonstrated successfully by detecting crack tip in appropriate Oconee Specim en Circumferential Flaw Over Weld (Detection of crack tip in Oconee Specimen in required)

Dem onstrated successfully by detecting crack tip in appropriate Oconee Specimen Over Weld (Detection of crack tip in Oconee Sp ecim en required)

Demonstrated successfully by detecting crack tip in appropriate Oconee Specimen Surface Exam of Attachment Weld (Currently no MRP dem o available)

Weld metal not addressed Flaw Depth Sizing (Currently no MRP demno available)

Flaw sizing not addressed.

Framatome Rotating Ultrasonics CI I Axial FHaw

Meihottý UTol'the Inteije'rence Fit Region

- Demonsirated to Mill.ýIoiie NDE Personnel that dala takeii tit variou.s siles can reliablv defect the leak palh throul(,)h the lmeljýrelicejil region.

lyle abilitY to review this reglon ultrasonically enhances our leak detection capabilities beýbre a

leak

ývould be detected blv a bare head visual examination.

12 c117-

INTERFERENCE FIT HOT TO SCALE

Ae ultrasonic in.spection technique, capturing rellected encrg.v oll compitlerized C-scan dj,ý/?/(I.vs, can accuratelY defect a

leak path emalialing either 11-om the we/d to tube Intei.-Iiice or above the we/d 1111-Olf"17 the 1*1110jercticefil reg

  • 1011.

14

This page is intentionally blank.

15

This page is intentionally blank.

16

F77 chosen bused oil:

(, olltilluous Improvelliellt ill exalllillatioll teclmiqlw increasin'(1, their abilitY to detect till the

./laws aliticipated ill the Ilfbe.

Continuou's improvellielit Ill equipment ellubling odditional dato to he obtained bY 111COMORI/i/I(I) multiple probe rotamil(.,

head design.

Colltilliloirs improvement ill examination lechnique to imesti(i.,ate 111tel-ferencefit regionftv evidence ol'a leak path.

17 615

Ill Progress NDE Development FTI Is con till to make advances ill ultrasonic examillalioll lcclllliqllcý Ilial call assess cracks illiliatilig I'll the weld reglOll.

18

Q-7

clca

.1 r.,

We expect thal our MP2 RPV Head is healthY Our owage plan includes planftw 1001/c voltimetric inspections

ofRPVHP, A

minimifin conlidenceftictor ol'90%

wi//

be attained

,similar to the Steam Generator Tlfbe Inspection StandartL AnY indication ol'PWýCC In anY RPVHP requires completion ofall penetratiOlls.

A RefielfReqtiestjor NRCapproval is beim) prepared to address vve/d repairs

ýfnecessar.V.

21 CAc

Assumes that the (IT inspection has identified no imacceptableflairs In "n

" RPVHPs Calculates the iq)per 90(/(

con

' fidence limit on the nuinber ol'RPVHPv with poten tia l/Y imacceplableflows (is a

'fillictioll of "n

This method is oppropriateft'ff the RPVHP inspection since the popidation sil-e is finite A

random sunipling that is consistent with SG Tube inspection wi//

be emplo.ved 22 oW

Cýzl

where:

r is the number o1'RPVHPs with in OUT' C11Se We require that I- =

0),

72 112 is the normal variale exceeded with probabilitv "12, and P

is the probabilit.l.

offinding a RVHP no'-Je with imacceptableflaws.

Note that Ilie equalion above dolthIc-sided distribillioll.

Since we have afiiiiie population with si,.e N

=

78, we replace

/--' '/' /).v 12

-n)4(N-

1)

Nole:

lor sing/c-sided distribution replace 12

'/1 (N

'12 ith 24 ciz?-

MP2 RPVHP Examination Potentially Uninspected Defects vs Sample Size Number of Penetrations Examined c-fl3 6

5 4?

3 o 2 z

0

Develop a design package)ý)r removable instilation Develop inspeclion plan based on 2002 residts llti'll,-,e doia and lesson.v Icanic(I.11-oin olher utilities il i specl I'M IS.

Participate in indirstrY work on replacements with our olher Dominion planl,ý.

EPRI and Owners Gl'Otlj)S.

26 02'f-

Millsione has been a((Nressive in addressing the AlloY 000 cracking problem.

DNC Intends to Inspect 100(/(

ofthe Millsione

-2 Reactor Vessel Head penetrations in the next rel'ieling outage.

tVe hare demon.strated el

ýýct've techn'ques to detect./laws Contin'tenci, to slop Inspecting w/H onlY be eml)1o.ved iftre aresatislied 1hat our Reactor Vessel Head can be returned ioservice sa,/e'/Y.

27 C-2S

Millton Uni 2

eactr Had Ispetio