ML20071B680: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:KANSAS GAS AND ELECTRIC COMPANY THE ELECTAC COMPANY GLENN L KOESTER WeCE PRESrDEast seuCLE AR February 17, 1983 Mr. W.C. Seidle, Chief Reactor Projects Branch 2 U.S. Nuclear Regulatory Commission Region IV                                                                                                '
{{#Wiki_filter:KANSAS GAS AND ELECTRIC COMPANY THE ELECTAC COMPANY GLENN L KOESTER WeCE PRESrDEast seuCLE AR February 17, 1983 Mr. W.C. Seidle, Chief Reactor Projects Branch 2 U.S. Nuclear Regulatory Commission p m T"g p p' 'r g' 3 5 Region IV ry
611 Ryan Plaza Drive, Suite 1003                              p m T"g p p' 'r g' 3ry 5       i Arlington, Texas      76011                                            ')L4 W ~       "- J '           ;
')L4 W ~
J                         i{i       ,
"- J '
f               b             t KMLNRC 83-016                                         Q                               .!
611 Ryan Plaza Drive, Suite 1003 i
                                                                                                                                )]
Arlington, Texas 76011 J
Re:   Dodet No. STN 50-482                               l Subj: Potential 10CFR50.55(e) Report -                         _
i{i
                                                                                                                . , , _      _          i Discrepancies in the BN System
; f b
t
.! )]
KMLNRC 83-016 Q
Re:
Dodet No. STN 50-482 l'
Subj: Potential 10CFR50.55(e) Report -
i Discrepancies in the BN System


==Dear Mr. Seidle:==
==Dear Mr. Seidle:==
This letter provides ar interin report on a potentici 10CFR30.55(u)
This letter provides ar interin report on a potentici 10CFR30.55(u)
                                                                            ~
~
item concerning discrepancies discovered in the Eorated Re. fueling                                           .
item concerning discrepancies discovered in the Eorated Re. fueling Water Storage System (BN) during a Kansas Gas and Electric Company (KG&E) Quality Assurance surveillance. This cor.cern was initially reported as a potential 10CFR50.55(e) by Mr. Earl Creel of KG&E to Mr. Jim Gagliardo of the Nuclear Regulatory Commission (Region IV) on January 20, 1983.
Water Storage System (BN) during a Kansas Gas and Electric Company (KG&E) Quality Assurance surveillance. This cor.cern was initially reported as a potential 10CFR50.55(e) by Mr. Earl Creel of KG&E to Mr. Jim Gagliardo of the Nuclear Regulatory Commission (Region IV) on January 20, 1983.
The BN System had been turned over and accepted by Startup on October 28, 1982. KG&E Quality Assurance later conducted a surveillance on the system and identified some discrepancies in the documentation and hardware. The discrepancies are being evaluated for reportability in accordance with 10CFR50.55(e).
The BN System had been turned over and accepted by Startup on October 28, 1982. KG&E Quality Assurance later conducted a surveillance on the system and identified some discrepancies in the documentation and hardware. The discrepancies are being evaluated for reportability in accordance with 10CFR50.55(e) .
KG&E has initiated actions to correct the identified discrepancies and to determine whether or not similar problems exist on other safety-related systems which have been turned over. Also, actions are being taken to preclude similar discrepancies on systems yet to be turned These actions will be taken regardless of the results of the over.
KG&E has initiated actions to correct the identified discrepancies and to determine whether or not similar problems exist on other safety-related systems which have been turned over. Also, actions are being taken to preclude similar discrepancies on systems yet to be turned over. These actions will be taken regardless of the results of the reportabilit/ evaluation.
reportabilit/ evaluation.
The status of this evaluation will be reported to you on or before April 25, 1983. In the interim, please direct any questions concerning this subject to me or to V.r. Otto Maynard of my staff.
The status of this evaluation will be reported to you on or before April 25, 1983. In the interim, please direct any questions concerning this subject to me or to V.r. Otto Maynard of my staff.
Yours very truly, GLK:bb                                                 t ////                                  - %          _
Yours very truly,
cc: RCDeYoung TVandel/SSchum 8302200533 g39g3,                                                                                               y
////
$DRADOCK 05000482             PDR 201 N. Market -Wichita, Kansas - Wail Address: PO. Box 208 I Wictuta. Kansas 67201 - Telephone: Area Code (316) 2616451}}
GLK:bb t
cc: RCDeYoung TVandel/SSchum 8302200533 g39g3, y
$DRADOCK 05000482 PDR 201 N. Market -Wichita, Kansas - Wail Address: PO. Box 208 I Wictuta. Kansas 67201 - Telephone: Area Code (316) 261645}}

Latest revision as of 08:44, 16 December 2024

Interim Deficiency Rept Re Discrepancies in Borated Refueling Water Storage Sys.Initially Reported on 830120. Actions Initiated to Correct Discrepancies & Determine If Similar Problems Exist.Next Rept by 830425
ML20071B680
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/17/1983
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMLNRC-83-016, KMLNRC-83-16, NUDOCS 8302280511
Download: ML20071B680 (1)


Text

KANSAS GAS AND ELECTRIC COMPANY THE ELECTAC COMPANY GLENN L KOESTER WeCE PRESrDEast seuCLE AR February 17, 1983 Mr. W.C. Seidle, Chief Reactor Projects Branch 2 U.S. Nuclear Regulatory Commission p m T"g p p' 'r g' 3 5 Region IV ry

')L4 W ~

"- J '

611 Ryan Plaza Drive, Suite 1003 i

Arlington, Texas 76011 J

i{i

f b

t

.! )]

KMLNRC 83-016 Q

Re:

Dodet No. STN 50-482 l'

Subj: Potential 10CFR50.55(e) Report -

i Discrepancies in the BN System

Dear Mr. Seidle:

This letter provides ar interin report on a potentici 10CFR30.55(u)

~

item concerning discrepancies discovered in the Eorated Re. fueling Water Storage System (BN) during a Kansas Gas and Electric Company (KG&E) Quality Assurance surveillance. This cor.cern was initially reported as a potential 10CFR50.55(e) by Mr. Earl Creel of KG&E to Mr. Jim Gagliardo of the Nuclear Regulatory Commission (Region IV) on January 20, 1983.

The BN System had been turned over and accepted by Startup on October 28, 1982. KG&E Quality Assurance later conducted a surveillance on the system and identified some discrepancies in the documentation and hardware. The discrepancies are being evaluated for reportability in accordance with 10CFR50.55(e).

KG&E has initiated actions to correct the identified discrepancies and to determine whether or not similar problems exist on other safety-related systems which have been turned over. Also, actions are being taken to preclude similar discrepancies on systems yet to be turned These actions will be taken regardless of the results of the over.

reportabilit/ evaluation.

The status of this evaluation will be reported to you on or before April 25, 1983. In the interim, please direct any questions concerning this subject to me or to V.r. Otto Maynard of my staff.

Yours very truly,

////

GLK:bb t

cc: RCDeYoung TVandel/SSchum 8302200533 g39g3, y

$DRADOCK 05000482 PDR 201 N. Market -Wichita, Kansas - Wail Address: PO. Box 208 I Wictuta. Kansas 67201 - Telephone: Area Code (316) 261645