{{#Wiki_filter:FirstEnery                                                                           Davis-Besse NuclearPower Station 5501 North State Route 2 Oak Harbor,Ohio 43449-9760 June 12, 2002 CCN: P-6-02-05 Docket No. 50-346 License No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:
{{#Wiki_filter:FirstEnery Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 June 12, 2002 CCN: P-6-02-05 Docket No. 50-346 License No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:
Monthly Operating Report, May 2002 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of May 2002.
Monthly Operating Report, May 2002 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of May 2002.
If you have any questions, please contact Aaron Quaderer at (419) 321-7384.
If you have any questions, please contact Aaron Quaderer at (419) 321-7384.
Very truly yours, J. Randel Fast Plant Manager Davis-Besse Nuclear Power Station ASQ/ljk Enclosure cc:     D. V. Pickett NRC Project Manager J. E. Dyer NRC Region III Administrator C. S. Thomas NRC Senior Resident Inspector J'ý'q4
Very truly yours, J. Randel Fast Plant Manager Davis-Besse Nuclear Power Station ASQ/ljk Enclosure cc:
D. V. Pickett NRC Project Manager J. E. Dyer NRC Region III Administrator C. S. Thomas NRC Senior Resident Inspector J'ý'q4


Docket Number 50-346 License Number NPF-3 P-6-02-05 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-7148) at Davis-Besse of any questions regarding this document or any associated regulatory commitments.
Docket Number 50-346 License Number NPF-3 P-6-02-05 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-7148) at Davis-Besse of any questions regarding this document or any associated regulatory commitments.
Commitments                                         Due Date None
Commitments Due Date None


OPERATING DATA REPORT DOCKET NO.                         50-0346 UNIT NAME                        Davis-Besse Unit 1 DATE                    06/03/02 COMPLETED BY                            A.S. Quaderer TELEPHONE                          419-321-7384 REPORTING PERIOD                          May, 2002 YEAR TO MONTH  DATE      CUMULATIVE 1 Design Electrical Rating (MWe-Net).                                     906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
OPERATING DATA REPORT DOCKET NO.
2 Maximum Dependable Capacity (MWe-Net).                                 882 The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 06/03/02 A. S. Quaderer 419-321-7384 May, 2002 1 Design Electrical Rating (MWe-Net).
3 Number of Hours the Reactor Was Critical.                     0.0  1,107.6      147,634.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
4 Number of Hours the Generator Was On Line.                   0.0  1,082.2      145,037.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.                                 0.0       0.0       5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
906 882 0.0 1,107.6 0.0 1,082.2 0.0 5 Unit Reserve Shutdown Hours.
6 Net Electrical Energy (MWH).                                   0  927,296    119,115,911 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
0.0 0
927,296 MONTH YEAR TO DATE CUMULATIVE 147,634.3 145,037.1 5,532.0 119,115,911


UNIT SHUTDOWNS DOCKET NO.         50-346 UNIT NAME   Davis-Besse #1 DATE   06/03/02 COMPLETED BY     A. S. Quaderer REPORTING PERIOD:      May, 2002                                                                                        TELEPHONE     (419) 321-7384 NO.     DATE         TYPE           DURATION     REASON (1) METHOD OF                     CAUSE/CORRECTIVE ACTIONS F: FORCED               (HOURS)                 SHUTTING
UNIT SHUTDOWNS REPORTING PERIOD:
                  &:SCHEDULED                                     DOWN (2)                             COMMENTS 2     2/16/02 S: SCHEDULED               744.0       C, H               1           13th refueling outage, discovery of boric acid corrosion (cont.)                                                                                 on reactor vessel head
May, 2002 DOCKET NO.
50-346 UNIT NAME Davis-Besse #1 DATE 06/03/02 COMPLETED BY A. S. Quaderer TELEPHONE (419) 321-7384 NO.
DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING  
&: SCHEDULED DOWN (2)
COMMENTS 2
2/16/02 S: SCHEDULED 744.0 C, H 1
13th refueling outage, discovery of boric acid corrosion (cont.)
on reactor vessel head  


==SUMMARY==
==SUMMARY==
The reactor was shutdown on February 16, 2002 to begin the 13th refueling outage. The plant remained shutdown throughout the month of May due to the discovery of boric acid corrosion on the reactor vessel head.
The reactor was shutdown on February 16, 2002 to begin the 13th refueling outage. The plant remained shutdown throughout the month of May due to the discovery of boric acid corrosion on the reactor vessel head.
(1) Reason:                              (2) Method:
(1) Reason:
A-Equipment Failure (Explain)             1-Manual B-Maintenance or Test                     2-Manual Trip/Scram C-Refueling                               3-Automatic Trip/Scram D-Regulatory Restriction                 4-Continuation E-Operator Training & License Exami       5-Other (Explain)
A-Equipment Failure (Explain)
F-Administrative G-Operational Error (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exami F-Administrative G-Operational Error (Explain)
H-Other (Explain)}}
H-Other (Explain)
(2) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)}}

Latest revision as of 17:56, 16 January 2025

May 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1
ML021690199
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/12/2002
From: Fast J
FirstEnergy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
P-6-02-05
Download: ML021690199 (4)


Text

FirstEnery Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 June 12, 2002 CCN: P-6-02-05 Docket No. 50-346 License No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:

Monthly Operating Report, May 2002 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of May 2002.

If you have any questions, please contact Aaron Quaderer at (419) 321-7384.

Very truly yours, J. Randel Fast Plant Manager Davis-Besse Nuclear Power Station ASQ/ljk Enclosure cc:

D. V. Pickett NRC Project Manager J. E. Dyer NRC Region III Administrator C. S. Thomas NRC Senior Resident Inspector J'ý'q4

Docket Number 50-346 License Number NPF-3 P-6-02-05 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-7148) at Davis-Besse of any questions regarding this document or any associated regulatory commitments.

Commitments Due Date None

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 06/03/02 A. S. Quaderer 419-321-7384 May, 2002 1 Design Electrical Rating (MWe-Net).

The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net).

The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical.

The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line.

(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

906 882 0.0 1,107.6 0.0 1,082.2 0.0 5 Unit Reserve Shutdown Hours.

The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH).

The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.

0.0 0

927,296 MONTH YEAR TO DATE CUMULATIVE 147,634.3 145,037.1 5,532.0 119,115,911

UNIT SHUTDOWNS REPORTING PERIOD:

May, 2002 DOCKET NO.

50-346 UNIT NAME Davis-Besse #1 DATE 06/03/02 COMPLETED BY A. S. Quaderer TELEPHONE (419) 321-7384 NO.

DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING

&: SCHEDULED DOWN (2)

COMMENTS 2

2/16/02 S: SCHEDULED 744.0 C, H 1

13th refueling outage, discovery of boric acid corrosion (cont.)

on reactor vessel head

SUMMARY

The reactor was shutdown on February 16, 2002 to begin the 13th refueling outage. The plant remained shutdown throughout the month of May due to the discovery of boric acid corrosion on the reactor vessel head.

(1) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exami F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(2) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)