ML021720429: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Duke Power Company Duke                                                      A Duke Energy Company 0 Power.                                                      Energy Center A Duke Energy Company                                       P.O. Box 1006 Charlotte, NC 28201-1006 June 13,           2002 U.S. Nuclear Regulatory Commission Attention:               Document Control Desk Washington, D.C.               20555
{{#Wiki_filter:Duke 0 Power.
A Duke Energy Company Duke Power Company A Duke Energy Company Energy Center P.O. Box 1006 Charlotte, NC 28201-1006 June 13, 2002 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555  


==Subject:==
==Subject:==
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers     50-369 and 50-370 Monthly Performance and Operation Status-May,     2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of May, 2002.
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-May, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of
Any questions or comments may be directed to Roger A.             Williams at (704) 382-5346.
: May, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely Terry Dimmery, Manager Nuclear Business Support Attachment XC:
Sincerely Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi,             Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Senior Resident Inspector                         V" Scott Schaeffer,
L.
A.
Reyes, Regional Administrator
: USNRC, Region II Frank Rinaldi, Project Manager
: USNRC, ONRR INPO Records Center Ms.
Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector V"


Document Control Desk U.S. NRC - McGuire bxc:
Document Control Desk U.S.
C. J. Thomas (MG01RC)
NRC -
McGuire bxc:
C.
J.
Thomas (MG01RC)
RGC Site Licensing File ELL (EC050)
RGC Site Licensing File ELL (EC050)


Operating Data Report Docket No.           50-369 Date                 June 13,2002 Completed By         Roger Williams Telephone             704-382-5346 Operating Status
Operating Data Report Docket No.
: 1. Unit Name:             McGuire 1
Date Completed By Telephone Operating Status
: 2. Reporting Period:     May 1, 2002 - May 31, 2002
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):                                                       3411               Notes: *Nameplate
McGuire 1
: 4. Nameplate Rating (Gross MWe):                                                       1305
: 2. Reporting Period:
* Rating (GrossMWe)
May 1, 2002 - May 31, 2002
: 5. Design Electrical Rating (Net Mwe):                                                 1180               calculated as 1450.000
: 3. Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):                                           1144               MVA * .90 power
3411
: 7. Maximum Dependable Capacity(Net MWe):                                               1100               factor per Page iii, NUREG-0020.
: 4. Nameplate Rating (Gross MWe):
1305 *
: 5. Design Electrical Rating (Net Mwe):
1180
: 6. Maximum Dependable Capacity (Gross MWe):
1144
: 7. Maximum Dependable Capacity(Net MWe):
1100
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-369 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reason for Restrictions, If any:
: 10. Reason for Restrictions, If any:
This Month       YTD              Cumulative
This Month
: 11. Hours in Reporting Period                                                       744.0        3623.0                179687.0
: 11. Hours in Reporting Period 744.0
: 12. Number of Hours Reactor was Critical                                             744.0       3561.1                138492.2
: 12. Number of Hours Reactor was Critical 744.0
: 13. Reactor Reserve Shutdown Hours                                                     0.0          0.0                      0.0
: 13. Reactor Reserve Shutdown Hours 0.0
: 14. Hours Generator On-Line                                                         744.0       3554.7                137235.3
: 14. Hours Generator On-Line 744.0
: 15. Unit Reserve Shutdown Hours                                                         0.0          0.0                      0.0
: 15. Unit Reserve Shutdown Hours 0.0
: 16. Gross Thermal Energy Generated (MWH)                                         2536476     37597628                467249374
: 16. Gross Thermal Energy Generated (MWH) 2536476
: 17. Gross Electrical Energy Generated (MWH)                                       882828       4233988                152287738
: 17. Gross Electrical Energy Generated (MWH) 882828
: 18. Net Electrical Energy Generated (MWH)                                         850634       4082405                145897415
: 18. Net Electrical Energy Generated (MWH) 850634
: 19. Unit Service Factor                                                             100.0           98.1                      76.4
: 19. Unit Service Factor 100.0
: 20. Unit Availability Factor                                                         100.0           98.1                      76.4
: 20. Unit Availability Factor 100.0
: 21. Unit Capacity Factor (Using MDC Net)                                             103.9         102.4                      71.5
: 21. Unit Capacity Factor (Using MDC Net) 103.9
: 22. Unit Capacity Factor (Using DER Net)                                               96.9         95.5                      68.8
: 22. Unit Capacity Factor (Using DER Net) 96.9
: 23. Unit Forced Outage Rate                                                             0.0           1.9                      9.7
: 23. Unit Forced Outage Rate 0.0
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 25. If ShutDown At End Of Report Period, Estimated Date of Startup
: 25. If ShutDown At End Of Report Period, Estimated Date of Startup
: 26. Units in Test Status (Prior to Commercial Operation)
: 26. Units in Test Status (Prior to Commercial Operation)
Forcast             Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 6/13/2002
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 3561.1 0.0 3554.7 0.0 37597628 4233988 4082405 98.1 98.1 102.4 95.5 1.9 Cumulative 179687.0 138492.2 0.0 137235.3 0.0 467249374 152287738 145897415 76.4 76.4 71.5 68.8 9.7 Achieved 3A - 6/13/2002


Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO.       50-369 UNIT NAME:        McGuire 1 DATE:    June 13, 2002 COMPLETED BY:          Roger Williams TELEPHONE:        704-382-5346 REPORT MONTH: May, 2002 No.        Date:            Type      Duration    (1) Reason      (2) Method of  Licensed    Cause and Corrective Action to Prevent Recurrence F - Forced    Hours                    Shutdown R/X  Event Report S - Scheduled                                                No.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO.
No      Outages        for the Month Summary:
UNIT NAME:
(1) Reason                                                                                       (2) Method A - Equipment failure (Explain)         E - Operator Training/License Examination               1 - Manual                 2 - Manual Trip/Scram B - Maintenance or Test                F - Administrative                                      3 - Automatic Trip/Scram   4 - Continuation C - Refueling                          G - Operator Error (Explain)                            5 - Other (Explain)
DATE:
D - Regulatory restriction              H - Other (Explain)                                                                                        3C - 6/13/2002
COMPLETED BY:
TELEPHONE:
50-369 McGuire 1 June 13, 2002 Roger Williams 704-382-5346 REPORT MONTH: May, 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 6/13/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST
: 1. Facility name:     McGuire Unit 1
: 1.
: 2. Scheduled next refueling shutdown: September 2002
Facility name:
: 3. Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
McGuire Unit 1
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 2.
Scheduled next refueling shutdown: September 2002
: 3.
Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
: 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5.     Scheduled date(s) for submitting proposed licensing action and supporting information.
: 5.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Scheduled date(s) for submitting proposed licensing action and supporting information.
: 7. Number of Fuel assemblies             (a)     in the core: 193 (b)     in the spent fuel pool: 1027
: 6.
: 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 9.     Projected date of last refueling which can be accommodated by present license capacity:
: 7.
November 2005 DUKE POWER COMPANY                                   DATE: June 13, 2002 Name of
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027
: 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
: 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: June 13, 2002 Name of


==Contact:==
==Contact:==
R. A. Williams             Phone:   (704) - 382-5346
R. A. Williams Phone:
(704) - 382-5346


Operating Data Report Docket No.           50-370 Date                 June 13,2002 Completed By         Roger Williams Telephone           704-382-5346 Operating Status
Operating Data Report Docket No.
: 1. Unit Name:             McGuire 2
Date Completed By Telephone Operating Status
: 2. Reporting Period:     May 1, 2002 - May 31, 2002
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):                                                     3411               Notes: *Nameplate
McGuire 2
: 4. Nameplate Rating (Gross MWe):                                                       1305
: 2. Reporting Period:
* Rating (GrossMWe)
May 1, 2002 - May 31, 2002
: 5. Design Electrical Rating (Net Mwe):                                                 1180               calculated as 1450.000
: 3. Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):                                           1144               MVA * .90 power factor per Page iii,
3411
: 7. Maximum Dependable Capacity(Net MWe):                                               1100 NUREG-0020.
: 4. Nameplate Rating (Gross MWe):
1305 *
: 5. Design Electrical Rating (Net Mwe):
1180
: 6. Maximum Dependable Capacity (Gross MWe):
1144
: 7. Maximum Dependable Capacity(Net MWe):
1100
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-370 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reason for Restrictions, If any:
: 10. Reason for Restrictions, If any:
This Month       YTD              Cumulative
This Month
: 11. Hours in Reporting Period                                                       744.0        3623.0                159983.0
: 11. Hours in Reporting Period 744.0
: 12. Number of Hours Reactor was Critical                                             744.0       2865.7                130684.5
: 12. Number of Hours Reactor was Critical 744.0
: 13. Reactor Reserve Shutdown Hours                                                     0.0          0.0                      0.0
: 13. Reactor Reserve Shutdown Hours 0.0
: 14. Hours Generator On-Line                                                         744.0       2847.6                129439.4
: 14. Hours Generator On-Line 744.0
: 15. Unit Reserve Shutdown Hours                                                         0.0          0.0                      0.0
: 15. Unit Reserve Shutdown Hours 0.0
: 16. Gross Thermal Energy Generated (MWH)                                         2536288     47122594              464513585
: 16. Gross Thermal Energy Generated (MWH) 2536288
: 17. Gross Electrical Energy Generated (MWH)                                       882260       3325078              148621617
: 17. Gross Electrical Energy Generated (MWH) 882260
: 18. Net Electrical Energy Generated (MWH)                                         851352       3200444              142669723
: 18. Net Electrical Energy Generated (MWH) 851352
: 19. Unit Service Factor                                                             100.0         78.6                      80.9
: 19. Unit Service Factor 100.0
: 20. Unit Availability Factor                                                         100.0         78.6                      80.9
: 20. Unit Availability Factor 100.0
: 21. Unit Capacity Factor (Using MDC Net)                                             104.0          80.3                      79.0
: 21. Unit Capacity Factor (Using MDC Net) 104.0
: 22. Unit Capacity Factor (Using DER Net)                                               97.0         74.9                      75.6
: 22. Unit Capacity Factor (Using DER Net) 97.0
: 23. Unit Forced Outage Rate                                                             0.0         4.3                      5.7
: 23. Unit Forced Outage Rate 0.0
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 25. If ShutDown At End Of Report Period, Estimated Date of Startup
: 25. If ShutDown At End Of Report Period, Estimated Date of Startup
: 26. Units in Test Status (Prior to Commercial Operation)
: 26. Units in Test Status (Prior to Commercial Operation)
Forcast             Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 6/13/2002
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 2865.7 0.0 2847.6 0.0 47122594 3325078 3200444 78.6 78.6 80.3 74.9 4.3 Cumulative 159983.0 130684.5 0.0 129439.4 0.0 464513585 148621617 142669723 80.9 80.9 79.0 75.6 5.7 Achieved 3A - 6/13/2002


Page: 1 of I UNIT SHUTDOWNS DOCKET NO.       50-370 UNIT NAME:       McGuire 2 DATE:     June 13, 2002 COMPLETED BY:           Roger Williams TELEPHONE:         704-382-5346 REPORT MONTH: May. 2002 No.        Date:            Type      Duration    (1) Reason      (2) Method of  Licensed Cause and Corrective Action to Prevent Recurrence F - Forced    Hours                      Shutdown R/X  Event Report S - Scheduled                                                No.
Page: 1 of I UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 (1) Reason A - Equipment failure (Explain)
No      Outages        for the Month Summary:
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
(1) Reason                                                                                     (2) Method A - Equipment failure (Explain)         E - Operator Training/License Examination               1 - Manual               2 - Manual Trip/Scram B - Maintenance or Test                F - Administrative                                      3 - Automatic Trip/Scram 4 - Continuation C - Refueling                          G - Operator Error (Explain)                            5 - Other (Explain)
H - Other (Explain)
D - Regulatory restriction              H - Other (Explain)                                                                                    3C- 6/13/2002
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-6/13/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST
: 1. Facility name:     McGuire Unit 2
: 1.
: 2. Scheduled next refueling shutdown: September 2003
Facility name:
: 3. Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
McGuire Unit 2
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 2.
Scheduled next refueling shutdown: September 2003
: 3.
Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
: 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5.     Scheduled date(s) for submitting proposed licensing action and supporting information.
: 5.
: 6.     Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Scheduled date(s) for submitting proposed licensing action and supporting information.
: 7. Number of Fuel assemblies             (a)     in the core: 193 (b)     in the spent fuel pool: 1041 (c)     in the ISFSI: 160
: 6.
: 8.     Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 9.     Projected date of last refueling which can be accommodated by present license capacity:
: 7.
June 2003 DUKE POWER COMPANY                                   DATE: June 13, 2002 Name of
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
: 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
: 9.
Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: June 13, 2002 Name of


==Contact:==
==Contact:==
R. A. Williams             Phone: (704) - 382-5346
R. A. Williams Phone: (704) - 382-5346


McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002
: 1. Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
: 1.
Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.}}
The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.}}

Latest revision as of 17:53, 16 January 2025

May 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2
ML021720429
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/13/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021720429 (9)


Text

Duke 0 Power.

A Duke Energy Company Duke Power Company A Duke Energy Company Energy Center P.O. Box 1006 Charlotte, NC 28201-1006 June 13, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-May, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of

May, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L.

A.

Reyes, Regional Administrator

USNRC, Region II Frank Rinaldi, Project Manager
USNRC, ONRR INPO Records Center Ms.

Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector V"

Document Control Desk U.S.

NRC -

McGuire bxc:

C.

J.

Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

May 1, 2002 - May 31, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2536476
17. Gross Electrical Energy Generated (MWH) 882828
18. Net Electrical Energy Generated (MWH) 850634
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 103.9
22. Unit Capacity Factor (Using DER Net) 96.9
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 3561.1 0.0 3554.7 0.0 37597628 4233988 4082405 98.1 98.1 102.4 95.5 1.9 Cumulative 179687.0 138492.2 0.0 137235.3 0.0 467249374 152287738 145897415 76.4 76.4 71.5 68.8 9.7 Achieved 3A - 6/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-369 McGuire 1 June 13, 2002 Roger Williams 704-382-5346 REPORT MONTH: May, 2002 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 6/13/2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: September 2002

3.

Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone:

(704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

May 1, 2002 - May 31, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2536288
17. Gross Electrical Energy Generated (MWH) 882260
18. Net Electrical Energy Generated (MWH) 851352
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 104.0
22. Unit Capacity Factor (Using DER Net) 97.0
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 2865.7 0.0 2847.6 0.0 47122594 3325078 3200444 78.6 78.6 80.3 74.9 4.3 Cumulative 159983.0 130684.5 0.0 129439.4 0.0 464513585 148621617 142669723 80.9 80.9 79.0 75.6 5.7 Achieved 3A - 6/13/2002

Page: 1 of I UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-6/13/2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: September 2003

3.

Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002

1.

Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.