{{#Wiki_filter:Status as of 9/25/2002
{{#Wiki_filter:Status as of 9/25/2002 Document Updates for MR 02-029, Aux Feed Mini Recirc Safety Upgrade
                                                                                                                  /
/
Document Updates for MR 02-029, Aux Feed Mini Recirc Safety Upgrade 03' Document               Description                                             Status 1 Training Docs           Update to reflect the upgradedsafety classification     e   TWR 02-240 (Lesson Plans, etc.)   of the mini-recircAOVs                                      initiated 2 Simulator               Changeprogrammingfor AF-117 to eliminate
03' V t Page 1 of 2 Document Description Status 1
* SDR 02-0074 Vt                            ability to prevent backflow       6'tI17~.C/                 initiated 3 P&ID BECH M-217         Add a note atAF-117 to reflect that the check valve     o   DCN 2002-1547 Sh. 1                   internalshave been removed incorporated Rev 73 of drawing issued
Training Docs Update to reflect the upgraded safety classification e
                                                                                                                  /
TWR 02-240 (Lesson Plans, etc.)
Drawing ALOYCO         Add a note to listpartsthat have been removed           a   DCN 2002-1548 A-46037                                                                             released for incorporation 5 Calc 2002-0026         Calculationto verify that relief valve AF-4035 can     a     Calc Approved
of the mini-recirc AOVs initiated 2
                            .. pelSs suffieientffioiio tkei-i ilAlV putips operable (for mod installationonly) 6 DBD-01, Auxiliary       Update to describe new safety function of             0     Issued Feedwater               components, and to addnew components installed by MR 01-144 andMR 02-001.
Simulator Change programming for AF-117 to eliminate SDR 02-0074 ability to prevent backflow 6'tI17~.C/
7 DBD-06, Instrument     Update to describe new safety function of             0   Markup not yet     o Air / Service Air       components, and to addnew components installed             prepared.
initiated 3
by MR 01-144 andMR 02-001.
P&ID BECH M-217 Add a note atAF-117 to reflect that the check valve o
8 PSA Analysis           Update to reflect check valve internals removal       0   Revision 3.05 of analysis completed 9 FSAR 9.7, Instrument   Update to reflect safetyfunction of backup             0   FCR currently
DCN 2002-1547 Sh. 1 internals have been removed incorporated Rev 73 of drawing issued 4
-to Air (IA) / Service Air (SA) pneumatic sources previously installed by MR 01-144 andMR 02-001.
Drawing ALOYCO Add a note to list parts that have been removed a
under preparation 4
DCN 2002-1548 A-46037 released for incorporation 5
10 FSAR 10.2, Auxiliary   Update to reflect safetyfunction of mini-recircAOVs
Calc 2002-0026 Calculation to verify that relief valve AF-4035 can a
* FCR currently Feedwater System                                                                   under preparation, (AF) 11 TS B 3.7.5, AFW         Update to tie operabilityof the AFW pumps to the       0   TS Bases revision System                 common mini-recircline                                    -  repaed and
Calc Approved pelS s suffieientffioiio tkei-i ilAlV putips operable (for mod installation only) 6 DBD-01, Auxiliary Update to describe new safety function of 0
__reviewed 12 CHAMPS                 Note to AF-117 equipment recordto document that
Issued Feedwater components, and to add new components installed by MR 01-144 and MR 02-001.
* Update completed the internalshave been removed 13 IT 08A, Cold Start of   Update to addacceptance criteriafor opening 1AF-
7 DBD-06, Instrument Update to describe new safety function of 0
* Update completed Turbine-Driven         4002, to add acceptance criteriafor exercising               - Rev 29 Issued Auxiliary Feed Pump     1AF-114, and to add a closurecheck of IAF-173 and Valve Test (Quarterly) Unit 1 14 IT 09A, Cold Start of   Update to addacceptance criteriafor opening 2AF-
Markup not yet o
* Update completed Turbine-Driven         4002, to add acceptance criteriafor exercising               - Rev 29 Issued Auxiliary Feed Pump     2AF-114, and to add a closurecheck of 2AF-173 and Valve Test (Quarterly0 Unit 2 15 IT 10, Test of         Update to addacceptance criteriafor opening AF-
Air / Service Air components, and to add new components installed prepared.
* Update completed Electrically-Driven   4007/AF-4014, and to addacceptance criteriafor              - Rev 45 Issued Auxiliary Feed Pumps   exercising check valves AF-115 andAF-116 and Valves (Quarterly) 16 IT 10A, Test of         Update to add acceptance criteriafor opening AF-           Update completed Electrically-Driven   4007/AF-4014, and to addacceptance criteriafor              - Ref 43"sued Page 1 of 2                                      dIYy)
by MR 01-144 and MR 02-001.
8 PSA Analysis Update to reflect check valve internals removal 0
Revision 3.05 of analysis completed 9
FSAR 9.7, Instrument Update to reflect safety function of backup 0
FCR currently Air (IA) / Service Air pneumatic sources previously installed by MR 01-under preparation (SA) 144 and MR 02-001.
10 FSAR 10.2, Auxiliary Update to reflect safety function of mini-recirc AOVs FCR currently Feedwater System under preparation, (AF) 11 TS B 3.7.5, AFW Update to tie operability of the AFW pumps to the 0
TS Bases revision System common mini-recirc line repaed and
__reviewed 12 CHAMPS Note to AF-117 equipment record to document that Update completed the internals have been removed 13 IT 08A, Cold Start of Update to add acceptance criteria for opening 1AF-Update completed Turbine-Driven 4002, to add acceptance criteria for exercising  
- Rev 29 Issued Auxiliary Feed Pump 1AF-114, and to add a closure check of IAF-173 and Valve Test (Quarterly) Unit 1 14 IT 09A, Cold Start of Update to add acceptance criteria for opening 2AF-Update completed Turbine-Driven 4002, to add acceptance criteria for exercising  
- Rev 29 Issued Auxiliary Feed Pump 2AF-114, and to add a closure check of 2AF-173 and Valve Test (Quarterly0 Unit 2 15 IT 10, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for
- Rev 45 Issued Auxiliary Feed Pumps exercising check valves AF-115 andAF-116 and Valves (Quarterly) 16 IT 10A, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for
- Ref 43"sued dIYy)
/
4
-to


Status as of 9/25/2002 Auxiliary Feed Pumps   exercising check valves AF-I15 and AF-116 and Valves with Flow to Unit I Steam Generators (Quarterly) 17   IT 1OB, Test of       Update to add acceptance criteriafor opening AF-
Status as of 9/25/2002 Auxiliary Feed Pumps exercising check valves AF-I15 and AF-116 and Valves with Flow to Unit I Steam Generators (Quarterly) 17 IT 1OB, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for
* Update completed Electrically-Driven   4007/AF-4014,and to add acceptance criteriafor            - Rev 12 Issued Auxiliary Feed Pumps   exercising check valves AF-115 and AF-116 and Valves with Flow to Unit 2 Steam Generators (Quarterly) 18   CHAMPS Callup M-       Delete callup to open and inspectAF-117, since
- Rev 12 Issued Auxiliary Feed Pumps exercising check valves AF-115 and AF-116 and Valves with Flow to Unit 2 Steam Generators (Quarterly) 18 CHAMPS Callup M-Delete callup to open and inspect AF-117, since Callup has been A6 internals are removed deleted, and next callup Work Order has been cancelled  
* Callup has been A6                     internals are removed                                     deleted, and next callup Work Order has been cancelled
.1 9-JSTBackground Update to reflectqnew safejyfunctiony ofmix-i-recrc_
.19- JSTBackground .        Update to reflectqnew safejyfunctiony ofmix-i-recrc_   _ Upd -e cot yet Document, Appendix     A OVs, recirc check valves, andpneumatic backup           prepared A, Auxiliary           check valves Feedwater Components 20   IT 08C                 Createnew procedure to perform a system pressure     e   Draft procedure drop test on the air backupfor IAF-4002 installed         prepared; going to by MR 02-001                                             MSS on 9/30.
_ Upd -e cot yet Document, Appendix A OVs, recirc check valves, and pneumatic backup prepared A, Auxiliary check valves Feedwater Components 20 IT 08C Create new procedure to perform a system pressure e
21   IT 09C                 Createnew procedure to perform a system pressure
Draft procedure drop test on the air backup for IAF-4002 installed prepared; going to by MR 02-001 MSS on 9/30.
* Draft procedure drop test on the air backupfor 2AF-4002 installed         prepared; going to by MR 02-001                                             MSS on 9/30.
21 IT 09C Create new procedure to perform a system pressure Draft procedure drop test on the air backup for 2AF-4002 installed prepared; going to by MR 02-001 MSS on 9/30.
22   CHAMPS Q-list           Update Q-list to add QA code 06 to the mini-recirc   0   Completed AOVs and the mini-recirccheck valves (1/2AF-114, AF-115, andAF-116) to reflect theirnew function to I provide coolingfor the AFW pumps.
22 CHAMPS Q-list Update Q-list to add QA code 06 to the mini-recirc 0
Completed AOVs and the mini-recirc check valves (1/2AF-114, AF-115, and AF-116) to reflect their new function to I provide cooling for the AFW pumps.
Per the station process for modification close-out, all documentation must be completed within 90 days after acceptance of the modification. The modification was accepted by Operations on 9/12/2002.
Per the station process for modification close-out, all documentation must be completed within 90 days after acceptance of the modification. The modification was accepted by Operations on 9/12/2002.
Page 2 of 2}}
Page 2 of 2}}

Latest revision as of 11:48, 16 January 2025

Document Updates for MR 02-029, Aux Feed Mini Recirc Safety Upgrade, June 2003
ML030770446
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/25/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094 MR 02-029
Download: ML030770446 (2)


Text

Status as of 9/25/2002 Document Updates for MR 02-029, Aux Feed Mini Recirc Safety Upgrade

/

03' V t Page 1 of 2 Document Description Status 1

Training Docs Update to reflect the upgraded safety classification e

TWR 02-240 (Lesson Plans, etc.)

of the mini-recirc AOVs initiated 2

Simulator Change programming for AF-117 to eliminate SDR 02-0074 ability to prevent backflow 6'tI17~.C/

initiated 3

P&ID BECH M-217 Add a note atAF-117 to reflect that the check valve o

DCN 2002-1547 Sh. 1 internals have been removed incorporated Rev 73 of drawing issued 4

Drawing ALOYCO Add a note to list parts that have been removed a

DCN 2002-1548 A-46037 released for incorporation 5

Calc 2002-0026 Calculation to verify that relief valve AF-4035 can a

Calc Approved pelS s suffieientffioiio tkei-i ilAlV putips operable (for mod installation only) 6 DBD-01, Auxiliary Update to describe new safety function of 0

Issued Feedwater components, and to add new components installed by MR 01-144 and MR 02-001.

7 DBD-06, Instrument Update to describe new safety function of 0

Markup not yet o

Air / Service Air components, and to add new components installed prepared.

by MR 01-144 and MR 02-001.

8 PSA Analysis Update to reflect check valve internals removal 0

Revision 3.05 of analysis completed 9

FSAR 9.7, Instrument Update to reflect safety function of backup 0

FCR currently Air (IA) / Service Air pneumatic sources previously installed by MR 01-under preparation (SA) 144 and MR 02-001.

10 FSAR 10.2, Auxiliary Update to reflect safety function of mini-recirc AOVs FCR currently Feedwater System under preparation, (AF) 11 TS B 3.7.5, AFW Update to tie operability of the AFW pumps to the 0

TS Bases revision System common mini-recirc line repaed and

__reviewed 12 CHAMPS Note to AF-117 equipment record to document that Update completed the internals have been removed 13 IT 08A, Cold Start of Update to add acceptance criteria for opening 1AF-Update completed Turbine-Driven 4002, to add acceptance criteria for exercising

- Rev 29 Issued Auxiliary Feed Pump 1AF-114, and to add a closure check of IAF-173 and Valve Test (Quarterly) Unit 1 14 IT 09A, Cold Start of Update to add acceptance criteria for opening 2AF-Update completed Turbine-Driven 4002, to add acceptance criteria for exercising

- Rev 29 Issued Auxiliary Feed Pump 2AF-114, and to add a closure check of 2AF-173 and Valve Test (Quarterly0 Unit 2 15 IT 10, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for

- Rev 45 Issued Auxiliary Feed Pumps exercising check valves AF-115 andAF-116 and Valves (Quarterly) 16 IT 10A, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for

- Ref 43"sued dIYy)

/

4

-to

Status as of 9/25/2002 Auxiliary Feed Pumps exercising check valves AF-I15 and AF-116 and Valves with Flow to Unit I Steam Generators (Quarterly) 17 IT 1OB, Test of Update to add acceptance criteria for opening AF-Update completed Electrically-Driven 4007/AF-4014, and to add acceptance criteria for

- Rev 12 Issued Auxiliary Feed Pumps exercising check valves AF-115 and AF-116 and Valves with Flow to Unit 2 Steam Generators (Quarterly) 18 CHAMPS Callup M-Delete callup to open and inspect AF-117, since Callup has been A6 internals are removed deleted, and next callup Work Order has been cancelled

.1 9-JSTBackground Update to reflectqnew safejyfunctiony ofmix-i-recrc_

_ Upd -e cot yet Document, Appendix A OVs, recirc check valves, and pneumatic backup prepared A, Auxiliary check valves Feedwater Components 20 IT 08C Create new procedure to perform a system pressure e

Draft procedure drop test on the air backup for IAF-4002 installed prepared; going to by MR 02-001 MSS on 9/30.

21 IT 09C Create new procedure to perform a system pressure Draft procedure drop test on the air backup for 2AF-4002 installed prepared; going to by MR 02-001 MSS on 9/30.

22 CHAMPS Q-list Update Q-list to add QA code 06 to the mini-recirc 0

Completed AOVs and the mini-recirc check valves (1/2AF-114, AF-115, and AF-116) to reflect their new function to I provide cooling for the AFW pumps.

Per the station process for modification close-out, all documentation must be completed within 90 days after acceptance of the modification. The modification was accepted by Operations on 9/12/2002.

Page 2 of 2