{{#Wiki_filter:Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:       . April 23,2004         Time:       1700       Preparer.           Andrea LUnsglon           U   I         R     28 NOTE:.         Refer to base procedureNP 10.3.6for safety assessmentchecklist KSFdefinitions.
{{#Wiki_filter:Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:  
NOTE:           Wheneverfuel has been removedfrom the reactorvessel and refueling cavity, all key safety functions are GREEN except spentfuel pool cooling.
. April 23,2004 Time:
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY                                                                         Subtotal       Condition
1700 Preparer.
: 1.       RCS Boron concentration = 2979 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C               (0-1)   1         0-1           RED
Andrea LUnsglon U
: 2.       Number of boration paths                                       (0-2)   2         2             ORANGE
I R
: 3.       No fuel motion                                                 (0-1)   1         3-4
28 NOTE:.
: 4.       SR instrumentation operable                                     (0-1)   1         5 Subtotal =       5 CORE COOLING                                                                       Subtotal     Condition
Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinitions.
: 1.       Number of SG available for DHR                                 (0-2)   0         0-1           RED
NOTE:
: 2.       Refueling cavity filled                                         (0-1)   1         2             ORANGE
Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fuel pool cooling.
: 3.       Number of trains RHR available                                 (0-2)   2         3
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY Subtotal Condition
: 4.       RCS level above REDUCED INVENTORY                             (0-1)   1         4-5 RCS TEMP = 92FF; 20 days shutdown,                             Subtotal         4 RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil         19 firs     (Applicable at Cold or Refueling Shutdown)
: 1.
POWER AVAILABILITY                                                               Subtotal       Condition
RCS Boron concentration = 2979 ppm a.)
: 1.       Independent off-site power sources                                                 I             RED available to A-O5 and A-06 (totally                                               2             ORANGE independent at the 4160 V, 13.8 kV,                                               3 and 345 kV levels)                                             (0-2)   2         4-5
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.)
: 2.       G-01 or G-021A-051B-03 available                               (0-1)   1 G-03 or G-04/A-06/B-04 available                               (0-1)   1
For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C (0-1) 1 0-1 RED
: 3.       G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.           (0-1)   0 Subtotal =     4 INVENTORY                                                                         Subtotal       Condition
: 2.
: 1.       Pressurizer level Ž20 percent wlhead on                                           0-1           RED (0-1)   0         2             ORANGE
Number of boration paths (0-2) 2 2
: 2.       Refueling Cavity filled (see definition)                       (0-3)   2         3           _ y ell
ORANGE
: 3.       RCS level above REDUCED INVENTORY                             (0-1)   1         4           C
: 3.
: 4.       Makeup from VCTIBLENDER and/or RWST available                                         (0-2)   1 Iifnrwstlon   In this record was deleted.       Subtotal   =   4 inaccordance with lte Freedom of Information PBF-1 562 Act,                                         Pg1tions o                                       Reremnces: NP 103.6 Revision 2 10/30Y02    O -t                                       Page I of 9                                               NP 102.1 s-\0U
No fuel motion (0-1) 1 3-4
: 4.
SR instrumentation operable (0-1) 1 5
Subtotal =
5 CORE COOLING Subtotal Condition
: 1.
Number of SG available for DHR (0-2) 0 0-1 RED
: 2.
Refueling cavity filled (0-1) 1 2
ORANGE
: 3.
Number of trains RHR available (0-2) 2 3
: 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 92FF; 20 days shutdown, Subtotal 4
RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19 firs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
: 1.
Independent off-site power sources I
RED available to A-O5 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
: 2.
G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
: 3.
G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
: 1.
Pressurizer level Ž20 percent wlhead on 0-1 RED (0-1) 0 2
ORANGE
: 2.
Refueling Cavity filled (see definition)
(0-3) 2 3
_ y ell
: 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
C
: 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 1 Iifnrwstlon In this record was deleted.
Subtotal =
4 PBF-1 562 Revision 2 10/30Y02 in accordance with lte Freedom of Information
: Act, Pg1tions o
O -t Page I of 9 Reremnces: NP 103.6 NP 102.1 s-\\0 U


        *:I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST I 9 CONTAINMENT                                                                 Subtotal          Condition
*:I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
: 1.       Containment integrity (TS 15.1.D) (Containment                             0                  RED Operable) (ITS TS 3.6.1) set                           ( or 4)    0        l                  ORANGE
: 1.
: 2.       Containment Closure CL-IE maintained                                       2-3              -.I.T.TOW-and closure < time to boil                               ( or 2)  2        4-5-6
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set
: 3.       No fuel motion                                             (0.1)  1
: 2.
: 4.       DHR Capability:
Containment Closure CL-IE maintained and closure < time to boil
          -    cavity flooded and internals out
: 3.
                          ' OR
No fuel motion
          -    at least one SG available
: 4.
          -    one fan cooler with Equip hatch installed and personnel hatches capable of being shut                               (0-1) 1 Subtotal =   4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
DHR Capability:
NOTE:           Take creditforonly one P-12 independent offsitepower source duringperiodsof single X-03 orX-04availabiity(*).
cavity flooded and internals out
Subtotal          Condition
' OR at least one SG available one fan cooler with Equip hatch installed and personnel hatches capable of being shut I 9
: 1.       'A' SFP cooling pump available                                             0-1              RED with power available from:                                                 2                ORANGE
( or 4) 0
          -    G-02 or G-01 via 2B-32                               (0-1) Wta        3                YELLOW an independent off-site power                                       4-5                GREEN source different than that for Train B below                                       10-1) n/a
( or 2) 2 (0.1) 1 Subtotal 0
: 2.       'B' SFP cooling pump available with power available from:
l 2-3 4-5-6 Condition RED ORANGE
          -    G-3 or G-04 via IB-42                               (0-1) n/a
-.I.T.TOW-(0-1) 1 Subtotal =
          .(*) an independent off-site power source different than that for Train A above
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
: 3.       Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours.                                                   ( 0-1) Wa SFP Temperatures:                                           Subtotal =    n/a NW         nWa     OF SE         n/a     OF SFP Average Temp             nla       OF SFP Time to Boil             n/a
NOTE:
                                                                .I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
Take creditfor only one P-12 independent
: 1.  
'A' SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below
: 2.  
'B' SFP cooling pump available with power available from:
G-3 or G-04 via IB-42
.(*) an independent off-site power source different than that for Train A above
: 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours.
offsitepower source duringperiods of single X-03 orX-04availabiity (*).
Subtotal Condition 0-1 RED 2
ORANGE (0-1)
Wta 3
YELLOW 4-5 GREEN 10-1) n/a (0-1) n/a
( 0-1)
Wa SFP Temperatures:
NW nWa OF SE n/a OF SFP Average Temp nla SFP Time to Boil n/a Subtotal =
n/a OF
.I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.
The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.
RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.
RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.
PBF-1562                                                                                                      
PBF-1562 Revision 2 10/30/02


==References:==
==References:==
NP 103.6 Revision 2 10/30/02                                            Page 2 of 9                                                  NP 10.2.1
NP 103.6 NP 10.2.1 Page 2 of 9


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:         I             DATE:         April 23, 2004           TIME:       1700 KEY SAFETY FUNCTIONS:
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
REACTIVITY:                   GREEN CORE COOLING:                 GREEN POWER AVAILABLE:             GREEN INVENTORY:                   GREEN CONTAINMENT:                 GREEN SFP COOLING:                 NA PROTECTED EOUIPMENT:
I DATE:
April 23, 2004 TIME:
1700 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
GREEN POWER AVAILABLE:
GREEN INVENTORY:
GREEN CONTAINMENT:
GREEN SFP COOLING:
NA PROTECTED EOUIPMENT:
COMMENTS:
COMMENTS:
Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Istaken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562                                                                                      
Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Is taken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562  


==References:==
==References:==
NP 103.6 Revision 2 10/302                                     Page 5 of 9                                         NP 10+/-1}}
NP 103.6 Revision 2 10/302 Page 5 of 9 NP 10+/-1}}

Latest revision as of 17:28, 15 January 2025

Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920308
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/23/2004
From: Longston A
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920308 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

. April 23,2004 Time:

1700 Preparer.

Andrea LUnsglon U

I R

28 NOTE:.

Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 2979 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C (0-1) 1 0-1 RED

2.

Number of boration paths (0-2) 2 2

ORANGE

3.

No fuel motion (0-1) 1 3-4

4.

SR instrumentation operable (0-1) 1 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 92FF; 20 days shutdown, Subtotal 4

RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19 firs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-O5 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level Ž20 percent wlhead on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

_ y ell

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

C

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 1 Iifnrwstlon In this record was deleted.

Subtotal =

4 PBF-1 562 Revision 2 10/30Y02 in accordance with lte Freedom of Information

Act, Pg1tions o

O -t Page I of 9 Reremnces: NP 103.6 NP 102.1 s-\\0 U

  • I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out

' OR at least one SG available one fan cooler with Equip hatch installed and personnel hatches capable of being shut I 9

( or 4) 0

( or 2) 2 (0.1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE

-.I.T.TOW-(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent

1.

'A' SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below

2.

'B' SFP cooling pump available with power available from:

G-3 or G-04 via IB-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

offsitepower source duringperiods of single X-03 orX-04availabiity (*).

Subtotal Condition 0-1 RED 2

ORANGE (0-1)

Wta 3

YELLOW 4-5 GREEN 10-1) n/a (0-1) n/a

( 0-1)

Wa SFP Temperatures:

NW nWa OF SE n/a OF SFP Average Temp nla SFP Time to Boil n/a Subtotal =

n/a OF

.I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.

RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 23, 2004 TIME:

1700 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

GREEN POWER AVAILABLE:

GREEN INVENTORY:

GREEN CONTAINMENT:

GREEN SFP COOLING:

NA PROTECTED EOUIPMENT:

COMMENTS:

Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Is taken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562

References:

NP 103.6 Revision 2 10/302 Page 5 of 9 NP 10+/-1