ML093360581: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2009 Vice President, Operations Entergy Operations, Inc. | ||
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 | River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 | ||
==SUBJECT:== | ==SUBJECT:== | ||
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157) | RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157) | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By {{letter dated|date=November 30, 2009|text=letter dated November 30, 2009}} (ADAMS Accession No. ML093380291), | |||
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291), | |||
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166. | Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166. | ||
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166. | Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166. | ||
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error. | This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error. | ||
Sincerely, G\J-bM VJ~ | Sincerely, G\\J-bM VJ~ | ||
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 | Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. Amendment No. 165, TS page 3.8-10 | : 1. Amendment No. 165, TS page 3.8-10 | ||
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv | : 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv | ||
ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165 | ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165 | ||
3.8.1 AC Sources-Operating SURVEILLANCE SR 3.8.1.12 | |||
: 1. | -----------------------------NOTES--------------------------- | ||
: 2. | : 1. | ||
All DG starts may be preceded by an engine prelube period. | |||
: 2. | |||
This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C) | |||
However. credit may be taken for unplanned events that satisfy this SR. | However. credit may be taken for unplanned events that satisfy this SR. | ||
Verify on an actual or simulated Emergency Core | Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and: | ||
: a. | : a. | ||
: b. | For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz; | ||
: c. | : b. | ||
: d. | In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage ~ 3740 V and frequency ~ 58.8 Hz. | ||
(continued) | : c. | ||
RIVER BEND | Achieves steady state voltage ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and | ||
: d. | |||
Operates for ~ 5 minutes. | |||
FREQUENCY 18 months (continued) | |||
RIVER BEND 3.8-10 Amendment No. 81 121 133,165 | |||
ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166 | ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166 | ||
5.6 5.6.5 Reporting Requirements 5.6 Reporting Requirements CORE OPERATING LIMITS REPORT (COLR) (continued) | |||
: 24) | : 24) | ||
: 25) | NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)". | ||
: c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met. | : 25) | ||
: d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC. | NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel. | ||
RIVER BEND | : c. | ||
The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met. | |||
: d. | |||
The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC. | |||
RIVER BEND 5.0-19 Amendment No. 81 9699 100 105 106 | |||
~, 166 | |||
December 14, 2009 Vice President, Operations Entergy Operations, Inc. | December 14, 2009 Vice President, Operations Entergy Operations, Inc. | ||
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT: | River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT: | ||
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157) | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By {{letter dated|date=November 30, 2009|text=letter dated November 30, 2009}} (ADAMS Accession No. ML093380291), | |||
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291), | |||
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166. | Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166. | ||
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166. | Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166. | ||
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error. | This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error. | ||
Sincerely, IRA! | Sincerely, IRA! | ||
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 | Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. Amendment No. 165, TS page 3.8-10 | : 1. Amendment No. 165, TS page 3.8-10 | ||
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION: | : 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION: | ||
PUBLIC | PUBLIC RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrDssSnpb Resource RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 12/09/09 12/7109 12/14/09 12/14/09 OFFICIAL AGENCY RECORD}} | ||
Latest revision as of 07:59, 14 January 2025
| ML093360581 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/14/2009 |
| From: | Wang A Plant Licensing Branch IV |
| To: | Entergy Operations |
| Wang, A B, NRR/DORL/LPLIV, 415-1445 | |
| References | |
| TAC ME0157, TAC ME0406 | |
| Download: ML093360581 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
Dear Sir or Madam:
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, G\\J-bM VJ~
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 165, TS page 3.8-10
- 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv
ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165
3.8.1 AC Sources-Operating SURVEILLANCE SR 3.8.1.12
NOTES---------------------------
- 1.
All DG starts may be preceded by an engine prelube period.
- 2.
This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C)
However. credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and:
- a.
For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz;
- b.
In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage ~ 3740 V and frequency ~ 58.8 Hz.
- c.
Achieves steady state voltage ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and
- d.
Operates for ~ 5 minutes.
FREQUENCY 18 months (continued)
RIVER BEND 3.8-10 Amendment No. 81 121 133,165
ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166
5.6 5.6.5 Reporting Requirements 5.6 Reporting Requirements CORE OPERATING LIMITS REPORT (COLR) (continued)
- 24)
NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)".
- 25)
NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.
- c.
The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d.
The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
RIVER BEND 5.0-19 Amendment No. 81 9699 100 105 106
~, 166
December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT:
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
Dear Sir or Madam:
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, IRA!
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 165, TS page 3.8-10
- 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrDssSnpb Resource RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 12/09/09 12/7109 12/14/09 12/14/09 OFFICIAL AGENCY RECORD