{{#Wiki_filter:}} | {{#Wiki_filter:Stephen B. Bran Vice President Consolidated Edison Company of New York, Inc. | ||
Indian Point Station Broadway & Bleakley Avenue Buchanan, NY 10511 Telephone (914) 737-8116 August 1, 1990 Re: | |||
Indian Point Unit No. 2 Docket No. 50-247 Document Control Desk US Nuclear Regulatory Commission Mail Station Pl-137 Washington, DC 20555 | |||
==SUBJECT:== | |||
Indian Point Unit 2 Final Report Inspection, Repair and Restoration Mid-Cycle Inspection on the Steam Efforts during This letter transmits 3 copies of the following documents on the Indian Point Unit 2 Steam Generator Inspection, Repair, and Restoration Program: | |||
(a) | |||
WCAP-12670, Indian Point Unit 2 Final Report on Generator Inspection, Repair and Restoration Efforts 1990 Mid-Cycle Inspection (Proprietary) | |||
(b) | |||
WCAP-12671, Indian Point Unit 2 Final Report on Generator Inspection, Repair and Restoration Efforts 1990 Mid-Cycle Inspection (Non-Proprietary) the Steam during the the Steam during the Also enclosed are a Westinghouse authorization letter, CAW-90-057, Proprietary Information Notice, accompanying Affidavit, and Copyright Notice. | |||
Since proprietary claims as to Item (a) are asserted by Westinghouse Electric Corporation, those claims are supported by an affidavit signed by Westinghouse. | |||
The affidavit sets forth the basis on which Westinghouse claims that the information may be withheld from public disclosure by the Commission, and addresses the considerations listed in 10 CFR Section 2.790(b)(4). Accordingly, it is respectfully requested that Item (a), or in the alternative such portions of Item (a) as the Commission determines to be protected by 10 CFR Section 2.790 as proprietary to Westinghouse, be withheld from public disclosure in accordance with the Commission's regulations. | |||
Correspondence with respect to the proprietary aspects of the application for withholding or the supporting Westinghouse Affidavit should refer to CAW-90-057 and should be addressed to R.A. Wiesemann, Manager of Regulatory & Legislative Affairs, Westinghouse Electric Corporation, P.O. | |||
Box | |||
: 355, Pittsburgh, Pennsylvania 15230-0355, with a copy to the undersigned. | |||
90091 201 90 -0001 I | |||
PDR ADOCK 0.5000247 7F'DC: | |||
(4i4 I tle 9 | |||
Generator the 1990 | |||
/ 1I I e | |||
Should you or your staff have any questions regarding this matter, please contact Mr. Charles W. Jackson, Manager, Nuclear Safety and Licensing. | |||
Very truly yours, Enclosures cc: | |||
Mr. Thomas T. Martin (2 copies) | |||
Regional Administrator -Region I | |||
US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Donald S. Brinkman, Senior Project Manager (5 copies) | |||
Project Directorate I-1 Division of Reactor Projects I/II US Nuclear Regulatory Commission Mail Stop 14B-2 Washington, DC 20555 Senior Resident Inspector (1 copy) | |||
US Nuclear Regulatory Commission P0 Box 38 Buchanan, NY 10511 | |||
..Ep 5 '3o 12:57 Westinghouse Electrit oprlo FRC;NCE"',P CTFN'PA 4051A EnerZY SYMMS1i t | |||
t. L) 4 6.2 | |||
.t 3 Augus US 19 NS-RAW-go0 010 Documenlt control Desk U.S. Nuclear P"eutory CoUsni6 1 washington, D.E. 20555 Attn: Dr. Thomas Kurley, Dire~;torp NR Reg Mr. Erik S. Seckiord, 0"'rector N4R Re$ | |||
Mr. Robert M. Bernero, Director, HMS&S | |||
==Subject:== | |||
Information Sezrin WestinghouJ-e Copyright Notices Gentlemen: | |||
By {{letter dated|date=May 8, 109|text=letter dated May 8, 109}}, Westinghouse advised the Nuclear F~iit Conwui$sior that work Prodlict issued by Westiflghause *ill contaifgl a copyr ih notice. | |||
Westinghouse! qrwited the NRC limited perminssionl to reproduc~t covI es of such docursents for its Internal usba nd for placlfemet in public do(uv.nt room&. However, Westinghoust-did not authorize the 4P.C to make copies for the personal use of memibers of the publie. | |||
We now have been' advised that the NRC is having difficulty ini the use e'nd treatment of Westinghouse. documents because of the restriction w1,ich has b-?ef placed on their copyintg. As an interim measure pending resclutlol of -this matter, Westinghouse is wiPirig t. | |||
allow the NRC to make copies of the Westinghouse copyright documents for m~embers of the public who mcy request such documnts from the NRC, Sutiject to the provisioris of this lettvr. | |||
In addition to the pernmissicin graktd in Our Ma1Y 8, 19;0 letter, Westirqghouse hereby grants further authorization tU the I4RC to copy non-propriellry Westinghouse documents sbmnitted in cconnec1.iof with Senuric or plant specific reviews &:2 aprovals, as wE'l as the issuance. denipil, amendment, transfer, renewal, moificktioIn suprii revocationi or vilation of a license,. | |||
permit, order or regulaticon., copyrigiht protection n-)twithstanding, to satisfy public raqmuests. | |||
Th is authorization, Is griftu with the un'derstanldinlg that any copies of do~cumnts mav.: by the NRC will continue to bear the copyright notice, which will be rtprtduced aOcng with tho docamtnts when the documnfts are being copied. The ikutIhorizationl set forth above does nut exten~d to the proprietary versionl of Westinghouse documents submiitted to the NRC (This doas, not in any way affect thme pcrm~isof previuusll grantid to the NRC to make copies of such docWtconts f4;r internal use hy 4he KRC). | |||
5 'go i2:ES i MIs.... | |||
FR#ECE.- 1P CTR-BY | |||
'4, 5 NS-RAW-90-010 Dr. T. E. Murley The authorization contained In this letter is valid for document$ received by NRC through December 31, 99C,, unless terminated by Westinghouse with appropriate written notice tc. th.. NRC, nd.y W extended by W ostinhous beyond that date. By rovid ng this authoVztio, i to the tRC, Westinghouse does not waive any rits it may otherwise he to control Westinghouse | |||
¢opyright material. | |||
Very traly yours, Robert A. Wiessmann, M4anager Regulatory & Legislative Affairs RAW/hs ct: | |||
Ms. Valeria Wilson, NRR, NRC C. M, Holzle, Esq., Vffice of the General Counsel | |||
*.P o,}} | |||
Latest revision as of 06:48, 14 January 2025
| ML100331490 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/01/1990 |
| From: | Bram S Consolidated Edison Co of New York |
| To: | NRC/IRM |
| Shared Package | |
| ML100331491 | List: |
| References | |
| NUDOCS 9009120190 | |
| Download: ML100331490 (4) | |
Text
Stephen B. Bran Vice President Consolidated Edison Company of New York, Inc.
Indian Point Station Broadway & Bleakley Avenue Buchanan, NY 10511 Telephone (914) 737-8116 August 1, 1990 Re:
Indian Point Unit No. 2 Docket No. 50-247 Document Control Desk US Nuclear Regulatory Commission Mail Station Pl-137 Washington, DC 20555
SUBJECT:
Indian Point Unit 2 Final Report Inspection, Repair and Restoration Mid-Cycle Inspection on the Steam Efforts during This letter transmits 3 copies of the following documents on the Indian Point Unit 2 Steam Generator Inspection, Repair, and Restoration Program:
(a)
WCAP-12670, Indian Point Unit 2 Final Report on Generator Inspection, Repair and Restoration Efforts 1990 Mid-Cycle Inspection (Proprietary)
(b)
WCAP-12671, Indian Point Unit 2 Final Report on Generator Inspection, Repair and Restoration Efforts 1990 Mid-Cycle Inspection (Non-Proprietary) the Steam during the the Steam during the Also enclosed are a Westinghouse authorization letter, CAW-90-057, Proprietary Information Notice, accompanying Affidavit, and Copyright Notice.
Since proprietary claims as to Item (a) are asserted by Westinghouse Electric Corporation, those claims are supported by an affidavit signed by Westinghouse.
The affidavit sets forth the basis on which Westinghouse claims that the information may be withheld from public disclosure by the Commission, and addresses the considerations listed in 10 CFR Section 2.790(b)(4). Accordingly, it is respectfully requested that Item (a), or in the alternative such portions of Item (a) as the Commission determines to be protected by 10 CFR Section 2.790 as proprietary to Westinghouse, be withheld from public disclosure in accordance with the Commission's regulations.
Correspondence with respect to the proprietary aspects of the application for withholding or the supporting Westinghouse Affidavit should refer to CAW-90-057 and should be addressed to R.A. Wiesemann, Manager of Regulatory & Legislative Affairs, Westinghouse Electric Corporation, P.O.
Box
- 355, Pittsburgh, Pennsylvania 15230-0355, with a copy to the undersigned.
90091 201 90 -0001 I
PDR ADOCK 0.5000247 7F'DC:
(4i4 I tle 9
Generator the 1990
/ 1I I e
Should you or your staff have any questions regarding this matter, please contact Mr. Charles W. Jackson, Manager, Nuclear Safety and Licensing.
Very truly yours, Enclosures cc:
Mr. Thomas T. Martin (2 copies)
Regional Administrator -Region I
US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Donald S. Brinkman, Senior Project Manager (5 copies)
Project Directorate I-1 Division of Reactor Projects I/II US Nuclear Regulatory Commission Mail Stop 14B-2 Washington, DC 20555 Senior Resident Inspector (1 copy)
US Nuclear Regulatory Commission P0 Box 38 Buchanan, NY 10511
..Ep 5 '3o 12:57 Westinghouse Electrit oprlo FRC;NCE"',P CTFN'PA 4051A EnerZY SYMMS1i t
t. L) 4 6.2
.t 3 Augus US 19 NS-RAW-go0 010 Documenlt control Desk U.S. Nuclear P"eutory CoUsni6 1 washington, D.E. 20555 Attn: Dr. Thomas Kurley, Dire~;torp NR Reg Mr. Erik S. Seckiord, 0"'rector N4R Re$
Mr. Robert M. Bernero, Director, HMS&S
Subject:
Information Sezrin WestinghouJ-e Copyright Notices Gentlemen:
By letter dated May 8, 109, Westinghouse advised the Nuclear F~iit Conwui$sior that work Prodlict issued by Westiflghause *ill contaifgl a copyr ih notice.
Westinghouse! qrwited the NRC limited perminssionl to reproduc~t covI es of such docursents for its Internal usba nd for placlfemet in public do(uv.nt room&. However, Westinghoust-did not authorize the 4P.C to make copies for the personal use of memibers of the publie.
We now have been' advised that the NRC is having difficulty ini the use e'nd treatment of Westinghouse. documents because of the restriction w1,ich has b-?ef placed on their copyintg. As an interim measure pending resclutlol of -this matter, Westinghouse is wiPirig t.
allow the NRC to make copies of the Westinghouse copyright documents for m~embers of the public who mcy request such documnts from the NRC, Sutiject to the provisioris of this lettvr.
In addition to the pernmissicin graktd in Our Ma1Y 8, 19;0 letter, Westirqghouse hereby grants further authorization tU the I4RC to copy non-propriellry Westinghouse documents sbmnitted in cconnec1.iof with Senuric or plant specific reviews &:2 aprovals, as wE'l as the issuance. denipil, amendment, transfer, renewal, moificktioIn suprii revocationi or vilation of a license,.
permit, order or regulaticon., copyrigiht protection n-)twithstanding, to satisfy public raqmuests.
Th is authorization, Is griftu with the un'derstanldinlg that any copies of do~cumnts mav.: by the NRC will continue to bear the copyright notice, which will be rtprtduced aOcng with tho docamtnts when the documnfts are being copied. The ikutIhorizationl set forth above does nut exten~d to the proprietary versionl of Westinghouse documents submiitted to the NRC (This doas, not in any way affect thme pcrm~isof previuusll grantid to the NRC to make copies of such docWtconts f4;r internal use hy 4he KRC).
5 'go i2:ES i MIs....
FR#ECE.- 1P CTR-BY
'4, 5 NS-RAW-90-010 Dr. T. E. Murley The authorization contained In this letter is valid for document$ received by NRC through December 31, 99C,, unless terminated by Westinghouse with appropriate written notice tc. th.. NRC, nd.y W extended by W ostinhous beyond that date. By rovid ng this authoVztio, i to the tRC, Westinghouse does not waive any rits it may otherwise he to control Westinghouse
¢opyright material.
Very traly yours, Robert A. Wiessmann, M4anager Regulatory & Legislative Affairs RAW/hs ct:
Ms. Valeria Wilson, NRR, NRC C. M, Holzle, Esq., Vffice of the General Counsel