{{#Wiki_filter:Exelon Nuclear Job Performance Measure PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:
{{#Wiki_filter:Exelon Nuclear Job Performance Measure PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-1-R Page 2 of 9 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
Revision 00 Modified for 2010 NRC exam.  
A-N-1-R                                                  Page 2 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-1-R Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 3. Ensure a calculator is available and the memory/display has been cleared.
: 2.
No Simulator setup needed.
: 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of APPENDIX A, attachment A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet.
: 1. Clean copy of APPENDIX A, attachment A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet.  
A-N-1-R                                                            Page 3 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-1-R Page 4 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
: 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
PUMP START           PUMP STOP           STOPWATCH Integrator           Integrator         Elapsed TIme 2A DWFDS                 00382                 00682             4 min 00 sec 2B DWFDS                 00250                 00556             4 min 15 sec 2A DWEDS                 01007                 01277             3 min 45 sec 2B DWEDS                 00970                 01236             3 min 30 sec INITIATING CUE
PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE
: 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
: 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
: 2. Another Operator will verify your calculations.
: 2. Another Operator will verify your calculations.
: 3. Provide the worksheet to the Unit Supervisor when the task is complete.
: 3. Provide the worksheet to the Unit Supervisor when the task is complete.  
A-N-1-R                                                              Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
A-N-1-R Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
Line 53: Line 53:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-1-R                                                                        Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-1-R Page 6 of 9 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A, DRYWELL FLOOR/EQUIPMENT DRAIN SUMP PUMPS FLOW RATE WORKSHEET.
Provide the examinee with the provided copy of Appendix A, DRYWELL FLOOR/EQUIPMENT DRAIN SUMP PUMPS FLOW RATE WORKSHEET.
NOTE:
Steps one (1) through four (4) may be performed in any order.
Steps one (1) through four (4) may be performed in any order.
* 1. For 2A DWFDS calculates             See Key.
: 1.
total gallons pumped of 300 (682 - 382) divided by pumping time of 240 seconds (4 min 00 sec) equals a pump flow rate of 75 gpm.
For 2A DWFDS calculates total gallons pumped of 300 (682 - 382) divided by pumping time of 240 seconds (4 min 00 sec) equals a pump flow rate of 75 gpm.
(300 gal) x (60 sec) = __75___ gpm                               _____      _____      _____
(300 gal) x (60 sec) = __75 See Key.
(240 sec) ( 1 min)
___ gpm (240 sec) ( 1 min)
* 2. For 2B DWFDS calculates             See Key.
: 2.
total gallons pumped of 306 (556 - 250) divided by pumping time of 255 seconds (4 min 15 sec) equals a pump flow rate of 72 gpm.
For 2B DWFDS calculates total gallons pumped of 306 (556 - 250) divided by pumping time of 255 seconds (4 min 15 sec) equals a pump flow rate of 72 gpm.
(306 gal) x (60 sec) = __72___ gpm                               _____      _____      _____
(306 gal) x (60 sec) = __72 See Key.
(255 sec) ( 1 min)
___ gpm (255 sec) ( 1 min)
* 3. For 2A DWEDS calculates             See Key.
: 3.
total gallons pumped of 270 (1277 - 1007) divided by pumping time of 225 seconds (3 min 45 sec) equals a pump flow rate of 72 gpm.
For 2A DWEDS calculates total gallons pumped of 270 (1277 - 1007) divided by pumping time of 225 seconds (3 min 45 sec) equals a pump flow rate of 72 gpm.
(270 gal) x (60 sec) = __72___ gpm                               _____      _____      _____
(270 gal) x (60 sec) = __72 See Key.
(225 sec) ( 1 min)
___ gpm (225 sec) ( 1 min)  
A-N-1-R                                                                      Page 6 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                             STANDARDS                 SAT
A-N-1-R Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 4. For 2B DWEDS calculates               See Key.
: 4.
total gallons pumped of 266 (1236 - 970) divided by pumping time of 210 seconds (3 min 30 sec) equals a pump flow rate of 76 gpm.
For 2B DWEDS calculates total gallons pumped of 266 (1236 - 970) divided by pumping time of 210 seconds (3 min 30 sec) equals a pump flow rate of 76 gpm.
(266 gal) x (60 sec) = __76___ gpm                                   _____  _____      _____
(266 gal) x (60 sec) = __76 See Key.
(210 sec) ( 1 min)
___ gpm (210 sec) ( 1 min)
: 5. Notify Unit Supervisor task           Notifies Unit Supervisor.
: 5.
complete and/or the need for calculations verification.                                           _____  _____      _____
Notify Unit Supervisor task complete and/or the need for calculations verification.
Notifies Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
END JPM Stop Time:_________
A-N-1-R                                                                          Page 7 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-1-R Page 8 of 9 Operators Name:
Job
Job


Line 100: Line 98:
==Title:==
==Title:==
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
K/A Number and Importance: Generic.2.1.18         3.6 / 3.8 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes             No Perform                 SRO Only:       Yes             No Time Critical:           Yes           No Estimated Time to Complete: 12 minutes               Actual Time Used:           minutes
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 106: Line 110:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                   Date:
Evaluators Signature:
A-N-1-R                                                                        Page 8 of 9
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-1-R Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
: 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
PUMP START           PUMP STOP         STOPWATCH Integrator           Integrator       Elapsed TIme 2A DWFDS               00382               00682           4 min 00 sec 2B DWFDS               00250               00556           4 min 15 sec 2A DWEDS               01007               01277           3 min 45 sec 2B DWEDS               00970               01236           3 min 30 sec INITIATING CUE
PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE
: 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
: 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
: 2. Another Operator will verify your calculations.
: 2. Another Operator will verify your calculations.
: 3. Provide the worksheet to the Unit Supervisor when the task is complete.
: 3. Provide the worksheet to the Unit Supervisor when the task is complete.  
A-N-1-R                                                              Page 9 of 9


Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-2-R Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 05 Revised for 2010 NRC exam.  
A-N-2-R                                                  Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-2-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
: 1.
Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.
: 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.  
A-N-2-R                                                                Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-2-R Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 and Unit 3 are operating at near rated power.
: 2. Unit 2 and Unit 3 are operating at near rated power.
Line 155: Line 159:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-2-R                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-2-R Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X.
Provide the examinee with the provided copy of Appendix X.
NOTE:
* 1. Record & initial Bus 24-1 &     Examinee records OPEN Bus 34-1 Tie ACB (902-8)         position.
* 1.
position.                                                     _____    _____      _____
Record & initial Bus 24-1 &
* 2. Record & initial Bus 24 & Bus   Examinee records 24-1 Tie GCB (902-8)             CLOSED position.
Bus 34-1 Tie ACB (902-8) position.
position.                                                     _____    _____      _____
Examinee records OPEN position.
* 3. Record & initial TR 22 to Bus   Examinee records 24 GCB (902-8) position.         CLOSED position.
* 2.
* 4. Record & initial Bus 24 & Bus   Examinee records 24-1 Tie GCB (902-8)             CLOSED position.
Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.
position.                                                     _____    _____      _____
Examinee records CLOSED position.
* 5. Record & initial Bus 24-1 &     Examinee records OPEN Bus 34-1 Tie ACB (902-8)         position.
* 3.
position.                                                     _____    _____      _____
Record & initial TR 22 to Bus 24 GCB (902-8) position.
* 6. Record & initial Bus 23-1 &     Examinee records actual Bus 24-1 Volts, by selecting     voltage (~4160 Volts).
Examinee records CLOSED position.
Bus 23-1.                                                    _____    _____      _____
* 4.
* 7. Record & initial Bus 23-1 &     Examinee records actual Bus 24-1 Volts, by selecting     voltage (~4160 Volts).
Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.
Bus 24-1.                                                    _____    _____      _____
Examinee records CLOSED position.
* 8. Record & initial Bus 23 & Bus   Examinee records actual 24 Volts, by selecting Bus 23. voltage (~4160 Volts).
* 5.
* 9. Record & initial Bus 23 & Bus   Examinee records actual 24 Volts, by selecting Bus 24. voltage (~4160 Volts).
Record & initial Bus 24-1 &
* 10. Indicate acceptance criteria       Examinee circles YES for met.                            acceptance criteria.
Bus 34-1 Tie ACB (902-8) position.
A-N-2-R                                                                    Page 5 of 8
Examinee records OPEN position.
* 6.
Record & initial Bus 23-1 &
Bus 24-1 Volts, by selecting Bus 23-1.
Examinee records actual voltage (~4160 Volts).
* 7.
Record & initial Bus 23-1 &
Bus 24-1 Volts, by selecting Bus 24-1.
Examinee records actual voltage (~4160 Volts).
* 8.
Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 23.
Examinee records actual voltage (~4160 Volts).
* 9.
Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 24.
Examinee records actual voltage (~4160 Volts).
* 10. Indicate acceptance criteria met.
Examinee circles YES for acceptance criteria.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT
A-N-2-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 11. Enter signature, date, and         Examinee enters time, for Performed By.       signature, current date, and current time, for         _____    _____      _____
: 11. Enter signature, date, and time, for Performed By.
Performed By.
Examinee enters signature, current date, and current time, for Performed By.
: 12. Informs Unit Supervisor task       Examinee notifies the Unit is complete.                   Supervisor.
: 12. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
A-N-2-R                                                                    Page 6 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-2-R Page 7 of 8 Operators Name:
Job
Job


Line 202: Line 221:
==Title:==
==Title:==
299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31       4.6 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 20 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 208: Line 233:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                               Date:
Evaluators Signature:
A-N-2-R                                                                    Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-2-R Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 and Unit 3 are operating at near rated power.
: 2. Unit 2 and Unit 3 are operating at near rated power.
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
: 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, ONLY, as required by T.S 3.8.1 action condition B.1.
: 2. The Unit 3 assist NSO has already collected the data for Unit 3.
: 2. The Unit 3 assist NSO has already collected the data for Unit 3.
: 3. Inform the Unit Supervisor when the task is complete.
: 3. Inform the Unit Supervisor when the task is complete.  
A-N-2-R                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-3-R Page 2 of 7 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 02 Revised for 2010 NRC exam.  
A-N-3-R                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 6600-02.
: 1. Provide a marked up copy of DOS 6600-02.  
A-N-3-R                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
Line 259: Line 285:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-3-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-3-R Page 5 of 7 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 6600-02.
Provide the examinee with the provided copy of DOS 6600-02.
NOTE:
* 1. Candidate should identify         Identifies differential step I.5 has a mathematical       pressure should read 4.
* 1.
error.                                                          _____    _____      _____
Candidate should identify step I.5 has a mathematical error.
* 2. Candidate should identify         Identifies incorrect step I.15 OR step I.16 is         verification of dP <6.
Identifies differential pressure should read 4.
signed off as verified dP of <6                                 _____    _____      _____
* 2.
(actual is 7).
Candidate should identify step I.15 OR step I.16 is signed off as verified dP of <6 (actual is 7).
* 3. Candidate should identify that   Identifies step NOT steps I.21.a & b have been       independently verified.
Identifies incorrect verification of dP <6.
initialed by the same person                                   _____    _____      _____
* 3.
performing the surveillance and were NOT independently verified.
Candidate should identify that steps I.21.a & b have been initialed by the same person performing the surveillance and were NOT independently verified.
: 4. Notify Unit Supervisor of         Notifies Unit Supervisor, discrepancies.                    may dispatch Operators to verify/correct issues, also   _____    _____      _____
Identifies step NOT independently verified.
may initiate IR.
: 4.
Notify Unit Supervisor of discrepancies.
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
A-N-3-R                                                                      Page 5 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-3-R Page 6 of 7 Operators Name:
Job
Job


Line 292: Line 318:


==Title:==
==Title:==
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12       3.7 / 4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:           Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes             Actual Time Used:           minutes
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 298: Line 330:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
A-N-3-R                                                                      Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
Line 311: Line 345:
INITIATING CUE
INITIATING CUE
: 1. Verify all requirements are within specifications, and paperwork is correct.
: 1. Verify all requirements are within specifications, and paperwork is correct.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
A-N-3-R                                                                Page 7 of 7


Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-4-R Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM.
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 01 Revised for 2010 NRC exam.  
A-N-4-R                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 3. Ensure a calculator is available and the memory/display has been cleared.
: 2.
No Simulator setup needed.
: 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.  
A-N-4-R                                                            Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-4-R Page 4 of 7 INITIAL CONDITIONS
: 1. You are an on-shift Operator.
: 1. You are an on-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
Line 348: Line 382:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-4-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-4-R Page 5 of 7 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.
Provide the examinee with the provided copy of DOS 1500-08.
NOTE:
The following steps can be performed in any order.
The following steps can be performed in any order.
* 1. Examinee fills out running       See attached key.
* 1.
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).                                                 _____    _____      _____
Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).
* 2. Examinee calculates Dilution     See attached key.
See attached key.
flow (1,017,000 gpm).
* 2.
: 3. Examinee enters dilution flow     See attached key.
Examinee calculates Dilution flow (1,017,000 gpm).
(from above) to calculate CCSW Activity Limit.                                           _____    _____      _____
See attached key.
* 4. Examinee calculates CCSW         See attached key.
: 3.
                                  -5 Activity Limit (2.91 x 10 ).
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
: 5. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                     Supervisor.
See attached key.
* 4.
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
See attached key.
: 5.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
A-N-4-R                                                                    Page 5 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-4-R Page 6 of 7 Operators Name:
Job
Job


Line 382: Line 420:
==Title:==
==Title:==
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11       3.8 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 388: Line 432:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                               Date:
Evaluators Signature:
A-N-4-R                                                                    Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-4-R Page 7 of 7 INITIAL CONDITIONS
: 1. You are an on-shift Operator.
: 1. You are an on-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
INITIATING CUE
: 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
: 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
A-N-4-R                                                            Page 7 of 7


Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-1-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed for2010 NRC exam.
Revision 00 New JPM developed for2010 NRC exam.  
A-N-1-S                                                Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. None.
: 1. None.  
A-N-1-S                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 1. You are the Unit 3 Unit Supervisor.
: 2. The following timeline occurred:
: 2. The following timeline occurred:
Line 437: Line 482:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-1-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-1-S Page 5 of 7 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Candidate locates a copy of Reportability Manual LS-AA-1110.
Candidate locates a copy of Reportability Manual LS-AA-1110.
NOTE:
* 1. Determines the event is        Determines the event is reportable per SAF 1.9.         reportable per SAF 1.9, News Release or Notification of Other           _____    _____      _____
* 1.
Government Agency.
Determines the event is reportable per SAF 1.9.
* 2. Determines the time limit to   Determines the time limit Notify the NRC Operations       to Notify the NRC Center via the ENS within       Operations Center via the four hours of the occurrence. ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has         _____    _____      _____
Determines the event is reportable per SAF 1.9, News Release or Notification of Other Government Agency.
been or will be made.
* 2.
END JPM Stop Time:_________
Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence.
A-N-1-S                                                                      Page 5 of 7
Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made.
END JPM Stop Time:_________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-1-S Page 6 of 7 Operators Name:
Job
Job


Line 463: Line 508:
==Title:==
==Title:==
299L001, Determine Reportability requirements as outlined in station Reportability manual.
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.2       4.1 / 4.4 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 469: Line 520:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
A-N-1-S                                                                      Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-1-S Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 1. You are the Unit 3 Unit Supervisor.
: 2. The following timeline occurred:
: 2. The following timeline occurred:
Line 483: Line 536:
: 3. The time is now 1715 hours.
: 3. The time is now 1715 hours.
INITIATING CUE
INITIATING CUE
: 1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.
: 1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.  
A-N-1-S                                                                    Page 7 of 7


Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:
Instructor                     Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-2-S Page 2 of 7 Revision Record (Summary)
Revision 03 Bank JPM.
Revision 03 Bank JPM.
Revision 04 Revised for 2010 NRC exam.
Revision 04 Revised for 2010 NRC exam.  
A-N-2-S                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-2-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
: 1.
Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.
: 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.  
A-N-2-S                                                                Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-2-S Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Supervisor.
: 1. You are the Unit 2 Supervisor.
: 2. Unit 2 and Unit 3 are at near rated power.
: 2. Unit 2 and Unit 3 are at near rated power.
Line 518: Line 569:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-2-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-2-S Page 5 of 7 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.
Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.
NOTE:
* 1. Verifies data all entered.     Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT
* 1.
                                          > 3851 Volts.                   _____    _____        _____
Verifies data all entered.
* 2. Verifies data all entered.     Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >
Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT  
3851 Volts.                     _____    _____        _____
> 3851 Volts.
* 3. Verify data is accurate, by     Verifies Voltmeter Bus 23-reading Voltmeter.              1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus         _____    _____        _____
* 2.
23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct value, CUE:
Verifies data all entered.
If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.
Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >
END JPM Stop Time:_________
3851 Volts.
A-N-2-S                                                                      Page 5 of 7
* 3.
Verify data is accurate, by reading Voltmeter.
Verifies Voltmeter Bus 23-1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus 23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct
: value, If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.
CUE:
END JPM Stop Time:_________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-2-S Page 6 of 7 Operators Name:
Job
Job


Line 547: Line 602:
==Title:==
==Title:==
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31       4.2 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 553: Line 614:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                               Date:
Evaluators Signature:
A-N-2-S                                                                    Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-2-S Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Supervisor.
: 1. You are the Unit 2 Supervisor.
: 2. Unit 2 and Unit 3 are at near rated power.
: 2. Unit 2 and Unit 3 are at near rated power.
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
: 1. Review the data and complete the paperwork.
: 1. Review the data and complete the paperwork.  
A-N-2-S                                                                  Page 7 of 7


Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-3-S Page 2 of 7 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
Revision 00 Modified for 2010 NRC exam.  
A-N-3-S                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-3-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of Appendix A.
: 1. Provide a marked up copy of Appendix A.  
A-N-3-S                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-3-S Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor.
: 1. You are the Unit 2 Unit Supervisor.
: 2. Unit 2 is operating at rated conditions.
: 2. Unit 2 is operating at rated conditions.
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
INITIATING CUE
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
: 2. Correct any discrepancies noted (if any).
: 2. Correct any discrepancies noted (if any).
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Line 600: Line 662:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-3-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-3-S Page 5 of 7 JPM Start Time:
UNSAT      Comment PERFORMANCE CHECKLIST                           STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A.
Provide the examinee with the provided copy of Appendix A.
NOTE:
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
* 1. Verifies Calculated Floor Drain  Determines Floor Drain Leakage is correct.               leakage for THU 1200 hours should be 4.50 gpm.           _____        _____          _____
* 1.
* 2. Verifies Calculated Floor Drain   Determines TOTAL leakage Leakage is correct.               for FRI 2000 hours should be 12.13 gpm.
Verifies Calculated Floor Drain Leakage is correct.
Determines Floor Drain leakage for THU 1200 hours should be 4.50 gpm.
* 2.
Verifies Calculated Floor Drain Leakage is correct.
Determines TOTAL leakage for FRI 2000 hours should be 12.13 gpm.
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
NOTE:
NOTE:
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
* 3.
* 3. Verifies Calculated Floor Drain  Determines Floor Drain Leakage is correct.               leakage for FRI 1200 hours should be 5.15 gpm (TS).     _____        _____          _____
Verifies Calculated Floor Drain Leakage is correct.
* 4. References Tech Specs.           References Tech Spec 3.4.4 and recognizes
Determines Floor Drain leakage for FRI 1200 hours should be 5.15 gpm (TS).
                                                *  >5 gpm unidentified leakage for FRI 1600 hours.
* 4.
References Tech Specs.
References Tech Spec 3.4.4 and recognizes  
>5 gpm unidentified leakage for FRI 1600 hours.
Recognizes in Cond A & B.
Recognizes in Cond A & B.
: 5. Reports discrepancies.           Examinee reports discrepancies noted.
: 5.
Reports discrepancies.
Examinee reports discrepancies noted.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
A-N-3-S                                                                        Page 5 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-3-S Page 6 of 7 Operators Name:
Job
Job


Line 634: Line 704:
==Title:==
==Title:==
29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.
29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.
K/A Number and Importance: Generic.2.2.40       3.4 / 4.7 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 640: Line 716:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                               Date:
Evaluators Signature:
A-N-3-S                                                                    Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-3-S Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor.
: 1. You are the Unit 2 Unit Supervisor.
: 2. Unit 2 is operating at rated conditions.
: 2. Unit 2 is operating at rated conditions.
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 ,
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2,
AND 3 REACTOR COOLANT LEAKAGE LOG.
AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
INITIATING CUE
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
: 2. Correct any discrepancies noted (if any).
: 2. Correct any discrepancies noted (if any).  
A-N-3-S                                                            Page 7 of 7


Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-4-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM.
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 01 Revised for 2010 NRC exam.  
A-N-4-S                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-4-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 3. Ensure a calculator is available and the memory/display has been cleared.
: 2.
No Simulator setup needed.
: 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.  
A-N-4-S                                                            Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-4-S Page 4 of 7 INITIAL CONDITIONS
: 1. You are an on-shift Operator.
: 1. You are an on-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
Line 690: Line 768:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-4-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-4-S Page 5 of 7 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.
Provide the examinee with the provided copy of DOS 1500-08.
NOTE:
The following steps can be performed in any order.
The following steps can be performed in any order.
* 1. Examinee fills out running       See attached key.
* 1.
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).                                                 _____    _____      _____
Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).
* 2. Examinee calculates Dilution     See attached key.
See attached key.
flow (1,017,000 gpm).
* 2.
: 3. Examinee enters dilution flow     See attached key.
Examinee calculates Dilution flow (1,017,000 gpm).
(from above) to calculate CCSW Activity Limit.                                           _____    _____      _____
See attached key.
* 4. Examinee calculates CCSW         See attached key.
: 3.
                                  -5 Activity Limit (2.91 x 10 ).
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
: 5. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                     Supervisor.
See attached key.
* 4.
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
See attached key.
: 5.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
A-N-4-S                                                                    Page 5 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-4-S Page 6 of 7 Operators Name:
Job
Job


Line 724: Line 806:
==Title:==
==Title:==
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11       3.8 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 730: Line 818:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                               Date:
Evaluators Signature:
A-N-4-S                                                                    Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-4-S Page 7 of 7 INITIAL CONDITIONS
: 1. You are an on-shift Operator.
: 1. You are an on-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
INITIATING CUE
: 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
: 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
A-N-4-S                                                            Page 7 of 7


Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
A-N-5-S Page 2 of 9 Revision Record (Summary)
Revision 00 Bank JPM.
Revision 00 Bank JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 01 Revised for 2010 NRC exam.  
A-N-5-S                                                  Page 2 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
A-N-5-S Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Two (2) marked up copies of EP-AA-113-F-02.
: 1. Two (2) marked up copies of EP-AA-113-F-02.
: 2. Blank copy of EP-AA-113.
: 2. Blank copy of EP-AA-113.
: 3. Blank copy of EP-AA-113-F-03.
: 3. Blank copy of EP-AA-113-F-03.  
A-N-5-S                                                    Page 3 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-5-S Page 4 of 9 INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
Line 779: Line 868:
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
INITIATING CUES
: 1. Execute section 4.4 of EP-AA-113.
: 1. Execute section 4.4 of EP-AA-113.  
A-N-5-S                                                                Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
A-N-5-S Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
Line 791: Line 879:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
A-N-5-S                                                                        Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
A-N-5-S Page 6 of 9 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee the provided copies of:
Provide the Examinee the provided copies of:
NOTE:
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03
: 1. Applicant determines need for   Emergency action is emergency action.                needed per initiating cue.
: 1.
Applicant determines need for emergency action.
Emergency action is needed per initiating cue.
If asked, Clay and Jax do NOT have any adverse reactions to KI.
CUE:
CUE:
If asked, Clay and Jax do NOT have any adverse reactions to KI.
: 2.
: 2. Applicant recognizes per the     Recognizes that initiating cue that             authorization to take KI authorization to take KI must    must also be completed.
Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.
also be completed prior to the                               _____        _____      _____
Recognizes that authorization to take KI must also be completed.
emergency workers entering the space.
* 3.
* 3. Determines there is or has       Determines KI must be been a Loss of Fuel Clad         issued.
Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
Determines KI must be issued.
* 4. Documents the decision to       BOTH individuals being issue KI using THYROID           authorized for KI and BLOCKING AGENT                   entering the space must be AUTHORIZATION Form               listed with their correct (EP-AA-113-F-03).               names and employee ID numbers:
* 4.
* Clay Morrow               _____        _____      _____
Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form (EP-AA-113-F-03).
123456
BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers:
* Jax Teller 891011 A-N-5-S                                                                    Page 6 of 9
* Clay Morrow 123456
* Jax Teller 891011  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
A-N-5-S Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
: 5. Notifies Occupational Health  Examinee states that (Medical) Services            he/she would notify OHS.
Department promptly that KI                                _____      _____      _____
is to be issued to Exelon Nuclear personnel or contractors.
NOTE:
NOTE:
: 5.
Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.
Examinee states that he/she would notify OHS.
JPM is complete when applicant notifies OHS of KI use.
JPM is complete when applicant notifies OHS of KI use.
NOTE:
END JPM Stop Time:_________
END JPM Stop Time:_________
A-N-5-S                                                                  Page 7 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
A-N-5-S Page 8 of 9 Operators Name:
Job
Job


Line 835: Line 925:
==Title:==
==Title:==
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.40       2.7 / 4.5 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 20 minutes Actual Time Used:                 minutes
K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 841: Line 937:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
A-N-5-S                                                                      Page 8 of 9
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
A-N-5-S Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
Line 861: Line 959:
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
INITIATING CUES
: 1. Execute section 4.4 of EP-AA-113.
: 1. Execute section 4.4 of EP-AA-113.  
A-N-5-S                                                                Page 9 of 9


Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:
Instructor                     Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-a Page 2 of 8 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
Revision 00 Modified for 2010 NRC exam.  
S-N-a                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-a Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE:       It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert following Malfunctions and/or Remotes:
: 2. Insert following Malfunctions and/or Remotes:
* IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
* IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
Line 882: Line 979:
: 3. Setup the following Triggers:
: 3. Setup the following Triggers:
* None.
* None.
DOCUMENT PREPARATION DOP 1100-02 hardcard.
DOCUMENT PREPARATION DOP 1100-02 hardcard.  
S-N-a                                                                            Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-a Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 901: Line 997:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-a                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-a Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Examinee should locate the hard card, then provide the included copy.
Examinee should locate the hard card, then provide the included copy.
NOTE:
* 1. Place the SBLC INJECTION           Turns the SBLC CONTROL keylock switch to           INJECTION CONTROL the SYS 1 OR SYS 2                  keylock switch to either the position.                          intermediate right OR         _____    _____      _____
: 1.
intermediate left position.
Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR Turns the SBLC INJECTION CONTROL keylock switch to SYS 2 position.
: 2. Verifies applicable SQUIB           SQUIB A or B light off.
either the intermediate right OR intermediate left position.
pilot light NOT lit.
: 2.
: 3. Verifies applicable PUMP           PUMP 1 or PUMP 2 light pilot light lit.                    on.
Verifies applicable SQUIB pilot light NOT lit.
: 4. Verifies FLOW pilot light lit.     WHITE light illuminated.
SQUIB A or B light off.
: 5. SBLC SQUIB VLV CKT                 Annunciator 902-5 H-6 FAILURE annunciator alarms          illuminated.
: 3.
(902-5 H-6).                                                       _____    _____      _____
Verifies applicable PUMP pilot light lit.
PUMP 1 or PUMP 2 light on.
: 4.
Verifies FLOW pilot light lit.
WHITE light illuminated.
: 5.
SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).
Annunciator 902-5 H-6 illuminated.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 6. Verifies RWCU valve                 Examinee recognizes that 2-1201-1 closed.                   valve 2-1201-1 valve did NOT close.                     _____    _____      _____
: 6.
* 7. Verifies RWCU valve                 Takes manual action for a 2-1201-1 closed.                   failed automatic action and closes 2-1201-1 valve, by     _____    _____      _____
Verifies RWCU valve 2-1201-1 closed.
placing c/s in the CLOSED position.
Examinee recognizes that valve 2-1201-1 valve did NOT close.
: 8. Verifies RWCU valve                 GREEN light illuminated.
: 7.
2-1201-1A closed.
Verifies RWCU valve 2-1201-1 closed.
* 9. Verifies RWCU valve                 Examinee recognizes that 2-1201-2 closed.                   valve 2-1201-2 valve did NOT close.                     _____    _____      _____
Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
S-N-a                                                                          Page 5 of 8
: 8.
Verifies RWCU valve 2-1201-1A closed.
GREEN light illuminated.
: 9.
Verifies RWCU valve 2-1201-2 closed.
Examinee recognizes that valve 2-1201-2 valve did NOT close.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT
S-N-a Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 10. Closes RWCU valve               Takes manual action for a 2-1201-2 closed.               failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED     _____    _____      _____
: 10. Closes RWCU valve 2-1201-2 closed.
position.
Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
: 11. Verifies RWCU valve             GREEN light illuminated.
: 11. Verifies RWCU valve 2-1201-3 closed.
2-1201-3 closed.
GREEN light illuminated.
: 12. Verifies RWCU valve             RED light illuminated.
: 12. Verifies RWCU valve 2-1201-7 closed.
2-1201-7 closed.
RED light illuminated.
: 13. Informs Unit Supervisor task   Reports SBLC is injecting is complete.                    and valves 2-1201-2 and 2-1201-3 failed to close automatically.                 _____    _____      _____
: 13. Informs Unit Supervisor task is complete.
Reports SBLC is injecting and valves 2-1201-2 and 2-1201-3 failed to close automatically.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-a                                                                      Page 6 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-a Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 950: Line 1,057:


==Title:==
==Title:==
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08         4.2 / 4.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 9 minutes             Actual Time Used:           minutes
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 9 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 956: Line 1,069:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-a                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-a Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 968: Line 1,083:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-a                                                            Page 8 of 8


Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-b Page 2 of 10 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 05 Revised for 2010 NRC exam.  
S-N-b                                                    Page 2 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-b Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE:       It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Start the LPCI/CS room cooler fans.
: 2. Start the LPCI/CS room cooler fans.
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
* trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON)
trgset 1 "cssbkppb.and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON) ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip) ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip) trgset 2 "(et_array(1).and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running) trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)
* ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip)
* ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip)
* trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running)
* trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).
: 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).  
S-N-b                                                                          Page 3 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-b Page 4 of 10 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
Line 1,011: Line 1,120:
: 2. All applicable Prerequisites have been met.
: 2. All applicable Prerequisites have been met.
: 3. Inform the Unit Supervisor upon completion of step I.8.
: 3. Inform the Unit Supervisor upon completion of step I.8.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.  
S-N-b                                                                Page 4 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Information For Evaluators Use:
S-N-b Page 5 of 10 Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Line 1,022: Line 1,130:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-b                                                                        Page 5 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-b Page 6 of 10 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide Examinee a copy of DOS 1400-05.
Provide Examinee a copy of DOS 1400-05.
: 1. Verify the following valve line  Verifies the following:
up:
* MO 2-1402-4B Closed
* Green light illuminated.
* MO 2-1402-38B Open
* Green light illuminated.
* 2-1402-6B Open
* Green light illuminated.
* MO 2-1402-25B Closed
* Green light illuminated.
* MO 2-1402-3B Open
* Green light illuminated.
* 2-1402-40B-SV Closed
* Directs NLO to Verify 2-1402-40B-SV Closed CUE:
2-1402-40B-SV, INST SV is closed.
NOTE:
NOTE:
: 1.
Verify the following valve line up:
MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Open MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:
Green light illuminated.
Green light illuminated.
Green light illuminated.
Green light illuminated.
Green light illuminated.
Directs NLO to Verify 2-1402-40B-SV Closed 2-1402-40B-SV, INST SV is closed.
CUE:
The next three (3) actions may be requested to be performed at the same time.
The next three (3) actions may be requested to be performed at the same time.
: 2. Verify 2B CORE SPRAY             Contacts NLO to verify 2B MOTOR has adequate                CORE SPRAY MOTOR lubrication.                      has adequate lubrication       _____      _____        _____
NOTE:
per step I.8.b.(1).
: 2.
CUE:
Verify 2B CORE SPRAY MOTOR has adequate lubrication.
Contacts NLO to verify 2B CORE SPRAY MOTOR has adequate lubrication per step I.8.b.(1).
2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).
2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).
: 3. Verify 2B LPCI/CS Room            Contacts NLO to verify Cooler is operating properly. proper room cooler operation per step I.8.c.      _____      _____        _____
CUE:
CUE:
: 3.
Verify 2B LPCI/CS Room Cooler is operating properly.
Contacts NLO to verify proper room cooler operation per step I.8.c.
2B LPCI/CS room cooler is operating normally.
2B LPCI/CS room cooler is operating normally.
S-N-b                                                                      Page 6 of 10
CUE:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                             STANDARDS                 SAT
S-N-b Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 4.     Direct NLO to open 2-1402-         Directs 2-1402-40B-SV 40B-SV and report pressure.        Open.
: 4.
CUE:
Direct NLO to open 2-1402-40B-SV and report pressure.
Directs 2-1402-40B-SV Open.
When asked, report: 2-1402-40B-SV Inst SV is Open.
When asked, report: 2-1402-40B-SV Inst SV is Open.
: 5.      Record suction pressure            Pressure of 7 psig provided by NLO.                  recorded on Data Sheet 1.
CUE:
CUE:
: 5.
Record suction pressure provided by NLO.
Pressure of 7 psig recorded on Data Sheet 1.
When asked, report: suction pressure is 7 psig.
When asked, report: suction pressure is 7 psig.
: 6.      Calculate 2-1402-8B initial        DP Calculated:
closed DP.
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5      _____      _____        _____
psig)
CUE:
CUE:
If examinee requests the above calculation to be verified, sign the verified by line.
: 6.
If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.
Calculate 2-1402-8B initial closed DP.
NOTE:
DP Calculated:
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 psig)
If examinee requests the above calculation to be verified, CUE:
sign the verified by line If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.
Candidate will N/A step I.8.g.
Candidate will N/A step I.8.g.
* 7.      Start 2B CORE SPRAY                Red light illuminated and Pump.                              annunciators H-13 and A-5 alarm.                        _____      _____        _____
NOTE:
NOTE:
: 7.
Start 2B CORE SPRAY Pump.
Red light illuminated and annunciators H-13 and A-5 alarm.
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.
S-N-b                                                                          Page 7 of 10
NOTE:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
S-N-b Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 8. Open FLOW TEST VLV MO           Rotates and holds MO 2-2-1402-4B.                      1402-4B Control switch CW to Open.                   _____      _____      _____
: 8.
Open FLOW TEST VLV MO 2-1402-4B.
Rotates and holds MO 2-1402-4B Control switch CW to Open.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 9. Acknowledge and report         Acknowledges annunciator alarm for 2B CS pump trip.     H-5 and makes report.
: 9.
CUE:
Acknowledge and report alarm for 2B CS pump trip.
Acknowledges annunciator H-5 and makes report.
Acknowledge report.
Acknowledge report.
* 10. Immediately Close              Green light illuminated.
2-1402-4B.
Red light illuminated.        _____      _____      _____
CUE:
CUE:
: 10. Immediately Close 2-1402-4B.
Green light illuminated.
Red light illuminated.
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE:
CUE:
If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:
If examinee terminates, or requests permission to terminate the surveillance CUE:
OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
: 11. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                   Supervisor.
: 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-b                                                                      Page 8 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-b Page 9 of 10 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,109: Line 1,221:


==Title:==
==Title:==
209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01           3.8 / 3.6 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator       Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete: 22 minutes             Actual Time Used:           minutes
209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 22 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,115: Line 1,233:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                   Date:
Evaluators Signature:
S-N-b                                                                        Page 9 of 10
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-b Page 10 of 10 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
Line 1,133: Line 1,253:
: 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
: 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
: 2. All applicable Prerequisites have been met.
: 2. All applicable Prerequisites have been met.
: 3. Notify the Unit Supervisor upon completion of step I.8.
: 3. Notify the Unit Supervisor upon completion of step I.8.  
S-N-b                                                              Page 10 of 10


Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-c Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM.
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam S-N-c                                                    Page 2 of 8
Revision 01 Revised for 2010 NRC exam  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-c Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
: 2. Ensure that Both DEHC monitors are displaying the STATUS screen .
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure that Both DEHC monitors are displaying the STATUS screen.
: 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
* None.
* None.
Line 1,155: Line 1,275:
* None.
* None.
: 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).
: 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).
DOCUMENT PREPARATION Markup a copy of DGP 02-03.
DOCUMENT PREPARATION Markup a copy of DGP 02-03.  
S-N-c                                                                          Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-c Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
Line 1,174: Line 1,293:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-c                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-c Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DGP 02-03.
Provide the Examinee with the provided copy of DGP 02-03.
NOTE:
All the below actions can be performed on either of the Digital EHC control stations.
All the below actions can be performed on either of the Digital EHC control stations.
* 1. Select <CONTROL>.               Utilizing the trackball controller, clicks on
: 1.
                                          <CONTROL>.                     _____      _____        _____
Select <CONTROL>.
* 2. Select <RX COOLDOWN>.           Utilizing the trackball controller, clicks on
Utilizing the trackball controller, clicks on  
                                          <RX COOLDOWN>.                 _____      _____        _____
<CONTROL>.
: 3. Verify REACTOR                  Observes the REACTOR COOLDOWN is OFF.                 COOLDOWN OFF select button is orange.             _____      _____        _____
: 2.
* 4. Select STPT/RAMP.               Utilizing the trackball controller, clicks on the
Select <RX COOLDOWN>.
                                          <STPT/RAMP>.                   _____      _____        _____
Utilizing the trackball controller, clicks on  
* 5. Enter desired target             Clicks in the Set Point box.
<RX COOLDOWN>.
temperature setpoint.            Utilizing the keyboard, enters 400.0.                 _____      _____        _____
: 3.
* 6. Enter desired cooldown rate     Clicks in the Ramp Rate in the Ramp box.                box. Utilizing the keyboard, enters 75.0.                   _____      _____        _____
Verify REACTOR COOLDOWN is OFF.
* 7. Select <OK>.                     Utilizing the trackball controller, clicks on <OK>.
Observes the REACTOR COOLDOWN OFF select button is orange.
Clicks <OK> on the Confirm Setpoint pop up       _____      _____        _____
: 4.
window.
Select STPT/RAMP.
* 8. Initiate Reactor cooldown by     Utilizing the trackball selecting ON for REACTOR         controller, clicks on <ON>.
Utilizing the trackball controller, clicks on the  
COOLDOWN.
<STPT/RAMP>.
Clicks <OK> on the Begin Reactor Cooldown pop up       _____      _____        _____
: 5.
window.
Enter desired target temperature setpoint.
S-N-c                                                                        Page 5 of 8
Clicks in the Set Point box.
Utilizing the keyboard, enters 400.0.
: 6.
Enter desired cooldown rate in the Ramp box.
Clicks in the Ramp Rate box. Utilizing the keyboard, enters 75.0.
: 7.
Select <OK>.
Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up window.
: 8.
Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN.
Utilizing the trackball controller, clicks on <ON>.
Clicks <OK> on the Begin Reactor Cooldown pop up window.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
S-N-c Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 9. On <CONTROL>                   If uses other DEHC
: 9.
        <PRESSURE CONTROL>             screen, utilizing the screen, adjust pressure       trackball controller, clicks setpoint as necessary to       on <CONTROL>.
On <CONTROL>  
maintain at least 50 psig above Reactor pressure.       Utilizing the trackball       _____    _____      _____
<PRESSURE CONTROL>
controller, clicks on
screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.
                                        <PRESSURE CONTROL>.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on  
<PRESSURE CONTROL>.
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
NOTE:
NOTE:
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
: 10. On <CONTROL> <BPV JACK> screen, verify BPV Jack position setpoint is  
: 10. On <CONTROL> <BPV             If uses other DEHC JACK> screen, verify BPV       screen, utilizing the Jack position setpoint is     trackball controller, clicks
-5.0%.
        -5.0%.                         on <CONTROL>.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >.                       _____    _____      _____
Utilizing the trackball controller, clicks on < BPV JACK >.
Observes BPV Jack position setpoint is -5.0%.
Observes BPV Jack position setpoint is -5.0%.
: 11. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                   Supervisor.
: 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-c                                                                    Page 6 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-c Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,232: Line 1,365:
==Title:==
==Title:==
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06         3.9 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,238: Line 1,377:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-c                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-c Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
Line 1,250: Line 1,391:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-c                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:
Instructor                     Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-d Page 2 of 9 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 06 Bank JPM.
Revision 07 Revised for 2010 NRC exam.
Revision 07 Revised for 2010 NRC exam.  
S-N-d                                                    Page 2 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-d Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
: 2. Verify NO LPCI pumps operating .
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify NO LPCI pumps operating.
: 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
* None.
* None.
: 4. Setup the following Triggers:
: 4. Setup the following Triggers:
* None.
* None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.  
S-N-d                                                                          Page 3 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-d Page 4 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection.
: 2. A transient has occurred requiring Alternate Water Injection.
Line 1,293: Line 1,432:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-d                                                                          Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-d Page 5 of 9 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                   STANDARDS                   SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DEOP 0500-03.
Provide the Examinee with the provided copy of DEOP 0500-03.
NOTE:
* 1. Place 2A LPCI PP control     ALL lights extinguished.
* 1.
switch in Pull-to-Lock.
Place 2A LPCI PP control switch in Pull-to-Lock.
* 2. Place PP SUCT VLV MO 2-       RED light illuminated.
ALL lights extinguished.
1501-5A control switch in Manual Bypass and verify                                   _____        _____      _____
* 2.
closed.
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
: 3. Verify MIN FLOW VLV 2-       RED light illuminated.
RED light illuminated.
1501-13A closed if not needed.                                                     _____        _____      _____
: 3.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
RED light illuminated.
2-1501-13A is not required for 2B LPCI pump.
CUE:
CUE:
2-1501-13A is not required for 2B LPCI pump.
The following valves may be verified in any order NOTE:
NOTE:
: 4.
The following valves may be verified in any order
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
: 4. Verify TORUS CLG/TEST         GREEN lights illuminated.
GREEN lights illuminated.
valves 2-1501-20A and 2-1501-38A closed.                                         _____        _____      _____
: 5.
: 5. Verify TORUS SPRAY VLVs       GREEN lights illuminated.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
2-1501-19A and 2-1501-18A closed.                                                     _____        _____      _____
GREEN lights illuminated.
: 6. Verify DW SPRAY VLVs 2-       GREEN lights illuminated.
: 6.
1501-28A and 2-1501-27A closed.                                                     _____        _____      _____
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
: 7. Verify TORUS CLG/TEST         GREEN lights illuminated.
GREEN lights illuminated.
valves 2-1501-20B and 2-1501-38B closed.                                         _____        _____      _____
: 7.
: 8. Verify TORUS SPRAY VLVs       GREEN lights illuminated.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
2-1501-19B and 2-1501-18B closed.                                                     _____        _____      _____
GREEN lights illuminated.
S-N-d                                                                      Page 5 of 9
: 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
S-N-d Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 9. Verify DW SPRAY VLVs 2-       GREEN lights illuminated.
: 9.
1501-28B and 2-1501-27B closed.                                                     _____      _____      _____
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
GREEN lights illuminated.
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
NOTE:
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.
: 10. Unlock AND open 2-1501-        Instructs NLO to complete 74A, U2 LPCI A PMP            step G.12.c.(5).(a).
VENT VLV.
: 11. Crack open 2-1501-15A, U2      Instructs NLO to complete LPCI A PMP VENT VLV until      step G.12.c.(5).(b).
flow is observed from pipe.                                  _____      _____      _____
: 12. Close 2(3)-1501-15A, U2        Instructs NLO to complete LPCI A PMP VENT VLV.          step G.12.c.(5).(c).
: 13. Close AND lock 2-1501-74A,      Instructs NLO to complete U2(3) LPCI A PMP              step G.12.c.(5).(d).
VENT VLV.
* 14. Open 2-1501-47A-R, U2          Instructs NLO to obtain PI LPCI A PUMP SUCT PI            2-1501-47A reading per 2-1501-47A ROOT VLV (at        step G.12.c.(6).              _____      _____      _____
pump) and verify PI 2-1501-47A indicates less than 15 psig.
CUE:
CUE:
: 10. Unlock AND open 2-1501-74A, U2 LPCI A PMP VENT VLV.
Instructs NLO to complete step G.12.c.(5).(a).
: 11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.
Instructs NLO to complete step G.12.c.(5).(b).
: 12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV.
Instructs NLO to complete step G.12.c.(5).(c).
: 13. Close AND lock 2-1501-74A, U2(3) LPCI A PMP VENT VLV.
Instructs NLO to complete step G.12.c.(5).(d).
* 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
Instructs NLO to obtain PI 2-1501-47A reading per step G.12.c.(6).
PI 2-1501-47A indicates 15.5 psig.
PI 2-1501-47A indicates 15.5 psig.
* 15. Recognizes reading is NOT       Determines reading is less than 15 psig.             greater than 15 psig.
CUE:
S-N-d                                                                    Page 6 of 9
* 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
S-N-d Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 16. Close 2-1501-47A-R, U2           Instructs NLO to close 2-LPCI A PUMP SUCT PI            1501-47A per step G.12.c.(8).                   _____    _____      _____
: 16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.
2-1501-47A ROOT VLV.
Instructs NLO to close 2-1501-47A per step G.12.c.(8).
2-1501-47A-R is Closed.
CUE:
CUE:
2-1501-47A-R is Closed.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 17. Open PP SUCT VLV MO 2-           GREEN light illuminated.
* 17. Open PP SUCT VLV MO 2-1501-5A.
1501-5A.
GREEN light illuminated.
* 18. Place 2A LPCI PP control         Depresses and places 2A switch in AUTO.                LPCI PP c/s to center (AUTO) position.             _____    _____      _____
* 18. Place 2A LPCI PP control switch in AUTO.
: 19. Notify Unit Supervisor that 2A   Examinee notifies Unit LPCI pump cannot be used       Supervisor of 2A LPCI with suction from the CST.     pump suction pressure         _____    _____      _____
Depresses and places 2A LPCI PP c/s to center (AUTO) position.
problem when aligned to CST. May recommend using another LPCI pump.
: 19. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.
CUE:
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected Acknowledge report of task completion.
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected CUE:
END JPM Stop Time:_________
Acknowledge report of task completion.
S-N-d                                                                    Page 7 of 9
END JPM Stop Time:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-d Page 8 of 9 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,373: Line 1,518:


==Title:==
==Title:==
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02         4.1 / 4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,379: Line 1,530:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-d                                                                        Page 8 of 9
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-d Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection.
: 2. A transient has occurred requiring Alternate Water Injection.
Line 1,393: Line 1,546:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-d                                                              Page 9 of 9


Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-e Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 05 Revised for 2010 NRC exam.  
S-N-e                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-e Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
: 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
: 2. Ensure Torus water level is 20 feet.
: 2. Ensure Torus water level is 20 feet.
: 3. Insert following Malfunctions and/or Remotes.
: 3. Insert following Malfunctions and/or Remotes.
* IMF CIGP2I (Spurious Group II Isolation)
IMF CIGP2I (Spurious Group II Isolation)
* IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
* Adjusts Torus Level indications to ~20 feet.
Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
* ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled
* Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
: 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
: 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
: 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 500-04.
DOCUMENT PREPARATION Markup a copy of DEOP 500-04.  
S-N-e                                                                      Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-e Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Aux NSO.
: 1. You are the Aux NSO.
: 2. A break inside the Primary Containment has occurred.
: 2. A break inside the Primary Containment has occurred.
Line 1,447: Line 1,595:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-e                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-e Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide examinee the marked up copy of DEOP 0500-04.
Provide examinee the marked up copy of DEOP 0500-04.
NOTE:
Annunciator 902-3 A-15 may be received during this JPM.
Annunciator 902-3 A-15 may be received during this JPM.
: 1. Verify SBGT is operating and     Verifies 2/3A SBGT train flow is ~ 4000 scfm.            FI 7540-13 is reading
: 1.
                                          ~4000 scfm.                     _____      _____        _____
Verify SBGT is operating and flow is ~ 4000 scfm.
: 2. Verify Reactor Mode switch       Verifies Reactor Mode NOT in RUN.                     switch NOT in RUN.
Verifies 2/3A SBGT train FI 7540-13 is reading  
: 3. Place VENT ISOL SIGNAL           Momentarily places BYPASS switch on 902-5           Bypass switch to Torus panel to TORUS.                 Position.                       _____      _____        _____
~4000 scfm.
: 2.
Verify Reactor Mode switch NOT Verifies Reactor Mode switch in RUN.
NOT in RUN.
: 3.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Momentarily places Bypass switch to Torus Position.
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOTE:
NOT open.
: 4.
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
NOTE:
NOTE:
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
: 4. Open AO 2-1601-61, TORUS        Places AO 2-1601-61 2-INCH VENT VLV.                control switch to OPEN position and determines        _____      _____        _____
that the valve will not open.
NOTE:
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 5. Place VENT ISOL SIGNAL           Momentarily places Vent BYPASS switch on 902-5           Isol Signal Bypass switch panel to DRYWELL.                to Drywell position.           _____      _____        _____
: 5.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to DRYWELL.
Momentarily places Vent Isol Signal Bypass switch to Drywell position.
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
CUE:
CUE:
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
: 6.
* 6. Open AO 2-1601-62, DW           Red Open light illuminated.
Open AO 2-1601-62, DW 2-INCH Vent.
2-INCH Vent.
Red Open light illuminated.
S-N-e                                                                        Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT
S-N-e Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 7.     Open AO 2-1601-63, VENT         Red Open light illuminated.
: 7.
TO SBGT.
Open AO 2-1601-63, VENT TO SBGT.
: 8.     Start as many Turbine           Initiates action to start All Building and Radwaste            available Turbine Building Exhaust fans as possible.        and Radwaste Exhaust fans.                           _____      _____          _____
Red Open light illuminated.
: 9.     Determine if SBGT flow is       Containment pressure adequate to control and         stable or decreasing.
: 8.
maintain DW pressure below the Primary Containment                                         _____      _____          _____
Start as many Turbine Building and Radwaste Exhaust fans as possible.
Pressure Limit.
Initiates action to start All available Turbine Building and Radwaste Exhaust fans.
: 9.
Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.
Containment pressure stable or decreasing.
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
CUE:
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
: 10. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                     Supervisor.
: 10. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-e                                                                          Page 6 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-e Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,502: Line 1,661:
==Title:==
==Title:==
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 295024.A1.14         3.4 / 3.5 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 17 minutes           Actual Time Used:           minutes
K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,508: Line 1,673:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-e                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-e Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Aux NSO.
: 1. You are the Aux NSO.
: 2. A break inside the Primary Containment has occurred.
: 2. A break inside the Primary Containment has occurred.
Line 1,525: Line 1,692:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-e                                                              Page 8 of 8


Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative       Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-f Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 01 Revised for 2010 NRC exam.  
S-N-f                                                    Page 2 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.
: 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert following Malfunctions and/or Remotes:
: 2. Insert following Malfunctions and/or Remotes:
* M63 (to prevent TR-22 to Bus 23 breaker from closing).
* M63 (to prevent TR-22 to Bus 23 breaker from closing).
Line 1,549: Line 1,715:
: 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
: 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Marked up copy of DOP 6500-01.
: 1.
S-N-f                                                                          Page 3 of 9
Marked up copy of DOP 6500-01.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-f Page 4 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
Line 1,570: Line 1,736:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-f                                                                          Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-f Page 5 of 9 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOP 6500-01.
Provide the examinee with the provided copy of DOP 6500-01.
NOTE:
This task has two parts, which can be performed in any order.
This task has two parts, which can be performed in any order.
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
CUE:
CUE:
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
TRANSFER BUS 21 TO TR-22
* 1. Position TR-22 to Bus 21         Switch in ON position.
: 1.
SYNCHROSCOPE selector switch to ON.                                                 _____        _____      _____
Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
: 2. Verify:
Switch in ON position.
INCOMING VOLTS and               Voltages approximately RUNNING VOLTS meters             equal.
: 2.
approximately equal.
Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.
NOT glowing.
Voltages approximately equal.
Meter NOT White lights extinguished.
rotating.
: 3.
Position TR-22 to Bus 21 breaker control switch to CLOSE.
RED light illuminated.
: 4.
Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902-8 D-1 in alarm.
Meter NOT rotating.
Meter NOT rotating.
SYNCHRONIZING meter at 12 oclock position and NOT      White lights extinguished.
RED light illuminated.
rotating.
Annunciator 902-8 D-1 illuminated.  
SYNCHRONIZING meter                                          _____        _____      _____
lights NOT glowing.
* 3. Position TR-22 to Bus 21        RED light illuminated.
breaker control switch to CLOSE.                                                        _____        _____      _____
: 4. Verify:
SYNCHRONIZING meter at          Meter NOT rotating.
12 oclock position.
TR-22 to Bus 21 breaker RED light illuminated.
indicates CLOSED.
Annunciator 902-8 D-1 in        Annunciator 902-8 D-1 alarm.                          illuminated.
S-N-f                                                                      Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT
S-N-f Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 5. Position TR-21 to Bus 21       GREEN light illuminated.
: 5.
breaker control switch to TRIP.                                                       _____    _____          _____
Position TR-21 to Bus 21 breaker control switch to TRIP.
: 6. Verify:
GREEN light illuminated.
TR-21 to Bus 21 breaker         GREEN light illuminated.
: 6.
indicates OPEN.
Verify:
Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.
TR-21 to Bus 21 breaker indicates OPEN.
extinguished.
Annunciator 902-8 D-1 clears.
: 7. Position TR-22 to Bus 21       Switch in OFF position.
GREEN light illuminated.
synchroscope selector switch to OFF.                                                     _____    _____          _____
Annunciator 902-8 D-1 extinguished.
: 8. Verify Bus 21 AMMETER and       Verifies Bus 21 amps and VOLTMETER indications are      volts are normal.
: 7.
normal.                                                     _____    _____          _____
Position TR-22 to Bus 21 synchroscope selector switch to OFF.
Switch in OFF position.
: 8.
Verify Bus 21 AMMETER and VOLTMETER indications are normal.
Verifies Bus 21 amps and volts are normal.
Amps may vary depending on conditions, and volts are normally ~ 4160.
NOTE:
NOTE:
Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
TRANSFER BUS 23 TO TR-22
* 9. Position TR-22 to Bus 23       Switch in ON position.
: 9.
SYNCHROSCOPE selector switch to ON.                                               _____    _____          _____
Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
: 10. Verify:
: 10. Verify:
INCOMING VOLTS and             Voltages approximately RUNNING VOLTS meters           equal.
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.
Meter NOT rotating.
NOT glowing.
SYNCHRONIZING meter at 12 oclock position and NOT     White lights extinguished.
Voltages approximately equal.
Meter NOT White lights extinguished.
rotating.
rotating.
SYNCHRONIZING meter                                          _____    _____          _____
lights NOT glowing.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 11. Position TR-22 to Bus 23       Breaker does NOT close.
: 11. Position TR-22 to Bus 23 breaker control switch to CLOSE.
breaker control switch to CLOSE.                                                       _____    _____          _____
Breaker does NOT close.
S-N-f                                                                    Page 6 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
S-N-f Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 12. IMMEDIATELY positions TR-       GREEN light illuminated.
: 12. IMMEDIATELY positions TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.
22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.                                     _____          _____      _____
GREEN light illuminated.
CUE:
IF an Operator is dispatched to check the tripped breaker, report:
IF an Operator is dispatched to check the tripped breaker, report:
the breaker is open, with NO flags up.
the breaker is open, with NO flags up.
CUE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
NOTE:
NOTE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
: 13. Informs Unit Supervisor task is complete.
: 13. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                   Supervisor.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
END JPM Stop Time:_________
S-N-f                                                                        Page 7 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-f Page 8 of 9 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,659: Line 1,830:
==Title:==
==Title:==
262L024, Transfer a 4160 volt bus between power supplies.
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04         3.6 / 3.7 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 14 minutes           Actual Time Used:           minutes
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,665: Line 1,842:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-f                                                                        Page 8 of 9
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-f Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
Line 1,679: Line 1,858:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-f                                                              Page 9 of 9


Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-g Page 2 of 7 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 05 Revised for 2010 NRC exam.  
S-N-g                                                Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-g Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
: 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
: 3. Enter the following Expert Command prior to starting this JPM.
: 3. Enter the following Expert Command prior to starting this JPM.
Line 1,702: Line 1,880:
: 5. Verify RWM operational and on Main Screen.
: 5. Verify RWM operational and on Main Screen.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
S-N-g                                                                          Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-g Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. Control Rod N-07 rod position has failed.
: 2. Control Rod N-07 rod position has failed.
Line 1,722: Line 1,899:
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-g                                                                          Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-g Page 5 of 7 JPM Start Time:
UNSAT    Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
Provide examinee a copy of DOP 0400-02.
Provide examinee a copy of DOP 0400-02.
: 1. Proceed to Step            Proceeds to Step G.3.c.(1) of G.3.c.(1) of DOP 0400-    DOP 0400-02.
NOTE:
02.
: 1. Proceed to Step G.3.c.(1) of DOP 0400-
* 2. Selects Secondary             Substitute Position screen Functions, then              SELECTED.
: 02.
Substitute Position screen
Proceeds to Step G.3.c.(1) of DOP 0400-02.
* 3. Selects control rod N-07     Control Rod N-07 outlined with on the touch screen.          blue box and shown on screen as SELECTED.
* 2. Selects Secondary Functions, then Substitute Position screen Substitute Position screen SELECTED.
* 4. Sets the desired Control     POSITION SHOWN on top of Rod position on the bar      position bar graph, reads 48.
* 3. Selects control rod N-07 on the touch screen.
graph on the left side of the screen.
Control Rod N-07 outlined with blue box and shown on screen as SELECTED.
* 5. Touches the ENTER             RWM accepts the request, rod REQUEST box.                  N-07 position indication changes from ?? to substituted 48 position.
* 4. Sets the desired Control Rod position on the bar graph on the left side of the screen.
: 6. Touches the EXIT           RWM returns to the Main FUNCTION box to            Display return to the Main Display CUE:
POSITION SHOWN on top of position bar graph, reads 48.
Respond as US when examinee informs you they have completed the task END JPM Stop Time:_________
* 5. Touches the ENTER REQUEST box.
S-N-g                                                                      Page 5 of 7
RWM accepts the request, rod N-07 position indication changes from ?? to substituted 48 position.
: 6. Touches the EXIT FUNCTION box to return to the Main Display RWM returns to the Main Display Respond as US when examinee informs you they have completed the task CUE:
END JPM Stop Time:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-g Page 6 of 7 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,754: Line 1,931:
==Title:==
==Title:==
201L027, Enter Substitute Rod Position.
201L027, Enter Substitute Rod Position.
K/A Number and Importance: 201006.A4.06         3.2 / 3.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,760: Line 1,943:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-g                                                                        Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-g Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. Control Rod N-07 rod position has failed.
: 2. Control Rod N-07 rod position has failed.
Line 1,775: Line 1,960:
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
: 2. Notify Unit Supervisor when the substitute position has been entered.
: 2. Notify Unit Supervisor when the substitute position has been entered.  
S-N-g                                                                    Page 7 of 7


Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-h Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed for 2010 NRC exam.
Revision 00 New JPM developed for 2010 NRC exam.  
S-N-h                                              Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-h Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
: 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
: 3. Setup the following Triggers:
: 3. Setup the following Triggers:
* None.
None.
DOCUMENT PREPARATION Markup a copy of DOP 5400-05.
DOCUMENT PREPARATION Markup a copy of DOP 5400-05.  
S-N-h                                                                          Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-h Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
Line 1,811: Line 1,994:
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-h                                                                          Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-h Page 5 of 7 JPM Start Time:
UNSAT    Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
Provide the Examinee with the provided copy of DOP 5400-05.
Provide the Examinee with the provided copy of DOP 5400-05.
: 1. Proceeds to step G.4 of     Locates step G.4 of the DOP 5400-05.                procedure (which then directs next step).                       _____    _____    _____
NOTE:
: 2. Determines the correct     Proceeds to step G.21 of the step to utilize is step     procedure.
: 1. Proceeds to step G.4 of DOP 5400-05.
G.21 of DOP 5400-05.                                           _____    _____    _____
Locates step G.4 of the procedure (which then directs next step).
* 3. Close AO 2-5417,               GREEN light illuminated.
: 2. Determines the correct step to utilize is step G.21 of DOP 5400-05.
ADSORBER TRN 2 BYPASS VLV.
Proceeds to step G.21 of the procedure.
* 4. Close AO 2-5423,               GREEN light illuminated.
* 3. Close AO 2-5417, ADSORBER TRN 2 BYPASS VLV.
ADSORBER TRN 3 BYPASS VLV.
GREEN light illuminated.
* 5. Open AO 2-5415,               GREEN light illuminated.
* 4. Close AO 2-5423, ADSORBER TRN 3 BYPASS VLV.
ADSORBER TRN 1 DISCH VLV.
GREEN light illuminated.
* 6. Open AO 2-5421,               GREEN light illuminated.
* 5. Open AO 2-5415, ADSORBER TRN 1 DISCH VLV.
ADSORBER TRN 2 DISCH VLV.
GREEN light illuminated.
* 7. Close AO 2-5416,               GREEN light illuminated.
* 6. Open AO 2-5421, ADSORBER TRN 2 DISCH VLV.
ADSORBER TRN 1 BYPASS VLV.
GREEN light illuminated.
* 8. Close AO 2-5422,               GREEN light illuminated.
* 7. Close AO 2-5416, ADSORBER TRN 1 BYPASS VLV.
ADSORBER TRN 2 BYPASS VLV.
GREEN light illuminated.
: 9. Notify Unit Supervisor of   Unit Supervisor notified of task task completion.           completion.
* 8. Close AO 2-5422, ADSORBER TRN 2 BYPASS VLV.
GREEN light illuminated.
: 9. Notify Unit Supervisor of task completion.
Unit Supervisor notified of task completion.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-h                                                                      Page 5 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-h Page 6 of 7 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,851: Line 2,034:


==Title:==
==Title:==
271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09         3.3 / 3.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,857: Line 2,046:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-h                                                                        Page 6 of 7
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-h Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-h                                                                Page 7 of 7


Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Facility Representative         Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-i Page 2 of 8 Revision Record (Summary)
Revision 09 Bank JPM.
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
Revision 10 Revised for 2010 NRC Exam.  
S-N-i                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-i Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.  
S-N-i                                                      Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-i Page 4 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 2 has just scrammed.
: 2. Unit 2 has just scrammed.
Line 1,904: Line 2,092:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-i                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-i Page 5 of 8 JPM Start Time:
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DEOP 0500-03.
Provide the Examinee with the supplied copy of DEOP 0500-03.
NOTE:
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is required only to identify which type of key is required to open the valve.
The examinee is required only to identify which type of key is required to open the valve.
: 1. Proceeds to the Unit 2           Proceeds to the U2 SBLC Standby Liquid Control           area.
: 1.
(SBLC) area.                                                   _____      _____          _____
Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.
* 2. Unlock and close 2-1101-4,       Unlock lock and removes SBLC STORAGE TK                  chain, then rotates valve OUTLET SV.                      hand wheel full clockwise. _____      _____          _____
Proceeds to the U2 SBLC area.
CUE:
: 2.
Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full clockwise.
The component is in the condition you have described.
The component is in the condition you have described.
* 3. Unlock and close 2-1199-37      Unlock lock and removes SBLC STORAGE TK                  chain, then rotates valve OUTLET SV.                      handle 1/4 turn clockwise. _____      _____          _____
CUE:
CUE:
: 3.
Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.
The component is in the condition you have described.
The component is in the condition you have described.
* 4. Open 2-4315-500, CLEAN          Rotates valve hand wheel DEMIN WTR SUPPLY TO              full counter-clockwise.
SBLC SV.                                                        _____      _____          _____
CUE:
CUE:
: 4.
Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV.
Rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
The component is in the condition you have described.
* 5. Open 2-1101-7, CLEAN            Rotates valve hand wheel DEMIN WTR TO SBLC TEST          full counter-clockwise.
TK SV.                                                          _____      _____          _____
CUE:
CUE:
: 5.
Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV.
Rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
The component is in the condition you have described.
S-N-i                                                                          Page 5 of 8
CUE:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT
S-N-i Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 6. Unlock and open 2-1101-8,       Unlock lock and removes SBLC TEST TK OUTLET SV.         chain, then rotates valve hand wheel full counter-       _____        _____        _____
: 6.
clockwise.
Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
CUE:
CUE:
The component is in the condition you have described.
NOTE:
NOTE:
* 7. Start both SBLC pumps from     Contacts the Unit 2 Control the main Control Room.          Room Operator to start the SBLC pumps.                   _____        _____        _____
: 7.
CUE:
Start both SBLC pumps from the main Control Room.
Contacts the Unit 2 Control Room Operator to start the SBLC pumps.
I have started both Unit 2 Standby Liquid Control pumps.
I have started both Unit 2 Standby Liquid Control pumps.
: 8. Throttle 2-1101-7, CLEAN        Opens / closes valve to DEMIN WTR TO SBLC TEST          maintain test tank level.
TK SV, to stabilize level in                                  _____        _____        _____
tank.
CUE:
CUE:
: 8.
Throttle 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank.
Opens / closes valve to maintain test tank level.
The test tank level is now stabilized (as much going in as is going out).
The test tank level is now stabilized (as much going in as is going out).
: 9. Informs Unit Supervisor task    Examinee notifies the Unit is complete.                    Supervisor.
CUE:
CUE:
: 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
Acknowledge report of task completion.
END JPM Stop Time:_________
CUE:
S-N-i                                                                        Page 6 of 8
END JPM Stop Time:_________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-i Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 1,964: Line 2,161:
==Title:==
==Title:==
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
K/A Number and Importance: 295031.A1.08         3.8 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 17 minutes           Actual Time Used:           minutes
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 1,970: Line 2,173:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-i                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-i Page 8 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 2 has just scrammed.
: 2. Unit 2 has just scrammed.
Line 1,983: Line 2,188:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-i                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:
Instructor                       Date Approved By:
Instructor Date Approved By:
Facility Representative           Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-j Page 2 of 8 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 02 Revised for 2010 NRC exam.  
S-N-j                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-j Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.  
S-N-j                                                      Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-j Page 4 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
Line 2,017: Line 2,219:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-j                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-j Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                           STANDARDS                 SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOA 6600-01.
Provide the Examinee with the supplied copy of DOA 6600-01.
NOTE:
: 1. Proceeds to the 2/3 Diesel         Proceeds to the 2/3 Diesel Generator Room.                    Generator Room.
: 1.
* 2. Examinee checks the level in       Observes day tank the D/G Fuel Oil Day Tank.         sightglass and determines day tank needs filling.
Proceeds to the 2/3 Diesel Generator Room.
Proceeds to the 2/3 Diesel Generator Room.
: 2.
Examinee checks the level in the D/G Fuel Oil Day Tank.
Observes day tank sightglass and determines day tank needs filling.
Point to the lower third area on the local sightglass measuring stick and state: the level is here.
CUE:
CUE:
Point to the lower third area on the local sightglass measuring stick and state:  the level is here.
Normal level is 30 - 38".
NOTE:
NOTE:
Normal level is 30 - 38".
: 3.
: 3. Verify that power is available     Verifies power available, to the DIESEL FUEL OIL             by local indicating lights TRANSFER PUMP 2/3.                 illuminated.
Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3.
CUE:
Verifies power available, by local indicating lights illuminated.
The GREEN LIGHT is illuminated.
The GREEN LIGHT is illuminated.
* 4. Start the Fuel Oil Transfer        Holds 2/3-5203 U2 Diesel Pump by holding local Test        Oil Transfer Pp c/s in ON Switch in the ON position.        position.
CUE:
CUE:
: 4.
Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.
Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position.
The pump is running.
The pump is running.
You have held the switch for approximately 5 minutes.
CUE:
S-N-j                                                                            Page 5 of 8
You have held the switch for approximately 5 minutes.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT
S-N-j Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 5. Checks the level in the fuel oil   OBSERVES sight glass day tank.                          and/or REQUESTS annunciator 902-8 G-4 status.                       _____      _____        _____
: 5.
CUE:
Checks the level in the fuel oil day tank.
Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.
OBSERVES sight glass and/or REQUESTS annunciator 902-8 G-4 status.
Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.
AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.
AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.
: 6. Informs Unit Supervisor task      Examinee notifies the Unit is complete.                      Supervisor.
CUE:
CUE:
: 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
Acknowledge report of task completion.
END JPM Stop Time:_________
CUE:
S-N-j                                                                          Page 6 of 8
END JPM Stop Time:_________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-j Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 2,063: Line 2,274:
==Title:==
==Title:==
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
K/A Number and Importance: 264000.G.1.30         4.4 / 4.0 Suggested Testing Environment:       In-Plant Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes             Actual Time Used:           minutes
K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 2,069: Line 2,286:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-j                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-j Page 8 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
S-N-j                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:
Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Facility Representative     Date
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-k Page 2 of 8 Revision Record (Summary)
Revision 10 Bank JPM.
Revision 10 Bank JPM.
Revision 11 Revised for 2010 NRC Exam.
Revision 11 Revised for 2010 NRC Exam.  
S-N-k                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOP 4650-01.
DOCUMENT PREPARATION Markup a copy of DOP 4650-01.  
S-N-k                                                      Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-k Page 4 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
Line 2,117: Line 2,333:
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-k                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-k Page 5 of 8 JPM Start Time:
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOP 4650-01.
Provide the Examinee with the supplied copy of DOP 4650-01.
NOTE:
: 1. Proceeds to Emergency            Proceeds to Emergency Breathing Air manifold in Unit   Breathing Air manifold in 2 Battery Room.                  Unit 2 Battery Room.           _____    _____      _____
: 1.
: 2. Verify the following:            Verifies valve handle perpendicular to valve body for:
Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.
Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.
: 2.
Verify the following:
* LP-1 CLOSED
* LP-1 CLOSED
* LP-1
* LP-2 CLOSED
* LP-2 CLOSED
* LP-2                      _____    _____      _____
* LP-3 CLOSED
* LP-3 CLOSED
* LP-4 CLOSED Verifies valve handle perpendicular to valve body for:
* LP-1
* LP-2
* LP-3
* LP-3
* LP-4 CLOSED
* LP-4
* LP-4
* 3. OPEN all Main Bank Cylinder       Turns hand wheels on shutoff valves (Cylinders 7       cylinders 7-13 full counter through 13).                     clockwise.                     _____    _____      _____
: 3.
OPEN all Main Bank Cylinder shutoff valves (Cylinders 7 through 13).
Turns hand wheels on cylinders 7-13 full counter clockwise.
The component is in the condition you have described.
CUE:
CUE:
The component is in the condition you have described.
NOTE:
Count cylinders from left to right to find cylinders 7-13.
Count cylinders from left to right to find cylinders 7-13.
* 4. Check Main Bank pressure.        Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side        _____    _____      _____
gauge).
NOTE:
NOTE:
: 4.
Check Main Bank pressure.
Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side gauge).
Have examinee read actual pressure.
Have examinee read actual pressure.
CUE:
NOTE:
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
S-N-k                                                                          Page 5 of 8
CUE:


Job Performance Measure (JPM)
Job Performance Measure (JPM)
UNSAT      Comment PERFORMANCE CHECKLIST                           STANDARDS                   SAT
S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 5.     Pressurize the supply           OPENS valve LP-3 by manifold from the Main Bank     turning valve handle by opening LP-3, CR EMERG       counter clockwise 1/4 turn     _____        _____      _____
: 5.
AIR BREATHING CYL SV.            so handle is in-line with valve body CUE:
Pressurize the supply manifold from the Main Bank by opening LP-3, CR EMERG AIR BREATHING CYL SV.
The component is in the condition you have described.
OPENS valve LP-3 by turning valve handle counter clockwise 1/4 turn so handle is in-line with valve body The component is in the condition you have described.
: 6.      Verify pressure regulator        VERIFIES manifold PRV-3 is maintaining            pressure between 65 and manifold pressure >65 psig      80 psig as read on CR          _____        _____      _____
and <80 psig.                    EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
CUE:
CUE:
: 6.
Verify pressure regulator PRV-3 is maintaining manifold pressure >65 psig and <80 psig.
VERIFIES manifold pressure between 65 and 80 psig as read on CR EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.
CUE:
Have examinee read actual pressure.
NOTE:
NOTE:
Have examinee read actual pressure.
: 7.
: 7.     Informs Unit Supervisor task     Examinee notifies the Unit is complete.                     Supervisor.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
END JPM Stop Time:_________
S-N-k                                                                            Page 6 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name:
S-N-k Page 7 of 8 Operators Name:
Job
Job


==Title:==
==Title:==
RO           SRO JPM
RO SRO JPM


==Title:==
==Title:==
Line 2,176: Line 2,399:
==Title:==
==Title:==
279M001, Valve in Control Room Breathing Air Supply.
279M001, Valve in Control Room Breathing Air Supply.
K/A Number and Importance: 600000.A2.10         2.9 / 3.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes  


==References:==
==References:==
Line 2,182: Line 2,411:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Name (Print):
Evaluators Signature:                                                 Date:
Evaluators Signature:
S-N-k                                                                        Page 7 of 8
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-k Page 8 of 8 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
Line 2,196: Line 2,427:
INITIATING CUE
INITIATING CUE
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
: 2. Inform the Unit 3 Supervisor when the task is complete.
: 2. Inform the Unit 3 Supervisor when the task is complete.}}
S-N-k                                                                Page 8 of 8}}

Latest revision as of 21:16, 12 January 2025

2011 Dresden Nuclear Power Station Initial License Examination Proposed Job Performance Measures
ML11364A008
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/29/2011
From:
NRC/RGN-III
To:
Exelon Generation Co, Exelon Nuclear
Shared Package
ML11104A073 List:
References
Download: ML11364A008 (158)


Text

Exelon Nuclear Job Performance Measure PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-1-R Page 2 of 9 Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-1-R Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

3.

Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Clean copy of APPENDIX A, attachment A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet.

Job Performance Measure (JPM)

A-N-1-R Page 4 of 9 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:

PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE

1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
2. Another Operator will verify your calculations.
3. Provide the worksheet to the Unit Supervisor when the task is complete.

Job Performance Measure (JPM)

A-N-1-R Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-R Page 6 of 9 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A, DRYWELL FLOOR/EQUIPMENT DRAIN SUMP PUMPS FLOW RATE WORKSHEET.

NOTE:

Steps one (1) through four (4) may be performed in any order.

1.

For 2A DWFDS calculates total gallons pumped of 300 (682 - 382) divided by pumping time of 240 seconds (4 min 00 sec) equals a pump flow rate of 75 gpm.

(300 gal) x (60 sec) = __75 See Key.

___ gpm (240 sec) ( 1 min)

2.

For 2B DWFDS calculates total gallons pumped of 306 (556 - 250) divided by pumping time of 255 seconds (4 min 15 sec) equals a pump flow rate of 72 gpm.

(306 gal) x (60 sec) = __72 See Key.

___ gpm (255 sec) ( 1 min)

3.

For 2A DWEDS calculates total gallons pumped of 270 (1277 - 1007) divided by pumping time of 225 seconds (3 min 45 sec) equals a pump flow rate of 72 gpm.

(270 gal) x (60 sec) = __72 See Key.

___ gpm (225 sec) ( 1 min)

Job Performance Measure (JPM)

A-N-1-R Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

4.

For 2B DWEDS calculates total gallons pumped of 266 (1236 - 970) divided by pumping time of 210 seconds (3 min 30 sec) equals a pump flow rate of 76 gpm.

(266 gal) x (60 sec) = __76 See Key.

___ gpm (210 sec) ( 1 min)

5.

Notify Unit Supervisor task complete and/or the need for calculations verification.

Notifies Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-1-R Page 8 of 9 Operators Name:

Job

Title:

RO JPM

Title:

PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE Revision Number: 00 JPM Number: A-N-1-R Task Number and

Title:

29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

APPENDIX A, rev 124 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-1-R Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:

PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE

1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
2. Another Operator will verify your calculations.
3. Provide the worksheet to the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-2-R Page 2 of 8 Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-2-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.

DOCUMENT PREPARATION

1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.

Job Performance Measure (JPM)

A-N-2-R Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 and Unit 3 are operating at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.

INITIATING CUE

1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
2. The Unit 3 assist NSO has already collected the data for Unit 3.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-R Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X.

NOTE:

  • 1.

Record & initial Bus 24-1 &

Bus 34-1 Tie ACB (902-8) position.

Examinee records OPEN position.

  • 2.

Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.

Examinee records CLOSED position.

  • 3.

Record & initial TR 22 to Bus 24 GCB (902-8) position.

Examinee records CLOSED position.

  • 4.

Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.

Examinee records CLOSED position.

  • 5.

Record & initial Bus 24-1 &

Bus 34-1 Tie ACB (902-8) position.

Examinee records OPEN position.

  • 6.

Record & initial Bus 23-1 &

Bus 24-1 Volts, by selecting Bus 23-1.

Examinee records actual voltage (~4160 Volts).

  • 7.

Record & initial Bus 23-1 &

Bus 24-1 Volts, by selecting Bus 24-1.

Examinee records actual voltage (~4160 Volts).

  • 8.

Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 23.

Examinee records actual voltage (~4160 Volts).

  • 9.

Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 24.

Examinee records actual voltage (~4160 Volts).

  • 10. Indicate acceptance criteria met.

Examinee circles YES for acceptance criteria.

Job Performance Measure (JPM)

A-N-2-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

11. Enter signature, date, and time, for Performed By.

Examinee enters signature, current date, and current time, for Performed By.

12. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-2-R Page 7 of 8 Operators Name:

Job

Title:

RO JPM

Title:

PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and

Title:

299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.

K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 20 minutes Actual Time Used:

minutes

References:

Appendix X, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-2-R Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 and Unit 3 are operating at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.

INITIATING CUE

1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, ONLY, as required by T.S 3.8.1 action condition B.1.
2. The Unit 3 assist NSO has already collected the data for Unit 3.
3. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-3-R Page 2 of 7 Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-02.

Job Performance Measure (JPM)

A-N-3-R Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The NLO reported all surveillance requirements were within specifications.

INITIATING CUE

1. Verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-R Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 6600-02.

NOTE:

  • 1.

Candidate should identify step I.5 has a mathematical error.

Identifies differential pressure should read 4.

  • 2.

Candidate should identify step I.15 OR step I.16 is signed off as verified dP of <6 (actual is 7).

Identifies incorrect verification of dP <6.

  • 3.

Candidate should identify that steps I.21.a & b have been initialed by the same person performing the surveillance and were NOT independently verified.

Identifies step NOT independently verified.

4.

Notify Unit Supervisor of discrepancies.

Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-3-R Page 6 of 7 Operators Name:

Job

Title:

RO JPM

Title:

VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 10 minutes Actual Time Used:

minutes

References:

DOS 6600-02, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-3-R Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The NLO reported all surveillance requirements were within specifications.

INITIATING CUE

1. Verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-4-R Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

3.

Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

Job Performance Measure (JPM)

A-N-4-R Page 4 of 7 INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-R Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.

NOTE:

The following steps can be performed in any order.

  • 1.

Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).

See attached key.

  • 2.

Examinee calculates Dilution flow (1,017,000 gpm).

See attached key.

3.

Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.

See attached key.

  • 4.

Examinee calculates CCSW Activity Limit (2.91 x 10-5).

See attached key.

5.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-4-R Page 6 of 7 Operators Name:

Job

Title:

RO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-4-R Page 7 of 7 INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-1-S Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM developed for2010 NRC exam.

Job Performance Measure (JPM)

A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. None.

Job Performance Measure (JPM)

A-N-1-S Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The following timeline occurred:
  • 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
  • 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
  • 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-S Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Candidate locates a copy of Reportability Manual LS-AA-1110.

NOTE:

  • 1.

Determines the event is reportable per SAF 1.9.

Determines the event is reportable per SAF 1.9, News Release or Notification of Other Government Agency.

  • 2.

Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence.

Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-1-S Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 10 minutes Actual Time Used:

minutes

References:

Reportability Manual LS-AA-1110, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-1-S Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The following timeline occurred:
  • 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
  • 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
  • 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.

Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-2-S Page 2 of 7 Revision Record (Summary)

Revision 03 Bank JPM.

Revision 04 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-2-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.

DOCUMENT PREPARATION

1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.

Job Performance Measure (JPM)

A-N-2-S Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
1. Review the data and complete the paperwork.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-S Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.

NOTE:

  • 1.

Verifies data all entered.

Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT

> 3851 Volts.

  • 2.

Verifies data all entered.

Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >

3851 Volts.

  • 3.

Verify data is accurate, by reading Voltmeter.

Verifies Voltmeter Bus 23-1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus 23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct

value, If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-2-S Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and

Title:

299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.

K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

Appendix X, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-2-S Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
1. Review the data and complete the paperwork.

Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-3-S Page 2 of 7 Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-3-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of Appendix A.

Job Performance Measure (JPM)

A-N-3-S Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
2. Correct any discrepancies noted (if any).

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-S Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A.

NOTE:

If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.

  • 1.

Verifies Calculated Floor Drain Leakage is correct.

Determines Floor Drain leakage for THU 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 4.50 gpm.

  • 2.

Verifies Calculated Floor Drain Leakage is correct.

Determines TOTAL leakage for FRI 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> should be 12.13 gpm.

If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.

NOTE:

  • 3.

Verifies Calculated Floor Drain Leakage is correct.

Determines Floor Drain leakage for FRI 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 5.15 gpm (TS).

  • 4.

References Tech Specs.

References Tech Spec 3.4.4 and recognizes

>5 gpm unidentified leakage for FRI 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.

Recognizes in Cond A & B.

5.

Reports discrepancies.

Examinee reports discrepancies noted.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-3-S Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and

Title:

29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.

K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

Appendix A, rev 124 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-3-S Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2,

AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
2. Correct any discrepancies noted (if any).

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-4-S Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-4-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

3.

Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

Job Performance Measure (JPM)

A-N-4-S Page 4 of 7 INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-S Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.

NOTE:

The following steps can be performed in any order.

  • 1.

Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).

See attached key.

  • 2.

Examinee calculates Dilution flow (1,017,000 gpm).

See attached key.

3.

Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.

See attached key.

  • 4.

Examinee calculates CCSW Activity Limit (2.91 x 10-5).

See attached key.

5.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-4-S Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

DOS 1500-08, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-4-S Page 7 of 7 INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-5-S Page 2 of 9 Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

A-N-5-S Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Two (2) marked up copies of EP-AA-113-F-02.
2. Blank copy of EP-AA-113.
3. Blank copy of EP-AA-113-F-03.

Job Performance Measure (JPM)

A-N-5-S Page 4 of 9 INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

Job Performance Measure (JPM)

A-N-5-S Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-5-S Page 6 of 9 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee the provided copies of:

NOTE:

EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03

1.

Applicant determines need for emergency action.

Emergency action is needed per initiating cue.

If asked, Clay and Jax do NOT have any adverse reactions to KI.

CUE:

2.

Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.

Recognizes that authorization to take KI must also be completed.

  • 3.

Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.

Determines KI must be issued.

  • 4.

Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form (EP-AA-113-F-03).

BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers:

  • Clay Morrow 123456
  • Jax Teller 891011

Job Performance Measure (JPM)

A-N-5-S Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.

NOTE:

5.

Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.

Examinee states that he/she would notify OHS.

JPM is complete when applicant notifies OHS of KI use.

NOTE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-5-S Page 8 of 9 Operators Name:

Job

Title:

SRO JPM

Title:

AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and

Title:

29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 20 minutes Actual Time Used:

minutes

References:

EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

A-N-5-S Page 9 of 9 INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-a Page 2 of 8 Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-a Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
  • IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
3. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION DOP 1100-02 hardcard.

Job Performance Measure (JPM)

S-N-a Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-a Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Examinee should locate the hard card, then provide the included copy.

NOTE:

1.

Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR Turns the SBLC INJECTION CONTROL keylock switch to SYS 2 position.

either the intermediate right OR intermediate left position.

2.

Verifies applicable SQUIB pilot light NOT lit.

SQUIB A or B light off.

3.

Verifies applicable PUMP pilot light lit.

PUMP 1 or PUMP 2 light on.

4.

Verifies FLOW pilot light lit.

WHITE light illuminated.

5.

SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).

Annunciator 902-5 H-6 illuminated.

BEGIN ALTERNATE PATH

6.

Verifies RWCU valve 2-1201-1 closed.

Examinee recognizes that valve 2-1201-1 valve did NOT close.

7.

Verifies RWCU valve 2-1201-1 closed.

Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.

8.

Verifies RWCU valve 2-1201-1A closed.

GREEN light illuminated.

9.

Verifies RWCU valve 2-1201-2 closed.

Examinee recognizes that valve 2-1201-2 valve did NOT close.

Job Performance Measure (JPM)

S-N-a Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

10. Closes RWCU valve 2-1201-2 closed.

Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.

11. Verifies RWCU valve 2-1201-3 closed.

GREEN light illuminated.

12. Verifies RWCU valve 2-1201-7 closed.

RED light illuminated.

13. Informs Unit Supervisor task is complete.

Reports SBLC is injecting and valves 2-1201-2 and 2-1201-3 failed to close automatically.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-a Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and

Title:

211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 9 minutes Actual Time Used:

minutes

References:

DOP 1100-02, rev 18 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-a Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-b Page 2 of 10 Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-b Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Start the LPCI/CS room cooler fans.
3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:

NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.

trgset 1 "cssbkppb.and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON) ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip) ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip) trgset 2 "(et_array(1).and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running) trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)

DOCUMENT PREPARATION

1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).

Job Performance Measure (JPM)

S-N-b Page 4 of 10 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
3. The operability surveillance for the 2A Core Spray pump is NOT needed.
4. The system is filled and vented.
5. The required valve operability surveillance has been completed.
6. Vibration data is NOT required.
7. The Unit 2 NLO is standing by in the corner room.
8. The LPCI/Core Spray Room Coolers are running.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Inform the Unit Supervisor upon completion of step I.8.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Job Performance Measure (JPM)

S-N-b Page 5 of 10 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-b Page 6 of 10 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide Examinee a copy of DOS 1400-05.

NOTE:

1.

Verify the following valve line up:

MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Open MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:

Green light illuminated.

Green light illuminated.

Green light illuminated.

Green light illuminated.

Green light illuminated.

Directs NLO to Verify 2-1402-40B-SV Closed 2-1402-40B-SV, INST SV is closed.

CUE:

The next three (3) actions may be requested to be performed at the same time.

NOTE:

2.

Verify 2B CORE SPRAY MOTOR has adequate lubrication.

Contacts NLO to verify 2B CORE SPRAY MOTOR has adequate lubrication per step I.8.b.(1).

2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).

CUE:

3.

Verify 2B LPCI/CS Room Cooler is operating properly.

Contacts NLO to verify proper room cooler operation per step I.8.c.

2B LPCI/CS room cooler is operating normally.

CUE:

Job Performance Measure (JPM)

S-N-b Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

4.

Direct NLO to open 2-1402-40B-SV and report pressure.

Directs 2-1402-40B-SV Open.

When asked, report: 2-1402-40B-SV Inst SV is Open.

CUE:

5.

Record suction pressure provided by NLO.

Pressure of 7 psig recorded on Data Sheet 1.

When asked, report: suction pressure is 7 psig.

CUE:

6.

Calculate 2-1402-8B initial closed DP.

DP Calculated:

2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 psig)

If examinee requests the above calculation to be verified, CUE:

sign the verified by line If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.

Candidate will N/A step I.8.g.

NOTE:

7.

Start 2B CORE SPRAY Pump.

Red light illuminated and annunciators H-13 and A-5 alarm.

2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.

NOTE:

Job Performance Measure (JPM)

S-N-b Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

8.

Open FLOW TEST VLV MO 2-1402-4B.

Rotates and holds MO 2-1402-4B Control switch CW to Open.

BEGIN ALTERNATE PATH

9.

Acknowledge and report alarm for 2B CS pump trip.

Acknowledges annunciator H-5 and makes report.

Acknowledge report.

CUE:

10. Immediately Close 2-1402-4B.

Green light illuminated.

Red light illuminated.

If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.

CUE:

If examinee terminates, or requests permission to terminate the surveillance CUE:

OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:

Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.

11. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-b Page 9 of 10 Operators Name:

Job

Title:

RO SRO JPM

Title:

CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and

Title:

209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 22 minutes Actual Time Used:

minutes

References:

DOS 1400-05, rev 41 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-b Page 10 of 10 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
3. The operability surveillance for the 2A Core Spray pump is NOT needed.
4. The system is filled and vented.
5. The required valve operability surveillance has been completed.
6. Vibration data is NOT required.
7. The Unit 2 NLO is standing by in the corner room.
8. The LPCI/Core Spray Room Coolers are running.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Notify the Unit Supervisor upon completion of step I.8.

Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-c Page 2 of 8 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam

Job Performance Measure (JPM)

S-N-c Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure that Both DEHC monitors are displaying the STATUS screen.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.
5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).

DOCUMENT PREPARATION Markup a copy of DGP 02-03.

Job Performance Measure (JPM)

S-N-c Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-c Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DGP 02-03.

NOTE:

All the below actions can be performed on either of the Digital EHC control stations.

1.

Select <CONTROL>.

Utilizing the trackball controller, clicks on

<CONTROL>.

2.

Select <RX COOLDOWN>.

Utilizing the trackball controller, clicks on

<RX COOLDOWN>.

3.

Verify REACTOR COOLDOWN is OFF.

Observes the REACTOR COOLDOWN OFF select button is orange.

4.

Select STPT/RAMP.

Utilizing the trackball controller, clicks on the

<STPT/RAMP>.

5.

Enter desired target temperature setpoint.

Clicks in the Set Point box.

Utilizing the keyboard, enters 400.0.

6.

Enter desired cooldown rate in the Ramp box.

Clicks in the Ramp Rate box. Utilizing the keyboard, enters 75.0.

7.

Select <OK>.

Utilizing the trackball controller, clicks on <OK>.

Clicks <OK> on the Confirm Setpoint pop up window.

8.

Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN.

Utilizing the trackball controller, clicks on <ON>.

Clicks <OK> on the Begin Reactor Cooldown pop up window.

Job Performance Measure (JPM)

S-N-c Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

9.

On <CONTROL>

<PRESSURE CONTROL>

screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.

If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.

Utilizing the trackball controller, clicks on

<PRESSURE CONTROL>.

The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.

NOTE:

10. On <CONTROL> <BPV JACK> screen, verify BPV Jack position setpoint is

-5.0%.

If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.

Utilizing the trackball controller, clicks on < BPV JACK >.

Observes BPV Jack position setpoint is -5.0%.

11. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-c Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and

Title:

29501LP040, Respond to a Reactor Scram IAW DGP 02-03.

K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

DGP 02-03, rev 89 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-c Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-d Page 2 of 9 Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-d Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify NO LPCI pumps operating.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

Job Performance Measure (JPM)

S-N-d Page 4 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.
5. An EO has been briefed and is in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-d Page 5 of 9 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DEOP 0500-03.

NOTE:

  • 1.

Place 2A LPCI PP control switch in Pull-to-Lock.

ALL lights extinguished.

  • 2.

Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.

RED light illuminated.

3.

Verify MIN FLOW VLV 2-1501-13A closed if not needed.

RED light illuminated.

2-1501-13A is not required for 2B LPCI pump.

CUE:

The following valves may be verified in any order NOTE:

4.

Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.

GREEN lights illuminated.

5.

Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.

GREEN lights illuminated.

6.

Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.

GREEN lights illuminated.

7.

Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.

GREEN lights illuminated.

8.

Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.

GREEN lights illuminated.

Job Performance Measure (JPM)

S-N-d Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

9.

Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.

GREEN lights illuminated.

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

NOTE:

When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.

CUE:

10. Unlock AND open 2-1501-74A, U2 LPCI A PMP VENT VLV.

Instructs NLO to complete step G.12.c.(5).(a).

11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.

Instructs NLO to complete step G.12.c.(5).(b).

12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV.

Instructs NLO to complete step G.12.c.(5).(c).

13. Close AND lock 2-1501-74A, U2(3) LPCI A PMP VENT VLV.

Instructs NLO to complete step G.12.c.(5).(d).

  • 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.

Instructs NLO to obtain PI 2-1501-47A reading per step G.12.c.(6).

PI 2-1501-47A indicates 15.5 psig.

CUE:

  • 15. Recognizes reading is NOT less than 15 psig.

Determines reading is greater than 15 psig.

Job Performance Measure (JPM)

S-N-d Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.

Instructs NLO to close 2-1501-47A per step G.12.c.(8).

2-1501-47A-R is Closed.

CUE:

BEGIN ALTERNATE PATH

  • 17. Open PP SUCT VLV MO 2-1501-5A.

GREEN light illuminated.

  • 18. Place 2A LPCI PP control switch in AUTO.

Depresses and places 2A LPCI PP c/s to center (AUTO) position.

19. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.

Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.

Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected CUE:

Acknowledge report of task completion.

END JPM Stop Time:

Job Performance Measure (JPM)

S-N-d Page 8 of 9 Operators Name:

Job

Title:

RO SRO JPM

Title:

LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

DEOP 0500-03, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-d Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.
5. An EO has been briefed and is in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-e Page 2 of 8 Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-e Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
2. Ensure Torus water level is 20 feet.
3. Insert following Malfunctions and/or Remotes.

IMF CIGP2I (Spurious Group II Isolation)

IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)

Adjusts Torus Level indications to ~20 feet.

ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)

Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.

ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0

4. Verify the SBGT system operating and verify flow ~4000 scfm.
5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 500-04.

Job Performance Measure (JPM)

S-N-e Page 4 of 8 INITIAL CONDITIONS

1. You are the Aux NSO.
2. A break inside the Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20'
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-e Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide examinee the marked up copy of DEOP 0500-04.

NOTE:

Annunciator 902-3 A-15 may be received during this JPM.

1.

Verify SBGT is operating and flow is ~ 4000 scfm.

Verifies 2/3A SBGT train FI 7540-13 is reading

~4000 scfm.

2.

Verify Reactor Mode switch NOT Verifies Reactor Mode switch in RUN.

NOT in RUN.

3.

Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.

Momentarily places Bypass switch to Torus Position.

The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOTE:

NOT open.

4.

Open AO 2-1601-61, TORUS 2-INCH VENT VLV.

Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.

IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.

NOTE:

BEGIN ALTERNATE PATH

5.

Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to DRYWELL.

Momentarily places Vent Isol Signal Bypass switch to Drywell position.

If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.

CUE:

6.

Open AO 2-1601-62, DW 2-INCH Vent.

Red Open light illuminated.

Job Performance Measure (JPM)

S-N-e Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

7.

Open AO 2-1601-63, VENT TO SBGT.

Red Open light illuminated.

8.

Start as many Turbine Building and Radwaste Exhaust fans as possible.

Initiates action to start All available Turbine Building and Radwaste Exhaust fans.

9.

Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.

Containment pressure stable or decreasing.

DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.

CUE:

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

10. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-e Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and

Title:

295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 17 minutes Actual Time Used:

minutes

References:

DEOP 0500-04, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-e Page 8 of 8 INITIAL CONDITIONS

1. You are the Aux NSO.
2. A break inside the Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20'
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-f Page 2 of 9 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • M63 (to prevent TR-22 to Bus 23 breaker from closing).
3. Setup the following Triggers:
  • None.
4. Ensure ONLY 2 RFPs operating.
5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.

DOCUMENT PREPARATION

1.

Marked up copy of DOP 6500-01.

Job Performance Measure (JPM)

S-N-f Page 4 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-f Page 5 of 9 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOP 6500-01.

NOTE:

This task has two parts, which can be performed in any order.

IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.

CUE:

TRANSFER BUS 21 TO TR-22

1.

Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.

Switch in ON position.

2.

Verify:

INCOMING VOLTS and RUNNING VOLTS meters approximately equal.

SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.

NOT glowing.

Voltages approximately equal.

Meter NOT White lights extinguished.

rotating.

3.

Position TR-22 to Bus 21 breaker control switch to CLOSE.

RED light illuminated.

4.

Verify:

SYNCHRONIZING meter at 12 oclock position.

TR-22 to Bus 21 breaker indicates CLOSED.

Annunciator 902-8 D-1 in alarm.

Meter NOT rotating.

RED light illuminated.

Annunciator 902-8 D-1 illuminated.

Job Performance Measure (JPM)

S-N-f Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

5.

Position TR-21 to Bus 21 breaker control switch to TRIP.

GREEN light illuminated.

6.

Verify:

TR-21 to Bus 21 breaker indicates OPEN.

Annunciator 902-8 D-1 clears.

GREEN light illuminated.

Annunciator 902-8 D-1 extinguished.

7.

Position TR-22 to Bus 21 synchroscope selector switch to OFF.

Switch in OFF position.

8.

Verify Bus 21 AMMETER and VOLTMETER indications are normal.

Verifies Bus 21 amps and volts are normal.

Amps may vary depending on conditions, and volts are normally ~ 4160.

NOTE:

TRANSFER BUS 23 TO TR-22

9.

Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.

Switch in ON position.

10. Verify:

INCOMING VOLTS and RUNNING VOLTS meters approximately equal.

SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.

NOT glowing.

Voltages approximately equal.

Meter NOT White lights extinguished.

rotating.

BEGIN ALTERNATE PATH

11. Position TR-22 to Bus 23 breaker control switch to CLOSE.

Breaker does NOT close.

Job Performance Measure (JPM)

S-N-f Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

12. IMMEDIATELY positions TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.

GREEN light illuminated.

IF an Operator is dispatched to check the tripped breaker, report:

the breaker is open, with NO flags up.

CUE:

Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.

NOTE:

13. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:

Job Performance Measure (JPM)

S-N-f Page 8 of 9 Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies.

K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 14 minutes Actual Time Used:

minutes

References:

DOP 6500-01, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-f Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-g Page 2 of 7 Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-g Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
3. Enter the following Expert Command prior to starting this JPM.
4. Acknowledge alarms and reset alarms.
5. Verify RWM operational and on Main Screen.

DOCUMENT PREPARATION Markup a copy of DOP 0400-02.

Job Performance Measure (JPM)

S-N-g Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod N-07 rod position has failed.
3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
4. The Control Rod has been currently verified to be at position 48.
5. The Rod Worth Minimizer is operational.
6. No other rods have had a substitute position assigned.

INITIATING CUE

1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
2. Notify Unit Supervisor when the substitute position has been entered.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-g Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Provide examinee a copy of DOP 0400-02.

NOTE:

1. Proceed to Step G.3.c.(1) of DOP 0400-
02.

Proceeds to Step G.3.c.(1) of DOP 0400-02.

  • 2. Selects Secondary Functions, then Substitute Position screen Substitute Position screen SELECTED.

Control Rod N-07 outlined with blue box and shown on screen as SELECTED.

  • 4. Sets the desired Control Rod position on the bar graph on the left side of the screen.

POSITION SHOWN on top of position bar graph, reads 48.

  • 5. Touches the ENTER REQUEST box.

RWM accepts the request, rod N-07 position indication changes from ?? to substituted 48 position.

6. Touches the EXIT FUNCTION box to return to the Main Display RWM returns to the Main Display Respond as US when examinee informs you they have completed the task CUE:

END JPM Stop Time:

Job Performance Measure (JPM)

S-N-g Page 6 of 7 Operators Name:

Job

Title:

RO SRO JPM

Title:

RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and

Title:

201L027, Enter Substitute Rod Position.

K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

DOP 0400-02, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-g Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod N-07 rod position has failed.
3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
4. The Control Rod has been currently verified to be at position 48.
5. The Rod Worth Minimizer is operational.
6. No other rods have had a substitute position assigned.

INITIATING CUE

1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
2. Notify Unit Supervisor when the substitute position has been entered.

Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-h Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM developed for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-h Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
3. Setup the following Triggers:

None.

DOCUMENT PREPARATION Markup a copy of DOP 5400-05.

Job Performance Measure (JPM)

S-N-h Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.

INITIATING CUE

1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-h Page 5 of 7 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Provide the Examinee with the provided copy of DOP 5400-05.

NOTE:

1. Proceeds to step G.4 of DOP 5400-05.

Locates step G.4 of the procedure (which then directs next step).

2. Determines the correct step to utilize is step G.21 of DOP 5400-05.

Proceeds to step G.21 of the procedure.

  • 3. Close AO 2-5417, ADSORBER TRN 2 BYPASS VLV.

GREEN light illuminated.

  • 4. Close AO 2-5423, ADSORBER TRN 3 BYPASS VLV.

GREEN light illuminated.

  • 5. Open AO 2-5415, ADSORBER TRN 1 DISCH VLV.

GREEN light illuminated.

  • 6. Open AO 2-5421, ADSORBER TRN 2 DISCH VLV.

GREEN light illuminated.

  • 7. Close AO 2-5416, ADSORBER TRN 1 BYPASS VLV.

GREEN light illuminated.

  • 8. Close AO 2-5422, ADSORBER TRN 2 BYPASS VLV.

GREEN light illuminated.

9. Notify Unit Supervisor of task completion.

Unit Supervisor notified of task completion.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-h Page 6 of 7 Operators Name:

Job

Title:

RO SRO JPM

Title:

OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and

Title:

271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

DOP 5400-05, rev 32 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-h Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.

INITIATING CUE

1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-i Page 2 of 8 Revision Record (Summary)

Revision 09 Bank JPM.

Revision 10 Revised for 2010 NRC Exam.

Job Performance Measure (JPM)

S-N-i Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

Job Performance Measure (JPM)

S-N-i Page 4 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-i Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DEOP 0500-03.

NOTE:

The examinee is NOT required to obtain a key to open or close locked valves.

The examinee is required only to identify which type of key is required to open the valve.

1.

Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.

Proceeds to the U2 SBLC area.

2.

Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV.

Unlock lock and removes chain, then rotates valve hand wheel full clockwise.

The component is in the condition you have described.

CUE:

3.

Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV.

Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.

The component is in the condition you have described.

CUE:

4.

Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV.

Rotates valve hand wheel full counter-clockwise.

The component is in the condition you have described.

CUE:

5.

Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV.

Rotates valve hand wheel full counter-clockwise.

The component is in the condition you have described.

CUE:

Job Performance Measure (JPM)

S-N-i Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

6.

Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV.

Unlock lock and removes chain, then rotates valve hand wheel full counter-clockwise.

The component is in the condition you have described.

CUE:

NOTE:

7.

Start both SBLC pumps from the main Control Room.

Contacts the Unit 2 Control Room Operator to start the SBLC pumps.

I have started both Unit 2 Standby Liquid Control pumps.

CUE:

8.

Throttle 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank.

Opens / closes valve to maintain test tank level.

The test tank level is now stabilized (as much going in as is going out).

CUE:

9.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-i Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and

Title:

295L088, Line Up SBLC Test Tank for Alternate Water Injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 17 minutes Actual Time Used:

minutes

References:

DEOP 0500-03, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-i Page 8 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-j Page 2 of 8 Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Job Performance Measure (JPM)

S-N-j Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DOA 6600-01.

Job Performance Measure (JPM)

S-N-j Page 4 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-j Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOA 6600-01.

NOTE:

1.

Proceeds to the 2/3 Diesel Generator Room.

Proceeds to the 2/3 Diesel Generator Room.

2.

Examinee checks the level in the D/G Fuel Oil Day Tank.

Observes day tank sightglass and determines day tank needs filling.

Point to the lower third area on the local sightglass measuring stick and state: the level is here.

CUE:

Normal level is 30 - 38".

NOTE:

3.

Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3.

Verifies power available, by local indicating lights illuminated.

The GREEN LIGHT is illuminated.

CUE:

4.

Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.

Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position.

The pump is running.

CUE:

You have held the switch for approximately 5 minutes.

Job Performance Measure (JPM)

S-N-j Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

5.

Checks the level in the fuel oil day tank.

OBSERVES sight glass and/or REQUESTS annunciator 902-8 G-4 status.

Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.

AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.

CUE:

6.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-j Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 02 JPM Number: S-N-j Task Number and

Title:

264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.

K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

DOA 6600-01, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-j Page 8 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-k Page 2 of 8 Revision Record (Summary)

Revision 10 Bank JPM.

Revision 11 Revised for 2010 NRC Exam.

Job Performance Measure (JPM)

S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DOP 4650-01.

Job Performance Measure (JPM)

S-N-k Page 4 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Control Room personnel have noticed a pungent odor in the Control Room.
3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
2. Inform the Unit 3 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-k Page 5 of 8 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOP 4650-01.

NOTE:

1.

Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.

Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.

2.

Verify the following:

  • LP-4 CLOSED Verifies valve handle perpendicular to valve body for:
3.

OPEN all Main Bank Cylinder shutoff valves (Cylinders 7 through 13).

Turns hand wheels on cylinders 7-13 full counter clockwise.

The component is in the condition you have described.

CUE:

Count cylinders from left to right to find cylinders 7-13.

NOTE:

4.

Check Main Bank pressure.

Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side gauge).

Have examinee read actual pressure.

NOTE:

If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.

CUE:

Job Performance Measure (JPM)

S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

5.

Pressurize the supply manifold from the Main Bank by opening LP-3, CR EMERG AIR BREATHING CYL SV.

OPENS valve LP-3 by turning valve handle counter clockwise 1/4 turn so handle is in-line with valve body The component is in the condition you have described.

CUE:

6.

Verify pressure regulator PRV-3 is maintaining manifold pressure >65 psig and <80 psig.

VERIFIES manifold pressure between 65 and 80 psig as read on CR EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).

If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.

CUE:

Have examinee read actual pressure.

NOTE:

7.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Acknowledge report of task completion.

CUE:

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-k Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and

Title:

279M001, Valve in Control Room Breathing Air Supply.

K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

DOP 4650-01, rev 09 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-k Page 8 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Control Room personnel have noticed a pungent odor in the Control Room.
3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
2. Inform the Unit 3 Supervisor when the task is complete.