ML040210006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


==SUMMARY==
==SUMMARY==
SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION SEP 2003
SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION - SEP 2003  


ES-501                         Power Plant Examination Results Summary                       Form ES-501-2 Facility: Prairie Island                                 Circle Plant Status:   Hot / Cold (1 Written Examination Date: 9/18/2003                     I Operating Test Date(s): 9/8-17/2003 ~~
ES-501 Power Plant Examination Results Summary Form ES-501-2 Facility: Prairie Island Circle Plant Status: Hot / Cold (1 Written Examination Date: 9/18/2003 I Operating Test Date(s): 9/8-17/2003  
II  NRC Examiners: C. Phillips, R. Morris, N. Valos, B. Palagi (written exam grader)
~~
OVERALL RESULTS Applicants:     Total #
NRC Examiners: C. Phillips, R. Morris, N. Valos, B. Palagi (written exam grader)
I II OVERALL RESULTS Applicants:
Total #
RO / SRO /TOT NOTES:
RO / SRO /TOT NOTES:
(11      1=RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-l-Retake; 6=SRO-U-Retake; 7=SRO-Fuel (2)      P=Passed; F=Failed; W=Waived
(1 1 (2) 1 =RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-l-Retake; 6=SRO-U-Retake; 7=SRO-Fuel P=Passed; F=Failed; W=Waived  
                                                                                        ~   ~~~
~  
PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY
~~~
PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY  


August 26, 2003 MEMORANDUM TO:               C. Phillips, N. A. Valos, and R. M. Morris, Region Ill FROM:                       Roger D. Lanksbury, Chief               IRA/
August 26, 2003 OFFICE RIII:DRS I
Operations Branch
RI I I : DRS I i J I
I NAME CPhil1ips:mab RDLanskburym DATE 08iZ72003.
08/& 12003 MEMORANDUM TO:
C. Phillips, N. A. Valos, and R. M. Morris, Region Ill FROM:
Roger D. Lanksbury, Chief IRA/
Operations Branch  


==SUBJECT:==
==SUBJECT:==
EXAMINATION ASSIGNMENTS Please make arrangements to administerwritten examinations and operating tests to the following applicants:
EXAM I NATION ASSIGNMENTS Please make arrangements to administer written examinations and operating tests to the following applicants:
APPLICANT                         DOCKET NO.                   EXAMINATION TYPE CAMERON, Robert D.                     55-32712                      55.41; 55.45 JULIAN, Joseph R.                       55-327 17                     55.41; 55.45 KRAMER, Philip                          55-3212 I                    55.41; 55.45 MEYER, Richard A.                       55-32719                      55.41; 55.45 SIMONSON, Dean T.                       55-32946                      55.41; 55.45 ZADRA, Jeffery D. II                    55-32945                      55.41; 55.45 CARVER, James D.                       55-31650                      55.43; 55.45 (SRO Upgrade)
APPLICANT DOCKET NO.
GREENFIELD, Tyler N ,                  55-32922                      55.43; 55.45 (SRO Instant)
EXAMINATION TYPE CAMERON, Robert D.
HOLT, Thomas E.                        55-32963                      55.43; 55.45 (SRO Instant)
55-3271 2 JULIAN, Joseph R.
INGALLS, Steven D.                      55-31736                      55.43; 55.45 (SRO Upgrade)
55-327 17 KRAMER, Philip 55-32 1 2 I MEYER, Richard A.
JENSEN, Kevin D.                      55-31655                      55.43; 55.45 (SRO Upgrade)
55-3271 9 SIMONSON, Dean T.
SMUTNY, Mark J.                        55-32924                      55.43; 55.45 (SRO Instant)
55-32946 ZADRA, Jeffery D. II 55-32945 CARVER, James D.
Facility and Location:       Prairie Island Nuclear Generating Plant, Welch, Minnesota Facility
55-31 650 GREENFIELD, Tyler N,
55-32922 HOLT, Thomas E.
55-32963 INGALLS, Steven D.
55-31 736 JENSEN, Kevin D.
55-31 655 SMUTNY, Mark J.
55-32924 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant)
Facility and Location:
Prairie Island Nuclear Generating Plant, Welch, Minnesota Facility


==Contact:==
==Contact:==
James D. Lash, Training Department, 651-388-1121, ext. 4053 NRC Chief Examiner:           Charles Phillips, Region Ill RO and SRO Written Examinations and Operating Tests: To be prepared by Prairie Island staff for evaluation and approval by NRC Region I l l Operations staff. The written examination will be administered by Prairie Island staff, and the operating tests will be administered by NRC Region Ill Operations staff.
James D. Lash, Training Department, 651-388-1 121, ext. 4053 NRC Chief Examiner:
Dates of Examinations:                 Weeks of September 8 and September 15,2003 cc: D. C. Trimble, NRR:DIPM:IOHS T. J. Kim, LPM, NRR Resident Inspector, Rlll P. L. Louden, DRP, Rlll A. Vegel, DRP, Rlll OFFICE    RIII:DRS      I    RI I I:DRS      IiJ                    I                  I .
Charles Phillips, Region Ill RO and SRO Written Examinations and Operating Tests: To be prepared by Prairie Island staff for evaluation and approval by NRC Region I l l Operations staff. The written examination will be administered by Prairie Island staff, and the operating tests will be administered by NRC Region Ill Operations staff.
NAME      CPhil1ips:mab      RDLanskburym                                                  -
Dates of Examinations:
DATE      08iZ72003 .        08/& 12003}}
Weeks of September 8 and September 15,2003 cc: D. C. Trimble, NRR:DIPM:IOHS T. J. Kim, LPM, NRR Resident Inspector, Rlll P. L. Louden, DRP, Rlll A. Vegel, DRP, Rlll}}

Latest revision as of 05:30, 16 January 2025

Assignment and Summary Sheets for the Prairie Island Initial Examination - September 2003
ML040210006
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/08/2003
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
References
50-282/03-301, 50-306/03-301
Download: ML040210006 (3)


Text

ASSIGNMENT AND

SUMMARY

SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION - SEP 2003

ES-501 Power Plant Examination Results Summary Form ES-501-2 Facility: Prairie Island Circle Plant Status: Hot / Cold (1 Written Examination Date: 9/18/2003 I Operating Test Date(s): 9/8-17/2003

~~

NRC Examiners: C. Phillips, R. Morris, N. Valos, B. Palagi (written exam grader)

I II OVERALL RESULTS Applicants:

Total #

RO / SRO /TOT NOTES:

(1 1 (2) 1 =RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-l-Retake; 6=SRO-U-Retake; 7=SRO-Fuel P=Passed; F=Failed; W=Waived

~

~~~

PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY

August 26, 2003 OFFICE RIII:DRS I

RI I I : DRS I i J I

I NAME CPhil1ips:mab RDLanskburym DATE 08iZ72003.

08/& 12003 MEMORANDUM TO:

C. Phillips, N. A. Valos, and R. M. Morris, Region Ill FROM:

Roger D. Lanksbury, Chief IRA/

Operations Branch

SUBJECT:

EXAM I NATION ASSIGNMENTS Please make arrangements to administer written examinations and operating tests to the following applicants:

APPLICANT DOCKET NO.

EXAMINATION TYPE CAMERON, Robert D.

55-3271 2 JULIAN, Joseph R.

55-327 17 KRAMER, Philip 55-32 1 2 I MEYER, Richard A.

55-3271 9 SIMONSON, Dean T.

55-32946 ZADRA, Jeffery D. II 55-32945 CARVER, James D.

55-31 650 GREENFIELD, Tyler N,

55-32922 HOLT, Thomas E.

55-32963 INGALLS, Steven D.

55-31 736 JENSEN, Kevin D.

55-31 655 SMUTNY, Mark J.

55-32924 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant)

Facility and Location:

Prairie Island Nuclear Generating Plant, Welch, Minnesota Facility

Contact:

James D. Lash, Training Department, 651-388-1 121, ext. 4053 NRC Chief Examiner:

Charles Phillips, Region Ill RO and SRO Written Examinations and Operating Tests: To be prepared by Prairie Island staff for evaluation and approval by NRC Region I l l Operations staff. The written examination will be administered by Prairie Island staff, and the operating tests will be administered by NRC Region Ill Operations staff.

Dates of Examinations:

Weeks of September 8 and September 15,2003 cc: D. C. Trimble, NRR:DIPM:IOHS T. J. Kim, LPM, NRR Resident Inspector, Rlll P. L. Louden, DRP, Rlll A. Vegel, DRP, Rlll