ML040210006: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
==SUMMARY== | ==SUMMARY== | ||
SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION SEP 2003 | SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION - SEP 2003 | ||
ES-501 | ES-501 Power Plant Examination Results Summary Form ES-501-2 Facility: Prairie Island Circle Plant Status: Hot / Cold (1 Written Examination Date: 9/18/2003 I Operating Test Date(s): 9/8-17/2003 | ||
~~ | |||
OVERALL RESULTS Applicants: | NRC Examiners: C. Phillips, R. Morris, N. Valos, B. Palagi (written exam grader) | ||
I II OVERALL RESULTS Applicants: | |||
Total # | |||
RO / SRO /TOT NOTES: | RO / SRO /TOT NOTES: | ||
( | (1 1 (2) 1 =RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-l-Retake; 6=SRO-U-Retake; 7=SRO-Fuel P=Passed; F=Failed; W=Waived | ||
~ | |||
PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY | ~~~ | ||
PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY | |||
August 26, 2003 MEMORANDUM TO: | August 26, 2003 OFFICE RIII:DRS I | ||
Operations Branch | RI I I : DRS I i J I | ||
I NAME CPhil1ips:mab RDLanskburym DATE 08iZ72003. | |||
08/& 12003 MEMORANDUM TO: | |||
C. Phillips, N. A. Valos, and R. M. Morris, Region Ill FROM: | |||
Roger D. Lanksbury, Chief IRA/ | |||
Operations Branch | |||
==SUBJECT:== | ==SUBJECT:== | ||
EXAM I NATION ASSIGNMENTS Please make arrangements to administer written examinations and operating tests to the following applicants: | |||
APPLICANT | APPLICANT DOCKET NO. | ||
EXAMINATION TYPE CAMERON, Robert D. | |||
55-3271 2 JULIAN, Joseph R. | |||
55-327 17 KRAMER, Philip 55-32 1 2 I MEYER, Richard A. | |||
55-3271 9 SIMONSON, Dean T. | |||
55-32946 ZADRA, Jeffery D. II 55-32945 CARVER, James D. | |||
Facility and Location: | 55-31 650 GREENFIELD, Tyler N, | ||
55-32922 HOLT, Thomas E. | |||
55-32963 INGALLS, Steven D. | |||
55-31 736 JENSEN, Kevin D. | |||
55-31 655 SMUTNY, Mark J. | |||
55-32924 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant) | |||
Facility and Location: | |||
Prairie Island Nuclear Generating Plant, Welch, Minnesota Facility | |||
==Contact:== | ==Contact:== | ||
James D. Lash, Training Department, 651-388- | James D. Lash, Training Department, 651-388-1 121, ext. 4053 NRC Chief Examiner: | ||
Dates of Examinations: | Charles Phillips, Region Ill RO and SRO Written Examinations and Operating Tests: To be prepared by Prairie Island staff for evaluation and approval by NRC Region I l l Operations staff. The written examination will be administered by Prairie Island staff, and the operating tests will be administered by NRC Region Ill Operations staff. | ||
Dates of Examinations: | |||
Weeks of September 8 and September 15,2003 cc: D. C. Trimble, NRR:DIPM:IOHS T. J. Kim, LPM, NRR Resident Inspector, Rlll P. L. Louden, DRP, Rlll A. Vegel, DRP, Rlll}} | |||
Latest revision as of 05:30, 16 January 2025
| ML040210006 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/08/2003 |
| From: | Lanksbury R NRC/RGN-III/DRS/OLB |
| To: | Nuclear Management Co |
| References | |
| 50-282/03-301, 50-306/03-301 | |
| Download: ML040210006 (3) | |
Text
ASSIGNMENT AND
SUMMARY
SHEETS FOR THE PRAIRIE ISLAND INITIAL EXAMINATION - SEP 2003
ES-501 Power Plant Examination Results Summary Form ES-501-2 Facility: Prairie Island Circle Plant Status: Hot / Cold (1 Written Examination Date: 9/18/2003 I Operating Test Date(s): 9/8-17/2003
~~
NRC Examiners: C. Phillips, R. Morris, N. Valos, B. Palagi (written exam grader)
I II OVERALL RESULTS Applicants:
Total #
(1 1 (2) 1 =RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-l-Retake; 6=SRO-U-Retake; 7=SRO-Fuel P=Passed; F=Failed; W=Waived
~
~~~
PRIVACY ACT INFORMATION - FOR OFFICIAL USE ONLY
August 26, 2003 OFFICE RIII:DRS I
RI I I : DRS I i J I
I NAME CPhil1ips:mab RDLanskburym DATE 08iZ72003.
08/& 12003 MEMORANDUM TO:
C. Phillips, N. A. Valos, and R. M. Morris, Region Ill FROM:
Roger D. Lanksbury, Chief IRA/
Operations Branch
SUBJECT:
EXAM I NATION ASSIGNMENTS Please make arrangements to administer written examinations and operating tests to the following applicants:
APPLICANT DOCKET NO.
EXAMINATION TYPE CAMERON, Robert D.
55-3271 2 JULIAN, Joseph R.
55-327 17 KRAMER, Philip 55-32 1 2 I MEYER, Richard A.
55-3271 9 SIMONSON, Dean T.
55-32946 ZADRA, Jeffery D. II 55-32945 CARVER, James D.
55-31 650 GREENFIELD, Tyler N,
55-32922 HOLT, Thomas E.
55-32963 INGALLS, Steven D.
55-31 736 JENSEN, Kevin D.
55-31 655 SMUTNY, Mark J.
55-32924 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.41; 55.45 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Instant) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Upgrade) 55.43; 55.45 (SRO Instant)
Facility and Location:
Prairie Island Nuclear Generating Plant, Welch, Minnesota Facility
Contact:
James D. Lash, Training Department, 651-388-1 121, ext. 4053 NRC Chief Examiner:
Charles Phillips, Region Ill RO and SRO Written Examinations and Operating Tests: To be prepared by Prairie Island staff for evaluation and approval by NRC Region I l l Operations staff. The written examination will be administered by Prairie Island staff, and the operating tests will be administered by NRC Region Ill Operations staff.
Dates of Examinations:
Weeks of September 8 and September 15,2003 cc: D. C. Trimble, NRR:DIPM:IOHS T. J. Kim, LPM, NRR Resident Inspector, Rlll P. L. Louden, DRP, Rlll A. Vegel, DRP, Rlll