{{#Wiki_filter:ZAm                                                       Tel: 623-393-6116         Mail Station 7602 Palo Verde Nuclear            David hL Smith                Fax: 623-393-6077         PO Box 52034 Generating Station            Plant Manager                e-nuil: DS1VMll0eapsc=cor Phoenix, Arizona 85072-2034 January 14, 2004 035-00717-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
{{#Wiki_filter:ZAm Palo Verde Nuclear Generating Station David hL Smith Plant Manager Tel: 623-393-6116 Fax: 623-393-6077 e-nuil: DS1VMll0eapsc=cor Mail Station 7602 PO Box 52034 Phoenix, Arizona 85072-2034 January 14, 2004 035-00717-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==
==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Line 28: Line 27:


==Enclosures:==
==Enclosures:==
DECEMBER 2003 Monthly Operating cc:       (all w/enclosures)
DECEMBER 2003 Monthly Operating cc:
(all w/enclosures)
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
                                                                                                                  -ZA
-ZA


OPERATING DATA REPORT DOCKET NO.             50-528 UNIT NAME             Palo Verde 1 DATE                   January 14, 2004 COMPLETED BY           Don Vogt TELEPHONE             (623) 393-5926 REPORTING PERIOD:               December 2003
OPERATING DATA REPORT DOCKET NO.
: 1. Design Electrical Rating                                   1,265.00
50-528 UNIT NAME Palo Verde 1 DATE January 14, 2004 COMPLETED BY Don Vogt TELEPHONE (623) 393-5926 REPORTING PERIOD:
: 2. Maximum Dependable Capacity (MWe-Net)                     1,243.00 This Month        Yr-to-Date      Cumulative
December 2003 1.
: 3. Number of Hours the Reactor was Critical                 744.00           8,620.72       122,781.92
2.
: 4. Number of Hours Generator On-line                        744.00           8,605.63       121,389.03
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.
: 5. Reserve Shutdown Hours                                    0.00             0.00             0.00
4.
: 6. Net Electrical Energy Generated (MWHrs)                933,399.75     10,587,106.34   146,255,690.34 UNIT SHUTDOWNS Type                         Method of No.     Date         FF:Forced   Duration Reason1     Shutting           Cause & Corrective Action S: Scheduled   (Hours)               Down 2                     Comments
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 8,620.72 122,781.92 744.00 8,605.63 121,389.03 0.00 0.00 0.00 933,399.75 10,587,106.34 146,255,690.34 UNIT SHUTDOWNS Type Method of No.
Date FF: Forced Duration Reason1 Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments


==SUMMARY==
==SUMMARY==
1                                                       2 Reason:                                                  Method:
1 2
A Equipment Failure (Explain)                             I  Manual B Maintenance or Test                                   2 Manual TrIplScram C Refueling                                               3 Automatic TriplScram D Regulatory Restriction                                 4 Continuation E Operator Training & License Examination               5 Other (Explain)
Reason:
F Administration G Operational Error (Explain)
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TrIplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of I
Page 1 of I


OPERATING DATA REPORT DOCKET NO.           5iO-529 UNIT NAME            FPalo Verde 2 DATE                    lanuary 14, 2004 COMPLETED BY          I )on Vogt TELEPHONE            I 623) 393-5926 REPORTING PERIOD:                December 2003
OPERATING DATA REPORT DOCKET NO.
: 1. Design Electrical Rating                                   1,265.00
5 UNIT NAME F
: 2. Maximum Dependable Capacity (MWe-Net)                       1,243.00 This Month          Yr-to-Date        Cumulative
DATE COMPLETED BY I
: 3. Number of Hours the Reactor was Critical                   461.87           6,877.76         120,789.26
TELEPHONE I
: 4. Number of Hours Generator On-line                          407.28            6,809.92         119,389.52
REPORTING PERIOD:
: 5. Reserve Shutdown Hours                                      0.00               0.00               0.00
iO-529 Palo Verde 2 lanuary 14, 2004
: 6. Net Electrical Energy Generated (MWHrs)                  412,119.45      8,444,411.87     145,388,092.87 UNIT SHUTDOWNS Type                           Method of No.       Date         FF:Forced     Duration Reasonl     Shutting             Cause & Corrective Action S: Scheduled     o.                     Down 2                       Comments 03.02   09/27/2003         S           329.32     C           4       U2R11 03-03   12/1142003         S             6.93     C           5       U2R1 High main turbine vibe on initial
)on Vogt 623) 393-5926 December 2003
. ______  _________                      ________                        pow er-up.
: 1.
03-04   12/15/2003         S             0.47     C           5       U2R11 Main turbine overspeed trip test
Design Electrical Rating
: 2.
Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 461.87 407.28 0.00 412,119.45 Yr-to-Date Cumulative 6,877.76 120,789.26 6,809.92 119,389.52 0.00 0.00 8,444,411.87 145,388,092.87 UNIT SHUTDOWNS Type Method of No.
Date FF: Forced Duration Reasonl Shutting Cause & Corrective Action S: Scheduled
: o.
Down 2 Comments 03.02 09/27/2003 S
329.32 C
4 U2R11 03-03 12/1142003 S
6.93 C
5 U2R1 High main turbine vibe on initial pow er-up.
03-04 12/15/2003 S
0.47 C
5 U2R11 Main turbine overspeed trip test


==SUMMARY==
==SUMMARY==
: Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1                                                         2 Reason:                                                    Method:
: Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1
A Equipment Failure (Explain)                               I Manual B Maintenance or Test                                     2 Manual TriplScram C Refueling                                               3 Automatic Trip/Scram D Regulatory Restriction                                 4 Continuation E Operator Training & License Examination                 5 Other (ExplaIn)
2 Reason:
F Administration G Operational Error (Explain)
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other {Explain)
H Other {Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (ExplaIn)
Page 1 of I
Page 1 of I


OPERATING DATA REPORT DOCKET NO.           50-530 UNIT NAME            Palo Verde 3 DATE                  January 14, 2004 COMPLETED BY          Don Vogt TELEPHONE            (623) 393-5926 REPORTING PERiOC              December 2003
OPERATING DATA REPORT DOCKET NO.
: 1. Design Electrical Rating                                 1,269.00
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERiOC 50-530 Palo Verde 3 January 14, 2004 Don Vogt (623) 393-5926 December 2003 1.
: 2. Maximum Dependable Capacity (MWe.Net)                     1,247.00 This Month        Yr-to-Date      Cumulative
2.
: 3. Number of Hours the Reactor was Critical                 744.00           7,779.60       117,963.30
Design Electrical Rating Maximum Dependable Capacity (MWe.Net) 1,269.00 1,247.00 3.
: 4. Number of Hours Generator On-iine                        744.00           7,715.47       116,911.37
4.
: 5. Reserve Shutdown Hours                                    0.00             0.00             0.00
5.
: 6. Net Electrical Energy Generated (MWHrs)              946,310.55     9,554,709.02   143,061,868.02 UNIT SHUTDOWNS Type                         Method of F: Forced   Duration             Shutting           Cause & Corrective Action S: Scheduled   (Hours)               Down 2                     Commnents
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-iine Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 7,779.60 117,963.30 744.00 7,715.47 116,911.37 0.00 0.00 0.00 946,310.55 9,554,709.02 143,061,868.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Commnents


==SUMMARY==
==SUMMARY==
1                                                       2 Reason:                                                Method:
1 Reason:
A Equipment Failure (Explain)                           I  Manual B Malntenance or Test                                   2 Manual TriplScram C Refueling                                             3 Automatic TriplScram D Regulatory Restriction                               4 Continuation E Operator Training &l Ucense Examination               5 Other (Explain)
A Equipment Failure (Explain)
F Administration G Operational Error (Explain)
B Malntenance or Test C
H Other (Explain)
Refueling D
Regulatory Restriction E
Operator Training &l Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1}}
Page 1 of 1}}

Latest revision as of 05:30, 16 January 2025

December 2003 Monthly Operating Report for Palo Verde Units 1, 2 and 3
ML040210347
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/14/2004
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00717-DMS
Download: ML040210347 (4)


Text

ZAm Palo Verde Nuclear Generating Station David hL Smith Plant Manager Tel: 623-393-6116 Fax: 623-393-6077 e-nuil: DS1VMll0eapsc=cor Mail Station 7602 PO Box 52034 Phoenix, Arizona 85072-2034 January 14, 2004 035-00717-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for DECEMBER 2003 Enclosed are the Monthly Operating Reports for DECEMBER 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Don Vogt at (623) 393-5926.

Sincerely, DMS/ap

Enclosures:

DECEMBER 2003 Monthly Operating cc:

(all w/enclosures)

Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute

-ZA

OPERATING DATA REPORT DOCKET NO.

50-528 UNIT NAME Palo Verde 1 DATE January 14, 2004 COMPLETED BY Don Vogt TELEPHONE (623) 393-5926 REPORTING PERIOD:

December 2003 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 744.00 8,620.72 122,781.92 744.00 8,605.63 121,389.03 0.00 0.00 0.00 933,399.75 10,587,106.34 146,255,690.34 UNIT SHUTDOWNS Type Method of No.

Date FF: Forced Duration Reason1 Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TrIplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of I

OPERATING DATA REPORT DOCKET NO.

5 UNIT NAME F

DATE COMPLETED BY I

TELEPHONE I

REPORTING PERIOD:

iO-529 Palo Verde 2 lanuary 14, 2004

)on Vogt 623) 393-5926 December 2003

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 461.87 407.28 0.00 412,119.45 Yr-to-Date Cumulative 6,877.76 120,789.26 6,809.92 119,389.52 0.00 0.00 8,444,411.87 145,388,092.87 UNIT SHUTDOWNS Type Method of No.

Date FF: Forced Duration Reasonl Shutting Cause & Corrective Action S: Scheduled

o.

Down 2 Comments 03.02 09/27/2003 S

329.32 C

4 U2R11 03-03 12/1142003 S

6.93 C

5 U2R1 High main turbine vibe on initial pow er-up.

03-04 12/15/2003 S

0.47 C

5 U2R11 Main turbine overspeed trip test

SUMMARY

Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other {Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (ExplaIn)

Page 1 of I

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERiOC 50-530 Palo Verde 3 January 14, 2004 Don Vogt (623) 393-5926 December 2003 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe.Net) 1,269.00 1,247.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-iine Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 744.00 7,779.60 117,963.30 744.00 7,715.47 116,911.37 0.00 0.00 0.00 946,310.55 9,554,709.02 143,061,868.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Commnents

SUMMARY

1 Reason:

A Equipment Failure (Explain)

B Malntenance or Test C

Refueling D

Regulatory Restriction E

Operator Training &l Ucense Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1