ML040210347: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ZAm | {{#Wiki_filter:ZAm Palo Verde Nuclear Generating Station David hL Smith Plant Manager Tel: 623-393-6116 Fax: 623-393-6077 e-nuil: DS1VMll0eapsc=cor Mail Station 7602 PO Box 52034 Phoenix, Arizona 85072-2034 January 14, 2004 035-00717-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 | ||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS) | Palo Verde Nuclear Generating Station (PVNGS) | ||
| Line 28: | Line 27: | ||
==Enclosures:== | ==Enclosures:== | ||
DECEMBER 2003 Monthly Operating cc: | DECEMBER 2003 Monthly Operating cc: | ||
(all w/enclosures) | |||
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute | Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute | ||
-ZA | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
50-528 UNIT NAME Palo Verde 1 DATE January 14, 2004 COMPLETED BY Don Vogt TELEPHONE (623) 393-5926 REPORTING PERIOD: | |||
December 2003 1. | |||
2. | |||
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3. | |||
4. | |||
5. | |||
6. | |||
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs) | |||
This Month Yr-to-Date Cumulative 744.00 8,620.72 122,781.92 744.00 8,605.63 121,389.03 0.00 0.00 0.00 933,399.75 10,587,106.34 146,255,690.34 UNIT SHUTDOWNS Type Method of No. | |||
Date FF: Forced Duration Reason1 Shutting Cause & Corrective Action S: Scheduled (Hours) | |||
Down 2 Comments | |||
==SUMMARY== | ==SUMMARY== | ||
1 | 1 2 | ||
A Equipment Failure (Explain) | Reason: | ||
A Equipment Failure (Explain) | |||
B Maintenance or Test C | |||
Refueling D | |||
Regulatory Restriction E | |||
Operator Training & License Examination F | |||
Administration G | |||
Operational Error (Explain) | |||
H Other (Explain) | H Other (Explain) | ||
Method: | |||
I Manual 2 | |||
Manual TrIplScram 3 | |||
Automatic TriplScram 4 | |||
Continuation 5 | |||
Other (Explain) | |||
Page 1 of I | Page 1 of I | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
: 1. Design Electrical Rating | 5 UNIT NAME F | ||
: 2. Maximum Dependable Capacity (MWe-Net) | DATE COMPLETED BY I | ||
TELEPHONE I | |||
REPORTING PERIOD: | |||
iO-529 Palo Verde 2 lanuary 14, 2004 | |||
)on Vogt 623) 393-5926 December 2003 | |||
: 1. | |||
03-04 | Design Electrical Rating | ||
: 2. | |||
Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3. | |||
4. | |||
5. | |||
6. | |||
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs) | |||
This Month 461.87 407.28 0.00 412,119.45 Yr-to-Date Cumulative 6,877.76 120,789.26 6,809.92 119,389.52 0.00 0.00 8,444,411.87 145,388,092.87 UNIT SHUTDOWNS Type Method of No. | |||
Date FF: Forced Duration Reasonl Shutting Cause & Corrective Action S: Scheduled | |||
: o. | |||
Down 2 Comments 03.02 09/27/2003 S | |||
329.32 C | |||
4 U2R11 03-03 12/1142003 S | |||
6.93 C | |||
5 U2R1 High main turbine vibe on initial pow er-up. | |||
03-04 12/15/2003 S | |||
0.47 C | |||
5 U2R11 Main turbine overspeed trip test | |||
==SUMMARY== | ==SUMMARY== | ||
: Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1 | : Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1 | ||
A Equipment Failure (Explain) | 2 Reason: | ||
A Equipment Failure (Explain) | |||
B Maintenance or Test C | |||
Refueling D | |||
Regulatory Restriction E | |||
Operator Training & License Examination F | |||
Administration G | |||
Operational Error (Explain) | |||
H Other {Explain) | H Other {Explain) | ||
Method: | |||
I Manual 2 | |||
Manual TriplScram 3 | |||
Automatic Trip/Scram 4 | |||
Continuation 5 | |||
Other (ExplaIn) | |||
Page 1 of I | Page 1 of I | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERiOC 50-530 Palo Verde 3 January 14, 2004 Don Vogt (623) 393-5926 December 2003 1. | |||
2. | |||
Design Electrical Rating Maximum Dependable Capacity (MWe.Net) 1,269.00 1,247.00 3. | |||
4. | |||
5. | |||
6. | |||
Number of Hours the Reactor was Critical Number of Hours Generator On-iine Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs) | |||
This Month Yr-to-Date Cumulative 744.00 7,779.60 117,963.30 744.00 7,715.47 116,911.37 0.00 0.00 0.00 946,310.55 9,554,709.02 143,061,868.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours) | |||
Down 2 Commnents | |||
==SUMMARY== | ==SUMMARY== | ||
1 | 1 Reason: | ||
A Equipment Failure (Explain) | A Equipment Failure (Explain) | ||
B Malntenance or Test C | |||
H Other (Explain) | Refueling D | ||
Regulatory Restriction E | |||
Operator Training &l Ucense Examination F | |||
Administration G | |||
Operational Error (Explain) | |||
H Other (Explain) 2 Method: | |||
I Manual 2 | |||
Manual TriplScram 3 | |||
Automatic TriplScram 4 | |||
Continuation 5 | |||
Other (Explain) | |||
Page 1 of 1}} | Page 1 of 1}} | ||
Latest revision as of 05:30, 16 January 2025
| ML040210347 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/14/2004 |
| From: | Danni Smith Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 035-00717-DMS | |
| Download: ML040210347 (4) | |
Text
ZAm Palo Verde Nuclear Generating Station David hL Smith Plant Manager Tel: 623-393-6116 Fax: 623-393-6077 e-nuil: DS1VMll0eapsc=cor Mail Station 7602 PO Box 52034 Phoenix, Arizona 85072-2034 January 14, 2004 035-00717-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for DECEMBER 2003 Enclosed are the Monthly Operating Reports for DECEMBER 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
Sincerely, DMS/ap
Enclosures:
DECEMBER 2003 Monthly Operating cc:
(all w/enclosures)
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
-ZA
OPERATING DATA REPORT DOCKET NO.
50-528 UNIT NAME Palo Verde 1 DATE January 14, 2004 COMPLETED BY Don Vogt TELEPHONE (623) 393-5926 REPORTING PERIOD:
December 2003 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 8,620.72 122,781.92 744.00 8,605.63 121,389.03 0.00 0.00 0.00 933,399.75 10,587,106.34 146,255,690.34 UNIT SHUTDOWNS Type Method of No.
Date FF: Forced Duration Reason1 Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TrIplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
5 UNIT NAME F
DATE COMPLETED BY I
TELEPHONE I
REPORTING PERIOD:
iO-529 Palo Verde 2 lanuary 14, 2004
)on Vogt 623) 393-5926 December 2003
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 461.87 407.28 0.00 412,119.45 Yr-to-Date Cumulative 6,877.76 120,789.26 6,809.92 119,389.52 0.00 0.00 8,444,411.87 145,388,092.87 UNIT SHUTDOWNS Type Method of No.
Date FF: Forced Duration Reasonl Shutting Cause & Corrective Action S: Scheduled
- o.
Down 2 Comments 03.02 09/27/2003 S
329.32 C
4 U2R11 03-03 12/1142003 S
6.93 C
5 U2R1 High main turbine vibe on initial pow er-up.
03-04 12/15/2003 S
0.47 C
5 U2R11 Main turbine overspeed trip test
SUMMARY
- Unit was uprated during the last refueling outage. Design Electrical Rating and Maximum Dependable Capacity have been tentatively increased by 92 MW. Final capacity values will be determined in the near future and updated in the January 2004 report 1
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other {Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (ExplaIn)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERiOC 50-530 Palo Verde 3 January 14, 2004 Don Vogt (623) 393-5926 December 2003 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe.Net) 1,269.00 1,247.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-iine Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 7,779.60 117,963.30 744.00 7,715.47 116,911.37 0.00 0.00 0.00 946,310.55 9,554,709.02 143,061,868.02 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Commnents
SUMMARY
1 Reason:
A Equipment Failure (Explain)
B Malntenance or Test C
Refueling D
Regulatory Restriction E
Operator Training &l Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1