ML17228A246: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NUCLEAR ENGINEERING DEPARTMENT
{{#Wiki_filter:}}
'0                      EQUIPMENT, SUPPORT AND INSPECTIONS GROUP P.O. Box 14000 JUNo BEAcH, FLoRIDA 33408            =
St. Lucie Nuclear Power Plant Unit 2 SECOND INSERVICE INSPECT(ON INTERVAL INSERVICE INSPECTIONvSELECTED COMPONENT SCHEDULE''-'repared byy
                                                  . II Florida:Power and Light Comppny Code Programs Sectio'n" ','.
For St. Lucii<Nuclear. Power; Plant 10 Miles South of Ft. Pierce!on A1A-Ft. Pre'rce, Florida 33034'August Commercial Service Date:    .                              8, 1983 NRC Docket Number:                                  50-389 Document Number:                                    PSL-201 Revision Number:                  0                Date:        July 24, 1993 Prepared by:                      ~ ).
                          . Specialist Inservice Inspection Reviewed by:
Sup rvisor Inspection          Sectio'n n
Supervisor Code Programs Section Reviewed by:
Authorized Nuclear Inservice Inspector 9308ii0239 930804 PDR  ADQCK 05000389 8              PDR
 
-0 t
H i;
1
                                      ',t                        ~r)c.d I
9 al              '                  <':~as.l.''~
                                                                '.>.)e,
                                                '4'90"
                      '4 l
                                      .~>1l, li I
II I
4cG.
w,h,  .."~zAaf J k'L~$
              'Nl sg g      (
4 hd8'(
I I      (
I "g><A    $ q 4683 g,O  p')';ja'
                                                                            ;I 468'pi(
                                          >)(+  t <<g            "RQS 1
I                                                              4l)a'3 sl'E "P~I'~'h                        0
                                          ~C5C%'
 
SECOND INSPECTION INTERVAL          "; PSL-201 INSERVICE INSPECT/ON                  REVISION 0 SELECTED COMPONENTS SCHEDULE              July 24, 1993 LIST OF EFFECTIVE PAGES SECTION                  PAGES      CHANGE        DATE List of Effective Pages                2 thru 2      0    July  24, 1993 Table  of Contents                      3 fhru 4      0    July  24, 1993 Record of Revision                      5 thru 5      0    July  24, 1993 Abstract                                6 thru 6      0 -.. July  24, 1993 SECTIONS 1 Introducfion                          7 thru 9            Ju/y 24,  1993 2 Development of Inspection Plan      10 fhru 13          July 24,  1993 3 Records                              14 thru 18          July 24,  1993 4 Class 1 Inspection Tables          19 fhru 108          July 24,  1993 5 Class 2 Inspection Tables          109 thru 170          July 24,  1993 6 Class 3 Inspecfion Tables          171 thru 208          July 24,  1993 APPENDICES A Acceptance Criteria              209  thru 213          July 24, 1993 B NDE Procedures                  214  thru 215          July 24, 1993 C UT Calibration Blocks            216  thru 218          July 24, 1993 D Class 1 Weld/support Maps        219  fhru 267          July 24,. 1993 E Class 2 Weld/support Maps        268  thru 322          July 24, 1993 F Class 3 Weld/support Maps        323  thru 360          July 24, 1993 G ASME Code Cases                  361  thru 398          July 24, 1993 Page 2  of 398
 
3 k
      'l  ~  ~ \ ~
          ~
      ~  ~  ~  ~ ~
'V                      ~  ~    y  ~  \    ~  ~
            ~  ~ c              ~    f
                                  ~          ~
                            ~    ~  ~      ~
                ~ ~          ~    ~  ~
g~  h 0) 9$                  ~  ~            ~  ~  I V
I  L  '        ~
                              ~    I  ~      ' 'I t.
I    ~  ~  ~
I                ~  ~  ~            ~  ~
 
SECOND INSPECTION INTERVAL                                                            PSL-201 INSERVICE INSPECTION                                                              REVISION 0 SELECTED COMPONENTS SCHEDULE                                                                July 24, 1993 TABLE OF CONTENTS List of Effective Pages Table of Contents                  ..............................
Record of Revision Absffact      e
                    ~  ~  ~  ~  ~  ~  ~ ~ ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  e e  ~ ~ ~ ~ e ~ ~ ~  e ~
1.0 Introduction.............................................
pe 1.1  Inspection Interval                      .................;                                                                            7 1.2  Inspection Periods                      ..................                                                                ~ ~ ~
7
                                                                                                                                    ~    e ~
1.3  Applicable Documents                                                                                                        ~ ~ ~      7 1.4  Applicable Code Edition and Addenda...                                                                                      ~  ~ ~    9 1.5  Subsequent Code Editions and Addenda                                                                                        ~  ~ ~    9 2.0 Development of Inspection Plan                                    ..........                                                              10 2.1  Class 1 Systems/Components                                                                                                  ~    ~    10 2.2  Class 2 Systems/Components                                                                                                  ~  ~      10 2.3  Class 3 Systems/Components                                                                                                  ~  ~      10 2.4  Class 1, 2, 3 Component Supports                                                                                            ~    ~    10 2.5 Substitute Examinations........                                                                                              ~  ~    11 2.6 Nondestructive Examinations                                      ....                                                        ~  ~    11 2.7 Weld/Support Location Maps                                      ....        ~  e  ~  ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~        11 2.S Ultrasonic Calibration Blocks....                                                                                            ~  ~    11 2.9 Weld Identification                                                                                                        ~  ~      11 3.0 R ecords  e ~  ~  ~  ~  ~  ~  ~  ~      ~  ~  ~  ~  ~  ~  ~  ~  e  ~  ~  ~  ~  ~  ~  ~  ~                                                14 3    General      .........................                                                                                ~  ~  ~      14 3.1.1      Inspection Plan Tables.......                                                                                            14
                                                                                                                                  ~  ~  ~
3.1.1      Inspection Plan Zones                                                                                      ~  ~  ~    14 3.1.3      Code Item Classification                                                                                    ~  ~  e    14 3.1.4    Inspection Plan Table Contents                                                                              ~  ~  ~    14 3.2 Final Reports                                                                                                            ~  ~  ~      15 3.3 ISI Summary Report                                                                                                      ~  ~  ~      16 4.0 Class 1  Tables..........................................                                                                                19 5.0 Class  2 Tables.........................................                                                                                  109 6.0 Class  3 Tables.........................................                                                                                  171 Page 3            of 398
 
a 4  ~ ~
~ I  ~
~ w  A
  ~    'I ~ ~ ~ I
          ~ ~      ~ ~
        ~  ~    ~ +    ~
                \ ~  '
                          ~
 
SECOND /NSPECT/ON INTERVAL                            PSL-201 INSERVICE /NSPECTION                                REVISION 0 SELECTED COMPONENTS SCHEDULE                            Ju/y 24, 1993 APPENDICES A    Acceptance  Criteria.................                                                209 B    Nondestructive Examination Procedure                                                214 C    Ultrasonic Calibration Blocks  .........                                            216 D    Class 1 Weld/Support Location Maps    ...                                          219 E    Class 2 Weld/Support Location Maps    ...                                          268 F    C/ass 3 Weld/Support Location Maps ...                                              323 G    ASME Code Cases                            ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    361 LIST OF FIGURES 2~1  Tee Weld  ID.....................                                                    12 2~2  Elbow weld ID    ...................                                                  12 2-3  Reducer we/d /D    .................                                            ~ ~ ~  12 3-1  Inservice Inspection Schedule                                                          17 3-2  Inservice Inspection Summary Report                                                    18 LIST OF TABLES A-1  Class 1 Acceptance  Standards  ............................                        210 A-2 A-3 C/ass 2 Acceptance C/ass 3 Acceptance Standards Standards
                                      ............................                        211 212 A-4  Component Support    Acceptance Standards    ..................                    213 Page 4 of 398
 
1~
+ f)q~'
~'t l
1
                  /
)p i'(
'4              J I I I) kl p>>
r
)1 (I
lj lj (I
4 fl Il i) h I
I/
sl I
 
SECOND INSPECTION INTERVAL                  PSL-201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                    July 24, 1993 RECORD OF REVISION REVISION        DATE        AFFECTED        REASON FOR REVISION PAGES
        'o.
Ju/y 24, 1993      Entire      Inservice Inspection Selected Document      Component Schedule as required by ASME Section XI, IWA-2400 for the Second Ten Year Inservice Inspection Interval Page 5  of 398
 
SECOND INSPECTION INTERVAL                  PSL<<201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                  July 24, 1993 ABSTRACT This document provides the Inservice Inspection Selected Component Schedule for the Second Ten-Year Inservice Inspection Interval for Sf. Lucie Nuclear Power Plant, Unit 2.
This Schedule identifies those components and/or systems (including supports) which are classified ASME Code Class 1, Class 2, and Class 3, selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).
Where an examination required by Section Xlis determined to beimpractical, the basis for this determination is included in the St. Lucie Inservice Inspection Updated Program Plan, in the form of a Request for Relief.
Tables for each system selected for examination is included within this document, which provides Code classification, Code examination category, Code item number, componentidentification and description, examination method, and where within the inspection interval and period the component is scheduled to be performed.
Page 6 of 398
 
<It SECOND INSPECTION INTERVAL                    PSL-201 INSERVICE INSPECTION                        REVISION 0 SELECTED COMPONENTS SCHEDULE                    July24, 1993
 
==1.0 INTRODUCTION==
 
This document provides the Inservice Inspection Selected Component Schedule for the Second Ten-Year Inservice Inspection Interval for St.
Lucie Nuclear Power Plant, Unit 2.
The Commercial Service Date    for St. Lucie Nuclear Power Plant Unit 2 was August  8, 1983.
1.1  INSPECTION INTERVAL The Second Inservice Inspection Interval becomes effective on August 8, 1993 and is scheduled to end on August 8, 2003.
1.2  INSPECTION PERIODS The Second Inservice Inspection Interval is divided into three successive inspection period as determined by calendar years of plant service within the interval. Identified below are the period dates for the second inspection interval.
PERIOD            START                            END August  8, 1993                  August  8, 1996 August  8, 1996                  August  8, 2000 August  8, 2000                  August  8, 2003 1.3  APPLICABLE DOCUMENTS The components selected for ASME Code Class 1, Class 2 and Class 3 systems and components (and their supports) was developed after giving due consideration to the following documents and subject to the limitations and modifications listed in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction.
10 CFR 50.55(a) Code    of Federal Regulations, dated August 6, 1992 ASME Boiler and Pressure Vessel Code, Sections            V, 1989 Edition, "Nondestructive Examination" Page 7  of 398
 
Ilil SECOND /NSPECTION INTERVAL                  PSL<<201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                  July 24, 1993 ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, "Rules for Inservice Inspection of Nuclear Power Plant Components" USNRC REGULATORY GUIDES The following list of Regulatory Guides are applicable to fhe PSL-2 Inservice Inspection Long Term Plan:
1.14        Reactor Coolant Pump Flywheel Integrity Revision 1, August 1975 1.26        Quality Group Classifications and Standards for Wafer-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 3, February 1976 1.65        Materials and Inspections for Reactor Pressure Vessel Closure Studs, October 1973 1.150        Ultrasonic Testing of Reactor Vessel Welds during Preservice and Inservice Examinations, Revision 1, 1983 St. Lucie Unit 2 Final Safety Analysis Report St. Lucie Unit 2 Technical Specifications, Docket number 50-389, Sections 4.0.5, 3/4.4.5, 3/4.4.11, 3/4.7.9 USNRC Standard Review Plan 6.6, Section /.8, Augmented Inservice Inspection of Class 2 Welds.
Branch Technical Position APSCB 3.1, paragraph B.2.c(4)
USNRC BULLETINS 88-11 Pressurizer Surge Line Thermal Stratification USNRC /NFORMATIONAL NOTICES 93-20 Thermal Fatigue Cracking of Feedwater piping fo Steam Generators, dated March 24, 1993.
Page 8  of 398
 
SECOND INSPECTION INTERVAL                    PSL-201 INSERVICE INSPECTION                        REVISION 0 SELECTED COMPONENTS SCHEDULE                    July 24, 1993 ASME CODE CASES See Appendix G    for a complete list and copy of applicable Code Cases.
N-307-1      Revised Ultrasonic Examination Volume for Class Bolting, Table IWB-2500-1, Examination Category .B-G-1, When Examinations                are Conducted from the Center-Drilled Hole N-355        Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in accordance with Appendix lll-3410.
N-460        Alternative Examination Coverage for Class      1 and Class 2 Welds.
N-481      Alternative Examination Requirements        for Cast Austenitic Pump Casings.
N-498      Alternative Rules for 10-Year Hydrostatic Pressure Testing for Class 1 and Class 2 Systems.
1.4 APPLICABLE CODE EDITIONS AND ADDENDA Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of federal regulations, the Inservice Inspection requirements applicable to nondestructive examination for the Second Inservice Inspection Interval is based on the rules set forth in the 1989 Edition of Section XI, that was endorsed twelve months prior to fhe start of the inservice inspection interval.
1.5 SUBSEQUENT CODE EDITION and ADDENDA As permiffed by 10 CFR 50.55a(g)(4)(iv), FPL may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.
Portions of Editions and Addenda may also be used provided that all related requirements to fhe respective Edition and Addenda are met. FPL intends fo continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provides the continuing assurance of the quality and safety of pressure containing components and systems.
Page 9  of 398
 
, <~ll SECOND INSPECTION INTERVAL                PSL-201 INSERVICE INSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 2.0 DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Second Ten-Year
    'Inservice Inspection Interval on Class 1, Class 2 and Class 3 components and their supports of Florida Power and Light Company's (FPL) St. Lucie Nuclear Power Plant Unit 2. Component andlor system selected for nondestructive examination are scheduled for examination in accordance with Section XI.
2.1 CLASS 1 SYSTEMSICOMPONENTS The Class 1 system boundaries subject to examination          were developed based upon the requirements of 10 CFR 50.2(v) and FPL PSL-2-FSAR.      The Class 1 components and systems (including supports) selected for examination are identified in Section 4.0 of this document.
2.2 CLASS 2 SYSTEMSICOMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the FPL - PSL-2-FSAR. The Class 2 components and systems (including supports) selected for examination are identified in Section 5.0 of this document.
2.3 CLASS 3 SYSTEMSICOMPONENTS The Class    3 system  boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the FPL PSL-2-FSAR. The Class 3 components and systems (including supports) selected for examination are identified in Section 6.0 of this document.
2.4    CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF Component supports selected for examination shall be the supports of those components that    are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.
Page 10  of 398
 
SECOND INSPECT/ON INTERVAL                PSL-201 INSERVICE /NSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 2.5  SUBSTITUTE EX'AMINATIONS FPL may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional sample. This substitution may be done due to such conditions as /imited physical access, high radiation levels,
    'inaccessibi%ty etc. Such changes will be noted in the Summary Report Submittal. Specific examinations that are required, and can not be completed within the period/interval wil/ be identified within the Summary Report Submiffa/, and may be the subject of a request for relief.
2.6  NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established    Florida Power and Light (FPL) nondestructive examination procedures and/or FPL approved vendor procedures which conform to the requirements of the FPL Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code. A listing of nondestructive examination procedures applicable to the scheduled component are identified in Appendix B. FPL approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).
2.7  WELD/SUPPORT LOCATION MAPS Weld/Support location maps indicating components, areas, weld locations, and other information pertinent to the performance of the inservice NONDESTRUCTIVE examinations are contained in Appendix D, E and F, as applicable.
2.8  ULTRASONIC CALIBRATION BLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination is maintained at the plant site. A listing of applicable ultrasonic calibration blocks is included in Appendix C.
2.9  WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators. Since Class 2 longitudinal welds are required to be examined for a distance of 2.5 times the wall thickness from the intersecting circumferential weld; they will be given unique identification numbers as denoted below.
Page 11 of 398
 
SECOND INSPECTION INTERVAL                    PSL-201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                      July 24, 1993 Fittings:      Longitudinal welds in fittings are identified by adding letter A, B, or C to the I.D. for the reference weld. The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the fiow.
The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.
Tee Case 1: Three welds located as                                  Plow shown in Figure 2-1.
Tee Case      2: lf only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A.                            Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as    shown in Figure 2-2, one located on the inside radius and the other on the outside radius.
Elbow Case 2: If only one weld exists it is identified by the letter A.
Figure 2-2 Elbow weld ID Elbow Case 3: If two welds exist in locations other than Case 1, Weld A is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B.
Reducer Case 1: lf only one weld exists it is identified by the letter A.
Reducer Case 2: If two welds exist, weld A is the first weld                              0 encountered          when    moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B. See Figure 2-3.
Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld Page 12  of 398
 
jji SECOND INSPECTION INTERVAL                PSL-201 INSERVICE INSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                  July 24, 1993 identification number. They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.
Page 13  of 398
 
l, SECOND INSPECTION INTERVAL                  PSL-201 INSERVICE INSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                  July 24, 1993 3.0 RECORDS 3.1 General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, final reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section XI.
3.1.1  SCHEDULED EXAMINATION TABLES The Scheduled Examination Tables for Inservice examinations of major components of Florida Power and Light, St. Lucie Unit 2 Nuclear Power Station will be in a format similar to Figure 3-1.
3.1.2 INSPECTION ZONES Systems subject to examination have been divided into zones.
Each zone is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each zone.
3.1.3 CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code category and Code item number can be applied are identified.
3.1.4 INSPECTION/EXAMINATION TABLE CONTENTS The Inservice Inspection/Examination      Tables provide the following information:
PROGRAM
 
==SUMMARY==
'NUMBER - Each examination weld or component is assigned a unique summary number for the purpose of administrative control This provides a uniform
                                                  ~
format identification for accessing multiple data bases relating to each examination.
ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate item number from Table IWB-2600-1, IWC-2500-1, IWD-2500-1 or IWF-2600-1, as applicable, of the ASME Boiler & Pressure Vessel Code, Section XI.
Page 14  of 398
 
SECOND INSPECTION INTERVAL                  PSL-201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                    July 24, 1993 COMPONENT        IDENTIFICATION - The        examination area identification is the unique component or weld identification number. This number also appears on the applicable ISI Weld/Support Location Map.
COMPONENT DESCRIPTION - The examination                      area description is a brief description of the component or, in the case of a weld, the parts being joined.
CODE EXAMINATION CATEGORY - Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code, Section XI.
CODE EXAMINATION METHODS - Listed in this column are the appropriate nondestructive examination method(s) to be used for each component or item subject to examination, if applicable.
ISI INTERVAL - Identified in this column are numbers 1, 2, 3 and 4. Each number signifying a ten - year inspection interval.
The current inspection interval relating to this Table is number
: 2. Column 1 through 4 may be turned on or off depending on the preference of the user. Within each column a system of codes are entered to define the status of each component or item. For the purpose of providing Tables of components or areas selected for examination during the interval an (X) will be placed on the applicable row. Each row is defined by period and outage, depending on where the (X) is placed, will determine when that item is scheduled to be examined within the interval, period and outage. Additional codes are used to provide a status of examination conducted during a given period in time. Additional codes such as those identified in Figure 3-1 (0) may also be used.
INSTRUCTIONS - This column identifies examination note(s) and/or instruction applicable to a particular item.
3.2 'INALREPORTS Following the completion of the lnservice Inspection Activity, FPL shall prepare a Inservice Inspection Final Report. The Final Report will be filed at the St. Lucie site Document Control Center. Final Examination Report Tables, Figure 3-2, are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.
Page 15  of 398
 
,if SECOND INSPECTION INTERVAL                PSL-201 INSERVICE INSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                  July24, 1993 This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.
3.3 INSERVlCE INSPECTlON
 
==SUMMARY==
REPORT Following the units return to service, FPL shall forward a Summary Report of the ISl activity to the Nuclear Regulatory Commission as required by Section XI.
Page 16    of 398
 
I]
SECOND INSPECTION INTERVAL                  PSL-201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                  July 24, 1993 ST. LUCIE UNIT 2 DATE'A)          INSERVICE INSPECTION SCHEDULE              PAGE (D)
REVISION:      (B)
CLASS (C) COMPONENTS INSPECTION INTERVAL          PLAN STATUS SYSTEM        (E)                FIRST    SECOND THIRD ZONE NUMBER: (F) ASME PERIOD PERIOD PERIOD                          SEC. XI
 
==SUMMARY==
EXAM. AREA CATGY NUMBER IDENTIFICAT. ITEM NO NDE METHOD 1
OUTAGE 2 3 1 2 3 1
                                                                --- INSTRUCT.
2 3 CAL BLCK DWG. NO. (G)
(H)  (I)
(J)
(K)
(O)
(R)
(A)  Denotes the date of the inspection plan table (B)  Denotes the current revision number of the plan (C)  Identifies the ASME Code Class (D)  Identifies the page number of the table (E)  Identifies the System applicable to this table (F)  Denotes the applicable Zone number for this table (G)  Identifies the applicable isometric drawing number for this table (H)  Identifies the item number associated with the item (I)  Denotes the component or weld identification number (J)  Identifies the component or weld description (K)  Denotes the elevation level (L)  Denotes the ASME Code Category (M)  Denotes the ASME Code Item Number and Footnote, if applicable (N)  Denotes the NDE Method to be used for the examination (O)  Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.
X - Scheduled            P - Partial C Completed              E - Expanded Scope A Augmented              B - Baseline (p)  Denotes specific instruction applicable to the item (Q)  Identifies the ultrasonic calibration block to be used (R)  Denotes any remarks associated with the examination results FIGURE 3-1 Inservice Inspection Long Term Plan Page 17  of 398
 
SECOND INSPECTION INTERVAL            PSL-201 INSERVICE INSPECTION                REVISION 0 SELECTED COMPONENTS SCHEDULE              July24, 1993 .
ST. LUCIE UNIT 2 DATE:      (A)      INSERVICE INSPECTION
 
==SUMMARY==
PAGE (H)
REVISION: (B)
OUTAGE (C)(D ), (E ) PERIOD) ( F) INTERVAL CLASS (G) COMPONENTS SYSTEM        (I)                                      N  I  0 ZONE NUMBER: (J) ASME                                  ONGT SEC. XI                                RSEH
 
==SUMMARY==
EXAM. AREA CATGY                NDE            E I 0 E REMARKS NUMBER IDENTIFICAT. ITEM NO            METHOD PROC    C G M R CAL BLCK DWG. NO. (K)
(L)  (M)            (P)    (R)    (S)      (T)  (U)
(N)            (Q)
(O)
(V)
(A)  Denotes the date of the inspection plan table (B)  Denotes the current revision number of the plan (C)  Identifies the outage number within the period (D)  Identifies the year of the outage (E)  Identifies which period (First, Second, Third)
(F)  Identifies which interval (First, Second, Third, Fourth)
(G)  Identifies the ASME Code Class (H)  Identifies the page number of the table (I)  Identifies the System applicable to this table (J)  Denotes the applicable Zone number for this table (K)  Identifies the applicable isometric drawing number for this table (L)  Identifies the item number associated with the item (M)  Denotes the component or weld identification number (N)  Identifies the component or weld description (O)  Denotes the elevation level (p)  Denotes the ASME Code Category (Q)  Denotes the ASME Code Item Number and Footnote if applicable (R)  Denotes the NDE Method to be used for the examination (S)  Identifies which NDE procedure was used (T)  Identifies the results of the NDE examinations (U)  Denotes any remarks associated with the examination results (V)  .Identifies the ultrasonic calibration block to be used FIGURE 3-2 FINAL REPORT TABLE Page 1S  of 398
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE              July 24, 1993 4.0 CLASS    1 INSERVICE INSPECTION PLAN TABLES This section contains the Inservice Inspection Examination Tables for nondestructive examinations selected for examination during the Second Inservice Inspection Interval.
Page 19 of 398
 
il, DATE:  07/24/93                                            ST. LUCZE NUCLEAR PLANT UNIT 2                                PAGE:      20 REVISION:      0                          INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                        PLAN STATUS REACTOR PRESSURE VESSEL                                          I    FIRST      SECOND      THIRD ZONE NUMBER:  001                        ASME                    I    PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY        NDE          - - - - - - 0 U T A G E - - - - --  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH              1  2  3    1  2  3  4    1  2  3  eaCALIBRATZON BLOCK+a REF. DWG. NO. 02 001 B 000010  101 151                          BA          UT                                                USNRC REGULATORY GUIDE  l. 150 DOME;TO-PEEL SEG. TOR.            B1.21                  2              X                      APPLIES
                                                                                                        ~*UT-Z,UT 4~~
000020  101-154-A                        B-A        UT                                                USNRC REGULATORY GUIDE  l. 150 PEEL SEG.-TO-PEEL SEG. 8 30      B1.22                  2              X                      APPLIES DEGREES
                                                                                                        ~ ~UT-I UT-4~~
000030  101 154 B                        B-A                                                          USNRC REGULATORY GUIDE 1.150 PEEL SEG.-TO-PEEL SEG. 0'0                UI'1.22 2              X                      APPLIES DEGREES RCB                                                                                            ~~UT-I)UT-4~*
000040  101 154 C                        B-A        UT                                                USNRC REGULATORY GUIDE    1.150 PEEL SEG.-TO-PEEL SEG. 4 150    Bl ~ 22                2              X                      APPLIES DEGREES RCB                                                                                            *~UT-1, UT-4 ~ ~
000050  101-154-D                        B-A        UT                                                USNRC REGULATORY GUIDE 1.150 PEEL SEG.-TO-PEEL SEG. I 210    B1.22                  2              X                      APPLIES DEGREES
                                                                                                        ~~UT-1,UT-4~*
000060  101-154-E                        B-A        UT                                                USNRC REGULATORY GUIDE 1.150 PEEL SEG.-TO-PEEL SEG. 4t 270  B1.22                  2              X                      APPLIES DEGREES
                                                                                                        ~~UT 1,UT 4~~
000070  101 154 F                        B-A        UT                                                USNRC REGULATORY GUIDE 1. 150 PEEL SEG. - TO-PEEL SEG. 0 330    Bl. 22                2              X                      APPLIES DEGREES
~        RCe                                                                                            ~~UP-I) UT-4~~
 
fl DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE:      21 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAZ                  PLAN STATUS REACTOR PRESSURE VESSEL                                        PIRST      SECOND    THIRD ZONE NUMBER: 001                        ASME              I  PERIOD    PERIOD    PERIOD  I SEC. XZ                                              I SUGARY EXAMINATION AREA                  CA ICY  NDE      I          -OUTAGE-                  INSTRUCTIONS NUMBER    IDENTZPICATION                ITEM NO METH      I 1 2  3    1  2  3  4  1  2  3 I  iiCALIBRATIONBLOCKi~
REF. DWG. NO. 02 001 A 000080    201-141                        B-A      UT                                            USNRC REGULATORY GUIDE    1.150 BOTTOM HEAD-TO-LOWER SHELL      B1.21            2            X                        APPLIES GIRTH WELD
                                                                                                *iUT-1(UT-4i*
REP. DWG. NO. 02 001-C 000090  101 142-A                      B-A      UT                                            USNRC REGULATORY GUIDE  1.150 LOWER SHELL  LONGITUDINAL WELD  B1.12          2            X                        APPLIES 8 15 DEG.
                                                                                                *~UT-Ii UT-2*~
0100  101-142-B                      B-A    UT                                            USNRC REGULATORY GUIDE 1.150 LOWER SHELL LONGITUDINAL WELD  B1.12          2            X                        APPLIES 4t 135 i'UT-1, UT-2~ ~
000110  101-142-C                      BA      UT                                            USNRC REGULATORY GUIDE 1.150 LOWER SHELL  LONGITUDINAL WELD  Bl.12          2            X                        APPLIES 8 255 DEG.
RCB                                                                                    <<iUT-l,UT-2">>
RRP. DWG. NO. 02-001-A 000120  101 171                        B-A, UT                                                USNRC REGULATORY GUIDE  1. 150 LOWER SHELL-TO- INTERM. SHELL  Bl. 11          2            X                        APPLIES GIRTH WELD iiUT-1, UT-2 i
                                                                                                            ~
REF. DWG. NO. 02 001-C 000130  101 124-A                      B A    UI'                                            USNRC REGULATORY GUIDE 1.150 INTERM SHELL LONGITUDINAL WELD B1.12            2            X                        APPLIES 4 15 DEG.
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:      22 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE VESSEL                                        PZRST      SECOND    THIRD ZONE NUMBER: 001                        ASME                  PERIOD    PERIOD    PERIOD    I SEC. XI          I
                                                                                              - I
 
==SUMMARY==
EXAMINATION AREA                CATGY      NDE                  OUTAGE                I  INSTRUCTIONS IDENTIPICATZON                  ITEM NO METH                  1          1  2          ~ ~CALIBRATION BLOCK~~
NUMBER                                                      i 1 2  3        2  3  4        3  I REF. DWG. NO. 02-001-C 000140  101-124-B                      B-A      UT                                              USNRC REGULATORY GUIDE  1.150 INTERN SHELL LONGITUDINAL WELD B1.12            2            X                        APPLIES 8 135  DEG
                                                                                                  **UT-I)UT-2~~
000150  101-124-C                      BA        UT                                            USNRC REGULATORY GUIDE  1.150 INTERM SHELL LONGITUDINAL WELD B1.12            2            X                        APPLIES 0 255  DEG
                                                                                                  ~~UT-Z, UT-2~~
REF. DWG. NO. 02 001 A 0160  106-121                        B-A      UT                                            USNRC REGULATORY GUIDE    1. 150 ZNTERM SHELL-TO-UPPER SHELL    Bl. 11            2            X                        APPLIES GIRTH WELD
                                                                                                  ~ aUT Z~UT  2m*
REF. DWG. NO. 02-001-C 000170  101-122-A                      BA        UT                                            USNRC REGULATORY GUIDE  l. 150 UPPER SHELL LONGZTUDZNAL WELD  B1.12            2            X                        APPLIES 15 DEG.
                                                                                                  ~ OUT I **
000180  101-122-B                      B-A      UT                                            USNRC REGULATORY GUIDE  1.150 UPPER SHELL LONGITUDINAL WELD    B1.12            2            X                        APPLIES 8 135 DEG.
                                                                                                  ~ aUT Zee 000190  101 122 C                      BA        UT                                            USNRC REGULATORY GUIDE  1.150 UPPER SHELL LONGITUDINAL WELD    B1.12            2            X                        APPLIES 8 255  DEG.
RCB                                                                                      10UT 1*1
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGB:      23 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE VESSEL                                    I  FIRST      SECOND    THIRD ZONB NUMBER:  001                      ASME              I  PERIOD    PERIOD    PERIOD SEC. XI SUaaRY EXAMINATIONAREA                  CATGY      NDE                  OUTAGE-              I  INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH      ( 1 2  3    1  2  3  4  1  2  3    ~~CALIBRATION BLOCK~*
REF. DWG. NO, 02 001 A 000200  101-121                        BA        UT                                            USNRC REGULATORY GUIDE    1. 150 UPPER SHELL-TO-PLANGE GIRTH    B1.30            2            X                      APPLIBS, 1ST PERIOD (B D)
EXAMS MOVED TO 2ND PERIOD    IN RCB                                                                                      CONJUNCTION WITH 10-YEAR AUTOMATED EXAMS, SUBJECT OF RR
                                                                                                    &#xb9;  14 INPUT  ]If REP. DWG. NO. 02 001 B 000210    105 121 A                      B-D      UT                                            NOZZLE EXAMS MOVED TO 2ND OUTLET NOZZLE-TO-SHELL  I 0      B3.90            2            X                      PERIOD    IN CONJUNCTION WITH DEGREES                                                                                  10-YEAR AUTOMATED BXAM, SUBJECT OF RR    &#xb9; 14
                                                                                                  ~ oUT  14 4 000220  103-121-A                        B-D      UT INLET NOZZLE-TO-SHELL    60      B3.90            2            X DEGRBBS eeUT-1(UT-9ee 000230  103 121-B                        BD        UT INLET NOZZLE TO-SHELL I 120      B3.90            2            X DEGREES
                                                                                                  ~*UT-1,UT-9*~
000240  105-121-B                        B-D      UT                                            NOZZLE EXAMINATION MOVED TO OUTLET NOZZLE TO SHELL    180    B3.90            2            X                        2ND PERIOD    IN CONJUNCTION WITH DEGREES                                                                                  10 YEAR AUTOMATED EXAMSg RCB                                                                                      SUBJECT OP RR    &#xb9; 14
                                                                                                  ~ aUT  Ies t
000250  103 121 C                        B-D      UT INLET NOZZLE TO SHELL I 240    B3.90            2            X DEGREES RCB                                                                                      ~*UT-1, UT-9"
* DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE:    24 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS REACTOR PRESSURB VESSEL                                      I  FIRST      SECOND    THIRD ZONE NUMBER: 001                        ASME              I  PERIOD    PERIOD    PERIOD SEC. XI          I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                -OUTAGE-                INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH        1 2  3    1  2  3  4  1  2  3  ~ <<CALIBRATION BLOCK<<<<
RBP. DWG. NO. 02 001 B 000260    103 121-D                      B-D      UT INLET NOZZLE-TO-SHELL I 300    B3. 90            2            X DEGREES
                                                                                                <<<<UT-](UT-9<<<<
REF. DWG. NO. 02-001-A 000270  ON-IR-A                          B-D      UT                                        EXAM MOVED TO 2ND PERIOD  IN INNER RADIUS OUTLET NOZZLE l8 0 B3.100          2            X                    CONJUNCTION WITH 10-YEAR DEGREES                                                                              AUTOMATED EXAMS, SUBJECT OF RR
                                                                                              &#xb9;  14
                                                                                              **QT 10<<<<
000280  IN-IR-A                          B-D      UT INNER RADIUS INLET NOZZLE 0 60 B3.100            2            X DEGREES
                                                                                              <<*QT 1<<*
000290  IN-IR-B                          B-D      UT INNER RADIUS INLET NOZZLE  t8    B3.100          2            X 120 DEGREES
                                                                                              <<<<QT 1<< ~
000300  ON-IR-B                          B-D      UT                                        EXAM MOVED TO 2ND PERIOD  IN INNER RADIUS OUTLET NOZZLE e    B3.100          2            X                    CONJUNCTION WITH  10- YEAR 180 DEGREES                                                                          AUTOMATED EXAMS, SUBJECT OP RR
                                                                                              &#xb9;  14 10<<<<
000310  IN-IR-C                          B-D      UT INNER RADIUS INLET NOZZLE 8      B3.100          2            X 240  DEGREES
                                                                                              <<<<UT  ]<<<<
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    25 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS REACTOR PRESSURB VESSEL                                          FIRST      SECOND    THIRD ZONE NUMBER: 001                          ASME                  PERIOD    PBRIOD    PERIOD    I SEC. XI          I-                              -- I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDB                  -OUTAGE        - - - - I  INSTRUCTIONS IDENTIFICATION                  ITEM NO METH          2        1  2    4  1  2        ~ ~CALIBRATION BLOCK~~
NUMBER                                                      i 1    3          3            3 REF. DWG. NO. 02-001 A 000320    IN-IR-D                          B-D      UT INNER RADIUS INLET NOZZLE  4    B3.100          2            X 300 DEGREES ooUT 11 1 REF. DWG. NO. 02 001-B 000330  401-128-A                        B-J      UT                                            EXAM MOVED TO 2ND PERIOD    IN OUTLET NOZZLB-TO-BXTENSION  I  0 B9.11A MT      2              X                        CONJUNCTION WITH 10-YEAR DEGREES                                                                                  AUTOMATED EXAM,  SUBJECI'F  RR
                                                                                                  &#xb9;  14
                                                                                                  ~~5 CSCL-40 PSL1 BLOCK*"
I-42-RC-114  REF. DWG. NO. 02-001 B 000340  RC-114-1 OUTLET NOZZLB EXT. TO-PIPE  4l 0 B9.11D  MT    2              X
                                                                                                  *PUT REF. DWG. NO. 02-001-B 000350  201-128-A                        B-J      UT                                            AT 5-CSCL-40  {UNIT &#xb9;1 BLOCK) ~
INLET NOZZLE TO EXTENSION e 60 B9.11A      MT    2              X DEGREES
                                                                                                  ~ <<IR-CS-46-SLC,  UT-5*a I-30-RC 112  REF. DWG. NO  02-001-B 000360  RC 112 6                          B-J      UT                                            UT BXAMINED PROM NOZZLE BORE.
INLET NOZZLE EXT. TO ELBOW 8      B9.11D  MT    2  - -        X 60 DEGREES
                                                                                                  ~~UT-5,IR-CS-46-SLC~  ~
 
ill DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                    PAGE:      26 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                      PLAN STATUS REACTOR PRESSURE  VESSEL                                          FIRST      SECOND    THIRD ZONE NUMBER: 001                        ASME                  )  PERIOD    PERIOD    PERIOD  I SEC. XI            t                                I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                    -OUTAGE-                INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        i 1 2  3    1  2  3  4  1  2  3  <<<<CALIBRATION BLOCK<<*
REF. DWG. NO. 02-001 B 000370  201-128-B                        B-J      UT                                              AT 5-CSCL-40 (UNIT  &#xb9;1 BLOCK) .
INLET NOZZLE-TO-EXT. 120              MT  '9.11A 2            X DEGREES
                                                                                                  <<*IR-CS-46-SLC, UT-5<<*
I-30-RC-121    REF. DWG. NO. 02-001-B 000380  RC-121-6                        B-J      UT                                              UT EXAMINED PROM NOZZLE BORE.
ELBOW-TO-INLET NOZZLE EXT. t8  B9. 11D  MT        2  - - -    X 120 DEGREES
                                                                                                  <<<<UT-5,IR-CS-46-SLC<<*
REF. DWG. NO. 02-001-B 000390  401-128-B                        B-J      UT                                              1ST PERIOD EXAM MOVED TO 2ND OUTLET NOZZLE-TO-EXT. 4t 180    B9. 11A  MT        2            X                      PERIOD  IN CONJUNCTION, WITH DEGREES                                                                                    10- YEAR AUTOMATED'XAM, SUBJECT OF RR  &#xb9; 14
                                                                                                  <<<<5-CSCL-40 PSL1 BLOCK<<<<
I-42-RC-123    REF. DWG. NO, 02-001-B 000400  RC-123-1                        B-J      UT OUTLET NOZZLE EXT.-TO-PIPE  I  B9.11D    MT        2    - -    X 180 DEGREES
                                                                                                  <<<<LATER*<<
REF. DWG. NO. 02-001-B 000410  201-128-C                        B-J      UT                                              AT 5-CSCL-40 (UNIT  &#xb9;1  BLOCK) ~
INLET NOZZLE-TO-EXT. 8 240      B9. 11A MT          2            X DEGREES
                                                                                                  <<<<IR-CS-46-SLC(UT-5<<<<
 
l/i DATE:    07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:    27 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTBRVAL                    PLAN STATUS REACTOR PRESSURE VESSEL                                            PIRST      SECOND      THIRD ZONE NUMBER: 001                            ASME              I  PERIOD      PBRIOD      PERIOD SEC. XI SUMMITRY EXAMINATION AREA                  CATGY    NDE                - 0  U T A G  B-            INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH      i 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK">>
I  30 RC 124  REF. DWG. NO. 02 001-B 000420  RC-124-6                          B-J      UT                                              UT EXAMINED FROM NOZZLE BORE.
INLET NOZZLE EXT.-TO-BLBOW    I  B9.11D    Ml'        - - -      X 240 DEGREES
                                                                                                          *~UT-5(IR-CS-46-SLC~~
REF. DWG. NO. 02-001-B 000430    201-128-D                          B-J      UT                                              AT 5-CSCL-40 (UNIT  &#xb9;1 BLOCK) .
INLET NOZZLE-TO EXT. t9 300    B9. 11A MT        2            X DEGREES
                                                                                                        <<*IR-CS-46-SLC, UT-5**
I-30-RC-115  REF. DWG. NO. 02-001 B 000440  RC-115 6                            B-J      UT                                              UT EXAMINED FROM NOZZLE BORE.
ELBOW-TO-INLET NOZZLE EXT. 4        B9.11D    MT    2              X 300 DEGREES e*UT-S, IR-CS-46-SLCee I-30-RC-115  REF. DWG. NO. 02-009 000446  RC-115-105-742 LS-A                B-J      UT                                              EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM            B9. 12    MT    2              X                          INTERSECTING CIRCUMPERENTIAL WELD.
                                                                                                        +*UT 5 UT 6++
000448  RC-115-105-742 LS B                B-J      UT                                              EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM            B9. 12    MT    2              X                          INTERSECTING CIRCUMPERENTIAL UT-5 UT-6 REF. DWG. NO. 02-001-C t000450  S-01 STUD RCB THRU 54
                &#xb9;1 THRU STUD  &#xb9;54 B-G-1 B6.30 UT MT    2                            X CODE CASE  N-307-1 APPLIES, EXAM PERFORMED PROM CENTER-DRILLED HOLE AtUT 200&
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:    28 REVISION:      0                          ZNSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE VESSEL                                      I  PIRST      SECOND      THIRD ZONE NUMBER: 001                          ASME              I  PERIOD      PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                    CATGY  NDE                - OUTAG      E-          I  INSTRUCI IONS NUMBER    IDENTIFICATION                    ITEM NO METH      1 2  3      1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK">>
REF. DWG. NO. 02-001 C 000460  N-01 THRU 54                      B G-1    MT NUT  &#xb9;1  THRU NUT &#xb9;54              B6. 10          2                          X RCB otN/Af*
000470  W-01 THRU 54                      B-G-1    VT-1 WASHER  &#xb9;1 THRU WASHER  &#xb9;54      B6.50            2 RCB
                                                                                                      ~ eN/Aaa 000480  PL-01  THRU 54                    B-G-1    UT                                              EXAM MOVED TO 2ND PERIOD ZN IN BASE MATERIAL        B6.40                                                                        10- YEAR e
THREADS                                            2              X                        CONJUNCTiON WITH (FLANGE)                                                                                  AUTOMATED EXAMS RCB                                                                                        +FAUT  8ee REF. DWG. NO. 02-001-A 000485  RPV INTERIOR                      B-N-1    VT-3                                            EACH PERIOD, AREAS TO BE ACCESSIBLE AREAS                  B13. 10        2 X            X  - - -    X            EXAMINED INCLUDE THE SPACES ABOVE AND BELOW THE REACTOR CORE THAT ARE ACCESSIBLE DURING NORMAL REFUELING OUTAGES
                                                                                                      ~ *N/A**
REF. DWG. NO. 02 001 B 000490  MSH-01                              B-N-2    VT-3                                            REMOVED AND TESTED    IN 1984 i MATERIAL SURVEILLANCE HOLDER 8 B13.50              2              X                          {W83) 483 DEG. LOCATION 83 D RCB                                                                                          4*N/A0*
000500  MSH-02                              B-N 2    VT-3                                            SCHEDULED TO BE REMOVED AND MATERIAL SURVEILLANCE HOLDER        B13 ~ 50        2            X                          TESTED    IN THE 24TH YEAR 2004 RCB                                                                                          eeN/Aee
 
I[
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    29 REVISION:      0                          INSERVICE INSPECI'ZON SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS ZNSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE VESSEL                                    I  FIRST      SECOND      THIRD ZONE NUMBER: 001                          ASME            I  PERIOD      PERIOD      PERIOD SEC. XZ          I                                    I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - OUTAGE                    INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK*"
REF. DWG. NO. 02-001-B 000510  MSH-03                            B-N-2    VT-3                                          STANDBY NOT SCHEDULED MATERIAL SURVEILLANCE HOLDER 8 B13.50            2            X 104 D esN/Aae 000520  MSH-04                            B-N-2    VT-3                                          SCHEDULED TO BE REMOVED AND MATERIAL SURVEILLANCE HOLDER 0 B13.50            2            X                        TESTED  IN THE 12TH YEAR 1996 263 D
                                                                                                  +AN/Awe 000530  MSH-05                            B  N-2  VT-3                                          STANDBY NOT SCHEDULED MATERIAL SURVEILLANCE HOLDER 8 B13.50            2            X 277 D
                                                                                                  ~ oN/A+a 000540  MSH-06                            B-N-2    VT-3                                          STANDBY NOT SCHEDULED MATERIAL SURVEILLANCE HOLDER e B13.50            2            X 284 D
                                                                                                  +AN/Are REF. DWG. NO. 02-001-A 000550  101-141-A                        B-N-2  VT-3                                            ACCESSIBLE AREAS CORE  STABILIZING LUG e 0        B13. 60        2            X DEGREES 000560  101-141 B                        B-N-2  VT 3                                            ACCESSIBLE AREAS CORE  STABILIZING LUG 8 60        B13.60          2            X DEGREES
                                                                                                  **N/A0*
000570  101 141 C                        B N-2  VT-3                                            ACCESSIBLE AREAS CORE  STABILIZING LUG 4t 120      B13.60        2              X DEGREES RCB                                                                                      ~~N/A~~
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE: 30 REVISION:      0                        INSERVICE INSPEC1'ZON SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACIOR PRESSURE VESSEL                                  I  FIRST      SECOND      THIRD ZONE NUMBER: 001                        ASME            I  PERIOD    PERZOD      PERIOD SEC. XZ        I-
 
==SUMMARY==
EXAMINATION AREA                CATQY  NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 I <<<<CALIBRATION BLOCK<<<<
REF. DWG. NO. 02-001 A 000580  101 141-D                        B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STABILIZING LUG e 180      B13.60        2            X DEGREES
                                                                                                ~ <<N/A<<<<
000590  101-141-E                        B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STABILIZING LUG    240      B13. 60        2            X DEGREES RCB                                                                                    *<<N/A<<*
000600  101 141 F                        B-N-2  VT-3                                          ACCESSIBLE AREAS STABILIZZNG LUG 4 300 e
CORE                            B13.60        2            X DEGREES RCB                                                                                    <<"N/A<<*
000610  103-151-A                        B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG 8 10 DEGREES      B13.60        2            X RCB
                                                                                                <<<<N/A<<<<
000620  103-151-B                        B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG 8 40  DEGREES      B13.60        2            X RCB
                                                                                                <<<<N/A<<<<
000630  103-151-C                        B-N-2  VT 3                                          ACCESSIBLE AREAS CORE STOP LUG e 85  DEGREES      B13.60        2            X
                                                                                                ~ <<N/A<<<<
000640  103-151-D                        B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG 4t 135 DEGREES    B13.60        2            X
                                                                                                ""N/A<<*
 
0 DATE:  07/24/93                                ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  31 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR PRESSURE VESSEL                                  I  FIRST      SECOND      THIRD ZONE NUMBER: 001                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ                                            I
 
==SUMMARY==
EXAMINATION AREA                CATGY  NDE                -OUTAGE-      - - - - - I  INSTRUCTIONS NUMBER    IDENTIFICATION                ITEM NO METH      1 2  3    1  2  3  4    1  2  3    ~ iCALIBRATZON BLOCK*
I REF. DWG. NO. 02-001-A 000650  103 151-E                      B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG  160 DEGREES    B13.60        2            X
                                                                                                ~ eN/As*
000660  103-151-F                      B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG @ 205 DEGREES    B13.60        2            X aaN/Aao 000670  103-151-G                      B-N-2  VT 3                                          ACCESSIBLE AREAS CORE STOP LUG 8 250 DEGREES    B13.10        2            X
~        Ra
                                                                                                *1 N/A**
000680  103 151-H                      B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG 8 280 DEGREES    B13.10        2            X RCB 1 1N/A1 1 000690  103-151-I                      B-N-2  VT-3                                          ACCESSIBLE AREAS CORE STOP LUG 8 325 DEGREES    B13.60        2            X
                                                                                                +AN/Aee 000700  FB 01                          B-N-2  VT-3                                          ACCESSIBLE AREAS FLOW BAFFLE                    B13.60        2            X
                                                                                                *eN/A**
000710  CSB-01                          B-N-3  VT-3                                          STRUCTURE SHALL BE REMOVED CORE SUPPORT BARREL            B13.70        2            X                        FROM REACZOR VESSEL FOR RCB                                                                                  EXAMINATION.
                                                                                                ~ eN/Ass
 
DATE:    07/24/93                                    ST. LUCIB NUCLEAR PLANT UNIT 2                                  PAGE:    32 RBVIS ION:      0                          INSERVICE INSPBCTION SBLECTBD COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACZOR PRESSURE VESSEL                                        FIRST      SECOND      THIRD ZONE NUMBER: 001                            ASME                PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDB              -OUTAGE-                    INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH    i 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
REF. DWG. NO. 02-001-A 000711  CSA                                B-N-3    VT-3                                          STRUCZURE SHALL BE REMOVED CORB BARREL SHROUD                B13.70        2            X                        PROM REACTOR VESSEL FOR EXAMINATION.
                                                                                                    ~ sN/A+a 000712  CBAK-1 THRU CBAK-4                B-N-3    VT-3                                          STRUCTURB SHALL BE REMOVED CORE  BARREL ALIGNMENT KEYS (4) B13. 70          2            X                        FROM REACTOR VESSEL FOR EXAMINATION.
seN/Aaa 000713  CBGL-1 THRU CBGL-4                B-N-3    VT-3                                          STRUCTURE SHALL BE REMOVED CORE BARREL GUIDE LUGS    (4)      B13.70        2            X                        FROM REACTOR VBSSEL FOR EXAMINATION.
aeN/Ant 000714  SB-1 THRU SB-6                    B N-3    VT-3                                          STRUCTURE SHALL BE REMOVED CORE BARREL, SNUBBER BLOCKS    {6) B13.70        2            X                        FROM RBACTOR VBSSEL FOR RCB                                                                                      EXAMINATION.
aaN/Ae*
000720  UGS-01                            B-N-3    VT-3                                          STRUCTURE SHALL BB REMOVED UPPER GUIDE STRUCTURE              B13.70        2            X                        FROM REACTOR VESSEL POR EXAMINATION.
                                                                                                    ~*N/A~~
REF. DWG. NO. 02 001 C 000730  AK-01                              B-N 1    VT-3                                          BXAMINB BACH PERIOD ACCESSIBLE ALIGNMENT KEY  4t 0 DEGREES        B13.10        2 X          X  - - -    X            AREAS
                                                                                                    <<eN/Aee t000740  AK 02 ALIGNMENT KBY 8 90 DEGREES RCB B-N-1 B13.10 VT-3 2 X          X  - - -    X EXAMINE EACH PBRIOD ACCESSIBLB AREAS
                                                                                                    *1N/A%0
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGB:    33 RBVISZON:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE  VESSEL                                  I  FIRST      SECOND      THIRD ZONE NUMBER: 001                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI        I                                  I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-----            I  INSIRUCI'IONS NUMBER  IDENTIFICATION                  ITEM NO METH      i 1 2  3    1  2  3  4    1  2  3 I  i*CALIBRATIONBLOCK  i REF. DWG. NO. 02 001-C 000750  AK-03                            B-N-1    VT-3                                          EXAMINE EACH PERIOD ACCESSIBLE ALIGNMENT KEY    180 DEGREES    B13.10          2 X          X  - - -    X            AREAS e eN/Ae a 000760  AK-04                            B-N 1    VT-3                                          EXAMINE EACH PERIOD ACCESSIBLE ALIGNMENT KEY    270 DEGREES    B13.10          2 X          X  -  -  -  X            AREAS
                                                                                                **N/Ai*
REF. DWG. NO. 02-001-B 00770  ON  IE-A                        B-N-1    VT-3                                          EXAMZNE EACH PERIOD ACCESSIBLE INTEGRAL EXT. MAT SURFACE e 0    B13.10          2 X          X          X            AREAS DEG.
RCB                                                                                      +AN/A+a 000780  ON-ZB B                          BN-1      VT3                                          EXAMINE EACH PERIOD ACCESSIBLE INTEGRAL EXT MAT. SURFACE  4t  B13. 10          2 X          X  -  -  -  X            AREAS 180 DEG.
RCB                                                                                      ItN/A11 000785  RVMS                            B-N-1    VT-3                                          EXAMINE BACH PERIOD ACCESSZBLE REACTOR VESSEL FLANGE MATING    B13. 10          2 X          X  - - -    X            AREAS SURFACE SIN/A**
000787  VESSEL NOZZLES                  B-E      VT-2                                          25% OF NOEZLESg VT-2  EXAMS PARTIAL PENETRATION WELDS        B4. 10          2                        X            PERFORMED ZN ACCORDANCE WITH PLANT PRBSSURE TEST PROGRAM eoN/Awe
 
0 DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:      34 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                      PLAN STATUS REACTOR PRESSURE VESSEL CLOSURE HEAD                                FIRST      SECOND    THIRD    I ZONE NUMBER: 002                        ASME                      PERIOD    PBRIOD    PERIOD  I SEC. Xr                                                I SUI4ARY EXAMINATION AREA                  CATQY      NDB                    0UTAG B-                INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH        i 1 2  3    1  2  3  4  1  2  3    11CALIBRATION BLOCK11 REF. DWG. NO. 02 002 000790    101 101                        B-A        UT                                              USNRC REGULATORY GUIDE  1.150 FLANGE-TO- TORUS WBLD          B140      MT        2X                                  APPLIES.
21t 000800    101 104-A                      BA        UT                                              USNRC REGULATORY GUIDE  1.150 PEEL SEGMENT WELD  I 0 DEGREES  B1.22                2 X                                  APPLIES.
RCB
                                                                                                      ~ 1UT 3A11 000810  101 104 B                        B-A      UT                                                USNRC REGULATORY GUIDE  1.150 PEEL SEGMENT WELD 8 90 DEGREES B1.22
~
2 X                                  APPLIES.
Rn 1 1UT 000820  101-104-C                        B-A                                                        USNRC REGULATORY GUIDE  1.150 UI'1.22 PEEL SEGMENT WELD  8 180                            2 X                                  APPLIES.
DEGREES 000830  101 104-D                        B-A      UT                                                USNRC REGULATORY GUIDE  1.150 PEEL SEGMENT WELD    270        B1.22                2 X                                  APPLIES.
DEGREES 11UT  21t 000840  102-101                          B-A      UT                                                USNRC REGULATORY GUIDB  1.150, B1.21                2 X                                  APPLIES.
                                                                                                      ~ 1UT 21*
000841  &#xb9;1                              BG2      VT1 FLANGE BOLTING    8 32 DEG.      B7.10                2 X RCB
                                                                                                      ~ 1N/Att
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 35 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACIOR PRESSURE VESSEL CLOSURE HEAD                          PIRST      SECOND      THIRD ZONE NUMBER: 002                        ASME                  PERIOD    PERIOD      PERIOD  I XI        I-
 
==SUMMARY==
EXAMINATIONAREA SEC.
CATGY    NDE    I
                                                                      - 0 U T A G  B- -----I    I INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3    ~~CALIBRATION BLOCK~~
REF. DMG. NO. 02-002 000842  &#xb9;2                              B-G-2    VT-1 FLANGE  BOLTING 4 58 DEG.        B7. 10          2 X Oag/Ask 000843  &#xb9;3                              B G-2    VT-1 FLANGE BOLTING  e 122 DEG.      B7. 10          2            X RCB
                                                                                                  ~*g/A~*
000844  &#xb9;4                              B-G-2    VT-1 FLANGE BOLTING    148 DEG.      B7.10
~
2            X Rm cog/Aie 000845  &#xb9;5                              BG-2      VT1 PLANGE BOLTING t8 213 DEG.      B7.10            2            X
                                                                                                  *1N/A*4 000846  &#xb9;6                              B-G2      VT1 FLANGE BOLTING 8 238 DEG.        B7. 10          2            X
                                                                                                  ~ sg/A+a 000847  &#xb9;7                              BG2      VT1 FLANGE BOLTING  4 301 DEG.      B7.10          2                          X
                                                                                                  ~ eg/Ae*
000848  &#xb9;8                              B-G-2    VT-1 PLANGE BOLTING 4 328 DEG.        B7.10          2                          X sag/Awe
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    36 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COHPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR PRESSURE VESSEL CLOSURE BRAD .                    I  PIRST      SECOND      THIRD    I ZONE NUMBER: 002                        ASME            I    PERIOD    PERIOD      PERIOD  I SEC. XI        I                                    I SUYKLRY EXAMINATIONAREA                CATGY    NDE    I
                                                                    - OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3  i iCALIBRATION BLOCK ~
REP. DWG. NO. 02 002 000894  CONTROL ROD DRIVE NOZZLES      B-E      VT-2                                          VT-2  EXAM PERFORHED ZN 25't EXTERNAL SURPACE          B4. 12          2                        X            ACCORDANCE WITH PLANT PRESSURE TEST PROGRAM
                                                                                                ~ aN/Awe
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                    PAGE:    37 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS STEAM GENERATOR 2A PRIMMARY SIDE                            I  FIRST      SECOND      THIRD    I ZONE NUMBER: 003                        ASME              I    PERIOD    PERIOD      PERIOD  I SEC. XI                                              I SU&#xc3;4ARY EXAMINATION AREA                CAXUY    NDE                - 0 U T A G  E-            INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3    s <<CALIBRATION BLOCK~ a I
REF. DWG. NO. 02 003 000900  SG-2A-109-251                  B-H      MT                                              EXAM  LIMITED TO 1 STEAM SUPPORT SKIRT-TO-STAY BASE      B8.30            2                          X            GENERATOR
                                                                                                  **N/AI*
000905  SG  2A-109-251-SP              F-A      VT-3                                          PLATE AND SHELL TYPE SUPPORT SUPPORT SKIRT                  F1.30S          2                          X
                                                                                                  ~ aN/Are 000930  SG-2A-101-254-B                B-B      UT                                            BXAM MOVED FROM 1ST PERIOD TO MERIDIONAL 8 108 DEGREES        B2.32            2                          X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 RCB
                                                                                                  *aUT 27ee 000970  SG-2A-202-271                  B-B      UT                                            BXAM MOVED FROM 1ST PERIOD TO PRIMARY EXT. RING-TO-HEAD    "
B2.31            2                                      3RD PERIOD, SUBJECT OF RR  &#xb9; 14
                                                                                                  ~ JUT 2744 000980  SG-2A-201-246                  B-B      UT                                            EXAM MOVBD FROM 1ST PERIOD TO PRIMARY EXT. RING TO-TUBESHEET  B2.40            2                          X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 000990  SG-2A-104-251                  B-D      UT                                            EXAM MOVE FROM 1ST PERIOD TO INLET NOZZLE-TO HEAD            B3. 130          2                          X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 001000  SG-2A-102-251-A                B-D      UT                                            EXAM MOVED FROM 1ST PERIOD TO OUTLET NOZZLE-TO-HEAD 4 45      B3.130          2                          X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 DEGREES
                                                                                                  ~ JUT 270*
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    38 REVISION:      0                          INSERVICE INSPECTION SBLECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS STEAM GENERATOR 2A PRIMMARY SIDE                              FIRST      SECOND      TBIRD ZONE NUMBER: 003                        ASME                  PERIOD    PERIOD      PERIOD SEC. XI        I-                                  I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ++CALIBRATION BLOCK@a REF. DRG. NO. 02 003 001010  SG-2A-102-251-B                  B-D      UT                                            EXAM MOVED FROH 1ST PERIOD TO OUTLET NOZZLE-TO-HEAD  I 315    B3. 130          2                        X            3RD PERIOD, SUBJECT TO RR  &#xb9; 14 DEGREES RCB                                                                                      ~ JUT 2744 001030  SG-2A-101-244-B                  B-B      UT                                            EXAM MOVED FROM 1ST PERIOD TO EXT. RING LONG WELD    90      B2. 32          2                        X            3RD PERIOD,  SUBJECT OF RR &#xb9; 14 DEGREES 41UT 27 ~ I 001060  SG-2A-IN-IR                      B-D      UT                                            EXAM MOVED FROH 1ST PERIOD TO INLET NOZZLE INNER RADIUS        B3.140          2                                                                &#xb9; e
X            3RD PERIOD, SUBJECT OF RR    14 RCB
                                                                                                  **UT 2* 1 001070  SG-2A ON-IR A                    B-D      UT OUTLET NOZZLE (45D) INNER        B3. 140          2                        X RADIUS RCB                                                                                      ~ SUP 001080  SG-2A-ON-IR-B                    B-D      UT OUTLET NOZZLE (315D) INNER      B3.140          2                        X RADIUS IIUT 21*
001120  SG-2A-PMS-A                      B-G-2    VT-1                                          BXAH MOVED FROH 1ST PERIOD TO PRIMARY MANNAY STUDS  0  0      B7.30            2                        X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 DEGREES
                                                                                                  +AN/Are 001130  SG-2A-PMN-A                      BG2      VT1                                          EXAM HOVED FROM 1ST PERIOD TO PRIMARY MANWAY NUTS  0 0        B7.30            2                        X            3RD PERIOD, SUBJECT OF RR  &#xb9; 14 e                                                                                                  **N/A~*
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE:    39 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS STEAM GENERATOR 2A PRIMMARY  SIDE                        I  PIRST      SECOND      THIRD    I ZONE NUMBER: 003                        ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE                - OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~~CALIBRATION BLOCK~~
REF. DNG. NO. 02 003 001140  SG-2A-PMS-B                      B-G-2    VT-1                                          EXAM MOVED PROM 1ST PERIOD TO PRIMARY MANHAY STUDS  4 112D30'7.30                                                    3RD PERIOD, SUBJECT OP RR  &#xb9; 14
                                                                                                ~ aN/Awe 001150  SG  2A-PMN-B                    B-G-2    VT-1                                          EXAM MOVED FROM 1ST PERIOD TO PRIMARY MANWAY NUTS  8  112D30'7.30              2                        X            3RD PERIOD, SUBJEC1'P  RR &#xb9;  14
                                                                                                +AN/Aoi 001155  TUBE BUNDLE                      B-Q      ECT                                          THE EXTENT AND FREQUENCY OF 8,411 U-TUBES                    B16.20                          - - -                EXAMINATION IS DETERMINED BY
~
2 X          X          X Ra                                                                                      PLANT TECHNICAL SPECI PICATIONS
                                                                                                ~ ~LATER~*
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    40 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS STEAM GENERATOR 2B PRIMMARY SIDE                            I  FIRST      SECOND      THIRD ZONE NUMBER: 004                        ASME              I  PERIOD      PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                -  OUTAGE-                I  INSTRUCTIONS NUMBER    IDENTIPI CATION                  ITEM NO METH        1 2  3      1  2 3  4    1  2  3    *~CALIBRATION BLOCK~*
REF. DWG. NO. 02-004 001250  SG-2B-104-251                    B-D      UT INLET NOZZLE-TO-HEAD            B3. 130          2                          X
                                                                                                      *IUT 271 ~
001260  SG-2B-102-251-A                  B-D      UT OUTLET NOZZLE TO HEAD  e 45      B3.130            2                          X DEGREES 4tPJ 27of t001270  SG-2B-102-251-B OUTLET NOZZLE TO HEAD DEGREES RCB 4 315 B-D B3.130 UT 2                          X
                                                                                                    *'"UT-27**
001320  SG-2B-IN-IR                      B-D      UT INLET NOZZLE INNER RADIUS        B3.140          2                          X RCB
                                                                                                    ~ ~UT-2, UT-3A~ ~
001330  SG-2B-ON-IR-A                    B-D      UT OUTLET NOZZLE (45D) INNER        B3. 140          2 RADIUS
                                                                                                    ~*UT-2, UT-4A**
001340  SG-2B-ON-IR-B                    B-D      UT OUTLE NOZZLE (315D)  INNER      B3. 140          2                          X RADIUS
                                                                                                    **UT 2,UT 4A~~
001415  TUBE BUNDLE                      B-Q      ECT                                            THE EXTENT AND FREQUENCY OP 8,411 U-TUBES                    B16. 20          2 X            X  - - -    X            EXAMINATION IS GOVERENED BY PLANT TECHNICAL SPECIPICATIONS
                                                                                                    ~ ~LATER~ ~
 
'I DATE:  07/24/93                                          ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    41 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                        PLAN STATUS PRESSURIZER                                                      I  FIRST    SECOND    THIRD ZONE NUMBER: 005                        ASME                    I    PERIOD    PERIOD    PERIOD SEC. XI
 
==SUMMARY==
EXAMINATIONAREA                CA'ZQY        NDE                  -OUTAGE-              I  INSTRUC1 IONS NUMBER    IDENTIFICATION                  ITEM NO METH          I  1 2  3    1  2  3  4  1  2  3 I  <<<<CALIBRATION BLOCK<<>>
REF. DWG. NO. 02 005 001420    103-601                        B-D            UT SPRAY NOZZLE-TO-UPPER HEAD      B3.110                  2 X RCB                                                                                          >>>>UT-4A<< ~
001430  SN-IR                          B-D          UT SPRAY NOZZLE INNER RADIUS      B3. 120                2 X
                                                                                                      <<<<UT 6<<<<
001440  108-601-A                      B-D          UT                                              LIMITATIONS, SEE    PRE SERVICE SAFETY VALVE NOZZLE-TO-HEAD    B3.110                2 X                                  DATA. (RR  &#xb9;3),  EXAM MOVED FROM wno                                                                                          2ND PERIOD TO 1ST PERIOD, RCB                                                                                          SUBJECT OF RR    &#xb9;  14
                                                                                                      >>>>UT 4A>>>>
001450  SVN-IR-A                        BD        UT                                                EXAM MOVED FROM 2ND PERIOD TO SAFETY VALVE NOZZLE INNER      B3.120                2 X                                  1ST PERIOD, SUBJECT OP RR    &#xb9; 14 RADIUS 6<<>>
001460  503-671-A                      BF        UT SAFETY VALVE NOZZLE-TO FLANGE  B5.40      PT        2 X
                                                                                                      >> <<UT-17*>>
001465  SV-1200                        B-G-2    VT-1                                              EXAM MOVED FROM 3RD PERIOD TO SAPETY VALVE TO FLANGE BOLTING  B7.50                  2 X                                  1ST PERIOD, SUBJECT OP RR    &#xb9; 14 RCB
                                                                                                      ~ <<N/A>><<
t 001470  108-601-B                      B D                                                          EXAM MOVED FROM 2ND PERIOD TO RELIEF VALVE NOZZLE-TO-UPPER                                                                                              &#xb9; VI'3.110 2 X                                  1ST PERIOD    SUBJECT OF RR    14 HEAD WELD RCB                                                                                          >>>>UT-4A>>>>
 
Ill
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                            PAGE:    42 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS PRESSURIZER                                                I  FIRST    SECOND    TRIED ZONE NUMBER: 005                        ASME              I  PERIOD    PERIOD    PERIOD SEC. XI          I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE              INSTRUCTIONS NUMBER    IDENTIFICATION                ITEM NO METH      J 1 2  3    1  2  3  4          <<<<CALIBRATION BLOCK<<<<
REP. DWG. NO. 02-005 001480  RVN-IR                          B-D      UT                                        EXAM HOVED FROM 2ND PERIOD TO RELIEF VALVE NOZZLE INNER      B3. 120          2 X                              PIRST PERIOD, SUBJECT OF RR  &#xb9; RADIUS 6*<<
001490  108-601-C                      B-D      UT                                      EXAM MOVED FROM 2ND PERIOD TO SAPETY VALVE NOZZLE TO UPPER    B3.110          2 X                              1ST PERIOD, SUBJECT OF RR  &#xb9; 14
                                                                                            <<*UT-4A<<<<
001500  SVN-IR-B                        B-D      UT                                      EXAM MOVED FROM 2ND PERIOD TO SAFETY VALVE NOZZLE INNER      B3.120          2 X                              1ST PERIOD, SUBJECT OF RR  &#xb9; 14 RADIUS RCB                                                                                <<<<UT 6<<<<
001510  503-671-B                      B-F      UT                                      EXAM HOVED PROM 3RD PERIOD TO SAPETY VALVE NOZZLE-TO-FLANGE  B5.40    PT    2 X                              1ST PERIOD, SUBJECT OP RR  &#xb9; 14
                                                                                            <<<<UT-17"
* 001515  SV 1201                        B-G-2    VT-1                                    EXAM MOVED FROH 3RD PERIOD TO SAFETY VALVE TO FLANGE BOLTING  B7.50            2 X                              1ST PERIOD, SUBJECT OP RR  &#xb9; 14 RCB
                                                                                            ~ <<N/A<<<<
001520  108-601-D                      B-D      UT                                      EXAH MOVED PROM 2ND PERIOD TO SAFETY VALVE NOZZLE-TO UPPER    B3.110          2 X                              1ST PERIOD, SUBJECT OF RR  &#xb9; 14 HEAD WELD
                                                                                            <<<<UT-4A<<<<
001530  SVN  IR-C                      B-D      UT                                      EXAM MOVED PROH 2ND PERIOD TO SAFETY VALVE NOZZLE INNER      B3. 120          2 X                              1ST PERIOD, SUBJECT OP RR  &#xb9; 14 RADIUS
                                                                                            <<<<UT 6<<*
 
l DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    43 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS PRESSURIZER                                              I  PIRST      SECOND      THIRD    I ZONB NUHBER: 005                        ASHE            I  PERIOD    PERIOD      PERIOD  I SBC. XZ                                              I SUHHARY EXAMINATION AREA                CATGY    NDB                -OUTAGB-                    INSTRUCTIONS NUMBER    IDENTIFICATION                ITEM NO METH    / 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
REF. DWG. NO. 02-005 001540    503-671-C                      B-F                                                    EXAM MOVED FROM 2ND PBRIOD TO SAFETY VALVE NOZZLE-TO-FLANGE  B5.40    PT    2 X                                    1ST PERIOD, SUBJECT OF RR  &#xb9; 14 RCB                                                                                    ~ eUT 17ae 001545  SV-1202                        B-G-2    VT-1                                          EXAM MOVED PROM 3RD PERIOD TO SAFETY VALVE TO FLANGE BOLTING  B7.50          2 X                                    1ST PERIOD, SUBJECT OP RR  &#xb9; 14 RCB
                                                                                                  ~~N/A~~
001550  HS-01                          B-G-2  VT-1                                          EXAM MOVED PROM 3RD PERIOD TO MANWAY STUDS  (20)              B7.20          2 X                                    1ST PERIODS SUBJECT OF RR  &#xb9; 14 RCB eoN/Aea 001560  HN-01                          B-G-2  VT-1                                          EXAM MOVED FOR 3ED PERIOD TO MANWAY NUTS  (20)              B7.20          2 X                                    1ST PERIOD, SUMECT OF RR    &#xb9; 14 RCB
                                                                                                *IN/A*a 001570  501-671                        B-B    UT                                            EXAM MOVBD FROM 2ND PERIOD TO TOP HEAD TO-UPPER SHELL CIRC. 82.11          2 X                                    1ST PERIOD, SUBJECT OF RR  &#xb9; 14
                                                                                                *~UT 4A~*
001580  101 622-A                      B-B    UT                                            EXAMINE LONG SEAM  1'T UPPER SHELL LONGITUDINAL WELD  B2.12          2 X                                    SCHEDULED INTERSECTING 0 DEG.                                                                              CIRCUMFERENTIAL WELD. EXAM RCB                                                                                    MOVED FROM 2ND PERIOD TO 1ST PERIOD, SUMECT OF RR  &#xb9; 14 eaUT 4Am*
t001610  101-642-A LONER SHELL LONGITUDINAL WELD O
RCB 90 D BB B2.12 UT 2 X EXAMINE LONG SEAM  1'T SCHEDULED INTERSECTING CIRCUMFERENTIAL NBLD. EXAM MOVED FROM 2ND PERIOD TO 1ST PERIOD, SUBJECT OF RR
                                                                                                *~UT 4A**
                                                                                                                        &#xb9; 14
 
DATE:    07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                          PAGE:      44 REVISION:        0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS PRESSURIZER                                                I    FIRST      SECOND      THIRD ZONE NUMBER: 005                          ASME              I    PERiOD    PERIOD      PERIOD I SEC. Xi
 
==SUMMARY==
EXAMINATIONAREA                    CATGY    NDE                -OUTAGE                    INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH        1  2  3    1  2  3  4              ~~CALIBRATION BLOCK*~
REF. DWG. NO. 02-005 001630    304-671                        B-B      UT                                              EXAM MOVED FROM 2ND PERIOD TO LONER SHELL-TO-LOWER HEAD WELD  B2.11            2 X                                    1ST PERIODS SUBJECT OF RR          &#xb9; 14 RCB
                                                                                                    *~UT-4A*~
001640    103 651                        B-H      MT                                              EXAM MOVBD FROM 2ND PERIOD TO SUPPORT SKIRT-TO-LOWER HEAD    B8.20            2 X                                    1ST PERIODS SUBJECT OF RR          &#xb9; 14 eaN/Aea 001645    103-651-SP                      F-A      VT-3                                            PLATE AND SHELL TYPES'XAMINE e
SUPPORT SKIRT                  F1.30S            2 X                                    ACCESSIBLE SURFACES.
Rm a eN/Aa e 001650    105 651                        B-D      UT                                            BXAM MOVED PROM 2ND PERIOD TO SURGE NOZZLE TO-LOWER HEAD      B3.110          2 X                                    1ST PERIOD, SUBJECT OF RR          &#xb9;  14 WELD
                                                                                                    **UT-4A*~
001660  SRGN-IR                          B-D      UT                                            EXAM MOVED PROM 2ND PERIOD TO SURGE NOZZLE INNER RADIUS        B3.120          2 X                                    1ST PERIOD, SUBJECT OF RR          &#xb9;  14
                                                                                                    **UT 6ae 001661  TE-1101                          B E      VT-1                                          ALL NOZZLESg AUGMENTED VT-1 INSTRUMENTATION NOZZLB          B4.13    VT-2  2 X  X        X  X      -  X X        INSPECTION - INCONEL 600 CONCERN) VT-2 EXAM PERFORMED PER PLANT PRESSURE TBST PROGRAM
                                                                                                    **N/A~*
I-1-RC 130  REF. DWG. NO. 02-005 1662  V-1437                          PRZ INC    VT-1                                          AUGMENTED INSPECTION            SEE INSTRUMENTATION VALVE          AUG-1      VT 2  2 X  X        X  X  - -  X X        DRAWING NO.
RC-54'.S.
RCB                                                                                              gPERFORMED        IN CONJUNCI'ION WITH
 
==SUMMARY==
001661
                                                                                                    +AN/Aaa
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    90 REVISION:      0                          INSERVICE INSPECTION SELECZED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CHARGING LINE TO LOOP 2B1                                  I  FIRST      SECOND    THIRD ZONE NUMBER: 031                          ASME              I  PERIOD    PERIOD    PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                -OUTAGE-                I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4  1  2  3    ~~CALIBRATION BLOCK~~
I-2-CH-148  REF. DWG. NO. 02-031 008660  CH-148-SW-7                      B-J      PT                                            SS TEE-TO-PIPE                      B9.40B          2            X RCB
                                                                                                    ~ aN/Ae+
008710  CH-148-FW-12                    B-J      PT                                            SS PIPE- TO-ELBOW                  B9.40B          2            X
                                                                                                    ~~N/A~~
008720  CH-148-SW-13                    B-J      PT                                            SS ELBOW-TO-PIPE                    B9.40B          2            X RCB ooN/Awe 008750  CH-148-SW-16                    B-J      PT                                            SS PIPE-TO-TEE                      B9.40B          2            X
                                                                                                  ~ aN/Ae*
008760  CH 148-SW-17                    B-J      PT                                            SS,  2" X 3/4" REDUCING INSERT.
TEE- TO REDUCER                  B9.40B          2            X SIN/A%1 I-2  RC 150  REF  DWG. NO. 02 031 008820  RC-150-SW 2                      B-J      PT                                            SS PIPE-TO-ELBOW                    B9.40B          2            X
                                                                                                  ~ aN/A+a t008830  RC 150 SW-3 ELBOW-TO-PIPE RCB B  J B9.40B PT 2              X SS
                                                                                                  ~ ~N/A~>>
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:  91 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CHARGING  LINE TO LOOP 2B1                                I  FIRST      SECOND      THIRD ZONE NUMBER: 031                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-                I INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH    t 1 2  3    1  2  3  4    1  2  3  ~'CALIBRATION BLOCK~*
I-2-RC 150  REP. DWG. NO. 02-031 008850  CH-904-771                      B-P      PT                                            NOZZLE MATL.- SA-182, P-l.
SAFE END- TO-NOZZLE              BS. 140        2            X
                                                                                                +AN/gee I-2-CH 148  REF. DWG. NO. 02 031 008930  CH-108-R6                        P-A      VT-3 RIGID STRUT SUPPORT              Fl. 10K        2            X
                                                                                                **N/A4*
8940  CH-108-R7                        F-A      VT-3 RIGID STRUT  SUPPORT            Fl. 10K        2            X RCB
                                                                                                +AN/A+a
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    92 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CHARGING  LINE TO LOOP 2A2                                      FIRST    SECOND      THIRD ZONE NUMBER: 032                          ASME              I  PERIOD    PERIOD      PERIOD SEC. XI          I
 
==SUMMARY==
EXAMINATION AREA                  CATOY    NDE                  OUTAGE                I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  +~CALIBRATION BLOCK+*
I-2-CH-147  REF. DWG. NO. 02-032-A 009000  CH-147-SW-45                      B-J      PT                                            SS PIPE-TO-VALVE (SE-02-02)          B9. 21A          2            X aaN/Aee 009010  CH-147-SW-43                      B-J      PT                                              SS TEE-TO-PIPE                      B9.40B          2 X RCB
                                                                                                    **N/A%4 009030  CH-147-SW-41                      B-J      PT,                                            SS~  2a X 3/4 a REDUCING INSERT TEE-TO-REDUCER                    B9.40B          2 X RCB eoN/A@a 009070  CH-147-SW-37                      B-J      PT                                            SS PIPE- TO- TEE                    B9.40B          2                        X
                                                                                                    @AN/A+a 009080  CH-147 SW-36                    B-J      PT                                            SS, 2~ X  3/4  REDUCING INSERT.
TEE-TO REDUCER                  B9.40B            2                        X RCB aaN/Aaa 009090  CH-147-FW-35                    B-J      PT                                            SS TEE- TO-PIPE                    B9.40B            2                        X
                                                                                                    +AN/Awe I  2 CH 147  REF. DWG  NO  02-032-C t009340  CH-147-FW 9 PIPE-TO-TEE RCB BJ B9.40B PT 2            X SS
                                                                                                    +AN/Aee
 
0 DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE:    45 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAI                PLAN STATUS PRESSURIZER                                                  PIRST      SECOND      THIRD ZONE NUMBER: 005                        ASMB            I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE                -OUTAGE-                  INSTRUCTIONS NUMBER  IDBNTIPICATION                ITEM NO METH    i 1  2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
REF. DWG. NO. 02 005 001665  HA1 THRU HA4                    B-B      VT-1                                          ALL NOZZLES EXTBRNAL SURFACB, HEATER PENETRATIONS  - RADIUS  B4.20    VT-2 2 X X          X  X  - -  X X          VT-2 PER PLANT PRBSSURE TEST PROGRAM;  SPECIAL VT-1 AUGMENTED EXAMINATIONS
                                                                                              ~ eN/A*a 001670  NOZZLES {4)                    LER      VT"1                                          AUGMENTED EXAMINE PBR PZR STEAM SPACE NOZZLES        93-04          2 X  X  -    X  X    -  X X          LER-93-04 RCB aaN/A*a
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:    46 REVISION:      0                          INSERVICE INSPEC1'ION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR COOLANT  PIPING  LOOP A PROM RPV TO SG-2A            FIRST      SECOND      THIRD ZONE NUMBER: 006                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI CATQY    NDE                  OUTAGE                    INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
I  42 RC 114  REF. DWG. NO. 02-006 001740  RC  114-201-258                  B-J      UT                                            EXAM MOVED PROM 1ST PERIOD TO NOZZLE EXTENSION-TO-S/G NOZZLE  B9.11A MT      2                        X            3RD PERIOD, SUBJECT OP RR g 14 RCB
                                                                                                ~~UT-4A"~
001760  RC-114-502-771                  B-P      UT                                            NOZZLE MATL.- SA-105, GR-2.
NOZZLE-TO-SAFE END              B5 140  PT    2 X RCB
                                                                                                *PUT 33*4
 
i 0
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:  47 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR COOLANT  PIPING  LOOP B PROM RPV TO SG-2B            PIRST      SECOND      THIRD ZONE NUMBER:  007                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CAmr    NDE                -OUTAGE-                I INSTRUCTIONS NUMBER  IDENTIPICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
I-42  RC-123  REP. DWG. NO. 02 007 001870  RC-123-201-258                  B-a7      UT                                            NOZZLE EXTENSION PIECE MATL.-
NOZZLE EXTENSION-TO-S/G NOZZLE  B9.11A MT        2 X                                    SA-533, GR-2, CL-1.
UT 4A I-12-RC 123    RBP. DWG. NO. 02-007 001890  RC-123-205-771                  B  J    UT BRANCH CONNECTION-SDC NOZZLE    B9.31D    MT    2  - - -      - - - -    X
                                                                                                *~UT 4A~~
 
i DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    48 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR COOLANT    PIPING  LOOP A SG-2A TO RCP-2A2              PIRST      SECOND      THIRD ZONE NUMBER: 008                          ASME              I  PERIOD      PERIOD      PERIOD    I SEC. XI                                              - I SUHHARY EXAMINATIONAREA                    CATGY    NDE                - OUTAGE-                      INSTRUCTIONS NUHBER    IDENTIFICATION                  ITEM NO METH                                  1  2  3      ~ tCALIBRATION BLOCKt~
I-30-RC-115    REF. DWG. NO. 02-008 001910  RC 115  401-258 B                B-J      UT                                                BXAM HOVED PRON 2ND PERIOD TO S/G NOZZLE-TO-NOZZLE EXTENSION B9. 11A HT          2                          X              3RD PERIOD, SUBJECT OF RR &#xb9; 14 RCB
                                                                                                      ~ tUT 6tt 001920  RC-115-1                          B-J      UT                                              NOZZLB EXTENSION PIECE MATL.-
NOZZLE EXTENSION-TO-ELBOW        B9. 11B  HT    2                          X              SA-508, CL-1.MOVED  FROM 2ND PERIOD TO 3RD PERIOD, SUBJECT OPRR&#xb9; 14 ttUT Stt 001930  RC-115-103-742-LS-A              B-J      UT                                              EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9. 12    HT    2                          X              INTERSECTING CIRCUMFERENTIAL RCB                                                                                          WELD. MOVED FROH 2ND PERIOD TO 3RD PERIOD, SUBJECT OP RR  &#xb9; 14 ttUT  6tt 001940  RC-115-103 742-LS B              B-J      UT                                              EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9. 12    MT    2                          X              INTERSECTING CIRCUMPERENTIAL WELD. MOVBD FROM 2ND PERIOD TO 3RD PERIOD, SUBJECT OF RR  &#xb9; 14 ttUT 6tt 001960  RC-115 107-722-LS-A              B-J      UT                                              EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM            B9. 12    HT    2            X                          INTERSECTING CIRCUMFERENTIAL
                                                                                                      ~ tUT  6tt 001970  RC 115  107-722-LS-B              B-J:      UT                                              EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM            B9. 12    HT    2            X                          INTERSECTING CIRCUMPERENTIAL RCB                                                                                          WELD.
                                                                                                      ~ tUT  6tt
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE:    49 REVISION:      0                          ZNSERVICE INSPECI'ION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR COOLANT    PIPING  LOOP A SG 2A TO RCP 2A2        I  FIRST      SECOND      TBIRD ZONE NUMBER: 008                          ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ        I
 
==SUMMARY==
EXAMINATION AREA                    CATOY  NDE                - OUTAGE                INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4            >>>>CALIBRATION BLOCK>>>>
I-30-RC 115    REF. DWG. NO. 02 008 001980  RC-115-2                          B-J      UT PIPE-TO    ELBOW                  B9. 11B  HT    2            X
                                                                                                ~ >>UT 6>>>>
001990  RC-115-109-742-LS-A              B-J      UT                                          EXAMINE LONG SEAM 1'T ELBOW LONGITUDINAL SEAN          B9. 12  MT    2            X                      INTERSECTING CIRCUMFERENTIAL RCB
                                                                                                >>*UT  6**
002000  RC-115-109 742-LS-B              B-J      UT                                        EXAMINB LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9. 12  HT    2            X                      INTBRSECTZNG CIRCUMFERENTIAL RCB                                                                                  WELD.
                                                                                              **UT 6>>>>
002020  RC-115-109-722-LS-A              B-J      UT                                        EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM            B9.12    HT    2 X                                INTERSECTING CIRCUMFERENTIAL RCB                                                                                  WELD.
                                                                                              >>>>UT  6**
002030  RC  115-109 722 LS B              B  J    UT                                        EXAMINB LONG SEAM  1'T PIPE LONGITUDINAL SEAM            B9.12    HT    2 X                                INTERSECTING CIRCUMFERENTIAL WELD.
                                                                                              ~ >>UT  6>>>>
002040  RC-115 3                          B-J      UT PIPB<<TO-ELBOW                    B911B    MT    2X
                                                                                              >>>>UT 6>>>>
002050  RC  115-107 742-LS-A              B J      UT                                        EXAMINE LONG SEAM  1'T BLBOW LONGITUDINAL SEAM            B912    PT    2X                                  INTERSECTING CIRCUMFERENTIAL RCB                                                                                    WELD.
                                                                                              >>>>UT 6>>>>
 
DATB:  07/24/93                                    ST. LUCZE NUCLBAR PLANT UNIT 2                                  PAGE:    50 RBVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS RBACIOR COOLANT PIPING  LOOP A SG 2A TO RCP 2A2        I  FIRST      SECOND    THIRD ZONE NUMBER: 008                        ASME            I  PERIOD    PERIOD    PERIOD XI                                          -
                                                                    -OUTAGE ------I SEC.                                                I
 
==SUMMARY==
EXAMINATIONAREA                CATGUT  NDE                                          INSTRUCTIONS NUMBER  IDEHTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4              ~ <<CALIBRATION BLOCK*+
I  30 RC 115 REF. DWG. NO. 02-008 002060  RC-115-107-742-LS-B            B-8      UT                                          EXAMINE LONG SEAM    1'T ELBOW LONGITUDINAL SEAM        B9.12    PT    2 X                                  INTERSECTING CIRCUMPERENTIAL WELD.
                                                                                              ~ tUT 60 1 002070  RC-115 1501 771 A              B-F      UT                                          SAPE END    MATL.- SA-351, CP8M.
ELBOW-TO-SAFE END              B5.130  PT    2 X JIUT 5911 002080  RC-115-4                        B-J      UT                                          EXCEEDS STRESS AND TERMINAL SAFE END-TO-RC PUMP 2A2 INLET  B9.11B  PT    2 X RCB
                                                                                              ~ oUT 59 ~ 4
 
I DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE:    51 REVISION:      0                          ZNSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR COOLANT  PIPING  LOOP A PROM RCP 2A2 TO RPV      I  FIRST      SECOND      THIRD ZONE NUMBER: 009                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ          I SUYMARY EXAMZNATION AREA                CATQY    NDE                  OUTAGE-                I INSTRUCI ZONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ++CALIBRATION BLOCKa a I-30-RC 115    REF. DWG. NO. 02-009 002090  RC  115-5                        B-J      UT RC PUMP  2A2-TO-SAFE END        B9.11A  PT    2            X olUT 5940 002100  RC 115  701-771                  B-F      UT                                            SAFE END NATL. - SA-351, CFSM.
SAFE END-TO-PIPE                BS. 130  PT    2            X 4 1UT 59**
002110  RC-115-103-722 LS A              B-J      UT                                            EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9 12    MT    2            X                        INTERSECTING CIRCUMPERENTIAL RCB                                                                                    WELD.
                                                                                                ~ JUT 61 ~
002120  RC-115-103 722-LS-B              B-J    UT                                            EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9. 12  MT      2            X                        INTERSECTING CIRCUMFERENTIAL WELD.
I
                                                                                                ~ UT
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    52 REVISION:      0                          INSERVICE INSPECTION SELECIED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR COOLANT    PIPING  LOOP B SG 2B TO RCP 2B'l        I  FIRST      SECOND      THIRD ZONE NUMBER: 010                          ASME              I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - OUTAG      E-            INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3    ~ <<CALIBRATION BLOCK<<"
I I-30 RC-121    REF. DWG. NO. 02-010 002190  RC-121-401-258-B                  B-J      UT S/G NOZZLE-TO-NOZZLE EXTENSION B9.11A      MT    2 X RCB t<<UT"6**
002330  RC-121-107-742-LS-A              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B912    MT      2X                                    INTERSECTING CIRCUMPERENTIAL 002340  RC-121-107-742-LS-B              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B912    MT      2X                                    INTERSECTING CIRCUMFERENTIAL RCB t*UT 6<<*
002350  RC-121-1501-771-B                B-P                                                    SAFE END NATL. SA-351, CP8M.
ELBOW-TO-SAFE END                B5.130  PT      2 X
                                                                                                  *<<UT 59<<*
002360  RC-121-4                          B-J      UT SAPE EWD TO-RC PUMP 2B1          B9.11A  PT      2 X
                                                                                                  ~ <<UT 59t t
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    53 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACfOR COOLANT PIPING    LOOP B FROM RCP 2B1 TO RPV      I  PIRST    SECOND      THIRD ZONE NUMBER:  011                      ASME              I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                  OUTAGE                I  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 I  *~CALIBRATION BLOCK~~
I-30-RC-121  REF. DWG. NO. 02 011 002380  RC-121-5                        B-J      UT RC PUMP 2B1-TO-SAFE END          B9.11A  PT      2 X
                                                                                                  *lUT 59 ~
* 002390  RC  121 901-771                  BF      UT                                            SAPE END    NATL.- SA-351, CF8M.
SAFE END-TO-PIPE                B5.130  PT    2 X
                                                                                                ~ tUT  59ae 002400  RC-121-103-722 LS-A              B-J      UT                                            EXAMINE LONG SEAM    1'T PIPE LONGITUDINAL SEAM          B9.12    MT    2 X                                    INTERSECTING CIRCUMPERENTIAL RCB                                                                                    WELD.
                                                                                                ~ aUT  6ee 002410  RC-121-103-722 LS-B              B-J      UT                                            EXAMINE LONG SEAM    1'T PIPE LONGITUDINAL SEAM          B9.12    MT    2 X                                    INTERSECTING CIRCUMFERENTIAL RCB                                                                                    WELD.
14UT  6I*
I-3-RC 121  REF. DWG. NO. 02-011 002470  RC-121 812-771                  B-J      MT                                            NOZZLE MATL. SA 105, GR  2.
BRANCH CONNECTION SPRAY NOZZLE  B9.32          2            X RCB
                                                                                                *~N/A**
I-2  RC-121  REF. DWG. NO. 02-011 002480  RC-121-806 771                  B-J      MT                                            NOZZLE MATL.-  SA-182,  F-l.
BRANCH CONNECTION-CHARGING        B9.32          2            X NOZZLE RCB                                                                                      ~ eN/A@a
 
DATE:    07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    54 RBVI SION:      0                          ZNSERVICB INSPECTION SELECIED COMPONENT SCHEDULB CLASS 1 SCHEDULED COMPONENTS INSPECZ'ZON INTERVAL                PLAN STATUS REACTOR COOLANT    PIPING  LOOP A SG 2A TO RCP 2A1          I  FIRST      SECOND      THIRD ZONE NUMBER: 012                          ASMB              I  PERIOD    PERIOD      PBRZOD  I SEC. XI        I-
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE                -OUTAGE------I              INSTRUCTIONS NUMBER    IDENTIPICATION                    ITEM NO MBTH      1 2  3    1  2  3  4    1  2  3    ~ .CALIBRATION BLOCX**
I                                  I I  30 RC 112    RBF. DWG. NO. 02-012 002490  RC  112-401-258 A                B-J      UT                                            MOVED PROM 1ST PERIOD TO 3RD S/G NOZZLE-TO-NOZZLE EXTENSION B9.11A      MT    2  - -  -    - - - -    X            PERIOD, SUMECT OF RR    N  14 41UT  6tk 002630  RC-112-107-742-LS-A              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9.12    MT    2 X                                    INTERSECTING CIRCUMPERENTIAL WELD.
41UT 002640  RC-112-107 742-LS-B              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGZTUDINAL SEAM          B912      MT    2X                                    INTERSECTING CIRCUMFERENTIAL RCB                                                                                      WELD.
                                                                                                  ~ sUT 6am 002650  RC-112-1501-771-C                B-F      UT                                            SAPE END  MATL.- SA-351, CFSM.
ELBOW-TO-SAPE END                B5.130    PT    2 X
                                                                                                  "*UT 59**
002660  RC-112-4                          B-J      UT SAFE END TO-RC PUMP 2A1          B911A    PT    2 X s1UT 59ee
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:    55 REVZSION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR COOLANT  PIPING  LOOP A FROM RCP-2A1 TO RPV          FIRST      SECOND      THIRD ZONE NUMBER: 013                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I-30  RC-112  REF. DWG. NO. 02 013 002680  RC  112-5                        B-J      UT RC PUMP 2A1 TO SAFE END          B9. 11A  PT    2                        X toUT 5911 002690  RC-112 1066 771                  B-F      UT                                            SAFE END  NATL.- SA-351, CFSM.
SAFE END-TO-PIPE                B5.130  PT    2                        X RCB alUT 5941 002700  RC-112-105-722-LS-A              B-J      UT                                            EXAMZNE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9. 12  MT    2                        X            INTERSECTING CIRCUMFERENTIAL RCB                                                                                    WELD.
002720  RC-112-105-722-LS  B            B-J    UT                                            EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9.12  MT      2                        X            INTERSECTING CIRCUMFERENTIAL WELD.
o*UT 6*4
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    56 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACTOR COOLANT PIPING    LOOP B SG-2B TO RCP-2B2              FIRST      SECOND      THIRD ZONE NUMBER: 014                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                CATm      NDE                  0UTAG E-              I  INSTRUC1'IONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I  *~CALIBRATION BLOCK~~
I-30-RC-124  REF. DWG. NO. 02-014 002770  RC-124-401-258-A                B-J      UT S/G NOZZLE-TO-NOZZLE EXTENSION B9.11A      MT    2            X RCB f
4 UT 002910  RC-124-107-742-LS-A              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9. 12    MT    2                        X            INTERSECTING CIRCUMFEIKNTIAL WELD.
                                                                                                *PUT 6*4 002920  RC-124-107-742-LS-B              B-J      UT                                            EXAMINE LONG SEAM  1'T ELBOW LONGITUDINAL SEAM          B9. 12    MT    2                        X            INTERSECTING CIRCUMFERENTIAL RCB                                                                                      WELD.
10UT 6o ~
002930  RC 124  1501-771-D              B-F      UT                                            SAFE END MATL. SA 351( CFSM.
ELBOW TO SAFE END                B5.130    PT    2                        X
                                                                                                ~ oUT 5944 002940  RC-124-4                        B-J      UT SAPE END TO-RC PUMP 2B2          B9. 11A  PT    2                        X RCB
                                                                                                *1UT 591 ~
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    57 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACIOR COOLANT PIPING    LOOP B RCP 2B2 TO RPV              FIRST      SECOND      THIRD ZONE NUMBER: 015                        ASME            l  PERIOD    PERIOD      PERIOD SEC. XZ                                            -
 
==SUMMARY==
'XAMINATIONAREA                  CATGY    NDE I
                                                                    - OUTAGE      -----.-    I I  INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1          *~CALIBRATION BLOCKi~
I-30-RC-124  REF. DWG. NO. 02-015 002960  RC-124-5                        B-J      UT RC PUMP 2B2-TO SAFE END        B9. 11A  PT    2                        X
                                                                                                ~~UT-59i ~
002970  RC-124-1301-771                B-P      UT                                            SAPE END  NATL.- SA-351,  CFSM.
SAFE END-TO-PIPE                BS. 130  PT    2                        X
                                                                                                *NUT 59  '
002980  RC-124"105-722-LS A            B-J    UT                                              EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9. 12  MT      2                        X            INTERSECTING CIRCUMFERENTIAL RCB                                                                                    WELD.
                                                                                                ~ 4UT 6PJ 002990  RC-124-105-722 LS-B            B-J    UT                                              EXAMINE LONG SEAM  1'T PIPE LONGITUDINAL SEAM          B9.12  MT      2  - - -                  X            INTERSECTING CIRCUMFERENTIAL WELD.
                                                                                                *eUT See
 
DATB:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:    58 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS PRESSURIZER SURGE LINE                                        I  PIRST      SBCOND    THIRD ZONE NUMBER: 016                        ASME                I  PERIOD    PERIOD    PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY      NDE                -OUTAGB-                  INSTRUCTIONS NUMBBR    IDENTIFICATION                  ITEM NO METH          1 2  3    1  2  3  4  1  2  3 I  ~~CALIBRATION BLOCK~~
I 12 RC-108  REF. DWG. NO. 02 016 003060  RC-301-771                      B-F        UT                                            NOZZLB NATL. SA 105( GR-2.
SURGE NOZZLB-TO-SAFE END        B5.130      PT      2            X                        USE CS SIDE OF  UT-16 FOR CS SIDE OF WELD & UT-23 FOR SS.
                                                                                                    <<*UT-16*~
003070  RC-108-FW-3                      B-J        UT                                            SS( SAFE END MATL.- SA-351(
SAFE END- TO-ELBOW              B9.11C    PT      2            X                        CF8M.
ooUT 230 ~
003080  RC-106-751                      B-J        UT                                            SS ELBOW-TO- PIPE                  B9. 11B    PT      2            X RCe
                                                                                                  ~~UP-23**
003085  H-1B                            F-A        VT-3 VARIABLE SPRING CAN HANGER      Fl. 50A            2            X eaN/Aea 003100  RC-107-751                      B-J        UT PIPE-TO-ELBOW                    B9 11B    PT      2            X 2314 003110  RC-108-FW-2                      B-J        UT                                            SS ELBOW-TO PIPE                    B9 ~ 11B  PT      2            X RCB 44UT 2344 003130  RC-101-751                      B-J        UT                                            SS PIPE-TO ELBOW                  B9 11B      PT    2              X
                                                                                                  ~ JUT 2314
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  59 REVISION:      0                        INSERVICE INSPECTION SELBCTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS PRESSURIZER SURGE LINE                                  I  PIRST      SECOND      THIRD ZONB NUMBER: 016                        ASME            I  PERIOD    PERIOD      PERIOD
                                        'BC. XI          I
                                                                                      -- -- I
 
==SUMMARY==
EXAMINATION AREA                CAmr    HUE                  OUTAGE                  INSTRUCTIONS NUMBER  IDEHTIPICATION                ITEM NO MBTH    J 1 2  3    1  2  3  4    1  2  3 I ssCALIBRATION BLOCKss I-12-RC-108  REF. DWG. NO. 02-016 003140  RC-102-751                      B-J      UT                                            SS ELBOW-TO-PIPE                  B9. 11B  PT    2            X ssUT  23ls 003150  RC 108 FW-1                    B-J      UT                                            SS, SAPE END MATL.- SA 351(
PIPE TO SAFE END                B9.11A  PT    2 X                                    CP8M.
saUT 23ss 003160  RC 514 671                      B-P    UT                                            USB CS SIDE OP UT 16 POR CS SAFE END TO SURGE NOZZLB        BS ~ 40  PT    2 X                                    SIDE            UT-23 FOR SS
~
OP WELD &
Rn                                                                                    SIDE.
ssUT-16**
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    60 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS REACTOR COOLANT PUMP 2A1                                    I  FIRST    SECOND      THIRD ZONE NUMBER: 017                        ASMB                    PERIOD    PERIOD      PERIOD SEC. XI          I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY      NDE                  OUTAGE                I  INSTRUCTIONS NUMBER    IDENTIFICATION                ITEM NO METH          1 2  3    1  2  3  4    1  2  3 I  e*CALIBRATION BLOCKe*
REF. DWG. NO, 02-017 003200    02-017-004                    B-K-1      PT                                            100t OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;2                B10.20              2 X eeN/Aee 003210  02-017-005                    B  K-1      PT                                            100% OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;3                B10.20            2 X RCB eeN/Aee 003220  02-017-006                    B-K-1      PT                                            100% OF LENGTH OP ATTACHMENT SUPPORT IUG  &#xb9;4                B10.20            2 X RCB
                                                                                                  ~ eN/Aee 003230  02-017-007                    B-K-1      PT                                            100l  OF LENGTH OF ATTACHMENT SUPPORT LUG &#xb9;1                B10.20            2 X RCB eeN/Aee 003240  02-017-008                    RG 1 ~ 14 UT                                              EXAMINATION RBQUIRED BY USNRC PLYWHEEL BORE AND KEYWAY      C.4.B              2 X          X  - - -    X            REG. GUIDE  1.14 EACH PERIOD RCB
                                                                                                  ~ eLATERe e 003250  01-017-009                    RG  1.14 UT                                              EXAMINATION REQUIRED BY USNRC FLYWHEEL                      C.4.B      MT    2                        X            REG. GUIDE  1.14 NEAR END OF INTERVAL eeLATERee
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:  61 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACIOR COOLANT PUMP 2A2                                  I  FIRST      SECOND      THIRD    I ZONE NUMBER: 018                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI                                              I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                - OUTAG      E-            INSTRUCTIONS NUMBER    IDENTIPICATION                ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3    ~~CALIBRATION BLOCK*~
REP. DWG. NO. 02 018 003340  02-018-004                    B-K 1    PT                                              100t  OF LENGTH OF ATTACHMENT SUPPORT LUG  &#xb9;2                B10.20            2            X RCB
                                                                                                  ~ *N/Aa*
003350  02-018-005                    B-K-1    PT                                              100t  OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;3                B10. 20          2              X RCB
                                                                                                  *eN/Awe 003360  02-018-006                    B-K-1    PT                                            100t  OP LENGTH OF ATTACHMENT SUPPORT LUG  &#xb9;4                B10.20          2              X
~        RCS
                                                                                                  *1N/AI0 003370  02-018 007                    B-K-1    PT                                            100't OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;1                B10.20          2              X                        WELD RCB
                                                                                                  **N/A1~
003380  02-018-008                    RG  1.14 UT                                              EXAMINATIONS REQUIRED BY USNRC FLYWHEEL BORE AND KEYWAY      C.4.B            2 X            X  -  -  -  X            REG. GUIDE  1.14 EACH PERIOD
                                                                                                  ~~LATER*~
003390  02-018-009                    RG  1.14 UT                                              EXAMINATIONS REQUIRED BY USNRC PLYWHEEL                      C.4.B MT        2                          X            REG. GUIDE  1.14 NEAR END OP INTERVAL
                                                                                                  <<*LATER**
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                    PAGE:    62 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS REACIOR COOLANT PUMP 2B1                                  I    FIRST      SECOND    THIRD    I ZONE mMBER: 019                        ASME              I    PERIOD      PERIOD    PERIOD  l SEC. XI                                              I
 
==SUMMARY==
EXAMINATION AREA                CATOY    NDE                  - OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH      I  1. 2  3    1  2  3  4  1  2  3    ~"CALIBRATION BLOCK">>
REF. DWG, NO. 02 019 003480  02-019-004                    B-K-1    PT                                              100t  OF LENGTH OF ATTACHMENT SUPPORT LUG  &#xb9;2                B10.20            2              X                      WELD aaN/A+a 003482  02-019-RPH-10                  F-A      VT-3 SPRING SUPPORT    LUG &#xb9;2      F1.50B          2              X
                                                                                                  ~*N/A~~
003490  02 019-005                      B-K-1    PT                                            100t  OF LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;3                B10.20          2              X                      WELD
~        Ra
                                                                                                  ~~N/A~~
003492  02-019-RPH 11                  F-A      VT-3 SPRING SUPPORT  4 LUG &#xb9;3      F1.50B          2              X RCB
                                                                                                  ~ aN/Aee 003500  02-019-006                      B  K-1    PT                                            100t  OP LENGTH OF ATTACHMENT SUPPORT LUG  &#xb9;4                B10. 20          2              X RCB arN/Awe 003502  02-019-RPH-12                  F-A      VT-3 SPRING SUPPORT 0 LUG  &#xb9;4      F1. 50B          2              X RCB aeN/Aaa 003510  02-019-007                      BK1      PT                                            100t  OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;1                B10.20          2              X RCB e a N/Ae e
 
'I DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    63 REVISION:      0                        INSERVICB INSPEC1'ION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACIOR COOLANT PUMP 2B1                                      FIRST      SECOND      THIRD    I ZONE NUMBER: 019                        ASME              I  PERIOD    'PERIOD      PERIOD  I SBC. XI        )                                    I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDB                - 0  U T A G  B-            INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO MBTH      I 1 2  3    1  2  3  4    1  2  3 I <<<<CALIBRATION BLOCK<<1 RBP. DWG. NO. 02-019 003512  02-019-RPH-9                    F-A      VT-3 SPRING SUPPORT  I LUG  &#xb9;1        F1.50B          2            X
                                                                                                    ~ 1N/A<<1 003520  02-019-008                      RG  1.14 UT                                              EXAMINATIONS REQUIRED BY USNRC PLYWHEBL BORE AND KEYWAY        C.4.B            2 X          X  - - -    X            REG. GUIDE  1.14 EACH PERIOD 1 <<LATBR11 t003530  02-019-009 FLYWHEEL RCB RG  1.14 UT C.4.B    MT    2                          X EXAMINATIONS RBQUIRED BY USNRC REG. GUIDE INTERVAL 1 <<LATER*1 1.14 NEAR END OF 003540  02-019-S-001  THRU 016          B-G-1    UT                                              CODE CASE  N-307-1 APPLIES(
REACTOR COOL. PUMP STUDS  (16)  B6.180          2 X                                      EXAM PERFORMBD FROM RCB                                                                                        CENTER-DRILLED HOLE 1<<LATER<<*
003570  02-019-N-001  TO 016            B-G-1    VT-1 REACTOR COOL. PUMP NUTS  (16)  B6. 200          2 X RCB 1<<N/A<<t 003580  2B1-LIG 01 16                    B G-1    VT-1                                            EXAM PERFORMED WHEN CONNECTION STUD HOLE THREADS & LIGAMENT    B6.190          2            X                          IS  DISASSEMBLED RCB 1 <<N/A<<*
 
DATE:  07/24/93                                    ST. LUCZE NUCLBAR PLANT UNIT 2                                      PAGB:    64 RBVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS REACIOR COOLANT PUMP 2B2                                        FIRST      SECOND      THIRD ZONE NUMBER: 020                                          I    PERIOD    PERIOD      PERIOD  I SEC. XZ          I-                                    I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE      I
                                                            - -      - -OUTAGE--- -        - - I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEMNO METH        1  2  3    1  2  3  4    1  2  3    ~ a CALIBRATION BLOCK+a I                                    I REF, DWG, NO. 02 020 003590  02-020-001                      B  L-1  VT-1                                              CODE CASE    N-481 APPLIES, UPPER SCROLL WELD              B12. 10          2                          X            PERFORM  VISUAL VT-1 OP KCTERNAL SURPACB OP THE WELD IN  ONE PUMP 01N/At%
003600  02-020-002                      B-L-1    VT-1                                            CODB CASE    N-481 APPLIES, LOWER SCROLL WELD              B12.10          2                            X            PERFORM  VISUAL VT-1 OF EXTERNAL SURPACE OP THE WBLD IN  ONE PUMP
                                                                                                  %ON/A*~
03610  02-020-003                      B-L-2    VT 3                                            CODE CASE    N-481 APPLIBS, PUMP CASING INTERNAL SURFACE    B12.20                                      X            PERFORM    VISUAL VT-3 OP RCB                                                                                      INTERNAL SURFACES WHENEVER PUMP    IS DISASSEMBLED  FOR MAINTBNANCB e*N/Awe 003620  02-020-004                      B-K-1    PT                                              100t    OP LENGTH OF ATTACHMENT SUPPORT LUG  &#xb9;2                  B10. 20        2                            X RCB
                                                                                                  +AN/Awe 003630  02-020-005                      B-K-1  PT                                                100t    OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;3                  B10.20          2                            X RCB aaN/Aea 003640  02-020-006                      B-K-1  PT                                                100t    OP LENGTH OP ATTACHMENT SUPPORT LUG  &#xb9;4                  B10. 20        2                            X RCB
                                                                                                  ~ aN/A+a
 
0 DATE:  07/24/93                                    ST. LUCIB NUCLEAR PLANT UNIT 2                                PAGB:    65 REVISION:      0                        INSERVICB INSPECL'ZON SBLECTBD COMPONENT SCHEDULB CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS REACIOR COOLANT PUMP 2B2                                I  FIRST      SECOND      THIRD ZONE NUMBER: 020                      ASME              I  PERIOD    PERIOD      PERIOD SEC. XI        I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDB    I          -OUTAGE                  INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH        1 2  3    1  2  3  4    1  2  3  ~ ~CALIBRATION BLOCK~~
RBF. DWG. NO. 02-020 003650  02-020-007                    B-K-1    PT                                          1004 OF LENGTH OF ATTACHMENT SUPPORT LUG Nl                B10.20          2                        X          WELD
                                                                                            <<*N/A~*
003660  02-020-008                    RG  1.14 UT                                          EXAMINATIONS REQUIRED BY USNRC FLYWHEEL BORE AND KEYWAY      C.4.B            2 X          X  - - -    X          REG. GUIDE  1.14  EACH PERIOD eeLATERse 003670  02-020-009                    RG  1.14  UT                                          EXAMINATIONS REQUIRED BY USNRC C.4.B    MT    2                        X          REG. GUIDB  1.14  NEAR END OF INTERVAL
                                                                                            ~ o LATER'
 
0 DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 66 REVISION:      0                        INSERVICE INSPECTION SELECZED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2A1 SAFETY INJECI'ZON  PIPING  INSIDE  CIA'              FIRST    SECOND      THIRD    I ZONE NUMBER:  021                        ASME                  PERIOD    PERIOD      PERIOD  I SEC. XZ                                              I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE                  OUTAGE-                  INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH      ( 1 2  3    1  2  3  4    1  2  3 I  *~CALIBRATIONBLOCK**
I 12-RC-148  REF. DWG. NO. 02 021 003730  V-3624                          B-G-2    VT-1                                          GROUP 2 GATE VALVE BOLTING              B7.70            2                        X eaN/Aae 003745  SZ-148-FW-1                      B-J      UT                                            SS, TERMZNAL END.
VALVE (V-3624) -TO PIPE          B9. 11B  PT    2                        X 4*UT  35*t I-6  RC-516  REF. DWG. NO. 02 021 03780  V-3258                          B-G-2    VT-1                                          GROUP 4 CHECK VALVE BOLTING              B7.70          2                        X RCB 4 IN/A1~
003800  SZ-516-FW-1                      B-J    UT                                            SS VALVE (V-3258) -TO-PIPE          B9. 11B  PT    2                        X INPUT 381%
I  12 RC-148  REF. DWG. NO. 02-021 003890  SI 148-FW-801                    B-J    UT                                            SS, ELBOW MATL.- SA-403, PIPE-TO-ELBOW                    B9. 11B PT      2                        X            WP-304, ieUT 35+a 003900  SI-148-FW-4                      B-J    UT                                            SS, ELBOW MATL. SA-403, ELBOW-TO-PIPE                    B9. 11B PT      2                        X            WP  304.
                                                                                                **UT 35*0
 
DATB:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                    PAGE:    67 REVZSION:      0                          INSERVZCE INSPECTION SELECZED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2A1 SAFETY INJECTION    PIPING  INSIDE  CIA          I  FIRST      SECOND      THIRD BONE NUMBER:  021                        ASME            I  PERIOD    PERIOD      PERIOD XI
 
==SUMMARY==
EXAMINATIONAREA SEC.
CATQY    NDE                -OUTAGE        ------I    I INSTRUCTIONS NUMBER  IDENTIFICATION                  ZTEM NO METH      1 2  3    1  2  3  4            3    i~CALIBRATION BLOCK**
I  12 RC-148  REP. DWG. NO. 02-021 003930  SZ-148-FW-5                      B-J      UT                                            SS, EXCEEDS STRBSS AND PIPE-TO-VALVE tV-3227)            B9. 11E  PT    2                        X            TERMINAL END.
RCB ooUT 35k%
I-12 RC-15)    REF. DWG. NO. 02-021 003940  V-3227                            B-G-2    VT-1                                          GROUP 1 CHECK VALVE BOLTING              B7.70          2                        X RCB raN/Aea 03960  RC-151-FW-1                      B-J      UT                                            SS, EXCEEDS STRESS AND VALVE  (V-3227)-TO-PIPE          B9. 11B  PT    2                        X            TERMINAL END.
RCB
                                                                                                  ~ aUT-35m*
003990  RC-151-FW-2                      B-J      UT                                            SAPE END  MATL.- SA-351)    GR BLBOW TO-SAFE END                B9. 11C  PT    2                        X            CF8M, USE UT 23 FOR CS SIDB OF WELD & UT  50 FOR SS SIDE OF WELD.
                                                                                                  ~*UT 23(UT-50*~
004000  RC  1104-771                      B-F      UT                                            NOZZLE MATL.-    SA-182,  F-l.,
SAFE END-TO-SI NOZZLE            B5.130  PT    2                        X            USE CS SIDE OP    UT 16 FOR CS SIDE  OP WELD Sc  UT-23  FOR SS SIDE.
osUT 16,UT 23ee
 
DATE:  07/24/93                                  ST. LUCIE NUCLBAR PLANT UNIT 2                              PAGB: 68 REVISION:      0                        INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2A1 SAPETY INJECTION PIPING INSIDE  CIlfl'            PIRST      SBCOND      THIRD ZONE NUMBER: 021                      ASME            I    PERIOD    PBRIOD      PERIOD  I SBC. XI      I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDB              -OUTAGB-                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    1  2  3    1  2  3  4    1  2  3 I +*CALIBRATIONBLOCK+a RC 148  RBF. DWG. NO. 02-021 004010  SI-4201-7841                  P-A      VT-3 RIGID PRAME & VARIABLE SPRING  P1.50B          2                        X SUPP.
RCB                                                                                  *eN/Ate
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 69 REVISION:      0                          ZNSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2A2 SAFETY INJECTION    PIPING  INSIDE  CIA'              PIRST      SECOND    THIRD ZONE NUMBER: 022                          ASME              I  PERIOD      PERIOD    PERIOD SEC. XZ          I
                                                                                                - I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIPICATION                    ITEM NO METH    I  1 2  3      1  2  3  4  1  2  3  I  seCALIBRATZON BLOCK+
I-12 RC-14    REF. DWG. NO. 02-022 004090  V-3614                            B-G-2    VT-1                                            GROUP 2 GATE VALVE BOLTING                B7.70            2            X ION/A11 004105  SI-149 "FW  1                    B-J      UT                                              SS, EXCEEDS STRESS AND VALVE (V-3614) -TO-PIPE            B9. 11B  PT    2              X                        TERMINAL END.
                                                                                                    ~ JUT 35 ~ 1 I  6 RC-515    REF. DWG. NO. 02-022 04150  V-3259                            B-G-2    VT-1                                            GROUP 4 CHECK VALVE BOLTING                B7.70          2              X RCB eaN/Are 004170  SI-515-FW-2                        B-J      UT                                              SS, EXCEEDS STRESS AND VALVE {V-3259) -TO-PIPE            B9.11B  PT    2              X                        TERMINAL END.
RCB
                                                                                                    ~~UT-38**
I-12  RC-149    REF. DWG. NO. 02-022 004270  SI 149-FW-4                        B-J      UT                                              SS PIPE-TO-VALVE (V-3217)            B9. 11B  PT    2              X
                                                                                                    *NUT  35**
I-12-RC  154  REF. DWG. NO. 02 022 004280  V 3217                            B-G-2    VT"1                                            GROUP 1 CHECK VALVE BOLTING                B7.70          2              X
                                                                                                    +AN/Awe
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGB:  70 REVISION:      0                        INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPEC1'ZON INTERVAL                  PLAN STATUS LOOP 2A2 SAFETY INJECTION  PIPING  INSIDE CT&#xc3;T                FIRST      SECOND      THIRD ZONE NUMBER: 022                        ASME            I    PERIOD    PERIOD      PERIOD SEC. XI                                              -
CATOY    NDE I
                                                            - - - - - - 0 U T A G E - - - - --    I INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1  2  3    1  2  3  4    1  2  3      <<<<CALIBRATION BLOCK**
I-12-RC-154  REF. DWG. NO. 02-022 004330  RC  154-FW-2                    B-J                                                        SS, SAFE END MATL.- SA-351, GR ELBOW-TO-SAFE END                B9. 11C  PT    2                          X              CFSM, USB UT-23 TO EXAM. CS SIDE OF WELD & UT-50 FOR SS SIDE.
                                                                                                    ~ <<UT 23 UT 50<<<<
004340  RC-703-771                      B-F      UT                                                NOZZLE MATL.-  SA-182,  P 1.
SAFE END-TO-SI NOZZLE            B5.130  PT    2                          X              USB  UT-16 FOR CS SIDB OP WELD
                                                                                                    & UT-23 FOR SS SZDE.
                                                                                                    *<<UT 16,UT 23<<*
I  12-SI 149  REF. DWG. NO. 02-022 004345  SZ-4200-6373                              VT-3 RIGID STRUT                      P1.10K          2                          X RCB,20'-2"
                                                                                                    <<<<N/A<<<<
004370  SI-4200 6340A                    P-A      VT 3 VARIALBB SPRING SUPPORT          F1.50B          2              X
                                                                                                    ~ <<N/A<<<<
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  71 REVISION:      0                          INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2B1 SAFETY INJECTION    PIPING  INSIDE CDfI            I  PIRST      SECOND      THIRD ZONE NUMBER: 023                          ASME              I  PERIOD    PERIOD      PERIOD I SEC. XI CATm      NDE                - 0UTAG B                  INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH      i 1 2  3    1  2  3  4 i  1  2'3 I  ~iCALIBRATION BLOCKii I-12 SI  150  REF. DWG. NO. 02-023 004470  V-3634                            B-G-2    VT-1                                          GROUP 2 GATE VALVE BOLTING                B7.70            2                          X
                                                                                                      *"N/A**
004485  SI-150-FW-1                        B-J      UT                                            SS EXCEEDS STRESS AND TERMINAL VALVE  (V-3634)-TO-PIPE          B9. 11B  PT      2                          X
                                                                                                      ~ FAUT 35 ~ 0 I-6-SI  517  REF. DWG. NO. 02-023 4520  V-3260                            B-G-2    VT-1                                          GROUP 4 CHECK VALVB BOLTING                B7.70            2                          X RCB eaN/Are 004540  SI-517-FW-1                        B-J      UT                                            SS VALVE (V-3260) -TO-PIPE            B9.11A    PT    2                          X RCB
                                                                                                    ~ iUT-38*i 004570  SI-517-1    SW-3                  B-J      UT                                            SS, ELBOW MATL. SA 403, PIPE TO  ELBOW                    B9. 11B  PT    2                          X          WP-304.
40UT 38ea 004580  SI-517-1-SW-4                      B-J      UT                                            SS, BLBOW MATL.- SA-403, ELBOW-TO-PI PB                    B9.11B    PT    2                          X          WP-304.
iiUT 38**
t004590  SI-4204-153 WELDED ATTACHMENT (8 LUGS)
RCB BK1 B10.10 PT 2                          X saN/Aee
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:    72 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2B1 SAFETY    INJECIION PIPING  INSIDE CIMT            I    PIRST    SECOND      THIRD ZONE NUMBER: 023                            ASME              I    PERIOD    PERIOD      IERIOD SEC. XI                                              -
 
==SUMMARY==
EXAMINATIONAREA                    CATGY    NDE I
                                                                  - - - - - -OUTAGE-      - - - --  I INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH        1  2  3    1  2  3  4    1  2  3      >>>> CALIBRATION BLOCK>> ~
I I  12 SI 150    REF. DWG. NO. 02-023 004690  SI-4204-1270A                      B-K-1    PT WELDED ATTACHMENTS (8 SHEAR        B10.10            2                        X LUGS)
RCB                                                                                            *>>N/Aaa 004760  SI-150-FW-4                        B-J      UT                                              SS, EXCEEDS STRESS AND PIPE-TO-VALVE (V-3237)            B9. 11B  PT    2                          X              TERMINAL END.
RCB
                                                                                                        >>>>UT 35>>"
t 04770 I-12-SI-152 V-3237 REP. DWG. NO. 02 023 CHECK VALVE BOLTING RCB B-G-2 B7.70 VT-1 2              X GROUP 1
                                                                                                        ~ >>N/Aaa 004820  RC-152-FW-2                        B-J      UT                                              SAPE END    MATL.- SA-351, ELBOW-TO-SAFE END                  B9.11C    PT    2                          X              GR-CF8M, USE UT-23 FOR CS SIDE RCB                                                                                          OF WELD  4t  UT-35 FOR SS  SIDE.
                                                                                                        ~ >>UT 23~UT 35>>a 004830  RC-903-771                        BP        UT                                              NOZZLE MATL. SA-182,  F-l.
SAFE END TO    SI NOZZLE          B5. 130  PT    2                          X              USE UT-16 FOR CS SIDE OF WELD 8 UT-23 FOR SS SIDE.
                                                                                                        **UT-16,UT-23>>*
I-6-SI-517    REF. DWG. NO. 02-023 004840  SI-4204-153                        P-A      VT-3 RIGID STRUT                        Fi. 10K          2 a>>N/Aaa
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 73 REVISION:      0                        INSERVICE INSPECI'ION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2B1 SAFETY INJECTION  PIPING  INSIDE CIMT          I    FIRST    SECOND      THIRD ZONE NUMBER:. 023                      ASME            I    PERIOD    PERIOD      PERIOD  I SEC. XI        I
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE      - - - - - -OUTAGE      - - - - - - I INSTRUCTIONS NUMBER  ZDENTIPZCATZON                  ITEM NO METH      1  2  3    1  2  3  4    1  2  3 I ~*CALIBRATION BLOCK~~
I-12-SI  150 REF. DWG. NO. 02-023 004850  SZ-4204-123                    F-A      VT-3 VARIABLE SPRING SUPPORT        P1.50B          2                        X
                                                                                                ~ *N/A%*
004870  SI-4204-1270A                  F-A      VT-3 RIGID STRUT                    Fl. 10K        2                        X iPN/AP0
 
f DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:  74 REVISION:        0                          INSERVICE INSPECTION SELECIED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 282 SAFETY INJECTION    PIPING  INSIDE                      FIRST      SECOND    THIRD CIA'ONE NUMBER: 024                          ASME              I  PERIOD    PERIOD    PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                  CATGY      NDE    I          -OUTAGE-                I  INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH        1 2  3    1  2  3  4  1  2  3 I  oaCALIBRATION BLOCK+a I-12  SZ 151  REF. DWG. NO. 02 024 004940    V-3644                            B-G-2      VT-1                                        GROUP 2 GATE VALVE BOLTING                Bj. 70            2 X RCB
                                                                                                      ~ aN/Awe 004955    SI-151-FW-1                      B-J        UT                                          SS, EXCEED STRESS AND TERMINAL VALVE  (V-3644)-TO-PIPE          B9.11B    PT    2 X                                  END.
4%UT  35**
004960    SZ-4203-581C                      B-K-1      PT B10.10
~
2 X Rn
                                                                                                    ~~N/A**
004965    SI-4203-581B                      B  K-1    PT WELDED ATTACHMENT                  B10.10            2 X 0 1N/A**
Z-6 SZ-518    REF. DWG. NO. 02 024 004980  V-3261                            B-G-2      VT-1                                        GROUP 4 CHECK VALVE BOLTING              B7.70            2 X RCB
                                                                                                    ~~N/A~~
005000  SI 518-FW-1                        B-J        UT                                          SS VALVE (V-3261) -TO PIPE            B9.11B    PT    2 X
                                                                                                    **UT 3811 I-12-SZ    151  REF. DWG. NO. 02 024 05090  SZ-4203 69C                        B-K-1      PT WELDED ATTACHMENT                  B10. 10          2 X RCB saN/Ae  ~
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                      PAGE:  75 REVISION:      0                          INSERVICE ZNSPECTZON SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2B2 SAFETY INJECI'ION PIPING    INSIDE CIST          I  PIRST      SECOND        THIRD ZONE NUMBER: 024                          ASME            I  PERIOD    PERIOD        PERIOD    I SEC. XZ                                                - I SU)0QRY EXAMINATIONAREA                  CATUY    NDE                - 0 U T A G E  - - - - - -  I  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4      1  2  3      ~ <<CALIBRATION BLOCKe e I-12-SI    151 REF. DWG. NO. 02-024 005120  SI-4203-71                        B-K-1    PT WELDED ATTACHMENTS    t8 LUGS)    B10.10          2 X RCB
                                                                                                      **N/A~*
005150  SZ-151 FW-4                      B-J      UT                                                SS PIPB-TO-VALVE {V-3247)            B9.11B  PT    2 X
                                                                                                    **UT 351 ~
I-12-SZ-153    REF. DWG. NO. 02-024 05160  V-3247                            B-G 2    VT-1                                              GROUP 1 CHECK VALVE BOLTING              B7.70          2 X RCB eeN/Aea 005220  RC-1304 771                      B-F    UT                                                NOZZLE MATL. -  SA-182,  F-l.
SAFE END-TO-SI NOZZLE            B5. 130  PT    2                        X                USE UT-16 FOR CS SIDB OF WELD R  UT-23 FOR SS SIDE.
                                                                                                    **UT-16,UT-23**
I-12-SI-151    REF. DWG. NO. 02-024 005260  SZ-4203-581A                      P-A    VT-3 RIGID FRAME SUPPORT              F). 10D        2 X 4 1M/AI~
005290  SZ-4203-67                        F-A    VT-3 VARIABLE SPRING SUPPORT          F1.50B          2 X
                                                                                                    ~ aN/Aee
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    76 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMBINED PRESSURIZER SPRAY  LINE                            FIRST      SECOND      THIRD ZONE NUMBER: 025                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE                  OUTAGE                I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    i 1 2  3    1  2  3  4    1  2  3 I  iiCALIBRATIONBLOCKii I-4 RC-103  REF. DWG. NO. 02 025 005480  RC 103C-SN 1                    B-J      UT                                            SS PIPE-TO-TEE                    B9.11B  PT      2 X
                                                                                                ~ tUT-40@a 005490  RC-103C-SN-3                    B-J      UT                                            SS,  4  X  2" CONCENTRIC REDUCER REDUCER-TO- TEE                B9.11B  PT    2 X                                    MATL.- ASTM B-366    GR MPNCL.
RCB aaUT    40er 005500  RC-103C-SW-2                    B-J      UT                                            SS TEE- TO-PIPE                    B9.11B  PT    2 X
~        Rn l*UT 4 P 0 ~
005510  RC 103 FW-903                  B-J      PT                                            SS( SAFE END NATL.- SA-351, GR PIPE-TO-SAFE END                B9.1  C  UT    2 X                                    CF8M.
eaVI'-40am 005520  RC-504 671 SAPE END-TO-SPRAY NOZZLE BF B5.40
                                              'T PT    2 X 1*UT 1 90k 005550  SPS-787                                  VT-3 RIGID STRUT                    F1. 10K        2 X eeN/Aee
 
I DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:        77 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2B1 SPRAY  LINE                                    I  PIRST      SECOND      THIRD ZONE NUMBER: 026                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI        I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-                I  INSTRUCT IONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 )  ~~CALIBRATION BLOCK~~
I-3-RC-109  REF. DWG. NO. 02-026 005570  RC-906-771                      BP      PT                                            SPRAY NOZZLE  MATL.-
SA-105'R-2.
NOZZLE-TO-SAFE END              BS. 140        2            X
                                                                                              +AN/Aes 005580  RC-109-FW-912                  B-J      PT                                            SS( SAFE END MATL.- SA-182, SAFE END-TO-PIPE                B9.21C          2            X                        F-316.
                                                                                              **N/A*4 005590  RC-109A-SW-1                    B  J    PT                                            SS PIPE- TO-ELBOW                  B9. 21B        2            X
                                                                                              *aN/Aee 005600  RC-109A-SW-2                    B  J    PT                                            SS ELBOW-TO-PIPE                  B9. 21B        2            X
                                                                                              +AN/A+a 005610  RC 109 FW-901                  B  J    PT                                            SS PIPE-TO-PIPE                    B9.21B          2            X
                                                                                              **N/A*4 005760  RC 109 FW-908                  B-J      PT                                            SS PIPE-TO VALVE (PCV 1100P)      B9.21B          2            X RCB
                                                                                              **N/A**
005770  RC-109-FW-909                  B-J      PT                                            SS VALVE (PCV 1100F)-TO PIPE      B9.21B          2            X RCB
                                                                                              *aN/Awe
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 78 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONEHTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2B1 SPRAY  LINE                                      I  PIRST      SECOND      THIRD ZONE NUMBER: 026                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATIONAREA                O'ATGY    NDE                -OUTAGE                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 ~ +CALIBRATION BLOCKe e I  3 RC-109  REF. DWG. NO. 02-026 005850  SPH-327                                  VT-3 VARZABLE SPRING SUPPORT        F1.50B          2            X
                                                                                              ~ IN/A14 005940  SPS-407                        F-A      VT-3 RIGID STRUT SUPPORT            F1. 10K          2            X
                                                                                              %ON/APk 006000  SPS-508                        F A      VT-3 RIGID STRUT SUPPORT            P1. 10K          2            X RCB
                                                                                              ~ oN/Ace 006010  SPS-524                        F-A      VT-3 RIGID STRUT  SUPPORT            F1.10K          2            X
                                                                                              +AN/A**
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:    79 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2B2 SPRAY  LINE                                        I  FIRST      SECOND      THIRD ZONE NUMBER: 027                          ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATUY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH        2  3    1  2  3  4    1  2  3 I  >>>>CALIBRATION BLOCK>>>>
I-3-RC-141    REF. DWG. NO. 02 027 006060  RC-1305-771                      B-P      PT                                            SPRAY NOZZLE MATL.- SA-105, GR NOZZLE TO" SAFE END              B5.140          2                        X RCB
                                                                                                  >>>>N/A>>>>
006150  RC-141C-SW-1                      B  J      PT                                            SS PIPE<<TO-ELBOW                    B9. 21B          2            X
                                                                                                  **N/A>>*
006160  RC-141-FW-904                    B-J      PT                                            SS ELBOW-TO-PIPE                    B9. 21B          2            X RCB
                                                                                                  >>>>N/A>>>>
006170  RC-141-FW-905                    B-J      PT                                            SS PIPE-TO-VALVE (V-1441)            B9.21B          2            X
                                                                                                  >>>>N/A>>>>
006180  RC-141  FW  906                  B-J      PT                                            SS VALVE (V 1441) TO-PIPE            B9.218          2            X RCB RCB
                                                                                                  ~ >>N/A>>>>
006240  RC-141-FW-909                    B-J      PT                                            SS PIPE-TO-VALVE (PCV-11008)        B9. 21B          2            X RCB
                                                                                                  >>>>N/A>>>>
006250  RC-141-FW-910                    B  J      PT                                            SS VALVE tPCV 1100E) TO PIPE        B9.21B          2
                                                                                                  ~ >>N/A>>>>
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 80 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP 2B2 SPRAY LINE                                      I  PIRST      SECOND      THIRD ZONE NUMBER: 027                        ASME            j  PERIOD    PERIOD      PERIOD SEC. XZ          I
 
==SUMMARY==
EXAMINATION AREA                CATQY    NDE    I            OUTAGE                I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I aaCALIBRATION BLOCKaa I  3 RC-141  REF. DWG. NO. 02-027 006490  SPS-127                        F A      VT-3 RIGID  FRAME SUPPORT            Fl. 10D        2            X aaN/Aaa 006500  SPS-128                        F-A      VT-3 RIGID STRUT SUPPORT            Pl. 10K        2            X
                                                                                              ~ aN/Aaa 006530  SPS-237                        F-A      VT-3 RIGID STRUT SUPPORT            F1.10K          2            X Rn aaN/Aaa
 
DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    81 REVISION:      0                            INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2B SHUTDOWN COOLING    LINE                                  FIRST    SECOND      THIRD ZONE NUMBER: 028                            ASME                  PERIOD    PERIOD      PERIOD XI
 
==SUMMARY==
EXAMINATION AREA SEC.
CATGY    NDE I
i - - - - - -OUTAGE      ------I  I INSTRUCTIONS NUMBER  IDEHTIPICATION                      ITEM NO METH    I 1  2  3    1  2  3  4    1        ~*CALIBRATION BLOCK~ ~
I-12-RC-147    REF. DWG. NO. 02-028 A 006540  RC-302-771                          B-F      UT                                          NOZZLE MATL.-  SA-105,  GR 2.
NOZZLE TO-SAFE END                  BS  130  PT    2                        X
                                                                                                    ~~UT-16, UT-23" >>
006560  RC-147-1-SW-8                        B-J      UT                                          SSg  I-3-SI-191    PART OF SPOOL SWEEPOLET {3~)                      B9.32D  PT    2 X                                  12 -RC-147-1,  SHOP WELDS TAKE RCB                                                                                        SAME  &#xb9;.
                                                                                                  ~~VT-35~~
I-2  RC-158  REF. DWG. NO. 02-028-A 06710  PLANGE                              B-G-2    VT-1                                        8 STUDS, 16 HUTS BOLTING                            B7.50            2            X RCB
                                                                                                  *IN/A*0 I-10-RC-302    REF. DWG. NO. 02-028 B 006740  SI-4205-6408                        B-K-1    PT WELDED ATTACHMENTS (4 SHEAR        B10. 10          2 X LUGS)
RCB                                                                                        ~ aN/Ass 006830  V-3652                              B-G-2    VT-1                                        GROUP 3 GATE VALVE BOLTING                  B7.70            2            X RCB
                                                                                                  +AN/Aae I  10 SI 130    REF. DWG  NO. 02-028-B 006850  SI 130-1  SW-6                    B-J      PT                                          2i 6000&#xb9;  S.W. COUPLING.
BRANCH CONNECTION    (2")          B9.32D          2 X RCB ION/All
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:    82 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL LOOP 2B SHUTDOWN COOLING  LINE                            I    PIRST      SECOND      THIRD ZONE NUMBER: 028                          ASME                  PERIOD    PERIOD      PERIOD SEC. XZ          I-
 
==SUMMARY==
EXAMINATION AREA                  CATGY  NDE    )
                                                            - - - - - - 0 U T A G  E-          I  ZNSTRUCI'ZONS NUMBER  IDENTIPICATION                  ITEM NO METH      1  2  3    1  2  3  4    1  2  3    ~ ~CALIBRATION BLOCK~ ~
I                                    I I-2-SI-153  REF. D'WG. NO. 02 028 B 006860  SI-153-FW-1                      B-J    PT                                              SS BRANCH CONNECTION-TO-PIPE        B9.40D        2                          X
                                                                                                  *~N/A~*
006870  SZ-153-SW 2                      B-J    PT                                              SS, WELDS FABRICATED ON SITE, PIPE-TO-TEE                      B9.40D        2                          X            WELD RECORDS ORIGINATED ON SITE.
                                                                                                  +AN/gP*
006880  SZ-153-SW-3                      B-J    PT                                              SS, 2s X  3/4 ~ REDUCER. WELDS TEE-TO-REDUCER                    B9.40D        2                          X            PABRZCATED ON    SITE,  WELD Ra                                                                                        RECORDS ORIGINATED ON    SITE.
                                                                                                  +AN/Awe I-10-SZ-130  REF. DWG. NO. 02-028-B 006970  V-3651                            B-G-2  VT-1                                            GROUP 3 GATE VALVE BOLTING                B7.70          2              X
                                                                                                  **N/A**
I  10-SI-378  REF. DWG. NO. 02-028-B 007060  SI-378-2-SW-3                    B-J    UT                                              SS, THIS WELD HAS ELBOW-TO PIPE                    B9.11D  PT    2                          X            CODE ACCEPTABLE DISCONTINUITIES POUND BY UT DURING PSZ.
37**
007090  SI-4205-456B                      B-K-1  PT WELDED ATTACHMENT (8 LUGS)        B10. 10        2              X RCB
                                                                                                  +AN/Ae*
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 83 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS LOOP 2B SHUTDOWN COOLING    LINE                                FIRST      SECOND      THIRD ZONE NUMBER: 028                          ASME              I  PERIOD      PERIOD      PERIOD SEC. XZ          I
                                                                                            ----- I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - OUTAGE - - -            I  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH        1 2  3    1  2  3  4    1  2  3    ~ ~CALIBRATION BLOCK++
I                                    I I 10 SI 378  REF. DWG. NO. 02 028 B 007150  V-3545                            B-G-2    VT-1                                            GROUP 3 GATE VALVE BOLTING                B7.70            2                          X
                                                                                                      ~ eN/Aee I 3 SI 191  REF. DWG. NO. 02-028-A 007160  SZ-191-FW-3                      B-J      PT                                              SS PIPE- TO-VALVE (V-3527)          B9. 21D          2 X t
                                                                                                    ~~N/A~*
07180  SI 191  FW 2                    B-J      PT                                              SS VALVE (V 3527) -TO-PIPE          B9.21D          2 X
                                                                                                    **N/A*~
007190  SZ-191-1-SW-1                    B-J      PT                                              SS PIPE TO-ELBOW                    B9.21D          2 X
                                                                                                    +AN/A+a 007290  V 3526                            B-G 2    VT 1                                            8 STUDS & NUTS VALVE BOLTING                    B7.70            2              X RCB
                                                                                                    ~ aN/Awe 007300  SZ-4206-6361                      F-A      VT 3 RIGID STRUT  SUPPORT            F1.10K          2 X
                                                                                                    +AN/Are I-10-RC-302    REF. DWG. NO. 02-028-B 7310  SZ-4205 6408                      F A      VT-3 VARIABLE SPRING SUPPORT          F1.50B          2 X RCB
                                                                                                    **N/A4t
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                                  PAGE:  84 REVISION:      0                        INSERVICE INSPECZ'ZON SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS iNSPECTION INTERVAL                  PLAN STATUS LOOP 2A SHUTDOWN COOLING    LINE                            I  PIRST      SECOND      THIRD ZONE NUMBER: 029                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI        I
 
==SUMMARY==
EXAMINATIONAREA                  CATQY    NDE                  OUTAGE - - - - - -    I  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3    a a CALIBRATION BLOCKa a J                                  I I  12 RC-162 REF. DWG. NO. 02 029-A 007600  RC-501-771                      B-P      UT                                            SAFE END MATL.- SA-351, CP8M.
NOZZLE-TO-SAFE END              B5.130    PT      2 X
                                                                                                    **UT 16 ~ a I-10-RC-301  REF. DWG. NO. 02-029-B 007760  V-3480                          B-G-2    VT-1                                          GROUP 3 GATE VALVE BOLTING              B7.70            2 X aag/Aaa 007835  FLANGE                          B-G-2    VT-1 BOLTING                          B7.50            2            X aag/Aaa I-10-SI-127  REF. DWG. NO. 02 029 B 007880  V-3481                          B-G-2    VT 1                                          GROUP 3 GATE VALVE BOLTING              B7.70            2 X aag/Aaa I-10-RC-301  REF. DWG. NO. 02-029 B 008020  SI 4205 6713A                              VT 3 VARIABLE SPRING SUPPORT          F1. 50B          2 X RCB aag/Aaa t008025  SI-4205-6713A RIGID STRUT RCB F-A F1. 10D VT-3 2 X
                                                                                                  ~ ag/Aaa
 
DATE:  07/24/93                                          ST. IUCIE NUCLEAR PLANT UNIT 2                                PAGE:    85 REVISION:        0                            INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS PRESSURIZER AUXILIARYSPRAY                                      I  PIRST    SECOND      THIRD ZONE NUMBER: 030                              ASME              I  PERIOD    PERIOD      PERIOD SEC. XZ            I
 
==SUMMARY==
EXAMINATION AREA                      CA'TGY    NDE                -OUTAGE-                INSTRUCTIONS NUMBER    IDENTIPICATION                        ITEM NO METH        1 2  3    1  2  3  4    1  2  3  ~~CALIBRATION BLOCK**
I-2  RC 149      REF. DWG. NO. 02 030 A 008080    RC-149>>FW-2                          B-F      FT                                          SSg  4  X 2 CONCENTRIC REDUCER REDUCER- TO-PIPE                    B5.140          2 X                                  MATL.- INCONEL ASTM B-366  GR WPNCZ.
                                                                                                      ~ aN/A+a 008090  RC-149-SW-1                          B-J      PT                                          SS PIPE TO VALVE        (V-2483)        B9. 21B          2                        X
                                                                                                      +sN/Awe I  2-CH 146      REF. DWG. NO. 02-030-A 08100  CH-146-FW-28                          B-J      PT                                          SS VALVE    (V-2483)-TO-PIPE            B9.21B          2                        X RCB
                                                                                                      ~ eN/Aoo 008110  CH-146-SW-27                          B-J      PT                                          SS PIPE TO VALVE (V-2431)                B9.21B          2                        X
                                                                                                      ~ sN/Ae*
008120  CH-146-SW-26                          B-J      PT                                          SS VALVE (V 2431) TO PIPE                B9. 21B          2                        X
                                                                                                      +AN/Aea 008130  CH-146    SW  23                    B-J      PT                                          SS PIPE-TO-COUPLING                      B9.40B          2                        X
                                                                                                      +AN/Awe t008140  CH  146-FW-22 COUPLING RCB
                      - TO- PI PE B-J B9.40B PT 2                        X SS 0*N/AIP
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 86 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECI'ION INTERVAL                PLAN STATUS PRESSURIZER AUXILIARYSPRAY                                    FIRST      SECOND      THIRD ZONE NUMBER:  030                      ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XZ                                              I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                - OUTAGE -              I  INSTRUCTIONS NUMBER  IDENTIFICATZON                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 I  a*CALIBRATION BLOCKaa I-2-CH 146  REF. DWG. NO. 02 030 A 008150  CH-146-SW 21                    B-J      PT                                            SS PIPE-TO-COUPLING                B9.40B          2                        X RCB aaN/Aaa 008160  CH-146-FW-20                    B-J      PT                                            SS COUPLING-TO-PIPE                B9.40B          2                        X RCB
                                                                                                **N/Aaa 008170  CH-146-SW-19                    B-J      PT                                            SS PIPE- TO-COUPLING                B9.40B          2                        X RCB
                                                                                                *aN/Aaa 008180  CH-146-FW-18                    B-J      PT                                            SS COUPLING TO-PIPE                B9.40B          2                        X aaN/Aaa 008190  CH  146-SW-17                    B  J    PT                                            SS PIPE-TO-ELBOW                    B9.40B          2                        X
                                                                                                *aN/Aa*
008200  CH-146 FW-16                    B-J      PT                                            SS ELBOW-TO-PIPE                    B9.40B          2
                                                                                                *aN/Aaa 008210  CH-146-SW-15                    B  J    PT                                            SS PIPE-TO-ELBOW                    B9.40B          2                        X
                                                                                                ~ aN/Aaa
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 87 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS I
INSPECTION INTERVAL                PLAN STATUS PRESSURIZER AUXILIARYSPRAY                                I  FIRST    SECOND      THIRD ZONE NUMBER:  030                        ASME              I  PERIOD    PBRIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA SEC CATGY XI NDE I
                                                                      -OUTAGE      ------I  I INSTRUCTIONS
                                                                                                ~ >>CALIBRATION BLOCK>>>>
NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4 I-2-CH-146  REF. DWG. NO. 02-030-A 008220  CH-146-SW-14                    B-J      PT                                            SS ELBOW-TO-PIPE                    B9.40B          2                        X
                                                                                                **N/A*>>
I-2-CH-146    REF. DWG. NO. 02 030 B 008230  CH-146-SW-13                    B-J      PT                                          SS PIPE- TO- COUPLING              B9.40B          2                        X t
                                                                                                >>>>N/A>>>>
08240  CH-146-FW-12                    B-J      PT                                          SS COUPLING-TO-PIPE                B9.40B          2            X
                                                                                                ~ >>N/A>>>>
008260  CH-146-FW-11                    B-J      PT                                          SS PIPE-TO-TEE                      B9.40B          2            X
                                                                                                ~ >>N/A>>>>
008270  CH-146-SW-8                      B-J      PT                                          SS TEE-TO-PIPE                      B9.40B          2            X
                                                                                                *>>N/A>>*
008280  CH-146-SW-9                      B-J      PT                                          SS PIPE TO  ELBOW                  B9.40B          2            X
                                                                                                >>>>N/A>> ~
t008300  CH-146-SW-7 TEE-TO PIPE RCB B-J B9.40B PT 2 X SS
                                                                                                >>>>N/A>>>>
 
DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 88 REVISION:      0                            INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS PRESSURIZER AUXILIARYSPRAY                                    I  FIRST      SECOND      THIRD    I ZONE NUMBER:  030                          ASME              I  PERIOD    PERIOD      PERIOD  I SEC. Xr                                              I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE                - OUTA G    E-            INSTRUCTIONS NUMBER    IDENTIPICATION                    ITEM NO METH        1 2  3    1  2  3  4    1  2  3    ~~CALIBRATION BLOCK~~
I-2 CH-146    REP. DWG. NO. 02-030 B 008310  CH-146-PW-6                        B-J      PT                                            SS PIPE- TO- TEE                      B9.40B          2 X s*N/Aee I-2 CH 347    REF. DWG. NO. 02 030-B 008320  CH-347-FW-2                        B-J      PT                                              SS TEB-TO-PIPE                        B9.40B            2 X 1 lN/A**
8330  CH-347-SW-1                        B-J      PT                                            SS PIPE TO VALVE (SE-02 04)          B9.21B            2 X
                                                                                                    *IN/At%
I  2 CH-146    REF. DWG. NO. 02-030-B 008340  CH-146-SW-5                        B-J      PT                                            SS TEE TO-PIPE                        B9.40B            2 X
                                                                                                    +AN/A+a 008350  CH-146-SW 4                        B-J      PT                                            SS PIPE-TO TEE                        B9.40B          2 X 008370  CH-146-SW 2                        B-J      PT                                            SS TEE TO PIPE                        B9.40B          2 X
                                                                                                    ~ aN/Aee
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    92 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CHARGING  LINE TO LOOP 2A2                                  I  FIRST    SECOND      THIRD    I ZONE NUMBER:  032                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I SUNDRY EXAMINATIONARBA                    CATGY    NDE                  OUTAGE                    INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3    *~CALIBRATIONBLOCX~~
I-2-CH-147    REF. DWG, NO. 02-032-A 009000  CH 147-SW  45                    B-J      PT                                            SS PIPE-TO-VALVE (SE-02-02)          B9.21A          2            X aeN/Aaa 009010  CH-147-SW-43                      B  J    PT                                            SS TEB TO PIPE                      B9.40B          2 X e*N/Awe 009030  CH-147-SW-41                      B-J      PT                                            SS, 2" X  3/4'EDUCING    INSERT.
TEE TO-REDUCER                    B9.40B          2 X I          RCB 4 tH/AI0 009070  CH<<147-SW-37                      B-J      PT                                            SS PIPE-TO-TEE                      B9.40B          2                        X
                                                                                                    **N/A%I 009080  CH-147-SW-36                      B-J      PT                                            SS,  2i  X 3/4" REDUCING INSERT.
TEE-TO REDUCER                    B9.40B          2                        X 1 IN/Jp I 009090  CH-147-FW 35                      B-J      PT                                            SS TEE-TO PIPE                      B9.40B          2                        X RCB eeN/Awe I  2 CH-147  REF. DWG. NO. 02-032-C t 009340  CH-147-FW-9 PIPE-TO-TEE RCB B-J B9.40B PT 2            X SS
                                                                                                    ~ aN/Aae
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE:    93 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CHARGING  LINE TO  LOOP 2A2                                I  PIRST      SECOND    THIRD ZONE NUMBER: 032                          ASME              I  PERIOD    PERIOD    PERIOD SEC. XI        I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE    I          -OUTAGE-                INSTRUCTIONS NUMBER  IDENTIPICATION                    ITEM NO METH      I 1 2  3    1  2  3  4  1  2  3  oiCALIBRATION BLOCK+a I-2-CH-147    REF. DWG. NO. 02 032 C 009390  CH-147-SW-5                        B-J      PT                                        SS PI PE- TO- COUPLING                B9.40B          2            X
                                                                                                ~*N/A**
009400  CH-147-FW-4                        B-J      PT                                        SS COUPLING-TO- PIPE                  B9.40B          2            X
                                                                                                ~ aN/Aee I2  CH  148  REF. DWG. NO. 02 032 C 09440  RC-148-SW-2                        B  J      PT                                        SS VALVE (V-2485) -TO-PIPE            B9.21B          2            X RCB iiN/A~~
009450  RC-148-FW-1                        B-J      PT                                        SS PIPE-TO-SAFE END                  B9. 21C          2            X
                                                                                                *iN/Aii 009460  CH-704-771                        B-F      PT                                        NOZZLE MATL. SA  182, F 316.
SAFE END-TO-NOZZLE                B5.140          2            X
                                                                                                ~ *N/A@a I-2-CH-149    REF. DWG. NO. 02 032 A 009470  CH-106-R2                          F-A      VT-3 RIGID STRUT    SUPPORT            F1. 10K          2 X
                                                                                                +AN/Aea
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 94 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECI'ZON INTERVAL                PLAN STATUS CHARGING LINE TO  LOOP 2A2                                I  FIRST      SECOND      THIRD ZONE NUMBER: 032                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-                I INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~~CALIBRATION BLOCK~~
I-2-CH-147  REF. DWG. NO. 02-032-A 009480  CH-106-Rl                        F-A      VT-3 RIGID FRAME  SUPPORT            F1. 10D        2 X
                                                                                                ~~N/A~*
I-2-CH 147  REF. DWG. NO. 02 032-B 009700  CH-103-R7A                      F A      VT-3 RIGID  FRAME SUPPORT            P1. 10D        2                      -'
9730  CH-103-R6                        F-A      VT-3 RZGID FRAME SUPPORT              F1.)OD          2                        X RCB eeN/Aor Z-2-CH-147  REF. DWG. NO. 02-032-C 009740  CH-103-RSA                      F-A      VT 3 RIGID U-STRAP SUPPORT            P1. 10P        2            X
                                                                                                ~*N/A~*
009750  CH-103-RSB                      F-A      VT 3 RIGID STRUT  SUPPORT            F1. 10K        2            X 0lN/A41
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE:    95 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LOOP 2A1 PRIMARY DRAIN                                    I  FIRST      SECOND      THIRD ZONE NUMBER: 033                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE    I          -OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3      CALIBRATION BLOCK I-2-RC 113  REF. DWG. NO. 02-033 009800  RC-1503-771-C                  B-P      PT                                            SAPE END NOZZLE  MATL.- SA-105, NOZZLE-TO-SAFE END              B5.140          2 X                                    GR  2.
                                                                                                ~*N/A~~
009870  FLANGE                          B-G-2    VT-1                                          8 STUDS, 16 NUTS BOLTING                        B7.50            2 X RCB
                                                                                                ~~N/A~*
009880  VRC-1-R2                        FA        VT3 CLAMP SUPPORT                  F1. 10G          2 X
~        RCB
                                                                                                ~ aN/Aeo
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:    96 REVISION:      0                        INSERVICE INSPECTION SELECIED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECI'ION INTERVAL                PLAN STATUS LOOP 2A2 PRIMARY DRAIN                                      PIRST      SECOND      THIRD ZONE NUMBER: 034                      ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE    I            OUTAGE                I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3  <<<<CALIBRATION BLOCK<<<<
I  2 RC 116 REP. DMG. NO. 02-034 009890  RC-1503-771-A                  BP      PT                                            SAFE END MATL. SA 182, TYPE NOZZLE-TO-SAFE END            BS. 140        2            X                        F-316.
                                                                                              <<*N/A<<<<
009960  PLANGE                        B-G-2    VT-1                                          8 STUDS, 16 NUTS BOLTING                        B7.50          2 X RCB
                                                                                              ~ <<N/A<<<<
009970  VRC-1-Rl                      P-A      VT 3 CLAMP SUPPORT                  Fl. 10G        2            X
~        Rn
                                                                                              <<<<N/A<<<<
 
DATE:    07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    97 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCBEDULE CLASS 1 SCHEDULED COHPONENTS INSPECTION INTERVAL                PLAN STATUS LOOP  281 PRIMARY DRAIN                                    I  PIRST      SECOND      TBIRD ZONE NUMBER: 035                          ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I SUMHARY EXAMINATION AREA                  CATm    NDE                -OUTAGB- -              I  INSTRUCTIONS IDENTIFICATION                    ITEM NO METH        2        1  2                      ~ ~CALIBRATION BLOCK~ ~
NUMBER                                                      i 1    3          3  4    1  2  3 I I  2 RC-122    REF. DWG. NO. 02-035 009980  RC 1503    771-B                  B-F      PT                                            SAPB END  MATL.- SA-182, TYPB NOZZLE-TO-SAFE END                BS. 140        2                        X            P-316.
                                                                                                  ~ aN/A@a 009990  RC  122-FW-1                      B-J      PT                                            SS, SAFE END MATL.- SA-182, SAFE END-TO-PIPE                  B9. 21B        2                        X            TYPE  P-316.
                                                                                                  ~ aN/Aae 010000  RC-122-FW-2                      B-J      PT                                            SS PIPE-TO-TEE                      B9.40B          2            X RCB
                                                                                                  **N/A**
010010  RC-122-SW 3                      B-J      PT                                            SS TEE-TO PIPE                      B9.40B          2            X
                                                                                                  +AN/Ace 010020  RC-122-SW-4                      B-J      PT                                            SS PIPE TO-VALVE (V-1450)            B9.40B          2            X
                                                                                                  ~~N/A**
010050  FLANGE                            B G-2    VT-1                                          8 STUDS,  16 NUTS BOLTING                          B7.50          2 X
                                                                                                  ~~N/A~~
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    98 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECI'ZON INTERVAL                PLAN STATUS LOOP 2B2 PRIMARY DRAIN                                  I  FIRST      SECOND      THIRD    I ZONE NUMBER: 036                        ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XZ          I                                    I
 
==SUMMARY==
EXAMINATION AREA                CATm    NDE                - 0 U T A G  E-            INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~ ~CALIBRATION BLOCK~ ~
I I-2-RC-125  REF. DWG, NO. 02-036 010060  RC-1503-771-D                  B-P      PT                                            SAFE END NATL.- SA-182, TYPE NOZZLE TO-SAFE END              B5.140          2                          X            F 316.
                                                                                                *lN/A**
010130  PLANGE                          B-G-2    VT-1                                          8 STUDS,  16 NUTS BOLTING                        B7.50          2 X
                                                                                                *~N/A~*
010140  VRC-1-R3                        F-A      VT-3 CLAMP SUPPORT                  F1. 10G        2                          X
                                                                                                +AN/As@
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 99 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LETDOWN LINE    FROM LOOP  281                              I    FIRST      SECOND      THIRD ZONE NUMBER: 037                          ASME            I    PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE    I
                                                                - - - - - 0 U T A G E - - - - --  INSTRUCTIONS NUMBER  IDENTIPICATION                      ITEM NO METH      1  2  3    1  2  3  4    1  2  3  ~ ~CALIBRATION BLOCK~ ~
I-2-RC-142      REF. DWG. NO. 02-037 A 010150  RC-142-FW-1                        B-J      PT                                            SS TEE-TO-PIPE                        B9.40B          2                          X
                                                                                                  *IN/)+0 010160  RC-142-SW 2                        B-J      PT                                            SS PIPB- TO-COUPI ING                B9.40B          2 010170  RC-142-SW-3                        B-J      PT                                            SS COUPLING-TO-PIPE                  B9.40B          2                          X RCB IIN/A1~
010180  RC-142-SW-4                        B-J      PT                                            SS PI PE - TO- COUPLING              B9.40B          2                          X
                                                                                                  ~ eN/Aaa 010190  RC-142-FW-5                        B-J      PT                                            SS COUPLING-TO-PIPE                  B9.40B          2                          X e e N/Ae a 010200  RC  142-SW-6                      B-J      PT                                            SS PIPE-TO-COUPLING                  B9.40B          2                          X
                                                                                                  *eN/Aa*
010210  RC-142-FW-7                        B  J    PT                                            SS COUPLING-TO-PIPE                  B9.40B          2                          X IPN/A%A
 
DATE:  07/24/93                                    ST. IUCIE NUCLEAR PLANT UNIT 2                                PAGE: 100 REVISION:        0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LETDOWN  LINE  FROM LOOP 2B1                                    FIRST      SECOND    THIRD ZONE NUMBER: 037                          ASME                  PERIOD    PERIOD    PERIOD  I SEC. XI          I-                                I
 
==SUMMARY==
BXAMINATIONAREA                    CATGY    NDE      I          -OUTAGE------          I  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4  1  2  3    **CALIBRATIONBLOCK~~
I-2-RC-142    REF. DWG. NO. 02 037 A 010220  RC-142-SW-8                      B-J      PT                                            SS PIPE-TO-COUPLING                  B9.40B          2            X
                                                                                                    +AN/Aaa 010230  RC-142-FW-9                      B-J      PT                                            SS COUPLING TO PIPE                  B9.40B          2            X RCB OtN/A4k 010240  RC-142-SW-10                      B-J      PT                                            SS PI PE- TO-COUPLING                B9.40B          2            X
~        R~
                                                                                                  *ON/AI0 010250  RC  142-FW-11                    B-J      PT                                            SS COUPLING- TO-PIPE                B9.40B          2            X
                                                                                                  ~~N/A~ ~
010260  RC-142-SW-12                      B-J      PT                                            SS PI PE- TO-COUPLING                B9.40B          2            X e IN/A10 010270  RC 142 FW 13                      B-J      PT                                            SS COUPLING- TO- PI PE              B9.40B          2            X 0 1N/A1 e 010290  RC-142  SW 18                    B-J      PT                                            2~ X 3~ REDUCER. SS REDUCER- TO-VALVE {V  2593)      B9.21B          2            X eeN/gP>>
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 101 REVISION:      0                          INSERVICE INSPECI'ION SELECIED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LETDOWN LINE  FROM LOOP  2B1                              I  PIRST      SECOND      THIRD    I ZONE NUMBER: 037                          ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XI        I                                    I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - 0 U T A G  E-            INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3    a >>CALIBRATION BLOCK>> a I
I-2-RC-142    REF. DWG. NO. 02 037 A 010300  V-2593                            B-G-2    VT-1                                            16 STUDS AND NUTS VALVE BOLTING                      B7.70          2            X a>>N/Aaa 010310  RC-142-SW-19                      B  J    PT                                            2>> X  3" REDUCER. SS VALVE (V 2593)    TO-REDUCER      B9.21B          2            X a>>N/A" ~
010330  RC-142-FW-17                      B-J      PT                                            SS PIPE-TO-VALVE (V-2515)            B9.21B          2            X a>>N/Aaa I-2-RC-145    REF. DWG. NO. 02-037-8 010350  CH-145-SW-1                        B-J      PT                                            SS VALVE  (V-2515)-TO-PIPE          B9.21B          2 X a>>N/Aa*
010360  CH-145-SW-2                        B-J      PT                                            SS PIPE- TO-ELBOW                    B9.40B          2 X a>>N/Aaa 010370  CH-145-SW-3                        B-J      PT                                            SS BLBOW-TO-PIPE                      B9.40B          2 X RCB a>>N/Aa*
t010380  CH-145-SW 4 PIPE-TO-ELBOW RCB B-J B9.40B PT 2 X SS
                                                                                                    ~ >>N/Aaa
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 102 REVISION:      0                          INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LETDOWN  LINE  FROM LOOP 2B1                              I  FIRST      SECOND      THIRD ZONE NUMBER: 037                          ASME                PERZOD    PERIOD      PERIOD SEC. XZ          I SUh04ARY EXAMINATION AREA                  CATGY    NDE    I          -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I  "~CALIBRATION BLOCK~ i I2  RC-145    REF. DWG. NO. 02 037 B 010390  CH-145-SW-5                      B-J      PT                                            SS ELBOW-TO PIPE                    B9.40B          2 X
                                                                                                  *AN/Jpe 010400  CH-145 SW-6                      B  J    PT                                            SS PI PE- TO- TEE                    B9.40B          2 X
                                                                                                  +AN/A+a 010410  CH-145-SW-7                      B-J      PT                                            SS TEE TO-PIPE                      B9.40B          2 X RCB PPN/AP0 010430  CH-145-PW-8                      B-J      PT                                            SS TEE- TO-PIPE                      B9.40B          2 X
                                                                                                  +AN/Ae*
010440  CH-145-SW-9                      BJ    l  PT                                            SS PIPE TO-ELBOW                    B9.40B          2 X o*N/A+a 010450  CH-145-SW-10                      B-J      PT                                            SS ELBOW-TO-PIPE                    B9.40B          2 X
                                                                                                  +AN/Aae 010460 -CH-145 SW 11                      B-J      PT                                            SS PIPE TO-ELBOW                    B9.40B          2 X 41N/At%
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGB: 103 REVISION:      0                        INSERVICE INSPECTION SELECZED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LETDOWN  LINE  FROM LOOP 2B1                              I  PIRST    SECOND      THIRD ZONE NUMBER: 037                          ASME              I  PERIOD    PERIOD      PERIOD    I SEC. XZ                                            - I
 
==SUMMARY==
EXAMINATION AREA                  CATGY  NDE                --OUTAGE------I              INSTRUC1'ZONS NUMBER    IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  I  t*CALIBRATZON BLOCKtt I-2 RC 145  REF. DWG. NO. 02-037 B 010470  CH-145-SW-12                    B-J      PT                                              SS ELBOW-TO-PIPE                    B9.40B          2 X t*N/A*t 010480  CH-145-SW-13                    B-J      PT                                              SS PIPE-TO-TEE                      B9.40B          2 X RCB
                                                                                                    ~ tN/Att 010500  CH-145-SW-15                    B-J      PT                                              SS TEE-TO-PIPE                      B9.40B          2 X
~        R~
ttN/At*
010510  CH-145-SW-16                    B-J      PT                                              SS PIPE- TO-ELBOW                  B9.40B          2 X
                                                                                                    ~  *N/At*
010520  CH-145-SW-17                    B  J    PT                                              SS ELBOW-TO-PIPE                    B9.40B          2 X ttN/Att 010530  CH  145-SW-18                    B-J      PT                                              SS PIPE-TO ELBOW                    B9.40B          2 X
                                                                                                    **N/A*1 010540  CH-145-FW-19                    B-a7    PT                                              SS ELBOW-TO-PIPE                    B9.40B          2 X ttN/Att
 
DATB:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 104 REVISION:      0                        INSBRVICE INSPECTION SBLECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LETDOWN LINE  FROM LOOP 2B1                              I  FIRST      SECOND      THZRD ZONE NUMBER: 037                        ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XZ          I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY  NDB                -OUTAGB- -        - -    I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    ( 1 2  3    1  2  3  4    1  2  3 I tt CALIBRATION BLOCKtt I-2-RC-145  REP. DWG. NO, 02-037 B 010550  CH-145-SW-20                    B-a7    PT                                            SS PIPB-TO-VALVB (V-2516)          B9.21B          2 X
                                                                                              ~ tN/Att I-2-RC-142  REF. DWG. NO. 02-037 A 010610  RC-2-R4                        P-A      VT-3 RIGID  FRAME SUPPORT            Fl. 10D        2                        X
                                                                                              ~ tN/Att 10660  RC-2-Rl                        P-A      VT-3 RIGID U-STRAP SUPPORT          Fl. 10D        2            X ttN/Att 010670  RC-2-R8                        P-A      VT-3 VARIABLE SPRING SUPPORT        Fl.SOB          2            X ttN/Att I-2-CH-145  REF. DWG. NO. 02-037 B 010710  CH-109-R7A                      F-A      VT-3 VARIABLE SPRING SUPPORT        F1.50B          2 X
                                                                                              ~ tN/Att 010740  CH-109-R5                        F-A    VT-3 VARIABLB SPRING SUPPORT          Fl. SOB        2 X RCB
                                                                                              *tN/At*
 
DATB:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGB: 105 REVZSZON:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPBCTION INTERVAL                PLAN STATUS LETDOWN LINB FROM LOOP 2B1                            I    FIRST      SBCOND      THIRD ZONB NUMBER: 037                      ASME          I    PERIOD    PERIOD      PERIOD SEC. XZ        I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDB              -OUTAGB-                  INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH    1  2  3    1  2  3  4    1  2  3 ~~CALIBRATION BLOCKi~
I-2-CH-145  RBF. DWG. NO. 02-037-B 010780  CH-109-R4A                    F-A      VT-3 RIGID U-STRAP SUPPORT          F1. 10F        2 X 1 IN/A1I
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    106 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS PRESSURIZER RELIEF LINE                                            FIRST    SECOND      THIRD ZONE NUMBER: 038                          ASME                I  PERIOD    PERIOD      PERIOD  I SEC. XI          I-
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                  -OUTAGE-      - - -    I  INSTRUCTIONS IDENTIFICATION                    ITEM NO METH          2      1    3          2        >> <<CALIBRATION BLOCK>>>>
NUMBER                                                        I 1    3      2    4    1      3 I  4 RC 101  REF. DWG. NO. 02-038 010790  RC-506-671                        B-F      UT NOZZLE-TO-SAPE END                B5.40      PT      2 X
                                                                                                      <<*UT 19<<<<
010800  RC-101-FW 1                      B-J      UT                                              SAFE END MATL.- SA-182,    F-316.
SAFE END-TO-PIPE                  B9. 11B  PT      2                        X            SS
                                                                                                      <<<<UT 39<<<<
010810  RC-101-1-SW-13                    B-J      UT                                              TEE NATL.- SA-403, WP-304.      SS PIPE-TO-TEE                      B9. 11B  PT      2                        X RCS
                                                                                                    <<<<UT-39>>>>
I  3-RC-309 REF. DWG. NO. 02 038 010870  V-1476                            B-G-2    VT-1                                            PART OP  LINE 3 -RC-309 & SPOOL VALVE BOLTING                    B7. 70            2                        X            4"  RC 101-1, TAKE IDENT. PROM RCB                                                                                        SPOOL. 16 STUDS AND NUTS
                                                                                                    <<<<N/A>>>>
010880  RC-309-FW-2                      B-J      PT                                              SS VALVE (V-1476) -TO-PIPE          B9. 21B          2
                                                                                                    <<<<N/A<<<<
010910  V-1474                            B-G-2    VT-1                                            8 STUDS & NUTS VALVE BOLTING                    B7.70            2                        X
                                                                                                    >>*N/A>>>>
I  4 RC-101  REF  DWG. NO. 02-038 0930  RC-101-1-SW-7                    B-J        UT                                              ELBOW  MATL.- SA-403, WP-304.
PIPE- TO-ELBOW                    B9. 11B    PT    2                          X            SS
                                                                                                    <<<<UT 39<<*
 
DATE:  07/24/93                                    ST. IUCIE NUCLEAR PLANT UNIT 2                                    PAGE:  107 REVISION:      0                          INSERVZCE ZNSPECTZON SBLECZED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS PRESSURIZER RELIEF LINE                                    I  PIRST      SECOND      THIRD ZONE NUMBER: 038                        ASMB              I  PERIOD    PERIOD      PERIOD SEC. XI          I
 
==SUMMARY==
EXAMINATION AREA                  CATm      NDE                - OUT AG    E-          I  IN STRUCI'ZONS NUMBER    IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  iiCALIBRATIONBIDCKii I-4-RC-101  REF. DWG. NO. 02-038 010940  RC-101-1-SW-6                    B-J      UT                                            ELBOW  MATL.- SA-403, WP-304.
ELBOW-TO-PIPE                  B9.11B    PT      2                        X            SS 1*UT  39' 010950  RC-101-1-SW-5                    B-J      UT                                            BLBOW  MATL.- SA-403, WP-304.
PIPE-TO-ELBOW                  B9. 11B  PT    2                          X            SS
                                                                                                    **UT 3 9**
010960  RC-101-1-SW-4                    B-J      UT                                            BLBOW  NATL.- SA-403, WP-304.
ELBOW-TO-PIPE                    B9. 11B  PT    2                          X            SS RCB 41UT 394 ~
I  3 RC 310  REF. DWG. NO. 02-038 011010  V-1477                          B-G-2    VT-1                                          16 STUDS AND NUTS VALVE BOLTING                    B7.70            2
                                                                                                    ~ aN/Aee 011030  RC-310-1 SW-1                    B-J      PT                                            SS PIPB- TO-PLANGE                  B9.21B          2                          X
                                                                                                    *iN/A~+
011050  V-1475                          B-G-2    VT-1                                          8 STUDS & NUTS VALVE BOLTING                    B7.70            2                          X 1 1N/AI0 l011060  RC-4300-70 VARIABLE SPRING SUPPORT RCB F1.50B VT-3 2                          X
                                                                                                    +AN/Are
 
III DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 108 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 1 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS PRESSURIZER RELIEF LINE                                  I  FIRST      SECOND      THIRD ZONE NUMBER: 038                        ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                CATGY  NDE                  OUTAGE                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4          3  ~4CALIBRATZON BLOCK~~
I-3-RC-309  REF. DWG. NO. 02-038 011080  RC-4300-9                        F-A    VT-3 VARIABLE SPRING SUPPORT          F1.50B        2                        X
                                                                                              ~ sN/Aor
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVlSION 0 SELECTED COMPONENTS SCHEDULE              July 24, 1993 5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Inservice Inspection Examination Tables for nondestructive examinations selected for examination during the Second Inservice Inspection Interval.
Page 109 of 398
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:          110 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS STEAM GENERATOR 2A SECONDARY SIDE                                FIRST    SECOND      THIRD ZONE NUMBER: 041                        ASME              I    PERIOD    PERIOD      PERIOD  I XI                                            -
SEC.
CATGY    NDE    J I
                                                              - - - - - -OUTAGE        -----I  I INSTRUCTIONS NUMBER    IDENTIPICATION                ITEM NO METH      i 1  2  3    1  2  3  4                *~CALIBRATIONBLOCK~~
REP. DWG. NO. 02 041 011100  SG-2A-203-246                  CA        UT                                              EXTENSION RING  NATL.- SA-533, 2ND EXT. RING-TO-TUBESHEET      Cl. 30            2                        X            GR-B, CL-1, T~S  5/8  MIN.
SUBJECT OF RELIEF REQUEST 14
                                                                                                  %1UT 25%0 011110  SG-2A 101-241                  C-A      UT                                            EXTENSION RING  NATL.-
SA-533'R-Bg 2ND EXT. RING-TO-LOWER SHELL    C1.10            2                                              Ch-I) Ti5 5/8 MIN.,
LOWER  SHELL - Ti4 7/16 MIN.
SUBJECT OP RELIEF REQUEST 14
                                                                                                  ~*UT-25~~
011120  SG-2A-102-221                  C-A      UT                                            CONE  MATL.- SA 533, GR-B, INTER. SHELL-TO-CONE WELD      Cl. 10          2                          X            CL 1 g T~S  5/8 MIN RCB                                                                                      INTERMEDIATE SHELL MATL.-
SA-533 GR-Ag Ch-lg T 4 7/16
                                                                                                        ~
MZN. SUBJECT OF RELIEP REQUEST
                                                                                                  **UT 25' 011130  SG-2A-101-221                  C-A      UT                                            CONE  MATL.- SA-533, GR-B, CONE-TO"UPPER SHELL WELD        Cl. 10          2                          X            CL-1, T~S 5/8" MIN., UPPER RCB                                                                                      SHELL MATL.- SA-533, GR-A, Ch-lg T~4 7/8" MIN.
                                                                                                  ~~UP-25~*
011140  SG-2A 201 271                  C-A      UT                                            TORUS  -  T~3 1/4" MIN.(      UPPER TOP HEAD TO-UPPER SHELL WELD    C1.20            2                          X            SHELL MATL. - SA-533, GR-A, CL-1, Ta4 7/Si MZN.
                                                                                                  ~~UZ'-7,UT 25~*
011150  SG-2A-106-201                  C-A      UT                                            TORUS  - Tr3 1/4" MZN.,      DOME DOME- TO- TORUS WELD            Cl. 10          2                          X            MATL. SA-533, GR-B,CL 1( T~4 1/2"  MZN.
                                                                                                  **UT-7,UT-25**
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:  111 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS STEAM GENERATOR 2A SECONDARY SIDE                            I  FIRST    SECOND      THIRD    I ZONE NUMBER: 041                        ASME                I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY      NDE                  OUTAGE-                  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3    ~ ~ CALIBRATION BLOCK~ ~
REF. DWG. NO. 02-041 011160  SG-2A-105-201                    C-B        UT                                            DOMB  MATL.- SA-533, GR-B, STEAM NOZZLE-TO-HEAD HELD        C2. 21    MI'                              X            CL-1, T~4 1/2 MIN.
RCB esUT 25m*
011170  SG-2A-105-201-IR                C-B        UT STEAM NOZZLE INNER RADIUS        C2. 22            2                        X RCB otUT 251t 011180  SG-2A-111-221                    C-B                                                      UPPER SHELL    MATL.- SA-533, FEEDWATER NOZZLE-TO-SHELL HELD  C2.21                                                    GR-A, CL-1, Te4    7/8 MIN.
e 2                        X Rm                                                                                        SUBJECT OP RELIEP REQUEST 14
                                                                                                    **UT 251*
011190  SG-2A-111 221 IR                C-B        UT FEEDHATER NOZZLE INNER RADIUS    C2.22            2                        X 1aUT 2510 011200  SG  2A 204 246                  C-A        UT                                            SEE ZONE 3    (CLASS I)  FOR STAY CYL. DOME-TO- TUBESHEET    C1 . 30          2                        X            ADDITIONAL STAY CYLINDER WELDS.
                                                                                                    ~*UT 31ee 011210  SG-2A-103-221-A                  C-C        MT KEY BRACKET 0 0 DEGREES          C3. 10            2                        X RCB
                                                                                                    ~ ~N/A~ ~
011220  SG-2A-103-221-B                  C-C        PT KEY BRACKET 8 180  DEGREES        C3. 10            2                        X
                                                                                                    ~ aN/A+a
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                                  PAGE:  112 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS STEAM GENERATOR 2A SECONDARY SIDE                        I  PIRST      SECOND      THIRD ZONE NUMBER: 041                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE                -OUTAGE------            I  INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3    ~ ~CALIBRATION BLOCK~ ~
t REF. DWG. NO. 02-041 011230  SG-2A-104-221-A                C-C      MT CLEVIS BRACKET 8 45 DEGREES    C3.10            2                        X eaN/Aeo 011240  SG-2A-105-221-A                C-C      MT SUPPORT BRACKET 0 90 DEGREES    C3.10            2 RCB
                                                                                                ~*N/A~~
011250  SG-2A-104-221-B                C-C      MT CLEVIS BRACKET 4 135 DEGREES    C3.10            2                        X RCB eaN/Ass 011260  SG-2A 104 221-C                C-C      MT CLEVZS BRACKET  225 DEGREES    C3.10            2                        X saN/A>>"
011270  SG-2A-105-221-B                C-C      MT SUPPORT BRACKET 4 270 DEGREES  C3.10            2                        X
                                                                                                ~ aN/Ae a 011280  SG-2A-104 221-D                C-C      MT CLEVIS BRACKET Q 315 DEGREES    C3.10            2 RCB
                                                                                                ~ aN/Aee 011281  SG-2A-FR                        FEEDRNG VT                                              PEED RING TO BE EXAMZNED EACH FEED RING                      RING            2 X                                    OUTAGE ISN/A11
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                              PAGE:  113 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS STEAM GENERATOR 28 SECONDARY SIDE                      I    FIRST      SECOND      THIRD ZONE NUMBER: 042                        ASME          I    PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                CATGY  NDE                -OUTAGE-                INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    1  2  3    1  2  3  4    1  2  3 ~~CALIBRATION BLOCK+~
REF. DWG. NO. 02-042 011471  SG-2B-FR                        FEEDRNG VT                                          FEED RING TO BE EXAMINED EACH FEED RING                      RING          2                        x          OUTAGE.
                                                                                            **N/Aa*
 
DATE:    07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:  114 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECI'ZON INTERVAL                PLAN STATUS LPSI  PUMP 2A DISCHARGE HEADER    PIPING                      I  FIRST      SECOND      THIRD ZONE NUMBER: 043                            ASME              I  PERIOD    PERIOD      PERIOD SEC. XI        I                                  I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE              - -OUTAGE-      - - - - - I  INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 I  ~"CALIBRATION BLOCK~~
I 6-SI-409    REF. DWG. NO. 02-043-C 012390    SI-409-FW-1                        C-F-1    UT                                            SS, TERMINAL END.
VALVE (HCV-3615) -TO-PIPE          CS. 11A  PT      2            X PIUT 380P I-6 SI-129    REF. DWG. NO. 02-043-C 012400    SZ-129-1A-SW-1                    C-F-1    UT                                            SS, STRUCTURAL DISCONTINUITY PIPE- TO-ELBOW                    C5.11D    PT    2            X
                                                                                                    **UT-38~*
12410    SI-129  FW  901                    C-F-1    UT                                            SS, STRUCTURAL DZSCONTINUITY.
ELBOW-TO-PIPE                      CS. 11D  PT    2            X aeUT 38am I-6-SI-113    REF. DWG. NO. 02-043-C 012440    SI  113 1-SW-1                    C-F-1    UT                                            SS,  6~ X  6" X 3" REDUCING TEE.
PIPE-TO-TEE                        C5. 11D  PT    2            X 44UT 3841 I-6-SI-113    REF. DWG. NO. 02-043-D 012710    SI-113-FW-5                        C  F-1    UT                                            SS, STRUCTURAL DISCONTINUITY.
ELBOW-TO-ELBOW                    CS. 11D  PT    2 X 44UT 3814 012720    SZ 113 5 SW 1                      C  F-1    UT                                            SS, STRUCTURAL DISCONTINUITY.
ELBOW TO  PIPE                    C5.11D    PT    2 X
                                                                                                    ~ lUT  38I*
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  115 REVISION:      0                        INSERVICE INSPECTION SELECZED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LPSI  PUMP 2A DISCHARGE HEADER  PIPING                      I  FIRST      SECOND      THIRD ZONE NUMBER: 043                          ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XZ          I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE                - OUTAGE - -            I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    J  1                          2  3 I  >>>>CALIBRATION BLOCK>>>>
I'6-SI-113  REP. DWG. NO. 02-043-D 012750  SI-113-FW-6                      C-P-1    UT                                            SS, TERMINAL END.
PIPE-TO-PENETRATION 36          C5.11A  PT      2 X
                                                                                                  >>>>UT-38>>>>
I  6 SI-112  REF. DWG. NO. 02 043-F 013090  SI-112-2-SW 3                    CP1      UT                                            SS, STRUCIURAL DISCONTINUITY.
PIPE- TO-ELBOW                  CS. 11D  PT    2                          X
                                                                                                  *>>UT 38>>>>
13100  SI-112-2-SW-2                    C  P-1  UT                                            SS, STRUCTURAL DISCONTINUITY.
ELBOW-TO-PIPE                    CS. 11D  PT    2                          X
                                                                                                  <<>>UT-38>>*
013220  SI-112-FW-6                      C-F-1  UT                                              SS, TERMINAL END.
PIPE-TO PENETRATION 37          CS. 11A  PT    2                          X
                                                                                                  **UT 38>>>>
I  6 SI 113  REF. DWG. NO. 02-043-D 013430  SI-2408-9                        F-B    VT-3 RIGID  FRAME SUPPORT            Pl. 10D        2 X
                                                                                                  >>>>N/A>>>>
I-6-SI  112  RFF. DWG. NO. 02-043-F 013470  SZ-2408-106                      P-B    VT-3 RIGID PRAME  SUPPORT            F1.10D          2                          X
                                                                                                  >>>>N/A>>>>
 
e DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 116 REVISION:      0                        ZNSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LPSI  PUMP 2A DISCHARGE HEADER  PIPING                        FIRST      SECOND      THIRD    I ZONB NUMBER: 043                          ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XZ                                            I
 
==SUMMARY==
EXAMINATION AREA                  CATGY  NDE    I            0UTAG E-                INSTRUCTIONS NUMBER  IDENTIPI CATION                  ITEM NO METH    i 1 2  3    1  2  3  4    1  2  3  *tCALIBRATIONBLOCKtt I 6 SI-112  REF. DWG. NO. 02-043-F 013480  SZ-2408 114                      F-B    VT-3 RIGID FRAME SUPPORT              F1.10D        2                        X ttN/Att
 
DATE:    07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  117 REVZSZON:        0                          INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS LPSI  PUMP 2B DISCHARGE HEADER  PIPING                      I  FIRST      SECOND      THIRD    I EONB NUMBER: 044                            ASME              I  PERIOD      PERIOD      PERIOD  I SEC. XZ          I                                    I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE                - 0  U T A G  E-            INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH        1 2  3      1  2  3  4    1  2  3 I  **CALIBRATIONBLOCKt t I-6-SZ-146  REF. DWG. NO. 02-044 C I
014560    SZ-146-1A-SW-2                    C-F-1    UT                                              SS, STRUCTURAL DISCONTINUITY.
ELBOW-TO-PIPE                    C5.11D  PT      2 X t tUT 38 ~ t 014570    SI-146-FW-2                      C-F-1    UT                                              SS, TERMINAL END.
PIPE-TO-VALVE (V-3144)            C5.11A  PT    2 X
                                                                                                      *tUT-38tt I-6-SI-110  REF. DWG. NO. 02 044-D 4580    SI 110-FW  1                      C-F-1    UT                                              SS, TERMINAL END.
VALVE (V-3144) -TO-PIPE          C5.11A  PT    2 X ttUT 38tt I-6-SI-110  REF. DWG. NO. 02 044 E 014900    SZ-110-8-SW-1                    C-F-1    UT                                              SS, STRUCTURAL DISCONTINUITY.
PIPE-TO-ELBOW                    CS. 1 1D PT    2              X t*UT-38tt 014910    SI-110-FW-9                      C-F-1    UT                                              SS, STRUCTURAL DISCONTINUITY.
ELBOW-TO-PIPE                    C5. 11D  PT    2              X
                                                                                                    ~ tUT-38*>>
014920    SZ-110-FW-10                      C  F-1  UT                                              SS, TERMINAL END.
PIPE-TO-PENETRATION 39            CS. 11A  PT    2              X ttUT 38tt
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                              PAGE:  118 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LPSZ PUMP 2B DISCHARGE HEADER PIPING                        I  FIRST    SECOND      THIRD ZONE NUMBER: 044                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XZ          I SUh04ARY EXAMINATION AREA                CATm    NDE                  OUTAGE-                INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~ iCALIBRATION BLOCKii
(
I  6 SI 111  REF. DWG. NO. 02 044  G 015430  SZ-111-6A-SW-2                  CP1      UT                                          SS, STRUCZURAL DISCONTINUITY.
ELBOW-TO-PIPE                    CS. 11D  PT      2                        X
                                                                                                ~ 'UT-38*+
015440  SZ 111 6A-SW-3                  C-P 1    UT                                          SS, STRUCTURAL DISCONTINUITY.
PIPE- TO-ELBOW                  C5. 11D  PT    2                        X
                                                                                              *IUT 38ee 015450  SZ 111 FW 8                      C  P-1  UT                                          SS, STRUCTURAL DISCONTINUITY.
ELBOW-TO-PIPE                    CS  11D  PT    2                        X
                                                                                              ~ JUT  3841 015460  SI-111  FW 9                    C-P-1    UT                                          SS, TERMINAL END.
PIPE-TO-PENETRATION 38          C5. 11A  PT    2                        X
                                                                                              *JUT 380*
I  6 SI 110  REF. DWG. NO. 02-044-E 015610  SZ-2410 128                      P-B      VT-3 RIGID STRUI'UPPORT              Fl. 10K        2                        X PPN/A4 ~
015620  SI-2410-134                      F-B      VT-3 RIGID  FRAME SUPPORT            Fl. 10D        2                        X
                                                                                              +AN/Awe 015630  SI-2410-139                      P-B    VT-3 Fl. 10D        2                        X aoN/Aea
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 119 REVISION:        0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LPSI  PUMP 2B DISCHARGE HEADER  PIPING                    I  PIRST      SECOND      THIRD ZONE NUMBER: 044                          ASME            I  PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA SEC. XZ CATGY  NDE              - - 0 U T A G E ------I  I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1 2  3      1  2  3  4            iiCALIBRATIONBLOCKii I  6-SI-110  REF. DWG. NO. 02 044-E 015640  SI-2410 143                      F-B    VT-3 VARIABLE SPRING SUPPORT          F1.50B        2                          X
                                                                                              ~ iN/Aii I-6 SI-111  REF. DWG. NO. 02 044-G 015750  SI-2410 1401                    F-B    VT-3 RIGID  FRAME SUPPORT            P1. 10D        2              X e eN/Ae a 15760  SI-2410-10                      F-B    VT 3 RIGID  FRAME SUPPORT            F1. 10D        2              X
                                                                                              *ON/A11 015770  SZ-2410-6                        F-B    VT-3 RIGID STRUT  SUPPORT            F1.10K        2              X eaN/A@a
 
f>
DATE:  07/24/93                                      ST. LUCIB NUCLEAR PLANT UNIT 2                                PAGB:  120 REVISION:      0                        INSERVZCB INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS SAFETY INJECTION PIPING TO  SI TANK 2A2                  I  PIRST      SBCOND    THIRD BONE NUMBER:  045                        ASMB              I  PERIOD    PERIOD    PERIOD  I SEC    XZ        I                                  I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                - 0UTAG E-                INSTRUCTIONS NUMBER  IDENTIPZCATION                  ITEM NO MBTH        1 2  3    1  2  3  4  1  2  3 I ttCALIBRATION BLOCK>>"
I  6 SI 113  RBF. DWG. NO. 02-045 015790  SI-113-7-SW-3                    CP1      UT                                          SS, STRUCIURAL DISCONTINUITY.
PIPB-TO-BLBOW                    C5.11D    PT    2 X ttUT 38tt 015880  SI-4200-322C                    C-C      PT                                          THICKNESS t  1 1/4t WELDED ATTACHMENTS (8 SHEAR      C3. 20          2 X LUGS) 1 t N/Att 016000  SZ-4200-318                      F-B,      VT-3 RIGID FRAME  SUPPORT            F1.10D          2 X ttN/Att 016090  SI-4200-6330                    F-B      VT-3 RZGID STRUT SUPPORT              Fl. 10K          2            X
                                                                                                ~ tN/Att
 
DATEt  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:  121 REVISION:      0                        INSERVICE INSPEC1'ZON SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                    PLAN STATUS SAFETY INJECI'ION PIPING TO SI  TANK 2A1                  I    FIRST      SECOND      THIRD ZONE NUMBER: 046                        ASME              I    PERIOD      PERIOD      PERIOD SEC. XZ          I
                                                                                                  - I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE        - - - - - - 0  U T A G E - - - - - -  I  INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH      1  2  3    1  2  3  4    1  2  3  I  **CALIBRATIONBLOCK**
I-6-SZ-112  REF. DWG. NO. 02 046 016100  SZ 112-FW 7                      C-P-1    UT PENETRATION 37-TO PIPE          C5. 11A  PT      2              X 016110  SI-112-7-SW-3                    C-F-1    UT                                                  SS, STRUCIURAL DISCONTINUITY.
PIPE-TO-ELBOW                    C5.11D  PT    2              X 016290  SI-4201-702                      F-B      VT-3 RIGID STRUT SUPPORT              F1. 10K        2              X e*N/Awe 016320  SI-4201-711                      F-B      VT-3 VARIABLE SPRING SUPPORT          F1.50B          2              X
                                                                                                      *1N/JP t 016370  SZ-4201-7201A                    F-B      VT-3 RIGID PRAME Ec STRUT SUPPORT    F1.10K          2              X
                                                                                                      @AN/Aa*
016500  SZ-4201 7391                    F-B    VT-3 RIGID FRAME L STRUI'UPPORT      F1.10K          2              X
                                                                                                      ~~N/A~*
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 122 REVISION:      0                        INSERVICE INSPECTION SELECIZD COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS SAPETY INJECI'ION PIPING TO SI TANK 2B1                  I  FIRST      SECOND      THIRD    I ZONE NUMBER: 047                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                CATGY    NDE                - OUTAGE-                I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3  >><<CALIBRATION BLOCK>>>>
I-6-SI-111  REP. DWG. NO. 02 047 016520  SI-111-PN-10                    C  P-1    UT                                            SS, TERMINAL END.
PIPE-TO-VALVE (V-3260)          C5. 11A  PT    2                        X
                                                                                                <<>>UT-38<<>>
016530  SI-4204-1440                    P-B      VT-3 RIGID STRUT SUPPORT            Pl. 10K          2                        X
                                                                                                **N/A>>>>
 
DATE:  07/24/93                                      ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGB:  123 RBVZSION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PIJR STATUS SAFETY INJECI'ZON PIPING TO  SI TANK 2B2                  I  FIRST      SECOND    THIRD    I ZONE NUMBER: 048                          ASME              I  PERIOD    PERIOD    PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                  CATOY    NDE                - OUTAGE-                INSTRUC1 ZONS NUMBER  IDENTIFICATION                    ITEM NO METH        1 2  3    1  2    3 4  1  2  3  ~ ~CALIBRATION BLOCK~~
I  6 SI 110    REF. DWG. NO. 02 048 1
016590  SI 110  8A  SW  1                C-F-1    UT                                          SS, STRUCTURAL DISCONTINUITY.
PIPE-TO-ELBOW                    C5.11D    PT    2            X
                                                                                                +FAUT 38ee 016700  SZ-4203-201                      F-B      VT 3 VARIABLE SPRING SUPPORT          Fl. 50          2            X etN/A@a 016770  SI-4203-24A                      F-B      VT-3 RIGID STRUT SUPPORT              F1.10K          2            X
                                                                                                **N/A**
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  124 REVISION:      0                      INSERVICE INSPECTION SELECIED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS SHUTDOWN COOLING HEAT EXCHANGER 2A                          FIRST      SECOND      THIRD ZONE NUMBER: 055                      ASME                  PERIOD      PERIOD      PERIOD SEC. XI        I-                                  I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                - 0UTAG B-                  INSTRUCTIONS IDENTIFICATION                ITEM NO METH          2        1  2            2        ~ *CALIBRATION BLOCK>>>>
NUMBER                                                  i 1    3            3  4    1      3 I REF, DWG. NO. 02-055 020600  1-2701                        C-A      UT                                            MATL.- SA-240, TP-304 CLAD.
FLANGE-TO-BODY WELD            C1. 10            2                        X 56*>>
020610  1-2702                        C-A      UT                                            MATL.- SA<<240( TP-304 CLAD.
BODY-TO-TUBESHEET WELD        C1.30            2                          X
                                                                                                **UT-56>>'20620 1  2741-1                      C-B      VT-2                                          NOT ACCESSIBLB FROM  O.D.
INLET NOZZLE-TO-VESSEL WELD    C2. 33          2                          X            NATL.- SA-240, TP-304 CLAD.
REINFORCEMENT PAD WELDS.
                                                                                                >>*N/A**
020624  1-2741-2                      C-B      MT                                            REINFORCEMENT PAD WELD.
PAD- TO-VESSEL                C2.31            2  - -  -  '
                                                                          -  -  -  X
                                                                                                >>>>N/A**
020628  1-2741-3                      CB        MT                                            RBINFORCEMENT PAD WELD.
PAD- TO-VESSEL                C2. 31          2                          X
                                                                                                >>*N/A>>>>
020630  1 2742-1                      C-B      VT 2                                          NOT ACCESSIBLB FROM  O.D.
OUTLET NOZZLB-TO-VESSEL WELD  C2.33            2                          X            MATL.- SA-240( TP-304 CLAD.
REINFORCEMENT PAD WELDS.
                                                                                                <<>>N/A<<>>
020634  1-2742-2                      CB        MT                                            REINFORCEMENT PAD WELD.
PAD TO VESSEL                  C2. 31          2                          X
                                                                                                >> <<N/A>>>>
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 125 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECI'ZON INTERVAL                PLAN STATUS SHUTDOWN COOLING HEAT EXCHANGER 2A                      I    PIRST      SECOND      THIRD    I ZONE NUMBER: 055                      ASME            I    PERIOD    PERIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE    I          -OUTAGE-                I ZNSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1  2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
REF. DWG. NO. 02-055 020638  1-2742-3                      C-B      MT                                            REINFORCEMENT PAD WELD.
PAD-TO-VESSEL                  C2.31            2                        X
                                                                                              ~ aN/Are
 
l' DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                      PAGE:  126 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONEHT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS HPSI PUMP 2A TO HEADER A                                        FIRST      SECOND      THIRD ZONE NUMBER: 061                          ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI                                              I
 
==SUMMARY==
EXAMINATION AREA                  CATQY    NDE                -OUTAGE-----              I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      [ 1 2  3    1  2  3  4    1  2  3 I ++CALIBRATION BLOCK~~
I 3-SI-208  REF. DWG. NO. 02-061 021918  SZ-208-FW-1                      C-F-1    UT                                            SS, TERMZNAL END.
PIPE-TO-VALVE (V-3427)            C5. 21A  PT    2                          X
                                                                                                  ~ <<LATER>>"
I-3-SI-212    REF. DWG. NO. 02-061 021924  SI-212-1-SW-5                    C  F-1    UT                                            SS, TEE MATL.- SA-403, WP-304.
PIPE- TO- TEE                    C5.21D    PT    2                          X            STRUCTURAL DISCONTINUITY.
e <<LATER+ e I-6-SI-212    REF. DWG. NO. 02-061 021951  SI-212-1-SW-1                    C-F-1    UT                                            SS,  6'    6" X 3"  REDUCING TEE TEE-TO PIPE                      C5.11D    PT    2                          X            MATL.- SA-403, WP-304.
STRUCTURAL DISCONTINUITY.
eaUT 54  we 021954  SZ-212-FW 1                      C-F 1    UT                                            SS, TERMINAL END.
PIPE TO VALVE (V-3656)            CS. 11A  PT    2                          X I-6-SI-105    REF. DWG. NO. 02 061 021987  SZ-105-2-SW  8                  C-F-1    PT                                            SS,  6  X 2    6000() SOCKOLET.
SOCKOLET  2"                    C5.41D          2                          X            BRANCH CONNECTION.
021990  SZ-105-2-SW-6                    C  F-1    PT                                            SS,  6i X 2~ 60005 SOCKOLET.
1 SOCKOLET 2~                      C5.41D          2                          X            BRANCH CONNECTION.
                                                                                                  *OUT 38 ~ 1
 
t DATE:  07/24/93                                    ST. LUCIB NUCLBAR PLANT UNIT 2                                  PAGB:  127 REVISION:        0                      INSERVZCB INSPECTION SELECZBD COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSZ PUMP 2A TO HEADER A                                  I  FIRST      SBCOND      THIRD    I ZONE NUMBER: 061                          ASME            I  PERIOD    PERIOD      PERIOD    I SEC. XZ                                              I
 
==SUMMARY==
EXAMINATIONAREA                    CATGY  NDE                  OUTAGB- -      - - - - I INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO MBTH      1 2  3    1  2  3  4    1  2  3  I >>>>CALIBRATION BLOCK>>>>
I-4-SI-105    RBF. DWG. NO. 02 061 021996  SZ-105-2-SW-2                    C-F-1    UT                                            SS, 6  X  4" CONCENTRIC REDUCER-TO-PIPB                  C5.21D  PT    2                        X            REDUCER. PIPE MATL.- SA-312, TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                  >>>> LATER>>>>
I-4-SI-128    REF. DWG. NO. 02-061 022003  SI-2416-58                      C-C      PT                                            THICKNESS>> 3/4>>
WBLDED ATTACHMENT (4 LUGS)      C3.20          2 X BZ. (-) 2>>10>>
                                                                                                  >>>>N/A>>>>
022035  SI-2416-58                      F-B      VT-3 BOX RESTRAINT                    P1.10D          2 X EL(-) 2'10>>
                                                                                                  **N/A>>*
022038  SI-2416-630                      F-B      VT-3 BOX RESTRAINT                    Fl. 10D        2 X EL(-) 2'10"
                                                                                                  **N/A>>>>
 
DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:  128 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHBDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS HPSI PUMP 2B TO HEADER B                                            FIRST    SECOND    THIRD    I ZONE NUMBER: 062                            ASME              I  PERIOD    PERIOD    PERIOD  I SEC. XI          I-
 
==SUMMARY==
EXAMINATION AREA                    CAKY      NDE      I          OUTAGE                  INSTRUCTIONS NUMBER    IDENTIPZCATION                    ITEM NO METH      i 1 2  3    1  2  3  4  1  2  3 I  <<<<CALIBRATION BLOCK<<<<
I-3 SI    211  REF. DWG. NO. 02-062 022068  SI-211-1-SW-4                      C-F-1    UT                                            SS, ELBOW MATL.- SA-403, PI PE- TO- ELBOW                  C5.21D    PT      2            X                      WP-304. STRUCTURAL DISCONTINUITY.
                                                                                                    <<<<LATER>> <<
022072  SI-211-FW-1                        C  P-1    UT                                          SS PIPE-TO-VALVE (V-3414)              C5. 21D  PT    2            X
                                                                                                    <<<<LATER<<<<
022074  SZ-211-FW 2                        CP1      UT                                          SS, TBRMINAL END.
VALVE    (V-3414)-TO-PIPB          C5.21A    PT    2            X
                                                                                                    <<<<LATER<<<<
I-6-SI-213      RBF. DWG. NO. 02-062 022100  SI 213    FW-1                    C-F-1    UT                                          SS, NCR 1415 M RBPAIR WELD 1 PIPE-TO-VALVE (V-3654)              C5.11A    PT    2 X                                  1/2"  DOWNSTRBAM OP SI-213-FW 1. TERMINAL END.
54>><<
022110  SZ 213-FW-2                        C-F-1    UT                                          SS, TERMINAL END.
VALVE (V-3654) -TO PIPE            CS. 11A  PT    2            X
                                                                                                    <<<<UT 54<<<<
022200  SI-2415-2141                        F-B      VT-3 RIGID    FRAME SUPPORT              Fl. 10D          2            X
                                                                                                    ~ <<N/A<<<<
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  129 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS, INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM LINE 2A1 INSIDE CONTAINMENT                          FIRST      SECOND      THIRD ZONE NUMBER: 063                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI CATGY      NDE    I
                                                                      - OUTAG      E-          I  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEN NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I-36-MS-52  REP. DWG. NO. 02-063 022220  MS-201-208                      C-F-2      UT                                            STRUCTURAL DISCONTINUITY.
NOZZLE-TO-EXT. PIECE            C5.51D    MT    2 X 454k 022230  MS-52-FW-1                      C-F>>2      UT                                            36.625" O.D. X 1.245~  MW EXT. PIECE-TO-ELBOW              C5.51A    MT    2 X                                    WELDED ELBOW. TERMINAL END.
aaUT 45am 022240  MS-52-PW-1A-LS                  C-P-2      UT                                            EXAMINE LONG SEAM  2.5t  AT ELBOW LONG SEAM                  C5 ~ 52    MT    2 X                                    SCHEDULED INTERSECTING RCe                                                                                      CIRCUMFERENTIAL WELD.
                                                                                                  ~ 1UT 4511 022250  MS-52-FW-1B-LS                  C P-2      UT"                                          EXAMINE LONG SEAM 2 ~ St AT ELBOW LONG SEAM                  C5.52      MT    2 X                                    SCHEDULED INTERSECTING RCB                                                                                      CIRCUMFERENTIAL WELD.
e*UT 45am I  34-MS-28  REF. DWG. NO. 02-063 022410  MS-4100-9                        C-C        MT                                            THICKNESS ~ 2  I/2~
WELDED ATTACHMENTS (8 SHEAR      C3.20            2            X LUGS)
RCB                                                                                      eaN/Ass 022540  MS-28-5-SW-1                    C-P-2      UT                                            34" O.D. X 1.250"  MW WELDED ELBOW-TO-PIPE                    CS. 51D    MT    2                        X            PIPE, MATL.- SA-155 K.C.-65 RCB                                                                                      CL-1. 34" O.D.X 1.200~ MW WELDED ELBOW. SRP 6.6 APPLIES.
EXAM. LONG. WELD BETWEEN 1ST WHIP RESTR.  & PW 6 ~ STRUCTURAL DISCONT
                                                                                                  ~ sUT 45am
 
DATB:  07/24/93                                  ST. LUCZB NUCLEAR PLANT UNIT 2                                    PAGEOS  130 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHBDULBD COMPONENTS INSPECTION INTERVAL                PLAN STATUS MAIN STEAM LINE 2A1 INSIDE CONTAINMENT                  I  FIRST      SECOND      THIRD ZONE NUMBER: 063                        ASME            I  PERIOD    PERIOD      PERIOD  (
SEC. XZ          I-
 
==SUMMARY==
BXAMINATIONAREA                CAIQY    NDB                  OUTAGE                I  INSTRUCTZONS NUMBER  IDENTIPICATION                ITEM NO METH    f 1 2  3    1  2  3  4    1  2  3 I ieCALIBRATION BLOCK@a I-34-MS-28  RBP. DWG. NO. 02 063 022560  MS-28-5-SW-1-LS                C-P-2    UT                                            EXAMINE LONG SBAM  2.5t    AT PIPE  LONG SEAM                C5.52    MT    2                        X            SCHBDULED INTERSECTING CIRCUMPBRENTIAL WBLD.      SRP 6. 6 APPLIES. EXAMZNE LONG WELD BBTWBBN 1ST WHIP RESTRAINT &
FW-6  (IN GUARD PIPE)  .
                                                                                              **UT 45**
022580  MS-4100-4                      P-B      VT-3 CONSTANT SPRING SUPPORT        P1.50L          2 X
                                                                                              ~ *N/Aee F-B    VT-3 SNUBBER                        F1. 50C        2 X
                                                                                              ~ aN/Awe
 
DATB:  07/24/93                                      ST. LUCIB NUCLEAR PLANT UNIT 2                                  PAGE:  131 REVISION:      0                        ,
INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE e                                  INSPECTION INTERVAL CLASS 2 SCHEDULED COMPONENTS PLAN STATUS MAIN STEAM LINE 2B1 INSIDB CONTAINMENT                        FIRST      SECOND      THIRD ZONE NUMBER: 064                        ASMB              I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATIONAREA                  CAKY      NDB                -OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I-34  MS  29 REF. DWG. NO. 02 064 022860  MS-29-FW-1-LS                    C-P-2    UT                                            EXAMINE LONG SEAM  2.5t  AT PIPE LONG SEAM                  C5.52    MT    2                        X            SCHEDULED INTERSECTING RCB                                                                                      CIRCUMFERENTIAL WBLD.
11UT  45t4 022870  MS-29-2-SW-1                    C-F-2    UT                                            34~ O.D. X 1.250~  MW WELDED PIPE-TO-FLOW ELEMENT {FE-8021) CS. 51D    MT    2                        X            PIPE, MATL.- SA-155, KC-65, CL-1. STRUCZURAL DISCONTINUITY.
                                                                                                  ~~UT-45~~
t022880  MS-29-2-SW-1-LS FLOW ELEMENT LONG SEAM RCB C-P-2 C5.52 UT MI'                              X EXAMINE LONG SEAM  2.5t SCHBDULED INTERSECTING CIRCUMFERENTIAL WBLD.
otUT 45' AT 022940  MS-29-3-SW-1                    C-F-2    UT                                            34" O.D. X 1.250~ MW WELDED PIPE- TO-ELBOW                  CS. 51D  MT    2            X                        PIPE( MATL. - SA-155, KC 65, CL-1. 34'.D. X 1.200'W WELDED ELBOW. STRUCTURAL DISCONTINUITY.
                                                                                                  ~~UT-45 022950  MS-29-3-SW-1A-LS                C-P-2    UT                                            EXAMINE LONG SEAM  2.5t AT ELBOW LONG SEAM                  C5.52    MT      2            X                        SCHEDULED INTERSECTING CIRCUMPERENTIAL WELD.
                                                                                                  ~ IUT 4541 022960  MS-29-3-SW-1B-LS                C-P-2    UT                                            EXAMINE LONG SEAM  2.5t AT ELBOW LONG SEAM                  C5.52    MT      2            X                        SCHEDULED INTERSBCTING CIRCUMPBRENTIAL WBLD.
                                                                                                  ~~UT-45"~
 
, II DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:          132 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS MAIN STEAM LINE    2Bl INSZDE CONTAINMENT                  I  FIRST    SECOND      THIRD    I ZONE NUMBER: 064                          ASMB              I  PERIOD    PERIOD      PERIOD  I SEC. XZ                                              I
 
==SUMMARY==
EXAMINATION AREA                  CATGY  NDE      I
                                                                        -OUTAGE-'-                INSTRUCTIONS NUMBER  IDENTIPICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I 34 MS 29    REF. DWG. NO. 02-064 023050  MS  29-FW 901-LS                  C-F-2                                                  BXAMINB LONG SEAM  2.5t          AT PIPE LONG SEAM                  C5.52    MT      2            X                        SCHEDULED INTERSECTING CIRCUMPERENTIAL WELD.
                                                                                                  *IUT 45**
023070  MS-29-FW-SA                      C-F-2    UT                                            34~ O.D. X  1.250'W    WELDED PIPE- TO-ELBOW                    CS. 51D  MT    2            X                        PIPE, MATL. - SA-155, KC-65, CL-l. 34" O.D. X 1.200~ MW WELDED ELBOW. STRUCTURAL DISCONTINUITY.
                                                                                                  *iUT 4541 23080  MS-29-FW-SAA-LS                  C-F-2    UT                                            EXAMINE LONG SEAM  2.5t          AT ELBOW LONG SEAM                  C5.52    MT    2            X                        SCHBDULED INTBRSECTING CIRCUMFERENTIAL WELD.
                                                                                                  ~ *UT 45*1 023090  MS-29-FW-SAB-LS                  CF2      UT                                            EXAMINE LONG SEAM  2.5t          AT
        'ELBOW LONG SEAM                  C5.52    MT    2            X                        SCHEDULED INTERSECTING CIRCUMFERENTIAL WELD.
kfUT 454 ~
023110  MS-29-FW-6A-LS                    C F-2,  UT                                            EXAMINE LONG SEAM  2.5t          AT ELBOW LONG SEAM                  C5. 51  MT    2                        X            SCHEDULED INTERSECTING CIRCUMFERENTIAL WELD.
4*UT 45aP 023130  MS-29-FW-6B-LS                    CP2      UT                                            EXAMINE LONG SEAM  2.5t          AT ELBOW LONG SEAM                  C5.52    MT    2                        X            SCHEDULED INTERSECTING CIRCUMFERENTIAL WBLD.
                                                                                                  ~ <<UT-4 5>> ~
t023140  MS RCB 29 6 SW-1 BLBOW-TO- PI PE C-P-2 C5.51D UT MT      2                        X 34" O.D. X 1.250" MW PIPE, NATL. - SA-155, 34'.D. X WELDED 1.200'W KC-65'L-l.
WELDED ELBOW. STRUCTURAL DISCONTINUITY'RP 6. 6 APPLIES.
                                                                                                  +FAUT 45ee
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    133 REVISION:      0                        INSERVICE INSPECTION SELECZED COMPONENT SCHBDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTBRVAL                PLAN STATUS MAIN STEAM LINE 2EZ INSIDE CONTAINMENT                  I  PIRST      SECOND      THIRD ZONE NUMBER: 064                        ASMB            I  PERIOD    PERIOD      PERIOD  I SEC. XI
                                                                    - 0 U T A G  B-NUMBER  IDENTIFICATION CATGY    NDE ITEM NO METH I
I 1 2  3,    1  2  3  4    1  2  3 I INSTRUCTIONS
                                                                                              ~ iCALIBRATION BLOCKi*
I-34-MS-29  RBP. DWG. NO. 02-064 023150  MS-29-6-SW-1-LS                C-F-2    UT                                            EXAMINB LONG SEAM  2.5t  AT PIPE LONG SEAM                  C5.52    MT    2                        X            SCHEDULED INTERSBCTING CIRCUMFERENTIAL WBLD. BXAMINB LONG WELD PROM 1ST WHIP RESTRAINT  (IN GUARD  PIPE) . SRP 6.6 APPLIES.
14UT 45la 023170  MS-4101-320                    F-B      VT-3 CONSTANT SPRING SUPPORT        P1.50L          2                        X eeN/Ae*
023350  MS-4101-304B                    F-B      VT-3 RIGID STRUT SUPPORT            F1.10K          2 X esN/Aaa
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:    134 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM  LINB 2A1 OUTSIDE CONTAINMENT                  I  FIRST      SECOND    THIRD    I ZONE NUMBER: 065                        ASME              I  PERIOD    PERIOD    PERIOD  I SBC. XI                                            I CATGY    NDB                  OUTAGB                I INSTRUCTIONS ITEM NO METH        1 2  3    1  2  3  4  1  2  3 I ++CALIBRATION BLOCK+a I  35.5-MS-1  REF. DWG. NO. 02 065-A 023380  MS-1-SW-Pl                      C-F-2  ~
UT                                          35  1/2" O.D. X 2.000~  MW PENETRATION  1- TO-PIPE        C5.51A    MT    2 X                                  WBLDED  PIPE( MATL.- SA-155)
KC-65, CL-1. TERMINAL END(
SRP  6.6 APPLIBS.
                                                                                              ~ OUT 023390  MS-1-SW-Pl-LS                  C-F-2    UT                                          EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  C5.52    MT    2 X                                  SCHEDULBD INTBRSECTING CIRCUMFERENTIAL WELD. SRP      6. 6 APPLIES.
                                                                                              ~ eUT 23400  MS-1-FW-1                      C-P-2    UT                                          35  1/2  O.D. X 2.000" MW PIPE-TO-PIPE                    C5.51D    MT    2 X                                  WELDED  PIPE, MATL.- SA-155, KC-65, CL-1. SRP 6.6 APPLIES.
                                                                                              *1UT 023410  MS-1-FW-1-LS                    C-P-2    MT                                          EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  C5.52    UT    2 X                                  SCHBDULED INTERSECTING CIRCUMFERENTIAL WELD. SRP 6. 6 APPLIES.
kkUT 44*4 023420  MS-1-1-SW-30                    CF2      MT                                          35  1/2" O.D. X  2.000"  MW PIPE- TO-WELDOLET              CS. 81          2 X                                  WELDED  PIPE, NATL. SA 155, KC  65, CL 1. STRUCTURAL DISCONTINUITY.
                                                                                              ~~N/A~~
023430  MS-1-1-SW-29                    C  F-2    MT                                          35  1/2" O.D. X  2.000  MW PIPE, PIPB-TO-RELIEF NOZZLB          C5. 81D          2 X                                  MATL.- SA-155,    KC-65'L-1.
6" RELIEF NOZZLE, PER SHAW DETAIL 9320-9. STRUCIURAL DISCONTINUITY.
                                                                                              ~ 0N/A4*
 
DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGB:    135 RBVIS ION:      0                          INSERVICB INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECI'ION iNTERVAL                  PLAN STATUS MAIN STEAM LINE 2A1 OUI'SIDE CONTAINMENT                      I  PIRST      SECOND        THIRD    I ZONE NUMBER: 065                          ASME                I  PERIOD    PERIOD        PERIOD  I SEC. XI                                                I CATGY      NDB                -OUTAGE        - -    -    I INSTRUCTIONS NUMBBR  IDENTIPICATION                  ITEM NO METH      I 1  2  3    1  2  3  4      1  2  3  r *CALIBRATIONBLOCKrr I-6-MS 74  RBF. DWG. NO. 02 065 A 023440  MS-1-1-SW 9                      C-F-2      UT                                              RBLIEP NOZZLE, PER  SHAW  DETAIL NOZZLB-TO-PLANGE                C5.51D      MT    2 X                                      9320-9. 6'500&#xb9;  R.P. LONG WBLD NECK PLANGE, PER SHAW DETAIL 9320 10. STRUCIURAL DISCONTINUITY.
                                                                                                      **UP 44*t I-35.5-MS-1  REF. DWG, NO. 02-065-A 023610  MS-1-1-SW-1-LS                  C-F-2      UT                                              EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  C5.52      MT    2 X                                      SCHEDULBD INTERSECTING CIRCUMFERENTIAL WBLD. SRP    6.6 APPLIES.
                                                                                                      *rUT-44**
023620  MS-1  FW 2                      C  F-2      UT                                              35  1/2" O.D. X 2.000"  MW PIPE-TO-VALVE (HCV-08-1A)        C5.51D      MT    2 X                                      WELDED  PIPE, MATL.- SA-155, KC-65, CL-1. STRUCTURAL DISCONTINUITY, SRP 6. 6 APPLIBS.
44rr 023624  MS-32-FW-1                      C-P-2      UT                                              34  O.D. X 1.250r MW WBLDBD VALVE (HCV-08-1A) -TO-PIPE      C5.51D      MT    2            X                          PIPE) MATL.- SA-155, KC-65, CL-1. NRC BRANCH TECHNICAL POSITION APCSB 3 1 APPLIES.
SRP  6.6 APPLIES.
r*UT 441*
023626  MS-32-FW-1-LS                    C-F-2      UT                                              EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  CS  ~ 81    MT    2            X                          SCHEDULED INTERSECTING CIRCUMFERENTIAL WELD. SRP 6 ~ 6 APPLIES.
                                                                                                      **UT 44rr
 
, ff, DATB:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGB:  136 REVISION:      0                          INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM LINE 2A1 OUTSIDE CONTAINMENT                      I  PIRST      SECOND    THIRD ZONB NUMBER: 065                          ASME              I  PERIOD    PERIOD    PBRIOD  I
[------OUTAGE ------I SBC. XI                                            I CAVGY    NDE                                          INSTRUCTIONS NUMBER  IDENTIFICATION                      ITEMNO METH        1 2  3    1  2  3  4              a a CALIBRATION BLOCK*e I
I-35.5  MS 1    REF. DWG. NO. 02-065-A 023628  MS-4102-2705                        C-C      MT                                          THICKNESS  i1    1/4" WBLDED ATTACHMENTS (4 SHEAR        C3. 20          2            X LUGS) 4 IN/A**
I  10 MS-79    REF. DWG. NO, 02 065 1 023660  MS  79 1  SW 3                    C-F-2      RT                                          10    X 8 CONCBNIRIC REDUCER.
TEE-TO-REDUCER                    CS. 51D    MT    2            X                      STRUCTURAL DISCONTINUITY.
STM.TRSL
                                                                                                  ~ ON/A*P 023730  MS-124 FW-1                        C-P-2      UT                                          SEAMLESS CS  PIPE, STRUCTURAL PIPE-TO-VALVE (MV-08-18A)          C5. 51D    MT    2            X                      DISCONTINUITY.
                                                                                                  ~~UT-46~*
I  35.5  MS 1    REF. DWG. NO. 02-065 A 023900  MS-4102-2705                      F-B        VT-3 RIGID  FRAME SUPPORT              Fl. 10D          2 X
                                                                                                  *~N/A~*
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    137 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM LINB 2B1 OUTSIDE CONTAINMENT                  I    PIRST      SECOND      THIRD ZONB NUMBER: 066                        ASMB            I    PERIOD    PERIOD      PERIOD    I SEC. XI        I
                                                                                              - I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                  OUTAGB                  I INSTRUCTIONS 2  3    ~ iCALIBRATION BLOCK*i NUMBER  IDENTIPI CATION                  ITEM NO METH      1  2  3    1  2  3  4    1          I I  35.5-MS-3  RBF. DWG. NO. 02-066-A 023910  MS 3 SW-P2                      C-F-2    UT                                              35  I/2i O.D. X 2.000" MW PENETRATION 2-TO-PIPB            CS. 51D  MT    2                        X              WBLDBD  PIPE( MATL. SA-155, KC-65. CL-1. SRP 6.6 APPLIES.
                                                                                                  ~ aUT aaae 023920  MS-3-SW-P2-LS                    C-P-2    UT                                              EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  C5.52    MT    2                        X              SCHEDULED INTERSECTING CIRCUMFERENTIAL WELD. SRP  6. 6 APPLIBS.
                                                                                                  ~ *UT 44**
023930  MS-3-FW-1                        C-F 2    UT                                              35  1/2" O.D. X 2.000'W PIPE-TO-PIPB                    CS. 51    MT    2                        X              WELDED  PIPB, MATL. - SA-155, KC-65, CL-1. SRP 6.6 APPLIES.
                                                                                                  +OUT  aalu 023940  MS-3-FW-1-LS                    CF2      UT                                              EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                  C5.52    MT    2                        X              SCHBDULED INTERSECTING CIRCUMFERENTIAL WELD. SRP  6. 6 APPLIES.
                                                                                                  ~~UT-aa.i 024020  MS-3-1-SW-22                    C P 2    MTc                                            35  1/2" O.D. X 2.000" MW PIPE, PIPE- TO-RELIEF NOZZLE          C5.81            2                        X              MATL.- SA-155, KC-65, CL-1.
6i RELIEF NOZZLE, PER SHAW DBTAIL 9320-9.
eoN/Aoa I-6-MS-69    REF. DWG. NO. 02-066-A 024030  MS-3-1-SW-6                      C-F-2    UT                                              RELIBF NOZZLB, PER SHAW DETAIL NOZZLE TO-PLANGE                C5. 51D  MT    2                        X              9320 9. 6i 1500&#xb9; RP LONG WELD NECK FLANGE, PER SHAW DBATIL 9320 10.
 
DATE:  07/24/93                                      ST. LUCIB NUCLEAR PLANT UNIT 2                                    PAGE:    138 REVISION:        0                        INSBRVICE INSPECTION SBLECIED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM LINE 2B1 OUTSIDE CONTAINMENT                    I  FIRST      SECOND      THIRD ZONE NUMBER: 066                          ASMB              I  PERIOD    PERIOD      PERIOD SBC. XI                                              I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDB    I            OUTAGE                  I  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ttCALIBRATION BLOCKtt I  35.5-MS-3    REF. DWG. NO. 02 066 A 024100  MS-3-1-SW-18                      C-F-2    MT                                              35 1/2" O.D. X 2.000r MW PIPEg PIPE-TO-RELIBF NOZZLE            C5.81D          2                          X            NATL.- SA-155, KC-65( CL-1.
6r RELIBP NOZZLE, PER SHAW DETAIL 9320 9. STRUCTURAL DISCONTINUITY.
ttN/At~
I-6-MS-'/7    RBP. DWG, NO, 02 066 A 024110  MS-3-1-SW-2                      C-P-2    UT                                              RELIEF NOZZLB, PER  SHAW  DETAIL NOZZLE-TO-PLANGE                  C5 ~ 51D  MT    2                        X              9320 9. 6" 15008 RF LONG WELD NECK FLANGE, PER SHAW DEATIL 9320-10. STRUCIURAL DISCONTINUITY.
ttUT-44tr I-35.5-MS-3    REF. DWG. NO. 02-066-A 024120  MS 3  1-SW-1                    C-F-2    UT                                            '35 1/2  O.D. X 2.000 MW PIPE TO PIPE                      CS. 51    MT    2                        X              WELDED  PIPB, MATL.- SA 155, KC 65, CL-1. SRP 6.6 APPLIES.
                                                                                                    ~ IUT 44tt 024130  MS  3-1-SW 1-LS                  C-F-2    UT                                              EXAMINE ENTIRB LONG SEAM AT PIPE LONG SEAM                    C5.52    MT    2                        X              SCHEDULBD INTERSECTING CIRCUMPERENTIAL WELD. SRP    6. 6 APPLIES.
                                                                                                    ~ tUT 44tt 024140  MS 3 FW 2                        C-P-2    UT                                              35  1/2r O.D. X 2.000r MW PIPE-TO-VALVE (HCV-08-1B)        C5 ~ 51D  MI'                              X              WELDED  PIPE, NATL.- SA-155, KC 65, CL-1. SRP 6.6 APPLIES.
                                                                                                    ~ tUT 44tt
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PIANT UNIT 2                                    PAGB:    139 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHBDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN STEAM LZNB 2BZ OVZSZDE CONTAINMENT                        I  FIRST    SECOND      THIRD    I ZONE NUMBER: 066                            ASMB              I  PERIOD    PBRIOD      PERIOD  I SBC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDB                  OUTAGE-                I  INSTRUCZIONS NUMBER    IDENTIPICATION                    ITEM NO METH        1 2  3    1  2  3  4    1  2  3    ~ eCALIBRATION BLOCK+a I 35.5-MS  3  REF. DWG. NO. 02 066 A 024142  MS-33-FW-1                          C-F-2    UT                                            34~ O.D. X  1.250"  MW WELDED VALVE (HCV-08-1B) -TO-PIPE          C5. 51D  MT      2                        X            PIPE, NATL. SA 155( KC 65, RCB                                                                                        CL-1. NRC BR. TECH. POSTN APCSB  3-1 APPLIES. SEE NED-CIG 002 1, SEC. 2.2.2.3. SRP 6.6 APPLIES.
ooUT 450*
024144  MS-33-FW-I-LS                      C-F-2    UT                                            EXAMINE ENTIRE LONG SEAM AT PIPE LONG SEAM                    CS. 81    MT    2                        X            SCHEDULED INTERSECTING CIRCUMPERBNTIAL WELD.      SRP  6.6 APPLIES.
eeUT 45ee Z-8 MS-122    RBP. DWG. NO. 02-066 1 024280  MS-80-1-SW-5                      C-P-2    UT                                            SEAMLESS CS  PIPB. 10"  X 8" REDUCER-TO-PIPE                    C5. 51D  MT    2                        X            CONCENTRIC REDUCER,      PIPE NATL. A 106, B. STRUCZURAL DISCONTINUITY.
                                                                                                    ~ tUT 4440 024290  MS  122-FW-1                      C  F-2    UT                                            SBAMLESS CS  PIPE. STRUCTURAL PIPE-TO-VALVE (MV-08-16)          C5. 51D  MT    2                        X            DISCONTINUITY.
eaUT 44am I-10-MS 126    RBP. DWG, NO. 02-066-8 024330  MS-126-1-SW-2                      C-P-2    UT                                            SBAMLESS CS  PIPB. 10" X  8 REDUCER-TO-PIPE                    CS. 51D  MT    2                        X            CONCENTRIC REDUCER, MATL.-
A-234 WPB. STRUCZURAL DISCONTINUITY.
                                                                                                    ~ OUT 44 1 ~
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE:  140 REVISION:      0                        INSERVICB INSPECTION SBLBCZBD COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS MAIN STEAM LINE 2B1 OUTSIDE CONTAINMENT                  I  FIRST      SECOND      TRIED ZONE NUHBER: 066                        ASMB            I  PERIOD    PERIOD      PERIOD I XI
 
==SUMMARY==
EXAMINATION AREA SBC.
CATOY    NDB                - 0 U T A G B  ------I  I INSTRUCTIONS eeCALIBRATION BLOCKee NUMBER  IDENTIFICATION                    ITEM NO METH    I 1 2  3    1  2  3  4 I-10  MS  126 RBP. DWG. NO. 02 066 B 024340  MS-126-FW-1                      C-F-2    UT                                          SBAMLESS CA  PIPE. STRUCTURAL PIPE-TO-VALVB (MV-08-18B)        CS. 51D  MT    2                        X          DISCONTINUITY.
                                                                                              ~ eUT 44ee I-35.5  MS 3  RBF. DWG. NO. 02-066-A 024410  MS-4102-2931                    F-B      VT-3 RIGID FRAHB SUPPORT              F1.10D          2                        X
                                                                                              *eN/Aee
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    141 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN FEEDWATER TO SG 2A1 INSIDE CONTAINMENT                  I  FIRST    SECOND      THIRD ZONE NUMBER: 067                          ASME              I  PBRIOD    PBRIOD      PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                  OUTAGE                    INSTRUCTIONS ITEM NO METH        1 2,3    1  2  3  4    1  .2  3 I
                                                                                                    ~ ~CALIBRATION BLOCK~  i I 20 BF 14  REF. DWG. NO. 02-067 024450  BP 14 2 SW-1                      C-F-2    UT                                            SBAMLBSS  PIPE/PITTING. BLBOW PIPE-TO-BLBOW                    CS. 51D  MT      2            X                        MATL.- SA-234. STRUCIURAL RCB                                                                                      DISCONTINUITY.
                                                                                                    ~ oUT 414P 024500  BP-14-4-SW-2                      C-P-2    UT                                            SEAMLESS    PIPE/FITTING. 20" X PIPE- TO-REDUCER                  C5. 51D  MT    2            X                        18'ONCENTRIC REDUCER, NATL.
SA-234. STRUCIURAL DISCONTINUITY.
POUT 410 ~
I-18 BF-51    REF. DWG. NO. 02 067 024540  BF-4007-6081                      C-C      MT                                            THICKNESS ~    1" WELDED ATTACHMENTS  ll LUG)      C3.20A          2                        X RCB
                                                                                                  ~ aN/Aae 024550  BF-51-FW-3                        C  P-2    UT                                            SEAMLESS    PIPE/FITTING. NRC ELBOW-TO-S/G EXTENSION            C5.51A    MT    2            X                        BULLETIN 79 13. TERMINAL END.
RCB
                                                                                                  **UT 43**
024555  I. & E. 79-13                    B  79-13 UT                                            TO BE PERFORMED    IN CONJUNCTION AUGMENTBD EXAM                    N  93-20        2 X          X  - -  -  X            WITH EXAM 024550 AND 024560.
CONDUCT CONTINUOUS UT SCAN FROM NOZZLB RAMP TO 1      PIPB DIAMETER ON ELBOW.
                                                                                                  ~ LATER I-20-BF  14  REF. DWG. NO. 02-067 024560  BF-201-228                        C-F 2    UT                                            NRC BULLBTIN 79-13. STRUCIURAL S/G EXTENSION TO-NOZZLE          C5.51D    MT    2            X                        DISCONTINUITY.
4310
 
J DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE:    142 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN FHBDNATER TO SG 2A1 INSIDE CONTAINMENT                I  PIRST      SECOND      THIRD ZONE NUMBER: 067                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI        I
                                                                                              - I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE      ------OUTAGE---                    I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3  I ~~CALIBRATION BLOCK~~
I-20-BF-14  REF. DWG. NO. 02 067 024620  BP 4007-7012                    F-B      VT-3 RIGID STRUT SUPPORT              Pl. 10K          2 X
                                                                                                  **N/A**
I  18-BP-51  REF. DWG. NO. 02 067 024690  BP-4007-6081                    F-B      VT-3 CONSTANT NT. SPRING SUPPORT      Fl. SOI          2 X RCB
                                                                                                  +AN/Aee I-20-BF  14  REP. DMG. NO. 02-067 024701  20-BF 14                        B  79-13 VT-1                                            NO 2ND INTERVAL EXAM REQUIRED.
FEED WATER LINE                  N  93-20        2                        X
                                                                                                  ~ aN/Ate
 
0 DATE:  07/24/93                                        ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:  143 REVISION:      0                        INSERVICE INSPEC1'ION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPEC1'ION INTERVAL                    PLAN STATUS MAIN FEEDWATER TO SG 2B1 INSIDE CONTAINMENT                  I  FIRST      SECOND      THIRD ZONE NUMBER: 068                        ASME                  I  PERIOD    PERIOD      PERIOD  I SEC. XZ              I                                  I SU&#xc3;4ARY EXAMINATION AREA                CATGY    NDE                    - OUTAGE-                  INSTRUC1'IONS NUMBER  IDENTIFICATION                  ITEM NO METH          I 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I-20-BF-19  REF. DWG. NO. 02 068 024720  BF-19-2-SW-1                    C-F-2    UT                                                SEAMLESS PIPE/FITTING. ELBOW PIPE-TO-ELBOW                  CS. 51D  MT        2                        X            MATL.- SA-234. STRUCIURAL RCB                                                                                        DISCONTINUITY.
iiUT 41*"
024730  BF-19-FW-4                      C-P-2    UT                                                SEAMLESS    PIPE/FITTING. ELBOW ELBOW TO  PIPE                  C5. 51D  MT          2                        X            MATL. SA  234. STRUCTURAL DISCONTINUITY.
                                                                                                      **UT 4 1 **
I  18 BF-52  REF. DWG. NO. 02 068 e  24830  BF 4006 6076 WELDED ATTACHMENT (1 LUG)
RCB C-C MI'3.20 2                        X THICKNESS ~ 1 a*N/A@a 024840  BF 52 FW-3                      C  F-2  UT                                                NRC BULLETIN    79-13. SEAMLESS ELBOW-TO-S/G EXTENSION          C5.51A  MT          2 X                                    PIPE/PITTING. TERMINAL END.
RCB PoUT 430%
024850  BF-201 228                      C-P-2    UT                                                NRC BULLETIN 79-13,      STRUCIURAL S/G EXTENSION-TO-NOZZLE        C5.51D  MT          2 X                                    DISCONTINUITY.
11UT 43k%
024855  1.& E. 79-13                    B  79-13 UT                                                TO BE PERFORMBD    IN  CONJUCTION AUGMENTED EXAM                  N  93-20            2 X          X  -  -  -  X            WITH 024840 AND 024850.
CONDUCT CONTINUOUS UT SCAN PROM NOZZLE RAMP TO 1      PIPE DIAMETER ON ELBOW.
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 144 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPEC1'ZON INTERVAL                PLAN STATUS MAIN PEEDWATER TO SG 2B1 INSIDE CONTAINMENT              I  FIRST      SECOND      THIRD    I ZONE NUMBER: 068                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ          I                                  I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
I-20-BF-19  REP. DWG. NO. 02-068 024970  BP-4006-7409                    F-B      VT-3 RIGID STRUT SUPPORT            Fl. 10K          2 X RCB
                                                                                                ~ 1N/A1 4 I  18 BP-52  RBP. DWG. NO. 02-068 025030  BF-4006-6076                    F-B      VT-3 CONSTANT WT. SPRING SUPPORT    Fl. 50L          2 X RCB saN/Aes
 
DATB:  07/24/93                                ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 145 REVISION:      0                    INSERVICE INSPECI'ION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPBCTION INTERVAL                PLAN STATUS CHARGING PUMP 2A                                    I  FIRST      SECOND      THIRD ZONE NUMBER: 069                    ASMB          I    PBRIOD    PERIOD      PERIOD SEC. XI      I
 
==SUMMARY==
EXAMINATION AREA            CATGY    NDB              - OUTAGB-                INSTRUCTIONS NUMBER  IDENTIFICATION              ITEM NO METH  )  1 2  3    1  2  3  4    1  2  3 "*CALIBRATIONBLOCKi~
REP. DNG. NO. 02-069-A 025041  CP SUPPORT 2A-1              F-B      VT-3 PUMP 2A SUPPORT              Pl. 10I        2 X eaN/Aoa
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                                      e PAGE:    146 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS
~ MAIN FEEDWATER TO SG 2A1 OUTSIDE CONTAINMENT              i    PIRST    SECOND      THIRD ZONE NUMBER: 071                          ASME                  PERIOD    PERIOD      PERIOD SEC. XZ          I-
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE    I            0 UT A  G  E-            INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH    i 1 2  3    1  2  3  4    1  2  3 I  eeCALIBRATZON BLOCKee I-20 BF-55    REP. DWG. NO. 02-071 027010  BP-55  FW 2                      C-F-2    UT                                            SEAMLESS    PIPE. SRP  6.6 PIPE- TO-VALVE (HCV-09-ZA)        C5.51D  MT    2 X                                    APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BP-4004-7006 AND BP 14        SW P3 ~
e*UT 42 e e I-20-BF-14    REF. DWG. NO. 02 071 027020  BF-14-FW-1                        C  F-2  UT                                            SEAMLESS PIPE.      SRP 6.6 VALVE {HCV-09-1A) -TO-PIPE        C5.51D  MT    2 X                                    APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BF-4004-7006    AND BP-14-SW-P3.
41ee 027030  BF-14-FW-2                        C-F-2    UT                                            SEAMLESS    PIPE. SRP    6.6 PIPE-TO-PENETRATION EXT          CS. 51  MT    2            X                        APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BP-4004-7006    AND  BF-14-SW-P3.
                                                                                                    **UT 4] **
027040  BF-14-SW-P3                      C-F-2    UT                                            SEAMLESS    PIPE. SRP    6.6 PENETRATION EXT TO PENETRATION C5.51      MT    2  -    -    X                        APPLIES, EXAMINE ALL 3                                                                                        CIRCUMFERENTIAL WELDS BETWEEN S'IM TRSL.                                                                                BF-4004-7006    AND BP 14 SW P3.
eeUT 41e*
I-20  BF 55  REF. DWG. NO. 02 071 027050  BF-4004-7006                      F-B      VT-3 RIGID FRAME  SUPPORT            F1. 10D        2 X eeN/Aee I-20  BF 14  &  I-20-BF-55  REF. DWG. NO, 02-071 27051  20-BF-14  & 20-BF-55            B  79-13 VT-1 FEEDWATER LINES                  N  93-20        2 X  - -    X  - - -    X e eN/A e e
 
l DATE:  07/24/93                                    ST. ZUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 147 REVISION:      0                        INSERVICE INSPECZ'ION SELECIED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS MAIN FBEDWATER TO SG  2Al OUTSIDE CONTAINMENT            I  PZRST      SECOND      THIRD    I ZONE NUMBER: 071                        ASME            I  PERIOD    PERIOD      PERIOD  I SEC. XI
 
==SUMMARY==
EXAMINATION AREA                CATS Y  NDB    I            OUTAGB-                  INSTRUCZ'IONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I *~CALIBRATION BLOCK~~
I  20-BF-13  REF. DWG. NO. 02-071 027052  I-4-BF-34                      B  79-13 VT-1                                          NRC BULLETIN  79-13 EXAM AUX FEED  TIE IN                N  93-20        2                        X            DISCONTINUBD.
 
DATE:  07/24/93                                      ST. LQCZE NUCLEAR PLANT UNIT 2                                    PAGE:  148 REVISION:      0                          INSERVZCE INSPECZ'ZON SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS MAIN FEEDWATER TO SG 2B1 OUTSIDE CONTAINMENT              I  FIRST      SECOND      THZRD ZONE NUMBER: -072                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - 0U  TAG  E-          I  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3    ~ ~CALIBRATION BLOCK~ ~
(
I  20-BF-56  REF. DWG. NO, 02-072 027070  BF-56-PW-2                        C-P-2    UT                                            SEAMLESS  PIPE. SRP  6.6 PIPE-TO-VALVE (HCW-09-2A)        C5. 51    MT    2                        X            APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BF-4004-7002    & BF-19-SW-P4.
                                                                                                  **UT 42**
I-20-BF-19  REF. DWG. NO. 02-072 027080  BP-19-FW 1                      C-P-2    UT                                            SEAMLESS  PIPE. SRP  6.6 VALVE {HCV-09-2A1 -TO-PIPE      C5 51    MT    2                        X            APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BF-4004-7002    & BF-19-SW-P4.
1fQT 414 ~
027090  BF-19-FW-2                      C-P-2    UT                                            SEAMLESS  PIPE. SRP  6.6 PIPE-TO-PENETRATION EXT          CS. 51    MT    2                        X            APPLIES, EXAMINE ALL CIRCUMFERENTIAL WELDS BETWEEN BF-4004-7002  &  BF-19-SW-P4.
                                                                                                  *1UT 4] **
027100  BF-19-SW P4                      C-P-2    UT                                            SEAMLESS  PIPE. SRP  6.6 PENETRATION EXT-TO-PENETRATION C5.51      MT    2  - - -      -  -  -    X            APPLIES, EXAMINE ALL CIRCUMPERENTIAL WELDS BEZWEEN BF-4004-7002  &  BF-19-SW-P4.
IIUT 410 ~
I-20-BF-56  REF. DWG. NO  02 072 027110  BF-4004 7002                    F-B      VT-3 RIGID FRAME SUPPORT              Fi. 10D          2                        X
                                                                                                  ~ eN/Ate
 
DATE:  07/24/93                                ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 149 REVISION:      0                    INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSI PUMP 2A                                              FIRST      SECOND      THIRD ZONE NUMBER: 098                    ASME                PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA            CAVGY    NDE                  OUTAGE                I INSTRUCTIONS IDENTIPICATION              ITEM NO METH        2        1  2    4    1          ~ ~CALIBRATION BLOCK~~
NUMBER                                              i 1    3          3          2  3 I REF. DWG. NO. 02-098-A 027116  HP-SUPPORT 2A-2              F-B      VT-3 PUMP 2A SUPPORT              F1. 10I        2                        X
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 150 REVISION:      0                        INSERVICE INSPECI'ION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CONTAINMBNT SPRAY PUMP 2A                                  PIEST      SECOND      THIRD    (
ZONE NUMBER: 097                      ASMB                PERIOD    PERIOD      PERIOD SEC. XI        I-                                  I
 
==SUMMARY==
EXAMINATION AREA              CAKY    NDE                -OUTAGE-        - - - --    INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~ <<CALIBRATION SLOCX<<<<
I                                    I REF. DWG. NO. 02-097-A 028883  CS-2A-2-1                      C-C      VT-3 INTEGRAL ATTACHMENT            C3.30          2                        X
                                                                                              "*N/A<<<<
028886  CS-2A-2-2                      C-C      VT-3 INTEGRAL ATTACHMENT            C3.30          2                        X
                                                                                              *<<N/A*<<
028889  CS-2A-2-3                      C-C      VT-3 INTEGRAL ATTACHHMT            C3.30          2                        X
                                                                                              <<*N/A<<<<
028890  CS-SUPPORT 2A-3                P-B      VT-3 PUMP  2A SUPPORT              P1. 10I        2
                                                                                              *<<N/A<<*
 
DATB:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE: 151 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMBINED HPSI DISCHARGE                                      I  PIRST      SBCOND    THIRD ZONE NUMBER: 087                          ASME              I  PBRIOD    PBRIOD    PERIOD SEC. Xr
 
==SUMMARY==
EXAMINATION AREA                  CATOY    NDE                - OUTAGB-              I  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH      i 1 2  3    1  2  3  4  1  2  3 I  ++CALIBRATION BLOCK+
I-3-SI  179 REF. DWG. NO. 02-087-A 040000  SZ-179-FW-1                      C-P-1    UT                                          SS, TERMINAL END.
VALVE  (V-3547)-'K-PIPE        C5.21A    PT      2 X
                                                                                                  ~ PLATER*a 040010  SI-179-1-SW 6                    C-P-1    UT                                          SSi ELBOW MATL. SA-403, PIPE- TO-ELBOW                  C5. 21D  PT    2 X                                  WP-304. STRUCTURAL DISCONTINUITY.
                                                                                                ~  iLATERii 040040  SI 381-FW-1                      C-P-1    UT                                          SS, PLANGE MATL.- SA-182,    I TEE-TO-FLANGE (SO-03-17)        C5.21D    PT    2 X                                  F-304. STRUCIURAL DISCONTINUITY.
                                                                                                ~ eLATERa e 040135  SI-2413-352                      C-C      PT                                          THICKNESS    3/4" WELDED ATTACHMENTS (4 SHEAR      C3. 20          2 X LUGS)
                                                                                                ~ *N/Aee 040190  SI-179-20-SW-8                  C-P-1    UT                                          SS,  PIPB MATL. SA-312 g FLANGE (FE-3317)-TO-PIPE        C5.21D    PT    2 X                                  TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                ~ +LATER*a I  3 SZ-179  RBP. DWG. NO. 02-087 B 040260  SZ-179-3 SW-1                    C-F-1    UT                                          SS, ELBOW MATL. - SA-403, PIPE- TO-ELBOW                  C5. 21D  PT    2 X                                  WP-304. STRUCTURAL DISCONTINUITY.
                                                                                                ~ <<LATER>> ~
040380  SI-179-6-SW-2                    C-P-1    UT                                          SS,  PIPE NATL.- SA-312, BLBOW-TO PIPB                    C5.21D    PT    2 X                                  TP 304. STRUCTURAL DISCONTINUITY  ~
                                                                                                **LATBR**
 
r DATB:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE:    152 REVISION:      0                          INSBRVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMBINED HPSI DISCHARGE                                    I  PZRST      SECOND      THIRD    I ZONE NUMBER: 087                          ASMB            I  PERIOD    PERIOD      PERIOD  I SBC. XZ                                              I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDB    I
                                                                      - 0 U T A G  B-            INSTRUCTIONS NUMBER  IDENTIPI CATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3    a a CALIBRATION BLOCKaa I
I  3 SZ 179  REF. DWG. NO. 02-087-B 040490  SI-179-8-SW-1                    C  F-1  UT                                            SS,    PIPE MATL.- SA-312, ELBOW-TO-PIPE                    C5.21D  PT    2 X                                    TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                *aLATERaa 040500  SZ 179 FW-10                      C-P-1    UT                                            SS, TERMINAL END.
PIPE-TO-PENETRATION 69            C5.21A  PT    2 X
                                                                                                ~ aLATER*~
I-2-SI-109    RBF. DWG. NO. 02-087-C 40510  SZ-109-FW-1                      C  F-1  UT                                            SS,  4" X 2"  CONCENTRIC RBDUCBR-TO-PIPB                  C5.21D  PT    2 X                                    REDUCER,    MATL.- SA 403, WP-304. STRUCTURAL DISCONTINUITY.
a a LATERa a 040520  SZ-109-SW-2                      C-F-1    PT                                            SS, TERMINAL END.
PIPE- TO-VALVE (HCV-3647)        C5.30A          2 X aaN/Aaa I-2-SI-274    REF. DWG. NO. 02 087-C 040540  SI-274  FW 2                    CP1      PT                                            SS, TBB MATL.- SA-182, F-304.
PZPB-TO TBB                      C5.30D          2 X                                    STRUCTURAL DISCONTINUITY.
aaN/Aaa I  3-SI-137  REF. DWG. NO. 02 087 D 040700  SI-137-1-SW-2                    C-F-1  UT                                            SS( PIPB MATL. SA 312, REDUCER  TO-PIPE                C5.21D  PT      2 X                                    TP-304.      2a X 3" CONCENTRIC REDUCER. STRUCTURAL DISCONTINUITY.
aaLATER"*
 
DATB:  07/24/93                                              ST. LUCIB NUCLEAR PLANT UNIT 2                                  PAGE: 153 REVISION:        0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                        PLAN STATUS COMBINED HPSI DISCHARGE                                            I  FIRST      SECOND    THIRD    I ZONE NUMBER: 087                            ASME                  I  PERIOD    PERIOD    PERIOD  I SEC. XI                                                I
 
==SUMMARY==
EXAMINATION AREA                      CATGY      NDE                    -OUTAGB-                I  INSTRUCTIONS NUMBBR, IDENTIP ICATION                      ITEM NO METH            1 2  3    1  2  3  4  1  2  3    >>>>CALIBRATION BLOCK>>>>
I-3 SI-137    REF, DWG. NO. 02-087-D 040710  SI-137-1-SW-1                        C  F-1                                                      SS, FLANGE MATL.- SA-182, UI'521D PIPE-TO-FLANGE tFB-3341)                      PT          2 X                                  F-304. STRUCTURAL DISCONTINUITY.
                                                                                                          ~ >>LATER>>>>
I-3-SI-110    REF. DWG. NO. 02-087 D 040750  SI-110 1-SW-6                      C-F-1      UT                                                SS, 6>> X 6" X 3>> REDUCING TEB PI PE - TO- TEE                    C5.21A    PT          2 X                                  MATL.- SA-403, WP-304.
TERMINAL END.
                                                                                                          **LATER>>>>
I-2-SI-145      RBF. DWG. NO. 02-087-F 040970  SI-145-SW-1                        CP1        PT                                                SS, TERMINAL END.
VALVB {V-3133) -TO-PIPE            C5.30A                2 X
                                                                                                          **N/A>>>>
040980  SI-145-FW-2                        C-F-1      UT                                                SS,  2>> X 3>> CONCENTRIC PIPE-TO>>REDUCER                    C5.21D    PT          2 X                                  REDUCER. STRUCTURAL DISCONTINUITY.
                                                                                                          >>>>LATER>>>>
I  2 SI 217    RBF. DWG. NO. 02 087-F 041070  SI 217-FW    2                    C-F  1    PT                                                SS, TERMINAL END.
BRANCH CONNECTION TO    PIPE      C5.30A                2 X
                                                                                                          **N/A>>>>
I-2-SI-272      RBF. DWG. NO  02 087-G 041180  SI-272    SW-6                      CF1        PT                                                SS,  PIPE, NATL.- SA-312(
C5.30D                2 X                                  TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                          ~ >>N/A>>>>
 
DATB:  07/24/93                                    ST. LUCIB NUCLEAR PLANT UNIT 2                                  PAGE:  154 REVISION:      0                        INSERVICB INSPECTION SELECTED COMPONENT SCHBDULE CLASS 2 SCHBDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMBINED HPSI DISCHARGE                                    I  PIRST      SECOND    THIRD    I ZONB NUMBER: 087                          ASMB            I  PERIOD    PERIOD    PERIOD  I SEC. XI        I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDB                  OUTAGE                I INSTRUCTIONS NUMBBR    IDENTIPICATION                  ITEM NO METH    i 1 2  3    1  2  3  4  1  2  3 I i~CALIBRATION BLOCK ~
I-2-SI-271  REF. DWG. NO, 02 087  I 041420  SI-271-SW-2                      C-P-1    PT                                          SSI CROSS MATL.- SA-182 ~
PIPE-TO-CROSS                    C5.30D          2 X                                  P-304. STRUCTURAL DISCONTINUITY.
                                                                                                %IN/A*0 041430  SZ-271-SW-3                      C-P-1    PT                                          SS,  2"  X  3/4i REDUCING INSERT.
CROSS-TO-REDUCER                C5.30D          2 X                                  STRUCTURAL DISCONTINUITY.
14N/A@1 I-2 SI  215 REF. DWG. NO. 02-087-J 41540  SI-215-FW-2                      C-F-1    UT                                          SS,  4"  X  2" REDUCING INSERT.
REDUCER-TO-PIPE                  C5.21    PT    2 X                                  STRUCTURAL DISCONTINUITY.
                                                                                                + +LATER+ +
I-2-SI-131  REF. DWG. NO. 02-087  I 041610  SI-131-FW-4                      C-P 1    PT                                          SS,  COUPLING MATL. - SA-182, COUPLING-TO-PIPE                C5.30D          2 X                                  F-304. STRUCTURAL DISCONTINUITY.
                                                                                                ~ sN/A+a I  3  SI 179 REP. DWG, NO. 02-087-B 041750  SZ-2413-18                      P-B      VT-3 BOX RESTRAINT                    F1. 10D          2 X EL. 20'"
                                                                                                +AN/A*a 041760  SZ-2413 12                      F B      VT-3 BOX RESTRAINT                    F1. 10D          2 X EL.20'6"
                                                                                                +AN/Ass
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE: 155 REVISION:        0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMBINED HPSI DISCHARGE                                  I  FIRST      SECOND      THIRD ZONE NUMBER: 087                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI        I-                                  I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  ZDEHTIPICATION                  ITEM NO METH    ( 1 2  3    1  2  3  4    1  2  3 I  ~*CALIBRATION BLOCK~~
I-2 SI-109  REF. DWG. NO. 02-087-C 041770  SZ-4-R7                          F-B      VT-3 BOX RESTRAINT                    P1. 10D        2 X EL(-) 3'10"
                                                                                                +AN/gyes I-2-SI-274  REP. DWG. NO. 02-087-D 041820  SI 4-RS                          P-B      VT-3 BOX RESTRAINT                    P1. 10D        2 X EL.(-)4'3
                                                                                                +AN/Ass I-2-SI-145  REF. DWG. NO. 02-087 F 041880  SI-3-R5                          P-B      VT-3 BOX RESTRAINT                    P1. 10D        2 X EL.(-)5'6
                                                                                                *~N/A~*
I-2-SI-217  REP. DWG. NO. 02-087-P 041890  SI-3-R6                          P B      VT-3 BOX RESTRAINT                    P1.10D          2 X EL  (-) I'3a
                                                                                                **N/A**
I-2-SI-143  REP. DWG. NO. 02 087-G 041910  SZ-2-R1                          P-B      VT-3 RIGID STRUT                      P1.10K          2 X EL. (-) 6'4i
                                                                                                ~ eN/Ate I-2-SZ-131  REP. DWG. NO. 02-087-I 41990  SI-1  R5                        P B      VT-3 BOX RESTRAINT                    P1. 10D        2 X EL. ( ) 7'4"
                                                                                                *~N/A~~
 
0 DATE:  07/24/93                                  ST. LUCIB NUCLEAR PLANT UNIT 2                            PAGE: 156 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMBINED HPSI DISCHARGE                                      PIRST    SECOND      THIRD ZONE NUMBER: 087                      ASME                  PERIOD    PERIOD      PERIOD SBC. XI        I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE    J
                                                          -        OUT AG    B        INSTRUCTIONS NUMBER  IDENTIPICATION                ITEM NO METH    t 1  2  3    1  2  3  4          ~~CALIBRATION BLOCK~~
I-2-SI-131  REP. DWG. NO. 02 067-1 042000  SI-1-R4                        P B      VT-3 BOX RESTRAINT                  Pl. 10D        2 X EL( )2'10" t 1N/Ao P 042010  SZ-1-R3                        F B      VT-3 BOX RESTRAINT                  Pl. 10D        2 X EL(-) 2'10 4*N/AIP
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                  PAGE: 157 REVISION:      0                          INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CHARGING PUMP 2A DISCHARGE TO AUX. HPSI                        FIRST      SECOND    THIRD ZONE NUMBER: 088                        ASME              I  PERIOD    PERIOD    PERIOD SEC. XZ            I-                                I SU%CARY EXAMINATION AREA                  CATGY    NDE                -OUTAGE-                  INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH      J 1 2  3    1  2  3  4  1  2  3 I  >>>>CALIBRATION BLOCK>>>>
I 2 CH 104  REF. DWG. NO. 02-088-A 043000  CH-104-FW-21                    CF1      PT                                            SS, PIPE MATL.- SA-312(
FLANGE-TO-PIPE                  C5.30A            2            X                        TP-304. TERMINAL END.
                                                                                                  >>>>N/A>>>>
043060  CH-104-SW-18                    C-F-1    PT                                            SS, PIPE NATL.- SA 312, TEE-TO-PIPE                      C5.30D          2            X                        TP-304. STRUCZURAL DISCONTINUITY.
                                                                                                  >>*N/A>>>>
043070  CH-104-FW-19                    C-F-1    PT                                            SS,  60005 S.W. LATROLET.
C5.41D          2            X                        BRANCH CONNECTION.
                                                                                                  >>>>N/A>>>>
I-2-CH-109  RBF. DWG. NO. 02 088 C 043320  CH-109  SW 4                    C  F-1  PT                                            SS, ELBOW MATL.- SA-182, PIPE- TO-ELBOW                  C5.30D          2 X                                    F-304 ~ STRUCZURAL DISCONTINUITY.
                                                                                                  >>*N/A>>>>
043360  CH-109-SW-8                      C-F-1    PT                                            SS, ELBOW NATL. - SA-182, PIPE-TO-ELBOW                    C5.30D          2            X                        F 304 . STRUCTURAL DISCONTINUITY.
                                                                                                  >>*N/A>>*
I-2-CH-104  REF. DWG. NO. 02-088-B 043600  CH-72-R6                        F-B      VT-3 RZGZD STRUT                      F1. 10K          2            X EL.8'2"
                                                                                                  ~ >>N/A>>*
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 158 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CHARGING PUMP 2A DISCHARGE TO AUX. HPSI                      FIRST      SBCOND      THIRD ZONE NUMBER: 088                        ASME                PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE                  I INSTRUCTIONS NUMBER  ZDENTIPZCATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3 I *aCALIBRATION BLOCKa*
I  2-CH-109 REF. DWG. NO. 02-088 C 043630  CH-6-R3                        F-B      VT-3 BOX RESTRAINT                  Pi. 10D        2            X aaN/Aaa 043640  CH-6-R4                        F-B      VT 3 BOX RESTRAINT                  F1.10D          2            X EL.33'7 ~
aaN/Aaa I-2-CH-109  REP. DWG. NO. 02-088 D 43660  CH-6-R6                        F-B      VT-3 BOX RESTRAINT                  Fl. 10D        2            X EL.38'6" aaN/Aa*
 
DATB:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 159 REVISION:      0                        INSERVICE INSPECTION SELECIBD COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CHARGING PUMP 2B DISCHARGE TO AUX. HPSI                  I  FIRST      SECOND    THIRD BONE NUMBER:  089                      ASME              I  PBRIOD    PERIOD    PERIOD  I SBC. XI        I
 
==SUMMARY==
BXAMINATIONAREA                CATGY    NDE                  OUTAGE                I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4  1  2  3  ~ e CALIBRATION BLOCKe e I
I  2 CH-136  REF. DWG. NO. 02-089 044000  CH-136-FW-14                    CF1      PT                                          SS, PIPE MATL.- SA-312(
FLANGE-IO-PIPE                  C5.30A          2            X                      TP-304. TERMINAL BND.
                                                                                              *eN/Aee 044140  CH-136-SW-3                    C  F-1    PT                                          SS, TEE NATL.- SA-182, F-304.
PIPE-TO-TEE                    C5.30D          2            X                      STRUCTURAL DISCONTINUITY.
eeN/Aee 044160  CH-136-FW-2                    C  F-1    PT                                          SS,  PZPB MATL.- SA-312@
TBE TO PIPE                    C5.30D          2            X                      TP 304. STRUCTURAL DISCONTINUITY.
                                                                                              ~ eN/Aee 044170  CH-136-FW-1                    CP1      PT                                          SSg  TERMINAL BND.
PIPE-TO-BRANCH CONNBCTION      C5.30A          2            X eeN/Ae*
044220  CH 75  Rl                      F-B      VT 3 RIGID STRUT                    Fl. 10K          2            X EL.8'2"
                                                                                              ~ eN/Aee
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                            PAGE:  160 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CHARGING PUMP 2C DISCHARGE TO AUX. HPSZ                  I  FIRST      SECOND      THIRD ZONE NUMBER: 090                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                - OUTAGE                INSTRUCTIONS NUMBER  IDENTIPICATZON                  ITEM NO METH    I 1 2  3    1  2  3  4            **CALIBRATIONBLOCK>> ~
I-2-CH-137    REF. DWG. NO. 02-090-B 045150  CH-137-SW-12                    CF1      PT                                        SS, TERMINAL END.
VALVE (V-2339) -TO-PIPE          C5.30A          2            X P*N/A%4 045160  CH-137-FW-10                    C-P-1    PT                                        SS( TEE MATL.- SA-182, P-304.
PIPE- TO- TEE                    C5.30D          2            X                    STRUCTURAL DISCONTINUITY.
                                                                                            +AN/Aee 045170  CH-137-SW-11                    C-P-1    PT                                        SS,  2" X 3/4~ REDUCING INSERT.
TEE-TO REDUCER                  C5.30D          2            X                    STRUCTURAL DISCONTINUITY.
                                                                                            *IN/A**
045180  CH-137-SW-9                      CF1      PT                                        SS, PIPE MATL.- SA-312, TEE- TO-PIPE                    C5.30D          2            X                    TP-304. STRUCTURAL DISCONTINUITY.
ooN/Aae 045190  CH-137-FW-26                    CF1      PT                                        SS,  60008 S.W. LATROLET.
BRANCH SADDLE WELD              C5.41D          2            X                    BRANCH CONNECTION.
                                                                                            <<eN/A**
 
DATE:  07/24/93                                    ST. LUCIB NUCLEAR"PLANT UNIT 2                                    PAGE: 161 REVISZON:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS po INSPECTION INTERVAL                PLAN STATUS COMBINED CHARGING PUMP DISCHARGE TO HPSZ                      FIRST      SECOND      THIRD    I ZONE NUMBER: 091                        ASME                PERIOD    PERIOD      PERIOD    I SEC. XZ                                              I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE    I          -OUTAGB- -        - - - - I INSTRUCTIONS IDENTIFICATION                  ITEM NO METH        2        1  2          1  2  3    ~ ~ CALIBRATION BLOCK>> ~
NUMBER                                                    i 1    3          3  4              I I  2 SI 141  REF. DWG. NO. 02 091 046090  SZ-141-SW-12                    C-P-1    PT                                            SS, PIPE MATL. SA-312, ELBOW-TO-PIPE                    C5.30D          2            X                        TP-304. STRUCTURAL DISCONTINUITY.
eaN/Aea 046110  SI 141-SW-10                    C-F-1    PT                                            SS,  PIPE MATL.- SA-312, ELBOW-TO-PIPE                    C5.30D          2            X                        TP-304. STRUCTURAL DISCONTINUZTY.
                                                                                                    **N/A~*
046150  SI-141-SW  6                    C-F 1    PT                                            SS, PIPE NATL.- SA-312, ELBOW-TO-PIPE                    C5.30D          2            X                        TP 304. STRUCTURAL DISCONTINUITY.
4*N/J+4 046180  SI-141  SW-3                    C-F-1    PT                                            SS PIPE-TO-VALVE (V-3519)          C5.30A          2            X
                                                                                                    *aN/A**
046260  SZ-48-R4                        P-B    VT-3 BOX RESTRAINT                    Fi. 10D        2            X EL. 3'"
                                                                                                    ~ e N/Ae e 046270  SI-48-R5                        F-B    VT-3 BOX RESTRAINT                    F1. 10D        2            X EL.3'Oi
                                                                                                    +AN/Awe
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 162 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMBINED DISCHARGE TO HPSI  TIE IN  LOOP 2B              I    eXam      SECOND    THIRD ZONE NUMBER: 092                        ASME            I    PERIOD    PERIOD    PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE        -----OUTAGE------)              INSTRUCTIONS IDENTIFICATION                  ITEM NO METH          2      1  2    4  1  2  3  ~ ~CALIBRATION BLOCK~ ~
NUMBER                                                    i 1    3          3              I I-2-SI-176  REF. DWG. NO. 02-092 047130  SZ-176-SW-13                    C-F-1    PT                                          SS, PIPE NATL.- SA-312(
TEE TO-PIPE                      C5.30D          2            X                      TP-304. STRUCTURAL DISCONTINUITY.
* ON/A0 1 047140  SZ-176 FN 17                    C-F-1    PT                                          SS, TERMINAL END.
PIPE- TO-BRANCH CONNECTION      C5.30A          2            X
                                                                                              **N/A**
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                                PAGE: 163 REVISION:      0                          INSERVICE ZNSPBCTION SELECTED COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPBCTZON INTERVAL                    PLAN STATUS HPSI 2A DISCHARGE TO SDC LOOP 2A                              I  FIRST      SECOND      THIRD    I ZONE NUMBER: 093                          ASMB                I  PERIOD    PERIOD      PERIOD  I SBC. XI                                              I SUKQLRY EXAMINATIONAREA                    CATGY    NDE      )
                                                                          - 0 UTAGB-                  INSTRUCTIONS NUMBER  IDENTIPIC'ATION                    ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~ ~
I  3 SI 179    RBF. DWG. NO. 02-093 A 048000  SZ-179-FW-801                    CF1        UT                                            SS, TERMINAL END.
PENBTRATION 69-TO-PIPB            CS. 21A    PT      2                        X 048020  SI-179-9-SW-6                    C-F-1      UT                                            SS, PIPE MATL.- SA 312, ELBOW-TO-PIPE                    C5.21D    PT    2                          X            TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                    "~LATER**
048070  SZ-179-9-SW-1                    C-F  1    UT                                            SS( ELBOW MATL.-
SA-403'P-304.
PIPE-TO-ELBOW                    C5.21D    PT    2                          X                      STRUCIURAL DISCONTINUITY.
                                                                                                    ~~LATER~~
048100  SZ-179-10-SW-3                    C-F-1      UT                                            SS, PIPE MATL.- SA-312, ELBOW-TO- PI PB                  C5.21D    PT    2                          X            TP 304. STRUCTURAL DISCONTINUITY.
                                                                                                    ~ e LATER' 048120  SZ-179 10  SW  1                C-F-1      UT                                            SS, PZPB MATL.- SA-312, ELBOW-TO-PIPE                    CS  21D    PT    2                          X            TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                    ~~LATER~~
048470  SI 4208-210A                      F-B        VT-3 DUAL RIGID RODS                  F1. 10J          2                          X EL. 18'0~
                                                                                                    ~~N/A~*
048480  SZ-4208-210B                      F-E        VT-3 SNUBBER                            F1. 50C          2 EL. 18'4 ~
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 164 REVISION:      0                          ZNSERVICE INSPECTION SELBCTBD COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSI 2A DISCHARGE TO SDC LOOP 2A                              FIRST      SECOND      THIRD BONE NUMBER:    093                        ASMB                PERIOD    PERIOD      PERIOD  I SEC. XZ          I-
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDB              -OUTAGB-                    INSTRUCTIONS ZDENTIPICATION                  ITEM NO METH        2  3        2    4    1  2  3    ~ >>CALIBRATION BLOCK>>>>
NUMBER                                                    I 1          1    3                I I-3 SI-179  RBP. DWG. NO. 02 093 A 048490    SI-4208-210C                    F-E      VT-3 SNUBBER                          F1.50C        2                        X EL.19'3"
                                                                                                  >>*N/A**
048500  SI-4208-219                      F-B      VT-3 TRUNNION                          Fl. 10M        2                        X BL. 14'8>>
                                                                                                  **N/A*>>
048550  SI-4208-234                      F B    VT-3 TRUNNION                          Fl. 10M        2                        X EL.14'8"
                                                                                                  >>*N/A>>>>
I  3 SI-179  RBF. DMG. NO. 02-093-B 048630  SI-4208-264A                      P-B    VT-3 TRUNNION                          Fl. 10M        2                        X EL.16'0>>
                                                                                                  >>>>N/A>>>>
048640  SI-4208-264B                      P-E    VT-3 SNUBBER & TRUNNION                Pl. SOC        2                        X EL.16'0"
                                                                                                  >>>>N/A>>>>
048650  SI-4208-266A                      F-B    VT-3 TRUNNION                          Fl. 10M        2                        X EL. 16'>>
                                                                                                  >>>>N/A>>>>
048660  SZ-4208-266B                      F-B    VT-3 SNUBBER & TRUNNION                P1.50C        2                        X EL.16'0>>
                                                                                                  *>>N/A>>>>
 
0 DATB:  07/24/93                                      ST. LUCIS NUCLBAR PLANT UNIT 2                                                  PAGE: 165 RBVISION:      0                          INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS HPSI HEADER 8 TO SDC LOOP 2B                                      FIRST      SECOND      THIRD    I ZONE NUMBER: 094                            ASME              I  PBRZOD    PERIOD      PERIOD  I SEC. XI                                            I SWARY EXAMINATIONAREA                      CATGY    NDE                -OUTAGE                    INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH      i 1 2  3    1  2  3  4    1  2  3    ~~CALIBRATION BLOCK~~
Z-3-SI-213    REF. DWG. WO. 02 094-A 049000  SI-213-1  SW-11                  C  F-1    UT                                            SS, PIPE MATL.- SA-314, TEB-TO-PIPE                        CS  21A  PT    2                        X            TP-304. TERMINAL END.
1 %LATER*1 I-3-SI-180    RBF. DWG. NO. 02-094 A 049070  SI 180  FW 1                      C-F-1    UT                                            SS, PIPE MATL.- SA-312, ELBOW-TO-PIPE                      C5.21D    PT    2                        X            TP-304. STRUCTURAL DISCONTINUITY.
                                                                                                    ~*LATER~~
49080  SZ-180-1-SW-1                      C-P-1    UT                                            SSg  TBB MATL.- SA-403( WP-304.
PIPE-TO-TEE                        C5. 21D  PT    2                        X            STRUCTURAL DISCONTINUITY.
A
                                                                                                    *@LATER@*
I-3-SI-382  REF. DWG. WO. 02-094 A 049120  SZ-382-FW-1                        C  F-1    UT                                            SS,  FLANGE    MATL.- SA-182, ELBOW-TO-FLANGE  (SO-03-18)      C5.21D    PT    2                        X            F-304. STRUCTURAL DISCONTINUITY.
                                                                                                    <<*LATER~~
049170  SZ-220-FW-901                      C  F-1    UT                                            SS,  PIPE MATL.-
SA-312'P-304.
ELBOW-TO- PIPE                    CS. 21D  PT    2                        X                      STRUCTURAL DISCONTINUITY.
                                                                                                    ~ ~ LATER~ ~
049180  SI-220-1-SW-8                      C  F-1    UT                                            SS, 4" X    4i  X 3          REDUCING TEE PIPE-TO-TEE                        C5.21D    PT    2                        X            MATL.- SA 403,      WP            304.
STRUCTURAL DISCONTINUITY.
                                                                                                    ~ PLATER**
 
DATE:    07/24/93                                      ST. LUCIE NUCLEAR PLAHT UNIT 2                                PAGE: 166 RBVI SION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTBRVAL                  PLAN STATUS HPSI HEADER B TO SDC LOOP 2B                                  I  FIRST    SECOND      THIRD ZONE NUMBER: 094                            ASME              I  PERIOD    PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE                -OUTAGB-                INSTRUCTIONS NUMBBR    IDENTIFICATION                    ITEM NO METH        1 2  3    1  2  3  4    1  2  3  **CALIBRATIONBLOCK*>>
I-4-SI-220  REF. DWG. NO. 02-094-A 049190    SI-220-FW-1                      CF1      UT                                          SSg  6  X 4'ONCENTRIC REDUCER- TO-PIPE                  C5.21D  PT      2                        X          REDUCER. STRUCTURAL DISCONTINUITY.
                                                                                                    >>>>LATER>>>>
049200    SI 220-1-SW-7                      C-F-1    UT                                          SS, ELBOW NATL.- SA-403, PIPE-TO-ELBOW                    C5.21D  PT      2                        X          WP  304. STRUCTURAL DISCONTINUITY.
                                                                                                  **LATER>>>>
Z-3  SZ 180  REF. DWG. NO. 02 094-A 49270  SZ-180-FW-2                      C-P-1    UT                                          SS, TERMINAL END ~
PIPB- TO-VALVE (V 3522)          C5.21A    PT    2                        X
                                                                                                  >>>>LATER>>>>
I-3-SI  181  REF. DWG. NO. 02-094 B 049300    SI-181-1-SW-1                    CF1      UT                                          SS, BLBOW MATL. - SA-403, PIPE-TO-ELBOW                    C5. 21D  PT      2                        X          WP  304. STRUCTURAL DISCONTINUITY.
                                                                                                  ~ >>LATER>>>>
Z-3-SZ 180    RBP. DWG. NO. 02-094-A 049680    SZ-2415-134                                VT-3 BOX RESTRAINT                    P1. 10D          2                        X EL(-) 3'6>>
                                                                                                  ~ >>N/A>>>>
I-4-SI-220    REF. DWG. NO. 02 094-A t049690  SZ-2415-105 SLIDING BASE SUPPORT BL. (-)1'3>>
FB F1.10Z VT3 2                        X
                                                                                                  **N/A>>*
 
DATB:  07/24/93                                    ST. LUCIB NUCLEAR PLANT UNIT 2                                PAGE: 167 RBVIS ION:      0                          INSERVICE INSPECTION SBLECTBD COMPONENT SCHEDULB CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSI HBADBR B TO SDC LOOP 28                              I  PIRST      SBCOND      THIRD    I ZONE NUMBER: 094                          ASME            I  PBRIOD    PBRIOD      PERIOD  I SEC. XZ                                              I SUhRARY EXAMINATION ARBA                  CATGY    NDB              - 0 U T A G  E-            INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    i 1 2  3    1  2  3  4    1  2  3  a @CALIBRATION BLOCK a I
I-3-SI-181  RBF. DWG. NO, 02 094-B 049710  SZ-2415 138                      F-B      VT-3 BOX RESTRAINT                    F1.10D        2                          X EL.(-)3'6"
                                                                                                **N/A~~
049730 t-)3'6'-B SI-2414-8003 RESTRAINT BL.
F1. 10D VT 3 2                          X
                                                                                                @AN/Aoa I-3-SI  181  RBF. DWG. NO. 02-094 C 49820  SZ-2414-110                      F-B    VT-3 SLIDING BASE SUPPORT            F1. 60I        2 X EL.20'6~
                                                                                                ~ ~N/A~*
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGB: 168 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSI 2A DISCHARGE TO SDC LOOP 2B                              exam      SECOND      TNIaD ZONE NUMBER: 095                        ASME                  PERIOD    PERIOD      PERIOD    I SEC. XZ          I
                                                                                              - I
 
==SUMMARY==
EXAMINATION AREA                CAKY    NDB                  OUTAGE-      - - - -    I  INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3      ~ <<CALIBRATION BLOCK<<<<
J I-3-SI-181  REF. DWG. NO. 02-095 050170  SI-181-FW-13                    C-F-1    UT                                              SS, BLBOW MATL.- SA 403, DISCONTINUITY.
PIPE- TO-ELBOW                  CS. 21D  PT      2                        X              WP-304. STRUCTURAL
                                                                                                    **LATER*~
050190  SI-181-12-SW-4                  C-F-1    UT                                              SS, BLBOW MATL.- SA-403, PIPE TO-ELBOW                  C5. 21D  PT    2                        X              WP-304. STRUCTURAL DISCONTINUITY.
                                                                                                  <<<<LATER>> <<
050220  SZ-181 12 SW-1                  C-P-1    UT                                              SS, PIPE MATL.- SA-312, ELBOW-TO-PIPE                  C5.21D  PT    2                        X              TP-304. STRUCZURAL DISCONTINUITY.
                                                                                                  **LATER>><<
050230  SI-181-FW-14                    CF1      UT                                              SS, TERMINAL END.
PIPE-TO VALVE tV-3526)          CS. 21A  PT    2                        X
                                                                                                  ~ <<LATER<<<<
050250  SZ-4206-605                    F-B      VT-3 DUAL RIGID STRUTS              P1. 10K        2 EL.34'0<<
                                                                                                  <<<<N/A*>>
050330  SI-4206-6255                    P-B      VT-3 PIPE SUPPORT                    F1. 10D        2                        X EL.19'0"
                                                                                                  ~ <<H/A>>*
050340  SI-4206-6271C                  F-E      VT-3 SNUBBBR                          F1.50C          2                        X EL 18'0>>
                                                                                                  <<<<H/A<<<<
 
DATE:    07/24/93                                    ST. LUCZB NUCLEAR PLANT UNIT 2                                  PAGE:    169 RBVISION:        0                        INSBRVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS HPSI 2B DISCHARGE TO SDC LOOP 2B                          I  PIRST      SECOND      THIRD    )
ZONE NUMBER: 096                          ASMB            I  PERIOD    PERIOD      PERIOD  I C
SEC. XI        I                                  I
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDB                -OUTAGE-                    INSTRUCTIONS ZDENTIPZCATION                  ITEM NO METH                  1  2          1  2  3    e @CALIBRATION BLOCK~*
NUMBER                                                    i 1 2  3          3  4            I I  2 SI 205  REP. DWG. NO. 02-096 051000  SZ 205-FW-1                      CP1      PT                                            SS, TERMINAL END.
BRANCH CONNECTION- TO-PIPE      C5.30A          2                        X
                                                                                                  ~ aN/A+a 051010  SZ-205-SW-2                      C-P-1    PT                                            SS, ELBOW MATL.- SA-182, PIPE-TO-BLBOW                    C5.30D          2                        X            P-304. STRUCTURAL DISCONTINUITY.
                                                                                                ~ IN/AOO 051030  SI-205-SW-4                      C-P-1    PT                                            SS,  TEE MATL. - SA-182, P-304.
PIPE-TO-TEE                      C5.30D          2                        X            STRUCTURAL DISCONTINUITY.
1 IN/AI0 051040  SZ-205-SW-5                      C-F-1    PT                                            SS, 2~ X 3/4~ REDUCING INSERT.
TEE- TO-REDUCER                  C5.30D          2                                      STRUCTURAL DISCONTINUITY.
                                                                                                ~ aN/As+
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 170 REVISION:      0                        INSBRVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 2 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS REACTOR BUILDING CONTAINMENT VESSEL                      I  FIRST      SECOND      THIRD ZONE NUMBER: 150                        ASME            I  PERIOD    PERIOD      PERIOD SBC. XI
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGB-                I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I *~CALIBRATION BLOCK~*
VBSSBL LINER  REF. DWG. NO. N A 250000  REACIOR VESSBI                  RPLINER VT-1 VESSEL LINER                    AUG-3          2                        X
                                                                                              %IN/A1%
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE              Ju/y 24, 1993 6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the lnservice Inspection Examination Tables for nondestructive examinations selected for examination during the Second Inservice Inspection Interval.
Page 171 of 398
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 172 REVISZON:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER HX  2A 6  2B INLET HEADER            FIRST      SECOND      THIRD ZONE NUMBER: 100                          ASME            I  PERIOD    PERIOD      PERIOD    I SEC. XZ          I
                                                                                                - I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                - OUTA G    E-              INSTRUCTIONS NUMBER    IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3  I  ~~CALIBRATION BLOCK~~
I-20-CC-1  RBP. DWG. NO. 02-100-A 136510    CC-2073-441                      F-B      VT-3 VARIABLE SPRING SUPPORT          P1. 50B        2 X
                                                                                                    *~N/A~*
136515  CC-2073-441                      D-B      VT-3 D2.40          2 X
                                                                                                    <<eN/Aae I-24-CC-4  REF. DWG. NO. 02 100-A 36590  CC-2073-18                        PC      VT3 RIGID  PRAME SUPPORT              F1.10D          2 X
                                                                                                    ~~N/A*~
136595  CC-2073-18                        D-B    VT-3 INTEGRAL ATTACHMENT              D2.20          2 X 1 1N/A4 I I-20-CC-2    REP. DWG. NO. 02 100 A 136610  CC-2073-531                      P-C    VT-3 VARIABLE SPRING SUPPORT            F1. 10B        2 X e eN/Aa s 136615  CC-2073 531                        D-B    VT-3 INTEGRAL ATTACHMENT              D2. 40        2 X a eN/Ae a
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 173 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER HX 2A & 2B  INIET  HEADER            FIRST      SECOND      THIRD ZONE NUMBER: 100                        ASME            I  PERIOD    PERIOD      PERIOD I
 
==SUMMARY==
EXAMINATIONAREA SEC.
CATGY XI NDE I
                                                                    - OUTAGE      ------I  I INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1        ~~CALIBRATION BLOCK~"
I-20-CC  3 RBP. DWG. NO. 02-100-B 136650  CC-2073-76                      P-C      VT-3 RIGID BASE  & STRUT SUPPORT    F1. 10K        2 X
                                                                                            ~ eN/At*
136655  CC-2073-76                      D-B      VT-3 INTEGRAL ATTACHMENT            D2.20          2 X
 
DATE:  07/24/93                                  ST. LUCZE NUCLEAR PLANT UNIT 2                                PAGE: 174 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING MATER HX 2A & 2B DISCHARGE                  FIRST      SECOND      THIRD ZONE NUMBER: 101                          ASME            I  PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATIONAREA SEC. XZ CATGY  NDE I
i    -  - - OUTAGE      ------I  I INSTRUCTIONS NUMBER    IDENTIPICATION                  ITEM NO METH    I 1 2  3    1  2  3  4              rrCALIBRATION BLOCKrr I 24 CC-15  REF. DWG. NO. 02 101 A 136720    CC-2075-90                      P-C      VT-3 RIGID FRAME SUPPORT              F1.10D          2 X rrN/Arr 136725  CC-2075-90                      D-B      VT-3 INTEGRAL ATTACHMENT              D2. 20          2              X
                                                                                                *rN/Arr I  24-CC-13  REP. DWG. NO. 02-101-B
.36770  CC 2075-110,                    P-C      VT 3 RIGID FRAME SUPPORT              Fl. 10D        2 X r*N/Ar*
136775  CC-2075-110                      D-B      VT-3 D2.20          2              X
                                                                                                **N/Ar*
I-20-CC  16 REF. DWG. NO. 02-101-B 136810  CC-2075-8101                    P-C      VT-3 RIGID FRAME ANCHOR              Fl. 10E        2 X
                                                                                                *rN/Arr 136815  CC-2075-8101                    D-B      VT 3 INTEGRAL ATTACHMENT              D2. 20        2              X rrN/Arr
 
DATE:  07/24/93                                  ST. ZUCIE NUCLEAR PLANT UNIT 2                                PAGE: 175 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING WATER HX 2A & 2B DISCHARGE              I  FIRST      SECOND      THIRD ZONE NUMBER: 101                        ASME              I  PERIOD    PERIOD      PERIOD SEC. XI        I                                  (
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                - OUT AG    E-            INSTRUCTIONS NUMBER  ZDENTIPICATZON                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~~CALIBRATION BLOCK"~
I-24-CC-14  REF. DWG. NO. 02-101-A 136870  CC-2075-72                      F-C      VT-3 RIGZD FRAME SUPPORT            Pl. 10D          2 X IIN/A**
136875  CC-2075-72                      D-B      VT-3 INTEGRAL ATZ'ACHMENT            D2.20            2            X eeN/Aea I  20 CC-17  REF. DWG. NO. 02 101 A 36880  CC-2075-8100                    P-C      VT-3 RIGID FRAME  ANCHOR            Pl. 10E          2 X aeN/Awe 136885  CC-2075-8100                    D-B      VT-3 INTEGRAL ATTACHMENT            D2.20            2            X
                                                                                                ~ aN/Awe
 
DATB:    07/24/93                                    ST. LUCIE NUCLBAR PLANT UNIT 2                                  PAGE: 176 REV IS ION:      0                        INSERVICB INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING        SHUTDOWN COOLING HX 2A  INLET      I  FIRST      SECOND      THIRD EONB NUMBER:      102                      ASME              I  PERIOD    PERIOD      PERIOD SEC. XZ          I-
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE                -OUTAGB-                I  INSTRUCTIONS NUMBBR      IDENTIFICATION                  ITEM NO METH      I 1 2  3    1  2  3  4    1  2  3 I  ~~CALIBRATION BLOCK~~
I-20-CC-16  REP. DWG. NO. 02 102-A 136940      CC-2062-183                    P-C      VT-3 RIGID  FRAMB SUPPORT            Fl. 10D          2 X
                                                                                                    +AN/A+a 136945    CC-2062-183                      D-A      VT-3 INTEGRAL ATTACHMENT            D1.20            2                        X
                                                                                                    **N/Ai*
I  14 CC-20  REF. DWG. NO. 02 102-A 37000    CC-2062-6220                    F-C RIGID FRAME SUPPORT              Fl. 10D          2 X
                                                                                                    *sN/As+
137005    CC-2062-6220                    D-A      VT-3 INTEGRAL ATTACHMENT              D1.20            2                        X
                                                                                                    +AN/A+a 137020    CC-2062-7227                    P-C      VT-3 RIGID STRUT  SUPPORT            F1.10K          2 X
                                                                                                    *~N/A~"
137025    CC-2062-7227                    D-A      VT-3 INTEGRAL ATTACHMENT              D1.20          2                          X
                                                                                                    ~ eN/A+a 137030    CC  2062-6228                    F-C Pl. 10K        2                          X
                                                                                                    ~*N/A**
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 177 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING  - SHUTDOWN COOLING HX 2A  INLET            FIRST      SECOND      THIRD ZONE NUMBER: 102                        ASME            I    PERIOD    PERIOD      PERIOD SEC. XI l
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE I
                                                          - - - - - - 0 U T A G E - - - - --  I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1  2  3    1  2  3  4    1  2  3  <<<<CALIBRATION BLOCK<<<<
I-14-CC-20  REF. DWG. NO. 02 102 A 137035  CC-2062-6228                    F-C      VT-3 VARIABLE SPRING SUPPORT        F1. 10B        2                          X
                                                                                                <<<<N/A<<<<
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE:  178 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING  - SHUTDOWN COOLING HX 2B  INLET        I  PIRST      SECOND      THIRD ZONE NUMBER: 103                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI          I-                                  I SUNDRY EXAMINATION AREA                  CATGY    NDE                -OUTAGE------i            INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      ( 1 2  3    1  2  3  4    1  2  3 I <<<<CALIBRATION BLOCK<<<<
I-20-CC-17    REF. DWG. NO. 02-103 A 137080  CC-2061-191                      F-C        VT-3                                          PCH  230-288 MODIFICATION DONE RIGID  PRAME SUPPORT            F1. 10D          2 X                                    4-10-91.
                                                                                                  <<<<N/A<<<<
137085  CC-2061-191                      D  A      VT-3 INTEGRAL ATTACHMENT              D1.20            2                        X
                                                                                                  <<*N/A<<*
I-14-CC-21    REF. DWG. NO. 02 103 A 37150  CC-2061-7033                    F-C      VT-3 RIGID STRUT SUPPORT              F1. 10K          2 X
                                                                                                  ~ <<N/A<<<<
137155  CC-2061-7033                    D-A      VT-3 INTEGRAL ATTACHMENT              D1. 20            2                        X
                                                                                                  ~ <<N/A>> <<
SHUTDOWN COOLING HEAT EXCHANGER 2B      REF. DWG. NO. 02-187-8 137165  2B-E 6 2B-W                      F-C      VT-3 VESSEL SUPPORTS-SADDLE          F1.30N          2                          X
                                                                                                  <<<<N/A<<<<
 
DATB:  07/24/93                                  ST. LUCIB NUCLEAR PLANT UNZT 2                                PAGE: 179 REVZS ION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULB CLASS 3 SCHEDULED COMPONENTS INSPECZ'ZON INTERVAL              PLAN STATUS SPENT FUEL POOL COOLING HX 2A DISCHARGE PIPING          I  FIRST      SECOND      THIRD ZONE NUMBER: 104                        ASME            I  PBRIOD    PERIOD      PERIOD  I SEC. XZ        I
 
==SUMMARY==
EXAMZNATION AREA                  CATGY  NDB              -OUTAGB- -        - -    I INSTRUCTIONS NUMBER  ZDENTIPICATION                  ITEM NO METH    1 2  3    1  2  3  4    )  2  3 I ~"CALIBRATION BLOCK~~
I-12-CC-130  RBF. DWG. NO. 02-104-B 137210  CC-2160 8                        F-C    VT-3 RIGID  FRAME SUPPORT            F1. 10D      2 X
                                                                                                *ON/AP~
137215  CC-2160-8                      D-C      VT-3 INTEGRAL ATTACHMENT            D3.20          2 X
                                                                                                *aN/Aoo 137230  CC-2160-6085                    F-C      VT-3 RIGID FRAME SUPPORT            F1. 10D        2 X
                                                                                                ~ aN/Are 137235  CC-2160-6085                    D-C      VT-3 INTEGRAL ATTACHMENT            D3.20          2 X
                                                                                                +AN/A@a
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                                  PAGE: 180 REVISION:      0                        INSERVZCE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING SHUTDOWN COOLING HX 2A DISCHARGE      I  PIRST      SECOND      THIRD ZONE NUMBER: 105                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                            - I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE              -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3  I ~~CALIBRATION BLOCK~~
I-14  CC 22  REF. DWG. NO. 02-105-A 137260  CC-2064-7609                    F-C      VT-3 RIGID  FRAME SUPPORT            Fi. 10D        2 X 137265  CC-2064-7609                    D-A      VT-3 INTEGRAL ATTACHMENT            D1.20          2            X eeN/A**
137270  CC-2064-6614                    F-C      VT-3 RIGID  ROD HANGER                P1.10J        2 X
                                                                                                ~ aN/A+a I  6 CC 154  REF. DWG. NO. 02-105 C 137350  CC-2064-212                    P C      VT-3 RIGID FRAME SUPPORT            F1. 10D        2            X a*N/Aee 137355  CC-2064-212                    D  A      VT-3 INTEGRAL ATTACHMENT            D1.20          2            X
                                                                                                *ON/A*+
137360  CC-2064-61                      F-C      VT-3 RIGID FRAME SUPPORT            F1.10D          2 X eeN/Are 137365  CC-2064-61                      D A      VT-3 D1.20          2            X 1 1N/A1 0
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 181 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING SHUTDOWN COOLING HX 2A DISCHARGE          I  FIRST      SECOND      THIRD ZONE NUMBER: 105                          ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                            - I SUGARY EXAMINATION AREA                    CATm    NDE                  OUTAGE                  I  INSTRUC1'IONS NUMBER    IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3  I  eeCALIBRATION BLOCK+a I-6  CC-154  REF. DWG. NO. 02-105-C 137370  CC-2064-58                        F-C      VT-3 RIGID FRAME SUPPORT              Pl. 10D        2            X
                                                                                                    **N/A*~
I-8-CC-50  REF. DWG. NO. 02-105-B 137450  CC-2064-6692                      F-C      VT-3 VARIABLE SPRING SUPPORT          Fl. 50B        2 X t
aaN/Awe 37455  CC-2064-6692                      D A      VT-3 INTEGRAL ATTACHMENT              D1.40          2 X
                                                                                                    **N/A**
I  20-CC-26  REP. DWG. NO. 02 105 A 137500  CC-2064-7629                      F-C      VT-3 RIGID FRAME  SUPPORT            Pl. 10D        2 X esN/A+a 137505  CC-2064-7629                      D-A      VT 3 INTEGRAL ATTACHMENT              D1.20          2 X eaN/Aee 137510  CC-2064-31                        P-C      VT-3 RIGID PRAME SUPPORT              P1.10D        2                          X
                                                                                                    @AN/Are
 
DATE:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNZT 2                                PAGE: 182 REVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING SHUTDOWN COOLING HX 2B DISCHARGE          I  FIRST      SECOND      THIRD ZONE NUMBER: 106                          ASME              I  PERIOD    PERIOD      PERIOD SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                -OUTAGE                    INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3    i~CALIBRATION BLOCK i I 14-CC-23  REF. DWG. NO. 02-106 A 137540    CC-2063-7408                    F-C      VT-3 RIGID PRAME SUPPORT              F1. 10D          2 X
                                                                                                    **N/AI*
137545  CC-2063-7408                      D-A      VT-3 INTEGRAL ATTACHMENT              D1. 20          2 X
                                                                                                  ~ eN/Are I-20  CC  27  REF. DWG. NO. 02-106-A 37600  CC-2063-7425                      F-C      VT-3 RIGID FRAME SUPPORT              F1. 10D          2 X i*N/A**
I  6 CC-153  REF. DWG. NO. 02-106-C 137660  CC-2063-6461                      F-C      VT-3 RIGID PRAME SUPPORT              F1. 10D        2 X iiN/A*i 137665  CC-2063-6461                      D-A      VT-3 INTEGRAL ATTACHMENT              D1.20          2            X i*N/Ai*
137700  CC-2063-53                        F-C      VT 3 RIGID FRAME  SUPPORT            P1.10D          2
                                                                                                  +AN/A+a
 
EE DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 183 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING SHUTDOWN COOLING HX 2B DISCHARGE      I  FIRST      SECOND      THIRD ZONE NUMBER: 106                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                            - I
 
==SUMMARY==
EXAMINATION AREA                CAVSr  NDE    (          -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIPICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3    e e CALIBRATION BLOCKe e I
I-6-CC-153  REF. DWG. NO. 02 106-C 137705  CC-2063-53                      D-A      VT-3 D1.20          2                        X
                                                                                                ~ eN/Aee I-8-CC-52  REF. DWG. NO, 02-106-B 137755  CC  2063 76A                    F C      VT-3 RIGID STRUT SUPPORT            Fl. 10K        2 X eeN/Aee 3'7760 CC-2063-6474                    P-C      VT-3 VARIABLE SPRING SUPPORT        F1.50B          2 X e e N/Ae
* I-8-CC-54  REF. DWG. NO. 02 106 B 137790  CC-2063 6488                    P-C      VT-3 VARIABLE SPRING SUPPORT        F1.50B          2 X eeN/Aee
 
DATE:    07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 184 REVISION:        0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING WATER PUMPS 2A    2B & 2C INLET          I  PIRST      SECOND      THIRD    I ZONE NUMBER: 107                          ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XI                                              I SUK4hRY EXAMINATION AREA                  CATOY    NDE      I          -OUTAGE-                    INSTRUC1'IONS NUMBER    IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3    "~CALIBRATION BLOCK~ ~
I-24-CC-31  REP. DWG. NO. 02-107-A 137810  CC-2074-61                      P-C      VT-3 VARIABLE SPRING SUPPORT          Fl. SOB          2 X
                                                                                                    +AN/A+a 137815    CC-2074-61                      D-B      VT-3 INTEGRAL ATTACHMENT              D2.40          2            X esN/A+a 137830  CC-2074-59                        F-C      VT-3 RIGID STRUT SUPPORT              P1.10K          2 X
                                                                                                  ~~N/A~~
137835  CC-2074-59                      D-B      VT 3 INTEGRAL ATTACHMENT              D2. 20          2                          X
                                                                                                  ~ aN/Ass I-20-CC-26  REP. DWG. NO. 02-107-B 137870  CC-2064-8201                    F C      VT-3 ANCHOR                          Pl. 10E          2 X
                                                                                                  ~ aN/A+a 137875  CC-2064-8201                      D-B      VT 3 INTEGRAL ATTACHMENT              D2.40            2            X saN/Awe I-24-CC-34    REP. DWG. NO. 02-107 A F-C      VT-3 VARIABLE SPRING SUPPORT          Fl. SOB        2 X
 
DATE:  07/24/93                                    ST. LUCZE NUCLEAR PLANT UNIT 2                                PAGE: 185 RBVISION:      0                          INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING WATER PUMPS 2A    2B  Ec 2C INLET        I  PIRST      SBCOND      THIRD ZONE NUMBER: 107                            ASME            I  PERIOD    PERIOD      PBRIOD SEC. XZ          I
 
==SUMMARY==
EXAMINATION AREA                    CATGY    NDE    I            0UTAG E                INSTRUCTIONS NUMBER    IDENTIFICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3  aaCALIBRATION BLOCKaa I 24 CC 34  REF. DWG. NO. 02-107 A 137925  CC-2074-34                        D-B      VT-3 INTEGRAL ATTACHMENT              D2.40          2                        X aaN/Aa*
I 24 CC 30  REF. DWG. NO. 02-107-A 137960  CC-2074-7388                      F-C      VT"3 RZGID STRUT SUPPORT                F1. 10K        2 X aaN/Aaa 37965  CC-2074-7388                      D-B      VT 3 INTEGRAL ATI'ACHMENT              D1.20          2                        X
                                                                                                ~ aN/Aaa I-24  CC 33  REF. DWG. NO. 02-107 A 137980  CC-2074-19                        P-C      VT-3 VARIABLE SPRING SUPPORT            F1.50B        2 X
                                                                                                *aN/Aaa 137985  CC-2074-19                        D-B      VT 3 INTEGRAL ATTACHMENT                D2.40          2                          X
                                                                                                *aN/Aaa I-20-CC 27  REF  DWG. NO. 02-107    B 138020  CC-2074-8200                      P-C      VT 3 ANCHOR                              F1.10E        2 X aaN/Aaa
 
DATB:  07/24/93                                    ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE: 186 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING WATER PUMPS 2A  2B Ec 2C INLET            FIRST      SECOND    THIRD ZONE NUMBER: 107                        ASME            I    PERIOD    PERIOD    PERIOD  I XI
 
==SUMMARY==
EXAMINATION AREA SEC.
CADIZ    NDE                -OUTAGB-      -----I    I INSTRUCTIONS
                                                                                              ~~CALIBRATION BLOCK~~
NUMBER  IDENTIFICATION                  ITEM NO METH      1  2  3    1  2  3  4          3 I-20-CC-27  RBF. DWG. NO. 02-107-B 138023  CC-2074-8200                    D-B      VT-3 INTEGRAL ATTACHMENT              D2.20          2 X
                                                                                              ~ aN/A"a
 
DATE:    07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                    PAGE: 187 REVISION:        0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS AUX II ZARY FEEDWATER  PUMP 2C TO MAIN PEEDWATER          I  FIRST      SECOND      THIRD ZONE NUMBER: 108                            ASME                PERIOD    PERIOD      PERIOD  I I-
 
==SUMMARY==
EXAMINATION AREA SEC. XZ CATGY  NDE                -OUTAGE      ------I    I INSTRUCTIONS a a CALIBRATION BLOCK>> a NUMBER    IDENTIFICATION                  ZTEM NO METH    i 1 2  3    1  2  3  4    1  2  3 )
I-6-BF-32  REF. DWG. NO. 02 108-A 138051    BF-4001-283                      F-C    VT-3 RIGID PRAME  SUPPORT            Fi. 10D        2 X aaN/Aaa 138052    BF-4001-283                      D-B    VT-3 INTEGRAL ATTACHMENT            D2. 20          2 X aaN/Aaa I-4 BF-35  REF. DWG. NO. 02-108-B 38072    BF-4001-234                      F-C      VT-3 RIGID ROD STRUT                  F1. 10K        2 X EL. 28'0" aaN/Aaa 138075    BF-4001-237                      F-C      VT-3 BOX RESTRAINT                    F1. 10D        2 X EL. 28'0" aaN/Aaa 138090  BF-4001-251                      F-C      VT-3 BOX RESTRAINT                    F1. 10D        2 X EL. 29'0"
                                                                                                  ~ aN/Aaa 138091  BF>>4001-251                      D-B      VT-3 INTEGRAL ATTACHMENT              D2.20          2 X EL. 29'Oa aaN/Aaa
 
DATB:  07/24/93                                  ST. LUCIB NUCLEAR PLANT UNIT 2                                  PAGE: 188 REVISION:      0                        INSBRVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CONDENSATB SUCTION TO AUX. FBBDWATBR PUMP 2C            I  FIRST      SECOND      THIRD ZONE NUMBER: 109                      ASMB            I  PERIOD    PERIOD      PERIOD SEC. XI        I                                  I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                -OUTAGB-                  INSTRUCTIONS NUMBBR  IDENTIFICATION                ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~ eCALIBRATION BLOCKae I
I  8 C-85 RBF. DWG. NO. 02 109 E 138160  C-2204-60                      P-C      VT-3 RIGID FRAME  SUPPORT          F1. 10D        2 X teN/Awe 138165  C-2204-60                      D-B      VT-3 INTEGRAL ATTACHMENT            D1.20          2 X
                                                                                              *aN/Awe 138180  C-2204-66                      F-C      VT-3 F1.10D          2 X e a N/Ae a 138185  C-2204-66                      D-B      VT-3 INTEGRAL ATI'ACHMENT          D1.20          2 X
                                                                                              ~ eN/Aes
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 189 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CONDENSATE-SUCTION TO AUX    FEEDWATER PUMP 2A & 2B        i  FIRST      SECOND      THIRD ZONE NUMBER:  110                        ASME                PERIOD    PERIOD      PERIOD SEC. XI        I-
 
==SUMMARY==
EXAMINATION AREA                  CATGr    NDE                  OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH    ( 1 2  3    1  2  3  4    1  2  3 I ~~CALIBRATION BLOCK~~
I-8-C-68  REP. DWG. NO. 02 110 A 138200  C-2200-161                        F>>C      VT-3 RIGID  FRAME SUPPORT              F1. 10D        2 X
                                                                                                  +AN/A+a 138205  C-2200-161                        D-B      VT-3 INTEGRAL ATI'ACHMENT              D2.20          2 X
                                                                                                  ~ eN/Are t 38250 I-8-C  87 C-2202-203 REF. DWG. NO. 02-110-B RIGID FRAME SUPPORT F-C F1. 10D VT-3 2                        X saN/Awe 138255  C-2202-203                      D-B      VT-3 INTEGRAL ATTACHMENT              D2.20            2 X eaN/Ass I-6-C  90  REF. DWG. NO. 02-110-B 138260  C-2202-212                      F-C      VT-3 RIGID FRAME  SUPPORT            P1. 10D          2 X
                                                                                                  +AN/Ae*
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 190 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS AUX. FEEDWATER PUMPS 2A 8 2B DISCHARGE                    I  FIRST      SECOND      THIRD    I ZONE NUMBER:  111                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI
 
==SUMMARY==
EXAMINATIONAREA                  CATGY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIPI CATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3 I  a@CALIBRATION BLOCKae I-4-BF-30  REP. DWG. NO. 02-111-B 138264  BF-3020-99                        P C    VT-3 ANCHOR                          Fl. 10E        2                        X EL. 22'-2"
                                                                                                +AN/Aea 138265  BP-3020-99                      D-B      VT-3 INTEGRAL ATTACHMENT t2 SHEAR    D2.20          2            X LUGS)
EL. 22'-2                                                                              *+N/Aa*
138267 26'-6'-C BF-3020-89 ANCHOR EL.
F1.10E VT-3 2                        X osN/Awe 138268  BF-3020-89                      D-B      VT-3 INTEGRAL ATTACHMENT (8 SHEAR    D2.20          2            X LUGS)
EL. 26'-6"                                                                            +AN/As+
I-4-BF-63    REF, DWG. NO, 02-111 B 138271  BF-3020-85                      F-C      VT-3 ANCHOR                          Fl. 10E        2                        X EL. 26'-6 a e N/Aa a 138272  BF-3020-85                      D-B      VT-3 INTEGRAL ATTACHMENT {8 SHEAR    D2.20          2            X LUGS)
EL. 26'-6                                                                              +AN/A*~
138274  BF-3020-761                      F-C      VT-3 ANCHOR                          Fl. 10E        2                        X
                                                                                                *1N/A%A
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE: 191 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS AUX. FEEDWATER PUMPS 2A & 2B DISCHARGE                  I  FIRST      SECOND      THIRD ZONE NUMBER:  111                      ASME            I  PERIOD    PERIOD      PERIOD  I
 
==SUMMARY==
EXAMINATION AREA SEC.
CATGY XI NDE              -OUTAGE        ------I    I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH    I 1 2  3    1  2  3  4            3  <<<<CALIBRATION BLOCK<<<<
I-4-BF-63  REF. DNG. NO. 02-111-B 138275  BF-3020-761                    D-B      VT-3 INTEGRAL ATTACHMENT (8 SHEAR  D2. 20          2            X LUGS)
EL. 20'-9"                                                                            <<<<N/A<<<<
I-4-BF-28  REF. DWG. NO. 02 111-A 138278  BF-3020-60                      F-C    . VT-3 ANCHOR                          F1.10E          2 X EL. 22'-3>>
                                                                                                **N/A<<<<
38279  BF-3020-60                      D B      VT-3 INTEGRAL ATTACHMENTS (2 SHEAR  D2. 20          2            X LUGS )
EL. 22'i3>>                                                                            <<.N/A*<<
138281  BF-3020-520                    P-C      VT-3 ANCHOR                          Fl. 10E        2 X EL. 26'-6"
                                                                                                *<<N/A<<<<
138282  BF-3020-520                    DB,      VT3 INTEGRAL ATTACHMENT (8 SHEAR    D2. 20          2            X LUGS)
EL. 26'6>>                                                                              <<<<N/A<<<<
138285  BF-3020-39                      F-C      VT-3 ANCHOR                          Fl. 10E        2 X EL. 28'-0"
                                                                                                <<<<N/A<<<<
138286  BF-3020-39                      D B      VT-3 INTEGRAL ATTACHMENT (4 LUGS)    D2. 20          2            X EL. 28'>>
                                                                                                ~ <<N/A<<<<
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 192 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS AUX. FEEDWATER PUMPS 2A 6 2B DISCHARGE                    I  FIRST      SECOND    THIRD ZONE NUMBER:  111                      ASME              I  PERIOD    PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA SEC.
CATGY XI NDE    I
                                                                      - OUTAGE      ------I    I INSTRUCI'IONS
                                                                                                **CALIBRATIONBLOCKee NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4          3 I-4-BF-28  REP. DWG. NO. 02-111-A 138288  BF-3020-36                      F-C        VT-3 ANCHOR                          F1.10E            2 X EL. 28'-0
                                                                                                **N/Ae*
138289  BF-3020-36                      DB        VT3 INTEGRAL ATTACHMENT {2 LUGS)    D2.20            2            X EL. 28'-Oe
                                                                                                ~ eN/Aee 138291  BF-3020-310                    F-C        VT-3 ANCHOR                          Fl. 10E          2 X EL. 28'0"
                                                                                                ~ eN/Ae ~
138292  BF-3020-310                    D-B        VT-3 INTEGRAL ATTACHMENT (2 LUGS)    D2.20            2            X EL. 28'-0" eeN/Aee 138293  BF-3020-30                      F-C        VT-3 ANCHOR                          Fl. 10E          2 X EL. 28'-Oe e*N/Aee 138294  BF-3020-30                      D-B    "
VT 3 INTEGRAL ATI'ACHMENT            D2. 20            2            X EL. 28'-Oe eeN/Aee
 
DATE:  07/24/93                                      ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 193 REVISION:      0                            INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CIRCULATING WATER FROM INTAKE COOLING WATER PUMPS            I  FIRST      SECOND      THIRD ZONE NUMBER:  112                        ASME              I  PERIOD    PERIOD      PERIOD  I SEC. XZ                                              I S~~Y    EXAMINATIONAREA                  CATGY    NDE                -OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIPICATION                    ITEM NO METH      1 2  3    1  2  3  4    1  2  3  ~ ~CALIBRATION BLOCK~ ~
I I-30-CW-9  REF. D'WG. NO. 02-112-B 138300  CW-3000-7010                      P-C      VT-3 RIGID  FRAME SUPPORT              P1. 10D          2 X
                                                                                                  +AN/Aae 138305  CW-3000-7010                      D-B      VT 3 INTEGRAL ATTACHMENT                D2.20            2                        X
                                                                                                  ~~N/A~~
I-36-CW-16    REF. DWG. NO. 02-112-B 38320  CW-3000-7011                      P-C      VT-3 RIGID  FRAME SUPPORT              F1. 10D          2 X
                                                                                                  ~ ~N/A~*
138325  CW-3000-7011                      D-B      VT-3 INTEGRAL AT1'ACHMENT              D2.20          2                          X
                                                                                                  *aN/A+a I  36-CW-12  REF. DWG. NO. 02-112-A 138330  CW-3000-66                        F-C      VT-3 RZGID FRAME SUPPORT                F1. 10D        2 X
                                                                                                  @AN/Aee 138335  CW-3000-66                        D-B      VT-3 INTEGRAL ATTACHMENT                D2. 20          2                          X
 
DATE:  07/24/93                                    ST. IUCIE NUCLEAR PLANT UNIT 2                                      PAGE: 194 REVISZON:      0                        INSERVZCE INSPECl'ZON SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CIRCULATING WATER PROM INTAKE COOLING WATER PUMPS              FIRST      SECOND      THIRD    i (
ZONE NUMBER:  112                        ASME            I  PERIOD    PERIOD      PERIOD XI
 
==SUMMARY==
EXAMINATION AREA SEC.
CATGY    NDE I
                                                                      -OUTAGE        ------I      I INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH      1 2  3    1  2  3  4    1  2  3      ~ iCALIBRATION BLOCK  i I-36-CW-12  REF. DWG. NO. 02-112-A 138340  CW-3000-60                        F-C      VT-3 RZGZD FRAME SUPPORT              Fl. 10D        2 X 0 <<N/A1 1 138342  CW-3000-60                        D-B      VT-3 INTEGRAI ATTACHMENT              D2. 20          2                        X
                                                                                                    *ON/A*0 t 38370 I-30-CW-10 CW-3000-54 RIGID STRUT REF. DWG. NO. 02 112 A
                    & ROD HANGER F-C F1. 10K VT-3 2 X
                                                                                                    **N/AAP 138375  CW-3000-54                      D-B      VT-3 ZNTEGRAL ATTACHMENT              D2. 20          2                        X saN/Awe 138380  CW-3000-57                      F-C      VT-3 SLIDING BASE SUPPORT            F1. 60Z        2 X
                                                                                                    +AN/Aea 138385  CW-3000-57                      D-B      VT-3 INTEGRAL ATTACHMENT              D2.20          2                          X 40N/A**
I-30-CW-11  REF  DWG. NO. 02-112-A 38420  CW-3000-13                      P-C      VT 3 RIGID STRUT SUPPORT              F1. 10K        2                          X
                                                                                                    +AN/Aee
 
DATE:  07/24/93                                    ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 195 REVISZON:      0                          ZNSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS CIRCULATING WATER FROM INTAKE COOLING WATER PUMPS          I  FIRST      SECOND      THIRD ZONE NUMBER: 112                          ASME                  PERIOD    PERIOD      PERIOD SEC. Xi                                            - I
 
==SUMMARY==
EXAMINATION AREA                  CATGY    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEM NO METH        1 2  3    1  2  3  4    1  2  3    <<<<CALIBRATION BLOCK<<<<
I  30 CW  11 REF. DWG. NO. 02 112 A 138425  CW-3000-13                        D-B      VT-3 INTEGRAL ATTACHMENT              D2. 20          2                        X
                                                                                                    <<<<N/A<<<<
138430  CW-3000-7003                      F-C      VT-3 SLIDING BASE  4 RIGID STRUT      F1. 60K          2                        X
                                                                                                    <<<<N/A<<<<
138435  CW-3000-7003                      D-B      VT-3 D2.20            2                        X
                                                                                                    ~ <<N/A<<<<
I-36-CW 13    REF. DWG. NO. 02-112 B 138450  CW-3000-7006                      F-C      VT 3 RIGID  PRAME SUPPORT              F1. 10D          2 X
                                                                                                    <<<<N/A<< ~
138455  CW-3000-7006                      D B      VT-3 INTEGRAL ATTACHMENT              D2. 20          2                        X
                                                                                                    ~ <<N/A<<<<
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 196 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS CIRCULATING WATER TO  CCW NEAT EXCHANGER 2A                  FIRST      SECOND      THIRD ZONE NUHBER: 113                        ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                            - I
 
==SUMMARY==
EXAMINATION AREA                CATGY    NDE                -OUTAGE                      INSTRUCTIONS NUMBER  IDENTIFICATION                  ITEH NO METH    f 1 2  3    1  2  3  4    1  2  3  I <<<<CALIBRATION BLOCK<<<<
I-30-CW-78  REF. DWG. NO, 02-113 A 138490  CW-3001-7373                    P-C      VT-3 RIGID  FRAME & STRUT SUPPORT    F1.10K          2 X
                                                                                                <<<<N/A<<<<
138495  CW-3001-7373                    D-B      VT-3 D2.20          2 X
                                                                                                <<<<N/A<<<<
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE: 197 REVISION:      0                        ZNSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS 0>>
INSPECTION INTERVAL                PLAN STATUS CIRCULATING WATER TO CCW HEAT EXCHANGER 2B              I  PIRST      SECOND      THIRD ZONE NUMBER: 114                      ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ          I                                  I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                -OUTAGE                    INSTRUC1'ZONS NUMBER  IDENTIFICATION                ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3  ~*CALIBRATION BLOCK~ ~
I  30-CW 71 REF. DWG. NO. 02-114-B 138680  CW-3001-726                    F-C      VT-3 RIGID FRAME SUPPORT            F1. 10D        2 X
                                                                                                ~ aN/Are 138685  CW-3001-726                    D-B      VT-3 INTEGRAL ATTACHMENT            D2.20          2 X aaN/Awe
 
DATE:  07/24/93                              ST. LUCIE NUCLEAR PIANT UNIT 2                                PAGE: 198 REVISION:      0                  INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS LETDOWN HEAT EXCHANGER                                  PIRST      SECOND    THIRD    (
ZONE NUMBER: 180                  ASME            I  PERIOD    PERIOD    PERIOD  I SEC. XI        I
 
==SUMMARY==
EXAMINATION AREA          CATGY    NDE                  OUTAGE -              I INSTRUCTIONS NUMBER  IDENTIFICATION            ITEM NO METH      1 2  3    1  2  3  4  1  2  3  ~ eCALIBRATION BLOCXe*
[                                  I REF. DWG. NO. 02-180 139000  LDX-1                      D-A      VT-3 INTEGRAL ATI'ACHMENT      D1.20          2 X eeN/Are 139010  LDX-SUPPORT 1              P-C      VT-3 HX SUPPORT                P1.10D          2 X
                                                                                        **N/Aee 139020  LDX-2                      D-A      VT-3 INTEGRAL ATTACHMENT        D1.20          2 X
                                                                                        ~ eN/Aee 139030  LDX-SUPPORT 2              F-C      VT-3 HX SUPPORT                F1. 10D        2 X eeN/Ae*
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 199 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS COMPONENT COOLING WATER HEAT EXCHANGER 2A                I  FIRST      SECOND    THIRD ZONE NUMBER: 181                      ASME              I  PERIOD    PERIOD    PERIOD SEC. Xr SD&#xc3;4ARY EXAMINATION AREA              CATGY    NDE                - OUTAGE - - - - -    I  INSTRUCTIONS NUMBER    IDENTIFICATION                ITEM NO METH        1 2  3    1  2  3  4  1  2  3 I  **CALIBRATIONBLOCK~*
REF. DWG. NO. 02-181 140000  CCWX-2A-1                    D-B      VT-3 INTEGRAL ATTACHMENT          D2.20            2 X
                                                                                                ~ aN/Aas 140010  CCWX SUPPORT  2A 1            F-C      VT-3 HX 2A SUPPORT                  Fl. 10D          2 X OWN/A%0 140020  CCWX-2A-2                      D-B      VT-3 INTEGRAL ATTACHMENT          D2.20            2 X
                                                                                              <<~N/A~>>
140030  CCWX-SUPPORT  2A-2            F-C      VT-3 HX 2A SUPPORT                  Fl. 10D          2 X
                                                                                              *~N/A~*
140040  CCWX-2A-3                      D-B      VT-3 INTEGRAL ATTACHMENT            D2.20            2 X 1 1N/At 0 140050  CCWX-SUPPORT  2A-3            F-C      VT-3 HX 2A SUPPORT                  Fl. 10D          2 X e+N/Aaa 140060  CCWX  2A 4                    D-B      VT 3 INTEGRAL ATTACHMENT            D2.20            2 X
                                                                                              +AN/A@a
 
DATE:  07/24/93                                  ST. LUCIS NUCLEAR PLANT UNIT 2                                PAGE: 200 t
REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER HEAT EXCHANGER 2A              I    FIRST      SECOND    THIRD    I ZONE NUMBER: 181                      ASME            I    PERIOD    PERIOD    PERIOD  I SEC. XI                                            I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE    I
                                                                  - OUTAGE-              ) INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH      1  2  3    1  2  3  4  1  2  3  ~~CALIBRATION BLOCK~~
REP. DWG. NO. 02-181 140070  CCWX-SUPPORT  2A-4            F-C      VT-3 HX 2A SUPPORT                  F1. 10D        2 X
 
DATE: 07/24/93                                ST. LUCZE NUCLEAR PLANT UNIT 2                                  PAGE: 201 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER PUMP 2A                        I  FIRST      SECOND      THIRD ZONE NUMBER: 183                      ASME            I  PERIOD    PERIOD      PERIOD SEC. XZ SU&#xc3;4ARY EXAMINATION AREA              CATGV    NDE                -OUTAGE-                    INSTRUCTIONS NUMBER  IDENTIPICATION                ITEM NO METH      1 2  3    1  2  3  4    1  2  3    ~ ~CALIBRATION BLOCK~~
I REP. DWG. NO. 02  183-A 140300  CCWP-2A 1                    D-B      VT-3 INTEGRAL ATTACHMENT          D2.20          2 X 0 IN/A11 140310  CCWP-SUPPORT 2A-1            F-C      VT-3 PUMP 2A SUPPORT              Fl. 10D        2 X
                                                                                            ~~N/A~~
140320  CCWP-2A-2                    D-B      VT-3 INTEGRAL ATTACHMENT          D2.20          2 X
                                                                                            ~ eN/Aa*
140330  CCWP-SUPPORT 2A-2            P-C    VT-3 PUMP 2A SUPPORT              F1.10D          2 X
                                                                                            +AN/Awe 140340  CCWP-2A-3                    D-B    VT-3 INTEGRAL ATTACHMENT          D2.20          2 X 11N/A4k 140350  CCWP-SUPPORT 2A-3            P-C    VT-3 PUMP 2A SUPPORT              Pl. 10D        2 X eoN/A**
140360  CCWP-2A-4                    D-B    VT-3 D2.20          2 X
                                                                                            ~ aN/Aae
 
DATE:  07/24/93                                ST. LUCIE NUCLEAR PLANT UNIT 2                              PAGE: 202 REVISION:      0                      INSERVICE INSPECTION SELECIED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER PUMP 2A                        I  FIRST      SECOND      THIRD ZONE NUMBER: 183                      ASME            I  PERIOD    PERIOD      PERIOD SEC. XI                                          I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                  OUTAGE-              I INSTRUCTIONS NUMBER  IDENTIPICATION                ITEM NO METH    )  1          1  2  3  4    1        *~CALIBRATION BLOCK~*
RBP. DWG, NO. 02 183 A 140370  CCWP-SUPPORT 2A-4            P-C      VT-3 PUMP 2A SUPPORT              F1. 10D        2 X
                                                                                          **N/Aee
 
DATE:  0V/24/83                                ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 203 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS FUEL POOL COOLING PUMP 2B                              I  PIRST        SECOND  THIRD I
ZONE NUMBER: 184                      ASME            I  PERIOD      PERIOD  PERIOD  I SEC. XI        I                                  I
 
==SUMMARY==
EXAMINATIONAREA              CAN<    NDE                -OUTAGE-                  INSTRUCTIONS NUMBER  IDENTIFICATZON                ITEM NO METH    i 1 2  3    1    2  3  4 1  2  3 I ~~CALIBRATION BLOCK~~
REF. DWG. NO. 02-184-B 140820 ,PPCP-2B-1                    D-C      VT-3 INTEGRAL ATTACHMENT          D3.20          2            X
                                                                                            %ON/Ai~
140830  FPCP-SUPPORT  2B-1            F-C      VT-3 PUMP 2A SUPPORT              F1. 10D        2 X a aN/Ae e
 
DATE:  07/24/93                                ST., IUCIE  NUCLEAR PLANT UNIT 2                                PAGE: 204 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS FUEL POOL COOLING HEAT EXCHANGER 2B                          FIRST      SECOND      THIRD ZONE NUMBER: 185                      ASME            I    PERIOD      PERIOD      PERIOD XI        I-
 
==SUMMARY==
EXAMINATION AREA SEC.
CAKY    NDE    i - - - - - - 0  U T A G E  ------I    I INSTRUCTIONS
                                                                                                ~eCALIBRATION BLOCK+>>
NUMBER  IDENTIFICATION                ITEM NO METH    I 1  2  3    1  2  3  4    1  2  3 REF. DWG. NO. 02-185-B 141040  PPCX-2B 1                      D-C      VT-3 INTEGRAL ATTACHMENT            D3.20          2                          X s aN/Ae a 141050  FPCX-SUPPORT 2B 1              F-C      VT-3 HX 2B SUPPORT                  F1. 10D        2 X
                                                                                                ~ eN/Aee 141060  FPCX-2B-2                      D-C      VT-3 INTEGRAL ATTACHMENT            D3.20          2                          X
                                                                                                **N/A10 141070  FPCX-SUPPORT  2B-2            F-C      VT-3 HX 2B SUPPORT                  F1. 10D        2 X
                                                                                                ~~N/A~+
 
DATE:  07/24/93                                ST. LUCIB NUCLBAR PLANT UNIT 2                              PAGE: 205 REVISION:      0                      INSERVICE INSPECZZON SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONBNTS INSPECTION INTERVAZ                PLAN STATUS AUXILIARY FBBDWATBR  PUMP 2C                          I  PIRST      SECOND      THIRD ZONB NUMBER: 186                      ASME            I  PERIOD    PERIOD      PERIOD SBC. XI
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                -OUTAGE                INSTRUCTIONS NUMBER  IDBNTIPICATION                ITEM NO METH      1 2  3    1  2  3  4          ~ ~CALIBRATION BLOCK~ ~
REF. DWG. NO. 02-186-C 141240  AFP SUPPORT 2C 1              F-C      VT-3 PUMP 2C SUPPORT              Fl. 10D        2 X
                                                                                        *aN/Awe 141250  AFP-SUPPORT 2C-2              F-A      VT-3 PUMP 2C SUPPORT              Pl. 10D        2 X
                                                                                        %AN/A%0
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                PAGE: 206 REVISION:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                  PLAN STATUS SHUTDOWN COOLING HEAT EXCHANGER 2A                      I    PIRST      SECOND      THIRD ZONE NUMBER: 187                      ASME              I    PERIOD    PERIOD      PERIOD XI
 
==SUMMARY==
EXAMINATION AREA SEC.
CATGY    NDE I
[
                                                          - - - - - - 0 U T A G  E- -----I I INSTRUCTIONS
                                                                                              ~ ~CALIBRATION BLOCK~~
NUMBER  IDENTIFICATION                ITEMNOMETH        I 1  2  3    1  2  3  4    1 REF. DWG. NO. 02-187-A 141400  SDCX-2A 1                      D-B      VT-3 INTEGRAL ATTACHMENT            D2.20            2              X
                                                                                              ~ *N/Ai4 141410  SDCX-SUPPORT  2A-1            F-C      VT-3 HX 2A SUPPORT                  F1. 10D          2 X
                                                                                              **N/A~>>
141420  SDCX  2A-2                    D-B      VT-3 INTEGRAL ATTACHMENT            D2. 20          2              X 4 4 N/JP 0 141430  SDCX-SUPPORT  2A-2            F-C      VT-3 HX 2A SUPPORT                  F1. 10D          2 X
                                                                                              ~~N/A~~
 
DATE:  07/24/93                                ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 207 REVISZON:      0                      INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS INTAKE COOLING WATER PUMP 2C                              FIRST      SECOND      THIRD ZONE NUMBER: 188                    ASME                PERIOD    PERIOD      PERIOD SEC. XI        I
                                                                                          - I
 
==SUMMARY==
EXAMINATION AREA            CATGY    NDE                -OUTAGE------              I INSTRUCTIONS NUMBER  IDENTIPICATZON              ITEM NO METH    I 1 2  3    1  2  3  4    1  2  3  I ~~CALIBRATION BLOCK~ ~
REF. DWG. NO. 02-188-C 141680  ICWP-2C-1                    D-B      VT-3 INTEGRAL ATTACHMENT          D2.20          2
                                                                                              *aN/Are 141690  ICWP-SUPPORT 2C-1            F-C      VT-3 PUMP 2C SUPPORT              Fl. 10D        2 X
                                                                                              ~ aN/A@a 141700  ICWP-2C-2                    D-B      VT-3 INTEGRAL ATZACHMENT          D2.20          2                        X
                                                                                              +AN/Awe 141710  ICWP SUPPORT 2C-2            F-C      VT 3 PUMP 2C SUPPORT              Fl. 10D        2 X eeN/Ant
 
DATE:  07/24/93                                  ST. LUCIE NUCLEAR PLANT UNIT 2                                  PAGE: 208 REVISION:      0                        INSERVICE INSPECTION SELECTED COMPONENT SCHEDULE CLASS 3 SCHEDULED COMPONENTS INSPECTION INTERVAL                PLAN STATUS COMPONENT COOLING WATER SURGE TANK                      I  FIRST      SECOND      THZRD ZONE NUMBER: 189                      ASME                PERIOD    PERIOD      PERZOD  I SEC. XZ          I                                  I
 
==SUMMARY==
EXAMINATION AREA              CATGY    NDE                -OUTAGE"-----            I INSTRUCTIONS NUMBER  IDENTIFICATION                ITEM NO METH    (      3    12    3  4    12    3 t
                                                                                              + ~CALIBRATION BLOCK*~
REF. DWG. NO. 02-189 141800  CCWST-1                        D-B      VT-3 INTEGRAL ATTACHMENT            D2. 20          2                        X
                                                                                              **N/A~*
141810  CCWST SUPPORT 1                F-C      VT-3 TANK SUPPORT                  Fl. 10D        2 X 4 IN/AO~
141820  CCWST-2                        D-B      VT-3 ZNTEGRAL ATTACHMENT            D2.20          2                        X
                                                                                              ~ aN/Aae 141830  CCWST-SUPPORT 2                P-C      VT-3 TANK SUPPORT                  Fl. 10D        2 X
 
SECOND INSPECTION INTERVAL                PSL-201 INSERVICE INSPECTION                    REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 APPENDlX A ACCEPTANCE CRITERlA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).
Page 209  of 398
 
l c SECOND INSPECTION INTERVAL                          PSL-201 INSERVICE INSPECTION                              REVISION 0 SELECTED COMPONENTS SCHEDULE                              July 24, 1993 TABLE A CLASS            1  ACCEPTANCE STANDARDS EXAMINATION                    COMPONENT OR PART EXAMINED                  ACCEPTANCE CATEGORY                                                                  STANDARD 8-A                            Welds ln Reactor Vessels                  IW84510 B-B                            Welds in Other Vessels                  IWB-3510 8-D                              Vessel Nonle Welds                    IWB-3512 8-E                      Partial Penetration welds In Vessels          IWB-3522 B-F, 84                Dissimilar and Similar Metal Welds in Piping        IW84514 8-G-1                                Bolting > 2" dia.                  IWB-3515/3517 8-G-2                                Bolting c 2" dla.                    IWB-3517 B-H, 8-K-1      integral Attachments for Piping, Valves, Pumps & Vessels    IWB4516 B-L-1, 8-M-1                        Welds in Pumps & Valves                  IWB4518 B-L-2, 8-M-2                    Pump Casings & Valve Bodies                  IWB-3519 8-N-1 8-N-2    Interior Surfaces & Internal Components of Reactor Vessels  IWB-3520 8-N4 B-O                        Control Rod Drive Housing Welds              IWB-3523 8-P                          Pressure Retaining Boundary                IWB-3522 Steam Generator Tubing                  IWB-3521 Page 210      of 398
 
SECOND INSPECTION INTERVAL                        PSL-201 INSERVICE INSPECTION                          REVISION 0 SELECTED COMPONENTS SCHEDULE                          July 24, 1993 TABLE A CLASS 2 ACCEPTANCE STANDARDS EXAMINATION                                                          ACCEPTANCE COMPONENT OR PART EXAMINED CATEGORY                                                              STANDARD C-A                        Welds in Pressure Vessels              IWC-3510 C-B                        Nozzle Welds In Vessels                IWC-351 1 C-C          Integral Attachments for Vessels, Piping, Pumps and  IWC-3512 Valves C-D                                Bolting                        IWC-3513 C-F-1,C-F-2                        Welds ln Piping                    IWC4514 Welds In Pumps and Valves                IWC4515 C-H                    Pressure Retaining Components              IWC-3516 Page 211      of 398
 
SECOND INSPECTION INTERVAL                    PSL-201 INSERVICE INSPECTION                      'REVISION 0 SELECTED COMPONENTS SCHEDULE                    July 24, 1993 TABLE AN - CLASS 3 ACCEPTANCE STANDARDS EXAMINATION            COMPONENT OR PART EXAMlNED            ACCEPTANCE CATEGORY                                                      STANDARD D-A                    Pressure Boundary (VT-2)        "No Leakage 'Mfg.
Integral Attachments (VT4)      Codo & Appllcablo Standards D.B                    Pressure Boundary (VT-2)        "No Leakage Mfg.
Integral Attachmonts (VT4)      Code & Appllcablo Standards D*C                    Pressure Boundaty (VT-2)      INtA4250 'Mfg. Code &
Integral Attachments (VTQ)      Appllcablo Standards ASME Section XI Acceptance Standard in course of preparation.
Defined as no leakage from the pressure boundary, in excess of that which is expected and determined to be within acceptable limits, i.e., at valve packing, bolted connections, pump seals, etc.
Page 212      of 398
 
4 SECOND INSPECTION INTERVAL      PSL-201 INSERVICE INSPECTION          REVISION 0 SELECTED COMPONENTS SCHEDULE      July 24, 1993 TABLE AX - COMPONENT SUPPORT ACCEPTANCE STANDARDS EXAMINATION        COMPONENT OR PART EXAMINED ACCEPTANCE CATEGORY                                      STANDARD F-A                      Supports            IWF-3410 Page 213    of 398
 
SECOND INSPECTION INTERVAL                  PSL-201 INSERVICE INSPECTION                      REVISION 0 SELECTED COMPONENTS SCHEDULE                    July 24, 1993 APPENDIX B NONDESTRUCTIVE EXANIINATION PROCEDURES The following is a list of the standard NDE procedures used for ISI activities. The specific revision used during an activity will be listed in the final report for that examination activity.
Procedure    Title No.
NDE 1.3      Eddy Current Examinations of Non Ferro-magnetic Tubing with Multi Frequency Techniques MIZ-12 NDE 2.2      Magnetic Particle Examination NDE 3.3      Liquid Penetrant Examination Solvent Removable Visible Dye Technique NDE 4.1      Visual Examination VT-1 for Welds!Bolting/Bushings/Washers NDE 4.2      Visual Examination VT-2 Conducted During System Pressure Tests NDE 4.3      Visual Examination VT-3NT-4 NDE 4.4      Steam Generator Secondary Side Visual Examination NDE 5.1      Ultrasonic Examination of Pressure Vessel Welds Except Reactor Vessels NDE 5.2      Ultrasonic Examination of Ferritic Piping Welds NDE 5.3      Ultrasonic Examination of Primary Coolant Piping Welds (PSL-1&2)
NDE 5.4      Ultrasonic Examination of Austenitic Piping Welds NDE 5.6      Ultrasonic Examination of Integrally Welded Attachments to Piping NDE 5.7      Ultrasonic Examination of Reactor Pressure Vessel Studs and Reactor Coolant Pump Studs NDE 5.8      Ultrasonic Examination of Bolting Material for Cracking NDE 5.9      Ultrasonic Examination of Bolting Material for Corrosion NDE 5.10      Ultrasonic Examination of Nuts Two Inches in Diameter or Greater NDE 5.11      Ultrasonic Examination of Dissimilar Metal Welds Page 214 of 398
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 Procedure Title No.
NDE 6.12  Manual Ultrasonic Examination of Reactor Vessel Flange to Shell Welds and Stud Hole Threads NDE 5.13  Ultrasonic Examination of Nozzle Inner Radius Areas NDE 6.14  Manual Ultrasonic Examination of Reactor Pressure Vessel Shell and Closure Head Welds NDE 5.15  Ultrasonic Examination of Reactor Coolant Pump Flywheels NDE,5.16  Ultrasonic Examination Technique for the Evaluation of Cracking in Steam Generator Feedwater Piping NDE 5.18  Ultrasonic Thickness Measurement Page 215 of 398
 
SECOND INSPECTION INTERVAL            PSL-201 INSERVICE INSPECTION                REVISION 0 SELECTED COMPONENTS SCHEDULE            July 24, 1993 APPENDIX C ULTRASONIC CALIBRATION BLOCKS MATERIAL                      SIZE      APPLICATION SA-533 GR.B                            RPV UPPER SHELL SA-533 GR.B                  9 II      RPV SA-533 GR.B                  7ll      RPV SA-533 GR.B                  5 II      RPV SA-533 CL.1, GR.B            5 II      PZR SA-633 CL.1, GR.B            3II      3" RC PIPING SA-516 GR.70 W/304L CLAD 3 5ll          RC PIPING I
SA-516 GR.70 CLAD            3I SA-516 GR.70 UNCLAD          3 II SA-533 GR.B                  7I ~
RPV FLANGE LIGAMENT SA-533 GR.B                            RPV INLET NOZZLE SA-533 GR.B                            RPV OUTLET NOZZLE SA-633 GR.B                  OBSOLETE/NOT USED SA-533 GR.B                  OBSOLETE/NOT USED SA-533 GR.B                  OBSOLETE/NOT USED SA-533 GR.B                  OBSOLETE/NOT USED SA-516 GR.70 WI304L ROLL TRAINING ONLY REPLACED BY BOND/316                    UT-59 SA-351 CF8M                  1.25"    12.75" DIAMETER SA-106 GR.B                            SAFE ENDS SA-182, TP316                1.25"    6" DIAMETER SAFE SA-533 CL1 A                          ENDS SA-182 TP316                1.25"    5" DIAMETER SAFE SA-633 CL1 A                          ENDS SA-182 TP316                .625"    4 5/8" DIAMETER SA-533 CL1 A                          SAFE ENDS Page 216 of 398
 
SECOND INSPECTION INTERVAL            PSL-201 INSERVICE /NSPECT/ON                REVISION 0 SELECTED COMPONENTS SCHEDULE              July 24, 1993 I.D. MATERIAL                    SIZE    APPLICATION UT-20  SA-540 B-24                  OBSOLETE/NOT USED UT-21  SA-540 B-23                  OBSOLETE/NOT USED UT-22  SA-182 TP304                5.56    "O.D. RPV INST.
INCONEL 600                          NOZZLE UT-23  SA-351 CF8M                  1.312"  12.75" DIAMETER PZR. SURGE NOZZLE SAFE END UT-24  NO BLOCK IDENTIFIED WITH THIS NUMBER UT-25  SA-533 GR.B                  5 II    FLAT STM GEN. CL.
II UT-26  NO BLOCK IDENTIFIED WITH THIS NUMBER UT-27  SA-533 GR.B                  7ll      FLAT/CLAD STM GEN PRIMARY HEAD UT-28A SA-533 GR.B CL1              4II      CLAD UT-29  SA-516 GR.70                1l ~
18" DIAMETER FEEDWATER UT-30  NO BLOCK IDENTIFIED WITH THIS NUMBER UT-31  SA-516 GR.70                1.625"  FLAT BLOCK UT-32  SA-533 GR.B                  2 II    STAY CYLINDER UT-33  SA-182 TP316                          LETDOWN & DRAIN SA-533 CL1                  7/8"    NOZZLE SAFE END UT-34  SA-182 TP316                4 5I  ~
SPRAY NOZZLE SA-533 CL1                    93 II  SAFE END UT-35  SA-376 (SA-312)              1.34"    12" SCH. 160 UT-36  NO BLOCK IDENTIFIED WITH THIS NUMBER UT-37  TP304                        1.125"  10.75" O.D. NOT USED UT-38  SA-312 TP304                .719"    6" SCH. 160 PIPING UT-39  SA-312 TP304                .531"    4" SCH. 160 PIPING UT-40  SA-312 TP316                .531"    20" SCH. 80 PIPING UT-41  A-106 GR.B                  1.031"    20" SCH. 80 PIPING Page 217 of 398
 
SECOND INSPECTION INTERVAL          PSL-201 INSERVICE INSPECTION              REVISION 0 SELECTED COMPONENTS SCHEDULE          July 24, 1993 I.D. MATERIAL                    SIZE    APPLICATION UT-42 A-106 GR.B                  1.50"  20" SCH. 120 PIPING UTP3  A-106 GR.B                  .938"  18" SCH. 80 PIPING UTP4  A-515 GR 70                2 II    36.5" DIAMETER UT-45 A-166/615 GR.65            1.250"  34" DIAMETER UTQ6  A-106 GR.B                  1.125"  10" SCH. 160 UT-47 A-106 GR.B                  .594"  10" SCH. 80 UT-48 A-106 GR.B                  .906"  8" SCH. 160 UT-49 A-519                      1  5 II 6II UT-50 A-182 TP304                1.56"  12" SCH. 160 UT-51 NO BLOCK IDENTIFIED WITH THIS NUMBER UT-52 NO BLOCK IDENTIFIED WITH THIS NUMBER UT-53 NO BLOCK IDENTIFIED WITH THIS NUMBER UT-54 A-312 TP304                .562"  6" SCH. 120 UT-55 NO BLOCK IDENTIFIED WITH THIS NUMBER UT-56 A-516-79B GR.70            1.15"  1" + CLAD FLAT PLATE UT-57 NO BLOCK IDENTIFIED WITH THIS NUMBER UT-68 SA-640 GR.B23                      4.76" RCP STUD UT-59 A-361 CF8M                          RCP SAFE END BLOCK Page 218 of 398
 
SECOND INSPECTION INTERVAL  PSL-201 INSERVICE INSPECTION      REVISION 0 SELECTED COMPONENTS SCHEDULE,,  July 24, 1993 APPENDIX D CLASS  1 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-001-A  Reactor Pressure Vessel 02-001-B  Reactor Pressure Vessel 02-001-C  Reactor Pressure Vessel 02-002    RPV Closure Head 02-003    Steam Generator 2A 02-004    Steam Generator 2B 02-006    Pressurizer 02-006    RCS Loop 2A2 02-007    RCS Loop 2B1 02-008    RCS Loop 2A2 02-009    RCS Loop 2A2 02-010    RCS Loop 2B1 02-0'l1  RCS Loop 2B1 02-012    RCS Loop 2A1 02-013    RCS Loop 2A1 02-014    RCS Loop 2B2 02-016    RCS Loop 2B2 02-016    Pressurizer Surge Line 02-017    RCP 2A1 Page 279  of 398
 
              . SECOND INSPECTION INTERVAL  PSL-201 INSERVICE INSPECTION      REVISION 0 SELECTED COMPONENTS SCHEDULE    July 24, 1993 APPENDIX D CLASS'    WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-018    RCP 2A2 02-019    RCP 2B1 02-020    RCP 2B2 02-021    SIS Loop 2A1 02-022    SIS Loop 2A2 02-023    SIS Loop 2B1 02-024    SIS Loop 2B2 02-025    Pressurizer Spray Line 02-026    Spray Line Loop 2B1 02-027    Spray Line Loop 2B2 02-028A  Shutdown Cooling Loop 2B 02-028 B  Shutdown Cooling Loop 2B 02-029A  Shutdown Cooling Loop 2A 02-029 B  Shutdown Cooling Loop 2A 02-030A  Pressurizer Auxiliary Spray 02-030 B  Pressurizer Auxiliary Spray 02-031    Charging Line 2B1 02-032A  Charging Line 2A2-02-032 B  Charging Line 2A2 02-032 C  Charging Line 2A2 02-033    Primary Drain 2A1 Page 220  of 398
 
4 ~
d 1I l'
 
SECOND INSPECTION INTERVAL  PSL-201 INSERVICE INSPECTION      REVISION 0 SELECTED COMPONENTS SCHEDULE    July 24, 1993 APPENDIX D CLASS  1 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-034    Primary Drain 2A2 02-036    Primary Drain 2B1 02-036    Primary Drain 2B2 02-037A  Letdown Line 2B1 02-037 B  Letdown Line 2B1 02-038    Pressurizer Relief Line Page 221  of 398
 
INLET NOZZLE INNER RADIUS AREA IN-IR-A e 60    LOCAllON IN-IR-B OUTLET NOZZLE                                                                      e 120'OCATION INNER RADIUS AREA IN-IR-C ON-IR-A                                                                                240'OCATlON O'OCATION                                                                        IN-IR-D ON-IR-8                                                                            e 300'OCATlON 41  180'OCATION 103-151-A                                                        106-121 41 10'OCATlON 103-151-B                                                        101-171 41 40'OCATION 103-151 -C                                                CORE STABIUZING LUG 41 85'OCATION                                              (SNUBBER) 103-151 -D 9  135 LOCATION                                              101-141-A 103-151-E                                                      O'OCATION 41 160'OCAllON                                                101-141-B e 60'OCATION 103-151-F t0 205 LOCATlON 103-151-G 41 250'OCATION 103-151-H t FLOW BAFFLE FB-01 101-141-C 120'OCATION 101-I41-D 180'OCATION 101-141-E HKE SECllON SEE DWG.
SECTION A-A-02-001-B B-B-Cl 280'OCATION                                                                                      SEE DWG. 02-001-B 240'OCATION                        SECTION  X-X 103-151-I                                                    101-141-F                            SEE DWG. 02-001-C t0 325'OCATION  CORE STOP 201-141      e 300'OCATION                        SECTION  Y-Y-LUG                                                                          SEE DWQ. 02-001-C E-71I72-171-002  REV. 0 SECTION  Z-Z-E-71172-171-008                                                                                                                SEE DWG. 02-001-C REV. 0 REFERENCE DRAWINGS                        NOTES    CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT E-71172-I21-001 REV. 4                                                                                                    ST. LUCK UNIT 2 E-71172-124-001 REV. 5 E-71172-141-001                                                                                  TlTLE: REACTOR PRESSURE VESSEL REV. 2 E-71172-141-002 REV. 6 E-71172-142-001 REV. 7                                                                        DATE:  7/1 4/93      KK            ZONE: 1 E-71172-151-001 REV. 5                                                                          RCVKWKO SY:              DRAWNC HQ.:
E-71172-154-001 REV. 4                                      UT-1, UT-2, UT-10                                                02-001-A
 
CONT. ON 0WG. 02-007 ZONE 7 180'C-123-1 105-121-8                                  401-128-8 180' 201-128-8                                                          RC-124-6 101-154-C CONT. ON                                                                    CONT. ON 101-154-D            DWG. 02-011                                                                DWG. 02-015 ZONE 11                                                                    ZONE 15 101-151
                                                                              ~
MSH-03 RC-121-6
                                                                                                    +
Mss-oz                Mss-04
                                                                                                                              ~                    201-128-C
                                            ~                                                                                ~ ~
103-121-8                                      I                          103-121-C
                        ~
270 103-121-A
                                                                              ~90 oss-o>                use-os 270 103-121-0
                                                                          ~                                                                ~
101-154-s 90'01-154-8 i
RC-112-6                                                                            RC-115-6 MSH-06 101-154-A          ~        ~  101-154-F CONT. ON DWG. 02-013 ZONE 13 CONT. ON DWG. 02-009 ZONE 9 ps                                    201-128-A 105-121-A RC-114-1 ~            0
                                                                                                                      ~      401-128-A 201-128-D CONT. ON DWG. 02-006 ZONE 6 E-71172-171-002 E-71172-171-008 REV.
REV.
0 0                                                                    5KI10~
REFERENCE DRAWINGS              NOTES                              CALIBRAlION BLOCKS AND MATERIAL                                      FLORIDA POWER h LIGHT E-71172-121-001 E-71172-124-001 REV. 4 REV. 5 NOZZLE'A-516,GR-70                                            SK.              ST. LUCIE UNIT 2 E-71172-141-001          REV. 2                                                                                          llRE: REACTOR PRESSURE VESSEL E-71172-141-002          REV. 6 E-71172-142-001          REV. 7                                                                                        DATE:  7/14/93    KK            ZONE: 1 E-71172-151-001          REV. 5                                                                                        avmm  er:            ORA'NNC NK:
E-71172-154-001          REV. 4                                          UT-1, UT-4, UT-9, UT-10                                                02-001-8
 
101-124-B 180 180'01-142-8
                                                                                                  ~270'4  101-124-C 23 25 180'7 28 29 30 31 33 22                                          34 21                                                35 90'01-142-C                                                    20                                                      36 90                        270            101-124-A        ~                    0 INTERMEDIATE SHELL SEGMENT 18 17 16 19 AK-02 AK-03 37 38 39 40 15                                                                      41 SECTION Y-Y                    90'4                                                                          270'2
                  ~          0'01-122-8 ~                                    180 43 0'4 LOSER SHELL SEGMENT 11                  AK-01          I                            45 90'01-142-A 10                                                            46 SECllON  Z-Z 101-1 22-C 270'2                      8 50 49 48 47 5                              51 S-Ol  THRU 54  RPV STUDS N-01  THRU 54  RPV NUTS                                                                                                                      2                53 W-01 THRU 54  RPV WASHERS FL-01 THRU 54  RPV FLANGE THREADS E-71172-171-002 REV. 0 101-122-A                  ~
UPPER SHELL SEGMENT REACTOR VESSEL FlANGE PLAN MEW E-71172-121-ODB REV. 0 SECllON  X-X REFERENCE DRAWINGS                    NOTES                                              CALIBRATION BLOCKS AND MATERIAL                                          FLORIDA POWER dc LIGHT E-71172-121-001 E-71172-121-001 REV. 4                                                                                                                                      K%.                ST. LUCIE UNIT 2 REV. 5 E-71172-141-001 REV. 2 llTLE: REACTOR PRESSURE VESSEL E-71172-141-002  REV. 6 E-71172-141-001 REV. 7                                                                                                                          DATE:      7/14/93      KK            ZONE:    1 E-71172-151-001 REV. 5                                                                                                                          RKVEAG) QY:                DRA'NHC NR:
E-71172-154-001  REV. 4                                                                          UT-1, UT-2, UT-8, UT-20                                                      02-001-C
 
r ~
4
: 91) CEDM NOZZLE TO HEAD WELDS
: 11) INSTRVMENTATICN NOZZLES 102-101 SEE DETAIL "A" 101-101 FROM O.D.
OF I.D.
                                                                  ~
I g4 FLANGE BOLTTNG g3 FLANGE BOLTING O 148'5      101-104-C Qo SECTION 78 A-A FlANGE BOLTING O 213'AO g6 FlANGE 122'As                                                                                  BOLTING 502-101 0
o o          mo          0 o o
                                                                                    ~(QIPOirQ22 238'70'01-104-D 90'01-104-B o"o'*4~c                                                                                                  501-101
()q  Qo DETAIL "A" g2 FlANGE                                                                                  III7 FlANGE BOLllNG                                                                                        BOLTING O            301'8 FLANGE 58'III FlANGE BOLllNG O                                                                        BOLTING 328'01-104-A 0
CLOSURE HEAD 32'EFERENCE TOP VIEW DRAWINGS                                                      NOTES                            CALIBRATION BLOCKS AND MATERIAL                                                  FLORIDA POWER dc LIGHT 71172-112-001 REV. 01 (C-E)                                                                                                                                                                          ST. LUCK UNIT 2 71172-101-005 REV. 04 (C-E)
TlTLE: REACTOR PRESSURE VESSEL CLOSURE HEAD DATE:  7/14/93      KK              ZONE: 2 REVVED QY:            ORA'NNC HCL:
UT-2, UT-3A                                                    02-002
 
II 90 SG-2A-101        -254-8                                                                                          NOZZLE WELD O SG-2A-102-251-A        4'OCATION SC-2A-ON-IR-A      (LOOP    2AI)
SG-2A-201-246 J          H                      RC-112-401-258-A    (SEE ZONE 12 (2A1))
RC-115-401-258-8    (SEE ZONE 8 (2A2))
K                                                                                                                        SG-2A-ON-IR-8        NOZZLE WELD e SG-2A-101-254-C                                                                              315'OCAllON SG-2A-101-254-A  ~                                                                                                                                            SG-2A-102-251-8      (LOOP 2A2) 0
                        ~
180'G-ZA-205-271
                                                                                                                      ~                                                  SC-2A-109-251 SG-2A-1 01-251 SC-2A-101-254-E                                                                                  SG-2A-202-246
                                                                                                                      ~                                                    ~      SG-2A-109-251-SP
                                                                                  ~
90'4 SG-2A-101-254-0 SG-2A-1 01-244-8 SG-2A-302-252 SG-2A-104-251 SG-2A-IN-IR
                                                                                                                                                              ~
270'ECllON H-H
                          ~    MANWAY BOLllNC O 0 LOCATION 11/16'70 SG-2A-PMS-A 1 TO 20 STUDS SG-2A-PMN-A 1 TO 20 NUTS SG-2A-202-271                                            RC-114-201-258 (SEE ZONE 6)
SC-                      180'A-101-244-C H
MANWAY BOLTINC O                                                                    SG-2A-101-244-A 112'30'OCATION                                                                                      SECllONAL ELEVATION SG-2A-PMS-8    1  TO 20 STUDS SG-2A-PMN-8    1  TO 20 NUTS SECllON K-K                                                                                      SG-2A-1 01-244-D E-71272-271-003  REV. 0                                                                SECTION J-J E-71272-271-006  REV. 3 LOWER EXTENSION RING E-71272-271-009  REV. 3 REFERENCE DRAWINGS                                    NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT E-71272-246-002  REV. 5                                                                                                                                                      ST. LUCIE UNIT 2 E-71272-251-001 REV. 3 E-71272-252-003                                                                                                                                    'llTLE: STEAM GENERATOR 2A PRIMARY SIDE REV. 2 E-71272-254-001  REV. 4 E-71272-258-002  REV. 3                                                                                                                            DATE:  7/14/93      KK              ZONE: 3 E-71272-258-004  REV. 3                                                                                                                            REVEWED BY:            ORA'NNC Ka.:
E-71272-271-002  REV. 2                                                                                      UT-2. UT-27                                                        02-003
 
    ~ \
h e
h
 
90'G-28-101-254-8                                                                          SG  28 102 251 A NOZZLE WELD O SG-28-ON-IR-A      (LOOP 281)
SG-28-201-246                                RC-124-401-258-A  (SEE ZONE 14 (281))
RC-121-401-256-8  (SEE ZONE 10 (282))
K                                                                                                              SG 28  ON IR  8    NOZZLE WELD O SG-28-101-254-C SG-28-101-254-A    ~                                                                                                                                SG-28-102-251-8 315'OCATION (LOOP 282) 01
                        ~
SG-28-205-271
                                                                                                                    ~                                        SG-28-109-251 SG-28-101-251 SG-28-101-254-E                                                                              SG-28-202-246
                                                                                                                    ~
                                                                                                                                                                ~
90'4 SG-28-109-251-SP N
ID CV
                                                                                ~  SG-28-101-254-D SG-28-302-252 SG-28-101-244-8                      11/16" SG-28-104-251 SG-28-IN-IR
                                                                                                                                                  ~
270'ECTION H-H
                            ~  MANWAY BOLTING @
O'OCATION SG-2B-PMS-A  I TO 20 STUDS SG-28-PMN-A  1 TO 20 NUTS SG-28-202-271                                    RC-123-201-258 (SEE ZONE 7)
SG-                    180'8-101-244-C H
MANWAY BOLTING O                                                                SG-28-101-244-A 112'30'OCAllON                                                                                  SECTIONAL ELEVATION SG-28-PMS-8 I  TO 20 STUDS SG-28-PMN-8 I  TO 20 NUTS SECTION K-K                                                                          270'G-28-101-244-D E-71272-271-003  REV. 0                                                            ~SCllON J-J E-71272-271-006  REV. 3 LOWER EXTENSION RING E-71272-271-009  REV. 3 REFERENCE DRAWINGS                                  NOTES                                  CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT E-71272-246-002  REV. 5                                                                                                                                          ST. LUCK UNIT 2 E-71272-251-001  REV. 3 E-71272-252-003  REV. 2                                                                                                                  TITLE: STEAM GENERATOR  28 PRIMARY SDE E-71272-254-001  REV. 4 E-71272-256-002  REV. 3                                                                                                                  DATE: 7/14/93      KK            ZONE: 4 E-71272-258-004  REV. 3                                                                                                                  REVKKD OY:            MAWNC NO:.
E-71272-271-002  REV. 2                                                                                  UT-2, VT-27                                              02-004
 
108-601-0                                                                                                                                        101-622-A SAFETY VALVE                                MS-01-20 STlIDS NOZZLE 345'                  MN-01-20 NUTS 108-601-C SAFETY VALVE NOZZLE 90 (20)MANWAY STUDS  S NUTS 501-671 270'~
90'70''70 103-601 SPRAY NOZZLE gp. CONT. ON DWG. 02-025                                                                ISO'01-622-B ZONE 25 SECTION        8-B 108-601-B
                                                                                              ~
RELIEF VALVE 195' NOZZLE 0'01-642-A CONT. ON 02-038
                              ~*          180'WG.
108-601-A SAFETY VALVE NOZZLE 503-671- B 101-641 101-642-8 270'                                  90 r
SAFETY VALVE NOZZLE 503-671-C                                      FLANGE WELD SAFETY VALVE NOZZLE                                        (SV-1201 FLANGE BOLTING)
FLANGE WELD (SV-1202 FLANGE BOLTIHG)                          103-601 SN-IR INNER RADIUS                                                              TE-1101 (V-1437}
                    ~                            CONT. ON                                                                                                      C-C 180'ECTION SAFETY NOZZLE                                  OWG. 02-025 SUN-IR-C                                  ZONE  25 304-671 INNER RAOIUS
                            +                            503-671-A                                                    103-651                                    SRGN-IR
                                                                                                                    ~
SAFETY NOZZLE                                    SAFETY VALVE NOZZLE SVN-IR-B                                    FlANGE WELD INNER RADIUS                                    (SV-1200 FLANGE BOLTING)                                    103-651-SP                                                    (20)HEATER SLEEVE TO LOWER HEAD REUEF NOZZLE                                                                                                                                                        WELDS RVN-IR                                                                                                                                                    BOTTOM HEAD INNER RADIUS CONT. ON                                                      105-651 INNER RADIOS                                                  D      DWG. 02-016 VIEW A-A                                                                    ZONE 16                              SECTION        0-D REFERENCE DRAWINGS                                      NOTES                          CALIBRAlION BLOCKS AND MATERIAL                                                      POWER 8c LIGHT E-71372-651-001      REV. 3                                                                                                                                          ST. LUCIE UNIT 2  'LORIDA E-71372-661-002      REV. 0 E-71372-671-003                                                                                                                        TITLE: PRESSURIZER REV. 5 E-71372-671-005      REV. 2 E-71372-676-001      REV. 1                                                                                                          DATE:7/14/93              KK                    ZONE: 5 E-71372-684-001      REV. 1                                                                                                          acean en                      OaMINC ae UT-4A, UT-6. UT-17                                                      02-005
 
RC-114-101-722-LS-A RC-114-401-771                        RC-114-1      RC-114-1 01-722-LS-8 BELD WELD RPV EXT RC-114-201 -258 ~~
                                        ~
RC-114-2 e~
RC-114-101-742-LS-B f
RC-114-403-771 RC-501-771 CONT. ON DWG.
ZONE 29 I-12-RC-162 I-3/4-RC-144 FLOW 02-029-A I
CLASS NCC 1
401-128-A RC-114-407-771 RC-114-502-771 RC-1 45-FW-1 RC-145-SW-2 2" X 3/4.
RED.
RPV ELEVATION VIEW CONT. ON DWG. 02-179 ZONE 179 (SNUBBER)
RC-114-101-742-LS-A SK1lQKZLR                                                                                                                                      I-42-R C-114 ASSEMBLY NO: 771-501 REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AIID MATERIAL                              FLORIDA POWER Cc UGHT 2998-2662                                                                                                                                              ST. LUCK UNIT 2 RC-4 E-71472-771-001 REV. 5                                                            42                          SA-516, GR-70  TITlE: REACTOR COOLANT PIPING-LOOP      A-E-71472-771-023                                                                                                                        FROM RPV TO  SG-2A-HDT    LEG REV. 0                                                            2        160              SA-312, TP-304 E-71472-771-005  REV. 4                                                                                                        DATE:  7/14/93      KK            ZONE: 6 REVEN%D SY:            ORANNC NO.:
OPERATING PRESS. 2235  OPERATING TEMP. 604                    UT-4A, UT-33                                              02-006
 
d RC-123-101-742-LS-A
                            ~
CONT. ON                                                          RC-123-101-722-LS-8 DWG. 02-016                                401-128-8 ZONE 16          R C-123-203-771 RC-123-101 -722-LS-A SG-2B RC-123-101-742-LS-B                                                                                                              RPV EXT FLOW RC-123-201-258 BELD WELD
                                          ~
RC-123-2        B~
RC-123-201-771                    RC-123-205-771 CONT. ON                                  BELD WELD RC  302 771    DWG. 02-028-A ZONE 28 I-12-RC-147 ELEVATION VIEW I-42-RC-123 ASSEMBLY NO.: 771-301 REFERENCE DRAWINGS                        NOTES                          CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER 8c LIGHT 2998-2662                                                                                                                                        ST. LUCIE UNIT 2 E-71472-771-001  REV. 5 E-71472-771-022  REV. 0                                                    42                          SA-516, GR-70    TIRE: REACTOR COOLANT PIPING-LOOP      B-E-71472-771-003  REV. 4                                                                                                        FROM RPV TO SG-2B-HOT      LEG DATE:  7/14/93    KK            ZONE: 7 aavcrm ev.            ORANNC NO:.
OPERATING PRESS. 2235  OPERATING  TEMP. 604            UT-4A                                                      02-007
 
RC-115-107-722-LS-8 RC-115-109-722-LS-A R C-115-109-742-LS-8 RC-115-109-742-LS-A
                                                    ~
RC-115-109-722-LS-B                      RC-115-107-742-LS-8      ~
RC-115-107-722-LS-A                                                                          RC-115-141  3-77 I-A          RC-115-107-742-LS-A RC-115-401-256-8
                                            <<RC-115-1 FIELD
                                                      ~
WELD~
                                                                                                                      <<RC-115-4 FlELD WELD RC-115-1501-771-A RCP-2A2 RC-115-1404-77  I-A RC-115-103-742-LS-A                                                                  f    C p RC-115-103-742-LS-8 FLtlW
                                                          <<RC-115-2 FIELD WELD                                                                                  ELEVATION VIEW
                                                                                                                                        <<R 0-1 I 5-3 RC-115-1410-771-A                                                  FIELD WELD CONT. ON DWG    02 034    RC-1503-771-A ZONE  34 I-2-RC- l16 I-30-RC-115 REFERENCE DRAWNGS                          NOTES                          CALIBRAIION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT 2998-2662                        <<EXCEEDS STRESS CRITERIA                                                                                                ST. LUCIE UNIT 2 E-71472-771-001 REV. 5 E-71472-771-029                                                                30                          SA-516, GR-70    TITLE: REACTOR COOLANT PIPING-LOOP A-REV. 0                                                                                                            FROM SG-2A TO RCP-2A2-INTERM. LEG E-71472-771-028  REV. 0 DATE:  7/14/93        KK              ZONE: 8 DRA'NNC NO.:
VT-6, VT-59                                                        02-008
 
Cl RC-115-103-722-LS-B                                RC-115-103-722-LS-A                                                        RC-115-105-742-LS-A RC-115-105-742-LS-  B RC-115-604-771        RC-115-60)-77)
RC-115-5 FIELD WELD
                                                  ~                                                                        / RPV RCP-2A2 201-128-D RC-115-6
                                        )15 70) 77)
DWG.
CONT. ON 02-022 JL.          CONT. ON RC-115-606-771 PLAN VIEW ZONE 22                                    ~-704-77)
I-12-RC- I 54              DWG. 02-032-C ZONE  32 I-2-RC-148 RC-703-77)
ASSEMBLY NO.:    771-701 I-30-RC-115 REFERENCE DRAWINGS                            NOTES                                CALIBRAT)ON BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT 2998-2662                                                                                                                                                  ST. LUCIE UNIT 2 E-71472-771-024  REV. 0 E-7)472-77)-001                                                                    30                          SA-516, GR-70    TITLE: REACTOR COOLANT PIPING-LOOP A-REV. 5 FROM RCP 2A2 TO RPV-COLD LEG DATE:  7/20/93      KK              ZONE: 9 RCVKWED QY:            CRA'NNC Na.:
OPERAT)IIG PRESS. 2235  OPERATING TEMP. 540                  UT-6, UT-59                                                    02-009
 
Cl Ii
 
RC-121-107-722-LS-A RC-121-109-722-LS-8 RC-121-109-742-LS-8 R C-121-109-742-LS-A RC-121-109-722-LS-A                        RC-121-107-742-LS-A    ~
RC-121-107-722-LS-8                                                                            RC-121 -1413-771-8          RC-121-107-742-LS-8 SG-28 RC-121-401-258-8
                                                      ~                                                                    RC-121-4
                                                                                                                                        ~
RCP-281 RC-121-1 BELD WELD~
RC-121-1404-771-8 FIELD WELD RC-121-1501-771-8
                                                                                                                                        ~
                                                                                          ~C        ~D RC-1 21-103-742-LS-A RC-121-103-742-LS-8 FLOW 8
RC-121-2 FIELD WElD                                                                              ELEVATION VIEW RC-121-1 41 0-771-8 RC-121-3 CONT. ON                  .FIELD WElD DWG. 02-035          RC-1503-771-8 ZONE  35 I-2-RC-122 I-30-RC-121 REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER 8c LIGHT 2998-2662                                                                                                                                              ST. LUCIE UNIT 2 E-71472-771-029  REV. 0 E-71472-771-028  REV. 0 30                        SA-516, GR-70    TITLE: REACTOR COOLANT PIPING-LOOP 8-E-71472-771-001  REV. 5                                                                                                              FROM SG-28 TO RCP 281-INlERM. LEG DATE:  7/8/93      KK            ZONE: 10 RKVKWED BY:          DRAWNC R(L:
UT-6, UT-59                                                  02-01 0
 
RC-121-103-722-LS-A
                                        ~                    RC-121-812-771 RC-121-105-742-LS-A CONT. ON                                                                      R C-121-105-742-LS-B DWG. 02-026 ZONE 26 I-3-RC-109 RC-121-103-722-LS-B    ~                        RC-906-771 SKI10~
CONT. ON CONT. ON r
DWG. 02-131 DWG. 02-023                        RC-121-804-771 ZONE 131 ZONE 23 (SNUBBER) 1-12-RC-152              a t
RCP-281                                                FLOW 201-128-B RC-121-6
                                                                                                                    ~B          FlELD HELD RC-121-5                RC-903-771                                            RC-121-801-771 RC-121-901-771                                CONT. ON        RC-1 21-806-771 FIELD FIELD                              DWG. 02-031 CH-904-771          ZONE 31 I-2-RC-150                                    PLAN VIEW I-30-RC-121 REFERENCE DRAWINGS                          NOTES                                CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER IIc LIGHT 2998-2662                                                                                                                                                  ST. LUCIE UNIT 2 E-71472-771-025  REV. I E-71472-771-001 REV. 5 30"                          SA-516, GR-70    llTLE: REACTOR COOLANT PIPING-LOOP B-E-71472-771-009  REV. 4                                                                                                                  FROM RCP-2BI TO RPV-COLD LEG DATE:  7/20/93      KK            ZONE:  11 REYEWEO BY              DRAWNC Na:.
OPERATING PRESS. 2235  OPERATING TEMP. 540                    UT-6, UT-59                                                    02-011
 
S RC- l12-109-722-LS-A RC-112-109-742-LS-8
                                                                                          ~                        RC-112-107-722-LS-A
                                                                                                                                        ~
                +                                            +
RC-112-1D7-742-LS-A
                                                                + RC-112-109-722-LS-8 RC-112-107-742-LS-8          RC-112-141 3-771-C RC-112-109-742-LS-A  ~                        RC-112-107-722-LS-B  ~
SG-2A RCP-2AI
                          ~      RC-112-4                                                          ~
                                                                                                  ~
RC-112-401-248-A
                          ~      HELD WELD RC-112-1501-771-C
                                                                                                  ~
RC-112-1 FIELD WELD RC-112-1404-771-C RC-112-103-742-LS-A FLOW RC-112-2 FIELD WELD RC-112-103-742-LS-8  ~
ELEVATION VIEW      RC-112-3 RC-112-1407-771-A CONT. ON RC-1 502-771-C          DWG. 02-033 ZONE  33 I-2-RC-113                                                                                          I-30-RC-112 REFERENCE DRAWINGS                          NOTES                      CALIBRAllON BLOCKS AND MATERIAL                            FLORIDA POWER dc LIGHT 2998-2662                                                                                                                                    ST. LUCIE UNIT 2 E-71472-771-029  REV. 0 E-71472-771-026                                                            30                        SA-516, GR-70  WlE:  REACTOR COOLANT PIPiNG-LOOP A-REV. 0 E-71472-771-001                                                                                                            FROM SG-2A TO RCP 2A1-INTERM. LEG REV. 5 DATE: 7/14/93    KK            ZONE: 12 avmm ea              eaMtNc a(L UT-6-UT-59                                                02-012
 
RC-112-105-722-LS-8                                            RC-112-111-742-LS-B RC-112-105-722-LS-A  ~                                        RC-112-111-742-LS-A RPV RC-112-1066-771  ~          ~ RC-112-5 FIELD WELD I
FLOW                        RCP-2A1 210-128-A RC-112-6 BELD WELD      B~                          A~      ~ CONT. ON RC-112-1001-771                              DWG. 02-021 R C-112-1007-771            ZONE 21 I-12-RC-151 PLAN VIEW I-30-RC-112 REFERENCE DRAWINGS                      NOTES                        CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER IIc LIGHT 2998-2662                                                                                                                                    ST. WCIE UNIT 2 E-71472-771-001 REV. 5 E-71472-771-026  REV. 0                                                  30                        SA-518, GR-70    TIRE: REACTOR COOLANT PIPING-LOOP A-E-71472-771-011 REV. 3                                                                                                      FROM RCP-2A1 TD RPV-COLD LEG DATE: 7/20/93      KK            ZONE: 13 RCVEWED QYO          ORAWNC NCL:
OPERATING PRESS. 2235  OPERATING TEMP. 540        UT-6, VT-59                                                      02-013
 
RC-1 24-109-722-LS-A RC-124-109-742-LS-8
                                                                                              ~                        RC-124-107-722-LS-A
                                                                                                                                                ~
                +                                            +
RC-124-107-742-LS-8
                                                                + RC-124- I 09-722-LS-8 RC-124-1 07-742-LS-A          RC-124-141 3-771-D RC-124-109-742-LS-A    ~                        RC-124-107-722-LS-8    ~
RCP-282
                          ~
                          ~
RC-124-4 FIELD WELD RC-124-1501-771-0
                                                                                                      ~
RC-124-401-258-A RC-1 24-1 FIELD WELD
                                                                                                    ~    RC-1 24-1404-771-D D~ C~
RC-124-103-742-LS-8 FLOW RC-124-2 FIELD %ELO RC-124-103-742-LS-A    ~
RC-124-3 FIELD WELD                                        RC-124-1407-77 I-B CONT. ON OWG. 02-036    RC-1 503-771-D ZONE 36                              ELEVATION VIEW I-2-RC-125                                                                                                I-30-RC-124 REFERENCE DRAWINGS                          NOTES                          CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER L LIGHT 2998-2662                                                                                                                                          ST. LUCIE UNIT 2 E-71472-771-001  REV. 5                                                      30" C-71472-771-028  REV. 0                                                                                  SA-516, GR-70    TITIE: REACTOR COOLANT PIPING-LOOP 8-E-71472-771-029  REV. 0                                                                                                            FROM SG-28 TO RCP 282-INTERM. LEG OA'TE:  7/8/93    KK            ZONE: 14 REVEWED BY:          BRONC Ha:.
UT-6, UT-59                                                    02-01 4
 
RC-124-105-722-LS-A
                                                  ~                                                R C-124-111-742-LS-B
                                                                                                                          ~
R C-124-105-722-LS-  B ~                                                RC-124-111-742-LS-A  ~
KZcZQ~
CONT. ON                            RC-124-1301-771 R C-124 "1 207-771        DWG. 02-133                          FIELD WELD RPV ZONE 133                            RC-124-5 (SNUBBER)
RCP-282 210-128-C RC-124-8 FIELD VELD        8
                                                    ~
RC-124-1201-771                CONT. ON                            RC-124-121 0-771 OWG. 02-024              CONT. ON ZONE 24.            DWG. 02-027 RC-1304-771              I-12-RC-153              ZONE 27            RC-1305-771 I-3-RC-141 PLAN VIEW I-30-RC-124 REFERENCE DRAWINGS                          NOTES                                CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT E-71472-771-001 REV. 5                                                                                                                                  ST. LUCIE UNIT 2 E-71472-771-013 REV. 4 E-71472-771-027  REV. 0 30"                          SA-516, GR-70    TITLE: REACTOR COOLANT PIPING-LOOP B-FROM RCP-282 TO RPV-COLD LEG DATE:  7/20/93    KK          ZONE: 15 REVEL  QY:          omaha xa:
OPERATING PRESS. 2235  OPERATING TEMP. 540                UT-6, UT-59                                                    02-015
 
Cl h,
~ ~
 
CONT. ON DWG. 02-005 ZONE  5 PRESSURIZER RC-514-871 RC-108-FW-1  ~
Qr
                                                                                                                                    ~
CONT. ON DWG. 02-124 ZONE 12+
RC-102-751 (SNUBBER)
EL 34'-10" RC-106-751
                                                      ~    RE-RC-31 RE-RC-35
                                                                                                                ~                ~    RC-101-751 RC-113-751 H-38 ~                ~0$
RE-RC-30
                                ~                                        RE-RC-32 RE-RC-33 RC-108-FW-3
                                  ~                                                                      ~    RC-112-751 RC-301-771 r  CONT. ON DWG. 02-007
                                                            ~OP<<
H-28 ~                  ~            RE-RC-34 RC-108-FW-2 ZONE 7              RC-107-751 LOOP 8 HOT LEG LEGEND
                                                                                                                                                        ~      SHOP WELD
    << RE-RC-30                                                                                                                                        X        FIELD WELD RE-RC-31                                                                                                                                CH-146-FW-16      EXAMINATION AREA RE-RC-32 RE-RC-33                                                                                                                                  I-6"-SI-112    SPOOL PIECE NO.
RE-RC-34                                                                                                                                      V-02-03, VALVE DESIGNATION RE-RC-35 REFERENCE DRAWINGS                            NOTES                              CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc UGHT 2998-G-053  SHT. 5 OF 18 REV. 4    WHIP RESTRAINTS SHOWN FOR INFORMA1ION                                                                                  ST. LVCIE UNIT 2 ONLX I2"      180              SA-351-GR.CF8M    TITLE: PRESSURIZER SURGE LINE DATE:7/8/93        KK            ZONE: 18 REVVED QY:              ORMANC RO OPERATING PRESS. 2235  CPERATING  'TEMP. 653              UT-16 VT-23                                                      02-01 6
 
Cl A
 
02-017-OD2 02-017-001  ~                              02-01 7-003 A
02-017-RPH-3
                                                                                                        ~ 02-017-005 LUG 3 02-01 7-008 HIGH STRESS AREA AT BORE AND KEYWAY 02-01 7-004 m 02-017-006 LUG 2                  7 8910                    LUG 4
                                                                                                                  ~
11 02-017-RPH-2  ~                    4 2 1  1615 1
13 14 02-017-RPH-4 02-017-009 FLYAHEEL REFERENCE DRANtINGS SECllON B-B NOTES 02-017-RPH-1 SECTION
                                                                                                  ~
A-A CALIBRATION BLOCKS AND MATERIAL 02-017-007 LUG 1 FLORIDA POWER dc LIGHT 2998-2662                                                                                                                                      ST. LUCIE UNIT 2 SA-351, CF8M      TITLE: REACTOR COOLANT PUMP 2A1 DATE:  10/6/92                  ZONE: 17 RCVU%0 SY2          RRANNC K0.2 02-017
 
Cl 02-01 8-002 02-018-001  ~                          02-01 8-003 02-018-RPH-7
                                                                                      ~              ~ 02-018-005 LUG  3 02-018-008 HIGH STRESS AREA AT BORE AND KEYWAY 02-018-004                                          02-018-006 I,                            LUG 2 78910                  LUG  4
                                                                                                                ~
11 02-018-RPH-6  ~                    4 2 1 1615 1
1 14 02-01 8-RPH-8 02-018-009 FLYAHEEL REFERENCE DRAWINGS SECTION  B-B NOTES 02-018-808-8 82080
                                                                                                ~      02-018-007 1110 I CALIBRATlON BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT 2998-2662                                                                                                                                  ST. LUCIE UNIT 2 TITLE: REACTOR COOLANT PUMP    2A2 SA-35,CFBM DATE:  6/2/93    KK            ZONE: 18 REVE%CD SY:          ORAWNC NQ          ADISOMD 02-018              1
 
02-01 9-002 02-01 9-001  ~
02-0 I 9-RPH-11 02-019-003 02-01 9-005 LUG 3 02-01 9-008 HIGH STRESS AREA AT BORE AND KEYWAY
                          ~                                02-01 9-004 LUG 2                        8910                      02-019-RPH-12 7
                                                                      ~
11 02-019-RPH-10 21  1615 02-01 9-006 LUG 4 02-01 9-009 FLYWHEEL REFERENCE DRAWINGS SECTION B-B 02-01 9-RP H-9 SEC11ON
                                                                                                    ~
A-A 02-019-007 LUG  1 NOTES                              CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT 2998-2662                                                                                                                                      ST. LUCK UNIT 2
                                                                                                                        'ARE: REACTOR COOLANT PUMP 2B1 SA-351.CFBM OATE:6/2/93    KK            ZONE: 19 REVKKD 9%          OR&INC NO 02-01 9
 
02-020-002 02-020-001  ~                              02-020-003 02-020-008 02-020-RPH-15
                                                                                    ~                ~ 02-020-005 LUG 3 HIGH STRESS AREA AT BORE AND KEYWAY 02-020-004  ~                                          02-020-008 LUG 4 LUG 2                  78910
                                                                  ~                                            ~
11 12 4          13 02-020-RPH-14                                  14 2    1615 02-020-RPH-16 1
02-020-009 FLYWHEEL REFERENCE DRAWINGS SECllON B-B NOTES 02-020-RPH-13  ~  SECTION  A-A CALIBRATION BLOCKS AND MATERIAL 02-020-007 LUG 1 FLORIDA POWER dc UGHT 2998-2862                                                                                                                                  ST. LUCIE UNIT 2 SA-351,CF'8M        llTlE: REACTOR COOLANT PUMP 2B2 DATE: 6/2/93  KK              ZONE: 20 RCVKM) IY:          ORAWNC N(L 02-020
 
RC-151-1-SW-1 74  7 7760            X  V-3922 Sl 4201 Sl-148-4-SW-2          ~    ~li g
                                                                                                                                    ~lVENTSl 1    519 Sl-148-4-SW-I
                                                                                                          ~
EL 31'-0 y 3227 I- I 2-RC-15l RC-I SI-FW-1 6014 EL 29'-6" CONT. ON        RC-151-FW-2                  CONT. ON RC-1104-771                DWG. 02-013 Sl-148-1-SW-I                                                                                      ZONE 142                                      ZONE 13 S0-03-09 1-3/4-SI-122 Sl-148-FW-4  ~                    (SNUBBER)                                      LOOP A COLD LEG Sl-148-1-SW-2
                                                                    /-  0-4201-7241
                                                                          ~~>  V-3765 Sl-148-FW-2 SI-51 6- I -SW-5 12  X 12 REO. TEE X 6"
                                                                        ~Yv 1-3/4-Sl-234                ~            Sl-148-FW-801 Sl-4201-7541A Sl-148-FW-901 SI-51 6-1-SW-4                                                                                SI-4201-75418 SI-148-2-SW-6
                                                                                ~
10-4
                      ~
              ~SL IA
                                                                        ~i Y-3806                    06,                Sl-1 48-FW-1 Ql Sl-51 6-1-SW-3                I I-1-SI-232 Sl-516-1-SW-2      ~      V)
I 222 14'-0        < a-I              Sl-4201-753                                  V-3624 I ~SL.
I
                        ~
40-777-3                                                        )  CONT. ON                            LEGEND sl-sl6-Fw-I                                                                (      SIYG. 02-037 CLASS 2              ZONE 57 I-I-Sl-233 DRAIN
                ~im 3-sle-1-sw-I 2.
V
                            +~      V-3258 CLASS 1 AACLASS 2 sJ CONT. ON DWG. 02-046 TO Sl TANK 2A1 X
SI-112-FW-7 I-e"-Sl-112-7 SHOP SELD FIELD WELD EXAMINATION AREA V-3807                                                                                                                                                        SPOOL PIECE NO.
4                ZONE 46 TO LP HEADER A                                                                                                    V-3227          VALVE DESIGNATION REFERENCE DRAWINGS                                    NOTES                                              BLOCKS AND MATERIAL 6'ALIBRATION                                                                FLORIDA POWER 8c LIGHT Sl-N-16 REV. 15                            THE CON'HNUATION AT DWG. 02-057 DOES NOT                                                                                              ST. LUCIE UNIT 2 MATCH THE CONFlGURAllON FOR THIS DWG.
12"        160                    SA-312, TP-304      TITLE'OOP 2A1 SAF    TY INJEC ON PIPIN INSIDE CONTAINMENT 160 DATE: 7/20/93      KK            ZONE: 21 OPERATING PRESS. 2235  OPERATING IEMP. 330                                                                REVKKD SYS            ORAWNC NO.S CPERATING PRESS. 2235  CPERATING TEMP. 600          UT-16. UT-23. UT-35, UT-38. UT-50                                                02-021
 
t = ~
V-3801 S'
Sl-149-3-SW-4 X                EL  34'-8 I-1-Sl-227
                                                ~l SI-4200-6350
                                                  ~SSS
                                                                  ~        Sl-149-3-SW-3 1-3/4-Sl-124~    ~
50-03-10 SI-149-1-SW-4 EL. 20'-2"
                            ~
RC-154-FW-4                                                                                                          V-3803~ ~~X RC-154-FW-1 RC-154-1-SW-1  ~        pC V-3217 EL 31'-0                ~      I-1-Sl-125 I-1-Sl-229 Sl-4200-6373 Sl-1 49-FW-1
                                                                                                                                        ~~      cs I
T' SSS I
SSS
                                                                                                                                                                      ~
o Sl-149-1>>SW-5 I
RC-154-FW-2  ~
60'H EL 29'-6" SSS
                                                                          ~    SI-4200-6348                            CONT. ON  +
V-3614                I
                                                                                                                                                                      ~
I                                                                            CLASS I Vl      III DWG. 02-058                        OA I                                                        ZONE 58            CLASS 2 SV RC-703-771                                                                                                      TO Sl TANK I                                                              2A2 Sl-149-FW-2 CONT. ON OWG. 02-009 ZONE 9                                            DECK PLATE LOOP A SI-149-F W-3 45'H
                                                                                                    ~
COLD LEG
                                                        ~  s Sl-515-1-SW-1                    SI-51 5-1-SW-2 SI-535-F W-2
                                                            ~
Sl-149-2-SW-4 Sl-4200-6343A        ~
Sl-4200-63438 g          ~X~
OUTER BIO SHIELD WALL 0
9 V-3259
                                                                                                                ~CLASS CLASS 1
2 I
SI-4200-6340A                                          CONT. ON OWG.'02-045 Sl-4200-63408                    ~OIA              ZONE 45 LEGEND SI-149-2-SW-6                                TO LP HEADER    A I-I-St222  ~~17                      Sl-51 5-FW-1 SHOP FIELD FIELD WELD V-3807'                                                            Sl-112-F W-7          EXAMINATION AREA Sl-149-2-SW-2                    QA                                      I-6"-SI-1 I 2-7 12" X 12" X                                                                                  SPOOL PIECE NO.
Sl-149-2-SW-1                                          V-3227              VALVE OESGNATION REFERENCE DRAWINGS                              NOTES                                      CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER IL LIGHT Sl-N-16 REV. 15                                                                                                                                                            ST. LUCIE UNIT 2 6'60 12 160 SA-312, TP-304 SA-312, TP-304 TITlE: LOOP 2A2 SAFETY INJECTION PIPING DATE:
INSIDE CONTAINMENT 7/14/93        KK              ZONE: 22 OPERATING PRESS. 2235  OPERATING TEMP. 330                                                              RKVEWED SYS                ORASSNC  RR:
OPERATING PRESS. 2235  OPERATING TEMP. 600              UT-16 UT-23 UT-35 UT-3        UT-50                                            02-022
 
                                          < 7 V-3811                                                                              SI-517-1-SW-3                          SI-517-1-SW-2 I-I-Sl-237                                                                                                                      Sl-517-1-SW-1
                                                                                                                                            ~
I                                      CONT. ON                                            EL 34'-0 R 0-152-1-SW-I    I            Sl-150-3-SW-4        DWG. 02-059            CLASS 2 H-517-1-SW-4 ZONE 59            CLASS I CI.ASS 1 V-3237                                      TO Sl TANK 281                        Sl-150-FW-1
                                                                                                                                                                                              /CLASS 2
                                                              ~+~~    Sl-4204-f33                                    ~  Sl-150-FW-901                                  15 HP 60'H
            ~
I-12-RC-152 RC-152-FW-I                                      ~    SI-150-3-SW-2 V-3634 Sl-517-FW-1            V-3260
                                                                                                                                                                                                    )
                                                                      ~
SI-150-F W-4 RC-152-FW-2      Sl-150 3                                Sl-150-3-SW-I                                                                                                    CONT. ON SW  3                                                                                                                                        DWG. 02-047 RC-903-771                                                                                                                                                                ZONE 47 I
              )                                                  O                                                              ~EL    21'-2      213                                    TO LP COST. OH/
DWG. 02-011
                ~EL    26'-6                                    ECI I
Sl-150-1-SW-1                                    I I
HEADER 8 CTS ZONE 11                                                      I 04                                Sl-150-1-SW-2 LOOP 8 COLD LEG                                                        I Sl-150-FW-3                                        423 I
EL 18'-0"
                                                                                  ~                                                C2I                              Sl-4204-153
                                                              ~
Sl-4204-12708                                I X 12 X 6' CAI 12 I
RED. TEE SI-150-2-SW-3 Sl-150-2-SW-4                                                                                                      SI-517-1-SW-5 SI-4204-1271 I-3/4-SI-121 SI-4204-127OA                                      SI-4204-123 45'V SI-150-2-SW-2                                          I        O                      SI-517-I-SW-6 SO-03-11 LEGEND
              ~
CH-146-FW-16 SHOP WELD FIELD WELD SI-150-2-SW-I Sl-150-FW-2    ~~~l I-I-Sl-238
                                                                                                                                  ~
Sl-517-FW-2 Sl-150-1-SW-3 EXAMINATION AREA                                                                                            ~EL    TLT-S I-6"-Sl-112  SPOOL PIECE NO.                                                            DRAIN X V-3768        Sl-150-I-SW-4 V-3237  VALVE DESIGNATION REFERENCE DRAWINGS                                NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                        FLORIDA POWER 8c LIGHT SI-N-18  REV. 12                    THE CONTINUATION AT DWG. 02-059 DOES NOT                                                                                                ST. LUCIE UNIT 2 MATCH THE CONFIGURATION FOR THIS DWG.
6" 12" 160 160
                                                                                                              'A-312.                  TP-304 SA-312. TP-304 TITLE: LOOP 281 .SAFETY INACTION PIPING INSIDE CONTAINMENT DATE:    7/9/93      KK              ZONE: 23 OPERATING PRESS. 2235  CPERATING TEMP. 330                                                              RCVEAG)  RYE            DRA12CNC R(L CPERATING PRESS. 2235  OPERATING TEMP. 600            UT-16, UT-23, UT-35, UT-38, UT-50                                                02-023
 
8 EL 34'-10'C-153-I-SW-1 RC-153-FW-I
                                ~Tpp                C-151-FW-4 X
y 3815 RC-153-FW-2
                                    ~sg y 3247 l~
                                              '44' I~
LA I-1-Sl-241 RC-1304-771                                                        RC-151-3-SW-3
                                                        ~sg CONT. ON                                                                                                                                                                            EL DWG  02 015      CONT. ON                                                                                                                        CLASS 2
    ~EL  26  6  ~      206'E 16      GWG. 02-141                                                                                                                        CLASS 1 10-6'067.
IN ZONE 141 Q~                                    SW-2                                                SI-4203-581C                                          DWG.            02-060 LOOP 8 (SNUBBER)
Sl-151 Sl-4203-581 A 1LUG~                      V-3644 ZONE 60 TO Sl
                                                                    ~EL                                                                Sl-4203-5818                                                          TANK 282 2 LUGS SI-151-1-SW-3                                                  Sl-1 51-FW-1 31'-0'l-4203-71 12  X 12    X 6
                                                        ~                                                                          RED. TEE SI-151-1 -SW-2 I-1-SI-243 SI-151-FW-1 8 LUGS
                                                                                                            -3/4-SI-119  ~~~            X
                                                                                                                                                      ~
CLASS 2 1
EL  16'-6'LASS CONT. ON Sl-151-3-SW-1 Sl-151-FW-3
                                                        ~        I Sl-4203-698 Sl-4203-69C 2 LUGS S0-03-12 r
I                    Sl-151-1-SW-4 V-3261 GWG.
ZONE 48 TO LP HEADER 8 Sl-518-FW-1 02-046 I
Sl-4203-69A Sl-151-1-SW- I I-1-Sl-244
                                                                                              ~/
I I                                                                                                    V-3818 I
                                                                      $ -4203-67                              ~pip                                                Sl-151-I-SW-6 LEGEND                                                  I                                    n<
Sl-151-2-SW-5                                                  Sl-151-FW-2          Sl-151-1-SW-5
            ~    SHOP WELD                                                                  V-3816 v I-1-SI-242                ~EL CH-146-FW-16 FIELD WELD EXAMINATION AREA 16'-6'HIS lHIS SECTION IS IN                THE I-6 -Sl-112  SPOOL PIECE NO.                    1RENCH, UNDER THE DECK                      Sl-151-2-SW-I                                        SECllON IS IN THE TRENCH, PIATE.                                                                                      OUTSDE lHE BID. SHIELD V-3247  VALVE DESIGNAIION REFERENCE DRAWINGS                                NOTES                                              CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER 8c LIGHT Sl-N-18    REY. 12                  THE CONllNUATION AT DWG. 02-060 DOES NOT                                                                                                          ST. LUCIE UNIT 2 MATCH THE CONFIGURATION FOR THIS DWG.
6"                                                TllLE: LOOP 282 SAFETY INACTION PIPING 12'60      160                SA-312, TP-304 SA-312, TP-304 DATE:
INSIDE CONTAINMENT 7/14/93      KK              ZONE:          24 OPERATING PRESS. 2235  OPERATING lEMP. 330                                                                        aomm    av2              DNA'NHC NO.E OPERATING PRESS. 2235  OPERAllNG TEMP. 600                      UT-16 UT-23 UT-35 UT-3            UT-50                                        02-024
 
Cl RC-103-FW-901
                                                                        ~                RC-1 03A-SW-1 RC-103A-SW-2 SPH-808
                                                                ~                                      ~
RC-103A-SW-3 3 X4" SPS-787
                                    ~
RC-103A-SW-4 3 X 4  ~~        o CONC. REO.
C ONT. ON DWG. 02-026
                          ~
CONC. RED.
ZONE  26 SPS-797                                                                  I BEND CONT. ON DWG. 02-027 RC-103B-SW-I
                ~                                            i'r RC-1036-SW-3  ~
ZONE 27 RC-103-FW-902 RC-103B-SW-2 ~                                                                                  ~    RC-103C-SW-1 BEND RC-103C-SW-2
                                                                                            ~          c Oy      RC-103C-SW-3
                                                                                                                ~2"          X4.
RC-103-FW-903 RC-504-671
                                                                                            ~                            C ONT. ON DWG. 02-030-A ZONE 30 LEGEND PRESSURIZER CONT. ON                                          ~      SHOP WELD 02-005 DWG.
ZONE  5                                          X      FIELD WELD CH-146-FW-16    EXAMINA1ION AREA l-6"-Sl-112    SPOOL PIECE NO.
V-02-03    VALVE DESIGNATION REFERENCE DRAWINGS                        NOTES                          CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER Ilc LIGHT WELDS IIc SUPPORTS HAVE NOT BEEN VERIREO                                                                                ST. LUCIE UNIT 2 160              SA-376, TP-316  TITIE: COMBINED PRESSURIZER SPRAY LINE 160              SA-403, TP-316 DATE:    7/9/93      KK              ZONE: 25 RCVU%D BY:              BRONC CPERATING PRESS. 2235  OPERATING lEMP. 653            UT-19, UT-39, UT-40                                                RG'2-025
 
Cl SPS-467
                                                      ~              OA
                                              ~BEND SPS-448
                                                                                                                                                            ~~
SPH-378        RC-109-FW-905
                                                    ~
RC-109E-SW-2 DWG.
CONT. ON 02-025 (C ZONE 25 RC-109-FW-913 RC-109-FW-908
                                                                                                                                                        ~
PCV-110OF SPA-550 RC-109-FW-909 I-3/4-RC-308 RC-109C-SW-I          RC-109-FW-904 BEND V-1442                                            SPH-628 RC-109-FW-902
                      ~                RC-109-FW-914
                                                              ~    SPS-427                                    RC-109-FW -911 1-3/4-RC-307 SPS-387
                ~                                            ~    SPS-407 RC-109-FW-910    ~      V-1444 p
SPS-524 I
                                                                                                                                ~                <+ ~ V-1454 V
RC-109F-SW-2
          ~                                                                                                                          1/4 1      INSERT
                                                          ~
BEND                                RC-109-FW-903 SPS-347 BEND R C-109F-SW-1 BEND RC-109-FW-915 RC-109-FW- 901 SPS-417 RC-109C-SW-2 BEND
                                                                                                                    ~      SPS-508
                                                                                                                                                                    ~        RC-109G-SW-1
                                                                                          ~
RC-109 A-Siv-2                                                                          RC-109G-SW-3 SPH-327  ~                        O
                                      ~      RC-109A-SW-1 SPS-617 45'H SPS-497 RC-109G-SW-2 I                                                            BEND                                              BEND RC-109-FW-907 BEND                I v>
I        RC-109-FW-912 CONT. ON LEGEND X
4      SHOP WELD FIELD YiELD OA V-1249    ~      SPS RC-109-FW-906
                                            ~ DWG. 02-011          CH 146  FW 16    EXAMINATION AREA RC-906-771                ZONE  11                I-6 -SI-112    SPOOL PIECE NO.
LOOF e COLO LEG                    V-1442    VALVE DESIGNATION REFERENCE DRAWINGS                              NOTES                                CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT WELDS  k  SUPPORTS HAVE NOT BEEN VERIFlED.                                                              '@%5                  ST. LUCIE UNIT 2 160              SA-312. TP-316    TlTLE: LOOP 281 SPRAY UNE DATE:  7/14/93        KK              ZONE: 26 REVKKD SY:                DRAWNC NO:.
OPERATING PRESS. 2235  CPERATlNG TEMP. 540                                                                                    02-026
 
Qa
                                                                        ~
                                                                        ~      SPS-117
                                                                                                                                            ~
                                              ~ ~
PCV-1100E SPS-97                            SPS-107                                  RC-141-FW-909                      SPA-180 RC-141  -F W-910
                                        ~
SPS-78                                R C-141-FW-904 SPS-77 RC-141F-SW-2
                                                                                                            >>/4.
                                                                                                                            ~
                              ~
RC-141 C-SW-1 SPS-67                                      SPH-88                    SPS-148
                                                                                                      ~      INSERT V-1453 X          ~ I-3/4-RC-304
                    ~                                                                      ~
RC-141B-SW-5                                  RC-141-FW-903              RC-141-FW-908 RC-1418-SW-3
                                      ~            RC-141B-SW-2            RC-141-FW-907                                      RC-141 F-SW-1
                                                                                                                                                          ~
SPH-58                                                                CONT. ON
                                                                                    ~-
V-1248            02-025 RC-141-FW-902                                                                                                  DWG.
SPS-128                                ZONE 25                                        I-3/4-RC-303
                                                                                    ~
BEND I
                              ~
O SPS-l27                                    I
                                                                                                                          ~3" X4"                I
                        ~~                                                                                              ~
I SPS-48                              RC-141-FW-906 SPH-37                                RC-141-FW-905            V-1441                        RC-141-FW-913                RC-141 G-SW-3 RC-141A-SW-1 III                                                                                                                                RC-141G-SW-2 I
SPS-27
                    ~      RC-141A-SW-2 LEGEND
                                                          ~      SHOP WELD OA RC-141-FW-912 RC-141-FW-911              V-1443 RC-141G-SW-I X      FIELD WELD CH-146-FW-16    EXAMINAllONAREA                SPS-237 02-015                                                                            BEND              RQ-'141 G-SW-8 RC-1305-771              DWG.                      l-6 -Sl-112  SPOOL PIECE NO.
ZONE 15 LOOP A                          V-1443  VALVE DESIGNATION COLD LEG REFERENCE DRAWINGS                          NOTES                              CAUBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER k LIGHT 13172-PE-140 FIG. 3            WELDS HAVE BEEN VERIFIED USING SPOOL PIECE                                                                                    ST. LUCIE UNIT 2 DRAWINGS ONLY.
SUPPORTS HAVE NOT BEEN VERIRED.                    3        160                SA-312, TP-316    TITLE: LOOP  282 SPRAY UNE DATE: 7/20/93      KK              ZONE: 27 RCVUKD SY:              ORAWHC NO.:
OPERATING PRESS. 2235  OPERATlNG  TEMP. 540                                                                                  02-027
 
LOOP B HOT LEG CONT. ON DWG.      02-007                                                    SI-191-1-SW-3                    SI-191-1-SW-4 ZONE 7~
RC-147-1-SW-6
                                                                                                                                                                            ~
Sl-181-FW-804                              Sl-181-FW-802 RC-147-1-SW-7                                                        Sl-4206-6361
                                                    ~EL
                                                                                                                                                ~
26'-6'C-302-771 I                                                Sl-191-FW-901 l-3/4-SI-372          S0-03-14
                                                                                                                                                                                  ~~          I-1-Sl-533
                                                                        ~
RC-147-FW-I                                                  V-3527 8-191-FW-903                                Sl-191-FW-1 RC-147-1-SW-8 12' SWEEPOLET 3"    ~      6 Sl-181-FW-3 Sl-191-FW-2 Sl-1 91-I-SW-1 "Zp Oy Sl-191-I-SW-2 1-1-SI-373 ~ 'LASS        V-3526 CLASS 1 2
O I
RC-147-1 -SW-1 3                                                                  V-3544
                                                                        ~
I                                                                                                                CONT. ON CV DWG. 02-095 RC-147-I-SW-I                      I                                                                                                                ZONE  95 21'-6"                                                                                                    (SNUBBER)
EL.
RC-147-1-SW-3                  o+                      ~ RC-147-1-SW-2 RC-147-1 -SW-4 RC-147-1-SW-9 DWG.
CONT. ON 02-028-8
                                                ~
  ~EL ZONE        28 c~
gO>
CO EP I
CJ
                                          ~            12 X 10" ECC. RED.
RC-158-FW-1 21'-5'C-147-1-SW-5              I CV LEGEND RC-158-SW-2      ~~
RC-158-SW-3 I
V-1247 RC-158-SW-6 FLANGE BOLTING
                                                                                                                                                                                  ~
CH-146-FW-16 SHOP WELD BELD WELD EXAMINATION AREA 1-6"-SI-112      SPOOL PIECE NO.
RC-158-SW-4                          RC-158-SW-5 V-3526      VALVE DESIGNAIION REFERENCE DRAWINGS                                          NOTES                                      CALIBRAllON BLOCKS AND MATERIAL                                  FLORIDA POWER 8c LIGHT Sl-N-19    REV. 15                                                                                                                                                                ST. LUCK UNIT 2 SI-N-21    REV. 13 2"        160                SA-312, TP-304    lllLE: LOOP 28 SHUTDOWN COOLING UNE AND 3"        160                SA-312, TP-304.          HOT LEG INJECllON PIPING 10        160                SA-312, 'lP-304  DATE:7/14/93      KK              ZONE: 28 12"        160                SA-312, lP-304 Ravage er:            ORA'NNC RO:2 CPERAllNG PRESS.      2235  OPERATING        TEMP. 600            UT-16, UT-23, UT-35, UT-37                                          02-028-A
 
LEGEND
                                                                                                                                                                  ~        SHOP WELD X        BELD WELD Sl-153-SW-4                                                                  CH-146-FW-16        EXAMINATION AREA EL 30'-6"                        Sl-153-SW-5                                                                        I-6 -SI-1I2      SPOOL PIECE NO.
2"  X 3/4"
                                                                                                ~
V-3545
                                                              ~
RC-302-1-SW-2                              RC-302-1-SW-1                              RED.                                                            VALVE DESIGNATION RC-302-FW-901                                      RC-302-FW-903                          Sl-153-SW-3 FLANGE BOLTING/
                                                                    /~
RC-302-FW-902 Sl-4205-4080
                              ~~          Rc-302-Fw-904    ~        Op@
C-302-F W-2 Op V-3652 I
S!-153-SW-2 Sl-153-FW-1 Sl-130-FW-901
                                                                                      ~
R                                I Sl-4205-6408
                                                                                ~
Sl-130-FW-1                                    SI-4205-4107          SI-130-FW-906 RC-302-FW-1    ~            CONT. ON DWG. 02-028-A Sl-130-I-SW-6 g-378-2-SW-3 I-10-SI-130
                                                                                                                                        ~~      Sl-130-FW-908
                      ~SL 21  -5" r    ZONE 28 S I-378-FIT-801~
                                                                                            ~
(    Sl-378-F W-4
                                                                                                                      ~g-135    FTI 887 Sl-130-FW-905 Sl-130-1-SW-4 I-I-Sl-226 VENT Sl-378-2-SW-2 VV-3800
                                                                      ~pe Sl-4205-456A Sl-378-2-SW-7
                                                                                ~ Sl-4205-456B
                                                                                                                                                    ~~
Sl-130-FW-903
                                                                                                                                  '~o
                                                                                                                                      ~
Sl-130-FW-904 g 38'-3 V-3545              FLOW 60'H CONT. ON Sl-4205-456C                                                                    SI-130-1-SW-1 DWG. 02-029-8                                                          SI-378-FW-902                                Sl-130-FW-902 ZONE 29                                                                                                                                                          SI-130-FW-2 Sl-378-FW-3                                    Sl-378-2-SW-1                                                                                          V-3651 I PLUG Sl-4205-4590 Sl-4205-6458                                                                                      ~CLASS 1        w37 CONT. CN CLASS  2        <  0WG. 02-052-A ZONE 52 TO LPSI 28 REFERENCE DRAWINGS                              NOTES                                  CALI8RATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT Sl-N-19 REY. 15                                                                                                                                                      ST. LUCIE UNIT 2 10'60 2"
160 312 TP 304 SA-312. TP-304 TITLE LOOP 28 SHUTDOWN COOLING UNE AND HOT LEG INKCHM PIPING DATE:  7/14/93        KK            ZONE: 28 ORANNC NO CPERATING PRESS. 2235  CPERATING TEMP. 600                UT-16. UT-23. UT-35. UT-37                                            02-028-6
 
' * ~
LEGEND 0      SHOP WELD X      FIELD WELD                                                                                                    CONT. ON DWG. 02-006 CH-148-FW-18    EXAMINATION AREA                                                                                                ZONE 6 I-6"-SI-112  SPOOL PIECE NO.                                                                                                LOOP A HOT LEG V-3524  VALVE DESIGNATION
                                                                                                                  ~EL 29'-6'C-501-771 R C-162-FW-I CV EE9 I
r O
SO-03-12              SI-190-1-SW-2                                      CV I
RC-162-1-SW-B
                                                                                    ~l-3/4-SI-197                                      I Sl-190-1-SW-1                                                            EL  24'-3" Sl-190-FW-908 3-190-FW-902  ~                                      Sl-190-FW-907
                                                                                                                      /~
SI-190-FW-901  ~                    qO                          V-3525                  ~-s/~
99gG
                                ~~
                        ~                  ~EN          61-190-99-909                                            RC-162-1-SW-7 SI-4208-2801C                                    Sl-190-FW-904 Sl-190-I-SW-4 Sl-190-FW-604 Elll'-6'C-162-1-SW-6 RC-162-1-SW-13
                                                                                                                                            ~12" X 3 SI-190-FW-1                            rv      I I Sl 198          Sl-190-FIV-603 SWEEP OLET
                                              < >V-3542                                                  Sl-190-F W-602 Sl-190-FW-601                                                        RC-182-1-SW-5 CONT. ON W~                        I-4208-2801B 0WG. 02-093-B    ~
CLASS 1 ZONE 93 TO HPSI PUMP 2A CLASS 2 RC-162-1-SW-4      ~
ZONE 29 TO LPSI 2A REFERENCE DRAWINGS                            NOTES                                CALIBRA'110N BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT SI-N-17  REV. 13                  SEE (ZONE 144) FOR SNUBBER DWG.                                                                                                  ST. LUCIE UNIT 2 SI-N-20  REV. 13 3"          160                                      TITLE: LOOP 2A SHUTDOWN COOUNG LINE AND HOT LEG INACTION PIPING 12          160 DATE:  7/I 4/93      KK          ZONE: 29 RDKAEO RYE              ORAWNC Na OPERATING PRESS. 2235  OPERATING TEMP. 600                UT-16, UT-35, UT-37                                                  02-029-X
 
CONT. ON DWG. 02-051-A
                                                                                                                                                            ~ZONE    51
                                                                                                                                            ~82888  1 OA V-3481 O                                                                                                                SI-127-FW-2
                                                                                                                                            ~
kg I
O                                                        2" X 3/4 REO.
                                                                                                                    ~~
I O                                                                                                      8-127-1-SW-2 I
Sl-152-SW-3
                                                                                                                  ~
Sl-152-SW-2                        /          Sl-127-I-SW-4            Sl-378-I-SW-2 RC-162-I-SW-I                                                            Sl-152-SW-4                      /                                        Sl-4205-6465
                                                                                                              ~~
aO
                                                                                                                                  ~O 9-4205-6706                                                                                        I  ~/              SI-127-1-SW-I                          Sl-378-FW-2 Sl-152-SW-5                        2/2 RC-162-1 -SW-9                                                                                          I                9-127-I-SW-3 DWG.
CONT. ON 02-029-A  4  ~lg
                      ~
CV I
0-~L g8 FLOW l CONT. 02-028-B ON ZONE 29  1        C~T6                                RC-301-FW-I FLANGE  BOLTING~
Sl-152-FW-I                                                                V-3545      g  DWG.
ZONE 28 SI-127-1-SW-8
                                                                                                                                  ~  e 30T4                            ~ I-1-9-283
                                          ~        ~SL                                                                                                                      V-3841 CD                                                                                                                                  ~*2 12" X 10"          O
                                                                                                          ~
I 22'-8'C-106-FW-1 RC-1 27-FW-1                                              SI-378-FW-1                Sl-378-1-SW-1 ECC. RED.          O RC-162-I-SW-2 CL I
I
                                          ~
V-1215 RC-106-SW-2 RC-106-SW-4.
RC-301-FW-2 45V Sl-4205-67138 9-4205-67I3A FLANGE  BOLTING~ RC-106-SW-3
                                                                          ~EL SS'-0'C-301-1-SW-I
                                                                                                  ~
                                                                                                              ~      RC-301-1-SW-2                                              LEGEND
                                                                                                                                                                                  ~        SHOP WELD RELO WELD CH-146-FW-16        EXAMINATION AREA OA                                                                  I-6"-Sl-112      SPOOL PIECE NO.
V-3481    VALVE DE9GNATION REFERENCE DRAWINGS                              NOTES                                                    CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT Sl-N-17  REV. 13                  SEE (ZONE 144) FOR SNUBBER DWG.                                                                                                                    ST. LUCIE UNIT 2 Sl-N-20  REV. 13 2        160                                  TITLE: LOOP 2A SHUTDOWN COOUNG LINE AND 10"      160                                          HOT LEG INJECTION PIPING 12        160                                  DATE:  7/14/93        KK            ZONE: 29 OPERATING PRESS. 2300  OPERATlNG TEMP. 600                                                                          RCVK%ED RY2              ORAWNC R0.1 OPERATING PRESS. 2235  OPERATlNG TEMP. 600                                    UT-16, UT-35, UT-37                                                02-029-d
 
LEGEND CONT. ON DWG. 02-025                                                                                  SHOP WELD ZONE  25                                                                                    RElD WELD Sl-112-FW-7      EXAMINAllON AREA 4514 1-6"-Sl-112-7 76'-6'C-149-FW-2          I-2-RC-149                      EL. 77'-3 SPOOL PIECE NO.
                          ~EL BEND CONC. RED.
                                                                                      ~      I-4-RC-103 EL 76'-8" V-2483          VALVE DESIGNATION RC-149-SW-1 CH-146-FW-28
                                  ~
                                  ~ ~      V-2483                              PRESSURIZER CH-107-R7 CH-146-FW-20 BEND
                                                                                                                                                        ~    CH-107-R6
                                                                                                                                                        ~
CONT. ON CH-107-R12                DWG. 02-005 CH-146-SW-21
                                                                                                      ~
lO                                      ZONE 5                                                          xI            CH-107-R5
                                              ~
CP r
N I
I I
CH-107-Rll CH-107-R8                                            I C4 I
                                                                                                                                                    ~
                                                                                                                                                    ~
CH-146-SW-19 CH-146-SW-27                                                                                                                          CH-148-FW-18 BEND OA CH-146-SW-26 BEND V-2431
                                                                                                                                  ~
7211'I 7 H          ~    CH-107-R4 CH-107-R9
                ~                                                                                        CH-148-SW-17 O
CH-146-SW-23 CH-146-FW-22
                  ~
                  ~
BEND
                                        ~EL 66'-3 CH-107-R10 EL
                                                                                                                    ~
36-6'H-107-R3 CH-146-FW-16 FLOOR EL 62'-0"                                                                                      CH-146-SW-15 EL 33'-3
                                                                                                                                  ~                      CH-107-R2 CH-107-Rl 8
            ~EL 57'-6'A BEND CH-146-SW-14 4411 WALL CONT. ON DWG. 02-030-B ZONE 30 CH-107-RI A REFERENCE DRAWINGS                            NOTES                              CALIBRATION BLOCKS AND MATERIAL                                              FLORIDA POWER 8c UGHT CH-107 REV. 6                  THE CONTINUATION AT DWG. 02-030-B DOES NOT                                                                                              ST. LUCIE UNIT 2 MATCH THE CONFlGURATlON FOR THIS DWG.
160              SA-312. TP-304              llTLE: PRESSURIZER AUXILIARYSPRAY (NORTH ARROW DIRECTIONS  NO MATCH POINT.)
DATE:    7/12/93      KK            ZONE: 30 OPERATING PRESS. 2235  OPERATING  TEMP. 540                                                                aVmm    eW              ORAMNC NQ OPERATING PRESS. 2235  OPERAllNG  TEMP. 650                                                                                            02-030-A'
 
I-3/4-CM-441                                                            EL 35'-3" CH-146-SW-7                      V-2489              ~ELO'll X                                              BEND E.
                                                                                                                    -z-c"
                                                                                                                                      ~
CH-146-FW-11                          I4 CH-106-R9                                            I                                                  CH-106-R8 I
                                                                                              ~2" X3/4 BEND CH-146-SW-8
                                                                              ~                ~    RED. INS.
DWG.
CONT. ON 02-030-A ZONE 30 <
                                                  ~            CH-146-SW-9 CH-146-SW-11A CH-146-SW-IO CH-347-FW-2                ~      CH-146-FW-6 31'-3
                                                  ~                                                                                    ~~
EL.
CH-106-R10                                    CH-347-SW-1                              444-146-EW-6 WALL                                                                        ~ELOW        421 342 (EXEMPT)                        \
FROM REGENERATIVE CH-106-R7 CH-146-SW-13 CE-146-FW-12        4444  ~EL    33'-3'H-146-SW-2 HEAT EXCHANGER    L          SE  02 4                                    l11~
EL 26'-0 FROM REGENERATIVE CLASS 1 CLASS 2 (EXEMPT)
CH-146-SW-1
                                                                                                                            ~  ~    BEND CH-146-SW-4 CH-146-SW-3 HEAT EXCHANGER    (          SE-02-3 2" X 3/4" RED. INS.
I  3/4-CH 442  ~    ~l7 X V-2807 LEGEND Ch                                              SHOP WELD FIELD WELD Sl-112-FW-7      EXAMINAllON AREA I-6'-SI-112-7      SPOOL PIECE NO.
SE-02-03        VALVE DESIGNAllON REFERENCE DRAWINGS                            NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc UGHT CH-106 REV. 11                  THE CONTINUATION AT DWG. 02-030-A DOES NOT                                                                      %%.                ST. WCIE UNIT 2 CH-107 REV. 6                      MATCH THE CONFIGURATION FOR THIS DWG.              2"            160              SA-312, TP-304    TITLE: PRESSURIZER AUXILIARYSPRAY (NORTH ARROW DIRECTIONS  NO MATCH POINT.)
DATE:  7/20/93      KK            ZONE: 30 aCVam  eVE            ORAWNC N(4 OPERATING PRESS. 2235  CPERAllNC    TEMP. 540                                                                                      02-030-B
 
0 1'
 
CH-148-SW-9                CH-148-FW-8 CH-148-SW-13 CH-108-R3 EL 32'-6
                                                                                                                  ~                          CH-108-R2 BEND CH-148-SW-7 CH-108-R4                                        BENO                                                      CH-14'-)W-5 CH-108-RS                                ~      CH-148-FW-I 2    44424                  90'H                                  3/4-CH-152 CH-148-FW-l4 ~                                            BEND CH-148-SW-8 2" X 3/4    ~                      +    2 X 3/4 RED. INSERT CH-108-R8
                                                                                                                ~~    CH-l48-FW-10 RED. INSERT
                                                                                                                                                      ~l
                                                                                                                                                                            ~CH-148-SW-3
                                                                  ~
CH-148-SW-15 I  3/4  CH 154                            30V
                                                              ~        CH-108-R6          72 11'l7'H                                                    I CH-148-SVF-11                    V7 CH-148-SW-18                                                                                                        X V-2803 CH-148-SW-16                                                                      LA CH-148-SW-4 EL 29'-6"                                                                                  CH-148-SW-2 BEND CH-148-FW-20                                    CH-148-SW-17                                ~EL. 30'-X                                                          BEND
                                                                ~2 CH- 148-SW-21 RC-150-SW-I RC-150-SW-2 V-2432 X 3/4 RED. INSERT                                                                            CH-l08-Rl
                                                                                                                                                                        ~          /
                                                                                                                                                                                    +
p 29'-6'H-148-SW-19 V-2484                              V7
                                                                ~ 1-3/4-CH-153                                                                        CH-148-F W-1              p CH-108-R7        X 27'l2'35"H                                  L a V-2804                                                                                            SE-02-1 RC-150-SW-3 P                                                                                                                                                                    CLASS 1
        ~o FROM  REGENERATIVE~          CLASS 2 62'47'25 H            RC-150 -FW-4                                            LEGEND                                                        HEAT EXCHANGER            (EXEMPT)
CH-904-771                                              ~      SHOP WELD CONT. ON                                              X        FIELD WELD DWG. 02-011                                  CH-146-FW-16      EXAMINATION AREA ZONE 11
~EL                          LOOP B                                          1-6 -SI-112    SPOOL PIECE NO.
COLO LEG                                            V-248+    VALVE DESIGNATION REFERENCE DRAWNGS                              NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT CH-108 REV. 6                                                                                                                                                      ST. LUCIE UNIT 2 2"          160                                  TITLE: CHARGING LNE TO LOOP 281 DATE:  7/14/93      KK          ZONE: 31 CPERATNG PRESS. 2345  OPERATING TEMP. 395                                                          REVKKD DY:            DDAMNC HD OPERATNG PRESS. 2235  CPERATlNG TEMP. 600                                                                                      02-031
 
CH-147-SW-34                                      + IV-2802 CH-147-FW-33            CH-105-R6 X      !-3/4-CH-449 L(A CK-105-RGA                                                          2" X 3/4" EL  32'-0"                        I 2 CH-147 BEND
                                                                                                                  ~    RED. INSERT CH-147-SW-36 CH-147-SW-32 BEND
                                                      ~~                  ~      CH-105-RSB CH-147-FW-35
                                                                                                                        ~      CH-105-R7 CH-106-R2 EL. 31'-3 BEND CH-105-R2
                                                                          -105-R4 CH-147-FW-31 CH-1 47-SW-37 BEND CH-149-SW-4
                                                                                                                                            ~
V-2435~
11,0
                                                                                                                                                          ~2 CVI BEND.
CH-147-FW-26 g                                                                                                                FROM REGENERATIVE CH-149-SW-3 CLASS 1                    V-2434
              ~                                                                                                          EXCHANGER              CLASS 2 (EXEMPT)
                                                                                                                ~
CH-147-SW-27 EL 17'-9" BEND CM-105-R3 CH-147-SW-30 CH-147-SW-38
                                                                                                                ~          CH-147-SW 45 CH-149-SW-2 CH-147-SW-44
                                                                                                                                            ~                  ~              EL  28'-0"
                      ~    CH-103-R18 CH-147-FW-29                                CH-147-FW-39 FROM REGENERATIVE SE-02-2 1  2 CH CH-147-SW-43 142 HEAT EXCHANGER (EXEMPT)
CONT. ON DWG.
ZONE 02-032-B 32 CH-1 47-SW-40
                                                                                                                                              ~                            BEND LEGEND
        ~      SHOP WELD                                                                              E~L.
BEND
                                                                                                                                    $ ~2
                                                                                                                                        ~g,OS
                                                                                                                                                            ~
                                                                                                                                                            ~2 CH-147-SW-42 CH-147-SW-41 X 3/4" 25-0'H-106-Rl CH-146-FW-16 FIELD WELD EXAMINATlDN AREA V-2800'X v
I v~      RED. INSERT I-3/4-CH-448 l-6"-SI-112  SPOOL PIECE NO.
SE-02-02    VALVE DESIGNAllON REFERENCE DRAVNIGS                            NOTES                                CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT CH-103 REV. 7                    DWGS. 02-032-A, 8  Bc C HAVE Ph!0 DIFFERENT                                                                                    ST. LUCK UNIT 2 CH-105 REV. 5                      NORTH ARROW DIRECTIONS  NO MATCH POINT.
CH-106 REV. 11                                                                                                                      TITLE: CHARGING LINE TO LOOP 2A2 160 DATE:  7/14/93        KK            ZONE: 32 REVIEW) QY:                DRAWNC Na OPERATlNG PRESS. 2345  OPERATING  TEMP. 395                                                                                    02-032-A
 
Cl LEGEND 4        SHOP WELD CONT. ON DHQ. 02-032-A                                    FIELD WELD
                                                                                                          +ZONE rr 32                        CH-l'16-FW-16    EXAMINATlON AREA I-6 -SI-112
                                                                                    ~ L~
SPOOL PIECE NO.
CH-103-R17                                                                  V-2433    VALVE DESIGNATlON CH-147-SW-26
                                                                                ~~
CH-147-FW-25
                                                                ~EL. 17-9 CH-147-SW-24 CH-147-SW-23
                                                                                ~    CH-147-SW-22 111'-9'ONT. r DWG.
ON 02-032-C ZONE 32
                                                                              ~    CH-147-FW-21                                        CH-103-R16
                                                                                                                                                      ~                  BEND 45'H Qa BEND
~EL.
CH-1 47-SW-11 60'H CH-103-06  ~~                          CH-147-FW-12 CH-147-SW-14 CH-147-SW-13                  CH-147-FW-16 CH-147-SW-18 CH-147-SW-17 CH-147-SW-19
                                                                                                                                              ~
                                                                                                                                        ~
CH-103-1176                                                CH-1 47-SW-15 CH-103-R7A ~                                                                                                                            CH-147-FW-20 CH-103-RS CH-103-R9  ~
CH-103 R10A I  2-Cg-147 FLOVI CH-103-R12
                                                                                                                        ~    CH-103-RI 4 CH-103-R13 CH-103-R15 CH-103-R1 0                        CH-103-R11 REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT CH-103 REV. 7                    DWGS. 02-032-A, 8 8c C HAVE TWO DIFFERENT                                                                                  ST. LUCIE UNIT 2 NORTH ARROW DIRECTIONS  NO MATCH POINT.
2"        160                                TITLE: CHARGING LINE TO LOOP 2A2 DATE:  7/12/93      KK              ZONE: 32 RCYEWED OY:              ORA'NNC OPERATING PRESS. 2345  OPERATING  'TEMP. 395                                                                                    Ma'2-032-It
 
Cl CONT. ON DWG. 02-009 ZONE 9 LOOP A                29'-6" COLD LEG            EL.
QA 27'12'35 H                CH-704-771 RC-148-SW-2            ~/
                                    ~/
RC-148-FW-1
                                                                                                                                                                ~        CH-103-R1 CH-147-SW-1 V-2485                                                                                      CH-103-R3 CH-103-R4
                                                                                                                                  ~        ~                BEND CH-147-FW-601
                                                                                                                          ~
47e59IP4>>H V-2433
                                        ~        CH-147-FW-600 CH-103-RSB CH-147-FW-7
                                                                                                            ~
                                                                                                                                  ~4
                                                                                                                                  ~    'CH-147-SW-8 14'48'21 "H
                                                    ~
BEND CH-103-R2 CH-1 47-SW-8 CH-147-FW-9
                                                                                              ~                        ~    CH-103-R5A
                                              '+
5                                                          ~  CH-147-SW-10
                                                    ~
I BEND                          2  X 3/4 C7 CII-147-FW-4                                            RED. INS.
                                                    ~
I tV                              ~EL LEGEND I
16'-9'ONT.                      1-3/4-CH-447 0
CH-147-SW-5                                  I SHOP WELD ON    Tlv                                                        FIELD WELD DWG. 02-032-B      X  V-2801                                CH-148-FW-18 ZONE 32                                                                EXAMINATICN AREA I-6"-SI-112  SPOOL PIECE NO.
V-2433    VALVE DESIGNAllON REFERENCE DRAWINGS                                NOTES                            CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER    k LIGHT CH-103 REV. 7                      DWGS. 02-032-A,    8
* C HAVE TWO DIFFERENT                                                                              ST. LUCIE UNIT 2 NORTH ARROW DIRECTIONS NO MATCH PONT.
2"        160                                llTLE: CHARGING LINE TO LOOP 2A2 DATE:  7/14/93      KK            ZONE: 32 OPERATING PRESS. 2345  OPERATING TEMP. 395                                                  REVE%ED OY:            ORAWNC NO.:
CPERATING PRESS. 2235  OPERAllHG TEMP. 600                                                                              02-032-d
 
U, CONT. ON DWG. 02-012 ZONE 12 LOOP A INTERMEDIATE LEG6r RC 1503 RC-113-FW-1
                                                            ~EL. 25'-6" RC-113-SW-2 EL 20'-11" RC-113-SW-4 r              ~    RC-I I3-SW-3 RC-113-SW 6 RC-113-SW-5
                                            ~                  V-1235    ~        VRC-1-R2 TO REACTOR      ~  FLANGE BOLTING COOLANT DRAIN TANK LEGEND SHOP WELD X        BELD WELD CH-146-FW-16    EXAMINATION AREA 1-6 -Sl-112    SPOOL PIECE NO.
V-1235    VALVE DESIGNATION REFERENCE DRAWINGS                    NOTES                              CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER R UGHT RC-1 REV. 6                                                                                                                                    ST. WCIE UNIT 2 2          160              SA-312, TP-304 TITLE: LOOP 2A1 PRIMARY DRAIN DATE:  7/12/93    KK            ZONE: 33 RCVKNCD QY:            ORAWNC Ra OPERATING PRESS. 2235 OPERATING  TEMP. 600                                                                            02-033
 
C ONT. ON EL 23'-8"            DWG. 02-008 ZONE 8 LOOP A INTERMEDIATE LEG TO REACTOR                    RC-1 503-771-A g~
                                                                                            ~
COOLANT
(
                                                  ~
DRAIN TANK          FLANGE BOLTING RC-118-FW-1
                                                            ~
RC-116-SW-6 V-1234          O RC-116-SW-5                  /~
C'g RC-116-SW-4.
VRC-1-R1  ~                    ~      RC-116-SW-2 EL 20'-11" RC-116-SW-3 LEGEND
                                                                                                                                            ~        SHOP WELD FIELD WELD CH-146-FW-16        EXAMINATION AREA l-8"-SI-112      SPOOL PIECE NO.
V-1234      VALVE DESIGNA llON REFERENCE DRAWINGS                  NOTES                                CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT RC-1 REV. 6                                                                                                                                    ST. LUCIE UNIT 2 2"        160                SA-312. TP-304 TITLE: LOOP 2A2 PRIMARY DRAIN DATE:  7/I2/93      KK            ZONE: 34 DRA'NNC NO CPERATING PRESS. 2235  CPERATING  TEMP. 600                                                                              02-034
 
4 11
 
CONT. ON DWG. 02-010 ZONE 10
                                                                ~~
LOOP A INTERMEDIATE LEG RC  1503 771  B TO REACTOR                    EL  20'"              RC-122-FW-1 COOLANT  g~                                BEND
                                                ~
DRAIN TANK  <
FLANGE BOLTING Y//
                                                        ~
RC-122-SW-6 V-1450        45>
BEND RC-122-SW-5
                                                                                        ~EL. 19'-2
                                                                                          ~
C~
RC-122-SW-4 RC-122-FW-2 RC-122-SW-3 EL 16'-9 CONT. ON DWG. 02-037-A ZONE 37                                LEGEND
                                                                                                                                                ~      SHOP WELD X        FIELD WELD CH-146-FW-16    EXAMINATION AREA I-6"-SI-112    SPOOL PIECE NO.
V-1450    VALVE DESIGNATION REFERENCE DRAWINGS                  NOTES                              CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER 8c LIGHT RC-1 REV. 6                                                                                                                                      ST. LUCIE UNIT 2 2        160                SA-312, TP-304 TITLE: LOOP 281 PRIMARY DRAIN DATE:  7/12/93    KK            ZONE: 35 REVEWG) RYE            DRAWtR'O.:
OPERATING PRESS. 2235  OPERATING TEMP. 600                                                                                02-035 '
 
CONT. ON DWG. 02-014 ZONE 14 LOOP 8 INTERMEDIATE LEG RC-1 503-771-D                  TO REACTOR COOLANT RC-125-FW- I
                                                                                                        ~
DRAIN TANK
                                              ~EL                                                    $ 4~FLANGE BOLllNG RC-125-SW-6 O      V-1449
                                                                    ~
22'-6'C-125-SW-2
                                                                                                  ~ RC-125-SW-5
                                                                                        ~
G qG RC-125-SW-4
                                                        ~EL. 20'-11"
                                                                              ~    RC-125-SW-3 VRC-1-R3 LEGEND
                                                                                                                                                  ~        SHOP WELD FIELD WELD CH-146-FW-16      EXAMINATION AREA 1-6"-SI-112    SPOOL PIECE NO.
V-1449    VALVE DESGNATION REFERENCE DRAWINGS                  NOTES                                  CALIBRAllON BLOCKS AND MATERIAL                                FLORIDA POWER IL LIGHT RC-1 REV. 6                                                                                                                                          ST. WCIE UNIT 2 2          160                              TITLE: LOOP  282 PRIMARY DRAIN DATE:  7/12/93      KK            ZONE: 36 aZVKVm eVE            ORAWNC CPERATING PRESS. 2235  OPERATING TEMP. 600                                                                                      Na'2-036 ~
 
Cl RC-2-R2
                                                                            ~
                                                                                  ~                EL. 31'-0
                                                                    ~
RC-142-FW-11                      BEND                TOP OF, WE'LL EL 30'-0 RC-2-R3A RC-2-RIA BEND I-2"-RC-2-4 RC-142-FW-13 RC-2-R3                                                                  BEND RC-2-RI CONT. CN TO RCP LOOP B RC-142-FW-9
                                                                  ~~              RC-142-SW-8                                  ~2" CONT. ON DWG. 02-037-8 ZONE 37 DWQ. 02-035 ZONE 35 INTERMEDIATE LEG RC-142-SW-6                BEND
                                                                          ~      I-2"-RC-2-3 RC-1 42-SW-14 X
3'EO.
V-251
                                                                        ~
V-2593 RC-142-SW-18
                                                                                                                              ~3      X2
                                                                                                                                                  +~o"                              RC-I 42-FW-17 RC-142-FW-I  ~        /~
RC-2-R7 EL  'l9'-0'END
                                                        ~      RC-142-FW-5 RC-2-R4 RC-1 42-FW-7 RC-142-SW-19 RC-142-SW-15  ~            RED.
RC-2-R8
                                                                                                                                                      ~~
V-2463 I-1-CH-344 5,"BN'C-142-SW-2
                            ~
X C~/
                                                                                                                ~EL EB'-D'END RC-142-SW-4 Ill~
RC-142-SW-3 BEND
                                                              ~  RC-2-R5                                                                              LEGEND 4                    SHOP SELD RC-2-R6                      EL 16'-9 X                    BELD WELD CH-146-FW-16                  EXAMINATION AREA l-6"-SI-112                SPOOL PIECE NO.
V-2593                VALVE DESIGNATION REFERENCE DRAWINGS                            NOTES                                CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT RC-2 REV. 12                                                                                                                                                  ST. LUCIE UNIT 2 2"      160                        TP  304 TITLE: LETDOWN UNE FROM LOOP 281 DATE:    7/14/93      KK                      ZONE: 37 assam    eVE            OaAWNC              aa OPERATING PRESS. 2235  CPERATING  TEMP. 540                                                                                      02-037-A
 
CH-145-SW-1 3 E'
V-2540              CH-109-R5 X
LI I-3/4-CH-401 ~
                                                                  ~1 2"  X  3/4" RED. INSERT
                                                              ~                              CH-145-SW-11 CH-109-R6 CH-145-SW-14
                                                              ~
CH-145-SW-15 CH-109-RB      ~                                              (EXEMPT)
CLASS 2
                                                                                                              ~STAGS 1 TO REGENERATIVE
                                                                                                                              /HEAT EXCHANGER
                                                              ~
I O
I f4 V-2516 C.-145-SW      16                        I
                                                                  ~                      CH-145-SW-I8 CH-145-SW-20 CH-145-SW-17
                                                                      ~                        ~                  CH-109-R4A
                                                                                                                      ~~
CH-109-R48                                    CH-145-FW-19 C.7L~
CH-145-SW-10                ~A/ V-2539 CH-145-SW-2                      EL 25'-0                CH-145-SW-9 1-3/4-CH-4DO CH-145-FW-8 2" X 3/4"
                                                                      ~  CH- I 45-SW-3 ECC. RED.
CH-145-SW-21 CH-145-SW-1 V-2515 CH-109-R7      ~      Im 0
CH-145-SW-7 CH-145-SW-6 LEGEND
                                                                                                                                                            ~        SHOP WElD CONT. ON X        FIELD WElD DWG. 02-037-A              CH-145-SW-4                                                                                            CH-l48-FW-18      EXAMINATION AREA ZONE 37                                                            CH-109-R7A                                                I-6"-SI-1I2    SPOOL PIECE NO.
                                                  ~EL. 23'-6 CH-145-SW-5                                                            V-2515    VALVE DESIGNATION REFERENCE DRAWINGS                        NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER IIc LIGHT CH-109 REV. 12                                                                                                                                              ST. LUCK UNIT 2 2"      160                SA-312, TP-304. TITLE: LETDOWN UNE FROM LOOP 281 DATE:  7/14/93    KK            ZONE: 37 RCmm er:              ORNKEIC NO OPERATING PRESS. 2215  OPERATING 'TEMP. 540                                                                                    02-037-8
 
RC-101-1-SW-10
                                                                                                        ~
                                                                                                                  ~~
RC-101-1 -SW-11 RC-101-I-SW-9 RC-101-1-SW-8
                                                                                    ~      ~        o+
4" X3" CONC. RED.
RC-101-1-SW-12
                                                                                                                                /~
C 0p    4g              RC-309-FW-1 RC-309-FW-2 RC-101-I-SW-7 o~    RC 101  I SW 13
                                          ~
RC-101-I-SW-5
                                                                                                                                                    ~
I V-1476 RC-101-1-SW-4                                                          O                                                                            RC-309-1-SW-I
                            ~  e                                                                                                    RC-4300-9
                              '-1239      r~                            RC-101-1-SW-6 I
RC-101-FW-1                                                        V-1474 I-3/4-RC-131                                                                            EL 76'-4 Ir    @0 CONT. ON DWG. 02-117 RC-506-671                                                        NSC ZONE 117 RC-101-I-SW-3                                                                            PRESSURIZER                                            (SNUBBER)
CONT. ON                                      TO QUENCH TANK DWG. 02-005 78'-1I'C-101-1-SW-2                                                                  ZONE 5
~EL 4  X3"~
                      ~  RC-101-1-SW-I
                            /~
CONC. RED.
C'~~
                                      /o RC-31 0-FW-I V-1477
                                                      ~/~
RC-310-FW-2 C'
CONT. ON DYC. 02-137
                                                                                                                                                        ~GEN 0 0          SHOP WELD ZONE 137 (SNUBBER)                                                                  3I(          FIELD WELD RC-4300-70            y 1 475        TO QUENCH TANK                                                      CH-146-FW-16      EXAMINATION AREA NSC                                                                        I-6"-SI-112      SPOOL PIECE NO.
RC-310-1-SW-I                  CLASS  1 V-1 477        VALVE DESIGNATION REFERENCE DRAWINGS RC-AB-2  REV. 9 NOTES 3"
CALIBRATION BLOCKS AND MATERIAL 160              SA-312, TP-304
                                                                                                                                        -'E                  FLORIDA POWER 8c LIGHT TITLE: PRESSURIZER REUEF UNE
                                                                                                                                                                ., ST. LUCIE UNIT 2 4          160              SA-312, TP-304 7/14/93        KK              ZONE: 38
                                                                                                                                                                                'ATE:
RCVKWED OY:                DRA'NNC NO ~
OPERATING PRESS. 2235  OPERATING  TEMP. 653                                                                                    02-038
 
SECOND INSPECTION INTERVAL      PSL-201 INSERVICE INSPECTION          REVISION 0 SELECTED COMPONENTS SCHEDULE      July 24, 1993 APPENDIX E CLASS 2 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-041    Steam Generator 2A Secondary Side 02-042    Steam Generator 2B Secondary Side 02-043-C  LPSI Pump 2A Discharge Header Piping 02-043-D  LPSI Pump 2A Discharge Header Piping 02-043-F  LPSI Pump 2A Discharge Header Piping 02-044-C  LPSI Pump 2B Discharge Header Piping 02-044-D  LPSI Pump 2B Discharge Header Piping 02-044-E  LPSI Pump 2B Discharge Header Piping 02-044-G  LPSI Pump 2B Discharge Header Piping 02-045    Safety Injection Piping to Sl Tank 02-046    Safety Injection Piping to Sl Tank 2A1 02-047    Safety Injection Piping to Sl Tank 2B1 02-048    Safety Injection Piping to Sl Tank 2B2 02-055    Shutdown Cooling Heat Exchanger 2A 02-061    HPSI Pump 2A to Header A 02-062    HPSI Pump 2B to Header B 02-063  Main Steam 2A1 02-064  Main Steam 2B1 02-065-A Main Steam 2A1 Page 268  of 398
 
J ',g' SECOND INSPECTION INTERVAL      PSL-201 INSERVICE INSPECTION          REVISION 0 SELECTED COMPONENTS SCHEDULE        July 24, 1993 APPENDIX E CLASS 2 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER  TITLE 02-065-B  Main Steam 2A1 02-066-A  Main Steam 2B1 02-066-B  Main Steam 2B1 02-067    Main Feedwater to 2A1 02-068    Main Feedwater to SG 2B1 02-069-A  Charging Pump 2A 02-071    Main Feedwater to 2A1 02-072    Main Feedwater to SG 2B1 02-087-A  Combined HPSI Discharge 02-087-B  Combined HPSI Discharge 02-087-C  Combined HPSI Discharge 02-087-D  Combined HPSI Discharge 02-087-F  Combined HPSI Discharge 02-087-G  Combined HPSI Discharge 02-087-I  Combined HPSI Discharge 02-087-J Combined HPSI Discharge 02-088-A Charging Pump 2A Discharge to Aux. HPSI 02-088-B Charging Pump 2A Discharge to Aux. HPSI 02-088-C Charging Pump 2A Discharge to Aux. HPSI 02-088-D Charging Pump 2A Discharge to Aux. HPSI 02-089  Charging Pump 2B Discharge to Aux HPSI Page 269  of 398
 
SECOND INSPECTION INTERVAL          PSL-201 INSERVICE INSPECTION              REVISION 0 SELECTED COMPONENTS SCHEDULE          July 24, 1993 APPENDIX E CLASS 2 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-090-B  Charging Pump 2C Discharge to Aux. HPSI 02-091    Combined Charging Pumps Discharge to HPSI 02-092    Combined Discharge to HPSI tie in Loop 2B 02-093-A  HPSI 2A Discharge to SDC Loop 2A 02-093-B  HPSI 2A Discharge to SDC Loop 2A 02-094-A  HPSI Header B to SDC Loop 2B 02-094-8  HPSI Header B to SDC Loop 2B 02-094-C  HPSI Header B to SDC Loop 2B 02-095    HPSI 2A Discharge to SDC Loop 2B 02-096    HPSI 2B Discharge to SDC Loop 2B 02-097-A  Containment Spray Pump 2A 02-098-A  HPSI Pump 2A Page 270  of 398
 
LEVEL NOZZLES
                                              ~
FW NOZZLE
                                                              ~          SG-2A-111-221-IR BOTTOM BLOW F                                SG-2A-103-242 SG-2A-201-271                                  SG-2A-111-221                                                  DOWN NOZZLE LEVEL NOZZLES                                              SG-2A-203-246 INSTRUMENT                                                      SG-2A-101-271 NOZZlE SG-2A-105-201
                          ~                                                                                      SG-2A-204-246 CLASS 2 SG-2A-105-201-IR                                    SG-2A-102-221 SG-2A-106-201 SECONDARY            SG-2A-101-241 HANDHOLE SAMPLING                                    SG-2A-101-221 NOZZLE                                                                                                S G-2A-103-221-A 0      KEY BRACKET MANWAY SG-2A-104-221-D                                                            SG-2A-104-221-A CLEVIS BRACKET                                                          CLEVIS BRACKET I
SG-2A-105-221-B                                                          SG-2A-105-221-A SUPPORT BRACKET                                                          SUPPORT BRACKET 270'0'-71272-242-001 REV. 5 E-71272-244-001  REV. 6 E-71272-246-002  REV. 5 E-71272-271-001  REV. 2                                                      SG-2A-104-221-C                                                        SG-2A-104-221-B E-71272-271-003  REV. 3                                                        CLEVIS BRACKET                                                      CLEVIS BRACKET E-71272-271-006 E-71272-271-009 REV. 3 REV. 3 160'G F-F 2A 103 221 B E-71272-288-002  REV. 1                                                                                                    SECTION        KEY BRACKET REFERENCE DRAWINGS                      NOTES                            CALIBRATION BLOCKS AND MATERIAL                                                          POWER R LIGHT E-71272-201-001  REV. 2                                                                                                                                            ST. LUCIE UNIT 2
                                                                                                                                                                              'LORIDA E-71272-204-001  REV. 2 E-71272-221-001                                                                                                                          TITLE: STEAM GENERATOR 2A SECONDARY SIDE REV. 6 E-71272-222-001  REV. 8 E-71272-225-001  REV. 2                                                                                                                DATE:    7/12/93      KK            ZONE: 41 E-71272-228-002  REV. 3                                                                                                                RCYEINED SY;            oswego wa:
E-71272-241-001  REV. 2                                                              UT-7, UT-25, UT-31                                                              02-041
 
FW NOZZLE            SG-28-111-221-IR LEVEL NOZZLES                                                                                            BOTTOM BLOW F                                SG-28-103-242 SG-28-201-271                                  SG-28-111-221                                                  DOWN NOZZLE LEVEL NOZZLES                                              SG-28-203-246 INSTRUMENT SG-28-101-271 NOZZLE SG-28-105-201
                            ~                                                                                      SG-28-204-246 CLASS 2 SC-28-105-201-IR                                      SG-28-102-221 SG-28-1 06-201 SECONDARY              SG-28-101 -241 HANDHOLE SAMPLING                                    SG-28-101-221 NOZZLE                                                                                                S G-28-103-221-A 0      KEY BRACKET MANWAY SG-28-104-221-.D                                                          SG-28-104-221-A CLEVIS BRACKET                                                          CLEVIS BRACKET I
SG-28-105-221-8                                                          SG-28-105-221-A SUPPORT BRACKET                                                          SUPPORT BRACKET 270'0'-71272-242-001 E-71272-244-001 E-71272-246-002 E>>71272-271-001 E-71272-271-003 E-71272-271-006 REV. 5 REV. 6 REV. 5 REV. 2 REV. 3 REV. 3 SG-28-104-221-C CLEVIS BRACKET
                                                                                                                    ~                                  SG-28-104-221-8 CLEVIS BRACKET E-71272-271-009    REV. 3                                                                                                          180        SG-28-103-221-B E-71272-288-002    REV. 1                                                                                                    SECTION  F-F    KEY BRACKET REFERENCE DRAWINGS                        NOTES                            CALIBRATION BLOCKS AND MATERIAL                                                FLORIDA POWER dc LIGHT E-71272-201-001    REV. 2                                                                                                                                              ST. LUCIE UNIT 2 E-71272-204-001    REV. 2 E-71272-22'1-001  REV. 6                                                                                                                  TITLE: STEAM GENERATOR 28 SECONDARY SIDE E-71272-222-001    REV. 8 E-71272-225-001    REV. 2                                                                                                                  DA'TE:  7/12/93      KK            ZONE: 42 E-71272-228-002    REV. 3                                                                                                                  RCYEWED RY:              DRA'MNC Ra E-71272-241-001    REV. 2                                                                UT-7. UT-25, UT-31                                                                02-042
 
r CONT. ON DWG. 02-043-D ZONE 43 SI-113-2A-SW-2                          I
                                                                                                                                                  ~
CONT. OH                                                                                                                                                                  FLOOR OWG. 02-043-8                                                                                                                                                            EL  0'-6" ZONE 43                                                                                                        Sl-113-2A-SW-1 SI-409-2-SW-2                                                                                                                          ~ Sl-113-ZA-SW-4
                                                                                                                                                  ~
I                                                                8-409-2-SW-3 10  X6"~            8  40                                                                                                                                ~+op 0'-6'I-113-I-SW-2 Sl-2408-51 RED.                                                                              ~~  Sl-409-2-SW-4                        Sl-113-FW-2                                  /'L
              ~                                      V-3112                              Cp'l-409-FW-902
                                                                                                                                                          ~
Sl-2408-58                                              h 4SX                                                                              8'-10 l-l/2-SI-432                    g9                                                                                                                      8-113-2A-SW-3 I-1-Sl-321                r"v FLOOR
                                              ~(                        .~ I-I-SI-259 EL.                                                                                                                CONT. ON 02-087-1
                                                                                                                                                          ~      Sl-113-1-SW-3
                                                      ~
0WG.
ijr DRAIN r          V-3111                    I                                                    ZONE  87+~                          Sl-2408-36 O
V-3871,~I, T                        ofp lh V-3822
                                                              -409-2-SW-I SI-409-FW-2 O
                                                                                                    ~      Sl-2408-47                            g~ I-I-SI-231 Sl-409-FW-801
                ~                                      Sl-409-I-SW-2 EL          6'-9'CV-3615 SCH. 40S    y 3114 6" X 6 X RED. TEE 3"
                              ~
SCH, 180 Sl-2408-54                                                                        Sl-113-1-SW-I EL    4'-8                                                      SI-409-FW-I                    c)r                          8-2408-38 r
Sl-409-1-SW-I Sl-2408-56 Sl-129-1A-SW-1      ~                  V-3821
                                                                                                                ~ I-I  -Sl-260 DRAIN SI-113-FW-1 Sl-129-FW-2 8-129-FW-901 LEGEND
                                                                                                                                                                        ~        SHOP WELD X        FIELD WELD CH-146-FW-16        EXAMINATION AREA I-6"-Sl-112      SPOOL PIECE NO.
HCV-3615      VALVE 0E8GNATION REFERENCE DRAWINGS                                NOTES                                      CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT Sl-N-9  REV. 18                    ITEMS ON SCHEDULE 40S ARE                                                                                            A@9                ST. LUCIE UNIT 2 EXEMPT PER TABLE IWC-2500-1                                  6"      40S      T ~ .280                      llTLE: LPSI PUMP 2A DISCHARGE HEADER PIPING (T<375")                                                    6"      160      T ~ .719    SA-312, TP-304 DATE:  7/20/93      KK              ZONE: 43 OPERATING PRESS. 450  OPERATING TEMP. 300                                                                  REWED  QY:              ORA'NNC  NK:
OPERAllNG PRESS. 2235  OPERAllHG TEMP. 330                                    UT-38                                                  02-043-C'
 
CONT. ON DWG. 02-045 ZONE 4~5 PENETRATION 36
                  ~~
E'S X V-3804 I-I-Sl-230
                                                                                                                                              ~
cia
                                                                                                                                                          ~
Sl-113-FW-6                          VENT Sl-113-FW-903 Sl-113-F W-5 Sl-2408-23
                                                                                                                              ~~Sl-113-FW-3 Sl-113-2-SW-9 45~
                                      ~
9'20'10" H                          Sl-113-4-SW-1                    Sl-113-3-SW-9
                                                                                                                                                          ~    I-6"-Sl-113-2 Sl-113-5-SW-1 E~L34 -5 0+
Sl-113-3-SW-8 Sl-113-3-SW-7  ~t
                                                                                                                                ~-                        ~~    Sl-113-2-SW-8 Sl-113-2-SW-7
                                                                                                                                                                      ~~EL FLOOR EL 19'-6"
                                                                                                                                      ~      Sl-113-3-SW-6 Sl-2408-20
                                                                                                                                                                          ~
Sl-113-2-SW-8 7'-5 Sl-2408-9
                                                        ~                  Sl-2408-12              +544
                                                                                                      ~              ~      Sl-2408-18
                                                                                                                                                                          ~
Sl-113-FW-904 Sl-113-FW-905 Sl-113-FW-4
                                                            ~                            45+W SI-113-3-SW-13 Sl-113-3-SW-15 SI-113-3-SW-14 FLOOR EL 0'-8 SI-2408-30 Sl-113-FW-2A LEGEND                                    EL 10'-8 Sl-113-3-SW-12
            ~      SHOP WELD Sl-113-3-SW-1 BELD WELD                                                                                                                                        CONT. ON CH-146-FW-16      EXAMINATION AREA DWG. 02-0'I3-C ZONE 43 I-6 -Sl-112    SPOOL PIECE NO.
V-3114  VALVE DESIGNATION REFERENCE DRAWINGS                                                                        CAUBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT Sl-N-9  REV. 18                      THE CONllNUATION AT DWG. 02-045 DOES NOT                                                                                        ST. LUCE UNIT 2 MATCH THE CONFIGURAllON FOR THIS DRAWING.
TITLE: LPSI PUMP 2A DISCHARGE HEADER PIPING 6"      160    T = .719    SA-312, TP-304 DATE:  7/14/93      KK              ZONE: 43 REVKNG) BYE              DRA'NNC HO.E OPERATING PRESS. 2235  OPERAllNG    TEMP. 330                      UT-38                                                      02-043-I7
 
CONT. ON DWG. 02-046 '              X7V 3809 I~~ I-I-Sl-235
                                                                                                            ~
ZONE 46
                                                                <>                                                            SI-112-2-SW-2 PENETRATION 37 VENT            Sl-112-2-SW-3 34'-0'L ~
Sl-112-F W-8                          Sl-112-5-SW-1 Sl-112-2-SW-4 T-6"                    ~o4, EL                                                                  ~ Sl-112-2-SW-1
                                                    ~
Sl-112-5-SW-2 Sl-112-FW-5                                                              ~~                1p Sl-112-4-SW-I
                                                ~                  ~
Sl-112-2-SW-5
                                                                                                              ~ ~~
Sl-112-2-SW-B
                                                                                                                                            ~
                                              ~
Sl-112-FW-3 Sl-2408-135          Sl-2408-123 SI-2408-133                                                                                                Sl-112-2-SW-7 FLOOR  EL 19'-6                                  SI-2408-125
                                                                                                ~                                  ~    SI-112-FW-2A Sl-112-FW-4 EL.
                                                ~
10'-8" Sl-2408-126
                                                              / 6'~
                                                                              ~              o1I                                      FLOOR 51-2408-114 EL 0'-6" SI-112-3-SW-4
                                                    ~
                                                              ~ ~ ~
Nt SI-112-3-SW-1                                        Sl-112-2A-SW-1 0 Sl-112-3-SW-2                            Sl-112-3-SW-3 SI-112-2A-SW-8 Sl-112-FW-2 SI-112-1-SW-4      ~
DWG.
CONT. ON 02-087-G ZONE 87  ~                ~
EL    7'-4" Sl-112-I-SW-3 Sl-112-2A-SW-9 26 34'H 3-2408-106    ~                            6' LEGEND e" x 3                                        ~        SHOP WELD Sl-112-FW-1                                    RED. TEE FIELD  M.D SI-112-1-SW-1 CH-146-FW-16      EXAMINATION AREA
                                                                      ~ >/                  ~ I-1-Sl-236 CONT. ON                        w7 DWG. 02-043-E g                312      X                                                              I-6 -SI-112    SPOOL PIECE NO.
ZONE 43                    V 3810        DRAIN                                                      V-3124    VALVE DESIGNATION REFERENCE DRAWINGS                    NOTES                                      CAUBRATION BLOCKS AND MATERIAL                                        FLORIDA POWER R LIGHT Sl-N-8 REV. 18          THE CONTINUATION AT DWG. 02-046 DOES NOT                                                                                                ST. LVCIE UNIT 2 MATCH THE CONFlGURATlON FOR THIS DWG.                  6"          4OS                                    TITLE: LPSI PUMP 2A DISCHARGE HEADER PIPING e"          160                  SA-312, TP-304 DATE:  7/14/93      KK              ZONE: 43 avmm    er.              DRA'NNC NC.:
CPERATING PRESS. 2235  OPERATING TEMP. 330                                                                                            02-043-F'
 
Sl-464-3 SW-2A-LS                                                                                                                                LEGEND Sl-464-3-SW-2                          Sl-464-3-SW-3                                                                                            ~      SHOP WELD Sl-464-3-SW-1-LS                                      Sl-464-3-SW-3-LS                                                                                          BELD WELD Sl-46+-3-SW-I                                              Sl-464-3-SW-4                                                                          CH-146-FW-16    EXAMINAllON AREA
                                          //0                      Sl-464-3-SW-4A-LS
                                                                /+
1-6"-SI-112    SPOOL PIECE NO.
                                                                    ~  Sl-464-3-SW-5 Si-666-2-SW-6-99 V-3144    VALVE DESIGNATION CONT. ON  ~~ i~ >~ 'ONT. PN DWG. 02-044-B ZONE 44 4          DWG. 02-044-F ZONE  44  i        <04
                                                                            ~r~ ~
Sl-464-3-SW-6 S'- 64-F" I-1/2-Sl-168 10    10  X 6                                      ' V-3<0<
                                                                                                  ~
X I-1/2-SI-166                        RED.                                      E      T-f-Sl-175
                                                                          /~
Sl-464-3-SW-6A-LS
                                                                                                  /'-3141
                                                                                      ~ ~~                          I-l/2-SI-429 10" X 6 CONC. RED.
                                                                                                          )  'Y iy 3142CONT. ON Sl-464-I-SW-2 1-1-61-266                      //        ~/ZONE DWG. 02-143 116 DRAIN                        E-33    21  (SNUBBER V 3937  E Sl-464-1-SW-I SI-464-2-SW-4 Sl-464-2-SW-I SI-464-FW-903 6" X6 X4 RED. TEE
                                                                                                                                  ~EL. 0'-9' Sl-464-2-SW-3                              Sl-464-FW-909 S!-464-FW-907 EL. 2'-1"
                                                                                                                                  ~      8-46 4 -FW-2 V-31 44 CONT. ON DWG.
ZONE 02-044-D 44
                                                                                                                                                        ~
HCV-3645 SCH. 409
                                                                                                                        ~
SCH. 160 Sl-146-FW-1                      cd                  Sl-148-FW-2 Sl-l46-1A-SW-1                                          SI-2410-950
                                                                                                                                            % Jy 3636  I-1-SI-266 DRAIN Sl-148-1 A-SW-2 REFERENCE DRAWINGS                            NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                        FLORIDA POWER L LIGHT SI-N-4 REV. 19                ITEMS ON SCHEDULE 40S ARE EXEMPT PER TABLE                                                                                              ST. WCIE UNIT 2 Sl-N-6 REV. 17                I WC-2500-1 6            4OS    T  ~ .365"                      TITLE: LPSI PUMP 2B DISCHARGE HEADER PIPING (T<375 )                                                                    T  = .719 SA-312, TP-304 6            160 10"          20, 30, 40S      T~.250, .307', .365  DATE:  7/14/93      KK          ZONE: 44 OPERATING PRESS. 450  OPERARTING TEMP. 300                                                                                        DRAWNC NQ CPERATING PRESS. 2235  CPERATING TEMP. 300                                  UT-36                                                    02-044-C
 
h t
P
 
~0                    DWG.
CONT. ON 02-044-E SI-1IO-5-SW-2 EL.
ZONE 44 Sl-110-5-SW-3
                                  ~
2'-6"
                                    ~~
                                      ~
Sl-110-5-SW-4 Sl-I I 0-F W-5 3-110- F W-901
                                                                          ~4,0 SI-241 0-1190 Sl-110-5-SW-5 Sl-110-FW-3 Sl-110-FW-904
                                                                                            ~ r
                                                                                            ~
SI-110-4-SW-1 WALL
                                                                                                                        ~      Sl-2410-115 Sl-110-F W-4
                                                                                                                                ~ Sl-110-3A-SW-1 Sl-241 0-109 Sl-110-FW-2 EL SI-110-1-SW-5 Sl-110-1-SW-4 6'-5" DWG.
Sl-241 0-103 CONT. ON 02-087-D ZONE  87        )
                                                                                                                        ~
                                                                                                                +~ Sl-110-FW-903 Sl-110-FW-002
                                                                          ~
Sl 240 l4 1
DRAIN                                  LEGEND Sl-110-1-SW-15                                M  Sl 110 1      SW 2 6"                                                            ~          SHOP WELD Sl-110-FW-1                                            X 6" X BELD WELD 3'ED.
TEE DWG.
cows. os 02-044-C V-31 44 W
                                                                    ~f  'I-2410-101      SI-241 0-98 Sl-110-1-SW-1                                          CH-146-FW-16 EXAMINA'IION AREA l-6"-Sl-112 V-3144 SPOOL PIECE NO.
VALVE DESIGNATION ZONE 44 REFERENCE DRAWINGS                          NOTES                                      CAUBRATION BLOCKS AND MATERIAL                                        FLORIDA POWER dc LIGHT Sl-N-6 REV. 17                                                                                                                                                            ST. LUCE UNIT 2 TITLE: LPSI PUMP 28 DISCHARGE HEADER PIPING 160                    SA-312, TP-304 DATE:  7/14/93      KK              ZONE: 44 RCVKWED RYS            ORA%INC RO.I CPERATTNG PRESS. 2235  OPERATING TEMP. 330                                UT-38                                                          02-044-D
 
CONT. ON DWG. 02-048                      re V  3819 ZONE  48                    cs        I-I-Sl-245 VENT PENETRATION 39 6'~~          10'18'30"H        Sl-2410-143 Sl-110-FW-10              '>o
                                                                ~
SI-110-FW-9 EL 14'-3 St-110-0-SW-1            ~EL    34'-0"                                                Sl-110-FW-7 SI-2410-139 FLOOR EL.
                                                              ~
19'-6" Sl 110  7-4 S-S  4-~-
6-~ o+
Sl-110-6-SW-I SI-110-6-SW-2 Sl-110-FW-8    ~        45'H
                                                                                      ~ ~    Sl-110-7A-SW-3 S1-2410-134 El  7'-6" 9-2410-128 Sl-110-6-SW-3
                                                                                                                                      ~
Sl-110-7A-SW-1                      Sl-110-7A-SW-2 Sl-110-FW-6 Sl-110-6-SVl-4
                                                                                                                                                  ~ ~
4 Sl-110-5-SW-I                        Sl-2410-124 FLOOR EL. 0'-6 LEGEND
        ~        SHOP WELD FIELD WELD                                                                                                                      CONT. ON CH-146-FW-16                                                                                                                                      DWG. 02-044-D EXAMINATION AREA ZONE 44 1-6"-9-112    SPOOL PIECE NO.
V-3144    VALVE DESIGNATION REFERENCE DRAWINGS                                NOTES                              CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT Sl-N-6  REV. 17                                                                                                                                                    ST. LVCIE UNIT 2 TITLE: LPSI PUMP 28 DISCHARGE HEADER PIPING 6            160    T=.719    SA-312, TP-304 7/14/93    KK                  ZONE: 44 RCYEl%D QR            ORAWNC NO CPERATING PRESS. 2235  OPERATlNG TEMP. 330                          VT-38                                                    02-044-E'ATE:
 
V7 DWG.
CONT. ON 02-047 P
                  )      V-3813 X ca  ~ I-I-Sl-239
                                                ~
ZONE 47                          VENT 1513'10 H        Q-2410-6 PENETRATlON  38
                                              ~
SI-111-FW-9                                    Sl-111-FW-8 61-1 11-6A-6W-3          ~EL. 34'-6"
                                                                                        ~
SI-111-6-SW-1 EL 19'-6"                EL 14'-3'
                                            ~
FLOOR Sl-2410-1401 Sl-2410-10 Sl-111-6-SW-2 Sl-111-6A-SW-2  ~                Sl-111-6A-SW-I Sl-111-6-SW-3 SI-111-6-SW-4 EL  T-6" Sl-111-FW-904    ~                      SI-111-FW-6 Sl-111-5-SW-3 FLOOR EL  0'-6
                                                                                                      ~              Sl-111-F W-802 Sl-111-FW-5
                                                                                                                                ~
SI-111-4A-SW-1 Sl-111-FW-803
                                                                                                                                                            ~    SI-111-4A-SW-4.
                                                                                                  ~~
Sl-111-FW-905
                                                                                                                        ,6  ~6P+
Sl-2410-28
                                                                                                                                                        ~
LEGEND SI-2410-21                                                                            WALL
        ~      SHOP WELD                                                          Sl-111-5-SW-2 2'-6"                  Sl-1I1-5-SW-1      3-2'110-28 FIELD WELD                                                              EL CH-146-FW-16    EXAMINAllON AREA                                                                                                                                          CONT. ON I-B=SI-112  SPOOL PIECE NO.                                                                                                                                          050. 02-044-F ZONE 44 V-3134  VALVE DESIGNATlON REFERENCE DRAWINGS                            NOTES                                CALIBRA'nON BLOCKS AND MATERIAL                                  FLORIDA POWER ch LIGHT Sl-N-7  REV. 14                                                                                                                                                ST. LUCK UNIT 2 6"        40S    T~.280"                    TITLE: LPSI PUMP  28 DISCHARGE HEADER PIPING 8          160    T .719'A-312,      TP-304 DATE:  7/14/93      KK              ZONE: 44 RCYEKD OY6            DRA'NNC N0.3 OPERAllNC PRESS. 2235  OPERATIIIG  TEMP. 330                        UT-38                                                  02-044-G'
 
4' CONT. ON 02-043-0
                                                                                                            ~
DWG.
ZONE 43 Sl-4200-6307
                                                                                                          ~
SI-113-7-SW-I Sl-113-FW-7 Sl-113-FW-8 PENETRAllON 36 Sl-113-8-SW-1
                                                                                                          ~                AAI Sl-4200-6306 Sl-113-7-SW-3 Sl-113-FW-9  ~
Sl-4200-310              ~
SI-113-7-SW-2 Sl-113-9-SW-1
                                                                                                                                  ~
CONT. ON 01'N. 02-022 ZONE 22                                                                                                                          Sl-4200-314A
              ~    45'H SI-113-FW-13 III SSI-113-FW-10 V-3259          Sl-113-12-SW-1
        ~CLASS CLASS 2 1
                      ~            ~    Sl-4200-6330                                          Sl-I13-FW-11
                                                                                                                ~ ~
Sl-113-12-SW-2                                      SI-4200-3288 Sl-4200-322B
                                                                                                ~                                    Sl-4200-318
                                                                                                                  ~    Sl-4200-322A LEGEND 0            SHOP FIELD SI-4200-3220 Sl-4200-326A Sl-113-FW-12 X            FIELD SELD Sl-112-FW-7        EXAMINAllON AREA I-8"-SI-112-7        SPOOL PIECE NO.
V-3227            VALVE DESGNATION REFERENCE DRAWINGS                          NOTES                                                AND MATERIAL Sl-N-16 REV. 15                                                                  6'ALIBRATION BLOCKS                                                      FLORIDA POWER dc LIGHT lHE CONFIGURATION AT  DWG. 02-043-D  DOES                                                                                  ST. LUCIE UNIT 2 NOT MATCH THE CONFIGURATION FOR THIS DWG.
160    T~.719      SA-312, TP-304          '1 llTLE: SAFETY INJECTION PIPING TO TANK 2A2 INSIDE CONTAINMENT DAlE:  7/12/93        KK              ZONE: 45 RVIEKD QYS                DRAWNC RO.C OPERAllNG PRESS. 2235  OPERATING  TEMP. 330                  UT-38                                                          02-045 '
 
'0 EL. 34-0 SHOP WELD                                                                                              pSOCTOAOOO ST            Q    CONT. ON DWG. 02-043-F FIELD WELD                                                                                                                            ZONE 43 Sl-112-FW-7      EXAMINATION AREA                                                                  Sl-4201-702  ~
I-6 -SI-112-7 V-3227 SPOOL PIECE NO.
VALVE DESIGNATION                                                          Sl-112-7-SW-3
                                                                                                                  ~ ~                                Sl-112-FW-7
                                                                                                                    ~~ ~
8-4201-7061 Sl-4201-7062 Sl-112-7-SW-2 33'-3" 3-112-7-SW-1 3-112-FW-8    ~              EL SI-112-8-SW-I  ~~
SI-112-FW-9 Sl-4201-7111 Sl-4201-711 Sl-1 12-9-SW-5 CONT. ON 05Q. 02-021    J                  Sl-112-FW-16 ZONE 21 +~V-3258 7
                                        ~~    Sl-4201-7391
                                                                                                                                                    ~
                                                                                                                          ~
Sl-112-FW-10 CLASS ClASS 2 1
Sl-4201-736B SI-4201-730B 8-4201-7171 8-112-FW-ll                            ~          8-4201-7112 Sl-4201-7141 Sl-4201-736A  ~                                                      Sl-4201-724
                                                                                                                          ~
Sl-112-FW-15
                                                        ~                                                                            St-420<-7201A 3-4201-733 SI-112-F W-1 4 SI-4201-730A      Sl-1I2-FW-13
                                                                                                            ~              SI-4201-7201 Sl-4201-7231 SI- l12-FW-12 B
REFERENCE DRAWINGS                                NOTES                    CAUBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER 8c LIGHT Sl-N-16  REV. 15                    THE CONTINUATION AT DWG. 02-043-F DOES NOT MATCH THE CONFIGURATION FOR THIS DWG.
160  T~.719    SA-312, TP-304          'l                      ST. LUCIE UNIT 2 TITLE: SAFETY INJECTION PIPING TO TANK 2A1 IN30E CONTAINMENT 7/12/93        KK            ZONE: 46
                                                                                                                                                                      'ATE:
RCVKWED SYS              ORAWHC NO OPERATING PRESS. 2235  OPERATING TEMP. 330              UT-38                                                        02-046
 
il '
CONT. ON DWG. 02-023    15%
ZONE 23        y  3260    Sl-111-FW-10 CLASS I CLASS 2
                                                                    ~qG
                                                                      $/  1 1g PENETRATION 38 Sl-111-FW-903                        CONT. ON DWG. 02-044-G ZONE  44 lEGEND
                                                                                                                                                ~      SHOP WELD 3S(      FIELD WELD CH-146-FW-16      EXAMINATION AREA 1-6'-Sl-112    SPOOL PIECE NO.
V-3280    VALVE DESIGNATlON REFERENCE DRAWINGS                  NOTES                                CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT SI-N-18 REV. 12                                                                                                            -"  &#xc3;C%.              ST. LUCIE UNIT 2 160    T~.719"  SA-312, 1P-304  TITLE: SAFETY IN'IECTlON PIPING TO Sl TANK 2B1 INSIDE CONTAINMENT DATE:  7/12/93      KK            ZONE: 47 RYE            ORAWNC RO 2235  OPERATlNG
                                                                                                                                                              'CVKKD CPERATING PRESS.                  TEMP. 330                        UT-38                                                    02-047
 
L Sl-110-BA-SW-1 Sl-4203-701 EL 32'-0'X                                                Sl-110-BA-SW-4 SI-110-BA-SW-5 Sl-4203-11 45V
                                                                                                                                                      ~    Sl-4203-201 Sl-110-FW-801 SI-110-9-SW-1                                    yr
                                                    ~                                                                                        18'30                  PENETRATION 39 Sl-110-FW-11 L  SI-110-8A-SW-3
                                                                                                                                                                          ~EL.
                                                      ~      45'l-110-FW-908 Sl-110-8A-SW-2 0WG.
ZONE 34-0'ONT.
ON 02-044-E 44 Sl-110-10-SW-2
                                                                              ~
11 EL. 30'-0 Sl-110-10-SW-1 SI-110-FW-12 Sl-110-11-SW-1
                                                          ~
                                                          ~
                                                                                  ~        Sl-4203-19 Sl-4203-24A Sl-110-FW-13
                                                    ~  0 Sl-4203-24C ~                                                                                                                                          LEGEND
                                                    ~
y/                                                                                                                            0                SHOP WELD Sl-110-FW-14 X                FlELD WELD CONT. ON    V-3261                        Sl-4203-248                                                                                          CH-146-FW-16                EXAMINATION AREA 02-024 DWG.
ZONE
                ~fl 10 24 0
                            ~  r        ~CLASS 2 CLASS  1 l-6 -SI-112              SPOOL PIECE NO.
Q                                                                                                                                            V-3261              VALVE DESIGNAllON REFERENCE DRAWINGS                              NOTES                                            CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER Ec LIGHT Sl-N-19 REV. 15                                                                                                                                                                ST. LUCIE UNIT 2 6      160    T  719. SA 312  TP  304 llTLE: SAFETY INJECTION PIPING              TO Sl TANK 2B2 INSIDE CONTAINMENT DATE:    7/12/93      KK                    ZONE: 48 RCVEIKQ  RYE              DRA'NNC RO.E OPERATING PRESS. 2235  CPERATING TEMP. 330                                    VT-38                                                                02-048'
 
1-2701            1-2702 1-2742-2 1-2742-3 CONT. ON DWG. 02-187-A ZONE 187 1-2742-1 VIEW A-a OUTLET CLASS 2  CLASS 3 VIEW A-A 1-2741-2 1-2741-3 1-2741-1 VIEW A-A INLET REFERENCE DRAWINGS              NOTES                              CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT ST. LUCIE UNIT 2 SA-516, GR-70  TITLE: SHUTDOWN COOUNG HEAT EXCHANGER 2A 1 T      N/A DATE:  7/12/93      KK          ZONE: 55 REVVED RY:            DRAWNC Ra UT-56                                                  02-055 '
 
LEGEND SI-208-1-SW-3
            ~
CH-146-FW-16 SHOP WELD BELD WELD EXAMINATION AREA                                                                                                            Sl I-2-SI-206 2081 SW7            ~~            0            ~
EL.          3'-9 Sl-208-I-SW-4 I-6 -Sl-112 V-3656 SPOOL PIECE NO.
VALVE DESIGNATION DWG.
Sl-2416-524 Sl-105-2-SW-CONT. ON 02-087-G ZONE 87y
                                                                      ~
SI-105-2-SW-9
                                                                                                  ~*
Sl-105-F W-2 SI-105-1-SW-5 r fxV-3691 Sl-241 6-378 Sl-208-FW-901 Sl-208-I-SW-1
                                                                                                                                                            ~ ~                      cd
                                                                                                                                                                                                    ~EL.
SI-208-1-SW-5 PUMP 2A CONT. ON 5'-2'PSI V-3417                                            I-3/4-Sl-572                                                                          DWG. 02-098-A I-1-3-13                                                          l-3/4-Sl-104                  CONT. ON                            S(  208  FW  1 98 VP                0+~                                                      DWG. 02-087-A                                            ZONE Sl-105-2-SW-6 DWG.
CONT. ON 02-067-I                                            r  fY
                                                                                                      ~    Sl-105-1-SW-4                ZONE 87 V-3427 r'A W
OWS. 52-887-A ZO~,87P                                              " V-3416                          ZONE  87                  ~ iV-3547                SI-208-FW-2
                                                                                    ~
6
                              ~
V 3875  x                                    CONT. ON                                I I-I-Sl-336                                            DWG. 02-091                    03 15 J          Sl-105-1-SW-7
                                                                                                                    ~
SO f
Sl-105-FW-901
                                                                                                                                                                                      ~S
                      ~
SI-105-2-S'W-3 Sl-2416-48                                                                                    /    qO~                2121 SW8 Sl-105-2-SW-I
                ~
Sl-105-2-SW-2 6
Sl-241 6-4846 Sl-105-1-SW-3 SI-105- 1 -SW-2 8 X 6" X 3" RED. TEE
                                                                                                    ~~                      4 Sl-380-FW-1 St-212-1-SW-5 Sl-2416-44          ~ ~                            Sl-212-FW-901
                                                                                                                                ~
X4'ONC.
RED.
El    12'-10 Sl-105-1-SW-I                                  V-3656                                  SI-212-1-SW-6
                                                                                                                                                                            ~
I Sl-105-FW-1 Sl-128-FW-I                                                                                                                                  /~
                                                                                                                                              ~8~
I          SI-212-1-SW-4.
SI-212-FW-I
                                                                                                                                                    ~
I CONT. ON                                                              Sl-2416-44
                                          /~                        SI-128-1-SW-3                            DWG. 02-087-C SI-2416-58                                                                                ZONE 87            Sl -212-I-SW-I                              Sl  212 1 -SW-3
                                                      ~)    Sl-241 6-630 o4,  48
                                                                                                    ~4" X2  CONC. RED.
6" X  6" X 3'ED.
TEE Sl-212-1-SW-2 SI-21 2-1-SW-13
                                                                                                                                                                          ~pl                            8'-3" SI-128-1-SW-I
                                                                                      ~~ I CONT. ON SI-128-1-SW-4 I-2-Sl-108 I 1  Sl  326 DRAIN        zxsy EL Sl-128-1 -SW-2            DWG. 02-087-E ZONE 87 REFERENCE DRAWINGS                                    NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                                            POWER dc LIGHT SI-N-14  REV. 23                                                                                6"                                                                                          ST. LUCIE UNIT 2 120      T~.562*    SA-312. TP-304                                                      'LORIDA 6"          160      T~.719      SA-312,  TP-304          TITLE: HPSI PUMP 2A TO HEADER A 3          160      T~A38"      SA-312,  TP-304 4%          40S      T~.237"      SA-312,  TP-304          DATE:    7/20/93        KK              ZONE: 61 OPERATING PRESS.        2400  OPERATING  'TEMP. 300                                                                  aaVnm    ex2              ORA%INC IIL:
OPERATING PRESS.        1450  OPERAlING  TEMP. 300                            UT-38                                                                    02-061
 
CONT. ON                        Sl-211-FW-901 DWG. 02-096                              SI-211-I-SW-2 ZONE 96 I
                                                        ~
SI-211-I-SW-7                  ~p9 Sl-211-I-SW-4                                                              SI-211-1 -SW-I
                                                                                          ~EL.      5'-2 Sl-2I1-1-SW-5                      ~                          HPSI PUMP 28 CONT. ON DWG.
ZONE 02-09B-B 98 I-I-SI-161
                                                                                                                                                                        ~T V-3501
                                                                                                                                                                              <<1 CONT. ON OWG. 02-094-A A ZONE 94 Sl-211-FW-1                              V-341 4 Sl-21 3-2-SW-9
                                                                                                                                                                                              ~6          X4" CONC. RED.
Sl-211-FW-2                                                                                          ~0 SI-21 3-2-SW-5 SI-213-2-SW-B Sl-213-I-SW-5 Sl-241 5-21 61                    ~            ~      CONT. ON DWG.
ZONE 02-094-A 94 SI-2415-1518 r l-l/2-SI-225
                                                                                                                                      ~g(
                                                                                                                                            ~
V-341 2 >4M C ONT. ON DWG.
ZONE 02-087-F 87 EL
                                                              ~                                                  SI-21 3-2-SW-4
                                                                                                                                  ~                                  CONT. ON DWG.
ZONE 02-087-0 87 8'-3'l-213-I-SW-9 Sl-213-1-SW-8 6" X 6"
                                              ~
X 3'ED.
Sl-213-1-SW-6 Sl-21 3-1-SW-7 EL  1'-3 3-2415-208                ~      Sl-213-2-SW-3 TEE                                                SI-241 5-2141 SI-213-1-SW-10                                          V-3920 0
I-3/4-Sl-21 4
                                                                            ~~,
J k T  ~    I-1-Sl-359 p
I-I-Sl-327 DRAIN VENT I-3/4-SI-573        <Iy 3406      ~ 8-2425-213 WELD ONLY
                                                                                                                                                            <<+
V-3879                18                  VV-367                                                    LEGEND V 3654 SHOP WELD Sl-213-FW-1
                                                                                                              ~
Sl-213-FW-2                                          Sl-21 3-FW-904                              3I(      FIELD WELD CH-146-FW-16        EXAMINATION AREA Sl-241 5-211                                                                        l-6 -SI-112      SPOOL PIECE NO.
8-213-2-SW-1                                                                  V-3654      VALVE DESIGNATION REFERENCE DRAWINGS                                                    NOTES                                    CALIBRAllON BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT SI-N-14 REV. 23                                      <<<<SUPPORT REMOVED, WELDED LUGS REMAIN                                                                                                    ST. LUCIE UNIT 2 6          120    T~.562    SA-312, TP-304    TIRE: HPSI PUMP 28 TO HEADER B 3          160    T .438"  SA-312, TP-304 DATE:  7/20/93        KK              ZONE: 62 ORANNC NK:
OPERATING PRESS. 1450 -  OPERAIING TEMP. 300 REVISED 8Y:
02-062 '
 
MS-28-1-SW-2-LS MS-4100-'I                        V  /          MS-2B-I-SW-2 XV-8100
                                      ~
OA MS-28-I-SW-3                                  Ch            MS-28-1-SW-I MS-28-I-SW-3A-LS                                            I"                          93'-I"                                                          MS-28-3-SW-I
                                    ~
VENT                EL.
MS-28-1-SW-3B-LS MS-28-FW-1
                                    ~
FLOW I-34-MS-28
                                                                                ~
1-36-MS-52  ~
                                                                                                  /      MS  52-FW-IA-Ls MS-52-FW-I B-LS                                          EL. 45'-3
                                                                                                                                                              ~
MS-28-FW-I-LS                                      36" X 34"                          MS-52-FW-1                                                  MS-28-3-SW-IA-LS CONC. RED.                                                                                        MS-28-3-SW-I B-LS MS-28-1-SW-I A-LS MS-28 SW-18-LS                          MS-201-208                                                  MS-4100-101 III
                                                                                                                                  ~EL. 45'-5' MS-4100-51 STEAM                                                              MS-28-FW-+
GENERATOR 2A oe    e CONT. ON                                    (v    /
DWG. 02-041 FE-8011                                                            ZONE 41                                        ~/
                                  ~R              7 MS-28-2-SW-I-LS EL 44'-6"
                          ~EL. 52'-8 MS-28-FW-3 MS-4100-13 MS-28-FW-4-LS
                                                                                                                                      ~ ~              /5
                                                                                                                                                          ~  MS-28-FW-4A MS-28-FW-4AA-LS MS-28-FW-4AB-LS MS-28-FW-3-LS
                                    ~                                                                                              MS-4100-15      ~~          EL 44'-6"
                                                                                                                                              ~ ~
FLOOR  EL  62'-0
                                            ~  III
                                                  ~                                                                                  ~
MS-4100-16B                          MS-28-FW-5 LEGEND CH-146-FW-16 SHOP WELD FIELD WELD EXAMINATION AREA
                                            ~            MS-4100-9 MS-4100-6079 MS-4IOO-ISA MS-28-FW-6 20'H EL. 36'-0" MS-28<<FW-5A-LS MS-28-FW-5B-LS MS-28-5-SW-1 1-6 -SI-112  SPOOL PIECE NO.                                                                              CONT. ON                                MS-4100-6082A DWG. 02-065-A V-02-03    VALVE DESIGNAlICN                                                                              ZONE 65                          MS-28-5-SW-I-LS PENETRATION I REFERENCE DRAWiNGS                                NOlES                              CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER 4c LIGHT MS-L-I  REV. 20                    FROM WELD  MS-28-SW-I IS SUBJECT TO SRP 6.6.
TO PENETRATION                                                                'PE                ST. LUCIE UNIT 2 34"                          SA-155, KC-65    lllLE:  MAIN STEAM LINE 2A1 INSIDE CONTAINMENT CL I DATE:  7/I 4/93    KK              ZONE: 63 DRAWNC OPERATING PRESS. 885 OPERATING    lEMP. 532                      UT-45                                                        Na'2-063 '
 
MS-53 FW-1A-LS                          MS-29-1-SW-1 MS-53-FW-1B-LS          23                    MS-29-1-SVf-1A-LS I                    MS-29-1-SW-18-LS
                                                                                                                                        ~
M 36" X 34 I
CONC RED.
MS-29-FW-5A                                                      MS-53-FW-1                        2' MS-29-1-SW-2 MS-29-FW-5AA-LS                              MS-4101-31                                                    X V-8132 OC                EL 88 '-10 MS-29-FW-5AB-LS                                          MS-41 01-31 08                                      I.          MS 29  1-SW-2-LS MS-4101-305 ~
EL 36'-0                                                        MS-201-208 STEAM GENERATOR 2B O                  MS-41 01-320 MS-29-1-SW-3 MS-29-FW-6  ~        922 EAE I
2/2 I
SLOPE MS-29-FW-901-LS OA MS-29-FW-5-LS DWG.
CONT. ON 02-042 ZONE  42 MS-4101-319
                                                                                                                                      ~EL  93'-'I MS-29-1-SW-3A-LS MS-29-1-SW-38-LS MS-29-FW-1 MS-29-6-SW-1
                                            ~
I EL 36'-0                                                  MS-29-2-SW-1              III
                                                                                                                                                          ~  MS-29-FW-1-LS MS-4101-3048 MS-29-2-SW-I-LS~~
MS-29-FW-6A-LS
                                                  ~
MS-4101-3021A MS-29-FW-68-LS FE-8021 MS-4101-3044 MS-29-FW-7                                                                                                                        62'-9'
                                                                                                                                  ~EL MS-29-6-SW-1-LS                                                                    MS-29-FW-3 EL 62'-0" CONT. ON  ~
0WG. 02-066-A ZONE 66 C.
PENETRATION 2
                                                                                                                                                              ~    MS-4101-314 MS-29-FW-3-LS                    III~
LEGEND MS-4101-313 E            MS-4101-31 5
                                                                                                                                                        ~
I MS-29-FW-4 SHOP WELD                                                            MS-4101-31  OA                                                        MS-29-3-SW-1 FIELD WELD                                                                                                                                MS-29-3-SW-1A-LS MS-29-FW-7    EXAMINA'IION AREA                                                                                                                        MS-29-3-SW-1B-LS I-34"-MS-29-6    SPOOL PIECE NO.                                          OA                                                                          EL 45'-3 V-08-125  VALVE DESIGNATION                                                                                                    MS-29-EW-4-LS MS-29-FW-5 REFERENCE DRAWINGS                          NOTES                              CALIBRA'IION BLOCKS AND MATERIAL                                      FLORIDA POWER k LIGHT MS-L-2  REV. 20                  FROM WELD MS-29-6-SW-1 TO PENETRATION                                                                                            ST. LUCIE UNIT 2 IS SUBJECT TO SRP 6.6 34"                        SA-155, KC-65          TITLE: MAIN STEAM LINE 281 INSDE CONTAINMENT CL1 DATE:    7/14/93        KK          ZONE: 64 REVEl%D  RYE              DRMkNC RQ OPERATING PRESS. 865 OPERATING TEMP. 532                          UT-45                                                          02-064 '
 
LEGEND SHOP WELD                                                                                                    CONT. ON DYE. 02-065-B FIELD WELD                                                                                                  ZONE 65 MS-I-SW-P1    EXAMINATION AREA I-35.5"-MS-I- I  SPOOL PIECE NO.                                                                                                          MS-I -SW-P1 V-8212                                                                                                                    I VALVE DESIGNATION NSC MS-I-SW-P1-LS MS-I-I-SW-9                                    MS-I-FW-1 CLASS 2                                                        EL MS-1-1-SW-8              NSC                                                                          38'-8'ONT.
ON
                                                                                                ~CLASS  2 NSC                            V-8212822 I                                            DWG.          02-063 CLASS 2 X                                            ZONE 63 I
V-8201              O NSC                                          Cll          I                        PENETRATION    1 MS-I-I-SW-6                                      V 8202 i CLASS 2                                            I MS-I -FW-1-LS NSC MS-1-1-SW-5                                                                      I I          I V-8203        V)
NSC                                                                                          MS-79-FW-905 MS-1-1-SW-4                                                        E I
I
                                                                                                                                ?          MS-I-I-SW-30 MS-I-I-SW-3          NSC                        V-8204  I                  I E
MS-1-1-SW-29 NSC                        V-8209 I          I          MS                              MS-1-1-SW-28 MS-1-1-SW-2      CLASS 2                                          I                              MS-1-1-SW-27 V-8210  I          I                                                                                                        CONT. ON U)
E          I                                    MS-41 02-2305                                                        DWG. 02-168 V-8211              I                                                                                                                    ZONE 168 N                                            M S- I-I-SW-22                                                                      (SNUBBER)
I I
M S-I -I -SW-21                                                            MS-1-1 -SW-1 I                                                                                      I-3-MS-102 MS-1-1-SW-20                                                          BYPASS                                                      OA I
                                          ~    MS-1-1-SW-19                                              MS-32-FW-I-LS HCV-08-1A
                                                                                                                                                                        ~1"    DRAIN CONT. ON Oa                    MS-1-1-SW-1 8 DWG. 02-164 ZONE 164                                    SS                  MS-1-1-SW-I-LS (SNUBBER)                              MS NSC                  MS-1-FW-2 CLASS 2                  MS-4 202-2721 I
MS-32-FW-1 2014 MS-4102-2705 REFERENCE DRAWINGS                            NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER IIE,'LIGHT MS-L-I  REV. 20                ITEMS APPLICABLE TO SRP 6.6 ARE IDENTIRED                                                                                            ST. LUCIE UNIT 2 IN THE INSPECTION PLAN 35.5"                                                11TLE: MAIN STEAM LINE 2A1 OUTSIDE CONTAINMENT SA-155, KC-65 CLl 10"        160      T=1.125"    A-106, B DATE:    7/12/93    KK            ZONE: 65 REVEALED 9YS            DRANNC NO.S OPERATING PRESS. 885 OPERATING  TEMP. 532                    UT-44, UT-46                                                      02-065-A
 
MS-124-FW-I MV-08-18A
                  ~CLASS 2        /'\I                  MS-1 24-1-SW-2 NCC    I
                                                      ~ MS-124-1-SW-I ATMOSPHERE          8  X10~
CONC. RED.
MV-08-14
                                                      ~
MS-120-FW-2 MS-120-FW-I
                                                                  -a. M  Oy          MS-79-1-SW-2 MS-79-1-SW-3
                                                                          ~0 10  XS~
CONC. RED.
MS-79-1-SW'-4 MS-79-I-SW-1  ~  5
                                                                                                                <o~
                                                                                                                +s MS-79-,1-SW-5 10    X 8    ~pg    MV 08 15 MS-41028-l902 ~          I H        CONC. RED.
MS-121-FW-1 MS-122-FW-2 MS-125-1 -SW-1 MS-125-1-SW-2 8'  10"              Ig                  MS-125-FW-1 CONC. RED.
CONT. ON                                                  '+s                P LEGEND                                                                                  02-000-A OWG.                                                                MV-08-19A ZONE 65                                                CLASS 2
          ~        SHOP WELD                                                                                                                          NCC FIELD WELD MS-1-SW-PI      EXAMINATION AREA I-10 -MS-79-1  SPOOL PIECE NO.
A'TMOSPHERE TO  +
MV-08-15        VALVE DESIGNATION REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT MS-L-13  REV. 1l                                                                                                                                              ST. WCIE UNIT 2 8          160    T=.906      A-106, B        TITLE: MAIN STEAM LINE 2A1 OUTSIDE CONTAINMENT 10"        160  T=1.'I 25"    A-106, B DATE:  7/12/93      KK            ZONE: 65 RCVENG) SYS              DRAWNC NO:.
CPERATING PRESS. 885  OPERATING  TEMP. 532                  VT-48. UT-48                                                  02-065-8
 
F J,
 
LEGEND MS-I-SW-Pl I-35.5'-MS-1-1 V-8207 SHOP WELD FIELD WELD EXAMINATION AREA SPOOL PIECE NO.
VALVE DESIGNATION MS-3-1-SW-8 MS-3-I-SW-7 CLASS 2 MS-3-I-SW-9 CLASS 2 NSC CLASS 2 NSC V-8206 CO l
NSC MS-80-FW-1 CLASS V-8205 2
V-8216 IQ I
(A I
I CONT. ON DWG.
ZONE I
I 02-066-8 66 CI CO O
I I
I
                                                                                                                                                ~
PENETRATION 2 MS-3-FW-1-LS MS-80-FW-4 MS<<3-SW-P2-LS EL
                                                                                                                                                                                ~CONT.
DWG.
ZONE MS-3-SW-P2 MS-3-FW-1 36'-0" ON 02-064 64 MS-3-1-SW-6    NSC                                                                                  MS-3-I-SW-30 CLASS 2            V-8207            E                                            MS-3-I-SW-29                          CONT. ON I
MS-3-I-SW-5      NSC                                  CO I
DWG. 02-163 MS-3-I-SW-28                                      ZONE 163 CLASS 2            V-8208                '5                                                                                        (SNUBBER)
                                                                                                                                                                      ~
MS-3-I-SW-4        NSC E      c~
MS-3-1-SW-27
                                                                                    ~
CLASS 2              V-8213                                                                                                                          I            QA NSC I        I MS-4102-2931 MS-3-1-SW-3                                      M I
CLASS 2              V-8214                                            MS-4102-2999 NSC V-8215 tO I
MS-3-1-SW-22                                          I-3-MS-103 BYPASS
                                                                                                                                                    ~                                          CONT. ON M DWG. 02-166 ZONE 166 (SNUBBER)
I                                      MS-3-1-SW-21                                                  MS-3-FW-2 MS-3-I-SW-2              I I
I
                                                        ~ MS-3-1-SW-20                                                  I-3-MS-103 BYPASS
                                                                                                                                        ~                                          MS-3-I-SW-1 CONT. ON EO I                                                                                DWG. 02-165                          HCV-08-IB MS-3-I-SW-19                                                    ZONE 185 55 CLASS 2 (SNUBBER)                                NSC MS-3-I-SW-18                                                                                                      MS-33-FW-Io QA DRAWINGS
                                                                                              ~EL 36'-D'EFERENCE I
                                                                                                                                    ~            MS-33-FW-1-LS MS-'I102-2925 NOTES                                CAUBRATION BLOCKS AND MATERIAL                                                  FLORIDA POWER dc LIGHT MS-L-2  REV. 20                    ITEMS APPUCABLE TO SRP  6.6 ARE                                                                                                            ST. LUCIE UNIT 2 IDENTIFIED MS&-4    REV. 16                    IN THE INSPECTION PLAN 6                                                                TITLE: MAIN STEAM LINE 281 OUTSIDE CONTAINMENT ONRC BRANCH TECHNICAL POSITION                      10"                      160                  A-106, 8 APCSB  3-1                                        35.5"                                      SA-155, KC-65    CL1  DATE:  7/l2/93    KK            ZONE: 66 aomm  RVI            ORAWNC OPERATING PRESS. 885  OPERAllNG  TEMP. 532                                  UT-44, UT-46                                                        NO'2-066-A
 
MV-08-19B EL  44 -                MS-127-FW I CLASS 2 NCC      /N)                    MS 127-1-SW-2 O~
                          )          )q)          ~ MS-127-1-SW-I TO ATMOSPHERE 8  X 10                                MS-123-FW-2 CONC. RED.                                  MS-123-FW-1 MV-08-17 MS-80-I-SW-3 4/S MS-80-1-SW-2 10" X 8" CONC. RED.                                    MS-80-1-SW-4 MS-80-I-SW-I  ~                          MS-80-I-SW-5 MS-4102A-1951  ~    3 MV-08-16 MS-122-FW-1 MS-122-FW-2 MS-126-1-SW-1 O
MS- l26-I -SW-2 LEGEND
                                                                  ~EL  20'-0  Q CONT. ON 000. 02-066-A 8" X 10" CONC. RED.
                                                                                                                            ~          /~
Oi4                  MS-126-FW-1 SHOP WELD                                                      ZONE 66                                                MV-08-188 FIELD WELD
                                                                                                                                                            ~A00 NCC MS-1-SW-PI        EXAMINATION AREA                                                                                                                    I l-10'-MS-79-1        SPOOL PIECE NO.
V-SR-8201      VALVE DESIGNATION TO Q~
ATMOSPHERE REFERENCE DRAWINGS                              NOTES                            CALIBRA'1ION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT MS-L-14  REV. 16                                                                                                                                            ST. LUCIE UNIT 2 8        160              A-106, 8        TITLE: MAIN STEAM LINE 281 OUTSIDE CONTAINMENT 10"      160              A-106, B DATE:  7/I 2/93      KK            ZONE: 66 RCVKNG7 RY:              ORAWHC R0.2 CPERATING PRESS. 885  OPERATING  TEMP. 532                UT-46. UT-48                                                  02-066-EI
 
EL.
BF-4007-6081    ~
68'-4" BF-51-FW-3 BF-201-228 BF-51-FW-2            It)
I EI-                        STEAM ttt                        GENERATOR  2Al I
40 CONT. ON I
FLOOR            DWG. 02-041 EL  62'-0"        ZONE 41 1  DRAIN EL  57'-8" BF-51-FW-1 V-9252 BF-14-4-SW-2                      BF-14-FW-6 BF-4007-7007    ~
II
                                                                                                      ~    20 X 18 CONC. RED.
87-40D7-70D8 BF-14 SW<<1 i4              BF-14-FW-5 BF-4007-7012                EP
                      ~iS lS 9s<c
                        " 011 qq,pic'~~~
G~"90~~
BF-4007-7017 BF'-14-3-SW-3 BF-14-FW-4
                                                                      ~~                    ~    BF'-4007-701 2A BF-4007-6084A 15'H                                                                                    LEGEND BF-14-FW-3
                                                                        ~EL      38'-0"
                                                                                                                                                              ~      SHOP WELD 3S(    FIELD WELD PENETRATlON 3                                B F-14-2-SW-1                                                          CH-146-FW-16      EXAMINAllON AREA CONT. ON                                                                                                                I-6 -SI-112    SPOOL PIECE NO.
DWG. 02-071                                BF-4007-161 ZONE 71                                                                                                                  V-09-357    VALVE DESIGNA'llON REFERENCE DRAWINGS                            NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT BF-M-6 REV. 16                  NRC BULLETIN 78-13 FOLLOW-UP                                                                                                    ST. LUCIE UNIT 2 EXAMS APPLICABLE                                                                                            MAIN FEEDWATER TO SG 2A1 18"        80      T~.938"      SA-106B INSIDE CONTAINMENT            'ITLE:
20          80      T=1.1031    SA-106B DATE:  7/14/93      KK          ZONE: 67 REYNARD QY:              ORANG II&#xb9; OPERATING PRESS. 1050  OPERATINC TEMP. 440                      UT-41, UT-43                                                      02-067
 
STEAM              BF-201 -228 LEGEND                                                                                                      GENERATOR 281
          ~    SHOP WELD BF-52-FW-3 CONT. ON 02-042 X      FIELD 5ELD DWG.
ZONE 42                            BF-4008-6076 CH-146-FW-16  EXAMINAllON AREA I-6 -SI-112  SPOOl. PIECE NO.
68'-4"
                                                                                                                                                ~
EL.
V-9294  VALVE DESIGNATION BF-52-FW-2 FLOOR EL    62'-0' DRAIN    g BF-52-FW-I EL BF-19-FW-7                  57'-9'-9294 BF-19-5-SW-2              ~    20" X 18"
          ~o~
BF-4006-6080
                                                                                                                                                              ~  CONC. RED.
                                                                                                                                                                      ~
BF-'l006-7415 6 pO ~(pf, A g&O
(
BF 4006 BF-19-2-SW-1 7D20
                                      ~
BF-19-FW-4 8 F-4006-7407 BF-I 9-3-SW-4        BF-4006-7409 Il~
BF-4006-7416 BF'-19-5-SW-1 BF-4006-7402  ~                      o+~                                                                                                                                36'-0
                                    ~                                  I-20-BF                                                                              EL BF-19-FW-3                                                                                                                                            BF-19-FW-8 BF-4006-6086A                                                                                          BF-4006-6077 BF-4006-6079                                        BF-19-FW-5 CONT. ON                                                        BF-19-3-SW-3 0WG. 02-072                PENETRATION 4 ZONE 72 REFERENCE DRAWINGS                            NOTES                              CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT BF-M-6  REV. 16                  NRC BULLEllN 79-13 FOLLOW-UP                                                                                              ST. LUCIE UNIT 2 EXAMS APPUCABLE 18"      80      T~.938      SA-1068          lITLE: MAIN FEEDWATER TO SG 281 INSIDE CONTAINMENT 20        80      T~I.031    SA-1068 DATE:  7/14/93      KK                      ZONE: 68 ORAWNC NO:.
OPERATING PRESS. 1050  OPERATING TEMP. 440                  U T-41 ~ U T-43                                                02-068 '
 
                                                                      ~  CP-SUPPORT 2A-1 REFERENCE DRAWINGS NOTES CALIBRATION BLOCKS AND MATERIAL                    FLORIDA POWER 8c LIGHT ST. LUCIE UNIT 2 TITLE: CHARGING PUMP 2A DATE:  10/6/92                ZONE:  69 REVE%ED BY:          DRAWNC H0 02-069-A
 
AUXIUARY FEEDWATER I-4-BF-34                    PENETRATION 3 CONT. ON CONT. ON                          15'H                  DWG. 02-067 DWG. 02-169                                            ZONE  67 ZONE 169 (SNUBBER)
BF-14-SW-P3 x ~~@o+
B F-14-FW-2 S CH. 80 SCH. 120 HCV-09-1 A                  1- DRAIN BF-4004-7008                                          I qa X    V-9250 C. 4 BF-55-FW<<I                                      BF-14-FW-I HCV-09-1 B                              BF-55-FW-2 CONT. ON DWC. 02-171 ZONE 171 (SNUBBER)
LEGEND
                                                                                                                                                          ~        SHOP WELD FIELD WELD CH-146-FW-16      EXAMINATION AREA
                                                                                                                                                - I-6"-SI-112    SPOOL PIECE NO.
HCV-09-1B      VALVE DESIGNATION REFERENCE DRAWiNGS                            NOTES                                  CALIBRAIION BLOCKS AND MATERIAL                                FLORIDA POWER IL LIGHT BF-M-6 REV. 19                  SRP 6.6 WELDS IDENTIDIED IN                                                                                                ST. LUCIE UNIT 2 EXAMINAllON PLAN 20"      80    T~1.031    SA-106 B          TITLE: MAIN FEEDWATER TO SG 2A1 OUTSIDE CONTAINMENT 20        120  T~ I.500    SA-106B DATE:  7/14/93      KK              ZONE: 71 OPERATING PRESS. 1720  OPERATING TEMP. 440                                                      RCVKKD SY:            ORAlNNC NO:.
OPERATING PRESS. 1050  OPERATINC TEMP. 440                                                                                    02-07I
 
I' EL 35'-l1 PENETRATION 4 AUXILIARYFEEDWATER                                      CONT ON I-4-BF-36                                    DWG. 02-068 ZONE  66 CONT. ON DWG. 02-170                                    BF'-14-SW-P4 ZONE 170 (SNUBBER)                                  BF-19-FW-2 I
SCH. 80 SCH. 120 1    DRAIN HCV-09-2A 8 F'-4004-7002 gO                  BF-19-FW-I BF-56-FW-2 HCV-09-28 CONT. ON Lr                    BF-56-FW-1                                                                                        LEGEND DWG. 02-172    4        ClASS 2
                                                                                                                                                          ~      SHOP YIELD ZONE 172              NCC (SNUBBER)                                                                                                                                      FIELD WELD CH-146-FW-16    EXAMINATION AREA 1-6 -SI-112    SPOOL PIECE NO.
HCV-09-2B    VALVE DESIGNAllON REFERENCE DRAWINGS                              NOTES                                CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT BF-M-6 REV. 19                  NRC BULLETIN 79-13 EXAMS ANO SRP 6.6                                                                                        ST. LUCE UNIT 2 IOENTIFIEO IN INSPECTIDN PLAN 20"        80              SA-106B          TITLE: MAIN FEEDWATER TO SG 281 OUTSIDE CONTAINMENT 20"      120              SA-1068 DATE:  7/14/93      KK            ZONE: 72 OPERATING PRESS. 1720  OPERATING TEMP. 440                                                    REVKWED QY:            ORMlNC KK:
OPERATING PRESS. 1050  OPERATING TEMP. 440                                                                                02-072 '
 
CONT. ON DWG. 02-087-8 ZONE 87 SI-179-FW-902 V-3531~
SI-179-1-SW-2 SI-179-I-SW-3
                                      ~                  Sl-381-FW-I I-3/4-SI-182 V-3530
                                                                                                                                        ~
1-3/4-SI-183
                                                                                                                                            ~
                                                                                                                                                        ~+A EE
                                                                                                                                                                        ~ 8- l79-20-SW-7 EL                                                                                                                  T'ftk        9
                                                                                                                                                        ~~V-3529++
                                    ~
SO-03-17                                                          v r~    3317 5'-8'I-178-I-SW-4 9
                                                                                                                                                              ~v        Sl  2413 44 SI-381-FW-2                                                                                Sl-179-20-S'W-8 "1o              Sl-179-I-SW-8 8-2413-8009 o+
c  ++
                                                                                                                                                              ~ I-3/4-8-185
                                                                    ~                          Sl-179-FW-2A                              y  3528 I-3/4-Si-'184
                                                              ~
Sj Sl-179-19-SW-4
                                                            ~
Sl-179-1-SW-9 Sl 179-1-SW-10 Sl-17S-1-SW-il Sl-179-1-SW-12 Sl-178-FW-903 8'IPE SLEEVE SI-179-2-SW-1 2'-3" Sl-179-1-SW-5 EL          7'-I"~              0B CONT. ON I
T~EC S0-03-15 Sl-2416-352
                                                                                                                    ~                  ~
EL
                                      ~
DWG. 02-061                                                                                      SI-179-FW-2 ZONE 61 Sl-2416-366                                            Sl-179-FW-I Sl-179-1-SW-6                    I                                                                                                              LEGEND V-3547 <<w~
1-3/4-Sl-383                  X cs                                                                                                                4      SHOP WELD V-3548
                                                                        ~
C WA  CONT ON DWG. 02-061 ZONE 61                                                                    Sl-179-8-SW-1 FIELD WELD EXAMiNATION AREA 1-3 -SI-179-8      SPOOL PIECE NO.
V-3550    VALVE DESGNA'TION REFERENCE DRAWINGS                                          NOTES                        CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT Sl-N-10 REV. 14                                                                                                                                                        ST. LUCIE UNIT 2 TITLE: COMBINED HPSI DISCHARGE 3"      PIPE          SA-312, TP-304 ELBOW            SA-403, TP-304        DATE:  7/20/93        KK            ZONE: 87 R EYED  OYE              ORAWNC N(4 CPERATING PRESS. 2400  CPERATING TEMP. 300                                                                            02-087-A
 
1t CONT. ON DWG. 02-093-A ZONE  93 g            ~~
PENETRATION 69 I-3/4-Sl-275 DRAIN SI-179-FW-10
                                          ~ Sf-179-8-SW-I Sl-179-FW-901  ~      ~EL    24'-11 SI-179-8-SW-4
                                                                                                                                          ~                    Sl-179-FW-3
                                                                                                                                        ~
Sl-179-3-SW-1 4'25'30          Sl-179-FW-9                                            Sl-2413-37 H
                                  ~~                                                                                                                                            8-179-4-SW-2 r
Sl-2413-12 I-3/4-Sl-337                                                8-179-FW-7 V-3540 Sl-179-FW-8 V-3550 Sl-179-FW-6
                                                                                        ~    Sl-179-F W-915 Sl-179-6-SW-4
                                                                                                                                                          ~          ~        SI-179-4-SW-1 I-3/4-SI-568 W-179-EW-919
                                                                            ~                                Sl-179-4-SW-6                                      Sl-2413-31
                                                                                                                                                  ~
EL 29 91-241 3-290                                  Sl-179-3-SW-2
                                                            ~
Sl-179-FW-4                                        91-2413-39
                                                            ~ ~
Sl-179-6-SW-2                                      8-17S-5-SW-7
                                                                                                                                                        ~
SI-1 79-3-SW-3
                                                                                                                              ~q9 Sl-179-6-SW-I                      Sl-2413-18                                                  45 V                  Sl-179-3-SW-4 FL EL 19'-6" EL 14'-3"      ~      Sl-179-FW-5
                                                                                                          ~O
                                                                                                                      ~  8-2413-26 Sl-179-FW-3A 0'-6"
                                                              ~
FL EL LEGEND
            ~      SHOP WELD FIELD WELD Sl-179-5-SW-1 Sl-179-20-SW-6
                                                                                                                                                  ~
                                                                                    ~ ~
Oa Sl-17S-8-SW-1                                                                                                                        CONT. ON EXAMINATION AREA                                                                                              DWG. 02-087-A I-3'-Sl-1 79-8  SPOOL PIECE NO.                                                                                                      ZONE 87 Sl-179-5-SW-2                              3-179-5-SW-3 V-3550    VALVE DESlGNATION 8-2413-23 REFERENCE DRAWINGS                                NOTES,                              CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT 3-N-10  REV. 14                                                                                                                                                      ST. LUCIE UNIT 2 TITLE: COMBINED HPSI DISCHARGE 3"      PIPE            SA-312, TP-304 ELBOW              SA-403, TP-304-DATE:  7/12/93      KK            ZONE: 87 REVE%ED OYE              ORA'INC No OPERATlNG PRESS. 2400  OPERATING TEMP. 300                                                                                    02-087-6
 
4 BEND Sl-109-FW-I    +04
                  ~
SI-4-R7 4" X 2 CONG RED.                  I M
I CV CONT. ON 0WG. 02-061
                  +                I        SI-109-SW-2 ZONE 61                              SI-274-SW-1 HCV-3647 PIPE SLEEVE BEND Sl-274-FW-2 Sl-274-SW-4
                                          ~
Sl-274-FW-801
                                                                                      ~
Sl-4-RI BEND Sl-274 SW-3                                                        Sl-4-R2
                                                      ~lg~
I 2" X 3/4" RED. NSERT BEND NPT  ~ 3/4"  QUICK CONNECT SI-274-FW-802 CLASS 2 'g BEND iV-3685 CONT. ON 3/4    QUICK            2" X 3/4"                            DWG. 02-087-D CONNECT
                                                                            ~      Sl-274-SW-6 RED. INSERT                            ZONE 87 SI-4-R3 Sl-274-FW-5    ~          /~
                                                                                'P~~
8)~
Sl-274-SW-13
                                                                                                                        ~      Sl-274-SW-8 LEGEND Sl-274-SW-7 4                  SHOP WELD Sl-4-R4 BEND X                -  FIELD WELD Sl 274-SW-1                EXAMNATION AREA I-2'-Sl-4-1                SPOOL PIECE NO.
HCV-3647                VALVE DESIGNATION REFERENCE DRAWNGS                    NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT Sl-4 REV. 10                                                                                                                                              ST. LUCK UNIT 2 2"                                                    COMBNED HPSI DISCHARGE PIPE            SA-312, TP-304 FITllNGS          SA-182. F-304 DATE:  7/12/93      KK                        ZONE: 87 OPERATNG PRESS. 1450  OPERATING    TEMP. 300                                                      REVEM) SY:
02-087-C'ITLE:
DRA'NNC NO OPERATNG PRESS. 2400  OPERAllNG TEMP.      300
 
E L. 1'-3 CONT. ON DWG. 02-062            Sl-218-FW-2 ZONE 62 Sl-110-1-SW-8 V-3700 BEND 1-3/4-31-319  ~~
Sl-110-1 -SW-9 V-3699  /~A(I
                                                                                                                                    ~                          9-110-1-SW-7 SI-110-I-SW-6 2/          FE-3341 9-4-R6                                                Sl-137-1-SW-I          g-3I r+~
45~ g                  6" X 6    X  3"
                                                                                                                                                  ~  CONT. ON        UCING TEE
                                                                                                    ~
DWG. 02-044-D BEND                        2" X 3 ZONE  44 CONC. RED.                                              l-3/4-SI-850
                                                          ~
1-3/4-Sl-851
                                                                                                  ~41                  SI-137-1-SW-2 9-218-SW-1 SI-147-FW-2 9-134-SW-2                              V-3143 DWG.
CONT. ON 02-087-C
                            +
BEND Sl-134-FW-I 1-2-31-134 Sl-274-FW-9
                                                          ~
                                                        ~~ ~
HCV-3646 qh
                                                                                        ~  ~  Sl-147-SW-1 Sl-274-SW-12
                                                                      ~
ZONE 87 Sl-4-R5 O                                                    9-274-SW-11 Sl-274-SW-10 2"  X 3/4" I
RED. INSERT I
BEND          C~CISS                                                                                                                4        SHOP WELD
                                                      ~                                                                                                                    FIELD WELD t'v'-3850 NPT~
                                                    ~      3/4  QUICK CONNECT SI-137-1-5$ -1 l-3 110-1 V-3143 EXAMWATION AREA SPOOL PIECE NO.
VALVE DE9GNATION REFERENCE DRANtlNGS                          NOTES                                      CAUBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER 8c LIGHT Sl-N-6 REV. 17                                                                                                                                                      ST. LUCIE UNIT 2 Sl-4 REV. 10 2"                                                TITLE: COMBINED HPSI DISCHARGE
                                                                                            + 3    PIPE          SA-312, TP-304 2"  + 3    ELBOW          SA-403, WP-304 DATE:  7/20/93        KK            ZONE: 87 OPERATING PRESS. 2235 OPERATING TEMP. 330                                                              RCVESED 8YS              ORA'NHC RO.S OPERATING PRESS. 1450  OPERATING TEMP. 300                                                                                          02-087-D
 
CONT ON          EL. 1'-3" DWG. 02-062 ZONE  62 SI-217-FW-2    ~
SI-111-1-SW-8 EL. 5'-3" Sl-3-R6
                                                                                              ~                        BEND DWG.
SI-111- I-SW-4 CONT. ON 02-044-F
                                                                                                                                                                                ~        Sl-'l11-1-SW-7 Sl-11-1-SW-6 ZONE- 44 6  X6 X3 RED. TEE      Q~        45V CLASS 2                                                                                      EL. 8'-9"                                                      SI-111-1-SW-5 3/4" QUICK ~~~NSC    A V-3897                2  X 1-3/4 SI-619 ~V-36999 0+
                                            ~
CONNECT                                            3/4'ED.
INSERT        BEND V-3697 "~~ y Sl-273-SW-15                                                e++
                                                                      ~
NPT v                FE-33 1 CONT. ON                    Sl-217-SW-I                                  SI-138-I-SW-I                        ~>V-3135
                                                                                                                                ~
                                                                      ~
DWG. 02-087-E (                                                      Sl-138-1-SW-2
                                ~
ZONE  87                    Sl-133-FW-2                HCV-3636
                                                                                                                        <+'V-3136 2  X3            1-3/4-Sl-850 Sl-273-FW-8                                                    I CONC. RED.
V-3133                        Sl-145-FW-2
                                                                      ~
(0 Sl-133-SW-1              N I
I                  ~            Sl-3-RS Sl-145-SW-1 Sl-3-R4  ~                  Sl-273-SW-9              g      ~                  SI-273-SW-14 Sl-273-SW-13
                                                                    ~                  SI-273-SW-12
                                                                  ~~
LEGEND Sl-273-SW-11                                                                                    4      SHOP WELD Sl-273-SW-10                                                                                              FIELD WELD BEND
                                      ~
2" X 3/4"                                                                                Sl-111-1-SW-6 V 3889 IN~
y            RED. INSERT                                                                                l-3"-Sl-111-1 EXAMINATION AREA 3/4>>  QUICK                                                                                                                                              SPOOL PIECE NO.
CONNECT NPT A                                                                                                                      V-3133    VALVE DESGNATION REFERENCE DRAWINGS                              NOTES                                      CALIBRATION BLOCKS AND MATERIAL                                        FLORIDA POWER dc LIGHT Sl-3 REV. 10                                                                                                                                                                ST. LUCIE UNIT 2 Sl-N-7 REV. 14 IITLE: COMBINED HPSI DISCHARGE DATE:  7/14/93      KK              ZONE: 87 OPERATING PRESS. 2235  OPERATING TEMP. 330                                                                  REVEKD  QY:            DRAWNC k0.3 OPERATING PRESS. 1450  OPERATING TEMP. 300                                                                                              02-087-F'
 
LEGEND SI-268-SW-I l-2"-Sl-2-3 V-3766 SHOP WELD FIELD WELD EXAMINATION AREA SPOOL RECE NO.
BEND OA Sl-3/4-Sl-846 9 3/4 Sl 847    ~-
SI-112-1-SW-7 rv+Q n y-36g6
                                                                                                                                          ~ ~g EL      6'-4" 21-112-1-SW-S Sl-112-1-SW-5 nr+ (
VALVE DESIGNATION 26 34'V V-3695 9  13g  I SW v
1    gsl1    E-3321nV-3125
                                                                                                                                              -112-1-SW        r      CONT. ON DWG. 02-043-F CNt V-3126nn~  )~i                  6  X 6  X 3 I                            S,h~            v            SI 3/4-Sl-817 EO I                                              Sl-139-1-SW-2 N
EL  2'-10"                                                I                                            9-143-FW-2 9-107-FW-1                    V-3766
                                                                                                    ~ Sl-2-Rl Sl-2-R6 ~        o Oy              9-132-FW-1
                                                                    ~                              9-143-SW-1 SI-272-SW-7 I
V7 I
rr  CONT ON DWG. 02-061                          SI-272-SW-6 N                                                                                                                    Sl-2-R4 I                  ZONE 61                                                                BEND SI-272-SW-5 Sl-107-SW-2            HCV-3627            00      %1%
SI-272-F W-I CV Sl-132-SW-3
                                                                                          ~                                                          ~      Sl-132-SW-5
                    ~                                                                                                                    ~
CV
                              -I
                                                                                                  ~
V)
                                                                                                                                                                    ~
Sl-272-SW-2              I I                                                                                          SI-132-FW-4 2 X  3/4 RED. INSERT CLASS
    ~NSC 2
                  ~
                                  ~    SI-272-SW-4 0A                Sl-132-FW-2                                                          Sl-2-R3 Sl-272-SW-3                                                                                                                                      BEND V-3893 NPT
              ~ 3/4    OUICK CONNECT DWG.
CONT. ON 02-087-H ZONE 87 REFERENCE DRAWINGS                            NOTES                              CALIBRAIION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT SI-2 REV..B                                                                                                                                                      ST. LUCIE UNIT 2 9-N-8    REV. 18 TITLE: COMBINED HPSI DISCHARGE DATE:  7/14/93        KK            ZONE: 87 OPERATING PRESS. 1450  OPERATING TEMP. 300                                                      RCVD%D QYS              ORAlANC NO.S OPERATING PRESS. 2235  OPERATING TEMP. 330                                                                                  02-087-G
 
BEND                    Sl-131-FW-4 SI-1-R4 SI-I-R5                              SI-131-SW-5 BEND                                                Sl-1-R3
                                                                                                            @r~
o~
SI-1-R6                                            L Sl-131-SW-3
                                                                                ~
Sl-113-1-SW-5    ~                    Sl-113-FW-901 Sl-131-FW-2    ~X                        ~ ~~g~  ~(        I g +
x3wZONE87 8-113-1-SW-4 axe" CONT. ON DWG. 02-087-J EL  2'-10" BEND FE-3311~
                                                                                                                              ~+ ~" 3" 5 b~r'ONT.        ON BEND                                                                                                                      t.      DVa. 02-043-C
                                  /~
                                                  ~ Sl-106-FW-I                                                V-3116+~>    4~ Sl-3/4-Sl-816                ZONE 43 Og
                                                                                                              ~    Sl'-2415-170 Sl-1-R7                          CONT. ON                      Sl-131-SW-1    ~gb              Si-140-1-SW-2
                                                                                          ~
DWG. 02-061                                                  Sl-126-FW-2 ZONE 61                      V-3113 SI-106-SW-2 SI-271-FW-1 HCV 3617 Sl-271-SW-2 1%
                                                            ~ ~                                  Sl-126-SW-1 Sl-271-SW-5 Sl-271-SW-4 Sl-271-SW-3 lEGEND r1    0+                        2'  3/4" I
RED. INSERT                                                                4      SHOP WELD I
CLASS 2 J                                                                                      X      FIELD WELD
                                                  ~NSC                                                                                            Sl-131-SW-3      EXAMINAllON AREA BEND CONNECT    ~~~'V          3894                                                                              I-2"-Sl-1-4 HCV-3617 SPOOL PIECE NO.
VALVE DESGNATION NPT REFERENCE DRAWINGS                          NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT SI-1 REV. 9                                                                                                                                                      ST. LUCIE UNIT 2 Sl-N-9  REV. 18 TITLE: COMBINED HPSI DISCHARGE DATE:  7/14/93        KK            ZONE: 87 OPERATNG PRESS. 2400    OPERATING  'TEMP. 300                                                      avmm    ev:              ORAWNC OPERATING PRESS. 1450    OPERATING  TEMP. 300                                                                                      NO'2-087-I'
 
CONT. ON DWG. 02-087-1 ZONE 87 CONT. ON BEND DWG. 02-094-A ZONE 94 EL 4'-8'END Sl-215-FW-2
                                              /
Sl-131-SW-6                                    BEND
                                                    /h/
                                                ~~
Oy                    Sl-131-FV(-8 St-131-SW-7 2 X 3/4" RED. INSERT        I
                                                                      ~      PIPE SLEEVE HCV-3616
                                                                                                        ~      Sl-215-SW-1 SI-131-SW-9 BEND I                                            SI-1-Rl BEND CLASS 2
                                      ~sc                                Sl-1-R2 W'-3722 NPT9
                                              ~    3/4" CONNECT QUICK SEGSN0 4      SHOP WELD X        FIELD WELD Sl-21 5-SW-1    EXAMINATION AREA l-2 -Sl-1-5    SPOOL PIECE NO.
HCV-3616    VALVE DESIGNATION REFERENCE DRAWINGS                        NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                      FLORIDA POWER dc LIGHT Sl-1 REV. 9                                                                                                                                                    ST. LUCIE UNIT 2 TITLE: COMBINED HPSI DISCHARGE DATE:  11/13/92                    ZONE: 87 RCVEKD SYS              ORAMHC R&#xb9; OPERATING PRESS. 1450  OPERATING TEMP. 300                                                                                        02-087-J'
 
EL  6'-9'END DWG.
CONT. ON 02-088-8 ir      O ZONE 88 Oa 5
CH-85-R6
                                        ~                  EL BEND 6'-9" CH-104-FW-19 t
ED~V CH-41 2-F W-I CH-412-SW-2
                          ~
                          <<<<>> V-2549 CH-104-SW-18 OA CH-104-SW-19
                                                                                                  ~
TO CS                                                                                              EL  4'-4" PUMPS 2" X I 1/2" DN-194 SW-29 RED. INSERT 1-1 1/2-CH-121 I IE 15%
c VJ V-2324 BEND CH-104-SW-24 CH-104-FW-21
                                                                                          ~  ~        CH-104-SW-23 P ULSAlION                                CH-104-SW-22                                            LEGEND DAMPENER                                  2 X1                                                                SHOP WELD RED. INSERT X          FIELD WElD CH-136-RV-I      EXAMINATION AREA I-I-CH-123                                            I-2'-CH-75-2      SPOOL PIECE NO.
EL 2'-8 CHARGING PUMP 2A                                                                                                        V-2549      VALVE DESIGNAIION REFERENCE DRAWINGS                        NOTES                            CALIBRAlION BLOCKS AND MATERIAL                                            FLORIDA POWER 8c LIGHT CH-72  REV. 9                                                                                                                                                    ST. LUCIE UNIT 2 CH-85  REV. 7 TITLE: CHARGING PUMP 2A DISCHARGE TO AUX. HPSI DATE:  7/l4/93      KK              ZONE: 88 OPERATING PRESS. 2377  OPERATlNG TEMP. 120                                                              RCYHKD SYE            ORA'NNI>> NR:
OPERATING PRESS. 2400  CPERATlNG TEMP. 300                                                                                        02-088-A'
 
CONT. ON DWG. 02-088-C ZONE 88 2" X 2 I/2"      Q~ '~~I
                                                    ~  INST.
CH-1D4-FW-I CH-104-SW-2
                ~                            2  X 3/4" RED. INSERT CH-104-SW-3 EL. 6'-9 104 SW 4 ~            EP' 4514 g(  DWG  02 090 8 ZONE 90 BEND CH-104-FW-25
                                                                                                                                          ~
CH-104-SW-15 CONT. ON                                CH-104-SW-14                                      CONT. ON CH-72-R6                                      02-069 Q )    DWG.                                                                                      DWG. 02-088-A CH-72-R5  ~
CH-104-FW-26 45'H t
                                                                              ~
ZONE 89 CH-104-FW-28          CH-104-SW-13
                                                                                                                        ~
V-2169              ZONE 88
                                                                                                                                              ~
CH-104-SW-12 CH-104-SW-27 CH-72-R4  ~              BEND CH-1 04-FW-9 45V                        ~      CH-104-SW-10 CH-72-R1 CH-72-R3  ~        BEND CLASS 2 NSC CH-104-SW-11 2" X 3/4'ED.
INSERT LEGEND
                                                                                                                                                              ~      SHOP WELD a,V-2568                                    X        FIELD WELD T
                                                                                                                    ~ 3/4"  QUICK CONNECT CH-104-SW-2 I-2 -CH-72-1 EXAMINATION AREA SPOOL PIECE NO.
NPT                                          V-2336    VALVE DESIGNATION REFERENCE DRAWINGS                            NOTES                              CALI8RA110N BLOCKS AND MATERIAL                                      FLORIDA POWER 8c LIGHT CH-72  REV. 9                                                                                                                                  %%.              ST. WCIE UNIT 2 TITLE: CHARGING PUMP 2A DISCHARGE TO AUX. HPSI DATE: 7/12/93      KK            ZONE: 88 RUING) IY:            DRAWHC Na OPERATING PRESS. 2377  CPERATING  TEMP. 120                                                                                  02-088-1
 
CH-109-SW-9
                                                        ~
CH-6-RS CH-109-SW-10
                              ~                            CH-109-SW-8 CH-6-R4 CONT. ON                                      CH-109-F W-7 OWG. 02-088-D ZONE 88                                        CH-6-R3 CH-109-SW-6                                                                gA FL PENETRAllON EL 19'-6" f~
                                                                                                                        /o)  /// ~V-2427
                                                                                                                                    ~+~
                                                                                                                            //FE-2212 CH-109-F W-5                              CH-107-1 -SW-1 CH-106-1-SW-2
                                                                                                                                                        ~
                                            ~                                                                                              ~
CH-6-R2                                                                                      2  X 2 1/2
                                                                  ~    10" PIPE SLEEVE W/BOOT                                              CH-106-1-SW-I REO.
CH-109-SW-4
                                                                              ~ CH-109-SW-2                                                                  CONT. ON DWG. 02-088-8 ZONE  88 CH-109-FW-3  ~              BEND 11'44'1 7" V CH-6-R1
                                                                                            ~
BEND                  CH-109-FW-1                                    LEGEND CH-107-1-SW-2
                                                                                    ~
                                                                                                                                                    ~        SHOP WELD FIELD WELD 21/2    X 2"                                                      CH-178-SW-1      EXAMINA'IION AREA RED.              Qa                                      I-2 -CH-6-5      SPOOL PIECE NO.
V-2429    VALVE DESGNATION REFERENCE DRAWINGS                          NOTES                                CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER 8c LIGHT CH-6 REV. 5                                                                                                                                            ST. LUCIE UNIT 2 llTLE: CHARGING PUMP 2A DISCHARGE TO AUX. HPSI DATE:  7/12/93      KK            ZONE: 88 RCVKKD QY:            ORA'NNC NC OPERATING PRESS. 2377  CPERAllNG TEMP. 120                                                                              02-088-C'
 
0            0-890-ZO
                          . ON ON%%Id OZ1 dN3l SNUV83dO LLEZ SS38d SNllVH3dO iNOSH38                                            QS CSHA35 88:3NOZ                              r6/ZI/L:3lYa ISdH XAV  Ol 3SBYHSSIO VZ dAAd GNISHVHS:3ll.ll Z lINn 3IOm 'm                                                                                                                                                                    9 A38 9-N-HO lHSll 5 II3MOd VOIHOld                                        1VIII3lVYI 0NV S>D018 NOILVIIHIlVO                                        S3lON                            SSNIIINH0 30N383d38 NOILYNS830 3A IVA              6Zt Z-A
    'ON 303ld 100dS              8-9-HO- Z-I V3HV NOllVMYAfX3              I-MS-8Ll-R) 013M ldN 013'13IA dOHS                ~
0N3031                                                                                                        l03NNOO OZ-IIAS-60 1-HO XOInO P/C'~        l    OSN L~Z-Ai      Z SSV10
                                                                                                          ~0-PC    l3 lh
                                        ~
T lH3SNI  am
                                                                                                                  ~
Z-MS- K'2-HD                  t/C X Z 88 3NOZ          ~<
1 1-MS-601-HO 61-MS-601-HS HOC.Z.SZ 6ZWZ-A          ~    e-eS-ZC-HS 0-IAS- KC-HO 0-880-ZO    'Qh0 9-MS-lf2-HO NO 'JHOW IZ-IAS-601-HS                ~l'-eO C 1-II'01    HO I-MS-1K'-HS                          MGZ-A      ~Q    LZ NOUV813N3d 98-9-HO                                                                                                                                                              ( Ol Z I-MS-601-HO LH-9-HO                                        9 I-MS-601-HO
                                                                          ~
HOC,Z.CZ 91-IhS-601-HS 8II-9-HO 0'1-MS-601-HO Sl-MS-601-HO l83SNI '038 t/8  X  .Z ~
818Z A igni L I-Md-601-fQ OSN l03NNOD XOlnO  .I/C  ~
 
CH-75-R3
                                                                                                                        ~                          BEND
                                                                                                                      ~gb                              Oa
                                                                                            ~                        qO
                                                                                                                                        ~
                                                                                                                                                    ~
CH-75-R2 V-21 68                CH-75-Rs                60>l CH-75-Rl BEND CH-136-FW-2 V-2464
                                                                                                  ~      CH-136-SW-6 CH-136-SW-8 CH-136-SW-7 Ctl-415 FW-1 CH-136-FW-18
                                                                                      ~~
CH-136-FW- I                                                                                          CH-136-SW-5 CH-136-SW-3                                            CH-136-FW-11
                                                            ~      4SV CH-136-SW-4
                                                                                                                            ~
CH-75-R4                                                      CH-136-SW-12                          4'-4 ~
                                                                                                                                                      ~
El CONT. ON              45%    BEND                                                  2" X 3/4" DWG. 02-088-8                                                        BEND        I        RED. INSERT 2 X I    I/2                            CH-136-SIY-13 ZONE'8                                                                                                RED  INSERT I-1 1/2-CH-113 CLASS 2                                                  15'V T  NSC                              r  IM EL 6'-9                    lk                                      V-2326 3/4  OUICK                                                            BEND BEND              CONNECT                    CH-136-SW-15
                                                                                                                ~
CH-136-SW-17  ~
CH-4 IS-SW-2
                  ~
                  ~~+ V-2548 CH-136-FW-14 PULSATlON                            ~      CH-136-SW-16 OA                                      DAMPENER                                        X1"                LEGEND TO VOLUME P                                                                                                I 2
RED. INSERT                6      SHOP WELD CONlROL TANK X        FIELD WElD CH-136-FW-1        EXAMINATION AREA EL. 2'-4                                          I-1-CH-118 CHARGING PUMP 28 I-2 -CH-75-2        SPOOL PIECE NO.
V-2464      VALVE DESGNAIION REFERENCE DRAWINGS                          NOTES                        CALIBRA'TION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT CH-75  REV. 11                                                                                                                                            ST. LUCIE UNIT 2 CH-82  REV. 8                                                                                                                  TlTLE: CHARGING PUMP 2B DISCHARGE TO AUX. HPSI DATE:  7/14/93      KK              ZONE: 89 REVENG) OY:              DRAWNC NO:.
CPERATING PRESS. 2377  OPERATING TEMP. 120                                                                                  02-089 i
 
BEND                                                                  CONT. ON l        02-090-A CH-137-SW-12                r    DWG.
ZONE  90 CH-135-FW-1 j 1'8 V-2339
                                                      "'                                      CH-137-SW-9 DWG.
CONT. ON 02-088-8 ZONE 88
                                  ~y        ~"      BEND CH-135-SW-2 CH-135-SW-3 cH-78-R3
                                                                                                    ~                ~
                                                                                      ~
CH-137-FW-10 45V                        CH-137-SW-11 CH-135-FW-4                                      2" X 3/4" I
CLASS 2  y        RED. INSERT x V-2570 CH-137-SW-6                                            A CH-137-SW-4
                                                                                  ~  CH-137-FW-26 CH-137-SW-5              NP'3/4"        QUICK CONNECT CH-137-SW-3 CH-137-SW-2                            REO. INSERT CH-137-SW-I                    V-2340 V-2440                                                                                                    LEGEND CONT. ON                                                                                                                              SHOP WELD DWG. 02-091 ZONE 91                                                                                                                      X      FIELD WELD CH-135-SW-2      EXAMINAIION AREA 1-2"-CH-78-1    SPOOL PIECE NO.
V-2338    VALVE DESIGNATION REFERENCE DRAWINGS                            NOTES                            CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT CH-78  REV. 8                                                                                                                                            ST. LUCIE UNIT 2 CH-80  REV. 10 lITLE: CHARGING PUMP 2C DISCHARGE TO AUX. HPSI DA'IE: 7/12/93      KK            ZONE: 9D RKVEKD QY:            ORAWNC Na.:
OPERATING PRESS. 2377  OPERATING  TEMP. 120                                                                            02-090-B~
 
NPT I'OIGK                                      DONT, QN 10" PIPE SLEEVE                                    CONNECT                                      DltIQ'2 W/
9-48-R2 BOOT Q                                                    E y-3707,*,
E T
ASS 2 ZONE 90 090 Q    BEND 2 X 1" RED. INSERT  Q j
Sl-141-FW-15                                45'V          Sl-141-SW-19
                                                                                                                                                  ~%
Sl-141-SW-14
                                                                                                                        ~/
                                                                      ~~                                                                                                  ~
Sl-48-R6                                  Sl-141-SW-16                                                                  Sf-141-FW-21
                                                                                                                          ~                          cd Sl-141-FW-17                        r                                Sl-141-SW-20 Sl-141-SW-13 SI-141-SW-18 9-141-SW-12
                                                                                ~o+          I CONT. ON DWG. 02-092                9-48-R1 BEND ~EL ZONE 92 6'-B'l-141
                                                          ~~
Sl-48-R4
                                                      ~
Sl-48-R3 Sl-48-R7
                                                                                            -SW-11 SI-48-R5
                                                              ~      Sl-141-SW-9 Sl-141-FW-8 Sl-141-SW-10 EL  2'-10" CONT ON DWG. 02-061                                        9-141-FW-7 ZOIIE 61 9-141-SW-6 I
LEGEND V-3519          I 4
SI-1 41-FW-1 Sl-141-SW-2  ~
SI-141-SW-3 I        Sl-141-FW-5 X
CH-141-SW-2 SHOP WELD FELD WElD EXAMINATION AREA I-2"-Sl-48-1              SPOOL PIECE NO.
9-141 -SW-4                                                                                                                          V-3519              VALVE DE9GNATION REFERENCE DRAWINGS                            NOTES                                  CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER 8c LIGHT Sl-48  REY. 5                                                                                                                                                            ST. LUCE UNIT 2 TITLE: COMBINED CHARGING PUMPS DISCHARGE TO HPSI DATE:  7/12/93      KK                        ZONE: 91 REVEKD  OYE                        DRAWING NC,:
OPERATING PRESS. 2400  CPERATING    TEMP. 300                                                                                          02-091 '
 
CLASS 2
                                                                                                                      / NSC V-3570ggj T
3/4" CONT. ON DWG. 02-091 QUICK CONNECT                                                    r g~
r ZONE 91 NPT
                                          /
NSC CLASS 2 V-3520  2 Z I
Sl-1 76-FW-I l        2    X 3/4" I
I RED. INSERT
                                                      ~
I
                                      ~
I I
Sl-176-SW-4                                2" X1" Sl-176-SW-2 SI-176-FW-12                    ~  RED. INSERT Sl-176-SW-14
                                        ~
Sl-176-SW-3 9-176-SW-13 Sl-176-SW-11 SI-SS-Ri T
SI-176-SW-7                              I (0
V-3518
                                          ~
I N
                                                                          <S-7          -0
                                                                                                ~
I Sl-176-SW-5                                            -S Sl-176-FW-17 SI-176-SW-8
                                                    -//
(
2" X 3/4 Sl-176-SW-6                                                                                                  LEGEND I        RED. INSERT Sl-176-SW-9            I                      DWG. 02-094-B                                                                  SHOP WELD ZONE 90                                                                        FIELD WELD V-3521,1sr 3/4  QUICK CONNECT
                                          ~M~~        ~CLASS 2 CH-176-SW-2 I-2 -SI-56-1 EXAMINATION AREA SPOOL PIECE NO.
NPTV        NSC                                                                                    V-3518              VALVE DESIGNATION REFERENCE DRAWINGS                                                            CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER 8c LIGHT Sl-56 REV. 8                                                                                                                                            ST. WCIE UNIT 2 COMBINED DISCHARGE TO HPSI TIE IN LOOP 28 DATE:  7/12/93      KK      02-092'ITLE:
ZONE: 92 RCVKWED BYE              ORAWHC MQ.E OPERATING PRESS. 2400  OPERATING    TEMP. 300
 
SI- I79-9-SW-7 EL. 25'-0 Sl-179-9-SW-6                                        SI-4208-2021 PENETRATION Ol 4'25'30"            69 r
SI-1 79-9-SW-3                      I Vl 22'-0
                                                                                                                                ~
EL                            I SE)
I    Sl  I 79 FW 801
                                                                                                                                                              ~
3-179-9-SW-2 CONT. ON Sl-4208-210A
                                                                                                                                  ~                                              DWG.
8-179-9-SW-5 02-087-B ZONE 87
    ~
DWG.
ZONE 02-093-B 93 9-'179-17-SW-1 8-179-FW-18 SI-4208-210B
                                                                                                                            ~      II L    Sl-179-9-SW-4
                                                                                                                                                    ~ 3-4208-21          OC Sl-179-FW-907                                                                  8-179-10-SW-2 ll~ SI-179-9-SW-I Sl-4208-255                                                          Sl-179-10-SW-1                                          EL SI-179-FW-12                                                  14'-9'l-179-FW-11 8-179-16-SW-4 8-4208-252 Sl-4208-219  ~                                                  l-1-8-317 Sl-4208-222  ~                                                gn 8-179-FW-16          Sl-4208-225  ~                                                        +~V-3848 Sl-179-FW-17  ~
SI-4208-249 Sl-4208-240 Sl-179-F W-1 3 Sl-179-11-SW-3 Sl-179-1 O-SW-4 Sl-179-10-SW-3 Sl-4208-246                                                                                                                                          LEGEND Sl-4208-228 8-179-15-SW-3                                                                                                                                              ~        SHOP WELD Sl-4208-243 3-4208-231                                                                                    FIELD WELD SI-179-FW-14                                                              CH-179-9-SW-I          EXAMINATION AREA Sl-4208-237                                                                                                          l-3 -Sf-179-9          SPOOL PIECE NO.
Sl-179-FW-I 5                  SI-4208-234                                                                                  V-3524      VALVE DE8GNAVON REFERENCE DRAWINGS                              NOTES                                CALIBRATION.BLOCKS AND MATERIAL                                        FLORIDA POWER dc LIGHT Sl-N-20  REV. 13                  SEE (ZONE 144) FOR SNUBBER DWG.                                                                                                      ST. LUCIE UNIT 2 TIRE: HPSI 2A DISCHARGE TO SDC LOCP 2A DATE:  7/I4/93          KK            ZONE: 93 RCVEWEO QYS                  ORAWNC HC CPERATING PRESS. 2400  OPERATING  '1EMP. 300                                                                                        02-093-A
 
CLASS 1            ~  CONT. ON 1, OWO 02-029-A N 122-1S-SW-T
                                                                                                                        ~    CLASS 2      T V-SSZA ZONE  29 EL 24'-3
                                                                                                                      ~~      ~              Sl-1 79-FW-20 Sl-179-FW-912
                                                                                                            ~ ~
Sl-179-18-SW-6 Sl-179-FW-913 SI-4208-27058 Sl-179-18-SW- 5 SI-179-F W-914 Sl-179-18-SW-4 Sl-179-18-SW-3                      OOOO
                                                                                  ~EL Sl-179-18-SW-2    ~
12'-0 I
I SI-4208-2705A Sl-179-18-SW-I
                                                                            ~
I EL 16'-0" Sl-4208-266B SI-179-F W-905
                              ~
Sl-179-17-SW-4 Sl-4206-264B
                                                                    ~ ~                              Sl-179-FW-19 Sl-179-17-SW-3
                                                                                        ~        Sl-179-FW-904 Sl-179-17-SW-2
                  ~        o+M Sl-179-FW-906 20TI
                                                                              ~    Sl-4208-264A SI-179-17-SW-6 Sl-4208-266A LEGEND 4      SHOP WELD I                                                                                                                                              FIELD WELD SI-1 79-17-SW-5 8- l79-17-SW- I    EXAMINATION AREA CONT. ON                                                                                                                        I-3"-Sl-179-17    SPOOL PIECE NO.
DWG. 02-093-A                                                                                                                                V-3524 ZONE 93                                                                                                                                          VALVE DESGNA llON REFERENCE DRAWINGS                            NOTES                                CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT Sl-N-20  REV. 13                  SEE (ZONE 144) FOR SNUBBER DWG.                                                                                                ST. LUCIE UNIT 2 TITLE: HPSI 2A DISCHARGE TO SDC LOOP 2A DATE:  9/11/92                    ZONE: 93 aCmm    erS              eRANHC kO CPERATING PRESS. 2400  OPERATING TEMP. 300                                                                                      02-093-8
 
SI-241 5-134 V-3522 CONT. ON DWG.
ZONE 02-094>>8 94 9-220-I-SW-2
                                                                                                                                                        ~                      Sl-220-1-SW-3 Sl-180-1-SW-4
                            ~                                                      9-180-FW-2                                    DWG.
CONT. ON 02-087-H q
Sl-220-1-SW-I
                                                                                                                                                      ~
ZONE  87
                            ~
9-382-FW-1 4  X2" 9-180-1-SW-3                                            Sl-382-FW-2
                          ~
RED.
SI-180-1-SW-I                            SO-03-18                                                                                                CONT. ON SI-241 5-103                              02-087- J
                ~
DWG.
Sl-180-1-SW-2 ZONE 87 Sl-180-FW-I SI-220-I-SW-4 3'-6                                                                                                                                4" X 4" X
                      ~
EL                                                                                                                                                    3 4'O                    RED. TEE SI-213-1-SW-I SI-21 3-I-SW-2 9-180-I-SW-6 9-382-FW-3
                                                                                      ~      S0-03-16 SI-220-FW-903 Sl-220-1 -SW-5 9-2415-1 05 SI-220-1-SW-6 El  (-)  7'-1 SI-2415-119 SI-21 3-1-SW-3
                                          ~  Sl-213-FW-903 9-220-FW-901 6
9-220-1-SW-8 X4" CONC. RED.
                                                                                                                                    ~                    ~      Sl-220-1-SW-7
                              /~~
                                    /              ~ Sl-213-FW-902                                                    CONT. ON DWG. 02-062  OA Sl-220-FW-1 ZONE  82 CONT. ON DWG. 02-062 ZONE 62
                                ~8
                                              ~      Sl-213-I-SW-12 9-213-I-SW-11 LEGEND
                                                                                                                                                                ~      SHOP WELD FIELD WELD Sl-213-1-SW-I      EXAMINATION AREA I-6 -Sl-213-IA      SPOOL PIECE NO.
V-3522    VALVE DE9GNAllON REFERENCE DRAWINGS                                NOTES                              CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT 9-N-11    REY. 17                                                                                                                                                  ST. LUCIE UNIT 2 Sl-N-14    REY. 23 TITLE: HPSI HEADER    8  TO SOC LOOP    28 DATE:  11/13/92                      ZONE: 94 RCVKKO QY:                ORAWNC NQ.:
OPERATING PRESS. 1450  OPERATING TEMP. 300                                                                                  02-094-A
 
                                                                                          ~
Sl-181-3-SW-2          Sl-2414-44 Sl-181-3-SW-3                          ~~ V-3534
                                                                                                                    /)/
                                                                                                                                ~
                                                                                                                          ~n  V 3535 A
OA
                                                                                                                  /Q      c.q~
3327LE          Sl-2414-6003 EL 14'-10                SI-181-4-SW-2                                                                  CONT. ON V-3531 v~ 'VI                                  DWG. 02-092 Sl-161-4-SW-3    ~                      Sl-181-4-SW-1
                                                                            &~.
V-3532
(
                                                                                                                  +>
Sl-161-2-SW-I V
                                                                                                                                        <006, ZONE I
92
                                                              ~
SI-181 -FW-904
                                                                        .                                        Sl-1 81-FW-905 6 PIPE 51-2414-28                                                                                            SI-181-2-SW-2                                            SLEEVE Sl-241 4-31 SI-181 -F W-903                                      Sl-181-FW-2 r                                                                                                                                              (-) 3'-6"
                                                          ~
CONT. ON                                                                                                                                                                  EL.
DWG. 02-094-C                                              Sl-2414-350                                                                  Sl-2415-143 ZONE 94 SI-181-4-SW-4 Sl-181- I-SW-1 Sl-181-5-SW-I SI-181 SW-5                                                  3-181-FW-1 v~v  ~ l-3/4-51-384 45V                                                                                                        X~y 3549 Sl-181-4-SW-6    ~                                                                DWG. 02-094-A ZONE 94 Sl 2415    13&
3-181-FW-3 SI-241 4-40                                                                                                          LEGEND FL. EL. 19'-6"                                                                                                              ~        SHOP WELD SI-181-3-SW-5    ~                OA SI-1 81-3-SW-4 CH-181-1-SW-1 1-3"-Sl-I&I-I V-3522 FIELD WELD EXAMINATION AREA SPOOL PIECE NO.
VALVE DESGNATION REFERENCE DRAWINGS                              NOTES                                  CALIBRATION 8LOCKS AND MATERIAL                                      FLORIDA POWER 4c LIGHT Sl-N-11  REV. 17                                                                                                                                                        ST. LUCIE UNIT 2 TITLE: HPSI HEADER B TO SDC LOOP        28 DATE:  7/14/93      KK              ZONE: 94 REVEWED QYS            ORA'EENC RO OPERATTNG PRESS. 2400  OPERATING TEMP. 300                                                                                          02-094-8'
 
0 CONT. ON DWG. 02-095 ZONE  95 PENETRAllON
                                ~~        I-3/4-8-277 70 9-181-F W-10      25630  H
                                          ~      Sl 181 8 SW 4'I-181-6-SW-2                  ~
                                                                                                                                                            ~
Sl-IBI-6-SW-1
                                                                                                            ~M
                                      ~      ~EL 34'-0'I-181-8-SW-3 SI-2414-170 SI-181-FW-6                              /~
Sl-181-6-SW-5                  EL 20'-6" Sl-181-6-SW-6 8-2414-23 Sl-2414-6  ~                            Sl-2414-130
                                                                                  ~                          V-3551 Sl-181-FW-7
                                                                                                                                ~Op 3-181 SW-3  ~
                                                                                                                                          +I FL. EL. 19'-6" v7  ~  I 3/4  Sl 569          Sl-181-6-SW-4.
V-3523                    c~ V-3690 SI-181-8-SW-2
                                      ~                                  ~
Sl-181-FW-8 Sl-181-FW-9 Sl-181-FW-5
                                                                                                                                                                            ~
CONT. ON DWG.
ZONE 94 02-094-B Sl-181-8-SW-1                  ~                  SI-2414-110 I-3/4-Sl-566 LEGEND
                                                                                                                                                                        ~      SHOP WELD FIELD WELD Sl-181-6-SW-1    EXAMINATION AREA I-3"-Sl-181-6    SPOOL PIECE NO.
V-3523    VALVE DESGNATION REFERENCE DRAWINGS                            NOTES                                                CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT SI-N-11  REV. 17                                                                                                                                                            ST. LUCIE UNIT 2 TITLE: HPSI HEADER B TO SDC LOOP 28 DATE:  7/14/93      KK            ZONE:  94 RCVUCD QY".            ORANNC No.:
OPERATING PRESS. 2400  OPERATING                TEMP. 300                                                                              02-094-C
 
CONT. ON DWG. 02-028-A                  CLASS I ZONE 28        ~        CLASS 2 V-3526                      9-181-1 2-SW-1 Sl-181-FW-14                                                                                                        EL 34'-0"                Sl-181-9-SW-5
                                                    ~EL 24-3                                                              Sl-181-0-SW~4~
2'56'H 9-4206-6271C    ~          E~o 9-181-12-SW-2
                                            ~
I 9-181-9-SW-1                                                    Sl-181-FW-801
                                                                                                                                                          ~
Sl-181-12-SW-3                                  Sl-1 81-FW-11
                        ~ ~
EL 19'-0                                          15"I 5'H Sl 4206  6254
                      ~
SI-4206-6255 o                    Sl-181-12-SW-4 15 15'V
                                                                                                                                      ~    Sl-4206-601 I Sl-4206-605 PENETRATION 70
                                                                                                                  ~ ~
CONT. ON 9-181-12-SW-5                                                                                                                                                              DWG. 02-094-C
                  ~~
ZONE 94 Sl-181-FW-13 Sl-181-FW-909 EL 18'-8 15'15 V
                                                                                    ~            Sl-181-9-SW-2 Sl-4206-611 Sl-181-9-SW-3 Sl-181-FW-91 0  ~
Sl-181-FW-914    ~~
4            W-181-10-SW-1 SI-4206-614
                                                              ~ ~                SI-181-10-SW-2 Sl-4206-621 SI-4206-616A Sl-181-FW-917 Sl-181-FW-918
                                                                      ~17'-4'EGEND Sl-4206-616B 9-181-FW-911 Sl-4206-619  ~
V-3847 v wg
                                                                      ~EL II Sl-181-1W-12                                                                  ~
Sl-181-12-SW-    I SHOP WELD FKLD WELD EXAMINA'TION AREA I-1-Sl-316                                                                                              l-3"-Sl-181-9    SPOOL PIECE NO.
Sl-181-FW-913                                                                                                  V-3526    VALVE DE9GNATION REFERENCE DRAWINGS                                  NOTES                                CALIBRAIION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT Sl-N-21  REV. 13                    SEE (ZONE  145) FOR SNUBBER DWG.                                                                                            ST. LUCK UNIT 2 TITLE: HPQ 2A DISCHARGE TO SDC LOOP 2B DATE:  7/14/93      KK            ZONE: 95 RCVK%ED QYS              DRAWNC NG.S OPERATNG PRESS. 2400  OPERATlNG TEMP. 300                                                                                  02-095 '
 
SI-205-SW-3 INST
                                                                  ~RVy 3494 ITEM g  584                                            SI-205-SW-2 2" X 3/4" RED. INSERT  ~
                                                              ~ ~
I Sl-205-F W-l Sl-205-SW-5 EL. 3'-9 Sl-205-SW-4
                                ~
2  X1"
                                          ~                              SI-205-SW-6
                            ~
RED.
CONT. ON 1 X 2                                                                  DWG. 02-062 RED.                              SI-205-SW-7                      ZONE  62 S-205-SW-10
                ~
RECIR. ORIFICE g 0-HPSIP-2B Sl-205-FW-11
                  ~
Sl-205-SW-29
                                                                          ~                      9-205-SW-30 Sl-205-SW-13 Sl-205-SW-12                    /~
Cp4, OS SI-47-Rl V-3103
                                                                                                      ~      9-205-SW-14
                                                                                                              ~o Sl-205-FW-27    ~ ~                    SI-205-SW-28      SI-205-SW-15 SI-205-SW-16
                                                                                                                            ~ Sl-205-SW-18 Sl-205-SW-17 2" X3/4 RED. INSERT
                                                                                                        ~~~                        TO CS LEGEND
                                                                                                              ,I,                PUMPS                4      SHOP WEl9 3/4  CUICK CONNECT  ~      NPT CLASS 2 Sl-205-SW-2 1-2"-SI-47-2 V-3103 FIELD WELD EXAMINAllON AREA SPOOL PIECE NO.
VALVE DE9GNAIION REFERENCE DRAWINGS                          NOTES                                CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT 9-47  REV. 10                                                                                                                                              ST. LUCE UNIT 2 TITLE: HPSI 2B DISCHARGE TO SDC LOOP 2B CPERATING PRESS. 1450  OPERA'BHG TEMP. 300 DATE:
RCVE%ED QY.'ONE:
11/13/92 ORAWNC NO 02-096 '
96
 
                                                                                                                  ~      MAIN CONDUIT BOX CS-2A-2-2                  CS-2A-2-3 CS-SUPPORT 2A-2
                    ~                                  CS-SUPPORT 2A-3 30 A
                                                                                                                  ~
                                                                                                      ~
PUMP DISCHARGE PUMP SUCTION CS-2A-2-1 CS-SUPPORT 2A-1 SECTION A-A REFERENCE DRAWINGS                  NOTES                            CALIBRATION BLOCKS AND MATERIAL                          FLORIDA POWER dc LIGHT ST. LUCIE UNIT 2 TITLE: CONTAINMENT SPRAY PUMP 2A OA'TE:  11/1 7/92                  ZCNE: 97 a@men er:              OaA'NNC HO:.
02-097-A'
 
HP-SUPPORT 2A-1
                          ~      ~ HP-SUP PORT 2A-2 REFERENCE DRAWINGS          NOTES      CALIBRATION 8LOCKS AND MATERIAL                    FLORIDA POWER 8c LIGHT ST. LUCK UNIT 2 TITLE: HPSI PUMP 2A DATE:  11/1 7/92              ZONE: 98 RKVEKD QYS          ORAWNC NO          REMSONS 02-098-A'
 
SECOND INSPECTION INTERVAL                PSL<<201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 APPENDIX F CLASS 3 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER    TITLE 02-100-A  Component Cooling Water Hx 2A and 2B Inlet 02-100-B  Component Cooling Water Hx 2A and 2B Inlet 02-101-A  Component Cooling Water Hx 2A and 2B Discharge 02-101-B  Component Cooling Water Hx 2A and 2B Discharge 02-102-A  Component Cooling Shutdown Cooling Hx 2A Inlet 02-1 03-A  Component Cooling Shutdown Cooling Hx 2B Inlet 02-104-B  Spent Fuel Pool Cooling Hx 2A Discharge 02-105-A  Component Cooling Shutdown Cooling Hx 2A Discharge 02-105-B  Component Cooling Shutdown Cooling Hx 2B Inlet 02-105-C  Component Cooling Shutdown Cooling Hx 2A Discharge 02-106-A  Component Cooling Shutdown Cooling Hx 2B Discharge 02-1 06-B  Component    Cooling Water  Shutdown    Cooling  Hx 2B Discharge 02-1 06-C 'omponent Cooling Shutdown Cooling      Hx 2B Discharge 02-107-A  Component Cooling Water Pumps 2A, 2B and 2C Inlet 02-107-B  Component Cooling Water Pumps 2A, 2B and 2C Inlet 02-108-A  Auxiliary Feedwater Pump 2C to Main Feedwater 02-1 08-B  Auxiliary Feedwater Pump 2C to Main Feedwater 02-1 09-B  Condensate Suction to Auxiliary Feedwater. Pump 2C 02-110-A  Condensate Suction to Auxiliary Feedwater Pumps 2A and 2B Page 323 of 398
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE              July 24, 1993 APPENDIX F CLASS 3 WELD/SUPPORT LOCATION MAPS DRAWING NUMBER      TITLE 02-110-B    Condensate Suction to Auxiliary Feedwater Pumps 2A and 2B 02-111-A    Auxiliary Feedwater Pump 2A and 2B Discharge 02-111-B    Auxiliary Feedwater Pump 2A and 2B Discharge 02-112-A    Circulating Water from Intake Cooling Water Pumps 02-112-B    Circulating Water from Intake Cooling Water Pumps 02-113-A    Circulating Water to CCW Hx 2A 02-114-B    Circulating Water to CCW Hx 2B 02-180      Letdown Heat Exchanger 02-181      Component Cooling Water Heat Exchanger 2A 02-183-A    Component Cooling Water Pump 2A 02-184-B    Fuel Pool Cooling Pump 2B 02-185-B    Fuel Pool Cooling Heat Exchanger 2B 02-'I 86-C  Auxiliary Feedwater Pump 2C 02-187-A    Shutdown Cooling Heat Exchanger 2A 02-187-B    Shutdown Cooling Heat Exchanger 2B 02-188-C    Intake Cooling Water Pump 2C 02-189      Component Cooling Water Surge Tank Page 324 of 398
 
CC-2073-8 EL. 18'-0" CC-2073-70 CC-2073-602                                                        WALL 45V SB-14-1 A                      EL. 14'-9" CC-2073-13 COMPONENT COOUNG WATER HEAT    CONT. ON EXCHANGER 2A DWG. 02-181 24  X 24  X 20 24" X 30" ~              ZONE 181 EL 23-11" RED. TEE CC-2073-162
: r. REO cg Q
25'-9" X 20" RED.        CC-2073-392 CONT. ON
                                                                                      ~
EL.                      DWC. 02-183-A ZONE 183 MV-14-1 SB-14-8
                                                                                                                                                        ~
COMPONENT COOUNG WATER 12" X
                                                                  , /PUMP 20'/        2A                                                                                CC-2073-18 RED.
X V-14-658                                                                                24'      24'
                                                                                                                                    ~                                      'TEE 20'ED.
gQ    p4~                              12 X 20 CC-2073-492 RED.
EL CONT. ON DWG. 02-183-C Olv  P    CONT. ON 02-100-8 DWG.
25-9'RAIN ZONE 183                                        ZONE 100 CC-2073-441                                                                                                SB-1 4-8 COMPONENT LEGEND                                                                                                        COOLING WATER
                                                                                                                    /PUMP 2C
        ~      SHOP WELD FIELD WELD CH-146-FW-16    EXAMINA'1TON AREA V-14-858 1-6"-51-112  SPOOL PIECE NO.
                                                                                                                ~QO+
V-14-158  VALVE DESIGNATION CC-2073-531                1" DRAIN REFERENCE DRAWINGS                            NOTES                                CALIBRAllON BLOCKS AND MATERIAL                                    FLORIDA POWER 8c LIGHT CC-H-1  REV. 12                  SYSTEM IN SUPPORT OF ECCS, CHR, AC, AND RR                                                                                    ST. LUCIE UNIT 2 TITLE: COMPONENT COOUNC WATER HX 2A              Ec 28 INLET HEADER DA'TE: 6/7/93    KK                ZONE: 100
                                                                                                                                        @vms er.              DRA'NNC HO.:
OPERATINC PRESS. 100  OPERATINC TEMP. 180                                                                                      02-100-A
 
CONT. ON DlhG. 02-100-A ZONE 100 (
9 CC CC-2073-222 I" DRAIN                              24" X 24" X 20"
                                                                            ~
REO. TEE MV-14-2 12" X 20'ED.
CC-2073-592                                                  CC-2073-7011
                                                                                                      ~0@
CONT. ON EL 25'-9                    0WG. 02-183-B ZONE 183 COMPONENT SB-14-8      1" DRAIN    l~~                                    ~        CC-2073-29 CC-2073-7031  ~                      GG
                                                      /  COOLING WATER PUMP 2B V-14-658 CONT. ON DWG. 02-182 ZONE 182 COMPONENT COOUNG C~
45V WATER HEAT CC-2073-76              EXCHANGER 28 CC-2073-322                  G 1  DRAIN 24  X  30            EL 23'-11" RED.                                                                          CC-2073-73 LEGEND                                                                                                                SB-14-1A
          ~    SHOP WELD FIELD WELD CH-146-FW-16  EXAMINATION AREA 1-6"-SI-112  SPOOL PIECE NO.
SB-14-1A  VALVE DESGNATION REFERENCE DRAWINGS                                NOTES                                CALIBRA'110N BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT CC-H-1  REV. 12                  SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                          ST. LUCIE UNIT 2 AND RRHR TITLE: COMPONENT COOUNG WATER HX          2A IIc 2B INLET HEADER DATE:  6/7/93    KK              ZONE: 100 RCVKAED SY:          DRAWING OPERATING PRESS. 100 OPERATING  TEMP. 180                                                                                  NO'2-100-8(
 
LEGEND
                                                                                                                                                          ~        SHOP WELD OA CC-2075-7015                                                                                              FlELD WELD EL 17'-4"                                                                                                                                    CH-146-FW- I 6      EXAMINATION AREA CC-2075-6001                                    SB-14-lA                                                      I-6 -S!-112      SPOOL PIECE NO.
yP HCV-1 4-68                                                                                                                        S8-14-10      VALVE DESIGNATION CC-2075-72 NCC            18 CLASS 3                OC.
                                  '70 24" X 16" REO.
                              ~                            FE-14-18 DWG.
CONT. ON 02-101-B                  CC-2075-6005 1-1-C-231 24  X  20 RED.
ZONE 101
                                                                                                      ~    CC-2075-90
                                                                                                                                              /A,
                                                                                                                                                ~o
                                                                                                                                                      <c I" VENT CC-2075-8100 CC-2061-101              45V CC-2061-7105
                                                              ~                    EL 15'-0"            1
                                                                                                              ~ 58-14-1'0" DRAIN gO
                                                                          %1                      00-2075-87                                              X  24" RED.
                                                                                                                                                                  ~~        FR~5>>
45V                                                              14 1C EL. 12'-6"                                                              Q          L  17  4 CC-2061-7111                                                                        CC-2075-6003                          A rCG r514r                          COMPONENT COOUNG WATER HEAT EXCHANGER 28 1" DRAIN                                                                                                      CONT. ON Qa                                            DWG. 02-182 CONT. ON  >~                                                                                                                                ZONE 162 DWG. 02-103-A ZONE 103 REFERENCE DRAWINGS                                NOTES                              CAUBRA'HON BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT CC-H-2  REV. 12                    SVSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                      ST. LUCIE UNIT 2 CC-H-5  REY. 16                    AND RRHR TIRE: COMPONENT COOUNG WATER HEAT EXCHANGERS 2A IIc 28 DISCHARGE DAlE: 6/6/93      KK                ZONE: 101 REVEL)  QY:              ORA%INC Na            REMSOMC CPERATING PRESS. 100    OPERATING    TEMP. 120                                                                            02-101-A              I
 
EL. 36-5"          1" VENT Qa S~L17'-4'24"              RED.
X 20 CC-2075-7055                        3D'    24 EL. 32-5 CC-2075-85 I-1-CC-227 CC-2075-8101 COMPONENT COOUNG WATER HEAT C C-2082-6101      EXCHANGER 2A CONT. ON
                                                          , ~42ND DWG. 02-181 ZONE 181 6
SB-14-1C L
EL 12'-6"                                                    ~o+
SB-14-IA CC-2062-7106                                                                                                    SB-14-14+~
24  X CC-2075-6008 CC-2075-110 24" X 16
                                                                                                                              ~                CC-2075-6006 GD-2575-7DDB CONT. ON DWG. 02-101-A ZONE 101 CWG.
CONT. ON 02-102-A
                                        +                              RED. TEE XX FE-14-1A lEGEND ZOIIE 102                CC-2075-62
                                                                                        /~)                                                            ~      SHOP WELD 6-C,                                                                FIELD WELD 0 /gHCV 14    BA CH-146-FW-18      EXAMNA'DON AREA I-8"-Sl-112    SPOOL PIECE NO.
OA                            ~21455 3 NCC SB-14-1A      VALVE DESIGNATION REFERENCE DRAWNGS                          NOTES                                CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT CC-H-2 REV. 12                S&TEM IN SUPPORT OF ECCS, CHR, AC,                                                                                          ST. LUCIE UNIT 2 CC-H-3 REV. 13                AND RRHR                                                                                          TITLE: COMPONENT COOUNG WATER HEAT EXCHANGERS 2A R 28 DISCHARGE DATE:  6/8/93    KK              ZONE: 101 RCVEIN) QYS            DRA'NNC HO OPERATING PRESS. 100  OPERATING TEMP. 120                                                                                    02-101-8'
 
                                                                                                                                                                        .A LEGEND
          ~
X CH-146-FW-16 SHOP YEELD FIELD WELD EXAMINATION AREA                                                                              CONT. ON CC-2062-6001
                                                                                                                                        ~                                  CONT. ON DWG. 02-101-B ZONE 101 1-6 112                                                                                                DWG. 02-104-A SPOOL PIECE NO.                                                                              ZONE 104 S8-14-13  VALVE DESIGNATION 45'V I
                                                                                                                                  ~      CC-2062-183
                                                                                                                +o+              20" X 20" X 12" REO. TEE I-4-CC-209 1-2-1/2-CC-57                                ~    CC-2062-6208 OA
                                                                                                                              ~~        CC-2062-7226 DWG.
CONT. ON 02-102-8 ZONE 102 Cr        ~      CC-2062-9 CC-2062-6210 WALL                          ~
CC-2062-7227 CC-2062-6228 CC-2062-7217
                                  ~                    ~20 CC-2062-82
                        ~                    ELO X 20" RED. TEE X 10"
                                                                                                                                                    ~EL.      12'-6'66 CC-2062-6220
                ~              o+  ~      I-14"-CC-20-1 20" RED.
X 14 SB 14  3      EL 6  1
  ~EL 16'-0 COOLING 2'-6'HUTDOWN            HEAT EXCHANGER 2A CONT. ON DWG.        02-187-A
                                                                                                                          ~EL                                ZONE 187 REFERENCE DRAWINGS                            NOTES                          CAUBRAWON BLOCKS AND MATERIAL                                  FLORIDA POWER dc UGHT CC-H-3  REV. 13                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                                  ST. LUCIE UNIT 2 TITLE: COMPONENT COOUNG        -        SHUTDOWN COOUNG HX 2A INLET DATE:  6/7/93      KK                      ZONE: 102 acmic  ev:              DRA'RENC KQ OPERATING PRESS. 100  OPERATING  TEMP. 120                                                                            02-102-A'
 
EECENC
          ~
CH-146-FW-16 SHOP WELD BELD WELD EXAMINATION AREA CC-2061 -7001 CONT. ON
                                                                                                                                              ~                          CONT. ON DWG. 02-101-A ZONE 10I I-6"-SI-112  SPOOL PIECE NO.                                                                                      DWG. 02-104-A                      WALL ZONE 104.
SB-14-3  VALVE DESIGNATION I
20" X 20" X 12 45V                              RED. TEE CC-2061-191 I-4-CC-207  ~~    I                  ~
EL 12'-6 CC-2061-7011 Qa CC-2061-1 5 CC 20'    20'
                                                                    ~
10                EIO                      CC-2061-7013 CC-2061-7020 REO. TEE 20" X 14"
                                  ~  REO. ~
I-2-1/2-CC-58 1-1-1/2-66-186
                                                                                                                                                ~~  CC-2061 -7033 CC-2061-6034 CC-2061-7023
                        ~                                    CONT. ON 02-103-8                                                        WALL
                ~
OWG.
ZONE 103                                                                                ~EL    12'-6'L CC-2061-7027 8'-1"
~EL 16'-6'A SHUTDOWN COOLING HEAT EXCHANGER 28 CONT. ON OWG. 02-187-8
                                                                                                                                      ~EL  2'-6                          ZONE 187 REFERENCE DRAWINGS                            NOTES                              CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER 8c LIGHT CC-H-5  REV. 17                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                                  ST. LUCE UNIT 2 TITLE: COMPONENT COOUNG  SHUTDOWN COOUNG HX 28 INLET DATE:  6/7/93      KK                  ZONE: 103 RCVEl%D RYE            ORA'NNC      N(L CPERATING PRESS. 100  OPERAllNG  TEMP. 120                                                                              02-103-A'
 
Oa gp pp 28'-3"            r%
                              ~r EL EL 16'-0 CC-2160-6085 FE-14-2 CC-2160-6083    ~                                                                                                                                  60'H FLOOR EL. 19'-6"                                ~o4, 1" VENT                                    CC-21 60-6088
                                    /~1                                                                            EL. 28'-3" p+
C0
                                                        ~EL 2!!'-3' 14  X 12j RED.
EL 25'-8 EL  26'-0 45%
CC-21 60-501 gGr gr FUEL POOL HEAT SB-14-11        EXCHANGER 2A Qa CONT. ON EL 21'-9            DWG. 02-185-A ZONE 185 CC-2160-8 LEGEND MV-14-19
          ~      SHOP WELD                                                                                        CONT. ON DWG. 02-106-A RELO WaO                                                                                        ZONE 106 CH-146-FW-16    EXAMINATION AREA                                                                                                              I~)  ~0y 1'RAIN I-6"-SI-112  SPOOL PIECE NO.
                                                                                                                                                        ~8    CONT. ON SB-14-11  VALVE DESIGNAllON                                                                                                                              DWG. 02-105-A ZONE 105 REFERENCE DRAWINGS                              NOTES                                CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT CC-H-14  REV. 15                                                                                                                                                ST. LUCIE UNIT 2 SYSTEM IN SUPPORT OF RESIDUAL HEAT                                                                lllLE: SPENT FUEL POOL COOLING HEAT EXCHANGER REMOVAL FROM SPENT FUEL STORAGE POOL                                                                    2A DISCHARGE PIPING DATE:  6/23/93          KK            ZONE: 104 OPERAllNG PRESS. 100  OPERATING  TEMP. 120                                                    RVmm  eV:                DRAWNC NQ.:
OPERAllNG PRESS. 100    OPERATING TEMP. 150                                                                                  02-10+-9
 
LEGEND CC-2064-7638    ~          ~r'~5  CONT. ON DWG.          02-107-8
          ~      SHOP WELD                                                                                                                                                ZONE 107 WALL FIELD WELD                                                                                          CC-2064-35 CH-146-FW-16 1-6"-SI-112 EXAMINATION AREA SPOOL PIECE NO.
CONT. ON
                                                                                                            ~
HCV-14-3A  VALVE DESIGNAllON                                                                                        45V DWG. 02-104-8 ZONE  104"I CC-2064-7627                                  9'-0" EL DWG.
CONT. ON 02-105-8 g
20" X 20" X 12 0            ~      CC-2064-7609 12'-8'C-2064-31                                                ~ ZONE 105                                    RED. TEE 1/2  CC 187
                                                                ~
I 1 CC-2064-7629 PLUGGED I-2-1/2-CC-91          j              EIS
                                                                                            ~20"
                                                                                                                                                    /~
I-4-CC-21 0 CONT. ON 02-105-C 4r CC            X 20 RED. TEE X 10" C'EL              'l2'-6'CV
                                                                    ~
ZONE 105 14"  X 20" ~                                                                                                                  14 3A EL          10 CC-2064-6614 CC-2064-761 7
                            ~            SB-14-3 20  X 20 RED. TEE CC-2664-7623 X 6 CC yr 20" X 14 RED.
~EL EL  2'-6 WALL                FE-14-10A 4p+
SHUTDOWN COOLING
                                /y                                                                                            HEAT EXCHANGER 2A
('                                                                                                  DWG.
CONT. ON 02-167-A ZONE 187 REFERENCE DRAWINGS                              NOTES                                CALIBRAllON BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT CC-H-15  REV. 12                SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                                          ST. LUCIE UNIT 2 CC-H-16  REV. 15                FUNCTION llTLE: COMPONENT COOUNG  SHUTDOWN COOUNG HX    2A DISCHARGE
                                                                                                                                      'DATE:  6/7/93      KK            ZONE: 105 ORANNC RO CPERAllNG PRESS. 100    OPERATING    TEMP. 180                                                                                02-105-A'
 
0 CONT. ON DWG. 02-084-A            My 14 3/4
                                                                    ~CIASS 2 CLASS3 CC-2061-6679    ~
                                                                                                                    -e CONT. ON 12'45'50 H    Cg            ~ CC-2064-6681 DWG. 02-083-B      )
ZONE  83      w,y MV-14-10        PLUG
(
(      ~EL 29-9 2
                                        ~CLASS CLASS 3
                                                          ~iv co                                                      8    10'~
CC-2064-6691                                          ~ CC-2064-6692              X RED.                10"  X 10" X 8" RED. TEE
                                                                            ////
PLUG  CPE-44-12A 7'51'I 0"H                                        EL 23'-2 SB-14  4.
                                                                              ~EL. 29'-9" I
C7 I
CI
                                                                                                                                          ~      CC-2064-86 I-3/4-CC-97 FLOOR    EL 19'-6'EGEND
          ~      SHOP WELD RD.D WELD CH-146-FW-16    EXAMINATION AREA I-6 -SI-112  SPOOL PIECE NO.
SB-14-4                                                                                                                                        CONT. ON VALVE DESIGNATION                                                                                                                    DWG.          02-105-A ZONE          105 REFERENCE DRAWINGS                              NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                            FLORIDA POWER 8c LIGHT CC-H-16  REV. 15                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                    'PE                            ST. LUCK UNIT 2 FUNCTION TITS: COMPONENT COOUNG                  -  SHUTDOWN COOUNG HX              28 INLET DATE:    6/7/93                  KK          ZONE: 105 REVEALED RYE                        ORAWNC NO OPERATTNG PRESS. 100 OPERATING  TEMP. 210                                                                                                02-105-B
 
CC-2064-65 CC-2064-21 2                                                            CC-2064-68 EL 57'-7" CC-2064-6654
                                      ~                        SB-14-6 Z  ~    CC-2064-58 CC-2064-6670 FLOOR EL 62'-0" CONT. ON 69'-0'OMPONENT    COOUN0 SURGE  TANK DWG. 02-189 ZONE 189                                                          GGr            CC-2064-6672 5
        ~EL EL 72'-0 CC-2064-74
                                                                                              ~  N LEGEND
                                                                                                                                        ~        SHOP WELD X        FIELD WELD r  CONT. ON CH-146-FW-16 1-8"-Sl-112 EXAMINAllON AREA SPOOL PIECE NO.
DWG. 02-105-A ZONE 105                SB-14-16    VALVE DESIGNAllON REFERENCE DRAWiNGS                          NOTES                        CALIBRAllON BLOCKS AND MATERIAL                              FLORIDA'POWER dc LIGHT CC-H-15  REV. 12            SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                            ST. LUCK UNIT 2 FUN CllON TITLE: COMPONENT COOUNG  SHUTDOWN COOUNG HX 2A DISCHARGE DATE: 8/8/93    KK              ZONE: 105 ORA'NNC NO OPERATING PRESS. 100  OPERAllNG TEMP. 125                                                                      02-105-C'
 
                                                                                                                                                                ~r'5 LEGEND                                                                                                                      CC-2063-7437                        CONT. ON DWG. 02-107-8
          ~      SHOP WELD                                                                                                                                            ZONE 107 flELD WELD                                                                                      CC-2063-7433                                  WALL CH-146-FW-16    EXAMINATION AREA I-6'-SI-112    SPOOL PIECE NO.                                                      CC-2063-7427 HCV-14-38    VALVE DESIGNATION CC-2063-7425 1-2-1/2-CC-62 20" X 20 X10
                                                                                    ~            xrL EL  9'-0 CONT. ON DWG. 02-104-8 ZONE 104.            Oa          ~    CC-2063-7408 04 RED. TEE 20" X 20" X 12" CC-2063 -22
                                                                                                ~
RED. TEE CC-2063-6421                                              I-1-1/2- CC-189 20"  X6" 7  CONT. ON DWG. 02-106-8                                                                ~EL.
20    X                                                    ZONE 106                                                                            12'-6'CV RED. TEE CC-2063-7415 CC-2063-741 3 14" X 20" RED.
                                              ~
                                                            '6~ J  ~
CONT. ON 1-4-CC-208 0WG. 02-106-C 14 38      EL 10 2-ZONE 106 CC-2063-6411                              SB-14-3
~EL 20 X 14" RED.
                                                                                                                                                              ~
12'-6'ALL
                                                                                                                                                                        ~E. '-6 4PIR,      FE 14  108 CONT. ON
                                //                                                                                                  DWG:  02-187-8
                                  ?
Yo                                                                                                    ZONE 187 SHUTDOWN COOLING HEAT EXCHANGER 28 REFERENCE DRAWINGS                              NOTES                                CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc UGHT CC-H-13  REV. 18                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                                    ST. WCIE UNIT 2 FUNCTION                                                                                        TITLE: COMPONENT COOUNG  SHUTDOWN COOUNG HX 28 DISCHARGE DATE:  6/7/93    KK            ZONE: 106 REVKWED RYE          DRAWNC NO OPERATING PRESS. 100  OPERATING  TEMP. 180                                                                              02-106-A '
 
CONT. ON DM. 02-0&-B    )        My        16 ZONE 86 P 14                  3/4"
                                                                  ~
I I  '9 IA
                                                              ~CLASS  2 CLASS  3
                                                                                              ~low CC-2063-6474
                                                                                                                                      ~
4514 PLUG                      'e.                        CC-2063-76A C~
CC-2063-6488 FE-14-12D  //
PN MV-1'1-14.                                                                                8~('      ~EL
                                                                                                                                ~
OWG. 02-085-A                                                                                                                    20'-0'0" ZONE  85 8'    10" CLASS 2 CLASS 3 J                                          )/ p      CC-2063-6490          REO PLUG X 10" X 8"
                                                                                      //
FE-14-12C REO. TEE 2!!' 0 EL  23'-2 SB-14-4.
                                                                                                                ~e"    99
                                                                                    ~EL.
29'-9'EL gC O
O I
oI
                                                                                                                                          ~          CC-2063-81 I-3/4-CC-97 I
FLOOR        EL 19'-6" LEGEND
          ~      SHOP WELD CONT. ON FIELD WELD                                                                                OWG. 02-106-A ZONE 106 CH-146-FW-16    EXAMIIIATION AREA I-6 -SI-112  SPOOL PIECE ND.
MV-14-14    VALVE DESIGNAllON REFERENCE DRAWINGS                            NOTES                                    CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER R LIGHT CC-H-13  REV. 18                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                                              ST. LUCK UNIT 2 FUNCTION                                                                                            IlTLE: COMPONENT COOVNG WATER  SHUTDOWN COOUNG HX 2B DISCHARGE DATE: 6/7/93              KK                    ZONE: 106 QTE              DRAWNC NO OPERATlNG PRESS. 100  OPERAllNG TEMP. 210                                                                                          02-106-B'EVE%6)
 
I-4-CC-156 78'-6'OMPONENT
                                    ~              SURGE TANK COOUNG I-4-CC-158 EL
                        ~~                          EL  75'-3 CONT. ON                                                            CC-2063-6'I54 DWG. 02-189 ZONE 189 EL. 72'-0 CC-2063-53 PLATE EL  71'-3"
                                                                                                                      ~EL 5$ '-7 EL. 69'-0"
                                                                                                                        ~        CC-2063-58 CC-2063-6460 CC-2063-6461 82'-0'EL EL 66'-4" SB-14-6
                                                              ~    CC-2063-6452
                                                                                                                                        ~
37'-0'00 FLOOR  EL CC-2063-6464A CC-2063-6449    ~                          ~57'-7'C-2063-67 CC-2063-47 DWG.
CONT. ON 02-108-A
                                                                                                              ~                              LEGEND
                                                                                                                                                ~            SHOP WELD
                                              ~EL                                                  ZONE 106                                    X            FIELD WELD CH-146-FW-16          EXAMINATION AREA I-6 -SI-112          SPOOL PIECE NO.
V-02-03          VALVE DESIGNATION
                                                                                                                      ~EL  13-5 REFERENCE DRAWINGS                            NOTES                            CALIBRATION BLOCKS AND MATERIAL                          FLORIDA POWER 8c UGHT CC-H-12 REV. 18                  SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                                            ST. LUCIE UNIT 2 FUNCTION                                                                                llTLE: COMPONENT COOUNG  SHUTDOWN COOUNG HX 2B DISCHARGE DATE:  6/7/93    KK                  ZONE: 106 RCVEAED QY:            OAAWNC NO OPERA11NG PRESS. 100  OPERATING  TEMP. 125                                                                      02-106-0
 
COMPONENT COOUNG WATER PUMP 2A I
                                                                          ~r- 24"    X 14 ECC. RED.
CONT. ON DWG  02-183-A                EL 25'-4 ZONE 183                                    CONT. ON CC-2074-61  ~        D I
DWG. 02-183-C ZONE 183 COMPONENT COOLING WATER PUMP 2C CC-2074-59
                                                                                                      /            24 X 14 ECC. RED.
TEMP. SlRAINER I-SS-14-1A
                                              ~
0~
I" CC-2074-34
                                                                                                      ~        ~EL CV O
CJ 25-4 OWG.
CONT. ON 02-183-B ZONE 183 v            DRAIN                                          cv          COMPONENT COOLING EL 15'-5      WATER PUMP 2B SB-14-1B                                                                                                  24 X 14" ECC. RED.
DVEG.
CONT. ON ~A 02-107-B r            MV-14-3 TEMP. STRAINER I-SS-14-1C
                                                                                  ~
7'l CC-2074-19
                                                                                                                                            ~        ~EL M
I C3 25'-4
                                      ~
O ZONE 107                        ~CCR                                                                                                  I DRAIN CC-2874-7287                                                                                                                I  EL 15'-5
                                                                                ~SB-14-1 B CC-2074-7288  ~            Cg                                  TEMP. STRAINER  ~
I-SS-14-1 B CC-2074-7388  ~                    <o~
                                                                                    ~oj                                          1. DRAIN CC-2074-7289    ~          MV-14-4          ~SB-14-IB                              LEGEND X
                                                                                                                                                            ~
CH-146-FW-16 SHOP WELD FIELD WELD EXAMINATION AREA DWG.
CCNE. DN 02-107-8 Qal                                                    I-6"-SI-112    SPOCL PIECE NO.
ZONE 107                                                            SB-14-1B    VALVE DESIGNATION REFERENCE DRAWINGS                            NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                    FLORIDA POWER dc LIGHT CC-H-I1  REV. 18                SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                              ST. LUCK UNIT 2 AND RRHR                                                                                              llTLE: COMPONENT COOUNG WATER PUMPS 2A, 2B 4 2C INLET DATE:  6/7/93        KK            ZONE: 107 RCVEM)  QY:              ORAMNC Na OPERATING PRESS. 100 OPERATING    TEMP. 180                                                                                      02-107-P(
 
I-1-CC-228                                                                                                                          CONT. ON OA                                                                                              02-107-A
                                          ~
DWG.
CONT. ON                                                                                        ZONE    1 07 24  X CC-2014-50 24" X 16 RED. TEE
                                                ~~5a G
DWG.
ZONE 107 02-107-A 11  CC  230'l CC Qj( HCV-14-10 2074 9 L,MOBrr  >
20        X  24 RED.~              //                                                                              NCC
                                                                                                                                  ~ ~
CLASS 3              C Cci
                                                    ~// g  HCV-14-9                                                                                  22      12 CC-2074-7810
          ~EL  15'-5'-l 24 X 24 X 16
        /2-CC-187                              CLASS 3                                                                                                        REO. TEE PLUGGED                                  NCC                                                                            15'-5"                    20" X 24"
                        ~
                                                                                                                          ~EL                            RED.
I CC-2074-44                                                                        EL13  6          4>>
CC-2074-42
                          /~
8Q
                                                                                                                                              ~      1-1/2-CC-189 PLUGGED
                                                  ~
Cg                                                                                                                    /~~
                                                                                                                                        ~
                                                                                                                                                                              ~
p~                                                                                                                            p~                        CC-2063-210
                                ~
CC-2064-7210                                                    CC-2074-8200 CC-2063-8201 CC-2064-8201
                                                                ~  CC-2064-211 CC-2064-6201
                                                                  ~EL    13'-5'L 9'-0        LEGEND CC-2063-7205 CC-2063-6207
                                                                                                                                                        ~      ~        22'30'V          EL 9' CC-2064-6207
                                              ~                                        CH-146-FW-16 I-6"-SI-112 SHOP WELD FIELD WELD EXAMINATION AREA x  r DWG.
CONT. ON 02-105-A ZONE 105 i                1 DRAIN HCV-14-9 SPOOL PIECE NO.
VALVE DESIGNATION DWG.
CONT. ON 02-106-A ZONE 106 1 DRAIN REFERENCE DRAWINGS                                    NOTES                                  CALIBRA'IION BLOCKS AND MATERIAL                                  FLORIDA*POWER dc LIGHT CC-H-11 REV. 18                            SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                              ST. LUCIE UNIT 2 CC-H-13  REV. 16                          AND RRHR CC-H-16                                                                                                                                          TITLE: COMPONENT COOUNG WATER REV. I5 PUMPS 2A, 2B 4 2C INLET DATE:  6/7/93      KK                ZONE: 107 REVVED  BYE              DRA'NllC NR:
OPERATING PRESS. 100 OPERATING        TEMP. 180                                                                                  02-107-8
 
I-1-BF-59                                      CLASS 2 MV-09-11    A  ~  'L EXEMPT BF-4001-1 I9    ~                        ~4 X CEASE 2 CLASS  3
                                      ~EL  42'-9 BF-4001-6120                        FL EL 39'-6" BF-4001-1 24.
20'H
                      ~EL  29'-9 BF-4001-126 EL 28'-0" III 20'H BF-4001-130 SE-09-4 BF-4001-183                            EL 26'-6
                                                /~
                                    ~
BF-'l001-128
                                                                                                                ~
6" X 4" RED.
                                                    ~                          9' RED.
4' BF-4001-283 g 6 V-09-311
                                                                                                                                                                                    ~ 44 CONT. ON y  DWG. 02-108-8 ZONE 108
                                                                                          ~ECPII FE 09 20 EL 22'-11 LEGEND                                                              20'H                                  I-2-BF-39
                                                                                                                          ~~
                                                                                                                                                ~
SHOP WELD V-09-351 X        FIELD FIELD                                                                  AUX. FEEDWATER PUMP 2Ci 20'H            Epp'll BF-1006-108    EXAMINATION AREA                                                                                                                        BF-40gl-199 I-4-BF-33-1 V-09-311 SPOOL PIECE NO.
VALVE DESI GNA110N BF-4001-180 DWG.
CONT. ON 02-186-C ZONE 186
                                                                                                                            ~4        X6 RED.
REFERENCE DRAWINGS                                NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER dc LIGHT BF-M-7  REV. 13                    SYSTEM IN SUPPORT CF ECCS, CHR, AC,                                                                                            ST. LUCIE UNIT 2 AND RRHR                                                                                              TITLE: AUX. FEEDWATER PUMP 2C TO MAIN FEEDWATER DATE:  6/7/93      KK                        ZONE: 10&
QYE            DRA'NNC NQ.E CPERATING PRESS. 1115  OPERATING  TEMP. 100                                                                                02-108-A'EVVED
 
0 BF-4001-138 CONT. ON DWG. 02-108-A 2ONE 108
                  ~ I m      RED.
8 F-4001-242 BF-4001-234  ~                                  ~~/4 4
20'H BF-4001-144 20'H
                                                ~EL 2!!'-O'E-200!-222 BF-4001-248
                                                                                                ~                  20%
CLASS 2 CLASS 3 CIASS 2 EXEMPT SE-Og-5 I-I-BF-61  ~                MV-Og-12
                                                                ~EL  22'-0'~                                  BF-4001-159
                                                                                                                            ~          qO+
BF-4001-251 ~          '-e                EL. 42'-9 LEGEND
                                                                                                            ~
BF-4001-152 SHOP WELD X        FIELD WELD BF-4001-154
. BF-1006-108      EXAMINA'IION AREA I-4-BF-33-1      SPOOL PIECE NO.
V-09-311      VALVE DESIGNATION REFERENCE DRAWINGS                            NOTES                            CALIBRAllON BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT BF-M-7    REV. 13                  SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                  ST. LUCIE UNIT 2 AND RRHR                                                                                    TITLE: AUX. FEEDWATER PUMP 2C TO MAIN FEEDWATER DATE:  6/7/93    KK              ZONE: 108 REVEWED SY:            DRA%INC KO.E          REM SOME OPERAllNG PRESS. 1115  OPERATING TEMP. 100                                                                            02-108-8'
 
OA C-2204-74
                                                                                                                    ~
V-12-508 SS-2-3 EL. 22'-10" 6 I>>
PLUGGED g
3/4"                                S" X 6" ECC. REO.
                                                                                                                                                    ~
i6y,                                                          TOP OF TRENCH EL  19-6
                                                                                                                  +PLUGGED AUXIUARY FEED WATER PUMP 2C i-~  c+                                                                                                                                                      CONT. ON EL.                                C-2204-66                          OWG. 02-188-C
                                                                                                                          ~
17'-0'IPE ZONE 186 CONT. ON C                                                          UES IN DWG. 02-109-A                                                          CONCRETE TRENCH                                              C-2204-63 ZONE 109 2014 LEGEND X
SHOP ttIELO FIELD WELD
                                                                                    /~
a.
                                                                                  ~Co>>    4                                ~      C-2204-60 CH-146-FW-16 I-B-C-85-1 V-12-612 EXAMINATION AREA SPOOL PIECE NO.
VALVE DESIGNATION
                                                                                                                ~    C-2204-58 REFERENCE DRAWINGS                        NOTES                  CAUBRATION BLOCKS AND MATERIAL                                          FLORIDA POWER dc LIGHT C-E-23  REV. 15                SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                        '-" SPE                ST. LUCE UNIT 2 AND RRHR                                                                                11TLE: CONDENSATE    SUCTION TO AUXIUARY FEEDWATER PUMP 2C DATE:  6/7/93        KK            ZONE: 109 OPERATWG PRESS. 20  OPERATWG TEMP. 110                                                  REVEM)  QY:            DRAWNC OPERATWG PRESS. 0  OPERATING TEMP. 110                                                                                ko'2-109-8
 
NCC                  EL 22'-6 CLASS 3 V-12-497                                                I                                                                                              CONT. ON V-12-802                                                                                                        DWG. 02-110-8 3'H                                                                                                                                    ZONE 110 TO UNIT 6 C                                  1 CONDENSATE                            EL. 19'-6" STORAGE            55'H TANK Eo CO I
CP                                                                                                                            45V I
C)
I C-2200-161 C-2200-162                          Qa 10'H                                                                                  y6 DRAIN
                                                                              ~EL 0+
11' 1'"
E~L. 16-0 22'30'L                        17'-0" C-2200-171
                                                                      ~                        Y 6+
cS
                                                                                                        .c.
B~
                                                                                                                ~@~
lEGEND X
Sl-112-FW-7 SHOP IIELD FIELD YIELD EXAMINATION AREA I-6 -Sl-112-7      SPOOL PIECE NO.
REFERENCE DRAWINGS                          NOTES 0 A            C-2200-168                                                V-12-612      VALVE DESIGNATION CALIBRATION BLOCKS AND MATERIAL                          FLORIDA POWER IIc LIGHT C-E-22 REV. 14                SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                              ST. LUCIE UNIT 2 AND RRHR                                                                                TlTLE: CONDENSATE SUCTlON TO AUXIUARY FEEDWATER PUMPS 2A 8( 28 DATE:  6/7/93      KK            ZONE: 110 OPERATING PRESS. 0  OPERATING    TEMP. 110                                            REVKKD RYE            ORANNC NLE OPERATING PRESS. 120 OPERATING TEMP. 110                                                                          02-110-A
 
EL 21'-6'UXIUARY LEGEND FEED WATER
                                                                                ///
                                                                                                                                                        ~        SHOP WELD PUMP 2A CONT. ON                                                                                          FIELD WELD DWC. 02-186-A                                  2'I'-5                                CH-146-FW-16      EXAMINA'IION AREA ZONE 186 EL 1-6"-SI-112    SPOOL PIECE NO.
V-12-611    VALVE DESIGNATION SS-12-2 C-2202-226              V-12-498 EL
                                                                                                                                        //
21'-6'UXIUARY FEED WATER PUMP 2B TOP OF TRENCH                                                                      CONT. ON EL 19'-6"                                                              DWG. 02-186-B                                          21'-5 E
ZONE 186
                                                                                                                                                  'S-12-2 8 X 6"                          V-12-502
                                                                                ~
C  2202 212 RED.
C-2202-205
                                                                                            ~8" X6 C-2202-20D Y
C-2202-203
                                                    ~OIA
                                                                ~                                    /~
6~
a)                                                                    TOP OF TRENCH y                                                                <o~ >0                  EL 19'-6
                                                                                                    >/z~
Cr                                          4 0 6'5V CONT. ON DWG. 02-110-A ZONE 110 REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AHD MATERIAL                                  FLORIDA POWER h UGHT C-E-22  REV. 14                SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                      ST. LUCIE UNIT 2 AND RRHR TTTLE: CONDENSATE  SUCTION TO AUXIUARY FEEDWATER PUMPS 2A 4 2B DATE:  6/7/93      KK              ZONE: 110 OPERATTNG PRESS. 0  OPERATING 'TEMP. 120                                                        RKVKIKD OY            DRA'NNC N(L:
OPERATTNC PRESS. 0  OPERATING TEMP. 110                                                                                    02-110-8
 
QA CLASS 2 MV-09-9  ~g      EXEMPT BF-3020-21                                a4 FL EL 39'-6" BF-3020-26  ~                                                                                  20'H CLASS 2 CLASS 3
                                                                                          ~EL 42'-7
                            ~0,00 20'H                                                                      QA
    ~EL 20'-0 BF-3020-39 BF-3020-30    ~~
BF-3020-31 0 20'H          BF-3020-370 200 EL00 20'H BF-3020-43 BF-3020-55 EL  26'-6"
                                                                                    ~EL                                rP BF-3020-33                          BF-3020-36                          20'-0'E-09-2                                EL. 24'-0" V-09-310 BF-3020-48
                                                                      ~                    XX FE-09-2A    BF-3020-60    ~          EL 21'-6
                                                                                                        ~
                                                                    ++00 l-1 1/2-BF-42 V-09-350 SHOP WELD                                                        BF-3020-520 CONT. ON X          RELD WELD                      DWG. 02-111-B                                                            CONT. ON DWG. 02-186-A SI-112-FW-7    EXAMINATION AREA                      ZONE 111                                                            ZONE 186 I-6"-S!-112-7 V-3227 SPOOL PIECE NO.
VALVE DESIGNAllON                                                                  3  X4 RED.
                                                                                                                          / AUXILIARY FEED WATER PUMP 2A REFERENCE DRAWINGS                          NOTES                            CAU8RAllON BLOCKS AND MATERIAL                                  FLORIDA POWER dc UGHT BF-M-9  REV. 15                  SEE (ZONE 169) FOR SNUBBER DWG.                                                                                        ST. LUCIE UNIT 2 SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                          TITLE: AUX. FEEOWATER PUMP 2A        Cc 2B AND RRHR                                                                                              DISCHARGE DATE:  6/7/93        KK              ZONE: 111 DRA'NNC N0.2 OPERAllNG PRESS. 1115  OPERATING  TEMP. 100                                                                              02-111-A '
 
CONT. ON DWG. 02-111-A                                                                                                  2 ZONE 111 I-I-BF-60
                                                                                                          ~
42'-9'LASS MV-09-10 F"Br qr CLASS 2
                                                                                                                                                        ~
CLASS 3 EL,  26'-6" B                                                                                                                    BF-3626-92
(                                                                          ~EL
  ~EL 26'-6 BF-3020-68 FL EL  39'-6'E-09-3 BF-3020-110    ~                            FE-09-28 EL. 24'-0" EL 20'-9 21/2'4 BF-3020-85 4
B~
EL. 26'-6                            66 BF-3020-89 BF-3020-99
                                                                                                                                                                      ~          V-09-310
                                                                                                                                                    ~~
RED.
4" X 2                                                                                      I-1 I /2-BF-43 BF-3020-71                                    I/2'ED.
2I'-6'3 MV-09-13                  BF-3020-761                                                                                                            V-09-350 1 DRAI~N MV-09-14                                                                                  ~EL                                    X4" 21/2  X 4'ED.
4" X 2 1/2" RED.                                                          LEGEND
                                                                                                                                                                        /  AUXILIARY FEED WATER PUMP  28 BF-3020-8'I CONT. ON SHOP  SQD                                                DWG. 02-186-B X        FIELD WELD                                                ZONE  I86
                                                                                                  -SI-112-FW-7    EXAMINATION AREA I-6"-Sl-112-7  SPOOL PIECE NO.
V-3227      VALVE DESIGNATION REFERENCE DRAWINGS                                NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                FLORIDA POWER 8c LIGHT BF-M-8  REV. 18                  SEE (ZONE 170) FOR SNUBBER DWG.                                                                              :.'SR                ST. LUCIE UNIT 2 S'ISTEM IN SUPPORT OF ECCS, CHR, AC,                                                                      TIRE: AUX. FEEOWATER PUMP 2A      Bc 28 AND RRHR                                                                                                        DISCHARGE DATE:  6/7/93    KK              ZONE: 111 REVVED QY:            DRANNC NO OPERATING PRESS. 1115  OPERATINC  TEMP. 100                                                                                  02-111-8 '
 
n 0
                                                                ~A CONT.
DWG.
ON 02-112-B ZONE 112                                                                                        CW-3000-46 30" X 36" REO.                                                                                                                                        EXPANSION JOINT SJ-21-4 24  X 30 I
V-21-205 J    RED.
I                                          CONT. ON EL  9'-0'                                                DWG. 02-112-B ZONE 112 QSB-21 -209
                                                                                                                                                                              ~EL SB 21          CW-3000-60            QB                                                                          2I'-I'NTAKE COOUNG EL 14'-3"                                                                2f~f WATER PUMP 2C 61'30'V                                                                                        l                                                    CW 3000 7002      CONT. ON CW-3000-66    I                                                                      DWG. 02-188-C DRAIN                                                                                                                  ZONE 188 D
o
~EL 9'-2"                                      CW-3000-57 EEE 0@
DRAIN SB-21-165  j              I
                                                                                                                                        ~EL CW-3000-5 9'-0'W-3000-7004 EXPANSION JOINT Oy                                                                                                                  SJ-21-4 Cyg,                                                                              24  X 30 Cy                                                0                                                                            RED.
V-21-208 45'H EL 17'-8" SB-21-206
                                                                                                                                                                              ~EL CW-3000-7003                                                                                                                                21''NTAKE COOUNG LEGEND                                                                                                                                                                    WATER PUMP 2B
            ~      SHOP WELD                                                                                                                                    CW-3000-7001      CONT ON CW-3000-11                                                          DWG.        02-188-B FIELD WELD                                                                                                                                                    ZONE 188 CH-146-FW-16      EXAMINATION AREA                              CW-3000-13 I-6 -SI-112    SPOOL PIECE NO.
SB-21-3    VALVE DESIGNAllON                                                                          45'H REFERENCE ORAWNGS                                NOTES                            CAUBRA'TION BLOCKS AND MATERIAL                                              FLORIDA POWER dc LIGHT CW-F-I  REV. 14                    SYSTEM IN SUPPORT- OF ECCS, CHR. AC,                                                                                                  ST. LUCIE UNIT 2 CW-F-2  REV. 17                    AND RRHR                                                                                        TITLE: CIRCULATNG WATER FROM INTAKE COOUNG WATER PUMPS DATE:  6/7/93                    KK            ZONE: 112 ORA'NNC NO OPERATNG PRESS. 90  OPERATNG  TEMP. 95                                                                                              02-112-A'
 
EL. 9'-3" UNDERGROUND 30"                                                    EXEMPT 36
                                                                                              ~~
X RED.
I-3-CW-70 cw-3000-7006 ~se->>->>2 O
0
                                                                                                          ~      CW-3000-8033 EL  11
                                                          ' 3                                                                                                              EL.
MV-21-2                                                                                                  9'-3'NDERGROUND T ~ClASS 3                                                                                    %%EXEMPT
                                                                                                                                      ~~
CONT. OH 02-112-A                                            I      NCC DWG.            OA                                                                                              I-3-CW-69 ZONE 112 CW-3000-77 N,EIS 24"  X  30"                                                                  G V 21  162      RED                                                                            o<
233 I                                                                              4 DWG. 02-188-A  .                          O 21'-I'L C>
I ZONE 188 o
n CV I
                                                      / ~EL    INTAKE COOLING WATER PUMP 2A                      11'-5" I
MV-21-3 EL 17  10.
Se  21 163      EXPANSION JOINT            O 2
0                        'T ~CEASE    3 CW-3000-7011              NCC
                    ~
I RED.                    I-Iw CW-3000-701 0                                                      iO                                                                          LEGEND 14'-3'e SHOP WELD X            FIELD WELD SI-112-FW-7      EXAMINAllON AREA CW-3000-701    OA                                                                              1-6"-SI-112-7      SPOOL PIECE NO.
                  ~EL                                                  DYC. 02-112-A ZONE 112 MV-21-2      VALVE DESGNATION REFERENCE DRANIINGS                            NOTES                                  CALIBRATION BLOCKS AND MATERIAL                                  FLORIDA POWER dc LIGHT CW-F-1 REV. 14                  SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                          ST. LUCE UNIT 2 CW-F-2 REV. 17                  AND RRHR                                                                                            TITLE: QRCULATING WATER FROM INTAKE COOUNG WATER PUMPS DATE:  6/7/93      KK            ZONE: 112 OPERATING PRESS. 90  OPERAllNG TEMP. 95                                                            RCVEt%D OY:            ORAJKKC KQ OPERATING PRESS. 60  OPERATING TEMP. 95                                                                                        02-112-8
 
CW-3001-551
                                                                                          ~                OA                                    LEGEND CW-3001-7352
                                                                                  ~                                                                  ~
X CH-146-FW-16 1-6 -Sl-112 SHOP WELD BELD WELD EXAMINAllON AREA SPOOL PIECE NO.
SB-21-3    VALVE DESIGNAllON CONT. ON DWG. 02-113-C ZONE 113 CW-3001-601 0 CW-3001-6011 26'-D'@
CONT. ON CW-3001-7373 SB-21-186      ~OE    DWG. 02-113-B ZONE 113 CW-3001-7375 S8-21-188    CONT. ON                                                                CW-3001-601 4 SB-21-185                                                OWG. 02-113-C ZONE 113 SS-21-1A SlRAINER
                    ~EL 6'EL            2I'-0'L 21'-0 EL  9'-3" 30" X 30 X 20        ~o+  +1+
RED. TEE r                                            CLASS 3 0~
NCC CONT. ON DWG. 02-113-B                                                                                                                  LUG ZONE 113 QA
                ~  CW-3001-7351 EXEMPT  Q    UNDERGROUND REFERENCE DRAWINGS                          NOTES                              CALIBRATION BLOCKS AND MATERIAL                              FLORIDA POWER dc LIGHT CW-F-11 REV. 13                SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                    ST. LUCE UNIT 2 CW-F-13  REV. 10              AND RRHR                                                                                      TI'RE: CIRCULATING WATER TO CCW HEAT EXCHANGER  2A DATE:  6/7/93      KK            ZONE: 113 REVKM) Ql.            DRAWNC NO.E OPERATING PRESS. 60  OPERATING  TEMP. 95                                                                              02-113-A'
 
CONT. ON DWG. 02-113-8 ZONE 113 (  ~II 2 S8-21-'I90
                                        'V1                              CW-3001-726
                                                /~@      oy C'y 22 SB 21  241        CW 3001            61 49 4" DRAIN CONN.
CW-3001-26 SB-21-239P CONT. ON DWG. 02-182 4o~
ZONE 182 El  21'-0                            COMPONENT COOUNG WATER HX 28 Cy                    ~EL 26'-2                2 gg2 62226
                                                                            ~o                                                        CONN.
                                                                                                    ~EL.
                                                                                                        ~
26'-6'EGEND CONT. ON DWG. 02-114-A CW-3001-1010              ZONE 114.
0        SHOP WElD X        FIELD WElD                                                        2-1/2  DRAIN CONN.
SI-112-FW-7    EXAMINATION AREA I-6'-SI-112-7  SPOOL PIECE NO.
S8-21-4  VALVE DESIGNAllON REFERENCE DRAWINGS                            NOTES                                  CALIBRA'HPN BLOCKS AND MATERIAL                                        FLORIDA POWER 8c UGHT CW-F'-I2  REV. 15              SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                                                  ST. LUCK UNIT 2 AND RRHR                                                                                                      llTLE: QRCULATING WATER TO CCW HEAT EXCHANGER 28 DATE:  6/8/93  KK              ZONE: 1I4 RCVUKD SY;          DRAWHC RQ.E OPERATING PRESS. 60  OPERATING TEMP. 95                                                                                            02-114-8'
 
CLASS 2  GAS 3
                                                              ~      LDX-1                      LDX-2 CONT. ON DWG. 02-053 ZONE 53 (EXEMPT)
                                                          ~    LDX-SUPPORT I
                                                                                                                ~      LDX-SUPPORT 2 REFERENCE DRAWINGS                          NOTES                          CAUBRAllON BLOCKS AND MATERIAL                    FLORIDA POWER bc LIGHT SYSTEM IN SUPPORT OF REACTOR SHUTDOWN                                                  WE              ST. WCIE UNIT 2 FUNCTION TITLE: LETDOWN HEAT EXCHANGER DATE:  6/8/93  KK                ZONE: 180 anom>  ev:          eaAWNC Na'2-180 '
 
CHANNEL OUTLET
                      ~                                                        CCWX-2A-3 LIFTING LUGS UFTING LUGS CCWX-2A-2 J
CCWX-2A-1  ~
CCWX-SUPPORT 2A-1                                      SHELL OUTLET
                                                                                ~
CCWX-SUPPORT 2A-2              CCWX-2A-4 CCWX-SUPPORT  2A-3 CHANNEL INLET CCWX-SUPPORT    2A-4 SHELL INLET ~
ZEQI!Q~
REFERENCE DRAWiNGS                        NOTES SYSTEM IN SUPPORT OF ECCS, CHR, AC, AND RRHR CALIBRATION BLOCKS AND MATERIAL
                                                                                                                          '-'86                FLORIDA POWER Jc LIGHT ST. LUCIE UNIT 2 TITLE: COMPONENT COOUNG WATER HEAT EXCHANGER 2A DATE:  6/8/93      KK              ZONE: 181 REVERED RY'.            ORAWNC kO 02-181 '
 
~ SUCTION CCWP- A-2 DISCHARGE
                                                          ~~      ~~
CC  -2A-I                          CCWP-2A-3              CCWP-2A-4 CCWP-SUPPORT  2A-3                CCWP-SUPPORT 2A-4 CCWP-SUPPORT 2A-1 CCWP-SUPPORT  2A-2 S CTION a REFERENCE DRAWINGS                        NOTES              CAUBRATION BLOCKS AND MATERIAL                  FLORIDA POWER dc LIGHT SYSTEM IN SUPPORT OF ECCS, CHR, AC,.                                                      ST. LUCIE UNIT 2 AND RRHR TIRE: COMPONENT COOUNG WATER PUMP 2A DATE: 6/8/93  KK              ZONE: 183 ORA%lMC N(L 02-183-A
 
0 FPCP-28-1
                                                                                                    ~      FPCP-SUPPORT    28-1 REFERENCE DRAWINGS                  NOTES              CALIBRATION BLOCKS AND MATERIAL                    FLORIDA POWER 8c LIGHT ST. LUCIE UNIT 2 SYSTEM IN SUPPORT OF RESIDUAL HEAT                                  TITLE: FUEL POOL COOLING PUMP 28 REMOVAL FROM SPENT FUEL STORAGE POOL DATE:  6/8/93  KK              ZONE: 184 RKVKWED RY:          DRA'NNC RC 02-184-8
 
~ '
    ' ~ '          ~ ~ ~
I ~ ~4 ~
 
EI SUCTION
                                      ~
            ~  DISCHARGE
                                                / I STEAM INLET
                                                                                                          ~
                                                                                    /
                                                                                          ~      EXHAUST i+~/
          ~  AFP-SUPPORT 2C-1 AFP-SUPPORT  2C-2
                                                ~                                              /
l REFERENCE DRAWINGS                        NOTES      CALIBRATION BLOCKS AND MATERIAL                        FLORIDA POWER dc LIGHT ST. LUCK UNIT 2 TIRE: AUXIUARY FEEDWATER PUMP 2C DATE: 11/19/92                ZONE: 186 RCVKKD RY:          ORAMNC RO 02-186-C
 
CONT. ON OWG. 02-055 ZONE 55
                                              ~    OUTLET
                                                          ~  SDCX-2A-1        SDCX-2A-2
                                                                                          ~
SDHX-SUPPORT 2A-1 SDHX-SUPPORT 2A-2 CLASS 2  CLASS 3 REFERENCE DRAWINGS                    NOTES                            CALIBRATION BLOCKS AND MATERIAL                          FLORIDA POWER dc LIGHT SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                            ST. LUCIE UNIT 2 AND RRHR                                                                                TITLE: SHUTDOWN COOLING HEAT EXCHANGER 2A DATE:  S/e/93 KK                ZONE: 187 REVE@ED QY:          ORAWNC NO'2-187-A'
 
CONT. ON OWG. 02-056 ZONE 56 OUTLET
                                                                                                          ~  INLET
                                                          ~  SDCX-28-1        SDCX-28-2
                                                                                        ~
SDHX-SUPPORT 28-1 SDHX-SUPPORT 28-2 CLASS 2  CLASS  3 REVIEWED REFERENCE DRAWINGS                    NOTES                          CALIBRA110N BLOCKS AND MATERIAL                          FLORIDA POWER dc LIGHT S'lSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                          ST. LUCK UNIT 2 AND RRHR                                                                                TITLE: SHUTDOWN COOLING HEAT EXCHANGER 2B DATE:    6/8/93 KK                ZONE: 187 DY:        ORA%lNC NO.:          REM SON:
02-187-8'
 
MOTOR COUPUNG GUARD SCREEN EL 20'-3" IHIP-SUPPORT 2C-1 I CWP-2C-1            ICWP SUPPORT    2C-2 3/4  PRESSURE GAUGE CONN                                                                                                                        IMP-2C-2 EL 16'-6" DISCHARGE REFERENCE DRAWINGS                    NOTES              CALIBRATION BLOCKS AND MATERIAL                          FLORIDA POWER 8c LIGHT SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                            &#xc3;C%              ST. LUCIE UNIT 2 AND RRHR                                                                Tl'ILE: INTAKE COOLING WATER PUMP 2C DATE:  6/8/93  KK                ZONE: 188 REVKKD QY:            ORA'NNC N(L 02-188-C '
 
CCWST-1 CCWST-2 CCWST-SUPPORT 1 CCWST-SUPPORT 2 REFERENCE DRAWINGS                  NOTES                      CALIBRATION BLOCKS AND MATERIAL                    FLORIDA POWER R LIGHT SYSTEM IN SUPPORT OF ECCS, CHR, AC,                                                                ST. LUCIE UNIT 2 AND RRHR                                                                    jlTLE: COMPONENT COOUNG WATER SURGE TANK DATE:  6/8/93  KK            ZONE: 189 RCVK%6) SY:          DRAWNC Na 02-189 '
 
SECOND INSPECTION INTERVAL              PSL-201 INSERVICE INSPECTION                  REVISION 0 SELECTED COMPONENTS SCHEDULE                July 24, 1993 APPENDIX 6 ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Second Inservice Inspection Interval. Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/
Examination Tables.
CODE CASE NUMBER            TITLE N-216              ALTERNATE RULES FOR REACTOR VESSEL CLOSURE STUD EXAMINATION, SECTION XI, DIVISION 1 N-306              CALIBRATION BLOCK MATERIAL SELECTION, APPENDIX I, l-3121, SECTION XI, DIVISION 1 N-307-1            REVISED ULTRASONIC EXAMINATIONVOLUME FOR CLASS 1 BOLTING, TABLE IWB-2500-1, EXAMINATIONCATEGORY B-G-1, WHEN THE EXAMINATIONS ARE CONDUCTED FROM THE CENTER-DRILLED HOLE, SECTION XI, DIVISION 1 N-308              DOCUMENTATION OF REPAIRS AND REPLACEMENTS OF COMPONENTS IN NUCLEAR POWER PLANTS, SECTION XI, DIVISION 1 N-323              ALTERNATE EXAMINATIONS FOR INTEGRALLY WELDED ATTACHMENTS TO VESSELS, SECTION XI, DIVISION 1 N-366              CALIBRATION BLOCK FOR ANGLE BEAM ULTRASONIC EXAMINATIONOF LARGE FITTINGS WITH APPENDIX III-3410, SECTION XI, DIVISION 1 N-376-2            RULES FOR ULTRASONIC EXAMINATION OF BOLTS AND STUDS, SECTION XI, DIVISION 1 NP32              REPAIR WELDING USING AUTOMATIC OR MACHINE GAS TUNGSTEN - ARC WELDING (GTAW) TEMP ERBEAD TECHNIQUE, SECTION XI, DIVISION 1 USE OF LATER EDITIONS OF SNT-TC-1A FOR QUALIFICATION OF NONDESTRUCTIVE EXAMINATION PERSONNEL, SECTION XI, DIVISION 1 Page 361  of 398
 
SECOND INSPECTION INTERVAL          PSL-201 INSERVICE INSPECTION              REVISION 0 SELECTED COMPONENTS SCHEDULE            July 24, 1993 APPENDIX G ASME CODE CASES CODE CASE NUMBER  TITLE NP48      QUALIFICATIONS OF VT-2 AND VT-3 VISUAL EXAMINATION PERSONNEL, SECTION XI, DIVISION 1 N-458    MAGNETIC PARTICLE EXAMINATION OF              COATED MATERIALS, SECTION XI, DIVISION 1 NP60      ALTERNATIVE EXAMINATION,COVERAGE FOR CLASS      1 AND CLASS 2 WELDS, SECTION XI, DIVISION 1 N-463-1  EVALUATION PROCEDURES AND ACCEPTANCE CRITERIA FOR FLAWS IN CLASS 1 FERRITIC PIPING THAT EXCEED THE ACCEPTANCE STANDARDS OF IWB-3514.2, SECTION XI, DIVISION 1 NP81      ALTERNATE EXAMINATION REQUIREMENTS FOR CAST AUSTENITIC PUMP CASINGS, SECTION XI, DIVISION 1 N-489    ALTERNATE RULES FOR LEVEL III QUALIFICATION EXAMINATIONS, SECTION XI, DIVISION 1, 2, AND 3 N-490    ALTERNATIVE VISION        TEST  REQUIREMENTS      FOR NONDESTRUCTIVE EXAMINERS, SECTION XI, DIVISION 1, 2, AND 3 N-498    ALTERNATE RULES FOR 10-YEAR HYDROSTATIC PRESSURE TESTING FOR CLASS 1 AND CLASS 2 SYSTEMS, SECTION XI, DIVISION 1 N-503    LIMITED CERTIFICATION          OF NONDESTRUCTIVE EXAMINATION PERSONNEL, SECTION XI, DIVISION 1 Page 362 of 398
 
CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: July 13, 1981 See Numeric Index for expiretion end eny reeffirmetion dates.
Case N-216 Alternative Rules for Reactor Vessel Closure Stud Examination Section KI, Division 1 Inquiry: What alternative examination methods to those defined in Table IWB-2600-1 and Fig. IWB-2500-12 of Section XI, Division 1, may be used for reactor vessel closure studs that do not have an end surface sufficiently large to permit meaningful ultra-sonic examination?
Reply: It is the opinion of the Committee that for Section XI, Division 1 examination, alternate require-ments to those of Table IWB-2600-1 and Fig. IWB-2500-12 are permitted as follows.
For reactor vessel studs, upon which an ultrasonic examination from the end surfaces is not possible, sur-face examination only may be used, except that the examinations may not be deferred until the end of the inspection interval.
365
 
CASE N-3O6 CASES OF ASME BOKER AND PRESSURE VESSEL CODE Approval Date: January 16, 1881 See Numeric Index for expiration and any reaffirmatlon dates.
Case N-306 CaHbration Block Material Selection, Appendix      I, I-3121 Section  XI, Division 1 Inquiry: In performing ultrasonic examinations in accordance with Appendix I, Summer 1975 Addenda to Section XI, Division 1, may the requirements of T-434.1.1 of Article 4, Section V, for calibration block material, be used in lieu of the requirements of 1-31212 Reply: It is the opinion of the Committee that, when performing ultrasonic examinations in accordance with Appendix I, Summer 1975 Addenda to Section XI, Division 1, the requirements of T434.1.1 of Article 4, Section V, for calibration block material, may be used in lieu of the requirements of I-3121.
539
 
CASE N-307-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: December 6, 1984 See Numeric index for expiration and any reaffirmation dates.
Case N-307-1                                                    mented in a Certification Report. Procedure qualifi-Revised Ultrasonic Examination Volume        for Class  1      cation records shall bc retained for the service life of Bolting, Table IWB-2500-1, Examination Category                the bolt or stud examined. The Certification Report B-G-1, When the Extuninations Are Conducted                    shall include at least the foHowing items:
From the Center-Drilled Hole                                            (a) identification of procedure qualified; Section  KI, Division  1                                                (b) personnel performing and witnessing thc qualification tests; Inquiry: When ultrasonic examinations are con-                        (c) description and drawings of the quali6ca-ducted from the center-drilled hole of Class 1 bolts or        tion specimens and thc calibration blocks, as appli-studs to satisfy the examination requirements of Sec-          cable; tion XI, Division 1, Table IWB-2500-1, Examination                      (d) calibration and sensitivity details; Category B-G-1, may the examination volume be lim-                      (e) methods of identifying flaw indications and ited to the cylindrical region defined by A-B-C-D-F            discriminating between flaw indications and nonrele-F-A in Fig. 1?                                                  vant indications such as indications from probe lift-off, plating thickness changes, or permeability changes Reply: It is the opinion of the Committee that, when        in ferromagnetic material; conducting ultrasonic examinations from the center-                      N procedure for interpretation of results; drilled hole of Class 1 bolts or studs to satisfy the                    (g) qualification results; and examination requirements of Section XI, Division 1,                      (h) signature of the Authorized Nuclear Inser-Table IWB-2500-1, Examination Category B-G-1, the              vicc Inspector (ANII).
examination volume may be limited to the cylindrical                  (2) Eddy current exammations shall be performed region defined by A-B-C-D-E-F-A in Fig. 1 ifthe cen-            in  accordance    with a written procedure. Each proce-ter bore hole surface is examined with a qualified sup-        dure shall include at least the following information:
plemental ultrasonic, surface, or eddy current proce-                    (a) bolt or stud configuration to be examined, dure. The examination procedure shall be qualified to          including, as applicable, lengths, diameters, thread siz-cover the entire inner bore surface. If eddy current            es, plating and base materials, and product forms (e.g.,
examination is used, the following requirements shall          forging, bar, bolt or stud, rolled or cut threads);
apply.                                                                  (b) surface condition requirements and any ap-(a) The procedure qualification shall demonstrate            plicable preparation methods; the ability to detect and measure the length of the                      (c) sizes and types of probes, including descrip-maximum allowable flaws of IWB-3515-1. Qualifica-              tion and part or drawing numbers, and lengths of probe tion of the procedure shall include detection of at least      cable; one crack in each material type (ferromagnetic or non-                  (d) manufacturers and models of eddy current ferromagnetic) to be examined. The length of the crack        equipmcnt qualified; open to the surface shall not exceed the maximum                          (e) data recording equipment and methods; allowable length of IWB-3515-1 for nonaxial flaws. The                    N examination frequencies; crack shall be located in a bore hole surface and ori-                    (g) maximum scanning speed permitted and ented circumferentially. Alternatively, the crack may          demonstrated by procedure qualification; be located in a block with different geometry if thc                    (h) calibration procedure and calibration stan-qualification demonstrates cracks can be detected in            dards; bore holes. Demonstration may be performed by show-                        (i) examination technique (e.g., scanning in-ing equivalent response in both geometries (bore hole          structions, hand probe, and mechanized probe device);
and block) using calibration discontinuities specified                    g) reporting instructions; by the qualified procedure.                                              (k) personnel qualification requirements; (I) The procedure qualification shall be docu-                      (I) reference to the Certification Rcport.
541
 
ff fl 0
 
CASE (continued)
N-307-~
ChSES OF ASME BOILER AND PRESSURE VESSEL CODE Scanned from center drill hole Edge of nut in bolted position ti in.
I I
t l
Unthreaded part of bolt or stud i                          (where present)
Il l
I CI FIG. 1 REVISED EXAMINATIONVOLUME FOR        OR CLASS 1 BOLTING WHEN SCANNED FROM THE CENTER-DRILLED HOLE 542
 
CASE N-323 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: September 16, 1881 See Numeric Index for expiration and any reaffirmation dates.
Case N-323 Alternative Exatninations for Integrally Welded Attachments to Vessels Section XI, Division I Inquiry: What alternative examinations may be per-formed for the integrally welded attachments to vessels as shown in Figs. 1(a), 1(b), and 1(c) in lieu of the requirements of Examination Category B-H,'able IWB 2500-1 of Section XI, Division 1, 1974 Edition?
Reply:  It is thc opinion of the    Committee that only a surface examination      from the accessible side of the support is required in lieu of the requirements of Ex-amination Category B-H, Table IWB 2500-1 of Section XI, Division 1, 1974 Edition, provided the following conditions are met at the integrally welded attachment to vessels as shown in Figs. 1(a), l(b), and 1(c):
(1) the stress intensities in region C-D do not exceed 80% of the Levels A, B, C, and D Service Limits (NB-3000), and (2) the cumulative usage            factor U [(NB-3222.4(e)(5)]  does  not exceed  0.1.
(See  next page for Fig. 1.)
565
 
CASE (continued)
N-323 CASES OF ASME BOILER AND PRESSURE YESSEL CODE Vessel Vessel Weld buBdwp metal 1/2 in.
A 1/2 in.
Circumf.
weld D                                                                              weld C
0 Exam. cat. B H boundary                                  g 1/2 in.        1/2 in.
Shell type support                                                                    Exam. cat. B H boundary Shell type support (a)                                                    {b) 1/2 in.
D Circumf.
1/2 in.                            weld t
B~1/2 in.
Exam. cat.
Shell type  support~              B.H boundary (c)
FIG. 1 INTEGRALLYWELDED ATTACHMENTS TO VESSELS 566
 
CASE N-355 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: July 16. 1862 See Numeric Index for expiretion end eny reeffirmetion detee.
Case N-355                                                      practical, deposition of the cladding shall be by the Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in Accordance With Appendix III-3410 I
manual method.
The finish on the examination surfaces of the block shaH be representative of the surface finish of Section XI, Division 1                                          the applicable fitting or component examination sur-faces.
Inquiry: When using Appendix III of Section XI,                  (3) Search Unit and Couplant Selection Division 1, may flat calibration blocks be used for                Section V, Article 5, Appendix A shall be applied ultrasonic examination of elbows or other fittings with        for determining the critical radius for angle beam ex-compound curvatures if the elbow or fittings has an              aminations. The minimum radius of the fitting to be outside diameter greater than 20 in2                            examined shall be determined. The search unit wedge size, couplant, and frequency shall be selected so that Reply: It is the opinion of the Committee that flat          the minimum radius is greater than the critical radius calibration blocks may be used for ultrasonic exami-          as determined by Appendix A. If rectangular search nation of elbows or other fittings with compound cur-          units arc used, the dimension of the search unit face vatures if the elbow or fitting has an outside diameter        tangent to the minimum radius shall be used instead greater than 20 in., provided the following require-            of thc transducer diameter in Table A-10 of Appendix ments are met.                                                  A.
(I) Scope                                                      (4) Recording and Reporting A flat calibration block may be used for ultrasonic                (a) AH indications 50% of DAC or greater shaH examination of any weld within the fitting, fitting to        be recorded.
fitting weld, or component to fitting weld. For pipe to                (b) AH indications 100% of DAC or greater shall fitting or pipe to component welds, the examination            be investigated by a Level II or Level III examiner to shall be performed from the pipe side using Appendix            the extent necessary to determine thc shape, identity, III calibration blocks.                                        and location of the reflectors.
(2) Block Material                                                  (c) AH indications 20% of DAC or greater orig-(a) The basic calibration blocks shall be made          inating in the heat afl'ected zone or base metal shall from material of the same nominal thickness or pipe            be investigated by a Level II or Level III examiner to schedule as the fitting to be examined.                        the extent necessary to determine the shape, identity, (b) Where the examination is to be performed              and location of the reflector.
from only one side of the joint, the calibration block                (d) The following shall be recorded on an ex-material shall be of the same specification as the ma-        amination data sheet:
terial on that side of the joint.                                          (I) Data sheet identification, date, and time pe-(c) If material of the same specification is not        riod of examination; available, material of similar chemical analysis, tensile                  (2) Names and SNT-TC-1A levels of exami-properties, and metallurgical structure may be used.            nation personnel; (d) For calibration blocks for dissimilar metal                    (3) Examination procedure and revision; welds, the material selection shall be based on the side                  (4) Applicable calibration sheet identification; of the weld from which the examination will be con-                        (S) Identification and location of weld or vol-ducted. Ifthe examination will be conducted from both          ume scanned (for example, marked-up drawings or sides, calibration reflector shall be provided in cali-        sketches);
bration blocks of both materials.                                          (6) Surface from which examination 'is con-(e) Where the component material is clad, blocks        ducted; and shall be clad by the same welding procedure as the                        (7) Record of indications or of volume free of production part. Where the automatic method is im-            indications:
599
 
CASE (continued)
N-355 ChSES OF hSME BOILER AND PRESSURE VESSEL CODE (a) For each indication described in (4)(c),    For austcnitic material, the beam angle as measured excluding geometric and metallurgical indications, the    on the pipe or component shall be used to plot the search unit location and orientation and the foHowing      position of indications.
information shaO be recorded on the examination data                (b) For each indication that is equal to or sheet:                                                    greater than 50% of the primary rcferencc level, and (I) Peak ampHtude identifie as dB from      is not considered to be a Qaw, thc following shall be the reference level or as a percent of DAC curve, sweep    recorded:
reading to rcflector, search unit position, search unit                (I) Peak amplitude and amplitude range location, and sound beam direction;                        as either dB from the reference level, or as a percent (2) Search unit positions or locations par-  of DAC curve, sweep. readings to reflectors, search allel to the reflector at the end points where the re-    unit locations, and sound beam direction over the ex-Qector amplitude equals 50% of the peak amplitude          tent of the reflcctor; (estimated length);                                                    (2) Plot location of reflector (at a repre-(3) The true position of the indication plot- sentative position) on a cross-section sketch showing ted on a cross-section sketch showing O.D. profile and    surface discontinuities (such as root and counterbore);
I.D. discontinuities (such as root and counterbore).                    (3) Basis for disposition.
 
CASE N-375-2 CASES OF ASME BOILER hND PIIESSURE VESSEL CODE Approval Date: April 6, 1984 See Numeric index for expiretion end eny reeffirmetion dates.
Case N-375-2                                                    -3200                  Calibration Confirmation Rules for Ultrasonic Examination      of Bolts  and            -3210                  Instrument Linearity Check Studs                                                          -3220                  System Calibration Check Section XI, Division 1                                          -3230                  Sensitivity
                                                                -3240                  Sw'eep Range Inquiry: When conducting ultrasonic examinations              -3300                  Basic  Calibration Block Surface of bolts and studs in accordance with Section XI, Di-                                    Finish vision 1, what alternative requirements may be used?            -3400                Calibration Record Reply:  It is the opinion of the Committee that the                                EXAMINATION following  rules  may be used for conducting ultrasonic          P100                  Surface Preparation examinations of bolts and studs under Section XI, Di-            4200                  Record vision l.
                                                                -SUPPLEMENTS Supplement 1      Screen Height Linearity TABLE OF CONTENTS Supplement 2      Amplitude Control Linearity
-1000              INTRODUCTION
-1100              General FIGURES S-1                  Linearity
-2000              GENERAL REQUIREMENTS
-2100 TABLES Equipment Requirements                      -2430-1              Notch Dimensions
-2110              Instrument
-2120              Search Unit
-2200              Personnel Qualification      Require-ments
-2210              Personnel Requirements
                                                                -1000      INTRODUCTION
-2220              Qualification Test                        -1100      GENERAL
-2230              Requalification
-2240              Retests                                        (a) This Case provides the requirements for quali-fication of equipment, personnel, and procedures'or
-2250              Renewal  of Qualification the ultrasonic (UT) examination to detect nonaxial
-2260              Record of Tests indications in Class 1 (Category B-G-1) and Class 2
-2300              Written Procedure Requirements
-2400              Procedure Qualification                    (Category C-D) bolts and studs.
-2410              Purpose
-2420              Conditions Requiring Procedure              -2000    GENERAL REQUIREMENTS Requalification                          -2100    EQUIPMENT REQUIREMENTS
-2430              Qualification Specimen
-2440              Performance                                -2110      Instrument
-2450              Qualification                                A pulse echo ultrasonic flam detection instrument
-2460                Procedure Qualification Acceptance        shall be used.
Criteria                                    (a) The instrument shall be equipped with a stepped
-2470                Report of Qualification                    gain control calibrated in units of 2 dB or less.
-2500              General Examination Requirements (b) The pulse repetition rate of the instrument shall
-2510              Rate of Search Unit Movement                be controlled such that subsequent initial pulses will
-2520              Scanning Sensitivity
-3000              CALIBRATION
-3100              System Calibration                          'ualification of proccdurcs for sizing of indications is not covered
-3110              General Requirements                        by this Case.
613
 
CASE (continued)
N-375-2 CASES OF hSME BOILER hND PRESSURE VESSEL CODE not occur within the time required for the second beam              (c) Satisfactory completion of the procedure quali-to travel through the examination length and return              fication required by -2400 may also serve as the per-to the search unit.                                            sonnel performance qualification test.
(c) The instrument shall provide linear vertical pre-          (d) The test parts upon which the performance qual-sentation within ~ 5% of the full screen height for            ification test is performed shaH be a full scale bolt or 20% to 80% of the full screen height (base line to              stud or partial section as described in -2430. Alter-maximum calibrated screen height). The screen height            natively, other test part sizes may be used if they are linearity shall be measured and recorded as required            demonstrated to be equivalent during the procedure in Supplement l.                                                qualification required by -2400.
(d) The instrument shaH utilize an amplitude con-trol, accurate over its useful range to ~20% of the            -2230      Requalification nominal amplitude ratio, to allow measurement of in-dications beyond the linear range of the vertical display          Personnel shall be required to requalify when any on the screen. The amplitude control linearity shall be        of the conditions listed in -2420    are changed.
measured and recorded as required in Supplement 2.
                                                                -2240      Retests
-2120    Search Unit Personnel who fail the qualification test may be re-(a) Search units may contain either single or dual          tested under the following conditions:
transducer elements.
(a) Immediate Retest. When an immediate retest is (b) Search units with contoured contact wedges may          taken, personnel shall demonstrate the ability to detect be used to aid in ultrasonic coupling. Calibration shall        and locate aH test part reflectors without additional be performed with the contact wedges used during the guidance.
examination. Alternatively, a suitable means of pro-(b) Further Training. When further training or prac-viding equivalent calibration sensitivity shall be dem-        tice has taken place, a complete repeat of the qualifi-onstrated during the procedure qualification required          cation test is required.
by -2400.
                                                                -2250      Renewal of Qualification
-2200    PERSONNEL QUALIFICATION REQUIREMENTS                                            Renewal of personnel qualification by the perform-
-2210                                                          ance qualification test is required for any of the fol-Personnel Requirements lowing conditions:
(a) Personnel shall be qualified in accordance with            (a) when an examiner has not performed the bolting IWA-2300. In addition, they shall successfully com-            examination technique for which qualified for a period plete a performance qualification test (-2200) specific        of six months; to the examination procedure to be used.                            (b) when there is specific reason to question the
    '(b) In order to successfully complete the qualifica-      ability to perform the bolting examination technique; tion test, personnel must demonstrate to the Level III              (c) when recertification in accordance with IWA-Examiner conducting the test their ability to detect            2300 is required.
and locate aH test part reflectors within the detecta-bility and accuracy limits specified in the examination        -2260      Record of Tests procedure.
(a) Records of the personnel performance qualifi-cation tests shall include the following:
-2220      Qualification Test                                          (I) personnel name and SNT-TC-1A level (2) procedure identification (a) The performance qualification test shall deter-                (3) date of qualification mine the ability of personnel to operate the examina-                  (4) test part identification tion system and collect and interpret the data as spec-                (S) qualification test results ified in the examination procedure.                                    (6) limitations or restrictions placed on the qual-(b) The performance qualification test shall be per-        ification test formed using an examination procedure qualified in                      (7) signature of the Level III examiner who con-accordance with -2400.                                          ducted the test 614
 
CASE (continued)
N-375-2 CASES OF ASME BOILER AND PRESSURE VESSEL CODE (b) The personnel performance qualification records                                  TABLE -2430-l shall be retained for the duration of the certification.                            NOTCH DIMENSIONS Maximum Notch Dimensions
-2300    %9HTIEN PROCEDURE REQUIREMENTS                                                                                              Reflective Soit or Stud Size          Depth, in.'rea,      sq in.
Ultrasonic examination shall be performed in accor-dance with a written procedure that shaH include the            Greater than 4 in. diameter          0.157          0.059 foHowing information:                                          2 in. diameter and greater, but not over 4 In. diameter            0.107          0.027 (a) bolt or stud configurations to be examined, in-cluding length, diameter, thread size, plating, mate-          ~ For threaded surfaces, depth is measured from bottom of thread rials, and product form (e.g. bolt or stud, rolled or cut      root to bottom of notch.
thread);
(b) scanning surfaces, surface condition require-ments, and surface preparation methods;
                                                                -2420      Conditions Requiring Procedure (c) equipment used, including the following infor-RequaHfication mation:
(1) make and model of instrument                            Procedure requalification shall be required when any (2) search unit type, angle, frequency, and trans-        of the following are changed:
ducer size                                                          (a) make or model of ultrasonic instrument; (3) sizes and configurations of wedges and shoes              (b) size, type, angle, frequency, or transducer ma-(4) automatic alarm recording equipment                  terial of search unit; (5) rotating, revolving, or scanning mechanisms              (c) search unit cable type, length, or number of con-(6) couplant                                              nectors; (7) search unit cable type, length, and number of            (d) examination technique, including angles, modes connectors                                                      of wave propagation in the material, directions, max-(d) examination technique, including angles, modes          imum speed, or extent of scanning of wave propagation in the material, directions, max-              (e) techniques of calibration or of establishing scan-imum speed, and extent of scanning;                            ning sensitivity levels, including instrument controls (e) techniques of calibration and of establishing            to be used, or acceptance standards for the calibrated scanning sensitivity levels, including instrument con-trols to be used and acceptance standards for the cal-              I condition; calibration blocks; I
ibrated condition; identification of calibration blocks; (g) data to be recorded and method of recording; (g) bolt or stud design or configuration; (h) data to be recorded or method of recording; or (i) methods of data interpretation or plotting.
(h) detectability limitation and location accuracy;
                                                                -2430      Qualification Specimen (i) examination volume covered, considering loss in coverage from near and far surface resolution limita-              (a) The qualification process shall be performed with tions;                                                          a  full scale or partial section bolt or stud that is suf-g) methods of data interpretation and plotting              ficient to contain the beam path and demonstrate the (ic) personnel qualification requirements; and              scanning technique.
(i) reference to the report of procedure qualification          (b) The qualification specimen shall be of the same as required by -2470.                                          material specification and product form as the bolt or stud to be examined.
-2400    PROCEDURE QUALIFICATION                                  (c) CircumferentiaHy oriented notches shall be lo-cated in the qualification specimen at the minimum
-2410    Purpose and maximum qualified metal paths. These notches are The purpose of the examination procedure qualifi-            required on the outside threaded surface and the inner cation is to determine that the proposed examination            bore hole surface of bored studs with maximum depths technique is capable of detecting the specified flaw            and reflective areas as shown in Table -2430-1.
indications of interest and to assure that its capabilities        (d) Additional reflectors may be used provided they and limitations will be listed and recognized.                  do not interfere with detection of the required notches.
615
 
CASE (continued)
N-375-2 CASES OF      MME BOILER AND PRESSURE              VESSEL CODE
  -2440      Performance of Procedure Qualification                                (4) calibration and sensitivity details (5) qualification results (a) A calibration shall be performed on the basic                            (6) signature of the Examination Agency's autho-calibration blocksz in accordance with -3000.                              rized representative (witness)
(b) Without changing the ultrasonic examination                          (b) AH qualifying calibration and examination rec-system, the examination personnel shall perform an                        ords shall be retained for the duration of the certifi-examination of the qualification specimen. The refiec-                    cation.
tors in the qualification specimen shall be masked to prevent examination personnel from visually deter-mining either their depth or location.                                    -2500      GENERAL EXAMINATION (c) Data obtained from the qualification specimen                                REQUIREMENTS examination and the calibration process shaH be num-bered and identified to aHow comparison and evalua-                            Examination shall be performed by moving the tion in accordance with the following sections.                            search unit over the examination surface so as to scan the entire examination volume. As a minimum, each
  -2450      Qualification                                                  pass of the search unit shall overlap a minimum of The procedure shall be considered qualified when it                  50% of the transducer (piezoelectric element) dimen-is demonstrated        to comply with the requirements of                sion perpendicular to the direction of the scan.
this Case.
In addition to the requirements of IWA-2120, the                      -2510      Rate of Search Unit Movement Inspector shall assure himself that:
(a) the requirements of IWA-2300 and -2200 are                            The rate of search unit movement shall not exceed met for personnel performing the procedure qualifi-                      the maximum rate demonstrated by procedure quali-cation;                                                                    fication.
(b) the procedure meets the requirements of -2300; (c) the examination equipment used to qualify the                    -2520      Scanning Sensitivity procedure meets the requirements of -2100; and Scanning sensitivity shall be as specified by the qual-(d) the qualification specimen on which the proce-ified procedure.
dure qualification is performed represents the bolt or stud or acceptable range of bolts or studs to be ex-amined and meets the requirements of -2430.
  -2460      Procedure Qualification Acceptance Criteria                    -3000      CALIBRATION The procedure shall be qualified when each quali-                    -3100      SYSTEM CALIBRATION
. fication notch, as defined in -2430, has been detected and its response equals or exceeds the -2300 procedure                    -3110    General Requirements recording criteria. Qualification notch response shall                        (a) Calibration shall be performed in accordance have a minimum ratio of peak signal to peak noise of                      with the -2300 procedure and shall include the com-2:1. The notch axial location correlation shall be ~ />                    plete ultrasonic examination system.
in. or 5% of bolt of stud length, whichever is greater.                      (b) Complete ultrasonic examination system cali-
  -2470      Report of Qualification                                        bration shall be performed each day prior to use of the system and for each bolt or stud configuration.
(a) Documentation of the procedure qualification                          (c) For contact examination, the temperature of the shall include the following:                                              examination and basic calibration block surfaces shall (I) identification of procedure qualified                          be within 25'F. For immersion examination, the cou-(2) identification and qualification levels of per-                plant for calibration shall be within 25'F of the cou-sonnel performing and witnessing the qualification                        plant for scanning, or appropriate compensations for (3) description and as built drawings of the qual-                angle changes shall be made.
ification specimen and the basic calibration blocks                          (d) Any control that affects the instrument linearity (e.g., filters, reject, or clipping) shall be in the off or t The qualification specimen may also be used as a calibration block      minimum position for linearity check, calibration, and provided the requirements of the calibration block are met.              examination.
616
 
CASE (continued)
N-S75-2 CASES OF ASME BOILER AND PRESSURE VESSEL CODE
  -3200    CALIBRATIONCONFIRMATION                                        (1) calibration sheet identification and date
  -3210    Instrument Linearity Check                                    (2) examination personnel (3) exatniiiation procedure number and revision Instrument qualifications for screen height and am-(4) basic calibration block identification plitude control linearity shall be verified at the begin-(5) ultrasonic instrument identification, serial ning of each period of extended use (i.e., each nuclear number, and control settings unit preservice inspection or inservice inspection) or (6) beam angle, couplant, and mode of wave prop-every three months, whichever is less.
agation in the material
  -3220    System Calibration Check                                      (7) orientation of search unit with respect to the bolt or stud (a) A system calibration check shall verify the in-(8) search unit manufacturer, identification num-strument sensitivity and sweep range calibration at the ber, serial number, nominal frequency, and size start and finish of the examinations, with any change (9) identification of fixtures, types, or serial num-in examination personnel, and at least every four hours bers of 'wedges and shoes (if used) during an examination.
(10) search unit cable type, length, and number of (b) A system calibration check shall be performed connectors when search units, shoes, couplants, cables, ultrasonic instruments, recording devices, or any other parts of                (ll) times of initial calibration and subsequent cal-the examination system are changed.
ibration checks (12) amplitudes and sweep readings obtained from
  -3230    Sensitivity                                            the calibration reflectors (b) If an electronic DAC is being used, a record If the calibration reflector amplitude has decreased        shall be made of the resultant amplitudes and sweep more than 20% or 2 dB from its initial amplitude, all readings obtained from the calibration reflectors after data records since the last calibration check shall be marked void or deleted. A new calibration shall be DAC correction.
recorded and examinations performed since the last acceptable calibration check shall be repeated. If the calibration reflector amplitude has increased more than          M00        EXAMINATION 20% or 2 dB from its initial amplitude, recorded in-dications taken since the last valid calibration check          Q100        SURFACE PREPARATION may be reexamined with the correct calibration and                  The examination surfaces shall be free of irregular-their values changed on the data sheets.                        ities (e.g., raised markings, scale, or loose foreign mat-
-3240    Sweep Range                                            ter) or coating that interfere with ultrasonic wave transmission into the material.
If a point on the calibration or distance amplitude correction (DAC) curve has moved on the sweep line              Q200      Record more than 10% of the sweep reading or 5% of full                    (a) The following data shall be recorded:
sweep, whichever is less, correct the sweep range cal-                  (1) record identification, date, and time period of ibration and note the correction in the examination              examination record. All recorded indications since the last valid                  (2) identification and qualification levels of ex-calibration or calibration check shall be reexamined              amination personnel with the corrected calibration and their values shall                    (3) examination procedure and revision be changed on the data sheets.                                          (4) applicable calibration sheet identification
-3300      BASIC CALIBRATIONBLOCK                                        (5) bolt or stud identification SURFACE FINISH                                                (6) surfaces from which the examination is con-ducted. (When the examination technique requires sub-The finish on the surface of the block shall be main-        divisions of the examination surface or more than one tained similar to the finish existing during qualification.      examination surface, they shall be identified in the data
-3400      CALIBRATIONRECORD                                    record.)
(b) For each indication required to be recorded by (a) The following calibration data shall be recorded        the -2300 written procedure, the following information on a calibration sheet:                                          shall be recorded:
617
 
CASE (continued)
N-375-2 CASES OF ASME BOILER AND PRESSURE VESSEL CODE 2  4      e    S    10 Reflector itypteall Reflector ltypteall FIG. Sl  LINEARITY (1) search unit position                              a straight beam search unit may be used on any cal-(2) scan direction                                      ibration block that will provide the signal differences.
(3) metal path (sweep reading)
(4) signal amplitude at maximum response (5) signal to noise ratio                                  SUPPLEMENT 2          AMPLITUDECONTROL LINEARITY SUPPLEMENT          1 SCREEN HEIGHT                        To verify the accuracy of the amplitude control in LINEARITY the ultrasonic instrument, as required in -2110, position To verify the ability of the ultrasonic instrument to      a search unit so that an echo from one reflector in a meet the linearity requirement of -2110, position an          calibration block is peaked on the screen. With the angle beam search unit as shown in Fig. Sl so that            increases and decreases in attenuation shown in the indications can be observed from any two reflectors in        following table, the echo amplitude shall fall within a calibration block. Adjust the search unit position to      the specified limits. Convenient reflectors from any give a 2:1 ratio of amplitudes between the two echoes,        calibration block may be used with angle or straight with the larger set at 80% of full screen height. With-      beam search units. The settings and readings shall be out moving the search unit, adjust sensitivity (gain) to      estimated to the nearest 1% of full screen.
successfully set the larger indication from 100% to 20% to full screen height, in 10% increments (or 2 dB steps if a fine control is not available), and read        Indication Set at      dB Control      Indicanon Limits,
                                                              % of Full Screen        Change          % of Full Screen the small indication at each setting. The reading shall be 50% of the larger amplitude, within 5% of full                    80%                -6 dB            32 to 48%
80%              -12  dB            16 to 24%
screen height. The settings and readings shall be es-                40%                +6 dB            64 to 96%
timated to the nearest 1% of full screen. Alternatively,              20%              +12 dB            64 to 96%
618
 
CASE N-432 CASES OF ASME BOILER AND PRESSURE              VI~EL CODE Approval Date: February 20, 1986 See Numeric index for expiration and any reaffirmation dates.
Case    NM2                                                              2.1    Procedure Qualifications Repair Welding Using Automatic or Machine Gas                                (a) The test assembly materials for the welding pro-Tungsten-Arc Welding (GTAW) Temperbead                                    cedure qualification shall be of the same specification Technique type, grade, and class as the materials being repaired.
Section KI, Division 1 The test assembly shall receive a postweld heat treat-ment that is at least equivalent to the time and tem-Inquiry: May the automatic or machine GTAW                            perature applied to the materials being repaired. The process be used as an alternative to the          SMAW process            procedure and performance qualification tests may be for performing the temperbead technique on Class 1                        combined, provided Section IX requirements are met.
components?
The test assembly dimensions, including joint details, shall be documented on the PQR.
Reply:    It is the opinion of the Committee that repair                  (b) The test assembly thickness shall be at least five to P-Nos.      1, 3, 12A, 12B, and 12C'ase material and times the depth of repair, but need not exceed the associated welds may be made by the automatic or thickness of the material to be repaired provided the machine GTAW temperbead technique without the required test specimens can be removed. When the specified postweld heat treatment requirements of Sec-thickness of the base metal to be repaired is greater tion III, provided the requirements of 1.0 through 5.0 than 2 in., the depth of the cavity in the test assembly below are met. The depth of repair is not limited pro-shall be the greater of 1 in, or the depth of the cavity vided the test assembly meets the requirements of 2.1.
to be repaired. However, in no case shall the procedure qualification test assembly be less than 2 in. thick, nor shall the depth of the cavity in the test assembly be 1.0    GENERAL REQUIREMENTS less than 1 in.
(a) The requirements of            IWA~,          as applicable,          (c) The test assembly dimensions surrounding the shall be met.                                                              cavity shall be at least the thickness of the component (b) Only the automatic or machine GTAW process                        at the location of the repair or 6 in., whichever is using cold wire feed shall be used. No arc oscillation                    greater. Ifthe repair weld is to be performed remotely, shall be used.                                                            the procedure qualification test assembly shall be com-(c) Welding materials shall be controlled during re-                  pleted with the same or duplicate sensing and control pair so that they are identified as acceptable material                    equipment to be used for the repair. The test assembly until consumed.                                                            shall simulate the position and obstructions of the ac-(d) The neutron fluence in the repair areas shall be                  tual repair.
taken into account when establishing the weld metal                          (d) The root width and the included angle of the composition limits.                                                        cavity in the test assembly shall be no greater than the (a) Peening shall not be permitted.                                    minimum specified to be used in the repair.
(e) This test assembly may be used to qualify pro-cedures for weld buildup of pressure retaining mate-2.0    WELDING QUALIFICATIONS                                            rials. For this application, the depth of the cavity shall not be less than the thickness of the weld buildup or The Welding Procedure Specification and the weld-1 in., whichever is greater. In addition, the area of the ing operators shall be qualified in accordance with cavity shall not be less than the area of the weld buildup Section IX and additional requirements of Section III, as modified by 2.1, 2.2, and 3.0(c) and (d).
I to be applied or 54 sq in., whichever is less.
For all applications, the test assembly and cavity shall be of suScient size to obtain the required test
'-Nos. 12A. l2B, and l2C designations refer to specific material          specimens.
classifications originally identified in Section III, and subsequently        (g) Welding material shall meet the requirements of reclassified in a later edition of Section XL                              Sections IX and III, and the Edition and Addenda 701
 
CASE (continued)
N-432 CASES OF ASME BOILER AND PRESSURE VESSEL CODE shall be stated in the repair program. The appropriate              (a) The cavity or area to bc repaired by welding and toughness testing requirements of NB-2000 shall be              a band around the cavity or area shall be preheated completed for the weld materials used.                          to 300K minimum. This temperature shall be main-(h) Welding procedure qualification destructive tests        tained for at least 30 min before welding is started, shall be performed in accordance with Sections IX and            during welding, and until starting the postweld heat III for groove welds, and the Edition and Addenda              treatment of 45(FF to 550K described in (e) below.
shall be stated in the repair program. Dropweight tests,        The width of thc band shall be at least three times the impact tests, side bend tests, and all weld metal tension        thickness (3?) of the component to be welded, but tests of the weld deposit are required. A reference              need not exceed 10 in. The component thickness (?)
nilductility transition temperature ("HUNDT} of the              shall be determined for the area to be welded prior to weld metal and base metal shall be established in accor-        formation of the cavity. The interpass temperature dance with NB-2000. If "HUNDT is less than or equal              shall not exceed 450'F.
to 60'F, the qualification test shall be considered ac-            (b) Thermocouples and recording instruments shall ceptable. If "HUNDT is greater than 60'F, the qualifi-          be used to monitor the preheat, interpass, and postweld cation test shall be rejected and a requalification of the      heat treatment temperatures. Thermocouples shall be procedure shall be performed. Test specimens shall be          attached by welding or mechanical methods.
obtained from the completed test assembly at the max-                (c) The first six layers of the cavity shall be buttered imum practical depth of repair.                                as shown in Fig. 1, Steps 1 through 3.
(i) Impact testing of the procedure qualification test          (d) The essential welding variables shall bc con-assembly HAZ shall be conducted as follows.                    trolled as follows.
The TNDT of the unaffected base material shall be                  (I) The weld heat input for each of the first six determined by dropweight test to establish the test            layers shall be controlled to within ~ 10% of that used temperature for the C tests. The Cspecimens rep-              in the procedure qualification test.
resenting the HAZ material and the unaffected base                    (2) The remainder of the weld deposit shall be material shall be tested at the (HUNDT + 60F) tem-              completed (see Fig. 1, Step 4) with the heat input equal perature of the unaffected base material. The HAZ C            to or less than that used for layers beyond the sixth absorbed energy and lateral expansion shall be equal            in the procedure qualification.
to or greater than the unaffected base material at the                (3) The finished surface of the repair shall be sub-(HUNDT + 60'F) temperature of the base material.                stantially flush with the surface of the component sur-rounding the repair.
2.2    Performance Qualification                                      (4) The technique described in this paragraph The welding operator shall be qualified in accor-            shall be performed in the procedure qualification test.
dance with Section IX and the following additional                  (e) At the completion of welding, the 3T band as defined in (a) above shall be maintained in the range requirements. If the repair weld is to be performed of 450'F to 550'F for at least 2 hr.
where physical obstructions impair the welding oper-ator's ability to perform, the welding operator shall also demonstrate the ability to deposit sound weld            4.0      EXAMINATION metal in the positions required, using the same param-eters and simulated physical obstructions that are in-              (a) The repair area and the 3T band as defined in volved in the repair. Also, if the repair weld is to be        3(a) shall be nondestructively examined after the com-performed remotely, the performance qualification test          pleted weld has been at ambient temperature for at shall be completed with the same or duplicate sensing          least 48 hr. The nondestructive examination of the and control equipment to be used for the repair. For            repair welded region shall include radiography (ifprac-these applications, only nondestructive examination of          tical), ultrasonic examination, and surface examina-the weld is required. The procedure and welding op-            tion.
erator performance qualification tests may be com-                  (b) Areas from which weld-attached thermocouples bined, provided Section IX requirements are met.                have been removed shall be ground and examined using a surface examination method.
3.0    REPAIR WELDING                                          5.0    DOCUMENTATION Welding of the cavity or area being repaired shall              The use of this Code Case shall be recorded on Form be in accordance    with the following.                        NIS-2 or other applicable documents.
702
 
CASE (continued)
N-432 ChSES OF ASME BOILER AND PRESSURE VF'EEL CODE Step 1: Deposit layer one with first layer weld parameters used in qualifications.
Step 2: Deposit layer two with second layer weld parameters used in qualifications.
Step 3: Deposit next four layers with layer three through six weld parameters used in qualifications Step 4: Subsequent layers to be deposited ss qualified.
FIG. 1 AUTOMATIC OR MACHINE (GTAW) TEMPERBEAD TECHNIQUE 703
 
CASE N-444 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: December 7, 1987 See Numeric Index for expiration and any reaffirmation dates.
Case  N~                                                      -2000    INSPECTION PLAN CONTENTS Preparation of Inspection Plans                                -2100    BACKGROUND AND INTRODUCHON Section XI, Division 1 Inspection plans. which may consist of one or more Inquiry: What guidance may be used for preparing            parts (e.g., a part for general information and parts Section XI, Division 1 inspection plans?                      . with details), should include the following:
(a) Construction Codes used, including Editions and Reply: It is the opinion of the Committee that the          Addenda, for general categories of components (an following guidance may be used for preparing Section            itemized list of components is unnecessary);
XI, Division 1 inspection plans.                                  (b) dates of inspection periods and intervals; (c) the Section XI Edition and Addenda; (d) Code classification of components and bounda-ries of system classifications, including:
TABLE OF CONTENTS                                      (I) specific rules for classification; (2) lists of systems and identification of acronyms used; and
-1000              INTRODUCTION
-1100                                                                  (3) piping and instrument diagrams (P and ID's)
Scope showing classification boundaries (color coding is de-
-2000              INSPECTION        PLAN      CON-sirable).
TENTS (e) summary tables for each system showing Code
-2100              Background and Introduction classification, Code examination category and item
-2200              Summary of Changes in Updated number, types of components, examinations or tests to Inspection Plans be performed, and number of components for each
-2300              Applicable Documents
-2400 item number (information may be tabulated like Table Code Subsections IWX-2500-1); and
-2500              Detailed Contents
-3000              SUBSTITUTE EXAMINATIONS                        g  names, signatures, and company aSliations of the preparers and approvers of the inspection plan.
OR TESTS
-3100              General                                    -2200   
 
==SUMMARY==
OF CHANGES IN
-3200              Justification of Substitute Exami-                    UPDATED INSPECHON PLANS nations or Tests The following summary information should be in-Supplements cluded to describe changes in updated inspection plans Supplement    1    Contents of IWB, IWC, IWD, and except for preservice inspection plans:
IWE Tables (a) listing of new or revised procedures; Supplement 2      Contents of IWF Support Tables (b) changes in exemptions, samples, examinations, Supplement 3        Contents of IWP Pump Test Tables or tests; Supplement 4      Contents of IWV Valve Test Tables (c) any successive inspections required by IWB-2420, IWC-2420, IWE-2420, or IWF-2420; and (d) changes in substitute examinations or tests of
                                                                - 3000.
-1000  INTRODUCTION                                          -2300    APPLICABLE DOCUMENTS
-1100  SCOPE Inspection plans should include a reference list of This Case provides guidance for preparation of in-          applicable documents. The following documents spection plans to provide adequate information for sub-        should be considered:
mittal to reviewing agencies.                                    (a) 10 CFR 50; 727
 
CASE (continued)
N-444 CASES OF ASME BOILER AND PRESSURE VESSEL CODE (b) Section XI Edition and Addenda that apply (if            tions or tests, and when substitute examinations or portions of diQerent Editions or Addenda are selected,          tests're included in        the inspection plan.
identify the related requirements and components se-            -3200      JUSTIFICATION OF SUBSTHUI'E lected for examination or testing for each Edition and EXAMINATIONSOR TESTS Addenda);
(c) Code Cases; and                                            Justification of substitute examinations or tests (d) other regulatory documents.                              should include the following:
(a) Code Class;
-2400      CODE SUBSECTIONS (b) Section XI examination or test requirements and (a) Inspection    plans should address the following        identification of individual'components for which sub-Subsections:                                                    stitute examinations or tests are planned; (1) IWA    General Requirements;                            (c) identification of the substitute examinations or (2) IWB    Class Components; 1                                  tests (including, ifapplicable, fabrication examinations (3) IWC    Class 2 Components;                          or tests) that are planned:
(4) IWD    Class 3                                            (I) in lieu of the Section XI requirements, or (5) IWE    Class MCComponents; Components;                          (2) to supplement Section XI partial examinations (6) IWF    Class 2, 3,.and MC Component 1,                                or tests.
Supports;                                    (d) inspection schedule for the planned substitute (7) IWP      Pumps; and                                examinations or tests including any plans for deferring (8) IWV      Valves.                                    the 'required examinations or tests; (b) Plans for Subsections may be combined in whole              (e) documentation (drawings, sketches, or photo-or in part and published as part of one plan or as              graphs may be used) of reasons the required exami-separate plans; e.g., pump and valve inservice testing          nations or tests are impractical, e.g.:
plans are often separated from the plans for nonde-                    (1) geometric constraints; structive examinations.                                                (2) metallurgical constraints;
-2500      DETAILED CONTENTS                                          (3) inaccessibility, or (4) ALARAconcerns (e.g., radiation levels at the Inspection plans should include the following:              test area; total estimated man-REM exposure involved (a) drawings showing components to be examined              in the examination or test; flushing or shielding ca-or tested;                                                      pabilities that might reduce radiation level; and con--
(b) specific exemptions applied to each system cov-          siderations involving remote inspections).
ered by Section XI;                                                (f) technical justification and data to support the (c) line lists for each system, including system iden-      substitute examinations or tests, including:
tification, Code classification, pipe size and schedule,              (1) description and justification of any changes piping material specification, and maximum operating            expected in the overall level of plant quality and safety temperature and pressure;                                      by performing the proposed substitute examinations or (d) tables that provide details of examination or tests    tests in lieu of the Section XI requirements; (typical information to be included in these tables is                  (2) identification and discussion of similar com-shown in Supplements 1 through 4);                              ponents (in redundant systems or in the same system)
(e) list of calibration blocks, including identifica-      to be examined or tested as substitutes; tions, material specifications, and sizes; and                          (3) percentage of the required examinations or g  list of examination and test procedures, includ-      tests that have been or will be completed on each ing identifications, titles, and general descriptions of the components to which each procedure is applicable.
-3000      SUBSTITUTE EXAMINATIONSOR                            'ubstitute examination or test      an examination or test which replaces a Code-required examination or test when the Code re-TESTS                                                quirements are considered to be impractical. Examples include: the
-3100      GENERAL                                              component design (e.g., geometry, material, or structure) and lack of accessibility (e.g., space limitations, interference from adjacent The following should be used when any Code re-              components, or radioactive environment). Substitute examinations or tests should not be confused with alternative examination methods quirement is not being satisfied by planned examina-            that are allowed by IWA-2240.
728
 
n CASE (continued)
N-444, CASES OF ASME BOILER AND PRESSURE VESSEL CODE component for which the substitute examinations or                (i) reference: to Section XI requirements that are tests are planned, and                                      not being satisfied and identification of substitute ex-(4) discussion of the consequences of failure of      aminations or tests.
the component for which the substitute examinations or tests are planned.                                        SUPPLEMENT 3              CONTENTS OF IWP PUMP TEST TABLES SUPPLEMENT          1    CONTENTS OF IWBt IWCt                  (a) Identification of systems, in system-by-system IWD, AND IWE TABLES                order; (b) Code classification; (a) Identification of systems, in system-by-system            (c) identification of specific pumps to be tested; order;                                                          (d) reference to drawings locating the pumps; (b) Code classification;                                      (e) identification of speci6c tests to be performed, (c) examination category and item number;                such as speed, inlet pressure, flow rate, vibration, lu-(d) individual components and welds selected for examinations or tests; (e) reference to drawings locating welds and com-I brication level or pressure, and bearing temperature; test schedules; and (g) reference to Section XI requirements that are I
ponents; test or examination methods; (g) calibration blocks; not being satisfied and identification of substitute tests.
(h) references to procedures used;                        SUPPLEMENT 4              CONTENTS OF IWV (i) examination or test schedules; and                                                  VALVETEST TABLES g) reference to Section XI requirements that are            (a) Identification of systems, in system-by-system not being satisfied and identification of substitute ex-    order, aminations or tests.                                            (b) Code classification; (c) identification of specific valves to be tested; (d) reference to drawings locating the valves; CONTENTS OF IWF SUPPLEMENT 2 SUPPORT TABLES (a) Identification of systems, in system-by-system I
(e) valve category and sire; specific information on the valves to be tested, including valve type, actuator type, normal position, order;                                                      stroke direction, test to be performed, plant operational (b) Code classification;                                mode at time of test, and maximum stroke time; (c) examination category and item number;                    (g) test schedules2; and (d) individual supports and snubbers selected for            (h) reference to Section XI requirements that are examinations and tests;                                      not being satisfied and identification of substitute tests.
(e) reference to drawings locating supports and I
snubbers;,
for snubbers, acceptance criteria for the IWF-5300 and IWF-5400 tests; t Testing programs should include    a list of valves requiring IWV-3410 valve exercising tests. The program should also indicate valves with proposed variations in the rcquircmcn! to be exercised at least every three months as provided by IWV-3412(a), IWV-3415, or (g) test or examination methods;                          IWV-3416. Plant-specific explanations for valve exercising that is (h) examination and test schedules; and                    not practical during plant operation should be provided.
729
 
CASE N-445 ChSES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: May 7, t987 k
See Numeric Index for expiration and any reaffirmation dates.
Case NM5 Use of Later Editions    of SNT-TC-1A for Qualification of Nondestructive Exatnination Personnel Section XI, Divisions 1, 2, and 3 Inquiry: May a later edition of SNT-TC-1A than that referenced in Divisions 1, 2, or 3 of Section XI be used for qualification of nondestructive examination personnel?
Reply: It is the opinion of the Committee that an edition of SNT-TC-lA, up to and including the 1984 Edition, later than that referenced in the Code may be used for qualification of NDE personnel.
731
 
CASE N-446 CASES OF ASME BOILER AND PRESSUIIE VESSEL CODE Approval Date: May 7, 1887 See Numeric index for expiration and any reaHirmation dates.
Case  N~
Recertiflcation of Visual Examination Personnel Section XI, Division 1 Inquiry: What alternative rules to those stated in Section  XI, Division 1, IWA-2300 may be used for recertification of visual examination personne12 Reply: It is the opinion of the Committee that in lieu of recertification of visual examination personnel to IWA-2300(d), Level I and II visual examination personnel may be recertified every 3 years by exami-nation only, and Level IIIvisual examination personnel may be recertified by examination every 5 years.
733
 
CASE N-448 ChSES OF hSME BOILER hND PRESSURE VESSEL CODE Approval Date: July 27. 1987 See Numeric index for expiration and eny reaffirmatio dates.
Case N~
Qualification of VT-2 and VT-3 Visual Examination Personnel Section XI, Division  1 Inquiry: What alternative rules to those of IWA-2300(c) may be used for qualifying personnel to per-form VT-2 and VT-3 visual examinations?
Reply: It is the opinion of the Committee that in lieu of IWA-2300(c), personnel performing VT-2 and VT-3 visual examinations may be qualified in accor-dance with IWA-2300(a) and (b). All other applicable provisions of IWA-2300 shall be met.
735
 
CASE N-458 CASES OF ASME BOKER AND PRESSURE VESSEL CODE Approval Date: August 14, 1990 See Numerioel Index for expiretion end eny reeffirmetion detes.
Case NESS                                                          (D instructions for identification and confirmation Magnetic Particle Examination of Coated Materials              of suspected flaw indications Section XI, Division 1                                            (k) recording criteria (l) personnel qualification requirements Inqttt'ryt When conducting magnetic particle ex-              (m) reference to the procedure qualification rec-amination (MT) in accordance with Section XI, Di-              oi'ds vision 1, IWA-2221, which references Article 7 of                  (tt) method of verifying that the yoke lifting power Section V, what supplementary rules may be used for            and the illumination source, used in the production examining coated ferritic materials by the AC yoke            examination are at least as great as specified.
technique without removing the coating?
Reply: It is the opinion of the Committee that mag-netic particle examination may be conducted in ac-            2.0            EQUIPMENT cordance with IWA-2221 using the AC yoke tech-                    (a) A powered powder blower which provides for nique on coated ferritic materials without removing            controlled, continuous powder application shall be the coating, when the applicable requirements of              utilized for application of dry powder. Hand Section XI, Division 1, and the following require-            squeezed particle applicators shall not be used.
ments are met.                                                  'b) Magnetic particles shall contrast with the com-ponent background.
(c) Nonconductive materials such as plastic shim 1.0            PROCEDURE                                      stock may be used to simulate nonconductive coat-Magnetic particle examination shall be performed            ings for procedure and personnel qualification.
in accordance with a written procedure. The proce-dure shall include the following:
(a) identification of surface configurations to be          3.0            COATING THICKNESS examined, including coating materials, maximum                                MEASUREMENT qualified coating thickness, and product forms (e.g.,
base material or welded surface)                                  Procedure demonstration and performance of ex-(b) surface condition requirements and prepara-            aminations shall be preceded by measurement of the tion methods                                                  coating thickness in the areas to be examined. If the (c) manufacturer and model of AC yoke                      coating is nonconductive, an eddy current technique (d) manufacturer and type of magnetic particles            may be used to measure the coating thickness. If the (e) minimum and maximum yoke leg separation                coating is conductive, a magnetic coating thickness (0 method of measuring coating thickness                  technique shall be used in accordance with ASTM (g) identification of the steps in performing the          D1186. Coating measurement equipment shall be examination                                                    used in accordance with the equipment manufactur-(h) minimum lighting and AC yoke lifting power              er's instructions. Coating thickness measurements requirements (as measured in accordance with 4.0              shall be taken at the intersecitons of a 2 in. maximum below)                                                        grid pattern over the area of examination and at least (i) methods of identifying flaw indications and dis-            the maximum yoke leg separation beyond the ex-      '/,
criminating between flaw indications and nonrele-              amination area. The thickness shall be the mean of vant indications (e.g., magnetic writing or particle          three separate readings within '/, in. of each inter-held by surface irregularities)                                section.
750.1                                                  SUPP. 6 NC
 
CASE (continued)
N-4SS CASES OF ASME BOILER AND PRESSURE VESSEL CODE 4.0          PROCEDURE QUALIFICATION                          6.0            EXAMINATION (a)  A qualification specimen  is required. The ma-          (a) Surfaces to be examined, and all adjactcnt terial used for the specimen shall bc th'e same as the        areas within at least I in., shall bc free of all dirt, coated ferromagnetic material to be examined. The              grease, lint, scale, welding flux and spatter, oil, and specimen shall be of similar geometry or weld profile          loose, blistered, flaking,'or peeling coating.
and contain at least on surface crack no longer than              (b) Examine the coated item in accordance with the maximum flaw size allowed in thc applicable ac-            thc qualified procedure.
ceptance criteria.                                                (c) If an indication greater than 50% of thc max-(b) Examine the uncoated specimen in the most              imum allowable flaw size. is detected, the coating in unfavorable orientation expected during the per-              thc area of the indication shall be removed and the formance of the production examination.                        examination repeated.
(c) Document the mcasurcd yoke maximum lifting power, illumination levels, and the results.
(d) Measure the maximum coating thickness on the item to be examined in accordance with the re-            7.0          DOCUMENTATION quirements of 3.0 above.                                          (a) Procedure qualification documentation shall (e) Coat the specimen with the same type of coat-ing, conductive or nonconductive, to      "-  ..- !ximum include the following:
(1) identification of thc procedure thickness measured on the production! item to bc ex-                (2) identification of the personnel performing amined. Alternately, nonconductive shim stock may              and witnessing thc qualification be used to simulate nonconductive coatings, (3) description and drawings or sketches of the (f) Examine the coated specimen in the most un-            qualification specimen, including coating thickness favorable orientation expected during the perform-            measurements and flaw dimensions ance of the production examination. Document the                    (4) equipment and materials used measured yoke maximum lifting power, illumination                    (5) illumination level and yoke lifting power level, and examination results.                                      (6) qualification results, including maximum (g) Compare the length of the indication resulting          coating thickness and flaws detected, from the longest flaw no longer than the maximum                  (b) Personnel qualification documentation shall flaw size allowed by the applicable acceptance cri-            include the following:
teria, before and after coating. The coating thickness              (I) name and certification level is qualified when the length of the indication on the (2) identification of the procedure coated surface is at least 50% of the length of the (3) name of Level III administering the qualifii-corresponding indication prior to coating.                    cation examination (h) Requalification of the procedure is required                  (4) description and drawings or sketches of the for a decrease in either the AC yoke lifting power or          qualification specimen, including coating thickness the illuminated level, or for an increase in the coating      measurements and flaw dimensions thickness.
(5) equipment and materials used (6) illumination level and yoke lifting power (7) qualification results, including maximum coating thickness and flaws detected.
5.0          PERSONNEL QUALIFICATION In addition to the requirements of IWA-2300, per-sonnel shall be qualified by demonstrating that they can detect the qualification flaws through the maxi-8.0          DEMONSTRATION mum qualified coating thickness using the qualifed                The procedure shall be demonstrated to the sat-procedure.                                                    isfaction of the Inspector.
SUPP. 6  NC                                                  750.2
 
CASE (continued)
N-458 CASES OF ASME BOtLER AND PRESSURE VESSEL CODE
 
==9.0          REFERENCES==
TO TECHNICAL REPORTS The following Electric Power Research Institute reports are relevant to this Case. Requests for copies should be directed to EPRI Research Reports Cen-ter, Box 50490, Palo Alto, CA 94303.
NP-5834    Nondestructive    Examination of Welds Through Painted Surfaces, May 1988.
NP-5951 Reliability of Magnetic Particle Inspec-tion Performed Through Coatings, July 1988.
7503                                    SUPP. 6 NC
 
CASE N-460 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: July 27, 1988 See Numeric index for expiration end eny reeffirmetion detes.
Case  N~
Alternative Exantination Coverage for Class    1 and Class 2 Welds Section  XI, Division 1 Inquiry: What alternative rules may be used for Section XI, Division 1, examination of Class 1 welds (IWB-2500) or Class 2 welds (IWC-2500) when the entire examination volume or area cannot be examined duc to interference by another component or part ge-ometry?
Reply: It is thc opinion of the Committee that when thc entire examination volume or area cannot be ex-amined due to interferencc by another component or part geometry, a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10%. Thc applicable examination records shall identify both the cause and percentage of reduced examination coverage.
753
 
1 1
J P
pl+4
      ~ e O,t j'
 
CASE N-463-<
CASES OF ASME BOILER hND PRESSURE VESSEL CODE Approval Date: March 5, 1990 See Numerical Index for expiration and any reaffirmation dates.
Case  NA63-I                                                  tance of VR,t Rom the weld center line, where R, is Evaluation Procedures and Acceptance Criteria for              the outside radius and t is the thickness of the pipe.
Flaws in Class 1 Ferritic Piping That Exceed the                  (b) The evaluation procedures and acceptance cri-Acceptance Standards of IWB-3514.2                            teria are applicable to seamless or welded wrought Section XI, Division 1                                        carbon steel piping and pipe fittings that have a spec-ifled minimum yield strength not greater than 40 ksi, Inquiry: Under Section XI, Division 1, may Class            and their associated weld materials.
1  ferritic piping containing a flaw that exceeds the acceptance standards of IWB-3514.2 be evaluated and accepted for continued service as provided in 12            Acceptance Criteria IWB-3132.4?
A fcrritic pipe containing a Qaw exceeding thc ac-Reply: It is, the opinion of the Committee that            ceptance standards of IWB-3514.2 may be evaluated Class 1 ferritic piping containing a Qaw that exceeds          by analytical procedures such as those described in the acceptance standards of IWB-3514.2 may be ac-              Appendix A of this Case and are acceptable for con-cepted for continued service by following the rules            tinued service, during the evaluated time period when given below.                                                  the critical Qaw parameters satisfy the criteria in (a) or (b) below.
(a) Flaw Size Cntena 1.0          EVALUATIONPROCEDURES                                                        ar Ca AND ACCEPTANCE CRITERIA Ferritic piping containing a flaw exceeding the ac-        and ceptance standards of IWB-3514.2 may be evaluated by analytical procedures to determine acceptability for continued service to the next inspection or to the        where end of service lifetime. The pipe containing the flaw                  = the maximum depth to which the detected a<
is acceptable for continued service during the eval-Qaw is calculated to grow by the end of the uated time period if the criteria of para. 1.2(a) or (b) evaluation period are satisfied. The evaluation procedures and accept-                    = the maximum length to which the detected ance criteria shall be the responsibility of the owner              ~
flaw is calculated to grow by the end of the and shall be submitted to the regulatory authorities evaluation period having jurisdiction at the plant site. The evaluation shall be submitted to the enforcement authorities a=the maximum allowable flaw depth corre-sponding to the flaw length < for normal having jurisdiction at the plant site.
operating (including upset and test) condi-tions Evaluation Procedures a,=the maximum allowable flaw depth corre-sponding to the flaw length ~ for postulated Evaluation procedures based on flaw size or ap-                        emergency and faulted conditions plied stress such as those defined in Appendix A of            Tables of allowable flaw depths are given in Appen-this Case shall be used, subject to the following.            dix A of this Case. Thc allowable flaw depths for the (a) The evaluation procedures and acceptance cri-          flawed pipe, aand aare functions of the actual teria are applicable to ferritic piping NPS 4 or greater      pipe stresses, the required safety margins, the pipe and portions of adjoining pipe fittings within a dis-          material properties, the end-of-evaluation-period 759                                              SUPP. 12 NC
 
CASE (continued)
N-463-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE flaw length and depth, flaw orientation, and the pipe failure mode.
(b) Applied Stress Critena Pb  (S, for circumferential fiaws or oCS. for axial flaws where P,= the maximum applied pipe primary bending      ~
stress cr= the maximum applied pipe hoop 'stress S,= the allowable pipe bending stress for a pipe with a circumferential fiaw S.= the allowable pipe hoop stress for      a pipe with an axial flaw Equations for these values arc given in Appendix A of this Case. The allowable stress for the flawed pipe, S, or S is a function of the actual pipe stresses, the required safety margins, thc pipe material properties, the end-of-evaluation-period flaw length and depth, flaw orientation, and the pipe failure mode.
SUPP. 12 NC 760
 
  ~ -  ~
          ~ h I ~
I h ~  h
 
CASE (continued)
N-463-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE APPENDIX A TO CODE CASE NA63                            (c) Determine thc stresses normal to the Qaw at EVALUATIONOF FLAWS IN FERRITIC                          the location of the detected flaw for normal operat-PIPING                            ing (including upset and test) conditions and emer-gency and faulted conditions.
A-1000        INTRODUCTION                                    (d) Perform a Qaw growth analysis (described in A-1100        SCOPE                                        A-3000) to establish the cnd of evaluation period Qaw dimensions af and I.
(a) This Appendix provides a method for deter-              (e) Obtain actual pipe material properties at the mining the acceptability for continued service of fer-      temperature required for analysis, oand J. When ritic piping containing flaws that exceed the accept-        actual material properties are not available, mini-ance standards of IWB-3514.2. The evaluation                mum properties are given in Tables A4211-1 and methodology is based on:                                    A4212-1.
(1) limit load failure of the pipe cross section (f) Using'the screening procedure described in (which is reduced by the flaw area) for ductile ma-        A4000, determine the failure mechanism for the ma-terials where the limit load is assured;                    terial and temperature.
(2) elastic-plastic fracture mechanics where duc-(g) Using the procedures described in either A-tile flaw extension may occur prior to reaching limit        5000, A-6000, or A-7000 for the three failure modes, load; and                                                    determine thc allowable Qaw depths aand aor the (3) brittle fracture described by linear elastic      allowable applied stress S, or S fracture mechanics.
(h) Using the critical Qaw parameters a~and or (b) This Appendix provides a screening procedure        the piping stresses P, or cr, apply the flaw evaluation to determine the failure mechanism based on metal            criteria of para. 1.2 to determine the acceptability of temperature, applied loads, flaw size, and the ma-          the pipe for continued service.
terial properties. Flaws are evaluated by comparing the maximum flaw dimensions at the end of the eval-uation period with the allowable flaw size, or by com-      A-1300        NOMENCLATURE paring the actual pipe applied stress with the allow-able stress for the flaw size at the end of the                The following nomenclature is used in this Appen-evaluation period.                                          dix.
(c) This Appendix provides rules for flaw model-                  a= the general depth dimension for a flaw, ing and evaluation. Flaw growth analysis is based on                      in.
fatigue. When stress corrosion cracking (SCC) is ac-                af= the maximum depth to which thc detect-tive, the growth shall be added to the growth from                        ed flaw is calculated to grow by the end fatigue. Flaw acceptance criteria of para. 1.2 include                    of the evaluation period, in.
safety margins on failure for the three failure mech-                a= the maximum allowable fiaw depth cor-anisms described above. The acceptance criteria shall                      responding to the flaw length I for nor-be used to determine acceptability of the flawed pip-                      mal operating (including upset and test) ing for continued service until the next inspection (or                    conditions, in.
until the end of service life-time) or to determine the              a,= the maximum allowable flaw depth cor-time interval until a subsequent inspection.                              responding to thc flaw length    I for pos-tulated emergency and faulted condi-        .
tions, in.
A-1200          PROCEDURE OVERVIEW                                    A = parameter to establish the Z factor of Ta-ble A-6310-1, dimensionless The following is a summary of the analytical pro-                C, = material constant in flaw growth equation cedure.                                                              CL orientation of a test specimen in thc cir-(a) Determine the actual flaw configuration from                      cumferential direction with longitudinal the measured flaw in accordance with IWA-3000 us-                          crack plane orientation ing A-2000.                                                        CVN= Charpy V-notched absorbed energy, ft-lb (b) Resolve the actual. flaw into circumferential                D= pipe outside diameter, in.
and axial flaw components using A-2000.                          da/dN= flaw growth rate, in./cycle 761                                            svpp.12  - Nc
 
I
                  >>~
a ~ ~  II
            ~
n  ~                                  4 4
i'
~        f
                          ~ f f I if f              ~  > 1    "',g    f.
I L il I
  ~ ~
ll      I
                                    >C f  ~
                                        -\
 
CASE (continved)
N-463-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE E= Youngs modulus,        ksi                                    S,=allowable hoop membrane stress for an E' El(1 p,~), ksi                                                        axially flawed pipe, ksi F= parameter for        axial flaw stress intensity              S,'=a component of thc screening criteria factor                                                            (SC), the ratio of the sum of the primary F = parameter for circumferential flaw mem-                              bending and expansion stresses to the brane stress intensity factor                                    bending stress at limit load, dimcnsionless
              =
Fb parameter for circumferential flaw bend-                      S= the design stress intensity value as given ing stress intensity factor                                      in Table I-1.1 of Section III, ksi
              = measure of toughness at 1 mm of crack                    (SC)=screening criteria parameter for dctcr-growth at upper-shelf temperature, in.-                            mining the analysis method, dimension-lbsfinP                                                          less I= measure of toughness due to crack exten-                    (SF) = safety factor, dimensionless sion at upper shelf, transition, and lower                    t= pipe wall thickness, in.
shelf temperatures,    in.-lbs/in.'r x= parameter alt, dimensionless I
              = mode stress intensity factor, ksiVin.                        Z= load multiplier for ductile flaw extension, LK,= the maximum range of K, fluctuation dur-                            dim ensionless ing a transient, ksiVin.                                      a~ parameter (alt)l(al ), dimensionless K',=a component of the screening criteria                            P= angle to neutral axis of flawed pipe, ra-(SC), the ratio of the stress intensity fac-                      dians tor to the material toughness, dimension-                    8= one-half of the final flaw angle (see Fig. E less                                                              A4221-1), radians K, =mode        I  stress intensity factor for mem-                  p, = Poisson's'ratio brane loading, ksiVin.                                      of= flow stress as defined in Articles A-5320 I
mode stress intensity factor for bending
                                                        'n,=
and A-5420, ksi loading, ksiV in.                                          ob'= reference limit load bending stress, ksi KI,= stress intensity factor for residual stress,                  a 'reference limit load hoop stress, ksi ksiVin.                                                    o= hoop stress in pipe at the flaw, ksi
              = general flaw length dimension, in.                            o=material yield stress at temperature as I= the    maximum length to which the detect-                          specified in Tables A4211-1, A4212-1, ed flaw is calculated to grow by the end                          or A-6310-2, ksi of the evaluation period, in.
          ,, = critical  flaw length for stability of an axial through-the-wall flaw, in.
M= applied moment          on the pipe, in.-kips          A-2000          FLAW MODEL FOR ANALYSIS M,=parameter for circumferential collapse                  A-2100          SCOPE stress n = material constant in flaw growth equation                This Article provides the rules for flaw shape, mul-NPS= nominal pipe size, in.                                  tiple flaws, flaw orientation, and flaw location that p= internal pressure, ksi                                are used to compare the flaw with the allowable flaw P= total axial load on pipe including pres-              size.
sure, kips P = the primary membrane stress in the pipe at the flaw, ksi A-2200          FLAW SHAPE Pb= the primary bending stress in the pipe at the flaw, ksi                                          The flaw shall be completely bounded by a rectan-P,'= bending stress at limit load for any com-            gular or circumferential planar area in accordance bination of primary and expansion stress-          with the methods described in IWA-3300. Figures A-es, ksi                                            2200-1 and A-2200-2 illustrate flaw characterization P, = pipe expansion stress, ksi                          for circumferential and axial pipe flaws.
Q= flaw shape parameter, dimensionless R= mean radius of pipe, in.
R, = inside radius of pipe, in.
R,= outside radius of pipe, in.                            A-2300          PROXIMITYTO CLOSEST FLAW S,= allowable bending stress for a circumfer-                For multiple neighboring flaws, when the shortest entially flawed pipe, ksi                            distance between the boundaries of two neighboring SUPP. 12 NC 762
 
                                            <<I <<    ~ I~ ~
la* '
l ~
~  l 1k'          V IM~ <<*
i<<.iV'                                  ~<<
                                                            ~ I ' ~
        ~
* e I
                      ~    I II
                                    ~~  \O
                                ~ h I
 
CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: March 5, 1990 See Numerical Index for expiration and any reaffirmation dates.
Case  N481                                                    (c) Perform a VT-3 visual examination of the in-E Alternative Examination Requirements for Cast                ternal surfaces whenever a pump is disassembled for Austenitic Pump Casings                                      maintenance.
Section XI, Division 1                                          (d) Perform an evaluation to demonstrate the safe-ty and serviceability of the pump casing. The evalu-Inquiry: When conducting examination of cast aus-        ation shall include'the following:
tcnitic pump casings in accordance with Section XI,                (1).evaluating material properties, including Division 1, what examinations may be performed in            fracture toughncm values; lieu of the volumetric examinations spcciQed in Ta-                (2) performing a stress analysis of the pump cas-ble IWB-2500-1, Examination Category B-L-1, Item            ingl B12.10?                                                            (3) reviewing the operating history of the pump; (4) selecting locations for postulating Qaws; Reply: It is thc opinion of thc Committee that the              (5) postulating onc-quarter thickness refcrcnce following rcquiremcnts shall be met in lieu of per-          Qaw with a length six times its depth; forming the volumetric examination speciGed in Ta-                (6) establishing the stability of thc selected Qaw ble IWB-2500-1, Examination Category B-I 1, Item            under the governing stress conditions; B12.10:                                                            (7) considering thermal aging embrittlcment (a) Perform a VT-2 visual examination    of thc ex-      and any other processes that may degrade the pro-terior of all pumps during the hydrostatic pressure          perties of the pump casing during service.
test required by Table IWB-2500-1, Category B-P.                (e) A report of this evaluation shall bc submitted (b) Perform a VT-1 visual examination of the ex-          to the regulatory and enforcement authorities having ternal surfaces of the weld of onc pump casing.              jurisdiction at the plant site for review.
SUPP. 10 NC 817
 
'gf'I~fr fly< r, )r<i r.(,tg<<prr~r,ca~                  ~    ~ <  <>~              r  I~~.<  ( ( r JifG j 0Q+yJ)      f 'J<  ~fQ<r", j[t  g<)< ~
'Pff Pr          f)<< rf)%<< <<)P 4<A 'I        <      ~    VITA      f<<<r            <i <r gg 0' "
<<ftOIJJ'r.Nfr'X2 'Diff-: '"C rftr                                                '"l)."<r<',",
            .IT, MQ,Ci f:Ol')'.f)T:. >
ftc)I)f'<  ~ tt'<sg<</r
                                                              ~
f.'.              +f  ':
L~:~f'
                                                                                                            'r'<A(1 O,b bf<<<
0  <$                P              b
= G'r I III l"Vm', .-Vo '. t'C; f~&#xc3;l:V~l V<ih~ 9<rfr",f.r Q 'r'                              '                  y'off, yf
-i3" )fj )54.i"r: '< <Bf[I)I, r I'."'f                              '.              J+',<<<c ))(<        {4<)P':
                                                                        ~  '. 'rf)I<"<,W            ., ttraO"-                                                  < ~ '
~ ''.  "-    via,)ai.>< i BE r.".
I'<I      <  ~iif.l," "" Q,QVQ<" fg                      J.""g<    "",f)g          ~<  ~g    r' grrf'l;,'
f(<ff B      rg) <rg <<r<<  f  <)    fil    <<<< ~    .      <<(~I                                r'r<r<<<<
                                                                                                                                  ~    4 ~,
r
                                                                                                                                            ~    <4 J <<r V    ~r f'af      lf  Unrest ~I~ Bf
                                      ''). r    .,g  )., g<P~arfr                      (','<<I) EIL)
                                                    "--"lf" 1'r          I  ";;"            ~  "~Of ifCJ                  :-:GY. Ili t. "'.! J-'
f'~A 8            ". "<JJ.'J!r    I'.l ."'",'<. ~'              ',".
          ~        +<pf    If Ik',<A  <
Apl \ff'lr I            <
ff    <    ~        r      r  I    (Q)
                        "'  ~
                                  'O() q* frr
                                        ~              ~
                                                                <rP    )I I:    I    r
 
CASE N-489 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: August 14, 1990 See Numerical index  for expiration and any reaffirmation dates.
Case N-4S9                                                    piete a Level II Practical Examination for each NDE Alternative Rules for Level III NDE Qualification            method for which they seek certification.
Examinations                                                      (b) Level III personnel shall be recertified using Section XI, Divisions 1, 2, and 3                            only the written Method and Specific Examinations and a Level II Practical Examination for each meth-od for which they seek recertification.
Inquiry: What alternative rules to those of Section            (c) As an alternate to (b) above, Level III NDE XI, Divisions  1, 2, and 3, may be used for qualifica-      personnel may be recertified using only written tion examinations for certification and recertification      Method and Specific Examinations, provided the fol-of Level III NDE personnel?                                  lowing conditions are satisfied:
(I) The Level III candidate was previously cer-tified in accordance with (a) above, or recertified in Reply: It is the opinion of the Committee that the        accordance with (b) above.
following alternative rules may be used for Section                (2) The Level III candidate is not being recer-XI, Divisions 1, 2, and 3 qualification examinations          tified due to interrupted service as defined in the for certification and recertification of Level IIINDE        employer's written practice.
personnel.                                                          (3) The Level IIIcandidate is not being certified (a) Level III NDE personnel shall be certified us-        by a new employer.
ing the written Basic, Method, and SpeciTic Exami-              (d) These alternative rules for Level IIINDE qual-nations specified in the applicable division of Section      iQcation examinations shall be documented in the XI. The Level III candidate shall successfully com-          employer's written practice.
831                                                SUPP. 6  NC
 
s'3      'J    (GYP    .2.  'ssault      t.s.ys Js          7I        '    a  a  <<I >>  .O'C  >4 a)yif',I.f:r,fpw>:,r ".I !avcfqq's hs'Oil 4 tCXy~    .v. <<! I: I LhllOs 'P: yy
                                                                                              .s 2t35f'    Cis511 dt as 42s Fl y.ff',- uh      W3f<<Af'h.'A'                    -~N          BlG                                                        Zlflne5".It I        S  i;  ~
                                                                                                                                                      ''IrJfss h cia'. <<Wta.'.'i~+ asst s cht. .                        ~."tSZ .I JAR
( "tfs) ff Iaf                              s"*sf
                                  ~
                                                                                                  -fv '"t        ".I  ''"  "et"      t"~  rl Zfif-s
                                                                                                      . o'lOt.ff; ti X;        'Ytfl""I;2 i>fs>,
A
                                                                                                          ,')ssflQ    I'      '5p'asl        Jf i 3
                                                                                                    ~ httisiss, i w"  h 0 h    l/I  lfJs it' sf 1'JIfss
                                                                                                    ~ ~
:K"sfas '.!aafPfiGsaa8'S              F"4'a:ia'u        . t  h'.(:5:f."~&I; ZiQ:I 5ssJ I') ")as~i~I",IIIZJt5lV .Zt.'s",'s ii fhs55'35faQ I..f';"si d~fff Bl; s<<IOll '@Jan "Ga.,tf 4 '~fla JtJI..'.t a543 <<5..5)ZI>>
yr    'Igf~a5't.fffthP a s s 'J,...IIW ~s"lf                                                          a:iC            '
;:6 <1 "sf':);9 !q a.'l G  Jaf'v'a
-338jy>Z
: 38.  'I 'a 03 'fOI'" '
fs I .1,". a. ~'IC'I.a,la~"y I 't"Gt a 'F stat
                                                                      '"2" d30 0{ 'I s 6 09a'ISJZfu 'a'.~ .
                                                                                                            ~2vaS    s(t  (.      s.,sP..s 2's"-
                                                                                                                                                ~    (
                                                                                                                                                      ~
~    ssf Jaf    hg 3slhaa /sf st"        iles ~ t>> I w .i              g(f J t e.) rrm -I':na C".", ".Zf.'>--i5 ."..V ZOJ Z;::W:-=a:.!u,-
                            ~
                                                                            .l"'>',U                ~'taaf<C    . (
 
CASE N-490 ChSES OF hSME BOILER AND PRESSURE VESSEL CODE Approval Date: August 14, '1990 See Numerical Index for expiration and any reafiirmotion dates.
Case  N490                                                        TABLE 1      NEAR-DISTANCE ACUITYTEST Alternative Vision Test Requirements for                            DISTANCES AND CHARACTER HEIGHTS Nondestructive Examiners Maximum Lower Casa Section XI, Divisions 1, 2, and 3 Test Distance On)        Character Height (miis)
Inqut'ryt What alternatives to the near-distance vi-                    12                        22 sion test requirements of Section XI, Divisions 1, 2,                      13                        24 and 3 may be applied to nondestructive examiners'                          14                        25 15                        27 16                        29 Reply: It is the opinion of the Committee that the following alternative requirements may be applied in lieu of Section XI, Divisions 1, 2, and 3 near-distance vision test requirements of nondestructive examiners; acceptable test distances and corresponding maxi-Personnel shall demonstrate natural or corrected            mum character heights. Measurements of the near-near-distance acuity, with at least one eye, by reading        distance test chart shall be made once before initial words or identifying characters on a near-distance            use with an optical comparator (10X or greater) or test shart. For the selected type size, the height of          other suitable instrument to verify that the height of lower case characters, without ascenders or descen-            a representative lower case character, for the select-ders (e.g., a, c, e, o), shall subtend no more than a          ed type size, meets the requirements of Table 1, 6.25 minute angle (20/25 Snellen fraction) with the            Equivalent measures of near-distance acuity may be eye at the selected test distance. Table 1 provides            used.
833                                                  SUPP. 6 NC
 
(<<<(<p 2>> UZaaa (            [ r,      Oy  <,I, (            <      ~ <<'P OVff!O 32    "I Oflf.fZC 9'f> 1OI                ')3!      ( <Pa'      Qrf!<ra (. L'<OX+        <<1332'-"~          .'JE'a                    3'<.! >SOK4i '1(
  ,p.'oifso;t';o".r P,!soin,'.I              . p(3";,              pi ],on(sfro zs                                                            Z(OOI 'ff.~ ".        4;;~
  !:u:O>>n '..';.".2 OC'"1(-., -."> ((((.Z f s: ".1T (f']
,'") 1i o.(..''<>rob! .--'. >.ov ~(I                      f'9'          2!.-. r:oamo>>'t>>'QQS o"II(f mfa '>>>o as<                                  g)I c>>~ '                                              "'] '<<''. 1( ZO](31 O nli.n'a>>
      "<:r i
;ZOI Ns>ZZOTC Oi!SIZCr13''S''"-
e!.3 cp'<~I 9 <L>    s. I i -,c.
                                      ~
                                                          ],I        O1    "V<ISO1"J]al
                                                                    ]dsT v<< '>'ol(iifab'i
                                                                                          '((
Pafi (3>>s( <Il G.>3'i O]o>1. <.
                                                                                                    .:-ZP:-
P.ci.<~AG 7 n(. I W,t a>o!.(                          ns        'i".
:-OZO;-d lira= '.Oi 1 ynieOi C,''                        O1!.<Z    fgc      (i<iI?C'aa>~f, afi
>S  ~ IOJL:.0. OO            'if  Z "'.I'P4".I'>> a~ I''c f
                                                                                                                                                              '>'S p(.s        1(!(<<.-.Olney OO3!OO(.l:: r .": s, (.-O O;31 I""r.1
-f,'!IP( f>G1JD,':QZl ~OS. 1O f>O'BO ."O D'. 'Zn: -.'.,"l 2. I nGi)L'X>1"a,      O1      I<'ll 03    IO>>'O(32        (1ha.r.,'O          "'E 7    tD                2,  3 S
                                                                                                                      ~  at>>I<'r                        )
:(S O      .1OOI..O!(Sr>Z IZ=I: !!.Z "-q P..~IZ                                  ~PI .>.:r;u ..
        ']0 2 i 3(:1O          2'1O>I ...  ]'          L>.V ZIrl<<r
    "::,VZ P<J]:2 l!< ~ I<GjQU<'o>>!S1 '1<>>                                  '>> .1!(.")>>1 Zfnoa                                                                b>>
O... iO;.))finrC.".:
"fi !>'i>PV 10 (QV<
                                '.',f.':
i'i j.'(l'5',"
                                            'Oi;n!Or.,
                                                      '(a"."c",
                                                                    >>;I,.
                                                                    'i  '>PaAL
                                                                                      >-::;Or~'.
                                                                                    <<.'I();Yf(SV 3      >7/]1
                                                '!O                                                    <1< ng !( C'i        s      >> afi+
flol:On"" >. IS!l: n '<V 01!3'" Ol,'f>IOI' <<O "i(1O(J                                                                                                    . ur<S
                                                                                .~-OI(4'OOI Zl      )(3('-
--('I S"O        3"U~>V        ('-(V      mrs    n:iV.-OO O! '(C1~;~']
-OO ffir., P:.Cit      s",  D~.:31:.>ZZ 1<<C(]                OOZ "I<<)Z'"2 <..I,. G(I                            >I,ff;(    ~        ',1 r.-"a "                  s;
-(IZfll <<C'        t(3OP ~ "O '13>3(lfnlfr.                  ( OQI    "" 32ZO1.        >CP>(If)".S O!C>>3'nofl:Ol                  ZO;s      sif        <~
                                                          >a,  Dflfi      C.    ~ic'i2    ..'<P)'
fr fr,.o: rs t.".Of ".          'sm o .(sr!2 r '.x.<2 "r'.: . r NZv2
  ~r '.O:Or,;,-.~Of".r r.; Or i1:3'G O'ZZOIe un>i!S1>Oqo                                            "O>s" s(jc foal  10>
iV 0 1 5("'.Dn'            i'      O'" !S'ri.'. 32a t'") r..'ui ",O'I '- ' ."s':r:I r'..':Vi P.'.
i'"
                                                        >O(>Ca(fn(a.>>...>>"Zr<'-
Jl>  i  (b'<                  0('s(s  f.'f
                                                                                                                                  *.<OO(',.'IS.
                                                                                                                                    ~          '!fi Is' s                                                            '.',OqfnGO          S
 
CASE N-498 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: May 13, 1991 See Numerical Index for expiration and any reaffirmation dates.
Case  N498                                                          (4) Test temperatures    and pressures shall not Alternative Rules for 10-Year Hydrostatic Pressure            exceed limiting conditions    for hydrostatic test curve Testing for Class 1 and 2 Systems                              as contained in the  plant Technical Specifications.
Section XI, Division 1                                              (5) The  VT-2  visual examination shall include all components within the boundary identified in (2) above.
Inquiry: What alternative rules may be used in lieu            (b) It is also the opinion of the Committee that, as of those required by Section XI, Division 1, Table            an alternative to the 10-year hydrostatic pressure test IWB-2500-1, Catogory B-P, and Table IWC-2500-1,                required by Table IWC-2500-1, Categoty C-H, the Category C-H, for the 10-year hydrostatic pressure            following rules shall be used.
test?                                                                (I) A system pressure test shall be conducted at or near the end of each inspection interval or during the same inspection period of each inspection inter-Reply:                                                    val of Inspection Program B.
(a) It is the opinion of the Committee that as an                (2) The boundary subject to test pressurization alternative to the 10-year hydrostatic pressure test          during the system pressure test shall extend to all required by Table IWB-2500-1, Category B-P, the              Class 2 components included in those portions of sys-following rules shall be used.                                tems required to operate or support the safety system (I) A system leakage test (IWB-5221) shall be          function up to and including the first normally closed conducted at or near the end of each inspection in-            valve (including a safety or relief valve) or valve ca-terval, prior to reactor startup.                              pable of automatic closure when the safety function (2) The boundary subject to test pressurization        is required.
during the system leakage test shall extend to all                  (3) Prior to performing VT-2 visual examina-Class 1 pressure retaining components within the sys-          tion, the system shall be pressurized to nominal op-tem boundary.                                                  erating pressure for a minimum of 4 hours for insu-(3) Prior to performing VT-2 visual examina-            lated systems and 10 minutes for noninsulated tion, the system shall be pressurized to nominal op-          systems. The system shall be maintained at nominal erating pressure for at least 4 hours for insulated          operating pressure during the performance of the systems and 10 minutes for noninsulated systems.              VT-2 visual examination.
The system shall be maintained at nominal operating                  (4) The VT-2 visual examination shall include pressure during the performance of the VT-2 visual            all components within the boundary identified in (2) examination.                                                  above.
SUPP. 9 NC 859
 
-q >n=e. I:f).1",~t... S ".rf
'm 2IICI,Q IID)GXS i'Fa~it)1i ' 0
                                        ~.;          ~ ".t.        IfaqPII".:O i '~~i~ ~ p <ft'i7 l>ll                                                                IO
- l~ 1L'If.;,I! QRfi>l '-'I8.'".i.' ..~                    ''  I QJZb 'if"'I                                  .JOI)i)2'    'i)Diff i
:<<N )CiI':ilfi .()Ill "<<i<,Q QOia I
                                            '~ 'i
                                                        .~f acfdfX 8'fs!)I!I bOii    if',ti    7S~~a C
                          .'QI)G" I "i.  "'i)lffi)            .'f)1 )ffi"Y~
=1Jgl )ftfffhifIIV r," IOGQ'A i                          P:a '.~ fb ff)CT) qftjf:IIOriZOT:0-",: t).-i.~.- ---.", -'GP bf-.- ~~I lgfi il'IQ%p-" ft t) QL l itf+                i LI1'I;) I I fIQ:ioub " I
                                                                                              ~i'I'~      ItdiS  M .;,.i4 NBI;          '7.'I
.0". I'IIGJS, "IP '/th~> 2 '"">r-
                                      ~
                                                                      '(
fflfJfi~Xq'L(. ff'tfft 10    IIG!:"..*'f.        bOII7II
.IIQftt~bf: itt "-?""t)'.. <<1,'~'tt,;.1) t)ML fl.ift. 'Q>>)i
                    ~
ftf: abCrl)"ff) -"i.'".'i',i'. I.':        'alS '-r Ib e"Ic
                                                                                            <<"I)'>> fi&#xc3;i/Ii            7IIO')I ~it'r I"
'I01 P)lf    f'. I)It 4 . fi >~PE g.'I . i "I i) 'III)f'n4
                              ~                                ~
I',i t)"ft+.~f 8'i HQtti ~ a:,.". Ii,f. 'Laltiff'I      iQft'~IIIY':i1
.fft. <<c: i. IS:f.. "If, L    Q.af i".) ~0)iiv~f.";i.'>>3 '..."f ))  '5".If''tf)                  J+p  4  'Ql  If'/r 3)  i ~ 4 I
bc n'
                                                                                                    ~: ~ ri    ~, ~
                                                                                                                    .  "...i 1-5'
 
CASE N-503 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: February S, 1992 See Numerical Index for expiration end eny reaffirmation detes.
Case N-S03                                                        certiQcation of nondestructive examination person-Limited Certification of                                          nel who are restricted to performing examinations of Nondestructive Examination Personnel                              limited scope (i.e., limited operations or limited tech-Section XI, Division 1                                            niques within the method). Topics that are not rel-evant for the limited certiQcation may be deleted from the SNT-TC 1A or Appendix VIItraining out-Inqt(iryt When certifying nondestructive examina-              line and may be accompanied by a corresponding tion personnel in accordance with Section XI, Divi-                reduction in training hours, examination content, and sion 1, what alternative rules to those tabulated be-              number of examination questions. Only questions re-low may be used for limited certification of                      lated to the limited training are required. In addition, nondestructive examination personnel who are re-required experience may be reduced by a corre-stricted to performing examinations of limited scope sponding amount. The speciQc methods and tech-(i.e., limited operations or limited techniques within niques covered by limited certification and the train-the method)?
ing, examination, and experience requirements for limited certification shaH be deQned in the. written Repfyt  It is the  opinion of the Committee that the            practice and documented in the individual's certiQ-following  alternative    rules may be used for limited          cation records, Edition/Addenda Reference                                                        Up to and Including I WA-2300(a) (2)            1977 Edit(on with Summer 1978 Addenda I WA-2300(a) (3)            1980 Edition with Winter 1980    1987 Edition with the 1987 Addenda                          Addenda IWA-2350                    1987 Edition with the 1988                  1992 Edition Addenda SUPP. 12 NC 877
 
ll 4
F 1
  ~
e n I
0}}

Latest revision as of 13:50, 8 January 2025